Introduction
The Bicol Regional Development Plan (2011-2016) was prepared in
2010. Halfway through plan implementation is a need to assess the
achievement of the desired outcomes of the plan so that alternative strategies
and additional programs and projects are identified to ensure that the
objectives are achieved.
The updated RDP was prepared through a series of consultations with
the different stakeholders in the region. The RDC secretariat drafted the initial
assessment of the RDP, the strategies and programs and projects. These
were presented to the agencies and LGUs to get their inputs. Consultations at
the provincial level were conducted to validate the assessment and strategies,
and identify new PPAs that are doable in the next three (3) years. All the inputs
gathered from the provincial consultations were integrated, and were validated
with the agencies and LGUs during the validation workshop. The outputs of
the validation workshop were consolidated in coming up with the 2 nd draft
updated RDP. Prior to presentation to the RDC sectoral committees for review,
a regional consultation was again conducted to further enhance the Plan and
also gain the support of the stakeholders in terms of funding the programs and
projects in the plan. The updated RDP (2011-2016) was recommended by the
four (4) sectoral committees of the RDC during its meetings on 21 and 22
November 2013 and subsequently approved by the RDC during its meeting on
06 December 2013 per Resolution No. 53 (S 2013).
The updating of the RDP was guided by Memo Circular No. 43 issued by
the President and Memo Circular No. 3 series of 2012 issued by the RDC. It
was done parallel with the updating of the Philippine Development Plan (PDP).
The updated RDP (2011-2016) contains: Chapter One Introduction;
Chapter Two the Development Vision and Desired Outcomes; Chapter Three
the Midterm Assessment on the achievement of the development outcomes
and major final outputs, and the challenges that should be addressed in the
remaining plan period; Chapter Four The Plan describing the development
objectives, strategies, action plans, and priority programs, projects and
activities, and Chapter Five Implementing the Plan.
Chapter Two
are safe and secured. Given this situation, Bicolanos need not go out of the
region to have more decent lives, and those who are outside will be
encouraged to return.
The desired regional development outcome is that majority of the
population in the region, especially the poor and marginalized, enjoy the
benefits of social development and economic growth. This means that the
average annual family income in the region is increased to a level more than
the national average and income inequality is reduced. The regional
development framework is shown in Figure 1.
To attain the regional development outcome, the plan aims to achieve
the following sectoral outcomes:
Productive activities engaged by more people. It means that a vibrant
Bicol economy is present, sustainably producing goods and services, and
generating adequate high paying jobs and livelihood opportunities for the labor
force population. The plan targets an increased employment rate from 94.7
percent in October 2011, declined underemployment from 35.9 percent in Oct.
2011, improved labor productivity from P105,027 in 2009, and an increased
gross regional domestic product (GRDP) growth from 2.6 percent in 2011 to 78 percent in 2016.
Adequate and quality social services availed by more people. It means
that more people in the region are healthier, are equipped with productive
skills, live in safe and decent houses, and are provided with social protection
to enable them to actively participate in the development of the region. The
plan targets an improved functional literacy rate from 79.9 percent to 83.1
percent and an increased life expectancy from 66 to 71 years (male) and 71 to
77 years (female).
Reliable infrastructure facilities and services used by the people. It
means that transport systems are integrated, efficient, and able to handle
increased volume of passengers and cargo. The communication facilities and
services are efficient. The region enjoys sufficient, stable and low cost power
supply. The supply of irrigation water is provided in sufficient quantity and
delivered on time. The plan targets increased number of passengers and cargo
in air, water and land transportation and increased number of
telecommunication and internet subscribers.
Good governance and sustainable development practiced in the region.
It means that a conducive environment is provided for private investments, the
communities are prepared for disasters, and the natural environment is able to
sustain the needs of future generations. The plan targets increased private
investments, increased forest cover, reduced water and air pollution, and zero
casualties from natural and man-made calamities.
