Motivation
Project
Content
Interim Data
Future Work
1. Motivation
0.66 t CO2e
2. Project
3. Content
Two stage work plan
Stage 1 preliminary cement laboratory work
to re-affirm performance of cements with high
addition levels
Stage 2 Concrete laboratory and field
performance including durability
characterisation
Regular review of progress and data review
Stage 1
Scope:
Limestone levels - nominal 5%(Control), 7.5%, 10% and 12.5%
A production run at each of the limestone levels.
To be conducted at one or two plants by each cement manufacturer.
Expecting 5-6 sets of data.
Mortar:
Three grab samples for testing compressive strengths.
One sample tests of sulfate expansion, shrinkage and peak temperature rise.
Other tests at the discretion of the cement company would include the normal
suite of cement tests.
Concrete:
Standard concrete mix (32 MPa) by cement company.
Bleed rates.
Setting times.
Compressive strengths at 1, 3, 7, 28 and 56 days.
Drying shrinkage up to 56 days.
Water demand.
Stage 2
Stage 2
4. Interim Data
4. Interim Data
4. Interim Data
4. Interim Data
4. Interim Data
4. Interim Data
4. Interim Data
4. Interim Data
5. Further Work
Manufacture cements for concrete testing
Stage 1 continue to generate longer term
results
Stage 2 Manufacture cements for concrete
testing
Confirm logistics of field trials
Confirm test/laboratory availability
Continue regular review of progress and data
review