Management Plan
Construction Environmental
CONSTRUCTION
ENVIRONMENTAL
MANAGEMENT PLAN
[Company Name]
[Project]
[Location]
Issue
Description
Approved By
Signed
Date
[Company Name]
Management Plan
Construction Environmental
TABLE OF CONTENTS
1
Description of Works...................................................................................................3
Contractor Details........................................................................................................3
Environment Policy.....................................................................................................3
4.2
Water Quality.......................................................................................................5
4.3
Air Quality...........................................................................................................6
4.4
Noise....................................................................................................................7
4.5
Hazardous Substances.........................................................................................8
4.6
Contaminated Soil...............................................................................................9
4.7
4.8
Waste Management............................................................................................11
4.9
4.10
Cultural Heritage...............................................................................................13
APPENDICES
A. Site Layout Plan
B. PBPL Soil Disposal Protocol 2012
1 Description of Works
[Company Name]
Management Plan
Construction Environmental
Location of works
Specific activities
Plant on site
Environmental Approvals (or applications) and relevant conditions
Commencement date and duration of works
Schedule
2 Contractor Details
Information regarding the contractor and relevant tenant / PBPL contacts.
Table 1.
Name
Position
Contact
Number/s
3 Environment Policy
Attach the companys Environment Policy
[Company Name]
Management Plan
Construction Environmental
Objective
Actions
Requirements
e.g. Installation of
cattle grid at exit
point
Responsibility
e.g. Site Manager
Timing
Prior to construction
commencing
Performance
Indicators
e.g. No mud/dirt
visible on public
roads due to
construction works
Throughout
construction works
Monitoring
Throughout
construction works
Reporting
Throughout
construction works
Throughout
construction works
Corrective Actions
e.g. PBPL
Throughout
construction works
[Company Name]
Management Plan
Construction Environmental
Objective
Actions
Requirements
e.g. excavation of vdrains / settlement
ponds
Responsibility
e.g. Site Manager
Timing
Prior to construction
commencing
Performance
Indicators
e.g. no untreated
stormwater leaving
site
Throughout
construction works
Monitoring
Reporting
Corrective Actions
Throughout
construction works
Dust suppression
Stockpiles
Truck loads
5
Throughout
construction works
Throughout
construction works
Throughout
construction works
[Company Name]
Management Plan
Construction Environmental
Objective
Actions
Requirements
e.g. water carts will
be used for dust
suppression
Responsibility
e.g. Site Manager
Timing
Throughout
construction works
Performance
Indicators
e.g. no complaints
regarding dust from
workers / neighbours
/ community
members
Throughout
construction works
Monitoring
Throughout
construction works
Reporting
Throughout
construction works
Throughout
construction works
Corrective Actions
e.g. PBPL
Throughout
construction works
4.4 Noise
Include:
-
[Company Name]
Management Plan
Construction Environmental
Objective
Actions
Requirements
e.g. all significant
noise generating
activities will be
undertaken between
Mon-Sat 6.30am to
6.30pm
Responsibility
e.g. Site Manager
Timing
Throughout
construction works
Performance
Indicators
e.g. no complaints
regarding noise from
workers / neighbours
/ community
members
Throughout
construction works
Monitoring
Throughout
construction works
Reporting
Throughout
construction works
Throughout
construction works
Corrective Actions
e.g. PBPL
Throughout
construction works
Storage
MSDSs
Refuelling
Spill kits and emergency spill response
Spill kit training
Objective
[Company Name]
Management Plan
Construction Environmental
contaminated soil.
Actions
Requirements
e.g. all chemicals will
be stored in bunded,
roofed areas with
MSDSs kept nearby
Responsibility
e.g. Site Manager
Timing
Throughout
construction works
Performance
Indicators
e.g. no spills
Throughout
construction works
Monitoring
e.g.
chemical e.g. Site Manager
storage areas and
spill kits will be
inspected
on
a
routine basis
Throughout
construction works
Reporting
Throughout
construction works
Throughout
construction works
Corrective Actions
Throughout
construction works
[Company Name]
Management Plan
Construction Environmental
Objective
Actions
Requirements
e.g. no fill material
will be imported to or
removed from site
Responsibility
e.g. Site Manager
Timing
Throughout
construction works
Performance
Indicators
e.g. no evidence of
contaminated soil on
site
Throughout
construction works
Monitoring
e.g. any
contamination
sampling
Throughout
construction works
Reporting
Throughout
construction works
Throughout
construction works
Corrective Actions
e.g. PBPL
Throughout
construction works
Objective
Actions
Requirements
e.g. actions to be
undertaken
if
clay/ASS is disturbed
Responsibility
e.g. Site Manager
Timing
Throughout
construction works
[Company Name]
Management Plan
Construction Environmental
Performance
Indicators
No evidence of acid
sulfate soil impacts
(discoloration/odour)
Throughout
construction works
Monitoring
Throughout
construction works
Reporting
Throughout
construction works
Throughout
construction works
Corrective Actions
e.g. PBPL
Throughout
construction works
Sensitive receptors
Waste receptacles and servicing
Objective
Actions
Requirements
e.g. Appropriate
waste receptacles
will be provided on
site
e.g. No waste
deliberately or
unintentionally
Performance
Indicators
Responsibility
e.g. Site Manager
Timing
Prior to works
commencing
Throughout
remediation works
10
[Company Name]
Management Plan
Monitoring
Reporting
Corrective Actions
Construction Environmental
released
e.g. Waste
receptacles will be
inspected daily and
emptied weekly
e.g. reporting to site
manager and PBPL
e.g. Any reporting to
Department of
Environment and
Heritage Protection
e.g. corrective
actions and
implementation time
frame
Throughout
remediation works
Throughout
construction works
Throughout
construction works
e.g. PBPL
Throughout
construction works
Activities with potential to interfere with flora / fauna (both terrestrial and
aquatic)
Removal of flora and relevant environmental approvals
Importation of fill free from Red Imported Fire Ants
Landscaping works
Objective
Actions
Requirements
e.g. No marine or
terrestrial vegetation
will be disturbed
without prior
approval
Responsibility
e.g. Site Manager
11
Timing
Throughout
construction works
[Company Name]
Management Plan
Construction Environmental
Performance
Indicators
Throughout
construction works
Monitoring
e.g. Visual
monitoring
Throughout
construction works
Reporting
Throughout
construction works
Throughout
construction works
Throughout
construction works
Corrective Actions
e.g. PBPL
e.g. Site Manager
Objective
Actions
Requirements
e.g. All contractors
will be educated on
their cultural heritage
duty of care
e.g. No cultural
heritage artefacts
Performance
Indicators
Responsibility
e.g. Site Manager
Timing
Throughout
construction works
Throughout
construction works
12
[Company Name]
Management Plan
Monitoring
Reporting
Corrective Actions
Construction Environmental
uncovered
e.g. Visual
monitoring
e.g. reporting to site
manager and PBPL
e.g. Any reporting to
regulators
e.g. corrective
actions and
implementation time
frame
13
Throughout
construction works
Throughout
construction works
Throughout
construction works
Throughout
construction works
[Company Name]
Management Plan
Construction Environmental
14