SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)

SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


Pneumatic Pressure Testing

SATIP-A-004-01

PROJECT TITLE:

ITEM
NO.

1.0

PROJECT PHASE &


Activity Code

APPROVED DATE

WBS/BI/JO/NO.

TASK / ACTIVITY

QUALITY
PROCEDURE

QUALITY
RECORD

DISCIPLINE:

MECHANICAL

25-May-05
CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

SAUDI
ARAMCO

REMARKS

DOCUMENT REVIEW
Pressure Testing Procedure

SAIC-A-2001

RH1

RH1

1.2

Review of Test Package Preparation

SAIC-A-2003

RH1

R2

1.3

Line Flushing or Internal Cleanliness


Procedure

SAIC-L-2001

RH1

RH1

Verification of Testing Medium for


Pneumatic Testing

SAIC-A-2004

RH1

R1

3.1

Pre-Test Punch Listing

SAIC-A-2010

SATR-A-2007

H1

H1

In Conjunction with SATIP-L-350-01

3.2

Internal Cleanliness or Flushing

SAIC-L-2017

SAIC-L-2017
SATR-A-2008

H1

H1

In Conjunction with SATIP-L-350-01

SATR-A-2002
SATR-A-2005
SATR-A-2006
SATR-A-2001
for test
Manifold)
SAIC-A-2009

H1

W1

1.1

2.0

MATERIAL RECEIVING

2.1
3.0

APPLICATION

3.3

Test Preparation & Verification of


Testing equipment (including safety
requirements)

3.4

Filling & Pressurization


a) Strength test
b) Service test

SAIC-A-2020

SAIC-A-2020

W1

3.5

Visual Inspection at Test Pressure

SAIC-A-2021

SAIC-A-2021
SATR-A-2001

H1

H1

De-Pressurization

SAIC-A-2022

W1

4.0
4.1

* See Note 1 (General Notes)


This is in conjunction with SATIP-L-350-01or with the
applicable piping/equipment SATIP.

SAIC-A-2009

POST- TEST

Page 1 of 2

SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)


SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


Pneumatic Pressure Testing

SATIP-A-004-01

PROJECT TITLE:

ITEM
NO.

APPROVED DATE

WBS/BI/JO/NO.

PROJECT PHASE &


Activity Code

QUALITY
PROCEDURE

TASK / ACTIVITY

QUALITY
RECORD

DISCIPLINE:

25-May-05

MECHANICAL

CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

REMARKS

SAUDI
ARAMCO

GENERAL NOTES
1

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
levels of Saudi Aramco participation based upon the Contractors performance.

Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.

Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
representative is not present.

Hold:

If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

organization

QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

LEGEND
W1

100% Witness Inspection/Test

H2

Sample Hold Point for QC Inspection or Test

RH1 100% Review and Approval of Documents

W2
H1

Sample Witness Inspection/Test


100% Hold Point for QC Inspection or Test

R1
R2

100% Review of Documents


sample Review of Documents

RH2 Sample Review and Approval of Documents


S
Surveillance

Page 2 of 2