Académique Documents
Professionnel Documents
Culture Documents
RECTO, MANILA
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT
SUBMITTED BY:
AQUINO, ROSEMAY T.
20110109574
SUBMITTED TO:
ENGR. MARYCON A. SERRANO
24 MARCH 2015
ACKNOWLEDGMENT
It would not have been possible to write this project without the help and support of the kind
people of whom it is possible to give particular mention here.
Above all, I would like to thank God for the guidance He has providing me throughout this work,
for the wisdom He is giving me, and for giving knowledge as well.
I would like to thank Engr. Jefferson A. Lachica, Owner of JLachica Construction and Consultancy,
who guided me and had given me the knowledge I needed to finish this work.
I would also like to express sincere appreciation to young and beautiful Professor, Engr. Marycon
A. Serrano, who has supported the students throughout this work with patience and knowledge. The
students know that it wouldnt have been possible to finish this requirement without the Professors great
supervision.
Finally, I thank my parents for the support throughout all studies at University of the East Manila
and for providing a home in which to complete the project.
TABLE OF CONTENTS
I.
II.
III.
IV.
4.2
4.3
4.4
4.5
V.
VI.
6.2
6.3
PROJECT DESCRIPTION
GANTT CHART
MANPOWER SCHEDULE
MANPOWER SCHEDULE
MANPOWER
Foreman
Carpenter
Mason
Electrician
Plumber
Welder
Painter
Steelman
Helper / Laborer
Others:
Surveyor
Survey Aid
1 2 3
1 1 1
2 2
2
2 2
4
1
3
2
3
5
5
1
3
4
3
7
6
1
6
4
5
7
7
1
6
4
WEEKS
8
9
1
1
6
6
4
4
3
2
2
2
3
10
1
6
6
3
2
3
11
1
6
6
3
3
3
6
6
6
6
6
10 10 10 10 10
12
1
4
6
1
3
3
13
1
4
6
1
3
4
6
14
1
4
4
1
4
6
15
1
4
4
2
2
2
6
16
1
2
2
6
3
8
1
1
TOTAL: 3 5 7 14 18 23 27 32 34 37 38 29 25 20 21 11
EQUIPMENT SCHEDULE
EQUIPMENT SCHEDULE
EQUIPMENTS
Mini - Excavator
Plate Compactor
Concrete Mixer
Concrete Vibrator
Welding Machine
Rebar Cutter
Rebar Bender
Grinder
Compressor
TOTAL:
1 2
1
3
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
WEEKS
8 9 10 11 12 13 14 15 16
1
1
1
1
1 1 1 1 1
1 1 1 1 1
2 2
2
2 2 2 2
2 2 2 2
2
2 2 2 2 2
2 2 2 2
10 8 10 8 4 4 6 4 2
PRECEDENCE NETWORK
S CURVE
ROSEMAY T. AQUINO
4 Davao Street Bago Bantay, Quezon City
Contact Numbers: 0905-9332013
239-2712/982-8163
E-mail Address: rosemay.aquino07@gmail.com
OBJECTIVE
To increase my knowledge, skills and experience in the applications of Civil Engineering in the
industry and gain an insight on how the industry works as a preparation of my future career.
ELIGIBILITY
7th HONORABLE MENTION
Quezon City Academy
Batch 2010 2011
EDUCATIONAL ATTAINMENT
Tertiary Education:
Secondary Education:
Primary Education:
PERSONAL INFORMATION
Birthday
Age
Gender
Height
Civil Status
Religion
Skills
CHARACTER REFERENCES
ENGR. MARK ANTHONY L. ESCOBER
Instructor, College of Engineering
University of the East Manila
09178046486
ENGR. MARYCON A. SERRANO
Instructor, College of Engineering
University of the East Manila
09175527595
ENGR. REGINALD G. MORA
Instructor, College of Engineering
University of the East Manila
09275560762
I hereby certify that the above information is true and correct to the best of my
knowledge and belief.
____________________
ROSEMAY T. AQUINO
lot
lot
lot
1
40
1
20
2
2
112
7
3
213.22
5.48
1.19
261.90
275.38
120.00
118.61
cu.m.
cu.m.
cu.m.
sq.m.
cu.m.
cu.m.
cu.m.
0.255
9.46
9.46
1.22
1.22
7
10
2
2
4
5
4
3
17
4
3
3
3
3
7
5
4
7
5
10
9
5
7
8
5
79
13
24
5
3
2
7
7
11
4
3
29.68
208.98
61.88
26.60
110.32
115.96
14.05
75.67
73.14
2.40
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
1
0.85
1
1
1.2
1.2
1.2
0.65
0.65
1.2
QUANTITY
47.35
3,314.06
789.12
229.35
965.50
965.50
186.00
6,614.21
1,494.49
1,413.84
44.3907042
kgs.
kgs.
kgs.
kgs.
kgs.
kgs.
kgs.
kgs.
kgs.
kgs.
kgs.
10
10
10
10
10
10
10
10
10
10
10
3
4
3
3
5
5
4
10
9
8
4
27.42
10.51
6.19
3.33
11.0324375
11.8081875
0.83
5.27
4.70
3.84
5,308.88
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
kgs.
0.665
1.1
0.765
0.765
1.262
0.986
0.2
1.262
1.262
0.2
20
5
4
5
5
4
2
2
3
3
3
5
14
24
15
3
3
10
6
25
5
4
3
33
3
8
4
2
2
4
4
2
2
2
10
1,167.29
1,167.29
141.51
424.52
sq.m.
sq.m.
sq.m.
sq.m.
6.4
7.5
1.33
2.4
12
14
4
3
25
21
21
21
13.00
123.23
141.51
71.66
sq.m.
sq.m.
sq.m.
sq.m.
3.2
3.2
2.67
4
3
5
6
4
7
14
25
7
1,743.05
424.52
36.96
43.00
1
1
sq.m.
sq.m.
sq.m.
sets
lot
lot
7
8
7
4
-
3
2
2
4
3
5
28
21
7
7
14
21
1
1
1
1
lot
lot
lot
lot
5
4
3
3
27
21
7
7
lot
lot
lot
sq.m.
8
6
3
9
34
7
14
7
1
1
2
lot
lot
sets
8
4
4
28
7
21
SCHEDULES
APPENDIX