Chapter Three
Midterm Assessment
A. Ensuring Economic Grow th
The RDP aims to achieve the sectoral outcome of productive
activities engaged by more people. This means that a vibrant Bicol
economy is present, sustainably producing goods and services, and
generating adequate high paying jobs and livelihood opportunities for
the labor force population. This objective was partially attained as
indicated by GRDP growth rates, employment and underemployment
rates, and labor productivity.
The GRDP expanded by 7.1 percent, four times faster than the
1.9 percent growth in 2011, and higher than the countrys 6.8 percent
growth rate. The region ranked 9 t h in terms of GRDP growth rate and
12 t h in value among 17 regions of the country. GRDP in 2012 amounted
to P124.49 billion, an increase from P 114.11 billion in 2010. However,
per capita GRDP amounted to only P22,312.00 in 2012, the 2 n d lowest
among the countrys regions.
The high GRDP growth did not create enough employment for the
regions labor force as employment rate slightly went up from 94.2
percent in October 2010 to 95.1 percent in October 2012, or an
increase of 0.9 percentage point over the two-year period.
Underemployment rate (or the proportion of employed persons who
expressed the desire to have additional hours of work in their present
jobs, or to have additional jobs, or to have new jobs with longer
working hours to total employed persons) slightly went down from 35.0
percent in October 2010 to 34.6 percent in October 2012.
This
accounted for an increase of 0.4 percentage point over a period of two
years.
Bicol region still has the highest underemployment rate
among regions of the country with ARMM having the lowest at 11.8
percent. The regions underemployment rate was way below the
national average of 19 percent.
Labor productivity increased slightly by 1.6 percent from
P56,029.00 in 2010 to P56,932.00 in 2011. Bicol labor productivity is
way below the national average of P158,758.00 and is the second
lowest next to ARMM. Labor productivity is the ratio of the GRDP to the
number of employed persons.
Major Output 1: Adequate and quality technical assistance, extension
services, agricultural inputs, and infrastructure support facilities
provided to farmers and fishermen.
b.
c.
d.
technical-vocational,
and
higher
b.
c.
d.
e.
10
C. Improving Infrastructure
The RDP aims for reliable infrastructure facilities and services
used by the people. This means that all modes of transportation are
integrated; efficient communication facilities and services, sufficient
and stable power supply, and adequate and safe water supply and
irrigation facilities are provided to the people.
The partial achievement of the plan targets for the transportation
sector resulted to an increase in the volume of air passengers by 14.12
percent, from 729,909 in 2010 to 832,938 in 2012. Incoming and
outgoing cargo also increased by 14.89 and 20.91 percent,
respectively.
Additional flights in Naga and Legazpi airports, the
offering of promotional fares, and the intensive promotion of tourist
destinations in the region contributed to these increases.
Increases in the volume of passengers using water
transportation by 3.5 percent from 3,801,564 in 2010 to 3,934,436
in 2012 and cargo throughput by 13.13 percent were recorded.
The opening of the Pioduran Port in 2011 contributed to the sector
outcome of an integrated transportation system.
New RORO
routes were opened such as the Nato Port to Guijalo, Sagnay to
Guijalo.
Batangas-Masbate-Cebu,
Masbate-Romblon-Manila,
Pioduran-Claveria,
Pioduran-Masbate,
and
Pioduran-Aroroy.
Codon port was also modernized.
These developments in the water and air transport resulted to an
increase in the annual average daily traffic (AADT) by 10.61 percent,
from 530,340 in 2010 to 586,646 in 2012.
Major Output 1: Integrated transportation system established.
A negligible increase in the national road density was noted
because the focus of works was on the rehabilitation and improvement
of strategic national roads. The increase is attributed to the road
openings of 1.730 kilometers in the GUICADALE road network in Alba y
and the 0.87 kilometer in the Basud-Mercedes coastal/bypass road in
Camarines Norte.
From 2010 to 2012, 14 permanent bridges along national roads
were constructed, representing a 2.37 percent increase in the number
of permanent bridges along national roads. Among these bridges are
the San Fernando Bridge and Dorongan bridges in Masbate.
