SUMMARY REPORT FOR FOUNDATION DESIGN


Project Information
Project Name

140747104

Structure Name

HALTE JPO

1. CHECK OF STABILITY
1.1 Check of Sliding Force (Uni-Axial)

Ft.Name

# L/C

X - Fs

Y - Fs

Allowable

Result

F13

1.595

1.554

1.5

OK / OK

1.2 Check of Overturning Moment

Ft.Name

# L/C

X - OVM

Y - OVM

Allowable

Result

F13

48.82

8.59

1.5

OK / OK

1.3 Check of Bearing Pressure (Uni-Axial)


2

Ft.Name

# L/C

X - Qu(tonf/m )

Y - Qu(tonf/m )

Allowable

Result

F13

1.93

2.46

OK / OK

2. DESIGN OF FOOTING
2.1 Check of Reinforcement

(Unit : cm )

Ft.Name

Sec.Nam

# L/C

Req.As top / bottom

Used.As top / bottom

Result

S1 (X)

16.20 / 16.20

20.27 / 20.27

OK / OK

S1 (Y)

27.00 / 27.00

32.94 / 32.94

OK / OK

F13

2.2 Check of One Way Shear


Ft.Name

(Unit : tonf)

Sec.Nam

# L/C

fVc

Vu

Result

S1 (X)

64.87

1.19

OK

S1 (Y)

105.59

8.15

OK

F13

2.3 Check of Two Way Shear

(Unit : tonf)

Ft.Name

# L/C

Ct. Pr.Name

fVc

Vu

Result

F13

180.529

2.133

OK

Copyright (c) GS E&C. All Rights Reserved

Method 1 - ACI318(MKS) 14-Dec-14

Calculation Sheet
of
Foundation

CONTENTS
1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
4.2 CHECK OF OVERTURNING MOMENT
4.3 CHECK OF CONTACT PRESSURE

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT

Copyright (c) GS E&C. All Rights Reserved

Project Na. : BATAM15


Project No. : BATAM15
Client : Tower Bersama .....

Page 2

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

1. GENERAL
1.1 CODE & STANDARD
Items

Description

Design Code

American Concrete Institute (ACI 318) [Metric]

Horizontal Force for Wind

UNIFORM BUILDING CODE (UBC-1997)

Horizontal Force for Seismic

UNIFORM BUILDING CODE [UBC-1997]

Unit System

Input : MKS,

Output : MKS,

Calculation Unit : IMPERIAL

1.2 MATERIALS & UNIT WEIGHT


Items

Value
2

Concrete (f'c : compressive strength)

100.000 kgf/cm

Lean Concrete (Lf'c : compressive strength)

0.000 kgf/cm

Reinforcement (D10 ~ D16 , yield strength)

4000.000 kgf/cm

Reinforcement (D19 ~ , yield strength)

2400.000 kgf/cm

Rs (Soil unit weight)

1.600 ton/m

Rc (Concrete unit weight)

2.400 ton/m

Es (Steel Modulus of Elasticity)

2.000 106 kgf/cm

Ec (Concrete Modulus of Elasticity)

208908.000 kgf/cm

2
2
2

3
3
2
2

- Soil Capacity
Items

Value

Soil Name

Purworejo Barat

Footing List

F13

Qa (Soil Bearing Capacity)

4 tonf/m2

Buoyancy

Not Consider

WL (Water Label from the EL = 0)

0 mm

FD (Frost Depth from the EL = 0)

0 mm

Internal Friction Angle

Passive Soil Pressure

Not Consider

Cu (Undrained cohesion)

Clay , 0 tonf/m

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items

Description

Allowable Increase of Soil (Wind)

0%

Allowable Increase of Soil (Seismic)

0%

Allowable Increase of Soil (Test)

0%

Safety factor against overturning for OVM1(FO1)

1.5

Safety factor against sliding for the SL1(FS1)

1.5

Friction factor (m)

0.35

Copyright (c) GS E&C. All Rights Reserved

Page 3

Method 1 - ACI318(MKS) 14-Dec-14

Calculation Sheet
of
Foundation
1.4 LOAD COMBINATION
Index

Load Case Name

Load Case Description

SW

SELF WEIGHT

TLC

Tower Load Compress

Comb . ID
1

Comb . ID
2

Load Combination for stability


1.0 SW + 1.0 TLC

Load Combination for Reinforcement


1.0 SW + 1.0 TLC

Copyright (c) GS E&C. All Rights Reserved

Project Na. : BATAM15


Project No. : BATAM15
Client : Tower Bersama .....

Page 4

Method 1 - ACI318(MKS) 14-Dec-14

Page 5

2. DRAWING

REFERENCE DWGS
NO.

DWG NO.

DWG TITLE

A01

NOTES
* OUTPUT UNIT : mm

01
1

140747104 PROJECT

SQUAD CHECK

F13

FOUNDATION LOCATION PLAN


HALTE JPO

PROCESS PIPING

SCALE

AS SHOWN

Copyright (c) GS E&C. All Rights Reserved

VESSELS STRUCT.

