UNIVERSITY OF THE EAST

RECTO, MANILA
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

PROPOSED TWO STOREY RESIDENTIAL


BUILDING WITH ROOF DECK

CONSTRUCTION METHOD AND PROJECT MANAGEMENT


NCE 514 CE1

SUBMITTED BY:
AQUINO, ROSEMAY T.
20110109574

SUBMITTED TO:
ENGR. MARYCON A. SERRANO

24 MARCH 2015

ACKNOWLEDGMENT
It would not have been possible to write this project without the help and support of the kind
people of whom it is possible to give particular mention here.

Above all, I would like to thank God for the guidance He has providing me throughout this work,
for the wisdom He is giving me, and for giving knowledge as well.

I would like to thank Engr. Jefferson A. Lachica, Owner of JLachica Construction and Consultancy,
who guided me and had given me the knowledge I needed to finish this work.

I would also like to express sincere appreciation to young and beautiful Professor, Engr. Marycon
A. Serrano, who has supported the students throughout this work with patience and knowledge. The
students know that it wouldnt have been possible to finish this requirement without the Professors great
supervision.

Finally, I thank my parents for the support throughout all studies at University of the East Manila
and for providing a home in which to complete the project.

TABLE OF CONTENTS
I.

Project Description .................................................................................................................................... 1

II.

Construction Drawings .................................................................................................................... 2 16

III.

Bill of Quantities ......................................................................................................................... 17 107

IV.

Schedules ................................................................................................................................... 108 112


4.1

Gantt Chart ............................................................................................................................. 108

4.2

Manpower Schedule .............................................................................................................. 109

4.3

Equipment Schedule ............................................................................................................... 110

4.4

Precedence Network ............................................................................................................. 111

4.5

S Curve ................................................................................................................................. 112

V.

Work Methodogy Statement ................................................................................................ 113 127

VI.

Appendix .................................................................................................................................. 128 136


6.1

Resume ......................................................................................................................... 128 131

6.2

Computation for Labor ............................................................................................. 132 136

6.3

Rates Used .................................................................................................................. 132 136

PROJECT DESCRIPTION

Name: Proposed Two Storey Residential Building with Roof Deck


Lot Area: 240 square meters
Floor Area: 400.948875 square meters
Location: Guiguinto, Bulacan
Engineer: Engr. Jefferson A. Lachica
Owner: Carolina Rosales and Rowena Rosales

GANTT CHART

MANPOWER SCHEDULE
MANPOWER SCHEDULE
MANPOWER
Foreman
Carpenter
Mason
Electrician
Plumber
Welder
Painter
Steelman
Helper / Laborer
Others:
Surveyor
Survey Aid

1 2 3
1 1 1
2 2
2

2 2

4
1
3
2

3
5

5
1
3
4

3
7

6
1
6
4

5
7

7
1
6
4

WEEKS
8
9
1
1
6
6
4
4
3
2
2
2
3

10
1
6
6
3
2
3

11
1
6
6
3
3
3

6
6
6
6
6
10 10 10 10 10

12
1
4
6
1
3
3

13
1
4
6
1
3
4
6

14
1
4
4
1
4
6

15
1
4
4
2
2
2
6

16
1

2
2
6

3
8

1
1
TOTAL: 3 5 7 14 18 23 27 32 34 37 38 29 25 20 21 11

EQUIPMENT SCHEDULE
EQUIPMENT SCHEDULE
EQUIPMENTS
Mini - Excavator
Plate Compactor
Concrete Mixer
Concrete Vibrator
Welding Machine
Rebar Cutter
Rebar Bender
Grinder
Compressor
TOTAL:

1 2
1

3
1

1
1

1
1

1
1

1
1

2
2

2
2

2
2

2
2

2
2

2
2

WEEKS
8 9 10 11 12 13 14 15 16
1
1
1
1
1 1 1 1 1
1 1 1 1 1
2 2
2
2 2 2 2
2 2 2 2
2
2 2 2 2 2
2 2 2 2
10 8 10 8 4 4 6 4 2

PRECEDENCE NETWORK

S CURVE

ROSEMAY T. AQUINO
4 Davao Street Bago Bantay, Quezon City
Contact Numbers: 0905-9332013
239-2712/982-8163
E-mail Address: rosemay.aquino07@gmail.com
OBJECTIVE
To increase my knowledge, skills and experience in the applications of Civil Engineering in the
industry and gain an insight on how the industry works as a preparation of my future career.
ELIGIBILITY
7th HONORABLE MENTION
Quezon City Academy
Batch 2010 2011