Train service from Manila to Polangui was restored in December
2011. This was made possible through the completion of projects such
as the installation of temporary steel bridge to remedy the sinking
embankment at Sipocot; rectification of track defects, Travesia Bridge,
11
will
support
economic
13
productivity
b.
c.
d.
e.
f.
g.
Chapter Four
The Plan
A. Ensuring Economic Grow th
At the end of the plan period, the benefits of economic growth are
distributed equitably among Bicolanos. Economic activities produced
sufficient goods and services for home consumption and export. The
regions economy generates enough jobs to increase family incomes.
Every Bicolanos right to adequate food is satisfied. Food and
other basic commodities are available and affordable. Sustainable use
of agriculture, fishery, forestry, and mineral resources is maintained.
There is sufficient supply of raw materials and other production inputs
for manufacturing and other economic activities. Crop production
systems are resilient to changes in weather patterns.
Outputs from research and development are widely disseminated
to entrepreneurs. Quality Bicol products are sold locally and
internationally. Bicol is a primary tourist destination for ecological,
agricultural, educational, and medical tourism in the country. Meetings,
incentives, conferences and events are held in the region.
1. Agriculture, Fishery and Forestr y
Agricultural production is increased. Rice sufficiency is attained
with the surplus exported to other countries. Each province has a
commodity champion that leads to agribusiness expansion. Organic
and natural farming are adopted by farmers. Farmers transform their
produce into products and by-products with added values.
Objective: To increase GVA from agriculture, fishery and forestry.
Key Strategy: Provision of adequate and quality technical assistance,
extension services, agricultural inputs, and infrastructure facilities to
farmers and fishermen.
Action Plans:
a.
b.
c.
d.
e.
f.
g.
a.
Title
Agri-Pinoy Program
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
n.
o.
Duty Bearer(s)
DA, DAR, PCA, FIDA,
BFAR, LGUs
NIA, DA, DAR, LGUs
DA, DAR, PCA, FIDA,
LGUs, farmers
BFAR, LGUs,
private sector
DENR, LGUs, SUCs,
private sector, DepED
DA, PCA, LGUs
DAR, LGUs
LBP, DAR, DA
DA, LGUs
DA, LGUs
BFAR
DA, PCA, private sectors
DA, LGUs, private sector
DA, LGUs
BCARRD Consortium
Policy Actions
a.
b.
c.
d.
e.
17
Action Plans
a.
b.
c.
d.
e.
Duty Bearer(s)
e.
f.
g.
h.
i.
j.
k.
l.
b.
c.
d.
3. Tourism
Tourism support services and facilities are in place and
supported by the private sector. New and emerging destinations are
developed. Bicol is a major tourism destination with annual arrivals of
1.2 million foreign and local tourists.
Objective: To increase GVA from services/tourism sector.
Key Strategy: Provision of adequate and quality tourism promotion
services, and tourism infrastructure facilities.
Action Plans
a.
b.
c.
d.
e.
f.
g.
h.
Title
DOT-DPWH Convergence Program
BUB Projects
Financing for development of new tourism
products, sites and destinations
Construction/Upgrading of tourism
infrastructure facilities
Tourism Promotion Programs/Packages for
ALMASOR, CCTL and CTC
Ecotourism Development in Protected Areas
Training programs for LGUs on tourism promotion
Training Program for tourism service providers
i.
a.
b.
c.
d.
e.
Duty Bearer(s)
DOT, DPWH, LGUs
LGUs
LGUs, DOT,
private sector
LGUs, DPWH, DOT,
private sector
DOT, LGUs
DENR, DOT, LGUs
DOT
DOT, TESDA,
DOLE, LGUs
DOT, LGUs,
private sector
of
mining
and
quarrying
policies,
Action Plans
a.
b.
c.
a.
b.
c.
Title
Mineral Industry Development Program
Rehabilitation for Rapu-Rapu
mined areas
Masbate Gold
19
Duty Bearer(s)
DENR-MGB
DENR-MGB, LGU, RapuRapu Processing, Inc.