JOB NO.

140747104

ELEC.

INST.

MICROFILM NO.

Method 1 - ACI318(MKS) 14-Dec-14

Page 6

OUTPUT UNIT : mm
Copyright (c) GS E&C. All Rights Reserved

Method 1 - ACI318(MKS) 14-Dec-14

Page 7

REFERENCE DWGS
NO.

DWG NO.

DWG TITLE

CL FOOTING
5000
1000

1000
1500x2

NOTES

3000

1500x2

CL FOOTING

* OUTPUT UNIT : mm

140747104 PROJECT

FOUNDATION PLAN

SQUAD CHECK

FOUNDATION DETAIL FOR


F13

PROCESS PIPING

SCALE
REV.

Copyright (c) GS E&C. All Rights Reserved

DATE

DESCRIPTION

DRWNCHKDAPPD APPD APPD

AS SHOWN

VESSELS STRUCT.

JOB NO.

140747104

ELEC.

INST.

MICROFILM NO.

Method 1 - ACI318(MKS) 14-Dec-14

Page 8

REFERENCE DWGS
NO.

DWG NO.

DWG TITLE

CL FOOTING
BOTTOM

50
TYP.

TOP

NOTES

D13@200

D13@200

* OUTPUT UNIT : mm

140747104 PROJECT

D13@200
D13@200

REINFORCEMENT PLAN

SQUAD CHECK

FOUNDATION DETAIL FOR


F13

PROCESS PIPING

SCALE
REV.

Copyright (c) GS E&C. All Rights Reserved

DATE

DESCRIPTION

DRWNCHKDAPPD APPD APPD

AS SHOWN

VESSELS STRUCT.

JOB NO.

140747104

ELEC.

INST.

MICROFILM NO.

Method 1 - ACI318(MKS) 14-Dec-14

Page 9

600

300

LEAN CONC. 50 THK


CRUSHED STONE 100 THK

ELEVATION S1 - X

OUTPUT UNIT : mm
Copyright (c) GS E&C. All Rights Reserved

Method 1 - ACI318(MKS) 14-Dec-14

Page 10

Item No.

D10

28-D13

D13

D10 100
100 @200
75

30 GR.
500

D10 100
100 @200
75

75 PR.

30 GR.

75 PR.

500

D13

837.5

D10

28-D13

D10 100
100 @200
75

500

30 GR.

28-D13

Copyright (c) GS E&C. All Rights Reserved

50
TYP.

837.5

500

500

837.5

500

837.5

D10

D13

500
50
TYP.

837.5

500
50
TYP.

837.5

500

75 PR.

F13

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 11

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name

5000

3000

500 500

500 500

Ft. Type

MAT

Area

15.000 m

Ft. Thickness

600.00 mm

Ft. Volume

9.000 m

Ft. Weight

21.600 tonf

Soil Height

300.00 mm

Soil Volume

4.275 m

Soil Weight

6.840 tonf

Buoyancy

Not Consider

Self Weight (except Pr.SW)

28.440 tonf

600

300
500

500 500

F13

The Origin coordinate


The Center of gravity (0,0) mm

Section Data
( mm )

Ft.Name

Direction

Soil Volume

F13

All Direct

Sec.Name

Section Area
2

S1

Ft. Volume

15.000 m

Pier Wt

9.000 m

4.275 m

0.900 tonf

Ft. Weight

Soil Weight

Total Weight

21.600 tonf

6.840 tonf

29.340 tonf

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
2

Unit( Length : mm , Weight : tonf , Area : m)

Ft.Name

Pr.Name

Shape

Pw

Ph

Rectangle

500.000

500.000

500.000

0.250

0.300

-1500.000

0.000

Rectangle

500.000

500.000

500.000

0.250

0.300

0.000

0.000

Rectangle

500.000

500.000

500.000

0.250

0.300

1500.000

0.000

F13

Pl

Area

Weight

Off X

Off Y

3.3 LOAD CASE


Fz
Mz

Fy
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
based on the right hand rule.

My
Fx
Mx

Copyright (c) GS E&C. All Rights Reserved

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation
Index

Load Case Name

Load Case Description

SW

SELF WEIGHT

TLC

Tower Load Compress

Project No. : BATAM15


Client : Tower Bersama .....

Page 12

Unit( tonf , tonf-m )

Ft.Name

Pr.Name

Load Case

1
2

F13

Fx

Fy

Fz

Mx

My

-0.3

-2.16

-2

-0.3

-2

-2

-2

-0.3

-2

-2

-2

0.000

0.000

-28.440

0.000

0.000

Footing SW

3.4 LOAD COMBINATION


In Pier Top
without Self Weight

In Footing Bottom

In Footing Bottom Center

with Pier Self Weight,

with Pier & Footing Self Weight & Soil Weight,

But without Footing Self Weight,

Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.4.1 Load Combination in Pier Top (Without SW)


