Vous êtes sur la page 1sur 232

MGT 634

Purchasing and Supply


Management

Dr Atul Kanyalkar

The Course Objective


To
provide an overview of the Purchasing and Supply
Management (PSM) Function
understand the processes, procedures and policies
followed in PSM
provide a brief understanding about PSM functionalities in

ERP systems
provide the information about the tools and trends in PSM.

MGT634 Purchasing and Supply


Management

At the end of this course


You will be able to

Appreciate the significance of PSM function in


an organization

Appreciate relevance of various processes


followed in PSM function

Understand relevance of ERP in PSM.


MGT634 Purchasing and Supply
Management

Procurement-Production-Distribution System
Supplier 1
Selling
Location 1

Port
Supplier 2

Manufacturing Plant

Selling
Location 2

Supplier 3
Selling
Location 3

Inbound logistic or Procurement

Production

MGT634 Purchasing and Supply


Management

Outbound logistic or
Distribution

Supply Chain
Selling
Location 1

Port 1

Own
Manufacturing Plant 1

Selling
Location 2
Selling
Location 3

Supplier 1

Supplier 2

Port 2

Procurement

TP
Manufacturing Plant 2
LL
Manufacturing Plant 3

Production

HUB

Stockiest
Retailer
Selling
Location 4
Selling
Location 5
Selling
Location 6

Distribution

The syllabus
1.
2.
3.
4.
5.
6.
7.
8.
9.

PSM Concepts
Staging Policies and PSM
Purchasing Process
Make or buy decisions
Purchase Negotiations
Ethics in Purchasing
Legal Aspect in Purchasing
EDI and e-sourcing
Vendor development and evaluation
MGT634 Purchasing and Supply
Management

The syllabus
10. Vendor Managed Inventory
11. Vendor Performance Measurement
12. Capital Equipment Purchasing
13. Service Sourcing
14. Multi-Location Procurement Problem
15. Purchasing Functionality in ERP
16. Business Planning
17. Supplier Certification
MGT634 Purchasing and Supply
Management

The syllabus
18. Material Storage and Warehouse
Activities
19. Warehouse Utilization
20. Safety and Security Aspect
21. Obsolescence
22. Disposal of scrap
23. Material Handling
24. ERP in Warehouse
25. New Product Development
MGT634 Purchasing and Supply
Management

References
1.
2.

3.

4.
5.

Dobler D. W. and Burt D. N., Purchasing and supply


management, Tata McGraw-Hill Publishing company, 1996.
Monczka R., Trent R. and Handfield R., Purchasing: An
integrated supply chain approach, South-western Cengage
Learning. 2005.
Coyle J.J., Bardi E.J. and Langley(Jr.) C.J., The management
of business logistics, 7th ed., South-western Cengage
Learning, 2003.
Tony Arnold J.R. and Chapman S.N., Introduction to
Materials Management, 5th ed., Pearson Education, 2004.
Cases and papers provided time to time
MGT634 Purchasing and Supply
Management

Class Discipline
Attendance

Class timings (attendance will be taken at


the beginning)
Audit Attendance and minimum passing
criterion
Academic Dishonesty
MGT634 Purchasing and Supply
Management

Course Evaluation
1. Assignments (30%)
Case Analysis / Paper Reviews (Group & Individual) :

Tests

[30%]

(70%)

1. Mid-term test & class tests:

[20%] *

2. End-term Test:

[50%] *

* Closed Book
MGT634 Purchasing and Supply
Management

Teaching Sequence

Sep

Oct

Mon

Tue

Wed

Thu

Fri

3
10
17
24
1
8
15
22
29

4
11
18
25
2
9
16
23
30

5
12
19
26
3
10
17
24
31

6
13
20
27
4
11
18
25
1

7
14
21
28
5
12
19
26
2

MGT634 Purchasing and Supply


Management

Sat
1
8
15
22
29
6
13
20
27
3

Sun
2
9
16
23
30
7
14
21
28
4

Introduction to Purchasing and


Supply Management

Purchasing Supply Management : Terms


2nd Tier
Supplier

1st Tier
Supplier

Purchasing

Manufact. &
Distribution

Marketing

Customer

Value Chain Management

Supply Chain Management

Demand Chain Management


Business Logistics

Logistics Management
Purchasing and Supply Management Physical Distribution

MGT634 Purchasing and Supply


Management

Purchasing and Supply Management :


Definitions
Supply Management
It is the process responsible for the development and
management of a firms total supply system for both internal
and external components.

Purchasing
The purchasing function comprises of the essential activities
associated with the acquisition of the materials, services, and
equipments used in the operation of an organization.

MGT634 Purchasing and Supply


Management

Objectives

Support Production
Reduce Cost Of Materials
Ensure Consistent Quality
Reduce Inventory Investment
Improve Corporate Image Supplier Relations
Maintenance of Records
Preserve and Conserve Materials in Stock
Improve Competitive Strength
MGT634 Purchasing and Supply
Management

Purchasing and Supply Management


Activities
Materials Planning and Scheduling
Make or Buy
Procurement (materials, equipments, tools,
supplies and services)
Transportation
Warehousing
Salvage and Scrap Disposal

MGT634 Purchasing and Supply


Management

Importance
Purchasing and Supply Management can have a major
impact on organization success by influencing:

Cost
Quality
Sales
Profits
Product development
time

Technologies and
innovation
Customer service
Competitive
advantage

MGT634 Purchasing and Supply


Management

Why Purchasing is Important


Industry

Materials/Sales Revenue

Petroleum
Automobile
Wood Products
Textile Mills
Food Manufacturing
Machinery
Electrical Equipment
Computers and electronics

76%
70%
61%
59%
59%
50%
49%
44%

MGT634 Purchasing and Supply


Management

Why Purchasing is Important


Purchasing as a profit producer
Profit =

Revenues

Cost

Impact of Purchasing on Revenues

Impact of Purchasing on costs

Profit

= Revenues -

MGT634 Purchasing and Supply


Management

Cost

Why Purchasing is Important


Profit-Leverage Effect
Assuming an 8% margin
Profit (Rs 100,000)

Profit (Rs 100,000)

= Revenues -

= Revenues

Cost

(Rs.1,250,000)

(Rs 100,000)

Cost

THEREFORE, in this example, the Profit-Leverage


Effect is . . . 1,250 ,000
1

100 ,000

12 .5

MGT634 Purchasing and Supply


Management

0.08

Costs Involved

Basic Cost Of Materials


Government Levies And Taxes
Ordering Cost
Inventory Carrying Cost
Packaging And Packing Cost.
Material Handling Cost
Freight Cost
Insurance Cost
Wastage During Receipt , Storage etc.
MGT634 Purchasing and Supply
Management

Interdepartmental Relations
Production
Sales And Marketing
Finance
Research And Development
Engineering
Quality Control
Planning
Legal
Security
MGT634 Purchasing and Supply
Management

Purchasing and Supply Management


Procurement
Material
Source
Price
Quality
Quantity
Time
Place
MGT634 Purchasing and Supply
Management

Purchasing and Supply Management


Storage
Receive
Store
Track

MGT634 Purchasing and Supply


Management

Purchasing and Supply Management


Usage / Issue
Material
Sequence
Price
Quality
Quantity
Time
Place
MGT634 Purchasing and Supply
Management

Purchasing and Supply Management


Procurement

Storage

Usage
MGT634 Purchasing and Supply
Management

Recap
Introduction
Defn
Objectives
Activities
Importance
Costs

Procurement / Storage / Usage

MGT634 Purchasing and Supply


Management

Classification Of Materials
Large number of materials.
Planning, Procurement, storage, accounting of
so many materials is a Problem.

