Vous êtes sur la page 1sur 52

UNIVERSITI KUALA LUMPUR

Malaysian Institute of Industrial Technology (UniKL MITEC)

SEPTEMBER SEMESTER 2015


REPORT (GROUP A)
SUBJECT CODE

JGB 30503

SUBJECT TITLE

PROJECT MANAGEMENT

LECTURER

MR. SULASTRI BIN ZAINAL ABIDIN

DUE DATE

6th DECEMBER 2015

NAME:
Mohamad Haziq Fikri Bin Adnan
Norazliza Binti Zainal
Nur SyafiniAfni Binti Mohd Yatim
Fatin Binti Yaacob
Sharifah Nur Diana Binti Syed Azimuddin
Muhammad Zuhairi Bin Mohd Zamzuri
Ummi Halimatussadiah Binti Khamis
Fatin Nur Deana Binti Mohammad Zaidee
Mohammed Ashraf Bin Damiri
Muhammad Shahezad Bin Hashim

STUDENT ID:
57274214095
57274114880
57274113559
57274214023
57274214069
57274214035
57274113882
57274113514
57274214007
57274113789

Project Management MITEC Netball Championship 2015


ACKNOWLEDGEMENT
First of all, thanks to Allah for giving us the strength and determination to complete this project within
the time given by our supervisors, Mr. Sulastri Bin Zainal Abidin. We are really grateful because we
managed to complete MITEC Netball Championship 2015 successfully.
We would like to express our thanks to our supervisors, Mr. Sulastri Bin Zainal Abidin, who stood by
us and guide us in spite of their heavy schedule of work. We thanks to him for his invaluable
guidance, encouragement and moral support throughout of this project.
Our sincere thanks to all the sponsorship who willing to sponsor for our event. Without their sponsor,
our event cannot run smoothly. Our thanks and appreciations also go to all the participants who take
part during the event.
This project cannot be completed without the effort and cooperation from our groups members. Our
group members are Haziq, Azliza, Syafini, Fatin, Diana, Ummi, Deana, Ashraf and Shahezad. Last
but not least, we would like to express our gratitude to our colleague who have willingly helped us out
with their abilities during the event occurred.

Page
2

Project Management MITEC Netball Championship 2015

TABLE OF CONTENTS
CHAPTER 1.........................................................................................................................................5
1.1 Title..............................................................................................................................................5
1.2 Problem Background...................................................................................................................5
1.3 Justification..................................................................................................................................6
1.4 Objective......................................................................................................................................7
1.5Benchmarking...............................................................................................................................8
1.6 Concept........................................................................................................................................9
CHAPTER 2.......................................................................................................................................10
2.1 Team Structure...........................................................................................................................10
2.2 Issue Register Log......................................................................................................................12
2.3 Work Breakdown Structure........................................................................................................13
2.4 Gantt Chart.................................................................................................................................15
2.5 Risk Management......................................................................................................................17
CHAPTER 3.......................................................................................................................................19
3.1 Final Design...............................................................................................................................19
3.2 Monitoring System and Quality Check......................................................................................22
3.3 Change Management..................................................................................................................24
CHAPTER 4.......................................................................................................................................25
4.1 Performance Management.........................................................................................................25
4.2 Lesson Learned..........................................................................................................................30
4.3 Future Recommendation............................................................................................................31
4.4 Conclusion.................................................................................................................................32
4.5 Reference...................................................................................................................................33

Page
3

Project Management MITEC Netball Championship 2015


CHAPTER 5.......................................................................................................................................34
CHAPTER 6.....................................................................................................................................35

Page
4

Project Management MITEC Netball Championship 2015


CHAPTER ONE
DEFINING THE CONCEPT
1.1 TITLE
MITEC Netball Championship

1.2 PROBLEM BACKGROUND


The problems that we are facing to make this event success as such as bellows:

The selection of sport for the event


The title of the event that can attract participants.
The sponsorship for the cost of the event.
The number of the participants that attend the event.
The selection venue for the event.
The date and time of the event.
The ways to attract the participants to join the event.

Page
5

Project Management MITEC Netball Championship 2015


1.3 JUSTIFICATION
We, Group A as the organizer of the event take serious about the selection of the sport and the
concept of the event. Therefore, we come out with the idea to collaborate with Kementerian Belia
dan Sukan Negeri Johor but since there is no answer from them, we decided to stand by our own.
We choose to do netball sport event because tournament for the women rarely held and we
decided to create an open tournament which is no age limit to join the event. Other than that, this
is able to forming an attitude of cooperation in a team. As the organizer, this is a challenge to
handle the event successfully.
Once the concept has been selected, we are worried about the tittle for the event which able to
attract participants to join our event. We need to choose a proper and attractive tittle because we
are presenting University Kuala Lumpur Malaysian Institute of Industrial Technology (MITEC) to
the local community. Finally, we decided to name the event as MITEC Netball Championship.
This is because we are promoting our universitys name and the sport as well.
Our group also need to consider the overall cost of the event. This is because of the event is an
event which is need cooperation from all parties that are involve to make the event success. This
should be done to make sure the event run smoothly and success at the end. Therefore, the group
members must looking for the sponsorship.
Besides, the prize for winner of the event also been considered. The prize plays an important role
in this event. We choose to give RM 1000 as the 1 st prize, RM 650 as the 2nd prize and 3rd prize is
RM 350. This is one of our way to attract the players to join our event. In our observation, we are
one of the organizer that give an attractive prize to the winners.
Furthermore, the correct timing date and time also one of the important part to event. We choose
to do the event on Saturday because most of the participants are students, housewife and full time
employees. This is because we want to ensure the participants are free on that day so they can join
our event.
As an event planner and organizer, we need to find attractive ways to attract the participants to
join the event and we need to do contingency plan in case there will be some changes in the
future.

