1. Technical principle
1.1 Technical principle
Gas lift with gas from self-well is a
development method used for a well with
independent 2 sets of oil and gas zones. As to
this technology, the external high pressure gas
source is not needed. The high pressure gas
zone is used for the production of other oil
zones. The high pressure gas from gas zone is
continuously injected into tubing with regulated
volume via gas lift valves, where the gas well
mixes with the well fluids to form mixed fluids.
By doing so, the well fluid density is decreased
and the purpose of gas lift oil production is
realized. This method can not only rationally
control the production of high pressure gas
zone, but also the purpose of producing from
the oil zones can be realized.
1.2 Techncial features
The oil production cost is lowered by using the produced gas from self-well
gas zone;
The injection volume of the gas zone produced gas is controlled by gas lift
valves and the inter-layer interference of gas and oil zones is avoided, therefore, the
commingled production of oil and gas is realized;
The independent oil production requirements is satisfied by forming the single
well production system.
1.3 Scope of applicaiton
The oil and gas are in different zones with stable barriers in between;
The gas zone pressure coefficient is larger than 0.9MPa/100m;
The gas zone gas production must satisfy the gas demand of oil well
production, i.e.5000m3/d;
The barrier thickness of oil and gas zones shall be larger than 5m.
2. Purpose and requirement of construction
The high pressure gas source from AG 2D-1 zone of Well AZN-02 is used for the
pilot test of gas lift with self-well gas and the crude oil in the three zones of AG-2D-3,
AG-2D-5, and AG-2F-1 will be lifted.
3. Basic data
Size
N/A
244.5mm
N/A
177.8mm
88.9mm
Weight
N/A
59.5kg/m
N/A
43.0kg/m
13.84kg/m
Grade
N/A
K-55
N/A
K-55
J-55
Set at
N/A
1123
N/A
1700
Make
Size
WP
Stream Flo
52.38 mm
14 Mpa
Stream Flo
279.4 mm
21 Mpa
134628-15
Stream Flo
279X179 mm
21 Mpa
136991-07
Stream Flo
79.37 mm
21 Mpa
JMP
79.37 mm
21 Mpa
N/A
Stream Flo
52.38
21 Mpa
N/A
Stream Flo
52.38
21 Mpa
N/A
Serial Number
N/A
AG-2D-1
Pay zone
AG-2D-3, AG-2D-5,
AG-2F-1
1672~1675
1864
1673.5
83
73
2000
2183
40
Gas rateMMscf/d
Oil rateblpd
300~400
0.734
(m)
177.8
0.822
89
1.5
4.2 Process design for gas lift production with gas from self-well
1Calculation of gas injection pressure and volume
Fig. 3 Gas injection volume and depth of gas lift production with gas from self-well
It is calculated that when gas injection pressure is 7MPa and gas injection rate is
28317m3/d1mmscf/d, the lift depth can be 1620m and the production capacity of
the well can be well performed. The pressure of gas source zone of AG-2D-1 is high
as 15.05 MPa (2183psi), which can fully satisfy the requirement of gas lift.
2Gas lift design
It is calculated that the liquid production rate of three horizons of AG-2D-3, AG-2D5, and AG-2F-1 is 850STB/d.
Table 4-2 Design production parameters
Projected oil rateSTB/d
510
850
1620
Water cut%
40
FBHPpsi
1105
Model
Measured depth
m
KFT-B-25.4
1620
4.8
870/6.05
Total
lengthmm
Tools
n thread
quantityset
27/8EUE
2000
127
60
260
25.4
Y211-148 packer
1670
148
62
2 /8EUE
Bell mouth
165
78
50.6
2 /8EUE
327
94
56
27/8EUE
1021
105
57
27/8EUE
sleeve
Cross over
5. Procedure of construction
5.1 Wellbore prepoaration
Configure and run in string: run the gas lift string with gas from self-welll to the
design location as shown in Fig. 5. The string is composed of packer and gas lift
mandrels etc. From bottom to top are bell mouth+KZF landing nipple+Y211 pakcer+
KHT slickline operation sleeve+KPX gas lift mandrel.
(2) Measure the length of each tubing and completion tool to be run in hole (the error
shall be less than 1/1000) and record the data;
(3)Clean the dirt in tubing. When tubing is run, the 3 1/2heavy weight tubing shall be
drifted with 73mm0.5m gauge. When unqualified ones are found, replace in time;
(4) When string is connected, the arrow direction of side pocket mandrel (i.e. box
side) must be upward. The protection tape shall be taken off and gas lift valves shall
be installed in mandrels.