Common procedures for Planning, Control,


storage, issue, accounting for all materials
MGT634 Purchasing and Supply
Management

Basis Of Classification
Stage of conversion Process
Direct (Raw materials / WIP etc)
Indirect

Nature of Material
Finished goods
Semi-finished goods

etc.

MGT634 Purchasing and Supply


Management

Staging Policies
Staging Policies
Engineer to Order

Make to Order

Assemble to Order

Make to Stock

Design

Purchase

Manufacture

Assemble

Ship

Purchase Inventory

Manufacture

Assemble

Ship

Assemble

Ship

Assemble Inventory

Ship

Purchase Inventory Manufacture

Purchase Inventory

Inventory

Manufacture

Engineer to order

No stock at all. The purchase and order of materials takes place based on the specific
customer order. E.g. construction companies and shipyards.

Make to order

Only raw materials and components are kept in stock. Every customer is a specific
project. E.g. beer and lemonade cans, basic construction materials

Assemble to order

Only systems elements, modules or subassemblies are in stock at the manufacturing


center, whereas final assembly takes place based on a specific customer order.
E.g. cars, computers.

Make to stock

Finished products are kept in stock at the end of the production process and are
from there shipped to geographically dispersed customers. E.g. dairy
products.
MGT634 Purchasing and Supply
Management

Staging Policies
Staging Policies
Engineer to Order

Make to Order

Assemble to Order

Make to Stock

Design

Purchase

Manufacture

Assemble

Ship

Purchase Inventory

Manufacture

Assemble

Ship

Assemble

Ship

Assemble Inventory

Ship

Purchase Inventory Manufacture

Purchase Inventory

Inventory

Manufacture

Engineer to order

Procurement (?), Storage (?), Issue (?)

Make to order

Procurement (?), Storage (?), Issue (?)

Assemble to order

Procurement (?), Storage (?), Issue (?)

Make to stock

Procurement (?), Storage (?), Issue (?)

MGT634 Purchasing and Supply


Management

Procurement Process

1. Need

Major elements of the purchasing system

2. Make
or Buy

3. Purchase
requisitions

Make

4. Supplier selection

Article file

5. Quotation

Contract file
Supplier file

6. Order processing

11. Non-acceptance:
return to supplier

7. Order monitoring and


expediting

10. Supplier
evaluation

8. Incoming inspection
and quality control

9. Invoice
processing

MGT634 Purchasing and Supply


Management

Staging Policies
Staging Policies
Engineer to Order

Make to Order

Assemble to Order

Make to Stock

Design

Purchase

Manufacture

Assemble

Ship

Purchase Inventory

Manufacture

Assemble

Ship

Assemble

Ship

Assemble Inventory

Ship

Purchase Inventory Manufacture

Purchase Inventory

Inventory

Manufacture

ETO (for each materials)


Requirement Generation
Receiving and analysing PR
Supplier selection
Right price
PO
Follow up
Receiving and accepting
Invoice approval and payment
MGT634 Purchasing and Supply
Management

Staging Policies
Staging Policies
Engineer to Order

Make to Order

Assemble to Order

Make to Stock

Design

Purchase

Manufacture

Assemble

Ship

Purchase Inventory

Manufacture

Assemble

Ship

Assemble

Ship

Assemble Inventory

Ship

Purchase Inventory Manufacture

Purchase Inventory

Inventory

Manufacture

MTS (for most materials)


Supplier selection
Right price
Requirement Generation
Receiving and analysing PR
PO
Follow up
Receiving and accepting
Invoice approval and payment
MGT634 Purchasing and Supply
Management

1. Need

Reorder point (Office


stationary)

Need

Lot size
Lead time
MPS / MRP (ETO, ATO, MTS)
Lot Size
Lead time
Dependent
Independent

Need

Optimization (ETO, ATO, MTS)


Lot Size
Lead time
Dependent
Independent
MGT634 Purchasing and Supply
Management

Project Plan (ETO)


Technical & Unique
requirements
Well defined
timelines

Capacity Plans (Machines)


Technical & Unique
requirements
Well defined
timelines
Strategic Plans (Services)
Long term decisions
Timelines can be
uncertain
Plan and mitigation
plan

2. Make or Buy Decisions

Make or Buy
Strategic decision.

Precisely what business do we


really want to be in, to maximize
the use of our core competencies

as we proceed into future.


MGT634 Purchasing and Supply
Management

Make or Buy
Economics: It is not always economical for the
companies to make all the materials used in its
manufacturing process.
Abilities / Technical skills
Capacities
Quality
Design protection
Assured supply

MGT634 Purchasing and Supply


Management

Make / Buy ? ?
Making
Lower production cost
Unreliable or unsuitable
suppliers
Assure adequate supply
(Quantity)
Utilize surplus labor
capacity
Obtain desired quality
Protect special design or
quality
Expected benefit in long
term

Buying

Lower acquisition cost


Inadequate capacity
Reduce inventory costs
Ensure alternative sources
of supply
Item is protected by a
patent or trade license

MGT634 Purchasing and Supply


Management

Make or Buy
Choosing between making or buying an item is largely
dependent on the Vertical Integration strategy of a company.
Vertical integration - developing the ability to produce goods
or services that are previously purchased
It can take the form of forward or backward integration.