DENR-MGB, Filminera
Resources Corporation,
Phil. Gold Processing and
Refining, Corp.
d.
e.
f.
g.
h.
Policy Action
a.
services
to
include
20
Action Plans
a.
b.
c.
d.
e.
f.
a.
b.
c.
d.
e.
f.
g.
Title
Early Childhood Care and Development
Basic Literacy Program
Adopt a School Project
Private Education Student Financial
Assistance Program
Training for Work Scholarship Program
Ladderized Education Program
l.
m.
n.
o.
p.
q.
r.
s.
t.
u.
v.
w.
h.
i.
j.
k.
21
Duty Bearer(s)
DepED
DepED
DepED
Private sector,
TESDA, CHED
LGUs, TESDA
TESDA,
Private sector
DepED
CHED
CHED
DepED
CHED, DOST
DOST
TESDA
DOLE, TESDA,
DOST, PRC, CHED
All public and
private schools
LGU Albay
LGUs
DepED
DepED
DepED
DOLE
SUC/CBSUA
DepED
6. Health
Objectives:
a.
b.
Key Strategy:
more people.
Action Plans
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
L o c a l i z e h e a l t h l a ws t h a t r e s p o n d t o s p e c if i c h e a l t h i s s u e s i n
t h e a re a .
Continue to expand the national health insurance program among
LGUs and IPP group and sustain membership among other sectors
to social health insurance.
Upgrade facilities of rural health units to the level of accreditation
by health maintenance organizations and PhilHealth.
Emphasize preventive health services and promote integrated
programs for the prevention of communicable diseases.
Ensure the availability of low priced quality medicines and drug
packages in hospitals and Botika ng Barangay.
Intensify campaign on health, nutrition and population management
through quad media.
E n c o u ra g e L G U s t o s u s t a i n o p e ra t i o n o f b i r t h in g a n d o t h e r
h e a l t h f a c i l i t ie s .
Provide adequate manpower (population officers) and deploy
human resources for health to augment LGU health personnel.
Provide technical and logistics assistance for health
program implementation.
Establish geriatric fund.
Enhance research and development on health through PCHRD.
Duty Bearer(s)
DOH
DOH
DOH
PhilHealth
NNC
POPCOM
g.
h.
i.
j.
k.
l.
m.
n.
o.
POPCOM
POPCOM
DOH/LGUs
DOH
POPCOM
DOH/LGUs
DOH/LGUs
POPCOM
BU
7. Housing
Objective: To provide affordable, decent, and safe houses to the homeless.
Key Strategy:
more people.
Action Plans
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
23
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
Title
Resettlement Programs of NHA and LGUs
Community-Based Housing Program
Core Shelter Assistance Program
Settlement Upgrading Program
Housing Materials Assistance Program
Medium House Rising
Abot Kaya Pabahay
Community Mortgage Program/Localized
Community Mortgage Program
Pag-IBIG Housing Loan Program
AFP-PNP Housing Program
Local Housing Program
Duty Bearer(s)
NHA, LGUs
NHA, private sector
DSWD
LGUs
Private sector
Private sector
Private sector
Socialized Housing
Finance Corporation
HDMF(Pag-IBIG)
NHA, Private sector
NHA, congressmen,
private sector
8. Social Welfare
Objectives:
a.
b.
h.
i.
j.
F a c i l i t a t e e n ro l m e n t o f l i v e l i h o o d b e n e f i c i a r ie s t o s o c ia l
p r o t e c t io n s c h e m e s .
Provide livelihood assistance to informal sectors.
Provide skills-related trainings preparatory to livelihood assistance.
a.
b.
c.
d.
e.
f.
g.
Title
Pantawid Pamilyang Pilipino Program
Disaster Relief and Rehabilitation Programs
Self-Employment Assistance Kaunlaran Program
OFW Re-integration Programs
DOLE Integrated Livelihood Program
Establishment of Employment Protection
Capability Development Center
Microfinance Projects
Duty Bearer(s)
DSWD
DSWD
DOLE
OWWA
DOLE
DOLE
MFIs
C. Improving Infrastructure
Reliable infrastructure facilities must be available to the
population for equitable distribution of the benefits of economic growth
among Bicolanos. Reliable transportation and communication facilities
will provide people greater access to basic services and markets.