1.4 OBJECTIVE
The objectives of these programmes are as bellows:

To support and involved activity in Kementerian Belia dan Sukan Negeri Johor
Page
6

Project Management MITEC Netball Championship 2015

To improve the fitness level and spirit of sportsmanship in sport


To forming an attitude of cooperation in a team.
To expose student and society to join in the form of sport recreation.
To promote the University Kuala Lumpur Malaysian Institute of Industrial Technology
(MITEC) to the local community.

Page
7

Project Management MITEC Netball Championship 2015

1.5 BENCHMARKING
From previous sport event which is Kejohanan Futsal 1 Johor, we make this event as a benchmark
for us because they have an attractive way which leads participants to join to the event. This event
is about to create a close relationship between netballs athletes around Malaysia especially in
Johor.
In addition, the event is open to anyone who plays netball except for state and national netball
players that are still active in 2010 to 2015. There is no age limit to join the event and as the
organizer we want to create a spirit of sportsmanship in every netball player that join our event.
Based on the previous sport event that we do benchmarking; our event offers an attractive prize
which is RM 1000 for the 1 st prize, RM 650 for 2 nd prize and RM 350 for the 3 rd prize, which is
the highest amount prize in Johor and Malaysia. This is because most of netball event that
organized by Non- Government Organization (NGO) does not give attractive prize which the
organizer had done. By offering the attractive prize, this could attract participants to come and
join our event.

Figure 1

Page
8

Project Management MITEC Netball Championship 2015


1.6 CONCEPT
The concept of Group A is to expose student and society to join in the form of sport
recreation. By doing this event, it give us the opportunity to make some changes about the
thought and idea of the participants about the sport. This event will increase participants
sportsmanship and to create a close relationship between netballs athletes around Malaysia
especially in Johor. This event also reminds the participants to them to forming an attitude of
cooperation in a team.
Moreover, the concept of Group A also try to attract the audience by giving attractive prize
which is RM 1000 for the 1 st prize, RM 650 for 2 nd prize and 3rd prize is RM 350. This is one of
the way to attract the participants compete to archive their target. Other than that, we want to
promote Universiti Kuala Lumpur Malaysian Institute of Industrial Technology (MITEC) to the
local community in the simple attractive way.
Our concept is to create a spirit of sportsmanship in every netball player that join our event.
By using this concept, we could attract participants to come and join the event because we create
our event open to everyone who play netball except for the state and national player which still
active playing in 2010 to 2015. There is no age limit to join the event and this helps to create a
healthy competition between the players.
By having this kind of concept, the participants can improve their fitness level and the spirit of
sportsmanship in the sport which is really important to every athlete in the world. We as the
organizer hope that this event will helps them to create a spirit of sportsmanship and close
relationship between the netball players in Malaysia especially in Johor.

Page
9

Project Management MITEC Netball Championship 2015


CHAPTER TWO
PLANNING
2.1 TEAM STRUCTURE

DEAN
Prof. Dato Dr. Mansor Bin Salleh
DEAN DEPUTY
Pn. Jimisiah Binti Jaafar
ADVISER
En. Sulastri Bin Zainal Abidin
(Lecturer Project Management)
PROGRAM DIRECTOR
Mohamad Haziq Fikri Bin Adnan

ASSISTANT PROGRAM DIRECTOR


Ummi Halimatussadiah Binti Khamis
SECRETARY
Fatin Nur Deana Binti Mohammad Zaidee

TREASURER & SPONSOR


Nur Syafini Afni Binti Mohd
PUBLICITY
Yatim

Figure 2: Chart Organizational

Sharifah Nur Diana Binti Syed


Azimuddin

PICTURE AND POSITION

Nur Fatin Binti Yaacob

Page

PROGRAM
10 DIRECTOR
Mohamad Haziq Fikri Bin Adnan

Project Management MITEC Netball Championship 2015

TREASURER & SPONSOR


Nur Syafini Afni Binti Mohd Yatim

PUBLICITY
Nur SECRETARY
Fatin Binti Yaacob
Fatin Nur Deana Binti Mohammad Zaidee

ACTIVITY
Norazliza Binti Zainal

2.2 ISSUE REGISTER LOG


a) Additional team from 16 maximum team to 25 team at the final registration.
b) Additional referee
from 2 person to 5 person.
TECHNICAL
c) Discussion field at
stadium pusat bandar pasir
gudang(indoor) to

Muhammad Shahezad Bin Hashim

unikl mitec field(outdoor)

and backup vent to paticipant .


d) Standby bib for participant if any participant that do not bring bib.
e) standby spotlight if any unaxpected weather happen that can cause extend time.