MGT634 Purchasing and Supply


Management

Forward / Backward Integration

MGT634 Purchasing and Supply


Management

Planned Order

Planned Order
Opening
?? Period
Lead
??Time

Purchase Order
Specific Information

Purchase
Requisition

Planned order is used for visibility


MGT634 Purchasing and Supply
Management

Planned Order
General information

3. Purchase Requisitions

Purchase Requisition
XXX
Department

Purchase
Department

Supplier

Production

Warehouse

Formal communication
to Purchase department
to initiate procurement activities
and procure the material mentioned in the
requisition.
MGT634 Purchasing and Supply
Management

Purchase Requisition
The PR Should contain following information

Originator

Material Specification

Quantity and Unit of measure

Delivery date and place

Any other information

Signed (approved)

Account to be charged
MGT634 Purchasing and Supply
Management

4. Supplier Selection

Strategic Sourcing Plan


Discovery
Evaluation

Selection
Development
Management
MGT634 Purchasing and Supply
Management

Strategic Sourcing Plan


Engineer to Order
Make to Order
Assemble to Order
Make to Stock
MGT634 Purchasing and Supply
Management

Discovery
1. Supplies catalogue
2. Print media :Trade directories, trade
journals, news papers, yellow pages
3. Salespersons
4. Trade exhibition, fairs, conferences
5. Colleagues in similar field
6. Internet
..
MGT634 Purchasing and Supply
Management

Evaluation
Background
Informed

Surveys
Financial checks
Facility visits
Quality
Capacity
Management / Systems
IT Systems
-------MGT634 Purchasing and Supply
Management

Supplier Selection
Check the following
Whether the items were purchased earlier ?
(Straight rebuy)
Any change since then ? (Modified rebuy / new
buy)
Are the items similar / related to any other
item purchased ?
Can we replace the item by any other item
which we are currently purchasing ?
Are the items standard ?
MGT634 Purchasing and Supply
Management

Supplier Selection
Bidding

Negotiation

Value of Purchase
Clear specifications
Number of sellers available
Vendors interested in order
Time

Situations when cost


estimates are difficult
Price is only the only
important factor
Supplier may have better
knowledge then the buyer

Bidding and then negotiation


MGT634 Purchasing and Supply
Management

Overview of Vendor Selection Criteria

MGT634 Purchasing and Supply


Management

Prioritization Matrix
Weight

Score

Quality
Reliability
Capability
Financial

Others

Final result
MGT634 Purchasing and Supply
Management

Weighted
Score

Supplier Development
????????

-Alignment of systems
-Alignment of expectations
-Knowledge transfers
-------MGT634 Purchasing and Supply
Management

Managing Suppliers
Feedbacks
Situation recheck
Corrective actions
Realignment

MGT634 Purchasing and Supply


Management

Supplier Selection Issues

Size Relationship
Usage of International Suppliers
Competitors as Suppliers
Countertrade Requirements
Social Objective

MGT634 Purchasing and Supply


Management

Pricing

Sources of Price Information


Commodity Markets
Exists for basic materials (grain, oil,
sugar etc.)
Demand and supply
Long term prices
Price Lists
For standard products
Vendors catalog
Quantity discounts
available

Price

Price Quotations
For both Standard and
specialty items
Useful for promoting
competition
RFQ (Should contain the
manner in which supplier
should submit offers)
Specifications
Quantity
Period

Negotiations
For long term relationships or for high cost items
Time consuming Process
Can lead to significant quality and price benefits
MGT634 Purchasing and Supply
Management

Total Cost of Ownership


Acquisition Costs
Price
Planning costs
Duties
..
Ownership costs
Downtime costs
Risk
Cycle time
.
Post Ownership Costs
Warranty costs
Product Liability
..
Remember: As a purchasing Manager you should also focus
MGT634 Purchasing and Supply
on suppliers manufacturing
cost
Management

Paper Mill Case


Purchased Fabric Belt
12 FT X 60 FT (Circumference)
25000 USD
Lasts for 40 days
Belts break on the machine
Replacement takes 8 Hrs (16 man hours @ 45 USD per hour)
Per day downtime cost of the plant 100,000 USD
4 6 belts are kept in inventory
Industry average life of a belt is 60 days
Benchmark belt life span 470 days @ 500,000 USD
There are 20 plants across the world

MGT634 Purchasing and Supply


Management

Negotiations and e-Sourcing/Auctions


Negotiations

Purchase
requisitions

RFQ
/ Quotations

Supplier
Selection

E-Sourcing
/Auctions

MGT634 Purchasing and Supply


Management

Negotiations
/ Discussion

Learning Curve

Learning curve
Improvement in output due to learning
The learning rate represents productivity improvement
as production doubles.
Improvement in
Labour work style
Process modification
Product modification

Applicable when
New product / process
Complex product
Labour intensive
MGT634 Purchasing and Supply
Management

Learning curve
Cumulative Units
(N)

Total Labour Hrs


(A)

Avg Labour Hrs per


unit
(B)

Learning Rate (%)


(C)
= (Bn-1-Bn)/Bn-1

20

20

34

17

15.0

58

14.5

14.7

100

12.5

14.8

16

168

10.5

16.0

32

288

9.0

14.3

64

493

7.7

14.4

MGT634 Purchasing and Supply


Management

Quantity Discounts
Discounts on purchase of higher quantities
Tradeoff between
Discounts
Inventory carrying costs
Storage costs
Obsolescence costs

The order uncertainty getting transferred to


the buyer.
MGT634 Purchasing and Supply
Management

Quantity Discount

1 Unit @ $ 85
3 Units @ $ 80
6 Units @ $ 70
10 Units @ $ 69

Find Incremental price and units for the order


Incremental price per units
MGT634 Purchasing and Supply
Management

Quantity Discount

1 5 Unit @ $ 10 Each
6 10 Units @ $ 8 Each
11- 20 Units @ $ 7.8 Each
21- 100 Units @ $ 7.6 Each

Find Incremental price (for max order) and


units for the order.
Incremental price per units.
MGT634 Purchasing and Supply
Management

Negotiations

What Is Negotiation?
A process of formal communication,
either face-to-face or via electronic means,
where two or more people come together
to seek mutual agreement about an issue

or issues.
*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

MGT634 Purchasing and Supply


Management

What Is Negotiation?
Involves the

management of time,
information,

and power
between individuals and organizations who are

interdependent
*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

MGT634 Purchasing and Supply


Management

When Negotiation Required?

Is bid process inadequate?


Are many non-price issues involved?
Is contract large?
Are technical requirements complex?
Does contract involve plant, equipment or/and
customization?
Does contract involve a partnership?
Will supplier perform value-adding activities?
Will there be high risk or uncertainty?
*Purchasing & Supply Chain Management, Monczka, Trent, Handfield
MGT634 Purchasing and Supply
Management

Non-price Negotiation
Quality

Support

Specification compliance

Technical assistance

Performance compliance

Product research, development, and/or design

Test criteria

Warranty

Rejection procedures

Spare parts

Liability

Training

Reliability

Tooling

Design changes

Packaging

Supply

Data sharing, including technical data

Lead times

Transportation

Delivery schedule

FOB terms

Consignment stocks

Carrier

Expansion options

Commodity classification

Supplier inventories

Freight allowance/equalization

Cancellation options

Multiple delivery points

* From Leenders, Johnson, Flynn, and Fearon, Purchasing and Supply Management, Thirteenth Edition, McGraw Hill Irwin
MGT634 Purchasing and Supply
Management

Negotiation Strategy : Basic Steps


1.