Reliable power supply will encourage more investments in rural
enterprises. Reliable irrigation facilities will promote more activities in
agriculture to increase yield that will contribute to food security and
increase income of farmers.
The focus of the plan is to interconnect all modes of
transportation to reduce travel time and cost, and promote more
movement of people and goods. Railway transport will be revived,
expanded and modernized. More investments in communication
including interconnection of service providers will be encouraged to
make communication services more affordable and far reaching.
National and communal irrigation systems will be rehabilitated. Power
supply will be available to all barangays and sitios.
9. Transportation
Objective: To provide reliable infrastructure facilities to be used by the people.
Key Strategy: Establishment of an integrated transportation system.
25
Action Plans
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
n.
o.
p.
q.
r.
s.
t.
Title
a.
b.
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH
DPWH, DAR,
DA, LGU
DPWH, LGU
DPWH,DOT
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
n.
o.
DPWH
DPWH
DPWH
DPWH
PNR
PPA
DOTC, CAAP
CAAP
CAAP, LGU
CAAP
CAAP
CAAP
CAAP
Policy Actions
a.
b.
c.
d.
Privatize PNR
Convert Quirino Highway into a toll road
Conversion of strategic local roads to national roads
Adopt national road standards in the construction of all types of roads
10. Communications
Objective: To provide effective and efficient communication facilities and
services that are universally accessible, interconnected and affordable.
Key Strategy:
Action Plans
a.
b.
c.
d.
e.
Duty Bearer(s)
ICTO
ICTO, private
service providers
11. Energy
Objective: To provide sufficient, stable and low cost power supply to
all domestic and industrial users.
Key Strategy: Provision of sufficient, stable and low cost power supply.
Action Plans
a.
b.
c.
d.
e.
f.
a.
b.
c.
d.
Title
Development of renewable energy sources
Barangay and Sitio Energization Program
Upgrading of power distribution lines
and substations
Missionary Electrification
Duty Bearer(s)
DOE, private sector
DOE, NEA, ECs
NGCP, ECs
NPC SPUG
Policy Actions
a.
b.
c.
d.
e.
f.
28
Action Plans
a.
b.
c.
Duty Bearer(s)
NIA
NIA/LGU/DA
NIA
NIA
Policy Action
a.
D. Sustaining Development
The availability and quality of government services are important
factors that will attract people to live, and to engage in business in
Bicol. Peace and security must be improved for the safety of the
population and security of key businesses and installations. The public
and private sectors must be competitive to increase productivity for a
sustained growth.
The region still benefits from a relatively "clean" environment.
The priority is to maintain these key assets for the benefit of the future
generations. To do this, proper land use management practices must
be implemented in the region. Economic growth can be attained while
the natural environment is carefully managed and preserved. Local
government units have to implement their land use plans with the
cooperation of the national government agencies, private sector and
the communities. Disaster risk reduction and management and climate
change adaptation strategies must be integrated in the local land use
plans to mitigate the damage that may be caused by natural hazards.
For the next three years, the Plan will ensure that good
governance is practiced in the region, competitiveness in the public
and private sectors is improved and sustained, there is peace, order
and security, proper allocation of land is ensured for development and
environmental protection, and achieve zero casualty and minimum
damage to property during emergencies and disasters.
29
Key Strategies:
a.
b.
Establish
transparency,
accountability,
and
improvement systems in government offices.
Provide peace, security, and public safety services.
productivity
Action Plans
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
Duty Bearer(s)
DILG
CSC
DILG
COA
LGUs
f.
g.
h.
i.
j.
k.
l.
m.
n.
o.
p.
