Académique Documents
Professionnel Documents
Culture Documents
RENDIMIENTO DÍA
M2/DÍA 7.5 14.5 CASI 100% DE AVANCE
ECONOBLOCK 08 13.5 4.6 Kg
MANO DE OBRA
ECONOBLOCK 10 SOLES/M2 19.31 9.99 CASI LA MITAD DE COSTO
ECONOBLOCK 10 13.5 4.8 Kg.
COSTOS DIRECTOS
ECONOBLOCK 12 SOLES/M2 38.11 28.95 24% menos de costo
ECONOBLOCK 12 13.5 5.2 Kg.
Estribos
ECONOBLOCK 12
Fierros de 3/8’’
12
COLUMNETA
Estribos
ECONOBLOCK 10
Fierros de 3/8’’
10
COLUMNETA
Estribos
ECONOBLOCK 08
Fierros de 3/8’’
COLUMNETA
8 HUECOS 4.60 8 x 30 x 30
12 HUECOS 6.50 12 x 30 x 30
15 HUECOS 7.50 15 x 30 x 30
20 HUECOS 10.30 20 x 30 x 30
PESO (KG.) ANCHO / ALTO / LARGO
PORTANTES
25 HUECOS 12.30 25 x 30 x 30
KING KONG 18 HUECOS