Ft.Name

F13

SFx

SFy

SFz

SMx

SMy

2.000

-2.157

-2.000

2.000

2.000

2.000

-2.157

-2.000

2.000

2.000

2.000

-2.000

2.000

-2.000

-2.000

2.000

-2.000

2.000

-2.000

-2.000

2.000

-2.000

2.000

-2.000

-2.000

2.000

-2.000

2.000

-2.000

-2.000

Pr.Name L.Comb.
1
2
3

Unit( tonf , tonf-m )

3.4.2 Load Combination in Footing Bottom (With Pier SW)


Ft.Name

F13

2
3

Unit( tonf , tonf-m )

SFx

SFy

SFz

SMx

SMy

2.000

-2.157

-2.300

4.373

4.200

2.000

-2.157

-2.300

4.373

4.200

2.000

-2.000

1.700

0.200

0.200

2.000

-2.000

1.700

0.200

0.200

2.000

-2.000

1.700

0.200

0.200

2.000

-2.000

1.700

0.200

0.200

Pr.Name L.Comb.

Copyright (c) GS E&C. All Rights Reserved

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 13

3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
- C.G. of Load is coordinate from left bottom. Unit : mm

Ft.Name

L.Comb.

F13

SFx

Unit( tonf , tonf-m )

SFy
6.000

SFz

-6.157

SMx

-27.340

SMy
4.773

-1.400

C.G. of Loads
2280.5 , 1500.0

Load Combination of Ultimate Condition


- C.G. of Load is coordinate from left bottom. Unit : mm

Ft.Name

Sec.Na

L.Comb.

F13

S1

Copyright (c) GS E&C. All Rights Reserved

SFx
6.000

Unit( tonf , tonf-m )

SFy
-6.157

SFz
-27.340

SMx
4.773

SMy
-1.400

C.G. of Loads
2280.5 , 1500.0

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 14

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
Formula : (

mSFz + P.F
SFx

or

mSFz + P.F
SFy

) > Fs -> OK

(Uni-Axial)

P)
P.F = Passive Force (apply only in case checked passive force, mark by

Ft.Name

Unit ( tonf )

( mSFz + P.F) / SFx or ( mSFz + H.P.F) / SFy

Dir.

L.Comb.

Fs(i)

Result

0.35 27.34 / 6 = 1.59

1.5

OK

0.35 27.34 / 6.16 = 1.55

1.5

OK

F13

4.2 CHECK OF OVERTURNING MOMENT


Formula : (SMry / SMoy or SMrx / SMox) > OVM(i) -> OK

Ft.Name

Unit ( tonf-m )

SMry / SMoy = OVM or SMrx / SMox = OVM

Dir.

L.Comb.

OVM(i)

Result

-68.35 / -1.4 = 48.82

1.5

OK

-41.01 / -4.77 = 8.59

1.5

OK

F13

4.3 CHECK OF CONTACT PRESSURE


4.3.1 Contact Pressure Formula
'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel

q1,q2 =

SFz
Af

SMy X(i)
SMx Y(i)
or
Iy
Ix

if q1 or q2 < 0 , than q1 and q2 will be recalculated


by following formula
L
q(x) width(x) X dx
Px = 0 L
q(x) width(x) dx
0
P=

L
0

q(x) width(x) dx

4.3.2 Input Data


2

Ft.Name

Af (m )

Fl (m )

Fw (m )

Ix (m )

Iy (m )

F13

15.000

5.000

3.000

11.2500

31.2500

Copyright (c) GS E&C. All Rights Reserved

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 15

4.3.3 Pressure Check


- Qa = Soil bearing capacity
- Uc = Uplift Allowable capacity
- X-Direction (Uni-Axial)

Ft.Name L.Comb.
F13

Unit( tonf , tonf-m , tonf/m )

q1

q2

ci

cj

Qmax

Qa

Cont.A.R

Result

1.935

1.711

0.000

5.000

1.9

4.0(gross)

100 %

OK

- Y-Direction (Uni-Axial)

Ft.Name L.Comb.
F13

Unit( tonf , tonf-m , tonf/m )

q1

q2

ci

cj

Qmax

Qa

Cont.A.R

Result

2.459

1.186

0.000

3.000

2.5

4.0(gross)

100 %

OK

Copyright (c) GS E&C. All Rights Reserved

Method 1 - ACI318(MKS) 14-Dec-14

Calculation Sheet
of
Foundation

Project Na. : BATAM15


Project No. : BATAM15
Client : Tower Bersama .....

Page 16

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

5.1.1 Data
Ft.Name

Unit( mm , tonf , tonf-m )

Sec.Na

Dir.

L.Comb.