Page
11

Project Management MITEC Netball Championship 2015

Page
12

Project Management MITEC Netball Championship 2015


2.3 WORK BREAKDOWN STRUCTURE
PROGRAM DIRECTOR
Mohamad Haziq Fikri Bin Adnan

SCOPE OF DUTIES
Ensure the smoothness the flow of the journey.

Conduct a group discussion to plan the draft and


tentative of event

ASSISTANT PROGRAM

SCOPE OF DUTIES

DIRECTOR
Ummi Halimatussadiah Binti Khamis

Plan the tentative of the programme

Make a call towards the company.

SCOPE OF DUTIES
Complete the proposal approval and signature.

Help assistant to finsh the work that not complete

Write all the progress of activities are conducted.

SCOPE OF DUTIES
Prepare the sponsor from other company.

Make a document such as sponsorship form,

SECRETARY

Fatin Nur Deana Binti Mohammad


Zaidee

TREASURER & SPONSOR


Nur Syafini Afni Binti Mohd Yatim

registration form, certificate and so on.

Collect the money from sponsorship and participant

Follow-up the feedback from sponsorship

Find allocation for breakfast with a good condition

Arrange the lunch for referee.

SCOPE OF DUTIES
Prepare the IT system for the event

Rent chairs and tents.

Ensure the PA system during event do not have a

TECHNICAL

Mohammed Ashraf Bin Damiri


-Muhammad Shahezad Bin Hashim

problem

Page
13

Project Management MITEC Netball Championship 2015

SCOPE OF DUTIES
Promote the netball competition .

-Sharifah Nur Diana Binti Syed

Make a banner and poster for promotion.

Azimuddin

Promote at the social network such as

PUBLICITY

-Nur Fatin Binti Yaacob

ACTIVITY
- Muhammad Zuhairi Bin Mohd

facebook,instagram,whatsup.

Follow up the involvement of participant.

SCOPE OF DUTIES
Prepare the equipment that need during event such as

Zamzuri

ball,bib,net,pole,whistle,scoreboard,board and others.

-Norazliza Binti Zainal

Handle the registration of participant during event.

- Mohamad Haziq Fikri Bin Adnan

Handle the draw for each team by group

- Ummi Halimatussadiah Binti

Khamis
- Fatin Nur Deana Binti Mohammad
Zaidee
-Nur Syafini Afni Binti Mohd Yatim
-Sharifah Nur Diana Binti Syed

Group A - 6 team
Group B 5 team
Group C - 5 team
Group D 5 team

Handle the score goal for each game.

Take a photoshot during activity was conducted for


final report.

Azimuddin
-Nur Fatin Binti Yaacob

The presentation of prizes to the winners.

-Mohammed Ashraf Bin Damiri

Closing event officiated by Pn. Jimisiah Binti

-Muhammad Shahezad Bin Hashim

Jaafar(Dean Deputy),En. Sulastri Bin Zainal


Abidin(Advisor project management).

TABLE 1

Page
14

Project Management MITEC Netball Championship 2015


2.4 GANTT CHART
No

Week

Activities

Formation of group

Selection of project title

Identify objective, purpose

Formatting of organization

Approval of project tiltle by sir

Sulastri bin Zainal


7

Identify

the

detail

of

activities

place,

date,

program.
(Equipment,

time,

participant budget)
8

Preparing a proposal and sponsorship


latter

Approval of project proposal by


Sir Sulastri bin Zainal

10

First Presentation of program

11

Find the equipment program

12

Find a sponsorship and participant


program

13

Waiting

for

sponsorship

and

participant respond
14

Collecting a budget

15

Pre checking report

16

Group discussion

17

Preparing

the

program

venue

(Equipment, place, prize)


18

Program week

19

Documentation

Page
15

10

11 12

13

Project Management MITEC Netball Championship 2015


20

Final report

21

Final Presentation

TABLE 2

Page
16

Project Management MITEC Netball Championship 2015


2.5 RISK MANAGEMENT
No
1

Activities
Selection title

Risk Management
Difficult to select the
appropriate
because

Solution
A

leader

gives

title instructions to explain


all

team the idea of everyone.

members have their Leader


own ideas.

use

vote

rating to choose the


title. The
selection

of

title

according

to

consensus

of

all

members of the group


2

Documentation

Difficult to gather all

Create

discussion

the group members to group in WhatsApp to


prepare

proposal, facilitate all members

sponsorship letter and know


so on

the

progress

program
has

been

made. The division of


tasks is given to all
members. Set the date
to gather and discuss
the problems faced.
3

Marketing

Not

having

money

to

enough Apply a sponsorship


make from

advertisement.
Do not have time to
advertise. Difficult to
find a sponsorship and
participant

advertisement

shop.

