Accuracy Class of Metering CT:


Metering Class CT
Class

Applications

0.1 To 0.2

Precision measurements

0.5

High grade kilowa hour meters for commercial grade kilowa


hour meters

General industrial measurements

3 OR 5

Approximate measurements

Accuracy Class Letter of CT:


Metering Class CT
Accuracy Class
B

Applications
Metering Purpose
Protection Class CT

CT has low leakage ux.

CT can have signicant leakage ux.

CT accuracy is applicable within the entire range of secondary


currents from 5 to 20 times the nominal CT rating. (Typically
wound CTs.)

CT accuracy applies at the maximum rated secondary burden at 20


time rated only. The ratio accuracy can be up to four times greater
than the listed value, depending on connected burden and fault
current. (Typically window, busing, or bar-type CTs.)

11/30/2015 7:58 PM

Electrical Thumb Rules-(Part-8) | Electrical Notes & Articles

2 of 3

https://electricalnotes.wordpress.com/2013/10/01/electrical-thumb-rules-...

Accuracy Class of Protection CT:


Class

Applications

10P5

Instantaneous over current relays & trip coils: 2.5VA

10P10

Thermal inverse time relays: 7.5VA

10P10

Low consumption Relay: 2.5VA

10P10/5

Inverse denite min. time relays (IDMT) over current

10P10

IDMT Earth fault relays with approximate time grading:15VA

5P10

IDMT Earth fault relays with phase fault stability or accurate time
grading: 15VA

FILED UNDER UNCATEGORIZED


About Jignesh.Parmar
Jignesh Parmar has completed M.Tech (Power System Control), B.E(Electrical) from Gujarat University. He has more than 13 years
experience in Power Transmission-Power Distribution-Electrical energy theft detection-Electrical Maintenance-Electrical
Projects(Planning-Designing-coordination-Execution). He is Presently associate with one of the leading business group as a Deputy
Manager at Ahmedabad,India. He is Freelancer Programmer of Advance Excel and design useful Excel Sheets of Electrical
Engineering as per IS,NEC,IEC,IEEE codes. He is technical Author for Electrical Mirror and Electrical India Magazines. He is
Technical Blogger and Familiar with English, Hindi, Gujarati, French languages. He wants to Share his experience & knowledge and
help technical enthusiasts to nd suitable solutions and updating themselves on various Engineering Topics.

10 Responses to Electrical Thumb Rules-(Part-8)


murali sir says:
October 2, 2013 at 6:37 am
good help to eee technical people and
updating eee dedcator experience
Reply
rama says:
October 3, 2013 at 9:02 am
some times i see 0.2s 0.5s as accuracy classwhat exactly it meanspecically that s
thankyou in advance sir.
Reply
asimali856 says:
October 3, 2013 at 11:16 am
thanks sir
Thanks & regards

11/30/2015 7:58 PM

Electrical Thumb Rules-(Part-8) | Electrical Notes & Articles

3 of 3

https://electricalnotes.wordpress.com/2013/10/01/electrical-thumb-rules-...

Asam Ali
Al Mariah United Group Delma Hospital Abu Dhai U.A.E Cell No.: +971 567077962
________________________________
Reply
Ruid says:
October 9, 2013 at 6:29 pm
Sir, please tell me the tolerance of Copper Strip of size 32 x 6mm used for earthing, or ligtning protection ground conductor with
IS.
Reply
Muthukumar says:
October 11, 2013 at 12:09 pm
Thanks. all the datas are very use full for site engineers
Reply
Yasir Bashir says:
November 15, 2013 at 12:03 pm
thanks
Reply
Raut says:
June 11, 2014 at 12:08 pm
Sir,
please tell me the horizontal Clarence require between 220Kv & 132 Kv over head transmission line both are parallel running.
Reply
Jignesh.Parmar says:
June 11, 2014 at 4:10 pm
Already given in the Blog
Reply
Iraki jishan says:
June 20, 2014 at 1:31 pm
Sir i just want to know about complete information of Installation,Testing & Commissioning of Electrical Equipment like
motor,generator, transformer, substation etcstep by step complete procedure.. pls help sir
Reply
pravincares says:
May 2, 2015 at 7:13 am
very useful informations.thanks