Vous êtes sur la page 1sur 4

Latitude

2,9066 S
Longitude
103,96905 E
Height above mean sea level
16 m / 52 ft
Siesmic Zone
Lokasi: Jl. Betung Sekayu, Sekayu, Musi Banyuasin, Sumatera Selatan
30757 Indonesia

Highest monthly mean of daily


temperature
Lowest monthly mean of daily
temperature
Highest monthly mean of daily
temperature
Lowest monthly mean of daily
temperature
Annual
mean
of
daily
temperature
Annual
mean
of
daily
temperature
Extreme highest temperature

maximum 36 ( )
maximum 29 ( )
minimum 26 ( )
minimum 21 ( )
maximum 30 ( )
minimum 24 ( )

( )

Extreme lowest temperature


Relative Humidity:

( )

Maximum
Minimum

Average annual rainfall


Heaviest rainfall in 24 hours so far
Number of rainy days in a year
Highest monthly mean of wind speed
Lowest monthly mean of wind speed
Maximum wind speed

100 %
24 %
cm
cm
14 km/h
3 km/h
27 km/h

SPESIFIKASI ESP

Tecnical specification
Design efficiency

99,58 %

Guaranteed efficiency (12,5% of the dust collecting area is stop) :


99,20 %
Guaranteed efficiency (when one electric field is stopped)

99,20 %
Uniformity of the gas flow arrangement

: < 0,20

Resistance

: < 235 Pa

Gas leakage rate

: < 2,0 %

Noise

: < 80 dB

Electric field channel number

:2

24 ea

Electric field inter-pole distance

: 410 mm

Effective length of each electric field

: 3,85 m

Total effective length of each electric fields

: 15 m

Electric field effective width

:2

Electric field effective height

: 14 m

Total dust collecting area (each unit)


m2
Effective cross-section area

9,9 m

:
: 278 m2

41395

Length to high ratio

: 1,1

Number of chamber

:2

Number of electric field

:4

Anode plate model

: ZT24

Collection plate total effective area (each unit)

: 41395 m2

Collecting plate material

: SPCC

Collecting effective height

: 14 m

Plate current density

: 0,40

Discharge electrode type (as per field)


discharge wire

Total discharge electrode length

: 77711 m

Discharge electrode material

: Stainless

Collecting plate rapping mode


hammer,

: Side tumbling

Barbed

Wall rapping
Collecting plate rapping acceleration

150 g
Discharge electrode frame rapping type
rapper

: Top solenoid

Discharge electrode rapping acceleration

Rapping area for each rapping hammer

: 2587 m2

Effective length of each rapping hammer

: 808 m

Ratio of dust collection area


m2/m3/sec

Ratio of dust collection area when 12,5% is out of operation


m2/m3/sec
Advancing speed

80 g

81,19
:

71,04

: 5,95 cm/sec

Advancing speed when 12,5% of the dust collecting area is stop :


cm/sec

6,80

Flue gas flow speed

: 0,92 m/sec

Designed negative pressure of housing

: - 9,0 kPa

Designed positive pressure of housing

: 9,0 kPa

Housing material / thickness

: Q235 / 5 mm

Insulation material for each ESP


(from buyer)

wool

: 30 m3

Quantity of insulation material for each ESP


Hopper per ESP

rock

: 8 ea

Hopper heating mode


heater

Electric

Hopper level sensing device


level

Charging

Rectifier transformer per ESP

: 8 set

Rectifier transformer type


immersion type

Rectifier transformer weight

: ~2,1 t

Rated capacity for each rectifier transformer


95 + 6

Oil

: 2

103 kVA

Usage sea level height of rectifier transformer


Applicable ambient temperature for rectifier transformer

: 1000 m
:

+40

Total electric load (for each boiler)

: 1827,88 kVA

Maximum operation load (for each boiler)

: 1315,8 kW

Concentration of design gas dust discharge


mg/Nm3

<60

Vous aimerez peut-être aussi