Get

advertisement
sponsorship

and

T-

shirt program for all


team member.
Give a proposal letter
and registration form
for sponsorship and
participant

Page
17

in

early

Project Management MITEC Netball Championship 2015


week.
Give

advantages

to

sponsorship.
4

equipment

difficult

to

obtain ask

electric connection
5

Give information to participant

for

event

from

technician in MITEC

Difficult to inform the Create


program

help

discussion

to group in WhatsApp for

participant. Need to participant to know the

Program day

reply one by one went

program progress has

participant ask.

been made.

Not

enough

team get help from a few

members to do a work.

friends to help run the


program

Page
18

Project Management MITEC Netball Championship 2015

CHAPTER THREE
EXECUTING
3.1 FINAL DESIGN

Is this beginning of the project management will tell us a bit about how the group was formed and it
begins from the selection group name to join our team. We are from the group "A". Why our group
was given the title of group "A" is caused because the goal of our struggle where in all that we do as a
student is to obtain results which give us satisfaction. Not only is the A in any subject but in what
we do because we believe that with the onset of the letter A beginning to find what we needed as a
student. In addition, we want to keep our brains in your head where A is the beginning for us
successful in everything we do as a student and an established name that has been agreed by all the
members of our group. And from there is the beginning of the name of our group which was named
the group "A" of the subject "Project Management" JGB30503
In the Project Management JGB30503 we were given the choice of whether to choose for modeling or
event. At first we all agreed to choose to make the model. But when we do research to ensure that the
model is successful or not, there are some obstacles that we have faced so to not take high risks we
decided to remedy run event. Thats while our group change from do the model become an event.
Group "A" consisting of 10 members of the members have been jointly managing the event in which
the event is run on "Sport event management" that 'MITEC NETBALL CHAMPIONSHIP 2015
"(open) held in UNIKL Mitec for one day at 14 November 2015 and the event starts at 8.00 am until
6.00 pm at the Netball court. This event is subject under management according to project assignment
accomplished our task.
Before the start of the event, Group "A" proposes to create a sport event which is netball. This is
because the objective of our group is to improve the level of fitness and sportsmanship among
students and outsiders and the main thing is we want to promote University Kuala Lumpur Malaysian
Institute of Industrial Technology (MITEC) to the local community and indirectly Our university will
boast in the eyes of outsiders if the event that we run and we are also conducting a survey among
female students UNIKL Mitec event will we organize and some positive response we have received to
us. Finally, we intend to make netball competition open only a maximum of 10 teams. After
completing the paperwork and make a presentation about the paperwork we get a bit of advice we got
from project management lecturer Mr. Sulastri about the topics that we choose whether the game can
be continued or not and what should we accept that risk before, during and after the event Other than

Page
19

Project Management MITEC Netball Championship 2015


our lecturer Mr. Sulastri, we have also try to get some advice from Mr. Syukor about events related to
sports. Initially, we decided to limit to 10 teams but when the advice from Mr. Syukor( Top campus
lifestyle section), he stated that in addition to the 16 teams for matches involving sport can achieve
that goal. ". After confirmation about the topic we start to find the sponsor during our budget consists
of our publicity which is part bunting, posters and souvenirs for our sponsorship and our lecturer and
deputy of dean also provided food and drinks to the participate. We got the sponsorship from the
company that sponsored the printing of the posters, bunting and also foods for crowd and souvenirs.
We also did the promotion about our event 3 weeks before the date of the program through which
social media is Facebook account, instagram, twitter and others besides through face to face bunting
and posters from the first exit of Seri Alam, around the area of Unikl Mitec and inside our campus.
Before the event at 7:30 am we run banded together and began to divide the tasks according to their
work. For technical committee, for assembly work, they will provide all the equipment and make sure
all systems are in good condition such as sound systems, mixer, microphones, cordless, speaker and
also slide to a montage, or video. For the other group members have to manage part of the registration
as well as the top food and drink for the participants involved. And one assigned to take pictures of
the before, during, and after for the use of montages or video during an event that took place in the
run. Actually for the technical side we had a little trouble at first because we can only borrow portable
speaker of the UNIKL MITEC but before the event start, the portable speaker we must give back to IT
Department because have a lecturer want to used so to avoid anything that could pose a risk to our
event, we create a backup plan in where we tried to get the relevant sponsor of PA system and lastly
we get the one set of the PA
In addition, our group also did not think that the participants were more than what we expected.
Indirectly, it is a credit to our team to strengthen our financial terms where it covers all aspects.
Basically we have to limit the participants were 24 teams competing but there is a team in which the
Century Garden agreed to sponsor the food and drinks for all participants. So we decided to add one
more team makes all once be 25 teams. This is because we understand that the participant that
involved in this famous people. (Can be seen at the evidences).
The biggest factor obstacle for our event is because at 14 November 2015 was held another event
which is "CarrierFair" which is housed in the main hall UNIKL MITEC. So initially we made our
backup plan where we want to run this event in the main hall in the event of rain, and so on, but
because there are other events that took place the same day with the event MITEC Netball
Championships so we had to change the plan to the warehouse. So we go to the office of technician,
Mr Nizam and from there we try to ask them whether we can use or not the warehouse.But we cannot
use the warehouse because every warehouse is full. So the last step we take is to decide where in the
event of rain in drizzly conditions, we will continue the game and if we otherwise would have had to

Page
20

Project Management MITEC Netball Championship 2015


dismiss the possibility that we will continue until the evening. Alhamdullillah on the day of the event
the weather was very hot and our event can be terminated earlier than our initial expectations.
The event was end at 6.00pm and before end the program we give souvenirs to our lecturer and
deputy dean of that come and join for supporting our event. Not forgetting the winning team to
receive prizes and certificates of participation. For participation certificates we provide to all teams
who register understandable because we have groups coming from outside the district of Johor Bahru.
This is because although there are losers, but at least they did not go home empty handed. Based on
our event, we also got some feedback from the crowd about our event and almost of the crowd gave a
positive feedback which is they were satisfied about the program.