Fl or Fw

Sl or Sw

SFz

SM

SQ

S1

5000.00

3000.00

27.340

-1.40

-1.100

S1

3000.00

5000.00

27.340

4.773

-1.100

F13

5.1.2 Design Parameters


Yield Strength - D10 ~ D16 : yf1 , D19 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
f_clb : Clear Cover for bottom of footing reinforcement
Loc. : Location of Critical Point from left side of footing
2

Unit(kgf/cm ,mm)

f(Flexure)

f(Shear)

f'c

fy1

fy2

f_cl

f_clt

f_clb

0.8

0.75

100.00

4000.00

2400.00

50.0

50.0

50.0

5.2 REQUIRED REINFORCEMENT


5.2.1 Reinforcement Formula
- Shrinkage and temperature reinforcement
As = fac b h

---- ACI CODE 7.12.2

, fac = following

Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used.............................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used
.........................................0.0018
(c) Slabs where reinforcement with yield stress exeeding 60,000 psi measured at a yield
strain of 0.35 percent is used...........................................................................................................
- Required Reinforcement by Analysis
As As2
- At every section of flexural members where tensile reinforcement is required
As As5

As4

---- ACI Eq (10-3)

- The requirements of Eq (10-3) need not be applied, if every section As provided is


at least one -third greater then that required by analysis
As2 = r.req b d
As3 = 1.333 r.req b d
200
As4 =
bd
fy
3 fck
As5 =
bd
fy
Asmax = 0.75 rb b d

Copyright (c) GS E&C. All Rights Reserved

---- ACI CODE 10.5.3

0.0018 60,000
fy

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 17

fck
0.003 Es
fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )

rb = 0.85 b 1

If Selected As < Using As < Asmax , then OK!!


Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu
0.85 fck
Rn =
2 , f = 0.8 , r.req =
fbd
fy

( 1-

1-

2Rn
0.85fck

5.2.2 Check of Footing Reinforcement


Footing Name : F13

GroupType : Mat_Foundation

- X direction (All Width)

Sec.Nam

L.Comb.

Using Bar (mm)

Loc. (m)

Width b (m)

d (cm)

As (cm )

top

16 - D13 @ 200

2.950

3.000

54.365

20.268

botom

16 - D13 @ 200

0.750

3.000

54.365

20.268

S1

Sec.Nam

L.Comb.

Mu (tonf-m)

Rn

r.Req

top

0.373

0.053

0.0000

bottom

1.624

0.229

0.0001

S1

Sec.Nam

L.Comb.

As1(cm )

As2(cm )

As3(cm )

As4(cm )

As5(cm )

Asmax(cm )

top

16.200

0.214

0.286

57.334

32.434

132.566

bottom

16.200

0.935

1.246

57.334

32.434

132.566

S1

Sec.Nam

L.Comb.

Using As(cm )

Select As(cm )

Result

top

20.268

16.200

OK

bottom

20.268

16.200

OK

S1

- Y direction (All Width)

Sec.Nam

L.Comb.

Using Bar (mm)

Loc. (m)

Width b (m)

d (cm)

As (cm )

top

26 - D13 @ 200

1.500

5.000

53.095

32.936

botom

26 - D13 @ 200

1.250

5.000

53.095

32.936

S1

Sec.Nam

L.Comb.

Mu (tonf-m)

r.Req

Rn

top

bottom

8.915

0.791

0.0002

S1

Sec.Nam

L.Comb.

As1(cm )

As2(cm )

As3(cm )

As4(cm )

As5(cm )

Asmax(cm )

top

27.000

93.324

52.794

215.781

bottom

27.000

5.272

7.027

93.324

52.794

215.781

S1

Sec.Nam

L.Comb.

Using As(cm )

Select As(cm )

Result

top

32.936

27.000

OK

bottom

32.936

27.000

OK

S1

Copyright (c) GS E&C. All Rights Reserved

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 18

Title

Bending Moment Diagram


F13

Analysis Method

L/C ID

5000

Conventional Rigid Method with reaction (Method 1)


SMy

-27.340 tonf

Contact Area

15.000 m

Critical Value

-1.400 tonf-m
2

15.000 m (100 %)

Moment intia

31.2500 m

Critical Point Method

Critical Max Point

00
50

00
40

50
29

00
25

75

Mubottom = 1.624 tonf-m , Mutop = -0.373 tonf-m

00

Area

Direction

S1

10

SFz

Section name

3000

Foundation name

[ mm ]

[Loading]

[ tonf , tonf/m ]

5.27

5.47

5.67

5.13

5.8

[B.M.D]

[ tonf-m ]

-2.9
-2.2
-1.4
-0.7
0

-0.11
0.05

0.12

-0.37 -0.19
-0.05

0.11

0.7
1.45

1.62

1.4
2.2

2.88

2.9

[B/L.M.D]

[ tonf-m / ft ]

-1
-0.7
-0.5
-0.2
0

-0.04
0.01

0.04

-0.12 -0.06
-0.02

0.04

0.2
0.5

0.48

0.54

0.7
1

0.96

Copyright (c) GS E&C. All Rights Reserved

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 19

Title

Bending Moment Diagram


F13

Analysis Method

L/C ID

5000

Conventional Rigid Method with reaction (Method 1)

-27.340 tonf

Moment intia

4.773 tonf-m

Contact Area

15.000 m

Critical Value

SMx

15.000 m (100 %)

11.2500 m

Critical Point Method

Critical Max Point

32098
000

12

50

Mubottom = 8.915 tonf-m , Mutop = 0.002 tonf-m

50

Area

Direction

S1

17

SFz

Section name

3000

Foundation name

[ mm ]