Develop the specific objectives (outcomes) desired from the negotiation

2.

Gather pertinent data

3.

Determine the facts of the situation

4.

Determine the issues

5.

Analyze the positions of strength for both (or all) parties

6.

Set the buyers position on each issue, and estimate the sellers position
on each issue based on your research

7.

Plan the negotiation strategy

8.

Brief all persons on the negotiation team

9.

Conduct a dress rehearsal (Devils Advocate)

10. Conduct the actual negotiations with an impersonal calmness


11. Record the process and outcome
* From Leenders, Johnson, Flynn, and Fearon, Purchasing and Supply Management, Thirteenth Edition, McGraw Hill Irwin
MGT634 Purchasing and Supply
Management

Negotiation planning and execution

MGT634 Purchasing and Supply


Management

Game plan for Negotiation

* From Leenders, Johnson, Flynn, and Fearon, Purchasing and Supply Management, Thirteenth Edition, McGraw Hill Irwin
MGT634 Purchasing and Supply
Management

The Zone of Negotiation


Seller's Range
$220,000 $230,000 $240,000 $250,000 $260,000 $270,000 $280,000 $290,000 $300,000
Buyer's Range

The overlap between what the


Buyer will pay and what the
Seller will accept defines the

Zone of Negotiation

MGT634 Purchasing and Supply


Management

The Zone of Negotiation


$220,000 $230,000 $240,000
Buyer's Range

$250,000

$260,000

$270,000

Seller's Range
$280,000 $290,000

There is a gap between what the


Buyer will pay and what the Seller
will accept. There is NO DEAL
without Creativity or Compromise

MGT634 Purchasing and Supply


Management

$300,000

Sources of Negotiating Power


Informational power Access to information to be used for
persuasion using facts, data etc. (Only un/favorable is presented)

Reward power One party can offer something of value expecting


something in return. Give / Take.

Coercive power One party can withdraw something of value.


Legitimate power Position of the person
Expert power Special form of informational power
Referent power Personal qualities and attributes of individuals

*Purchasing & Supply Chain Management, Monczka, Trent, Handfield


MGT634 Purchasing and Supply
Management

Being an Effective Negotiator


Willing to compromise or revise goals
View issues independently
Establish upper and lower ranges for each major
issue
Explore additional options
Build on common ground between parties
Avoid making irritating comments
Avoid argumentation by presenting too many
reasons (quickly)
Make fewer counterproposals
*Purchasing & Supply Chain Management, Monczka, Trent, Handfield
MGT634 Purchasing and Supply
Management

Overcoming Tactics
Modify tactics when they dont work
Prepare for likely tactics to be used against
you
Tactics are more effective on you if you are
unprepared, stressed, under severe deadlines,
inexperienced, fatigued, or disinterested
Try not to react without thinking
*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

MGT634 Purchasing and Supply


Management

Influencing factors in Negotiations

Low ball / High ball


Honesty / Openness
Questions
Breaks
Trial Balloon
Price increase
Best and final offer
Silence
Planned concessions
Venue

*Purchasing & Supply Chain Management, Monczka, Trent, Handfield


MGT634 Purchasing and Supply
Management

Win-Win Negotiation
Win-lose competitive or distributive
bargaining
Win-win collaboration or integrative
bargaining
*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

MGT634 Purchasing and Supply


Management

Win-Win Methods

Expand the pie Ways to expand resources or value obtained


Logroll Tradeoff of disagreeing issues
Cost Cut Join hands in cutting costs and sharing benefits
Bridge Involves inventing new options to satisfy both parties
Non specific compensation One party achieves objective
other gets something of value as reward

*Purchasing & Supply Chain Management, Monczka, Trent, Handfield


MGT634 Purchasing and Supply
Management

Ethical Issues

Ethics
The set of moral principles or values guiding
our behavior
In business, ethical behavior is the use of
recognized social principles involving justice
and fairness
*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

MGT634 Purchasing and Supply


Management

Rules of Ethical Behavior


Buyers must commit their attention and
energies for the employers benefit rather than
their own
Buyers must act ethically towards suppliers and
potential suppliers
Buyers must uphold the ethical standards set
forth by the profession
*Purchasing & Supply Chain Management, Monczka, Trent, Handfield
MGT634 Purchasing and Supply
Management

Pressures Toward Unethical Behavior


Purchasing has control over large sums of
money.
Incentives linked to cost reduction.
Suppliers may have great pressure to meet
aggressive sales goals, leading to questionable
sales practices

*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

MGT634 Purchasing and Supply


Management

Risks of Unethical Behavior


The act may also be illegal
At a minimum, the buyer may lose his/her job
Personal bankruptcy
Jail

There is a risk to a buyers professional


reputation
Risk to the buying companys reputation
*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

MGT634 Purchasing and Supply


Management

Types of Unethical Behavior


Reciprocity Preferential treatment to suppliers who
are also customers to the organization.
Personal buying Purchasing for personal needs of the
employees.
Accepting supplier favors Gifts and favors.
Sharp practices Misrepresentation just short of fraud.
Financial conflicts of interest investment in other
companies.
*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

MGT634 Purchasing and Supply


Management

Reciprocity
Giving preferential treatment to suppliers who
are also customers
Restrain competition
Must rely on legitimate performance criteria
to evaluate supplier capability

MGT634 Purchasing and Supply


Management

Personal Buying
Purchasing department purchases materials or
goods for the personal needs of its employees
Subject to trade diversion laws
Some exceptions do exist
Often a gray area as to what to do

MGT634 Purchasing and Supply


Management

Accepting Supplier Favors


Accepting gifts
May effect a buyers judgment
At what point does the gift represent showing
appreciation vs. and attempt to influence
future buying behavior
Gifts from potential suppliers are particularly
questionable

MGT634 Purchasing and Supply


Management

Sharp Practices
Willful use of misinformation
Exaggerating problems
Requesting bids from unqualified suppliers
solely to drive down prices from qualified
suppliers
Gaining information unfairly through
deception

MGT634 Purchasing and Supply


Management

Sharp Practices
Sharing information on competitive
quotations
Not compensating suppliers for design or
other work
Taking unfair advantage of a suppliers
financial situation
Lying or misleading

MGT634 Purchasing and Supply


Management

Financial Conflicts of Interest


Direct financial interest in a supplier company
Buying companies typically require disclosure
by buyers having significant personal financial
interest
Similar to insider knowledge in buying and
selling stocks

MGT634 Purchasing and Supply


Management

Behaviors
Maintain highest standard.
No gifts / favors
Slow but steady

Remember: These are digital decisions in


terms of actions and occurrences
MGT634 Purchasing and Supply
Management

Cases
Gift delivered at home ?
Equipment purchased higher then the normal
price ?
Unwanted equipment purchased ?