Page
21

Project Management MITEC Netball Championship 2015

3.2 MONITORING SYSTEM AND QUALITY CHECK

Quality Checklist
Project: MITEC NETBALL CHAMPIONSHIP 2015
Quality Item

Date: 14/11/2015

Verification
Yes

1. Does the project have an approved quality


management plan or the adoption?

No

N/A Comments

2. Has the quality management plan that has


been reviewed by all stakeholders and gain
consensus?
3. Are all stakeholders are related to the quality
management plan??

Each member of the team as a


whole to play their respective roles

and know what they need to do to


the event.

4. Does the plan in accordance with the quality


management throughout the entire project
plan?
5. Does the team have to do with the event?

6. Does every team member have their own


jobs and do it well?

7. Are there any problems involving division of

Every team member knows their

labor, whether before, during and after?

job well and accepts their part for


the event.

8. Does the venue for the event with a strategic


event that created?

9. Are promotion and publicity sufficient to


attract participants?

Bunting, posters and guides have

been done way around UNIKL


MITEC and also through social
networking media.

10. Are there any problems during the event

Page
22

Didnt enough the committee

Project Management MITEC Netball Championship 2015


when the event took place?
11. Are food and drinks for participants
provided enough for them?
12. Is the work on schedule and tentative?

TABLE 3

Page
23

Have the another team take more


than should they have

Project Management MITEC Netball Championship 2015

3.3 CHANGE MANAGEMENT

No.

Situation

1.

PA system is In the beginning, what we found is

Technical crew decided to ask the

inadequate

just a microphone and speaker

sponsor for the use of the PA system

portable, but at those times was in

for the use of our event and we can

the end to get it because there are

replace it with a one set of PA

lecturers who want to use it

system.

2.

Increase
number
participants

3.

Description

Action Taken

the The number has been restricted to

of just 16 but more than the initial registered to 25 groups and make it
plan

outside our range

The venue of Our initial plan was to make the So we replace the netball court as the
event

main hall UNIKL MITEC but main venue of the match and
conflict with another event

4.

We open again for the team to be

everything went smoothly

Committee not Only use the 10 team members

We take Committee volunteers to

enough

only for conduct the event but it is

help run the activities that goes

not enough

smoothly

TABLE 4

Page
24

Project Management MITEC Netball Championship 2015


CHAPTER 4
CLOSURE
4.1 PERFORMANCE MEASUREMENT (EVALUATION)

NO

ACTIVITIES

PIC

MARK FROM TEAM


MEMBERS

1.

2.

First Meeting

Proposal
Preparation

MARK

POINT
Haziq

Norazliza

Haziq

Deana

Proposal
3.

Presentation

4.

AVERAGE

Shahezad

Norazliz
Create Question

Page
25

Ummi

Diana

Fatin

Deana

Syafini

Ashraf

Zuhairi

Ezad

Project Management MITEC Netball Championship 2015


Survey

5.

6.

7.

8.

9.

Distribute
Question Survey

Documentation

Approval from
UniKL MITEC

Meeting with
(MAIJ)

Public Relation /
Marketing

Ummi

Syafini

Haziq

Norazliz
a

Diana

Page
26

Project Management MITEC Netball Championship 2015

10.

Sponsor

Fatin

11.

Design Banner

Fatin

12.

13.

Distribute
Banner

Advertisement

Diana

Fatin

Photographer
14.

15.

Performance

Food And
Beverage

Zuhairi

Ashraf

Page
27

Project Management MITEC Netball Championship 2015

16.

Finance

17.

Register Crowd

18.

19.

Register
Counter

Runner During
Event

20.

Analysis Result

21.

Prepare Draft Of

Syafini

Fatin

Diana

Ashraf

Norazliz
a

Ummi

Report

Page
28

Project Management MITEC Netball Championship 2015

22.

