Items to Take Up with Carsten:

Top (ceiling insulation)


1. Panel insulation orientation.
2. Location of end suspension bars.
3. Supply of suspension cables.
4. Location of suspension points.
5. Location of electrical wiring.
6. Installation of cooling units.
Wall Insulation
1. External lateral supports.
2. Location of doors.
3. Location of bollards and door protection.
4. Details of dock levellers including slab preparation.
5. Margin vs external edge of slab.
6. Location of drains.
7. Slab preparation for door heaters.
8. Sequence of slab preparation ( slab corridors first then cold room
lower slabs?)
9. Allowance for office.
10.
Plastic curtains for sorting area.
11.
Distance between sidings and wall insulation.
12.
Slab to wall panel detail for anteroom.
13.
Forklift maintenance and battery charging area.
Floor insulation
1. Thickness of floor insulation.
2. Vent pipe positions and layout.
3. Drainage below lower slab.
4. Coarse gravel for backfill.
5. Lower slab floor finish.
Contract Items Review (Please see proposed format of items and
quantities)
1. Panel quantities /thickness.
2. Door quantities per type.
3. CO2 detectors.
4. Area thermometers. Types suitable? How to install?
5. Spare door heaters.
6. ISO docks.

Items and Quantities Proposed Format:


Ite
m
No.
1

Description

Qty

Price

Insulation panels for

Cold Room: 18m x 18m x 8m high


Cold Room: 18m x 36m x 8m high
Corridors: 6m x 54m x 8m high
Ante Room (Loading Area): 60m x 6m x 8m high
Sorting Room: 21.6m x 10.3m x 8 m high
Rear Corridor(Back Passage): 84m x 5m x 8m high
Note: Panel Thickness:
Cold room exterior walls and ceilings
150mm
Remaining walls and ceilings: 100mm
Shall conform to specifications per CTtechnologies ApS No. 051.04.14.G dated March 25,
2015

Installation Accessories:
Flashings with double bend of edges for corners,
etc.
Closed rivets in same colors as panels.
Silicone and Butyl sealant:
PU assembly foam
Alu-omega ceiling suspension profiles.
Ceiling Suspension system
Fixation items:
Alu-bitumen band for external ceiling joints
Note: Above items shall be of adequate
quantity to install, completely seal, erect and
support all of Item 1.

Pressure relief valves: (of sufficient size


and quantity to minimize buildup of
differential pressures between rooms and
exterior)
Doors:
4.1 Doors for Cold Rooms, size 3000 x 3200 mm
Each door shall include:
Manual sliding doors with 120 mm thickness door
blade.
Lock and emergency release.(set)
PVC tape curtains.(set)
4.2 Doors for Ante Room/Corridor, size 3000 x
3200 mm
Each door shall include:
Manual sliding doors, thickness 70 mm
Lock and emergency release. (set)
PVC tape curtains. (set)
4.3 Vertical sliding hatches for Sorting area, 1500
x 1500mm
Each door shall include:

6
3
2
1
1
1

Euro 496,400
FOB
See
not
e

Euro 75,540
FOB
?
Euro 2,320
FOB
12
12
12
12
4
4
4
4
2
2
2

Sliding hatches
PVC tape curtains

4.4 1-Leaf hinged door for Rear Corridor towards


Machine room, size 1000 x 2000 mm, with door
blade thickness 70 mm

4.5 Insulated overhead sectional door for Rear


corridor, 3000 x 3200 mm, electrically operated,
with 2 windows, with PVC tape curtains.

Euro 65,220
FOB

Note: All doors are supplied with clamping frame


for easy installation in panels, and doors for
negative temperature are supplied. Also supplied
with heating cables and gaskets for control of ice
formation.

Docks and Sectional Doors


5.1 Docking Stations
Each docking station shall consist of:
5.1.1 Retractable DS Dock Seal, size 3450 x
3500 x 600mm
5.1.2 Insulated overhead sectional door, size
2750 x 3300mm, electrically operated
with 2 windows.
5.1.3 Hydraulic dock leveler, size 2000 x 2500
mm

5
5
5
4

5.2 Manual sectional door for Anterooms, size


2400 x 3000 mm.

Euro 30,560
FOB
6

Floor Insulation, total thickness 2 x 60


mm
Note: Supply shall be of sufficient
quantity to cover the floor area for the
Cold Room.
Vapour Barrier, 5 layer with a core of
aluminum foil.
Note: Supply shall be of sufficient
quantity to cover the floor area for the
Cold Room.
Total FOB Hamburg Price

Freight to pier General Santos City,


Philippines
Total C&F Price General Santos
Less Discount:
Total Net Price Materials C&F General
Santos
(above net price excludes custom duties,

See
not
e

Euro 96,130
FOB

See
not
e
Euro 14,730
FOB
Euro 780,900
Euro 49,470
Euro 830,370
(Euro 30,370)
Euro 800,000

custom clearance and local taxes)


Installation of supplied materials
Price excludes VAT and other taxes.
Warranties: Materials?
Installation workmanship?

Php
3,780,000.