(5) When string is run, strictly prevent the adherence of foul or clay to avoid the
plugging of valve ports.
(6) When running in gas lift completion string as per the gas lift completion string
schematic (when tubing and tubing, tubing and completion tool are connected), PTFE
tape coated with sealing grease must be applied to the tubing threads and completion
tools. The threads shall be tightened to guarantee no leakage under the pressure of
35MPa; when string is run, the operation shall be stable, and no running and puling
violently. The net running time for joint shall be no less than 20s and the drillpipe net
running time shall be no less than 45s.
(7) Depth calibration and string adjustment: magnetic depth calibration shall be
conducted. The strings shall be adjusted as per the result of depth calibration to match
the design location. Ensure the accuracy of packer setting location.
(8) Set Y211: when the casing is fully filled, set Y211-148 packer. Pull up string by
1.0 1.2m, and record the maximum load. Slowly lower the string and the hanging
weight decreases 810 tons to set Y211-148 packer.
(9) Install wellhead according to the requirements. Well connect gas injection
pipelines, oil outlet pipeline and casing & tubing pressure gauges. Guarantee no
leakage and the integrity of gauges.
5.3 Induced flow commissioning
(1) Install the flowline and carry out commissioning with the format of open flow;
(2) If production cannot be achieved, commissioning shall be made by injecting N 2
produced from Nitrogen trailer into annulus and deliquification shall be conducted
from tubing;
6. Requirements of construction
Killing fluids shall be filled from casing in time during tripping and the liquid
level shall be maintained at wellhead.
All the tools to be run in hole shall be checked and made sure qualified by the
killing fluids and equipments. The preparation for the installation of wellhead during
emergency shall be made. The wellhead shall be installed immediately once well kick
is discovered to carry out well killing operation. The well control measures shall be
strictly executed to strictly avoid environmental pollution.
7.4.2 The blowout prevention shall be able to seal the operation string of all sizes.
7.4.3 When continuous operation cannot be made to the well with natural flow
capacity, the wellhead facility shall be well installed to avoid blowout.
7.4.4 During tripping, the blowout prevention facility (such as tubing control valve
and tubing cocks etc.) capable of plugging tubing shall be prepared.
7.4.5 During tripping operation, if the wellbore fluids touch the string, the wellhead
blowout prevention facility shall be shut off under the premise of guaranteeing the
smooth operation of string and then the following step shall be adopted.
7.4.6 During tripping operation, the killing fluids in wellbore shall be maintained
permanently fully filled. Killing fluids shall be supplemented once for each tripping
of 10 20 pieces of tubing. Opening while blowout occurs is not allowed. The
blowout prevention facility shall be immediately shut off once the string is tripped
out.
7.5 Precautionary measures
7.5.1 The relevant norms and standards in terms of blowout prevention and pollution
prevention for oil well operation shall be strictly executed.
7.5.2 No smoking in the operation job site.
7.5.4 The pressure test of the pipeline must conform to the requirement of design.
7.5.5 Nitrogen purging must be carried out to the high pressure gas pipeline during
welding to guarantee the safety of welding operation.
7.5.6 After the high pressure pipeline is installed, air tightness test shall be made to
verify the leak points. Open the surface gas supply valves and slowly control the
pressure to 20MPa to check if there are leak points. If there are such points, vent the
pipeline, fasten connections and reliably seal; dedicated personnel shall be designated
to check the leak points. The irrelevant personnel shall stay 30m from the operation
site and no fire source shall be taken into the operation area.
7.5.7 The speed of tripping operation shall be controlled within 30 pieces per hour.
The blowout preventer shall be well installed. Once well kick or blowout occurs, swift
handling shall be made in accordance with the well control emergency procedure.
7.5.8 Before construction, the pressure test shall conform to the design requirement.
The overpressure operation shall be prohibited; during construction, the field
operators shall wear the personal protection equipment and shall stay out of the safety
distance from the high pressure zone.
7.5.9 The field operators shall pay high attention to safety and be aware of the escape
route.
31/2 tubing
1717m
Oil zone
2012m
Fig.5 Completion string for gas lift well AZN-02 with gas from self-well