Prepare Final
Report

1 VERY LOW

Syafini

2 LOW

3 MIDDLE 4 HIGH

Page
29

5 VERY HIGH

Project Management MITEC Netball Championship 2015


4.2 LESSON LEARNED
MITEC Netball Championship is fully conducts by student of project management. The team that
been conducted for this event is 10 persons in a team. Each of the team members is givens a
responsibility to make the event success. From this event, what lesson we can get is to success one big
event we need to build a great and strong team member. Teamwork is very important to organize an
event. If the team does not have teamwork, the event cannot organize well.
Helping each other is a main thing that each team should do. It is a biggest point to make the event
went well. For example, although each of the team members is given their responsibility but not all of
them can do it well. Helping from other is completing each of the responsible to make it done. Even
though it is not our work as a team, we should help others that cannot complete their task. It is the real
teamwork.
Another lesson that we get is we have to make a plan on what to do first and what to do after that.
Planning is main role to organize an event. We should plan on how to advertise the event, how to
handle crowd, how to get the sponsorship, what should we do when facing the problems and much
more related to the event. The event cannot easily run without any preparation. Whether, budget, stuff,
court, emergency kid and much more need to be taken into account for the absolute event runs
smoothly.
To organize an event we cannot put 100 % of hope that we can get a sponsor from others. We should
have our own money to run an event. We should do a budget and finance. Financial to organize event
should strong.
For every plan we made we have to do a backup plan in case of original plan cannot be do. For every
organization the organizer should prepared a backup plan such as what if the event cannot do at that
lace where should we do. What action should we take if the crowd are not achieved the target.

Page
30

Project Management MITEC Netball Championship 2015


4.3 FUTURE RECOMMENDATION
Venue:
The venue should be play in indoor incase if the day is raining and play at night.

Promotion:
Promote the project in and out from Johor.
Promote the project to all the institute and school at Malaysia.
Promote the project in netball club in Malaysia.

Organization for registration:


For registration, we can open up a page so the participant can submit the registration on the page
without need to email to selected people. By this, all the organizer can keep update with current
number of team that have register.
The total number of team that participates can be increase because the numbers of team
interested are higher.

Sponsorship:
We can maximize the number of submission of the sponsorship letter so that the organizer of the
project can run without using any money that they get to pay the expenses.
Maybe can ask sponsorship out from Johor.
Only use the sponsorship to pay the expenses.

Economy:
Cut any unnecessarily thing and used anything that can be used as used any source that can be
get.
If there are unexpected profit are gain, the profit can be split to different charity fund.

Page
31

Project Management MITEC Netball Championship 2015


4.4 CONCLUSION
Financial operation
We have learned on how to manage and handling a project expenses. We had cut off all the
expenses that we can cut as the netball ball, vessel, net, banner and others because we get a
sponsorship from UniKL MITEC and other company that willing to support n sponsor our
project.
This project helps us to know what is the money flow whether in or out the spending how
manage it.

Networking relationship
We have learn on how to get network to get a sponsorship, deal with the referee, and other
organization to make sure our project becomes smooth without any problem. As a result, we have
collaborated with UniKL MITEC and get to use their facilities as outdoor court, ball, net and
others.

Management system:
We have learned on how to handle the project and come with backup plan in every single process
and how to organize people to do job with their specialty. We also learn on how to work with
others people, have teamwork spirit and respect others to avoid any conflicts occur. If something
happen, they come out to voice up and solve the problem together.

Experience:
We have learn and get the experience on how to manage a event that related to sport especially in
netball games even though all of us doesn't have any experience on netball games and success to
handling it with 25 teams participation.

Page
32

Project Management MITEC Netball Championship 2015


4.5 REFERENCE

1. Competitions.

(n.d.).

Retrieved

October

18,

2015,

from

http://www.englandnetball.co.uk/competitions
2. (n.d.).

Retrieved

October

18,

2015,

from

http://morcombetravel.com/wp-

content/uploads/2014/10/Malaysia_Friendly_Games.pdf
3. (n.d.).

Retrieved

November

25,

2015,

from

http://www.prosci.com/change-

management/definition/.
4. Lexicon. (n.d.). Retrieved November 28, 2015, from http://lexicon.ft.com/Term?term=riskmanagement
5. Project Management in Practice: Practical Planning and Delivery of Projects, wit. (n.d.).
Retrieved November 25, 2015, from http://www.successful-project-management.com/

Page
33

Project Management MITEC Netball Championship 2015


CHAPTER 5
TEAMWORK
The concept of teamwork is extremely important to the success of any team including our team. All
people talk about working as one unit, as a unified team. Teamwork and unselfishness create the
backbone of a great team, without them a team cannot realistically compete. We can have a group of
superstars, but if we do not work well as one unit, chances that we are going to be as successful as we
would think is cant to be a real. The team working as one cohesive unit is going to be the key in their
success.
Here are some things that we take into consideration in our team:
1. Does our team have agreed-upon goals we created as a team?
2. Do the teammates openly encourage and support one another?
3. Do we have open communication with one another, as well as the good organization?
4. Does each player know what their role in this team?
5. Is there mutual respect among the teammate?
6. Do the teammates use statements such as "we" when referring to the team, or is it more of an
"every man for himself" mentality?
7. Have we created a positive team image for our team?
8. Are the individual contributions of each teammate recognised (regardless of whether he/she is a
starter or not a starter)?
9. Do our team as a whole committed to improving performance?
10. Does each member consider themselves as a "team player?"
To succeed at the task in hand everyone involved needs to combine our efforts. If we does our job well,
then it increases what our team can accomplish. This teamwork has to be recognised by everyone and
know that great things can happen if individuals master the fundamentals and work together as one unit.
Everyone has their own unique role, but each person's individual role must be recognised and appreciated.

