Activity
Location OJT
Remarks
Induction Pump
2 Juli 2015
3 Juli 2015
1 Juli 2015
6 Juli 2015
8 Juli 2015
Name
Position
Checked By :
Page
Initials
Dari
Date
Wahyu Widyantoro
NIM
Nama Pekerjaan
13 611 022
Lokasi OJT
Rangkaian Pekerjaan
Knowing how sensors work of high-level and lowlevel in the pump while working or running, if the
water in the vacuum tank touching the sensors
high level then automatically vacuum or
compressor will shut down self and after the water
went down touching the sensor low level then the
engine will re-start and operate back.
9 Juli 2015
13 Juli 2015
Instalasion electrical
Test the cable connection from the junction box and the
control panel if there is a cable break or not, use a
digital avo meter to know.
15 Juli 2015
22 Juli 2015
23 Juli 2015
Diperiksa Oleh :
Nama
Posisi
Page
Paraf
Dari
Wahyu Widyantoro
Date
NIM
13 611 022
Nama Pekerjaan
Lokasi OJT
Rangkaian Pekerjaan
Alignment is to do the alignment of pump and engine by
moving one component of the engine or pump. If the
engine does not equal then the addition or subtraction
sim while for fixed pump no additional sim.
If there is a miss alighment engine vibration and pump
are too high can cause damage to the pump unit taupun
engine.
24 Juli 2015
Alighment
27 juli 2015
29 Juli 2015
Maintenance engine
28 Juli
Nama
Posisi
Page
Paraf
Diperiksa Oleh :
Dari
Wahyu Widyantoro
Date
NIM
13 611 022
Nama Pekerjaan
Lokasi OJT
Rangkaian Pekerjaan
Cleaning workshop
6 Agustus 2015
7 Agustus 2015
10 Agustus 2015
11 Agustus 2015
Nama
Posisi
Diperiksa Oleh :
OJT - TEKNIK MESIN PERAWATAN
Page
Paraf
Dari
Wahyu Widyantoro
Date
NIM
Nama Pekerjaan
Rangkaian Pekerjaan
Workshop assembly
24 Agustus 2015
Workshop assembly
18 Agustus 2015
Nama
Posisi
Page
Paraf
Diperiksa Oleh :
Dari
NIM
Wahyu Widyantoro
Date
13 611 022
Nama Pekerjaan
Lokasi OJT
Rangkaian Pekerjaan
Prepare engine
01 September 2015
02 September 2015
03 September 2015
Alighment KSB 12
04 September 2015
Workshop assembly
fabrication welding
reducer.
Nama
Posisi
Paraf
Page
MESIN PERAWATAN
POLITEKNIK NEGERI SAMARINDA
Dari
Wahyu Widyantoro
Date
NIM
13 611 022
Nama Pekerjaan
Lokasi OJT
Rangkaian Pekerjaan
9 September 2015
Workshop assembly
fabrication welding
reducer.
10 September 2015
11 September 2015
14 September 2015
Nama
Posisi
Paraf
Page
MESIN PERAWATAN
POLITEKNIK NEGERI SAMARINDA
Dari
Wahyu Widyantoro
Date
NIM
13 611 022
Nama Pekerjaan
Lokasi OJT
Rangkaian Pekerjaan
15 September 2015
16 September 2015
17 September 2015
18 September 2015
21 September 2015
Aligment KSB 13
Nama
Posisi
Paraf
Page
Dari
Wahyu Widyantoro
NIM
13 611 022
Lokasi OJT
Date
Nama Pekerjaan
Rangkaian Pekerjaan
22 September 2015
23 September 2015
Workshop assembly
fabrikation cover coupling
25 September 2015
28 September 2015
Aligment KSB 21
30 September 2015
Nama
Posisi
Paraf
Page
Dari
Wahyu Widyantoro
Date
NIM
13 611 022
Nama Pekerjaan
Lokasi OJT
Rangkaian Pekerjaan
1 Oktober 2015
Training safety K3
2 Oktober 2015
4 Oktober 2015
Workshop assembly
fabrikation cover coupling
5 Oktober 2015
6 Oktober 2015
Nama
Posisi
Paraf
Page
Dari
Wahyu Widyantoro
Date
NIM
13 611 022
Nama Pekerjaan
Lokasi OJT
Rangkaian Pekerjaan
Alignment is to do the alignment of pump and
engine by moving one component of the engine or
pump. If the engine does not equal then the
addition or subtraction sim while for fixed pump
no additional sim.
If there is a miss alighment engine vibration and
pump are too high can cause damage to the pump
unit taupun engine.
7 Oktober 2015
Alighment KSB 21
8 Oktober 2015
Workshop assembly
fabrikation cover coupling
9 Oktober 2015
Do it 5S
Nama
Posisi
Paraf
Page
Dari
Wahyu Widyantoro
Date
NIM
13 611 022
Nama Pekerjaan
Lokasi OJT
Rangkaian Pekerjaan
19 Oktober 2015
20 Oktober 2015
Workshop assembly
fabrikasi cover coupling
21 Oktober 2015
Workshop assembly
fabrikasi cover coupling
Workshop assembly
fabrikasi cover coupling
Base pontoon
Base hand rail
Nama
Posisi
Paraf
Page
Dari
Wahyu Widyantoro
Date
NIM
13 611 022
Nama Pekerjaan
Lokasi OJT
Rangkaian Pekerjaan
29 Oktober 2015
30 Oktober 015
02 November 2015
Workshop assembly
fabrikasi cover coupling
Workshop assembly
fabrikasi cover staffing
box.
09 November 2015
Nama
Posisi
Paraf
Page
Jl.
Dari
Wahyu Widyantoro
Date
NIM
13 611 022
Nama Pekerjaan
Lokasi OJT
Rangkaian Pekerjaan
10 November 2015
Cleaning mounting
engine
11 November 2015
12 November 2015
Workshop assembly
fabrikasi cover coupling
13 November 2015
Workshop assembly
fabrikasi cover coupling
Nama
Posisi
Paraf
Page
Dari
Wahyu Widyantoro
Date
NIM
13 611 022
Nama Pekerjaan
Lokasi OJT
Rangkaian Pekerjaan
19 November 2015
5S
20 November 2015
Nama
Posisi
Paraf
Page