MGT634 Purchasing and Supply


Management

Cases
You joined a new company and found that
some of the employees are suppliers.
Find other employees accepting / demanding
gifts from suppliers

MGT634 Purchasing and Supply


Management

Legal Aspects

Contract Terms
Ex-works: In an ex-works contract, the purchaser
accepts full responsibility for arranging
transportation from the suppliers location.
For Purchaser this involves:
Arranging transportation, insurance, and documentation
to move the goods to the required source port (air or
sea)
Have them loaded on to the mode of transport
Transported to, and unloaded at the destination port
Cleared through customs and transported to the
purchasers location.
MGT634 Purchasing and Supply
Management

Contract Terms
Free alongside (FAS): In this arrangement, the supplier
agrees to deliver to the (source) port specified by the
purchaser
For Supplier this involves
Arranging transportation, insurance, and documentation
to move the goods to the required source port (air or sea)

For Purchaser this involves


Have them loaded on to the mode of transport
Insured, transported to, and unloaded at the destination
port
Cleared through customs and transported to the
purchasers location.
MGT634 Purchasing and Supply
Management

Contract Terms
Free on board (FOB): Here the supplier pays for and
arranges loading on to the outward-bound
transportation and thereafter the purchaser becomes
responsible.
For Supplier this involves
Arranging transportation, insurance, and documentation
to move the goods to the required source port (air or sea)
Have them loaded on to the mode of transport

For Purchaser this involves


Insured, transported to, and unloaded at the destination
port
Cleared through customs and transported to the
purchasers location.
MGT634 Purchasing and Supply
Management

Contract Terms
Cost and Freight (C&F): This is a split responsibility
arrangement in that the supplier arranges and pays for
transportation to an agreed point,
For Supplier this involves
Arranging transportation, insurance, and documentation
to move the goods to the required source port (air or sea)
Have them loaded on to the mode of transport
Transported to, and unloaded at the destination port

For Purchaser this involves


Pay insurance from when the goods are loaded on board.
Cleared through customs and transported to the
purchasers location.
MGT634 Purchasing and Supply
Management

Contract Terms
Cost, Insurance, and freight (CIF): This is similar to C&F
But here the insurance during transportation is
responsibility of the supplier.
For Supplier this involves
Arranging transportation, insurance, and documentation
to move the goods to the required source port (air or sea)
Have them loaded on to the mode of transport
Insured, transported to, and unloaded at the destination
port

For Purchaser this involves


Cleared through customs and transported to the
purchasers location.
MGT634 Purchasing and Supply
Management

Contract Terms
Delivered: This is the opposite of ex-works in that the
supplier has total responsibility for the goods, their
transportation, insurance, and all documentation until
they are delivered to the purchaser.
For Supplier this involves
Arranging transportation, insurance, and documentation
to move the goods to the required source port (air or sea)
Have them loaded on to the mode of transport
Insured, transported to, and unloaded at the destination
port
Cleared through customs and transported to the
purchasers location.
MGT634 Purchasing and Supply
Management

Contract Terms

MGT634 Purchasing and Supply


Management

Contract Terms
Supplier
Transport

Port

Ship

Supplier
Purchaser

Ex Works
Insurance

Supplier
Purchaser

Transport

Supplier
Purchaser

Free Alongside
Insurance

Supplier
Purchaser

Transport

Supplier
Purchaser

Free On Board
Insurance

Supplier
Purchaser

Transport

Supplier
Purchaser

Cost and Freight


Insurance

Supplier
Purchaser

Transport

Supplier
Purchaser

Cost Insurance
and Freight
Insurance

Supplier
Purchaser

Transport

Supplier

Purchaser

Delivered
Insurance

Supplier
Purchaser

MGT634 Purchasing and Supply


Management

Transit

Ship

Port

Purchaser

EDI and E-Sourcing

Groups and cases


Metal craft (12 Oct)
E Sourcing strategy (13 Oct)
Bose (19 Oct)
Multisite case (20 Oct)
MGT634 Purchasing and Supply
Management

Types of e-Procurement
1. Web-based ERP (Electronic Resource Planning): Creating and
approving purchasing requisitions, placing purchase orders and
receiving goods and services by using a software system based on
Internet technology.
2. e-MRO (Maintenance, Repair and Operating): The same as webbased ERP except that the goods and services ordered are nonproduct related MRO supplies.
3. e-sourcing: Identifying new suppliers for a specific category of
purchasing requirements using Internet technology.
4. e-tendering: Sending requests for information and prices to
suppliers and receiving the responses of suppliers using Internet
technology.
5. e-reverse auctioning: Using Internet technology to buy goods and
services from a number of known or unknown suppliers.
6. e-informing: Gathering and distributing purchasing information
both from and to internal and external parties using Internet
technology.
MGT634 Purchasing and Supply
Management

Reverse Auctions
When possible ?

Requirements ?

Steps ?

MGT634 Purchasing and Supply


Management

Reverse Auctions
Problems ?

MGT634 Purchasing and Supply


Management

Electronic Data Interchange


The EDI (Electronic Data Interchange) enables
customers and suppliers to electronically exchange
transaction information such as PO, invoices, and

MRP.
Simplifications: This eliminates time consuming
paperwork and facilitate easy communication
between buyer and supplier
MGT634 Purchasing and Supply
Management

Electronic Data Interchange


External Supplier
RPM Supplier
E-mail to the supplier
Uploading the information on the portal

Subcon / TPM
E-mail to the supplier
Uploading the information on the portal
Linkage through ERP system

Internal Supplier
Intercompany
E-mail to the supplier
Linkage through ERP system

MGT634 Purchasing and Supply


Management

Electronic Data Interchange


Purchaser: Requirement generation
Purchaser: Scheduled line is generated against blanket order /
Scheduling agreement and sent to the supplier and accounts
electronically
Supplier: receives and acknowledges the order.
Supplier: sends the shipping notification while dispatching the
material.
Purchaser: records the shipping notification in expected
receipt file.
Purchaser: on receipt of the material the entry is made
against expected receipt and the scheduling line and an
intimation is sent to accounts payable.
Purchaser: accounts payable dept electronically transfer the
payment to the suppliers account.
Purchaser: sends remittance advice to the supplier.
MGT634 Purchasing and Supply
Management

Electronic Procurement
Disadvantages
Security of electronic messages
Lack of face-to-face contact
Other technological concerns
Standard protocols
System reliability

MGT634 Purchasing and Supply


Management

Purchasing

Purchasers Duties
Know the market for their commodities; ascertaining
price
Understand the laws (tax, contract, patent)
Process purchase requisitions and quotation requests
Make supplier selections
Negotiate prices and conditions of sale
Place, follow-up, expedite purchase orders
Supplier relations
Maintain ethical behavior

Do you see any problem


MGT634 Purchasing and Supply
Management

Strategic Sourcing and Planner Buyer


Strategic Sourcing

Know the market for their commodities; ascertaining price


Understand the laws (tax, contract, patent)
Make supplier selections
Supplier relations
Negotiate prices and conditions of sale
Maintain ethical behavior

Planner Buyer

Determine material requirements


Generate purchase requisitions, PO and schedules.
Issue and controlling Shop orders for factory
Place, follow-up, expedite purchase orders
Maintain ethical behavior
MGT634 Purchasing and Supply
Management

6. Order Processing

Purchase Order
Significance
Parts of PO

MGT634 Purchasing and Supply


Management

Purchase Order.
The PO is a legal offer to purchase.
Once accepted by supplier it becomes a legal
contract for delivery of goods according to the
terms and conditions specified in the purchase
agreement.