Page
34

Project Management MITEC Netball Championship 2015


Teamwork is something that must be a high priority and given constant attention. Every teammate needs
to understand how important it is for them to work smoothly together if we want to be successful. Each
player must be dedicated to the whole team and be willing to act unselfishly. When challenges arise (as
we always do), the team needs to have the resources, accountability and commitment to deal between us
in a constructive and positive manner. A sense of teamwork will play an integral part in the project.
CHAPTER 6
APPENDIX
With the love for sports we would like to share our journey from the beginning planning to the event day
this are several photo that we catches before ,during and after our netball event. With the help from all
group members the event are succeed and runs smoothly.
6.1 Technical Setup

6.2 Event Day

Page
35

Project Management MITEC Netball Championship 2015


6.3 Prize Giving Ceramony For Winner ,Runner Up And Third Place

6.4 THE ORGANIZER FOR MITEC NETBALL CHAMPIONSHIP 2015

Page
36

Project Management MITEC Netball Championship 2015

6.5 THE SPONSORSHIP FOR MITEC NETBALL CHAMPIONSHIP 2015

Page
37

Project Management MITEC Netball Championship 2015

6.6 RULES AND REGULATION FOR MITEC NETBALL GAME

Page
38

Project Management MITEC Netball Championship 2015

Page
39

Project Management MITEC Netball Championship 2015

Page
40

Project Management MITEC Netball Championship 2015

Page
41

Project Management MITEC Netball Championship 2015


6.7 The Sponsorship Letters
Our Reference : ( ) MITEC/SD/PM/ 002
Date

: 1 October 2015

Ms. Soo Mey Chan,


Nestle Product Sdn. Bhn.
17 Jalan Petaling,
No. 282, Mukim 18, Kubang Ulu,
Larkin Industrial area,
80350 Johor Bahru,Johor.
Ybhg. Tan Sri/Dato/Sir/Madam,
SPONSORSHIP FOR THE MITEC Netball Championship 2015

Please be informed, students of the subject Project Management Universiti Kuala Lumpur, Malaysian
Institute of Industrial Technology will organize a project to meet demands of the subject Program
Manangement under the supervisory of Sir Sulastri bin Zainal Abidin, lecturer of UniKL MITEC (0127881766). This program is for open Netball competition known as MITEC Netbll Championship 2015.
The program detail as per below:

Program

: MITEC Netball Championship 2015

Date

: 14 November 2015

Time

: 7.00 am- 6.00 pm

Venue

: Universiti Kuala Lumpur


Malaysian of Industrial Technology (UniKL MITEC)

Participant
2.

: Students,IPTA,IPTS,Zone Pasir Gudang Netballers.

We are writing you concerning a sponsorship opportunity for the above program. We know that

your organization has as its mission a desire to give back to the community, and we greatly appreciate
your support in this program. The donation can be in monetary or any other that suitable for the open

Page
42

Project Management MITEC Netball Championship 2015


netball competition. For the sponsorship surplus will be donated to charitable organizations. Enclosed the
proposal approved by the management for your reference.
3.

If your organization would like to participate in this event as a sponsor, please contact our

representatives:i)

Mr Haziq Fikri bin Adnan


019-7129245
Program Management MITEC Netball Championship 2015

4.

All the contributions may in all form and address to the account of:
TABUNG KEBAJIKAN SISWA UniKL MITEC
01087010045677 (BANK ISLAM)
(Mr. Muhamad Izzat Izzaruddin Bin Mohd Ramli)

5.

Every kind of sponsorship is appreciated.

Thank You
BERSATU MEREALISASIKAN IMPIAN

Yours sincerely,

..............................................
Prof. Dato Dr. Mohd Mansor Bin Salleh
Dean
Universiti Kuala Lumpur
Malaysian Institute of Industrial Technology

Page
43

Project Management MITEC Netball Championship 2015


6.8 Minutes Meeting for MITEC Netball Championship 2015

MINUTES OF MEETING
TIME UTILIZATION
Date: 9 September 2015
Time: 8.00 p.m
Place: Seminar Room 2
Attendees:
Bil.

Names

Position

Mohamad Haziq Fikri Bin Adnan

Norazliza Binti Zainal

Nur Syafiniafni Binti Mohd Yatim

Treasurer

Fatin Binti Yaacob

Promotion

Sharifah Nur Diana Binti Syed Azimuddin

Promotion

Muhammad Zuhairi Bin Mohd Zamzuri

Activity

Ummi Halimatussadiah Binti Khamis

Activity

Fatin Nur Deana Binti Mohammad Zaidee

Activity

Mohammed Ashraf Bin Damiri

Technical

10

Muhammad Shahezad Bin Hashim

Technical

Bil.

Issues

1.

Minutes of Last Meeting

Project Manager
Assistant manager

Responsible
All Parties

Selection of event idea by each

Page
44

Action / Status
The minutes were viewed and
verified accordingly.

Project Management MITEC Netball Championship 2015


members
2.