DILG
DBM
CSC
DBM
BIR
DBM, COA
PNP
DILG, PNP, AFP,
NAPC, OPPAP
DILG
Policy Action
a. Review policies on share of LGUs from national wealth.
14. Land Use
Objective: To ensure sustainable allocation of land for development
and environmental protection.
Key Strategy: Provide assistance to LGUs on land use planning.
Action Plans
a.
b.
c.
Title
a. Capability building program for LGUs
DRR-CCA enhanced CLUPs and PDPFPs
CLUP/Zoning Ordinances
Zero Backlog project
b. Trainers training on CLUP preparation
c. Land surveys
d. Foreshore land management
e. Forest land use planning
31
NEDA
DILG
HLURB
PASUC
DENR-LMS
DENR-LMS
DENR-FMS
g.
Duty Bearer(s)
c.
d.
e.
f.
g.
h.
LGUs
DPWH, DENR,
DENR-EMB
DepEd, OCD
DPWH, LGU
MGB
DENR, LGUs
DENR
PAGASA
RDRRMC/OCD
PAGASA
DPWH
LGUs
DENR-EMB
DENR-EMB
Policy Actions
a.
b.
c.
d.
16. Competitiveness
Objective: To improve and sustain competitiveness in the public and
private sectors.
Key Strategy:
Creation of an environment
productivity of individual businesses.
that
will
increase
Action Plans
a.
b.
c.
d.
Duty Bearer(s)
DILG, DTI
DTI, DILG
LGUs, DILG
DILG, DTI, LGUs
LGUs, DTI
DOLE, DTI,
RTWPB, DOT
a.
Policy Action
a.
33
Chapter Five
Implementation Arrangements
The RDC shall coordinate the implementation of the plan. The
plan shall be translated into a regional development investment
program consisting of public sector programs, projects, and activities
(PPAs). The RDIP shall be the basis for preparing the annual budget
proposals of RLAs and SUCs. Given the limited resources of the
government, the most feasible projects shall be prioritized for funding
and implementation during the plan period. The Bicol Project
Development Committee shall provide technical assistance to LGUs in
project development.
B.
Financing
Funds for the implementation of PPAs shall be sourced mainly
from the generated funds of the national government. Other sources
of funds are official development assistance, corporate funds of
government owned and controlled corporations (GOCCs) government
financial institutions (GFIs) and local government revenues. The
private sector shall also be tapped for public private partnership
projects. The implementation of the strategies and PPAs in the plan
shall be undertaken by the RLAs, GOCCs, GFIs, LGUs, SUCs, and
other concerned agencies. An annual regional development report
shall be prepared to assess plan implementation.
C.
Monitoring
The implementation of the updated regional development plan
shall be monitored using the plan implementation monitoring system.
The PIMS is a new system that combines the Regional Project
Monitoring and Evaluation System (RPMES) a formal system created
by EO 93 (S. 1993), and the assessment of plan implementation
system. This system standardizes the gathering, processing, and
organizing of information into the regional development report (RDR).
From the usual RPMES process, the status of implementation
of programs and projects shall be determined. Inputs shall be from the
national project monitoring committee/RPMC/RDC list, reports from the
local project monitoring committees, PSO/CSO, SUC and agency which
shall be based on the RDP results framework. Annex 1 presents the
34
Ad vocac y
The plan shall be communicated and advocated to various
stakeholders within and outside the region to encourage them to
participate in plan implementation. A strong and continuous advocacy
of the plan shall raise the level of awareness of leaders and other
major key players in regional development.
The Regional Information and Advocacy Committee (RIAC) of
the RDC shall take the lead in the information dissemination and
advocacy activities of the plan. It shall formulate a social marketing
plan that will serve as guide and provide the directions in advocating
and promoting the RDP. The social marketing plan shall build on the
35
PLANS
INVESTMENT
PROGRAMS
National Level
NFPP/PDP
MT PIP
Regional level
RPFP/RDP
RDIP
PDPFP
PDIP
CDP/ MDP/CLUP
MDI P/CDI P
Provincial Level
City/Municipal Level
37