MGT634 Purchasing and Supply


Management

Major Parts of a P.O.

Fixed prices and quantities (including taxes)


Buyers right of inspection and rejection
Right to make specification/design changes
Holding buyer harmless, patent infringement
Suppliers right to assign contract to a third party
Instructions regarding risk of loss
Statement of credit and payment terms
Identification
Packing and preparation
Statements of warranty
MGT634 Purchasing and Supply
Management

Major Parts of a P.O.

Shipment quantities, dates and place


Assignment of sellers rights
Arbitration clause
Right to cancel unshipped portion
And other relevant information etc.

MGT634 Purchasing and Supply


Management

7. Order Monitoring and


Expediting

Order Monitoring and Expediting


Significance

MGT634 Purchasing and Supply


Management

Follow-up (Including expedite and de-expediting)


Supplier is responsible for delivery.
Purchase department is responsible for
ensuring the delivery.
Follow-up is required for
Changes in the plans
IRA issues
QA issues in previous delivery
Product structure change
etc.
MGT634 Purchasing and Supply
Management

8 Incoming Inspection and


Quality Control

Incoming Inspection and Quality


Control
Significance

MGT634 Purchasing and Supply


Management

Receiving
Warehouse is responsible for receiving the
goods. They should confirm
Item
Quantity
Place
Absence of transit damage
Open Purchase Order
Delivery due date
Provide acknowledgement.
MGT634 Purchasing and Supply
Management

Receiving

Mark the goods


Store the goods
Operate information system
Communicate to QA and other concerned
departments

MGT634 Purchasing and Supply


Management

Self Certification

Self Certification
Significance
Where to use
Staging policies
Lot size and consumption
Stocking policies

MGT634 Purchasing and Supply


Management

Supplier Self Certification


Companies spend a large amount of money on
quality inspection of incoming material
This is time consuming and complicated.

Supplier self certification is therefore very useful.


In this supplier certifies and assures that the quality
of the material is as per the company standard.
Cost implication ?
MGT634 Purchasing and Supply
Management

Supplier Self Certification


STEPS
Agreeing upon common Specs.
Process Parameter standardization.
Vendor audits and Inputs.
Trial Lots.
Roll out.

MGT634 Purchasing and Supply


Management

9. Invoice Processing

Invoice Processing
Significance
Factors to be considered

MGT634 Purchasing and Supply


Management

Payment
Accounts is responsible for payment (after QA release
of the received material).
Three way reconciliation
Suppliers invoice
PO
Received quantity

To confirm
Conditions
Prices
Quantities

The accounts should be very efficient and accurate


MGT634 Purchasing and Supply
Management

10. Supplier Evaluation

Supplier evaluation
Why
Better decision making
Better communication
Feedback
Motivate and direct behavior

Problems
Too much data
Wrong measures
Conflicting measures
Drive wrong performance
MGT634 Purchasing and Supply
Management

Performance Measurement - Importance

Systematizes organizational memory


Pool information across plants
Remove excuse for poor quality
Ensure consistent policies across supplier and
plants
To identify the supplier performance and
improvement opportunities.
Helps in decision making.
Negotiations
Resource allocations etc.
MGT634 Purchasing and Supply
Management

Performance Measurement

Characteristics of good performance measure


The measurement should be usable.
Without any scope for adjustment
Communicate / Agreed
Simple to measure

MGT634 Purchasing and Supply


Management

Measures
Measures Must Be ...
Strategically Significant
Driving Right
Behaviors
Balanced
Aligned
Owned
Linked to Compensation
Actionable
Easy to Collect
MGT634 Purchasing and Supply
Management

Balance
Balance is Assessed and Viewed Across Three Specific Dimensions:
1. Financial v. Customer v. Process v. People
2. Leading v. Lagging
3. Efficiency v. Effectiveness

Why Does Balance In These Dimensions Matter?

1. Complete Business Perspective


2. Causality
3. Cost (Time, Resources, Investment) & Quality
MGT634 Purchasing and Supply
Management

Balanced Measures
Example Measure Set

F-C-P-P [1]

Leading v.
Lagging

Effective v.
Efficient

Percent Sales from New Products

Financial

Lagging

Effectiveness

Net Trade Sales Total Growth

Financial

Lagging

Effectiveness

NPV of NPD Pipeline (NPDC Data)

Financial

Leading

Effectiveness

Market Share (TRx)

Customer

Lagging

Effectiveness

Line Item Fill Rate

Process

Lagging

Effectiveness

Percent Growth of Net Trade Sales


from Existing Products

Financial

Lagging

Effectiveness

Manufacturing Compliance Index

Process

Lagging

Effectiveness

Adverse Events/Product (Top 5 Products)

Customer

Lagging

Effectiveness

S/G&A Productivity

Process

Leading

Efficiency

R&D Productivity

Process

Leading

Efficiency

Resource Alignment Index

People

Leading

Effectiveness

Percent Critical Positions Filled

People

Leading

Effectiveness

[1] Financial v. Customer v. Process v. People (from The Balanced Scorecard)

MGT634 Purchasing and Supply


Management

Acceptable/
Satisfactory

Caution/
Additional
Work Reqd.

Unacceptable;
Additional
Work Reqd.

Balanced Process Measures


Suppliers
S-1
S-2
S-3

Leading

Inputs

Process

O-1
O-2
O-3

I-1
I-2
I-3

Input
Measures

Process
Measures

Lagging
Effectiveness
Efficiency

Outputs

Outcome
Measures

X
X

X
X
MGT634 Purchasing and Supply
Management

Customers
C-1
C-2
C-3

The Operational Definition


A Precise Description that communicates how to arrive at a value for
an objective.
Identifies Who, What, Where, When, How
Who = Measure Owner
What = What to Measure (Clear, Specific, Objective)
Where = Where the Measure Data Resides
When = When Measured & Reported
How = How to Measure (Mathematical Formula) (Longer
Term)

Measure Playbook
Not all of the Measure Playbook attributes need to be
defined at the same time its okay to let them mature as the
MGT634 Purchasing
Supply
measure
focus and
matures.
Management

A Well-Dressed Measure

Clean Data Display, Control Limits,


Mean, and Trend Line and Goal

Quick Reference Legend


I.E. Trend Up = Good

4
2

Title

Data Legend and


Chart and Data
Owner Information,
Update Frequency

Description,
Explanation, and
Action Plan
MGT634 Purchasing and Supply
Management

Performance Measurement
SP = Wi X Pi

Wi Weight attached to the performance


characteristic i
Pi Performance of characteristic I
It can be

Quality (material / documentation )


Delivery
Quantity
Flexibility
Technical Contribution etc.

