3, 2003 getting pricing right is a big deal. However, pricing is often an afterthought in
corporate strategy. If:
Profit = (Price Cost) *Unit Sales
There is often more emphasis on the Cost and Unit Sales parts of the profit equation than Price.
Price is seen as determined by the market or something we really dont have much control
over. Marketers with this reactive attitude typically miss great profit opportunities.
2. Further in the article (November-December 1976) Pricing Policies for New Products by Joel
Dean it is mentioned that how to price a new product is a top management puzzle that is too
often solved by cost-theology and hunch.
3. Taking clue from these few observations and also the test cases performed by the Colerick
Test and Fazio Construction, and giving credence to the belief of Thomas Simpson, Group
Manager that a curled metal set life of 10 times more than asbestos and a performance increase
of 20% were probably more reasonable, the price determination has been attempted as under the
Colerick Test & Fazio Construction.
Colerick Test:
Under this test the price of asbestos set was $50 and there were 20 number of set changes that
means it costed Colerick 50x20=$1000.
The time taken for affecting the changes was 20x20 minutes = 400 minutes 60 =6.4 hrs.
Average cost for real hour = 240x6=$1440.
So the price of the curled metal set has to be more than $1000, even if we do not take into
account the time saved / labor cost of $1440.
On the other hand, as per Simpson belief the price would be = 50x10=$500 + add 20%
performance increase (14405=288). So the total price would be $788.
to
$164
per
pad
and
$985
per
set.
Thus costing method the price per pad is $164 and by selling price method the cost price is $207.
Following the pricing method and keeping in view that this is an innovative product for which lot
of advertising and publicity and distribution markups will have to be provided, the right price can
be quoted as $250 per pad. Here it would be better to go with the equation Profit = (Price
Cost) *Unit Sales where price will also matter a lot.