[Loading]

[ tonf , tonf/m ]
5.93
9.64

8.58

12.3

[B.M.D]

[ tonf-m ]

-8.9
-6.7
-4.5
-2.2
0

0
2.2

1.6
2.94

4.5
6.7
8.91

8.9

[B/L.M.D]

[ tonf-m / ft ]

-1.8
-1.3
-0.9
-0.4
0
0.4

0.32
0.59

0.9
1.3
1.8

Copyright (c) GS E&C. All Rights Reserved

1.78

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 20

Title

Shear Force Diagram


Analysis Method

L/C ID

5000

Conventional Rigid Method with reaction (Method 1)


SMy

-27.340 tonf

-1.400 tonf-m

Contact Area

15.000 m

Critical Value

15.000 m (100 %)

Moment intia

31.2500 m

Critical Point Method

Critical Max Point

40

50

00

00

10

6
20

00

Vu = 1.193 tonf

25

Area

Direction

S1

00

SFz

Section name

F13

3000

Foundation name

[ mm ]

[Loading]

[ tonf , tonf/m ]

5.27

5.47

5.67

5.13

5.8

[S.F.D]

[ tonf ]
5.74

6
4.32

4.5
3
1.5

1.86
1.39

1.19

-1.06

-1.55
-2.04

-1.5
-3

-3.89

-4.5
-6

[S/L.F.D]

[ tonf / ft ]
1.91

2
1.44

1.5
1
0.5

0.62
0.46

0.4

0
-0.5
-1
-1.5
-2

Copyright (c) GS E&C. All Rights Reserved

-0.35

-0.52
-0.68
-1.3

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 21

Title

Shear Force Diagram


F13

Analysis Method

L/C ID

5000

Conventional Rigid Method with reaction (Method 1)

-27.340 tonf

Moment intia

4.773 tonf-m

Contact Area

15.000 m

Critical Value

SMx

15.000 m (100 %)

11.2500 m

Critical Point Method

Critical Max Point

30

12

50

6
70

00

Vu = 8.152 tonf

17

Area

Direction

S1

50

SFz

Section name

3000

Foundation name

[ mm ]

[Loading]

[ tonf , tonf/m ]
5.93
9.64

8.58

12.3

[S.F.D]

[ tonf ]
13.71

13.7
10.3

8.15

6.9
3.4
0
-3.4

-4.72

-6.9
-10.3
-13.7

[S/L.F.D]

[ tonf / ft ]
2.74

2.7
2.1

1.63

1.4
0.7
0
-0.7
-1.4
-2.1
-2.7

Copyright (c) GS E&C. All Rights Reserved

-0.94

Method 1 - ACI318(MKS) 14-Dec-14

Calculation Sheet
of
Foundation

CONTENTS
1. INPUT DATA
1.1 GENERAL
1.2 PIER DATA
1.3 LOADING DATA

2. CANTIL BEAM DESIGN


2.1 FORMULA
2.2 CANTIL BEAM DESIGN

3. TENSION DESIGN
3.1 FORMULA
3.2 TENSION DESIGN

4. PM DIAGRAM
4.1 FORMULA
4.2 PM DIAGRAM & ANALYSIS
4.3 ANALYSIS & RESULT
4.4 DETAIL PM DIAGRAM

5. ONE-WAY SHEAR
5.1 FORMULA
5.2 ONE-WAY SHEAR

Copyright (c) GS E&C. All Rights Reserved

Project Na. : BATAM15


Project No. : BATAM15
Client : Tower Bersama .....

Page 1

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 2

1. INPUT DATA
1.1 General
Design Code

American Concrete Institute (ACI 318) [Metric]

Input Unit

MKS

f Bending

f Axial

0.8

f'c

f Sprial reinf.
0.8

fy (D10 ~ D16)
2

100 kgf/cm

Output Unit

4000 kgf/cm

MKS

f Tied reinf.

0.7

fy (D19 ~)
2

2400 kgf/cm

f Shear

0.7

Ec

0.75

Es
2

208908 kgf/cm

2000000 kgf/cm

Steel Db

Cover

KS D3504 (D)

