Académique Documents
Professionnel Documents
Culture Documents
and manufacturing efficiency, empower staff and reduce their stress as well as foster team
work (Engel, P. 2012) (Tapping & Dunn, 2006). In complex manufacturing operations the
efficiency of the manufacturing process is dependent on the front office activities (IFS
WHITE PAPER). Implementing LEAN management in the non-manufacturing areas at
Daktronics will address the waste commonly found in office operations. Typical office waste
includes waiting, excessive motion, over production of paperwork and knowledge waste (ie.
underutilized staff)(Chaneski, 2005). A LEAN initiative will address waiting related to
customer specifications, approvals, and financial information and will result in increased
lead time for downstream office processes (Chaneski, 2005). Motion related to walking and
searching will be reduced and handoffs of approvals and other paper work will be
diminished. A focus on optimizing staffs roles will reduce muda related to knowledge
waste. The LEAN initiative will reduce stress because the employees will know where to find
the materials they need, information will be available when they need it and they will have
a better understanding of their roles and responsibilities so will not be as stressed in the
office.
Implementing LEAN in Daktronics non-manufacturing areas will be more challenging
than the improvements made in the manufacturing aspect of the company for the following
reasons: visualizing the work is more difficult, service and front office processes are
complex with few repeatable process steps and the company will lose the focus it currently
has on improving manufacturing (Morgan & Liker, 2006). When LEAN initiatives are focused
on production lines the process steps are physically apparent in comparison with office
processes where materials are not physical and processes are invisible therefore defects
are more difficult to see (Taninecz, G, n.d.). Office processes are more complex than
manufacturing, each process step has a wider degree of variability and typically has longer
cycle times (Bindekrans & Magnusson, 2012). Taken together these factors result in more
detailed analysis and planning for successful LEAN implementation. Additionally, Daktronics
will need to re-focus its resources on improving office processes which will reduce the time
and energy the leadership has to focus on improving manufacturing.
August
-October
Develop
a
project
charter
Analysis Define
October- the
Decembe problem
r
Develop Develop
a work
a
plan
communi
cation
plan
Affinity
with
staffuse
results
Define
the key
problems
Using
prioritizat
Develop
a change
manage
ment
plan
Set
SMART
goals
Have
plan
approve
d by
senior
leadersh
ip
Determi
ne
metrics
to track
improve
Identify a
trained in
house
Sensei
Create
buy-inShare
story of
manufact
Provide
an
introduct
ion to
LEAN
with
educatio
n
provided
in the
context
of
administ
rative
work
Value
stream
map the
key
processe
Tools:
Hoishin Kanri
Consider the
importance of
continuous
flow
Revise
the WP,
CP and
CMP as
required
Ensure
inclusion of
front line staff
at the
beginning of
the LEAN
office
initiative
Tools:
Affinity
SMART Goals
Optimiz
e the
physical
environm
ent
Decembe
rFebruary
Provide
5S
training
for
office
staff
to
determi
ne
priority
areas of
opportu
nity (ie.
Low
hanging
fruit)
ion
matrix to
determin
e priority
improve
ment
initiatives
(ie. Quick
Wins,
Gems,
Dont
Dos and
Major
Projects)
Develop
a
working
group
of 5S
champi
ons
Complete
spaghetti
diagram
of work
flow
ment
Reconfig
ure the
location
of staff
Consider
Cell
design
to bring
function
s closer
together
and
improve
commun
ication
uring
success
5S the
offices
and
workspac
es as
moves
are
occurring
Hold a
friendly
competit
ion
between
staff to
determin
e who
complet
ed the
most
effect 5s
Value Stream
Mapping
Develop a
plan to
sustain
the 5S
changes
*take
before
and after
pictures
and share
with staff
and
managem
ent
Tools:
5S
Spaghetti
diagram
Optimiz
e Hiring
Process
Map the
process
FebruaryApril
Perform
ance
Reviews
AprilJune
Map the
process
Define
roles of
clerical
staff
and
manage
rs in the
posting,
Intervie
w and
onboardin
g
process
es
Standardi
ze the
interview
booking
process
and
interview
questions
for each
position.
