Académique Documents
Professionnel Documents
Culture Documents
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 1.1
Unidad
Costo
cantidad
Importe
Unidad: M2
LTO
$95.14
0.002943
Subtotal: MATERIALES
$0.28
4.27%
$0.28
4.27%
$4.82
73.59%
$4.82
73.59%
MANO DE OBRA
CUAD09-TOPOGRAFIA
JOR
$2,410.62
0.002000
$81.99
0.016000
$1.31
20.00%
$4.82
0.030000
$0.14
2.14%
$1.45
22.14%
Costo directo
$6.55
HERRAMIENTA MENOR
HORA
%
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
$1.19
$7.74
CARGOS ADICIONALES
3.627%
$0.28
SUBTOTAL
$8.02
PRECIO UNITARIO
$8.02
Pgina: 2+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 2.1
Unidad
Costo
cantidad
Importe
Unidad: ML
CORTE CON SIERRA EN PAVIMENTO DE CONCRETO ASFALTICO CON PROFUNDIDAD MAYOR DE 5.01 CMS
MATERIALES
AGUA DE TOMA
M3
$80.00
0.001000
$0.08
1.77%
$0.08
1.77%
$4.44
98.23%
$4.44
98.23%
Costo directo
$4.52
Subtotal: MATERIALES
EQUIPO Y HERRAMIENTA
CORTADORA MANUAL DE PISO ASFALTICO
INDIRECTO INTEGRADO
HORA
$111.06
18.16%
SUBTOTAL
0.040000
$0.82
$5.34
CARGOS ADICIONALES
3.627%
$0.19
SUBTOTAL
$5.53
PRECIO UNITARIO
$5.53
Pgina: 3+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 3.1
Unidad
Costo
cantidad
Importe
Unidad: M3
JOR
$911.61
0.060000
$54.70
0.030000
$54.70
97.09%
$54.70
97.09%
$1.64
2.91%
$1.64
2.91%
$56.34
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
$10.23
$66.57
CARGOS ADICIONALES
3.627%
$2.41
SUBTOTAL
$68.98
PRECIO UNITARIO
$68.98
Pgina: 4+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 4.1
Unidad
Costo
cantidad
Importe
Unidad: M3
JOR
$911.61
0.030000
$27.35
0.030000
$27.35
97.09%
$27.35
97.09%
$0.82
2.91%
$0.82
2.91%
$28.17
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
$5.12
$33.29
CARGOS ADICIONALES
3.627%
$1.21
SUBTOTAL
$34.50
PRECIO UNITARIO
$34.50
Pgina: 5+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 5.1
Unidad
Costo
cantidad
Importe
Unidad: M3
JOR
$911.61
0.010000
$9.12
97.12%
$0.27
2.88%
$0.27
2.88%
Costo directo
$9.39
18.16%
SUBTOTAL
0.030000
97.12%
$9.12
$9.12
$1.71
$11.10
CARGOS ADICIONALES
3.627%
$0.40
SUBTOTAL
$11.50
PRECIO UNITARIO
$11.50
Pgina: 6+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 6.1
Unidad
Costo
cantidad
Importe
Unidad: M3
JOR
$911.61
0.010000
$9.12
64.59%
$9.12
64.59%
$9.12
0.030000
$0.27
1.91%
CAMION VOLTEO
HORA
$324.69
0.010000
$3.25
23.02%
HORA
$147.86
0.010000
$1.48
10.48%
$5.00
35.41%
$14.12
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
$2.56
$16.68
CARGOS ADICIONALES
3.627%
$0.60
SUBTOTAL
$17.28
PRECIO UNITARIO
$17.28
Pgina: 7+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 6.2
Unidad
Costo
cantidad
Importe
Unidad: M3/KM
HORA
$3.43
100.00%
$3.43
100.00%
Costo directo
$3.43
INDIRECTO INTEGRADO
$324.69
18.16%
SUBTOTAL
0.010560
$0.62
$4.05
CARGOS ADICIONALES
3.627%
$0.15
SUBTOTAL
$4.20
PRECIO UNITARIO
$4.20
Pgina: 8+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 7.1