Or treat individual performance characteristic


separately.
MGT634 Purchasing and Supply
Management

Measures Implementation

Drive down from OGSM


Develop specific measures
Identify the base line data
Finalize details
Communicate and implement
Measure and identify projects.

MGT634 Purchasing and Supply


Management

Measures
Engineer to order
Make to order

Assemble to order
Make to stock

MGT634 Purchasing and Supply


Management

11 Non Acceptance Return to


Supplier

Return to supplier
Based on the PO
Local / Imported
Rework / Destroy
Credit note

MGT634 Purchasing and Supply


Management

Others

Multi-location problem

MSPPDS: Multi-Site Procurement Production


Distribution System
Selling
Location 1

Manufacturing Plant 1

Port 1

Selling
Location 2
Selling
Location 3

Supplier
Selling
Location 4

Manufacturing Plant 2

Port 2

Selling
Location 5
Selling
Location 6

Inbound logistic or Procurement

Production

Outbound logistic or
Distribution

-Alternate sourcing for manufacturing and selling locations


-Opportunities for reduction in costs and improved availability
represented by solid and dotted lines.
MGT634 Purchasing and Supply
Management

MSPPDS: Multi-Site Procurement Production


Distribution System
Selling
Location 1

Manufacturing Plant 1

Port 1

Selling
Location 2
Selling
Location 3

Supplier
Selling
Location 4

Manufacturing Plant 2

Port 2

Selling
Location 5
Selling
Location 6

Inbound logistic or Procurement

Production

Outbound logistic or
Distribution

-Alternate sourcing for manufacturing and selling locations


-Opportunities for reduction in costs and improved availability
represented by solid and dotted lines.
MGT634 Purchasing and Supply
Management

EXTENT OF CONTROL
Centralized v/s Decentralized Purchase
Centralized
- Ease Of Operation, buyer specialization, Less ordering
cost, control.

- Consistency
- Better Pricing, more clout, better continuity
- Better Maintenance Of Records

MGT634 Purchasing and Supply


Management

EXTENT OF CONTROL
Decentralized
- Better Time To React
- Developing Local Vendors
- Better Control On Local Vendors
- Close Co-ordination with Plant

MGT634 Purchasing and Supply


Management

Optimization

GLPK
Path command
Program file / Data file
Set / Param / Var / Min / Max / s.t. / end.

MGT634 Purchasing and Supply


Management

Simulation
Random parameters interacting with each
other.
Arena
Vensim / Stella

MGT634 Purchasing and Supply


Management

Purchasing Functionality of ERP

ERP - What is it?


ERP is a generic term used to describe a
comprehensive information system designed to
integrate all the business processes found in an
enterprise.
Efficiency and productivity are improved through
the integration of information and the removal of
duplicate information and processes.

MGT634 Purchasing and Supply


Management

MRP OVERVIEW

MGT634 Purchasing and Supply


Management

MRP RUN

MGT634 Purchasing and Supply


Management

PLANNING FILE AND MRP

MGT634 Purchasing and Supply


Management

PLANNING SEQUENCE

MGT634 Purchasing and Supply


Management

BOM EXPLOSION

MGT634 Purchasing and Supply


Management

MRP: NET REQUIREMENT CALCULATION

MGT634 Purchasing and Supply


Management

LOT SIZING PROCEDURES

MGT634 Purchasing and Supply


Management

MRP SCHEDULING

MGT634 Purchasing and Supply


Management

STATIC LOT SIZING PROCEDURES

MGT634 Purchasing and Supply


Management

PERIOD LOT SIZE PROCEDURE

MGT634 Purchasing and Supply


Management

Safety stock
Fixed safety stock
Range of coverage
Safety days

MGT634 Purchasing and Supply


Management

Purchasing master Data


Vendor master (at client level)
Information about the vendor.

Source list (at Plant level)


The master which links a material to a vendor for a
period.

Purchase Info Record (at Plant level)


The master containing pricing and other information
of the material if sourced from a particular vendor
(This data gets adapted while converting PR to PO)
MGT634 Purchasing and Supply
Management

Purchasing master data


Outline agreement
The agreement against which scheduled lines are
generated.

MGT634 Purchasing and Supply


Management

Process
Sourcelist

Purchase
Requisition of a
material

Vendor
Purchase
Info Record /
Scheduling
Agreement
Quality UD

Payment

PO/ Scheduled
Line
Follow-up
Receipt

MGT634 Purchasing and Supply


Management

Business Planning in an ERP


system

Business Planning in an ERP System


Once a year activity
Based on the Business Plan for the next
periods.
To arrive at
Annual production plans
Standard costs
Machine loadings
Annual Purchase volumes
MGT634 Purchasing and Supply
Management

Business Planning in an ERP System


The output is used to
Arrive at the variances during the year.
Bargain with supplier
Decide on the focus cost improvement ideas

MGT634 Purchasing and Supply


Management

Business Planning in an ERP System


1. The business plan is uploaded in System in a
scenario.
2. Master data is corrected in the scenario.
3. MPS orders for the Business Plan are generated
4. Machine loading is checked to make appropriate
corrections are made.
5. MRP is generated for the entire period using
appropriate assumptions
6. Total consumptions is checked.
MGT634 Purchasing and Supply
Management

Material Storage

Why Storage is required ?


Material
Handling

Inventory
Material Storage

IRA

Pilferage
SLOB

MGT634 Purchasing and Supply


Management

Is it only a storage facility?


A warehouse is typically viewed as a place to
store inventory.
However, in many logistical system designs,
the role of the warehouse is more properly
viewed as a switching facility as contrasted to
a storage facility.
Value Addition?
MGT634 Purchasing and Supply
Management

Storage
Objective
Minimize costs
Maximize customer service

This is achieved by
Timely customer service
Keep track of the items
Minimize total physical efforts
Provide requisite communication
MGT634 Purchasing and Supply
Management

Storage Costs
Costs
Capital costs
Space
Material handling equipments
Etc.

Operating costs
Labor costs
Etc.

