CODE FGPR-012
version 1.0
DRAFT
PREPARED BY:
REVIEWED BY:
APPROVED BY:
2009
2009
2009
NOTE: List all the project risks identified in each category. Keep this information for your reference
through process management risk:
Threats: (what potential hazards exist about the project, project requirements, the
requirements of product, he timetable of draft, the means, the quality, etc.?)
1.
Than he personal highly trained can be grasped by other companies.
2. Do not fulfillment of contract from from the Business contractors from
service programming and assembly electric.
CODE FGPR-014
version 1.0
Automation of Area from Evaporation Y Clarification from Syrup Factory Sugar / DULCECITO
Jorge Alvarado Quintana DATE 05 04 2009
Head Instrumentation and
Automation
Adriano Goicochea Cornejo - Head of
DATE 06 04 2009
Division Energy.
Mendizabal Humberto Lozada DATE 07 04 2009
Superintendent Factory
Jorge Alvarado Quintana
Position:
Group Participant:
Location:
Deliverable:
Identified risk
(metalanguage)
Probability
of
Occurrence
Half
Degree
of
Impact
High
Actions proposals
Set in the
contract a
clause penalty
for noncompliance
with the date
delivery.
I
Identified
by?
Jorge
Alvarado
Quintana
Half
High
Staff
instrumentation
system
maintainer
must be
present in the
FAT, before
being sent
equipment to
plant facilities.
Kiran Rios
Macedo
Deliverable:
3.2.1 Service Programming
Risk Identified
Probability
Idea
Half
High
Degree
of
Impact
High
High
Actions proposals
I
Identified
by?
Having a UPS
system with
battery bank 30
minutes of battery
to prevent any
fluctuation of
power outages
plant.
Carlos
Moya
Charcape
Deliverable:
3.2.2 Installation Service Electric
Risk Identified
Probability
Idea
Half
Average
Degree
of
Impact
High
High
Actions proposals
I
Identified
by?
Set in the
provider's contract
a clause of penalty
Carlos
for nonMoya
compliance on the
Charcape
date of service
delivery.
Declare the
provider's
contract the
technical
specifications of
the supply of
electrical
equipment, which
comply with the
noise protection
and harmonics.
Jorge
Alvarado
Quintana.
RESPONSE PLAN
RISKS
CODE FGPR-015
version 1.0
Time
Quality
Scope
Cause
Probabilit Half
y
To transfer
Strategy
Actions drink
Residua
l Risks
Affect Cost
Pr 0.50
Impact
high
Priority (Chance x
Imp)
Owner
Responsibl Triggers
e
Jorge
Alvarado
Quintana
Go 0.40
Pr * Go 0.20
0.20
Cost
S /. 35,000.00
Risks
Side
Ps = 0.90
Is = 0.80
Continge
ncy Plan
Time
Quality
Scope
The measurement from the instrumentation from country would errors from accuracy
To the have glitch from factory the modules from entry Analog
Cause
Probabilit Half
y
Avoid
Strategy
Actions drink
Instrumentation personnel
maintainer of the system,
must be present in the FAT
before be
Residua
l Risks
Affect Cost
Pr 0.7
Impact
high
Priority (Chance x
Imp)
Owner
Responsibl Triggers
e
Kiran Rios
Macedo
Go 0.80
Pr * Go 0.72
Risks
Side
Continge
ncy Plan
0.20
Cost
S / 100 thousand
Ps = 0.30
Is = 0.10
Affect Cost
Time
Quality
Scope
Cause
Probabilit Half
y
To transfer
Strategy
Actions drink
Impact
Pr 0.50
high
Priority (Chance x
Imp)
Owner
Responsibl Triggers
e
Residua
l Risks
Go 0.40
0.20
Cost
S /. 35,000.00
Pr * Go 0.20
Risks
Side
Ps = 0.90
Is = 0.80
Continge
ncy Plan
Cause
Probabilit
Affect Cost
Time
Quality
Scope
Impact
0.80
Priority (Chance x
0.72
y
Avoid
Strategy
Actions drink
Having a UPS system with
battery bank 30 minutes
autonomy to prevent any
fluctuation of power outages
plant.
Residua
l Risks
Pr 0.90
Imp)
Owner
Responsibl Triggers
e
Carlos Moya
Charcape
Go 0.80
Pr * Go 0.72
Cost
S /. 15,000.00
Risks
Side
Ps = 0.30
Is = 0.10
Continge
ncy Plan
Reservation S / 20,000.00
Cause
Probabilit
y
Strategy
Affect Cost
Time
Quality
Scope
Impact
To transfer
Owner
high
Priority (Chance x
Imp)
0.20
Actions drink
Responsibl Triggers
e
Residua
l Risks
Pr 0.50
Go 0.40
Cost
S /. 25,000.00
Pr * Go 0.20
Risks
Side
Ps = 0.90
Is = 0.80
Continge
ncy Plan
Affect Cost
Time
Quality
Scope
Produce distortions in the signals due to the Harmonic in he area from evaporation
The inadequate protection from the wires Electric
Cause
Probabilit 0.50
y
Avoid
Strategy
Actions drink
Impact
0.40
Priority (Chance x
Imp)
Owner
Responsibl Triggers
e
Cost
0.20
Residua
l Risks
Secondar
y risks
Continge
ncy Plan
Pr 0.50
Go 0.40
S /. 15,000.00
Pr * Go 0.20
Ps = 0.30
Is = 0.10
Reservation S / 10,000.00