50 mm

1.2 Pier Data


50

500

500

Main Bar
Bar Check

Main Bar
Bar Check

500

500

Main Bar
Bar Check

Ver Bar

D13, 8 8 EA

Pier Shape

Rectangle

Tie Bar

D10 @ 200 mm

Width

500 mm

f'c

100 kgf/cm

Length

500 mm

fy

4000 kgf/cm

Height

500 mm

Using As

35.47 cm

dx

434.12 mm

dy

434.12 mm

8-8-28 , Area = 35.47cm , Amin (1%) = 25cm , Amax (8%) = 200cm


Reinforcrment Area is OK
50

500

500

Pier Name

Pier Name

Ver Bar

D13, 8 8 EA

Pier Shape

Rectangle

Tie Bar

D10 @ 200 mm

Width

500 mm

f'c

100 kgf/cm

Length

500 mm

fy

4000 kgf/cm

Height

500 mm

Using As

35.47 cm

dx

434.12 mm

dy

434.12 mm

8-8-28 , Area = 35.47cm , Amin (1%) = 25cm , Amax (8%) = 200cm


Reinforcrment Area is OK
50

Pier Name

Ver Bar

D13, 8 8 EA

Pier Shape

Rectangle

Tie Bar

D10 @ 200 mm

Width

500 mm

f'c

100 kgf/cm

Length

500 mm

fy

4000 kgf/cm

Height

500 mm

Using As

35.47 cm

dx

434.12 mm

dy

434.12 mm

8-8-28 , Area = 35.47cm , Amin (1%) = 25cm , Amax (8%) = 200cm


Reinforcrment Area is OK

Copyright (c) GS E&C. All Rights Reserved

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 3

1.3 Loading Data


1.3.1 Load Case
Pier Name

Unit( tonf , tonf-m )

Name

1
2
3

Fx

Fy

Fz

Mx

My

SW

-0.3

TLC

-2.157

-2

SW

-0.3

TLC

-2

-2

-2

SW

-0.3

TLC

-2

-2

-2

1.3.2 Load Combination List


Comb . ID

Load Combination for Reinforcement

1.0 SW + 1.0 TLC

1.3.3 In Pier Top

Unit( tonf , tonf-m )

P. Name

LC#

SFx

SFy

SFz

SMx

-2.157

-2

-2

-2

-2

-2

-2

-2

1.3.4 In Pier Bottom

SMy

Unit( tonf , tonf-m )

P. Name

LC#

SFx

SFy

SFz

SMx

SMy

-2.157

-2.3

1.784

1.8

-2

1.7

-2.2

-2.2

-2

1.7

-2.2

-2.2

Copyright (c) GS E&C. All Rights Reserved

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 4

2. CANTIL BEAM DESIGN


2.1 FORMULA
- Shrinkage and temperature reinforcement
As = fac b h

---- ACI CODE 7.12.2

, fac = following

Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used.............................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used
.........................................0.0018
(c) Slabs where reinforcement with yield stress exeeding 60,000 psi measured at a yield
strain of 0.35 percent is used...........................................................................................................

0.0018 60,000
fy

- Required Reinforcement by Analysis


As As2
- At every section of flexural members where tensile reinforcement is required
As As5

As4

---- ACI Eq (10-3)

- The requirements of Eq (10-3) need not be applied, if every section As provided is


at least one -third greater then that required by analysis

---- ACI CODE 10.5.3

As2 = r.req b d
As3 = 1.333 r.req b d
200
As4 =
bd
fy
3 fck
As5 =
bd
fy
Asmax = 0.75 rb b d
fck
0.003 Es
rb = 0.85 b 1
fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!
Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu
0.85 fck
Rn =
2 , f = 0.8 , r.req =
fbd
fy

( 1-

1-

2Rn
0.85fck

2.2 CANTIL BEAM DESIGN

Unit( cm )

P.Name

bx

by

dx

dy

50

50

43.412

43.412

50

50

43.412

43.412

50

50

43.412

43.412
2

Unit(cm )

P.Name

Pier As

temp. As (As1)

Using As (All)

Result

35.47

4.5

35.47

OK

35.47

4.5

35.47

OK

35.47

4.5

35.47

OK
2

Unit(cm )

P.Nam

Dir

LC#

UsingAs

As2

As3

As4

As5

AsSelect

Result

10.13

1.31

1.75

7.63

4.32

1.75

OK

10.13

1.3

1.74

7.63

4.32

1.74

OK

10.13

1.61

2.15

7.63

4.32

2.15

OK

1
2

Copyright (c) GS E&C. All Rights Reserved

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 5

10.13

1.61

2.15

7.63

4.32

2.15

OK

10.13

1.61

2.15

7.63

4.32

2.15

OK

10.13

1.61

2.15

7.63

4.32

2.15

OK

3. TENSION DESIGN
3.1 FORMULA
D1

-For rectangular shape


A = 2(D1+D2) t = Nb As
t = A / (2 * (D1 + D2))
3
3
(D1 + t) * (D2 + t)
(D1 - t) * (D2 - t)
Ix =
12
12
3
3
(D2 + t) * (D1 + t)
(D2 - t) * (D1 - t)
Iy =
12
12
-S Fz
Mux (D2 / 2)
Tux = (
+
) As
A
Ix
-S Fz
Muy (D1 / 2)
Tuy = (
+
) As
A
Iy
Tu = Max(Tux, Tuy)
Tu
Req.As =
, f = 0.8
f fy

D2

Dia

-For circular or octagonal shape


S Fz
4 SMu
Tu = As fs =
Nb Dia
Nb
If Tu is negative that means Tu is in compression. That Case is N/A!!
Tu
Req.As =
, f = 0.8
f fy
Nb = number of bars
Dia = Diameter of Rebar arrangement
SFz = vertical load + Pier self weight

3.2 TENSION DESIGN

Unit(mm , tonf,cm )

P. Name

LC#

Dia (D1/D2)

Tu

UsingAs/EA

Req.As/EA

Result

368.24 / 368.24

0.44

1.27

0.14

OK

368.24 / 368.24

0.7

1.27

0.22

OK

368.24 / 368.24

0.7

1.27

0.22

OK

Copyright (c) GS E&C. All Rights Reserved

Method 1 - ACI318(MKS) 14-Dec-14

Calculation Sheet
of
Foundation

4. PM DIAGRAM
4.1 FORMULA
1) Maximum Axial Load Strength
- Po = 0.85 f'c (Ag-Ast) + S fy Ast
- Pnmax = f1 Po

( f1 = Axial Strenth Resuction Factiors)

- Mnmax = The Value of diagram, When P is Pn.