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$80.00
0.120000
$9.60
4.95%
M3
$105.00
1.120000
$117.60
60.63%
PRUEBA DE LABORATORIO
M3
$18.00
1.120000
Subtotal: MATERIALES
$20.16
10.39%
$147.36
75.97%
$40.05
20.65%
$40.05
20.65%
MANO DE OBRA
CUAD03-ALBAILERIA
JOR
$1,001.28
0.040000
HORA
$76.49
0.070000
$5.35
2.76%
$40.05
0.030000
$1.20
0.62%
$6.55
3.38%
$193.96
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
CARGOS ADICIONALES
$35.22
$229.18
3.627%
$8.31
SUBTOTAL
$237.49
PRECIO UNITARIO
$237.49
Pgina: 9+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 8.1
Unidad
Costo
cantidad
Importe
Unidad: M3
SUB-BASE CON GRAVA CEMENTADA CON ACARREO LIBRE DEL MATERIAL AL PRIMER KILOMETRO
MATERIALES
GRAVA
M3
CEMENTO
TON
$44.50
1.150000
$51.18
25.53%
$2,250.00
0.050000
$112.50
56.11%
$163.68
81.64%
$20.00
9.98%
$20.00
9.98%
Subtotal: MATERIALES
MANO DE OBRA
CUAD02-PEONES
JOR
$911.61
0.021939
HORA
$324.69
0.010000
$3.25
1.62%
HORA
$147.86
0.040000
$5.91
2.95%
HERRAMIENTA MENOR
$20.00
0.030000
$0.60
0.30%
HORA
$76.49
0.092105
$7.05
3.52%
$16.81
8.38%
$200.49
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
CARGOS ADICIONALES
$36.41
$236.90
3.627%
$8.59
SUBTOTAL
$245.49
PRECIO UNITARIO
$245.49
Pgina: 10+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 8.2
Unidad
Costo
cantidad
Importe
Unidad: M3/KM
HORA
$324.69
0.010560
$3.43
100.00%
$3.43
100.00%
$3.43
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
$0.62
$4.05
CARGOS ADICIONALES
3.627%
$0.15
SUBTOTAL
$4.20
PRECIO UNITARIO
$4.20
Pgina: 11+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 9.1
Unidad
Costo
cantidad
Importe
Unidad: M3
BASE HIDRAULICA CON GRAVA CEMENTADA CON ACARREO LIBRE DEL MATERIAL AL RPIMER KILOMETRO
MATERIALES
CEMENTO
TON
GRAVA
M3
$2,250.00
0.050000
$112.50
53.59%
$44.50
1.150000
$51.18
24.38%
$163.68
77.97%
$30.00
14.29%
$30.00
14.29%
Subtotal: MATERIALES
MANO DE OBRA
CUAD02-PEONES
JOR
$911.61
0.032909
HORA
$147.86
0.040000
$5.91
2.82%
$30.00
0.030000
$0.90
0.43%
HORA
$76.49
0.080952
$6.19
2.95%
HORA
$324.69
0.010000
$3.25
1.55%
$16.25
7.74%
HERRAMIENTA MENOR
$209.93
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
CARGOS ADICIONALES
$38.12
$248.05
3.627%
$9.00
SUBTOTAL
$257.05
PRECIO UNITARIO
$257.05
Pgina: 12+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 9.2
Unidad
Costo
cantidad
Importe
Unidad: M3/KM
HORA
$324.69
0.010560
$3.43
100.00%
$3.43
100.00%
$3.43
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
$0.62
$4.05
CARGOS ADICIONALES
3.627%
$0.15
SUBTOTAL
$4.20
PRECIO UNITARIO
$4.20
Pgina: 13+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 10.1
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$911.61
0.002000
$1.82
97.33%
$1.82
97.33%
$0.05
2.67%
$0.05
2.67%
Costo directo
$1.87
INDIRECTO INTEGRADO
$1.82
18.16%
SUBTOTAL
0.030000
$0.34
$2.21
CARGOS ADICIONALES
3.627%
$0.08
SUBTOTAL
$2.29