Project Quality Review

All parties

any support from the

Observe the prospect of the event

participation.

itself.

3.

Review either the event gets

Develop Quality Plan

All Parties

Give review what best for


improving quality.

The project was reviewed for


estimating quality value.

The plan then reviewed

Setting the standards, acceptance


criteria.
4.

Team commitment

All Parties

Event can be proceed with


measure all consequences.

Positive feedback by members

Prepared by:

Checked & Verified by:

..

..

(Minutes Provider)

(Project Manager)

MINUTES OF MEETING
TIME UTILIZATION
Date: 16 September 2015

Page
45

Project Management MITEC Netball Championship 2015


Time: 8.00 p.m
Place: Seminar Room 2
Attendees:
Bil.

Names

Position

Mohamad Haziq Fikri Bin Adnan

Project Manager

Norazliza Binti Zainal

Nur Syafiniafni Binti Mohd Yatim

Treasurer

Fatin Binti Yaacob

Promotion

Sharifah Nur Diana Binti Syed Azimuddin

Promotion

Muhammad Zuhairi Bin Mohd Zamzuri

Activity

Fatin Nur Deana Binti Mohammad Zaidee

Activity

Ummi Halimatussadiah Binti Khamis

Activity

Mohammed Ashraf Bin Damiri

Technical

10

Muhammad Shahezad Bin Hashim

Technical

Assistant manager

Page
46

Project Management MITEC Netball Championship 2015


Bil.

Issues

Responsible

Action / Status

1.

Minutes of Last Meeting

All Parties

The minutes were viewed and


verified accordingly.

Reviews the previous meeting for


refreshment.
2.

Project Quality Review

All parties

The progress were reviewed and


discussed.

There are no problems on the


problem the event.
Discuss among team members

All preparation within the scope is in


order.

to know progress others


department.

Prepared by:

Checked & Verified by:

..

..

(Minutes Provider)

(Project Manager)

Page
47

Project Management MITEC Netball Championship 2015


MINUTES OF MEETING
TIME UTILIZATION
Date: 28 October 2015
Time: 8.00 p.m
Place: Seminar Room 2
Attendees:
Bil.

Names

Position

Mohamad Haziq Fikri Bin Adnan

Project Manager

Norazliza Binti Zainal

Nur Syafiniafni Binti Mohd Yatim

Treasurer

Fatin Binti Yaacob

Promotion

Sharifah Nur Diana Binti Syed Azimuddin

Promotion

Muhammad Zuhairi Bin Mohd Zamzuri

Activity

Ummi Halimatussadiah Binti Khamis

Activity

Fatin Nur Deana Binti Mohammad Zaidee

Activity

Mohammed Ashraf Bin Damiri

Technical

10

Muhammad Shahezad Bin Hashim

Technical

Assistant manager

Page
48

Project Management MITEC Netball Championship 2015


Bil.

Issues

Responsible

Action / Status

1.

Minutes of Last Meeting

All Parties

The minutes were viewed and


verified accordingly.

Reviews the previous meeting for


refreshment.
2.

Project Quality Review

All parties

any issue arise within crew


members for improvement

The progress were reviewed and


discussed.

There is quite positive review


from public response.

Team commitment

All Parties

Sponsorship and promotion


department required help and

Asked for help to advertising.

team members give a hand to

Make sure the project progress going


smoothly.

smoothie the work progress.


All team members are required
to help other members that
have critical tasks.

Prepared by:

Checked & Verified by:

..

..

(Minutes Provider)

(Project Manager)

MINUTES OF MEETING

Page
49

Project Management MITEC Netball Championship 2015


TIME UTILIZATION
Date: 11 November 2015
Time: 8.00 p.m
Place: Seminar Room 2
Attendees:
Bil.

Names

Position

Mohamad Haziq Fikri Bin Adnan

Project Manager

Norazliza Binti Zainal

Nur Syafiniafni Binti Mohd Yatim

Treasurer

Fatin Binti Yaacob

Promotion

Sharifah Nur Diana Binti Syed Azimuddin

Promotion

Muhammad Zuhairi Bin Mohd Zamzuri

Activity

Fatin Nur Deana Binti Mohammad Zaidee

Activity

Ummi Halimatussadiah Binti Khamis

Activity

Mohammed Ashraf Bin Damiri

Technical

10

Muhammad Shahezad Bin Hashim

Technical

Assistant manager

Page
50

Project Management MITEC Netball Championship 2015


Bil.

Issues

1.

Minutes of Last Meeting

Responsible
All Parties

Action / Status
The minutes were viewed and
verified accordingly.

Reviews the previous meeting for


refreshment.
2.

Project Quality Review

All parties

Preparation for the event are


observe and revise.

The progress were reviewed and


discussed.

Discuss with crew if any


problem occur for counter the

Preparations for the event.

problem as soon as possible.


All team members prepare for
the event day. Setup all
equipment that should be
done .last touchup before event
.revise any weakness before
event

Prepared by:

Checked & Verified by:

..

..

(Minutes Provider)

(Project Manager)

Page
51

Project Management MITEC Netball Championship 2015

Page
52

Vous aimerez peut-être aussi