- Pumax = f2 Pnmax
f2 = Sprial or Tied Reinforcement Reduction Factor

2) Balanced Strain Condition


A balanced Strain condition exists at a cross-setion
when the maximum strain at the extreme
compression fiber just reacheseu = 0.003 simultaneously
with the first yield strain ofes = fy/Es in the tension reinforcement.
The ratio of neutral axis depth bc is shown below
eu
Cb
=
eu + ey
d
eu = 0.003
fc = 0.85 fck

3) Strength for Combined Flexure and Axial Load


Maximum usable strain at extreme
concrete compression fiber shall
be assumed equal toeu = 0.003
if c that is neutral axis is supposed,
Pn and Mn can be calculated as below
fPn = f0.85 fck ( Acomp - S(1 to 11) Ast ) + S(1 to 28) fs Ast
fMn = f0.85 fck ( Acomp - S(1 to 11) Ast ) ( h/2 - c + yc )
+S(1 to 28) fs Ast ( h/2 - c + ys )
fs(i) = e(i) Es

, - fy

fs(i)

fy

Sprial or Tied Reinforcement Reduction Factor f = 0.9 - 0.2

Pn
Pa

0.9

Pa = 0.1 fck Ag
Acomp is Area from top to a b( 1c)
b 1c = 0.85 - 0.05 ( fck - 4000 ) / 1000 0.65

(psi)

4) Slenderness Effects
dns =

Cm
1-Pu/0.75Pc

p EI
2
(klu)
2

Pc =

5) Shear
fVc = f 2

f'c bw d

, fVs =

fVsmax = f 8 f'c bw d (psi)


fVn = fVc + fVs

Copyright (c) GS E&C. All Rights Reserved

f fy Av d
(psi)
s

EI =

0.2EcIg + EsIse
1+b d

Project Na. : BATAM15


Project No. : BATAM15
Client : Tower Bersama .....

Page 6

Method 1 - ACI318(MKS) 14-Dec-14

Calculation Sheet
of
Foundation

Project Na. : BATAM15


Project No. : BATAM15
Client : Tower Bersama .....

4.2 PM DIAGRAM & ANALYSIS


4.2.1 Pier Name : 1
(tonf , tonf-m )

P
350
300

Pnmax

250
200

fPnmax

150
100

Balanced

50
0

Mx

Axis

X - Axis (All comb.)

Po

351.358 tonf

Pn / fPn

281.086 tonf / 196.760 tonf

Mn / fMn

12.75 tonf-m / 8.92 tonf-m

Pb / fPb

97.732 tonf / 68.412 tonf

Mb / fM

30.85 tonf-m / 21.6 tonf-m

c(Balanced)

260.47 mm

emin

30.24 mm

klu / rx

6.67

Slender

Neglect

Axis

Y - Axis (All comb.)

Po

351.358 tonf

Pn / fPn

281.086 tonf / 196.760 tonf

Mn / fMn

12.75 tonf-m / 8.92 tonf-m

Pb / fPb

97.732 tonf / 68.412 tonf

Mb / fM

30.85 tonf-m / 21.6 tonf-m

c(Balanced)

260.47 mm

emin

30.24 mm

klu / rx

6.67

Slender

Neglect

-50
-100
-150
10

20

30

40

(tonf , tonf-m )

P
350
300

Pnmax

250
200

fPnmax

150
100

Balanced

50
0

My

-50
-100
-150
10

20

Copyright (c) GS E&C. All Rights Reserved

30

40

Page 7

Method 1 - ACI318(MKS) 14-Dec-14

Calculation Sheet
of
Foundation

Project Na. : BATAM15


Project No. : BATAM15
Client : Tower Bersama .....

4.2.2 Pier Name : 2


(tonf , tonf-m )

P
350
300

Pnmax

250
200

fPnmax

150
100

Balanced

50
0

Mx

Axis

X - Axis (All comb.)

Po

351.358 tonf

Pn / fPn

281.086 tonf / 196.760 tonf

Mn / fMn

12.75 tonf-m / 8.92 tonf-m

Pb / fPb

97.732 tonf / 68.412 tonf

Mb / fM

30.85 tonf-m / 21.6 tonf-m

c(Balanced)

260.47 mm

emin

30.24 mm

klu / rx

6.67

Slender

Neglect

Axis

Y - Axis (All comb.)