Benchm
ark
other
areas
and
busines
ses to
determi
ne best
practice
Brainstor
m
solutions
with staff
involved
Develop
orientati
on
checklist
by role
Analyze
the Takt
time and
compare
with
manager
s
schedule
to
ensure
reviews
can be
complete
d
Track
cycle
time for
the
activitie
s
Complet
e PDCA
cycle of
prioritize
d
improve
ment
ideas
Develop
orientatio
n video
for staff
to watch
before
they start
on their
first day
Collect
data on
the time
required
from
initiation
to
booking
of
performa
nce
review
(ie. Cycle
time
Load
level by
training
multiple
staff to
complet
e
aspects
of the
process
while
others
are away
(eg. Two
week
Vacation
Get staff
feedback
on the
improve
metns
Reduce
cycle
time from
positing
to onboarding
Eliminate
redundan
t activity
Tools:
Standardizatio
n
Cycle time
analysis
Plan-Do-Study
Check cycles
Heijunka
Modify
the
process
as
needed
indicated
by data
Tools:
Process
mapping
Brainstorming
PDCA
Educatio
n
booster
sessions
for staff
Cycle time
analysis
Huddles for
staff to ask
annually
new staff
Establish
clear
roles
Standard
ize the
scheduli
ng
procedur
e
Financin
g
JuneAugust
Develop
an
underst
anding
of
current
state
billing
procedu
res
Comple
te a
swim
lane
map of
the
invoicin
g
process
( define
steps
for
custom
er,
operati
ons,
finance,
manage
ment
etc.)
Include
cross
functiona
l
members
in the
improve
ment
team
The
team will
go the
Gemba
and
observe
the
processe
s
So
understa
nding is
develope
d from
multiple
perspecti
ves
Include
cross
function
al
member
s in the
improve
ment
team
Brainstor
m
solutions
PDCA
questions and
receive
updates on
progress
Develop a
Tools:
sustainm
ent plan Ensure
continuous
flow of work
Kaizen
Heijunka
Standardize
skill sets to
support the
financial
services
Custom
er
Service
AugustOctober
Develop
an
underst
anding
of
custom
er value
for each
custom
er
segmen
t
Identify
perform
ance
metrics
Eg.
Time
require
d to
respond
to
request
for
support
Eg. % of
resolve
d
request
s on
first
contact
Standard
Examine
tracking
the
of service
Value
requests
Chain to
Standardi
create
ze
understa
training
nding
of staff so between
load
manufac
leveling
turing
of work
and
can occur custome
and
r service
efficiency resulting
can
in shared
increase
understa
nding of
common
issues
with
products
Identify
the
bottlene
cks
Brainstor
m
solutions
Benchmar
k
competito
rs and
other
industries
for
solutions
Prioritize
solutions
Initiate a
test of
change
Use
PDCA
cycles
Sustain
the
changes
through
on-going
data
collection
and
continuou
s
improvem
ent
References
Bindekrans, G. & Magnusson, M. (2012). Creating a LEAN Value Flow in White Collar Organizations.
Retrieved from http://publications.lib.chalmers.se/records/fulltext/159084.pdf
Tools:
Visualization
Create a
dashboard to
display
metrics
Go to the
Gemba
Chaneski, W.S. (2005, September). Lean in the office- Identifying waste. Modern Machine Shop 78.4 44,46
Damrath, F. (2012) Increasing competitiveness of service companies: developing conceptual models for
implementing Lean Management in service companies. Retrieved from http://www.divaportal.org/smash/get/diva2:557034/fulltext01.pdf
Engle, P.C.(2012, August). Lean office?. Industrial Engineer. 44.8 22
George M.L. (2003). Lean Six Sigma for Service, McGraw-Hill.
Morgan, J. M., & Liker, J. K. (2006). The Toyota product development system. New York: Productivity Press.
Tapping D. & Dunn, A. (2006). Lean Office Demystified: Using the Power of the Toyota Production System in
Your Administrative Areas