1st YEAR and 2nd YEAR 2nd SEMESTER


University of the East Manila
Academic Half Scholar
S.Y. 2011 2012

EDUCATIONAL ATTAINMENT
Tertiary Education:

University of the East - Manila


Bachelor of Science in Civil Engineering
S.Y. 2011 Present

Secondary Education:

Quezon City Academy


1144 Epifanio delos Santos Avenue, Quezon City
S.Y. 2007 - 2011

Primary Education:

Bago Bantay Elementary School


Bago Bantay, Quezon City
S.Y. 2001 - 2007
WORK EXPERIENCE

CASHIER @ MOA Arenas VIP RESTAURANT


BBMarciano Catering Services
52 Road 2, Pag-asa, Quezon City
Tel. (02) 929-8291
April 2014 May 2014
ASSISTANT BANQUET MANAGER
BBMarciano Catering Services
52 Road 2, Pag-asa, Quezon City
Tel. (02) 929-8291
December 17, 2011 April 2013

PERSONAL INFORMATION
Birthday
Age
Gender
Height
Civil Status
Religion
Skills

: December 10, 1994


: 20 years old
: Female
: 4 11
: Single
: Methodist / Born Again Christian
: Knowledgeable in Microsoft office
(i.e. Excel, Word, PowerPoint, Publisher, etc.)
: Skilled in some Design / Engineering software
(i.e. AutoCAD, Google Sketchup, Solid Edge)
: Have good negotiating skills.
: Has the ability to attend good customer relation and has good communication skills
TRAININGS/SEMINARS ATTENDED

ENGINEERING SEMINAR 2015


Safe and Sound: An Engineering Checklist on Redefining Safety
February 07, 2015
University of the Philippines Los Baos
JPICE STUDENTS SEMINAR
Building Supremacy
February 02, 2015
University of the East Manila
THE ROTARACT SERVICE AND LEADERSHIP JOURNEY
Rotaract Club of San Francisco Del Monte Malaya Achievers
January 15, 2015
Bluepoint Building Kamuning, Quezon City
INFRASTRUCTURE SOLUTIONS FOR SUSTAINING THE ENVIRONMENT AND PROFESSIONS
November 26, 2014
University of the East Manila
ENGINEERS ON SCENE
A Civil Engineering Specialization Congress
November 21, 2013
University of the East Manila
NATIONAL CIVIL ENGINEERING SYMPOSIUM 2013
September 06, 2013
University of the Philippines Diliman
AFFILIATIONS
ACES PICE
Treasurer (S.Y. 2015 2016)
University of the East Manila
2219 CM Recto Avenue Sampaloc, Manila
YOUTH PROFESSIONAL CIRCLE
Word of Hope Christian Family Church
EDSA, Quezon City
May 13, 2014 Present
CHOIR, MUSIC MINISTRY
Word of Hope Christian Family Church
EDSA, Quezon City
March 2011 August 2013

CHARACTER REFERENCES
ENGR. MARK ANTHONY L. ESCOBER
Instructor, College of Engineering
University of the East Manila
09178046486
ENGR. MARYCON A. SERRANO
Instructor, College of Engineering
University of the East Manila
09175527595
ENGR. REGINALD G. MORA
Instructor, College of Engineering
University of the East Manila
09275560762

I hereby certify that the above information is true and correct to the best of my
knowledge and belief.

____________________
ROSEMAY T. AQUINO

COMPUTATION FOR LABOR and RATES USED


ACTIVITY
I. MOBILIZATION AND DEMOBILIZATION
II. SURVEY WORKS
III. SITE CLEARING
IV. EARTHWORKS
Excavation
Gravel Bedding
Lean Concrete
Soil Poisoning
Backfill
Earthfill
Compaction
V. CIVIL STRUCTURAL WORKS
Form Works
Footing
Columns
Footing Tie Beam
Wall Footing
Slab on Grade
Suspended Slab
Stairs
Beams and Girders
Roof Beams
Septic Tank

QUANTITY UNIT UNIT/MH NO. OF WORKERS NO. OF DAYS


1.00
1.00
1.00

lot
lot
lot

1
40
1

20
2
2

112
7
3

213.22
5.48
1.19
261.90
275.38
120.00
118.61

cu.m.
cu.m.
cu.m.
sq.m.
cu.m.
cu.m.
cu.m.