PRECIO UNITARIO
$2.29
Pgina: 14+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 10.2
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$911.61
0.002000
$1.82
97.33%
$1.82
97.33%
$0.05
2.67%
$0.05
2.67%
Costo directo
$1.87
INDIRECTO INTEGRADO
$1.82
18.16%
SUBTOTAL
0.030000
$0.34
$2.21
CARGOS ADICIONALES
3.627%
$0.08
SUBTOTAL
$2.29
PRECIO UNITARIO
$2.29
Pgina: 15+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 11.1
Unidad
Costo
cantidad
Importe
Unidad: M3
SUMINISTRO
ECOLOGICO,
MATERIALE MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA EJECUCION DE LOS TRABAJOS
MATERIALES
ASFALTO EN FRIO VPR PRIME PATCH
M3
$3,590.00
1.020000
Subtotal: MATERIALES
$3,661.80
95.18%
$3,661.80
95.18%
$153.32
3.99%
$153.32
3.99%
MANO DE OBRA
CUADRILLA DE ASFALTO
JOR
$1,226.58
0.125000
HORA
$324.69
0.050000
$16.23
0.42%
HORA
$147.86
0.050000
$7.39
0.19%
HERRAMIENTA MENOR
$153.32
0.030000
$4.60
0.12%
HORA
$76.49
0.050000
$3.82
0.10%
$32.04
0.83%
$3,847.16
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
CARGOS ADICIONALES
$698.64
$4,545.80
3.627%
$164.88
SUBTOTAL
$4,710.68
PRECIO UNITARIO
$4,710.68
Pgina: 16+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 11.2
Unidad
Costo
cantidad
Importe
Unidad: M3/KM
HORA
$324.69
0.010000
$3.25
100.00%
$3.25
100.00%
$3.25
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
$0.59
$3.84
CARGOS ADICIONALES
3.627%
$0.14
SUBTOTAL
$3.98
PRECIO UNITARIO
$3.98
Pgina: 17+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 12.1
Unidad
Costo
cantidad
Importe
Unidad: HRS
HRS
$31.84
1.000000
$31.84
100.00%
$31.84
100.00%
$31.84
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
$5.78
$37.62
CARGOS ADICIONALES
3.627%
$1.36
SUBTOTAL
$38.98
PRECIO UNITARIO
$38.98
Pgina: 18+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 13.1
Unidad
Costo
cantidad
Importe
Unidad: LT
RIEGO DE LIGA CON EMULSION ASFALTICA INCLUYE: ACARREO LIBRE AL PRIMER KILOMETRO
MATERIALES
RIEGO DE LIGA
LTO
$8.15
1.020000
Subtotal: MATERIALES
$8.31
76.87%
$8.31
76.87%
$1.82
16.84%
$1.82
16.84%
MANO DE OBRA
CUAD02-PEONES
JOR
$911.61
0.002000
HORA
%
$314.12
0.002000
$0.63
5.83%
$1.82
0.030000
$0.05
0.46%
$0.68
6.29%
$10.81
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
$1.96
$12.77
CARGOS ADICIONALES
3.627%
$0.46
SUBTOTAL
$13.23
PRECIO UNITARIO
$13.23
Pgina: 19+0
21-Aug-2015
DOCUMENTO E.3.6
Concepto
Anlisis: 13.2
Unidad
Costo
cantidad
Importe
Unidad: LT
RIEGO DE IMPREGNACION CON EMULSION ASFALTICA CR2-2 INCLUYE: ACARREO LIBRE AL PRIMER
KILOMETRO
MATERIALES
RIEGO DE IMPREGNACION
LTO
$8.15
1.020000
Subtotal: MATERIALES
$8.31
76.87%
$8.31
76.87%
$1.82
16.84%
$1.82
16.84%
MANO DE OBRA
CUAD02-PEONES
JOR
$911.61
0.002000
HORA
$1.82
0.030000
$0.05
0.46%
$314.12
0.002000
$0.63
5.83%
$0.68
6.29%
$10.81
INDIRECTO INTEGRADO
18.16%
SUBTOTAL
$1.96
$12.77
CARGOS ADICIONALES
3.627%
$0.46
SUBTOTAL
$13.23
PRECIO UNITARIO
$13.23