MGT634 Purchasing and Supply


Management

Warehouse Activities
Receive goods

Check the goods against order and Bill of lading


Check the quantities
Check for damage
Inspection if necessary

Identify the goods


Dispatch to storage
Hold goods
Pick
Marshal shipment
Dispatch
Operate Information system
MGT634 Purchasing and Supply
Management

Benefits of Warehousing

Consolidation
Break bulk
Processing
Postponement
Stockpiling

MGT634 Purchasing and Supply


Management

Warehouse Location

Warehouse Location
Modeling the supply chain, J F Shapiro (pp 143)

MGT634 Purchasing and Supply


Management

Warehouse Location
Objective / Constraints
Modeling the supply chain, J F Shapiro (pp 143)

Objective: Minimization of transportation cost and fixed


and variable costs for warehouse
Warehouse Capacity (Supply plan <= Operating Capacity)
Transfer Quantity (Transferred quantity from warehouse <= operating
capacity of warehouse)

Demand Satisfaction (Transferred quantity to CFA >= Demand of CFA)


Unique Channel Matrix (All product demands of a CFA to be
satisfied by one warehouse)

MGT634 Purchasing and Supply


Management

Channel matrix definition


Objective / Constraints
Objective: Minimization of transportation cost
Manufacturing Capacity (Production plan <= Mfg Capacity)
Transfer Quantity (Transferred quantity from plant <= Production plan at
plant)

Demand Satisfaction (Transferred quantity to CFA >= Demand of CFA)


Unique Channel Matrix (All product demands of a CFA to be
satisfied by one manufacturing plant)

MGT634 Purchasing and Supply


Management

Warehouse Layout

Design Considerations in Warehousing


General considerations
Quantity and character of goods must be known
product profiling
Know the purpose to be served
Storage
Distribution
Cross-docking

MGT634 Purchasing and Supply


Management

Warehousing Trade-offs

Fixed / variable slot locations for merchandise


Build out (horizontal) / build up (vertical)
Order-picking / stock-replenishing functions
Two-dock / single-dock layout
Labor-intensive / mechanization / automation
Space devoted to aisles / space devoted to
storage

MGT634 Purchasing and Supply


Management

Warehousing Trade-offs
Paperless warehousing / traditional paperoriented warehousing operations
Virtual warehouse / real warehouse
Other space needs
Retail store rooms

MGT634 Purchasing and Supply


Management

Warehouse

Pallet Positions

(Refer Tony Arnold)

Number of pallet positions on ground required


1. Per pallet = 30 Cartons
2. For storing 13000 Cartons

3. Number of pallets required = 13000/30 =


433.33 = 434 Pallets
4. Three high placement
5. 434 / 3 = 144.67 = 145 pallet positions
MGT634 Purchasing and Supply
Management

Accessibility
Being able to get at the goods wanted with
minimum amount of work (directly)
1. Industry

2. Expiry periods
3. Fifo / Lifo etc

MGT634 Purchasing and Supply


Management

Cube utilization

(Refer Tony Arnold)

Use of space horizontally and vertically


Number of pallets actually stored / Maximum
number of pallets can be stored

Accessibility vs. Cube utilization

MGT634 Purchasing and Supply


Management

Stock Location

Functionally similar items together


Fast moving / slow moving
Physically similar items
Working stock and reserve stock

MGT634 Purchasing and Supply


Management

Stock Location
Point of usage
Central storage
Fixed location
Advantages / disadvantages

Floating location
Advantages / disadvantages

MGT634 Purchasing and Supply


Management

Order picking

Picking
Area
Through out the warehouse
selecting items for one order

Zone
Picker works in his zone

Single
order
MGT634 Purchasing and Supply
Management

Multi order

Warehouse Safety

Warehouse Safety
Safety
Guarding
Material safety data sheets
Employees safety

Industrial hygiene
Ergonomics

Environment
Spills / incidences
Disposals
MGT634 Purchasing and Supply
Management

MGT634 Purchasing and Supply


Management

Security of goods

Pilferage Protection
Shortage (IRA / loss)
Brand name issues
Etc.

MGT634 Purchasing and Supply


Management

Pilferage Protection
Theft: Protection against theft of merchandise has
become a major factor in warehouse operations.
No private automobiles
All normal precautions employed throughout the
enterprise should be strictly enforced at each warehouse.
Many are honest mistakes in order selection and
shipment, but the purpose of security is to restrict theft
from all angles.
Security begins at the fence.
As standard procedure, only authorized personnel should
be permitted into the facility and surrounding grounds
and entry to the warehouse yard should be controlled
through a single gate.
MGT634 Purchasing and Supply
Management

Pilferage Protection
Computerization
Computerized inventory control and order processing
systems help protect merchandise from being carried out
of the warehouse doors.
No items should be released from the warehouse unless
accompanied by a computer release document.
If samples are authorized for use by salespersons, the
merchandise should be separate from other inventory.

MGT634 Purchasing and Supply


Management

Scrap Disposal

Salvage and Scrap Disposal


Value of scrap may be income to the firm.
Disposal must adhere to environmental
regulations.
Ensure no possibility of misuse
The organizations interest

MGT634 Purchasing and Supply


Management

Inventory Record Accuracy and


Cycle count

IRA and Cycle count


Please refer to Tony, Arnold

MGT634 Purchasing and Supply


Management

VMI

Stockless Purchasing
The supplier maintains the inventory for the
purchaser.
The cost of stocking inventory has been
temporarily transferred from the purchaser to
the supplier.

MGT634 Purchasing and Supply


Management

NPD

NPD
Timelines based on the understanding /
experience
Clear expectations beforehand
Involve suppliers early

MGT634 Purchasing and Supply


Management

Standardization

Standardization

Rather than obtaining a variety of components


similar in labeling, coloring, packaging, etc.
The purchasing agent should try to have those
components standardized.
For every component that is standardized,
There is one less invoice, one less item to be
inventoried, etc.

MGT634 Purchasing and Supply


Management

Value Analysis

Value analysis
Process of examining all elements of
a component, assembly, end product,
or service to make sure that it fulfils
its intended function at the lowest
cost throughout the intended life.

Objective : Increase the value of the product at the lowest cost while maintaining
quality.
Value = function / cost

MGT634 Purchasing and Supply


Management

Value analysis

Gather information
Study
Speculate
Analyse
Recommend
Summerize

MGT634 Purchasing and Supply


Management

Value analysis
Separate the object in its component
Check the value addition by each component
Check the manufacturing process for each
component
Check the value addition by each process step
Apply creativity

MGT634 Purchasing and Supply


Management

Value analysis Team members

Executive management
Suppliers
Purchaser
Design engineer
Marketing
Production
Industrial / process engineer
Quality control
MGT634 Purchasing and Supply
Management

Team exercise
Identify Object (and its function)
Separate the object in its component
(Understand the assembly process)
Understand the manufacturing process for
each component (and go on further exploding
its BOM)
Identify the value addition by each process
and component
Brainstorm
MGT634 Purchasing and Supply
Management

Thanks
Best of luck
MGT634 Purchasing and Supply
Management

Vous aimerez peut-être aussi