0.255
9.46
9.46
1.22
1.22
7

10
2
2
4
5
4
3

17
4
3
3
3
3
7

5
4
7
5
10
9
5
7
8
5

79
13
24
5
3
2
7
7
11
4
3

29.68
208.98
61.88
26.60
110.32
115.96
14.05
75.67
73.14
2.40

sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.

1
0.85
1
1
1.2
1.2
1.2
0.65
0.65
1.2

COMPUTATION FOR LABOR and RATES USED


ACTIVITY
Form Works
Footing
Columns
Footing Tie Beam
Wall Footing
Slab on Grade
Suspended Slab
Stairs
Wall
Beams and Girders
Roof Beams
Septic Tank
Concrete Works
Footing
Columns
Footing Tie Beam
Wall Footing
Slab on Grade
Suspended Slab
Stairs
Beams and Girders
Roof Beams
Septic Tank
Structural Steel Works

QUANTITY

UNIT UNIT/MH NO. OF WORKERS NO. OF DAYS

47.35
3,314.06
789.12
229.35
965.50
965.50
186.00
6,614.21
1,494.49
1,413.84
44.3907042

kgs.
kgs.
kgs.
kgs.
kgs.
kgs.
kgs.
kgs.
kgs.
kgs.
kgs.

10
10
10
10
10
10
10
10
10
10
10

3
4
3
3
5
5
4
10
9
8
4

27.42
10.51
6.19
3.33
11.0324375
11.8081875
0.83
5.27
4.70
3.84
5,308.88

cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
kgs.

0.665
1.1
0.765
0.765
1.262
0.986
0.2
1.262
1.262
0.2
20

5
4
5
5
4
2
2
3
3
3
5

14
24
15
3
3
10
6
25
5
4
3
33
3
8
4
2
2
4
4
2
2
2
10

COMPUTATION FOR LABOR and RATES USED


ACTIVITY
VI. ARCHITECTURAL WORKS
Masonry Works
CHB Laying
Plastering
Floor Topping
Ceiling Works
Tile Works
Supply and Installation of 200 x 200 Lavatory Counter Tiles
Supply and Installation of 300 x 300 Toilet Wall Tiles
Supply and Installation of 600 x 600 Floor Tiles
Supply and installation of 150 x 900 Vinyle Planks
Painting Works
Wall Painting (Semi Gloss Latex in Roller Finish)
Ceiling Painting (Flat Latex in Roller Finish)
Painting of Doors (Enamel Paint in Roller Finish)
Doors and Windows
Carpentry Works
Metal Works
VII. ELECTRICAL WORKS
Roughing - ins
Wires and Cables
Fixtures and Devices
Testing and Commissioning

QUANTITY UNIT UNIT/MH NO. OF WORKERS NO. OF DAYS

1,167.29
1,167.29
141.51
424.52

sq.m.
sq.m.
sq.m.
sq.m.

6.4
7.5
1.33
2.4

12
14
4
3

25
21
21
21

13.00
123.23
141.51
71.66

sq.m.
sq.m.
sq.m.
sq.m.

3.2
3.2
2.67
4

3
5
6
4

7
14
25
7

1,743.05
424.52
36.96
43.00
1
1

sq.m.
sq.m.
sq.m.
sets
lot
lot

7
8
7
4
-

3
2
2
4
3
5

28
21
7
7
14
21

1
1
1
1

lot
lot
lot
lot

5
4
3
3

27
21
7
7

COMPUTATION FOR LABOR and RATES USED


ACTIVITY
VIII. PLUMBING AND SANITARY WORKS
Roughing - ins
Fixtures and Devices
Testing and Commissioning
IX. THERMAL AND MOISTURE PROTECTION
X. SITE DEVELOPMENT WORKS
Fence and Posts
Lights
Gates

QUANTITY UNIT UNIT/MH NO. OF WORKERS NO. OF DAYS


1
1
1
218.75

lot
lot
lot
sq.m.

8
6
3
9

34
7
14
7

1
1
2

lot
lot
sets

8
4
4

28
7
21

SCHEDULES

APPENDIX