Po

351.358 tonf

Pn / fPn

281.086 tonf / 196.760 tonf

Mn / fMn

12.75 tonf-m / 8.92 tonf-m

Pb / fPb

97.732 tonf / 68.412 tonf

Mb / fM

30.85 tonf-m / 21.6 tonf-m

c(Balanced)

260.47 mm

emin

30.24 mm

klu / rx

6.67

Slender

Neglect

Axis

X - Axis (All comb.)

Po

351.358 tonf

Pn / fPn

281.086 tonf / 196.760 tonf

Mn / fMn

12.75 tonf-m / 8.92 tonf-m

Pb / fPb

97.732 tonf / 68.412 tonf

Mb / fM

30.85 tonf-m / 21.6 tonf-m

c(Balanced)

260.47 mm

emin

30.24 mm

klu / rx

6.67

Slender

Neglect

-50
-100
-150
10

20

30

40

(tonf , tonf-m )

P
350
300

Pnmax

250
200

fPnmax

150
100

Balanced

50
0

My

-50
-100
-150
10

20

30

40

4.2.3 Pier Name : 3


(tonf , tonf-m )

P
350
300

Pnmax

250
200

fPnmax

150
100

Balanced

50
0

Mx

-50
-100
-150
10

20

Copyright (c) GS E&C. All Rights Reserved

30

40

Page 8

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation
(tonf , tonf-m )

P
350
300

Pnmax

250
fPnmax

200
150
100

Balanced

50
0

My

Project No. : BATAM15


Client : Tower Bersama .....

Axis

Y - Axis (All comb.)

Po

351.358 tonf

Pn / fPn

281.086 tonf / 196.760 tonf

Mn / fMn

12.75 tonf-m / 8.92 tonf-m

Pb / fPb

97.732 tonf / 68.412 tonf

Mb / fM

30.85 tonf-m / 21.6 tonf-m

c(Balanced)

260.47 mm

emin

30.24 mm

klu / rx

6.67

Slender

Neglect

Page 9

-50
-100
-150
10

20

30

40

4.3 ANALYSIS & RESULT


4.3.1 Moment Check

unit (tonf-m )

Pier

L/C#

dx

dy

SdMux

SdMuy

fMnx

fMny

Result

1.78

1.8

12.69

12.69

OK

2.2

2.2

12.78

12.78

OK

2.2

2.2

12.78

12.78

OK

4.3.2 Force Check

unit (tonf )

Pier

L/C#

SFz

fPs

fPnmax

Result

-110.89

-113.5

196.76

2.3

OK

196.76

-1.7

OK

-113.5

196.76

-1.7

OK

4.4 DETAIL PM DIAGRAM


Pier Name : 1 , L/C= 2 , Axis Angle : 45 degree
P

(tonf , tonf-m )

350
300
250
200
150
100
50
0
-50
-100
-150

My

(tonf-m )

25
Pnmax
(13,13)

fPnmax

10
0

Balanced
(P=2,Mu=3,Mn=18)

Mx

-10

-25
5

10

15

20

Copyright (c) GS E&C. All Rights Reserved

25

30

25

10

-10

-25

Method 1 - ACI318(MKS) 14-Dec-14


Project Na. : BATAM15

Calculation Sheet
of
Foundation

Project No. : BATAM15


Client : Tower Bersama .....

Page 10

Pier Name : 2 , L/C= 2 , Axis Angle : 45 degree


P

(tonf , tonf-m )

My

(tonf-m )

25

350
300
250
200
150
100
50
0
-50
-100
-150

Pnmax
(13,13)

fPnmax

10
0

Balanced
(P=-2,Mu=3,Mn=18)

Mx

-10

-25
5

10

15

20

25

30

25

10

-10

-25

Pier Name : 3 , L/C= 2 , Axis Angle : 45 degree


P

(tonf , tonf-m )

My

(tonf-m )

25

350
300
250
200
150
100
50
0
-50
-100
-150

Pnmax
(13,13)

fPnmax

10
0

Balanced
(P=-2,Mu=3,Mn=18)

Mx

-10

-25
5

10

15

20

25

30

5. ONE-WAY SHEAR
5.1 FORMULA
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- Vc = 2 fck Bw d
Av fy d
- Vs =
s
- Vu <= f Vc + f Vs

(eq 11-3)
(eq 11-15)
, f = 0.75 (eq 11-1)

- When, Value off Vs shall not exceedf 8

Copyright (c) GS E&C. All Rights Reserved

fck Bw d (Vs max)

25

10

-10

-25

Method 1 - ACI318(MKS) 14-Dec-14

Calculation Sheet
of
Foundation

Project Na. : BATAM15


Project No. : BATAM15
Client : Tower Bersama .....

5.2 ONE-WAY SHEAR


P. Name

Page 11

Unit(tonf)

Dir.

LC#

fVc

fVs

fVs max

Vu

Result

8.633

23.224

34.532

OK

8.633

23.224

34.532

2.157

OK

8.633

23.224

34.532

OK

8.633

23.224

34.532

OK

8.633

23.224

34.532

OK

8.633

23.224

34.532

OK