SUMMARY OF BID PRICES


(All Parts of Bill of Quantities)
Instruction for completing the Summary of Bid Prices:
1. Part No. - Enter the "Part No." for each section of the BOQ where the unit prices are entered.
2. Part Description - Enter the "Part Description" corresponding to the "Part No."
3. Total Amount - Enter the "Total Amount" in Pesos for all pages having the same "Part Description"

Contract ID:
PART NO.

15IO0061
PART DESCRIPTION

OTHER GENERAL REQUIREMENTS

EARTHWORKS

SURFACE COURSE

DRAINAGE & SLOPE PROTECTION STRUCTURES

MISCELLANEOUS STRUCTURE

TOTAL OF AMOUNTS =
TOTAL AMOUNT IN WORDS:

#VALUE!

Submitted by :

Ruben G. Santos
(Name and Signature of Bidder's Representative)
President/AMO
( Position)

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.


(Name of Bidder)

ways ( DPWH )

an Tabunok Consuegra Road, K1026+3882


00079LT, Villaba, Leyte

RICES

s)

ry of Bid Prices:

are entered.

"Part Description"

TOTAL AMOUNT

895,492.67
346,437.00
40,861,695.01
4,351,227.10
4,198,404.28

50,653,256.06

Santos

der's Representative)

AMO

n)

CONCRETE PRODUCTS INC.

dder)

###
4%

VARIANCE

9,094,400.00

-0.75
266 C.D.

ABC=
LESS 3%=
BID AMT.=

51,034,811.64
510,348.12

50,524,463.52
128,792.54

TARGET

218,265,600.00

Department of Public Works and Highways (DPWH)


Contract ID.: 15IO0061
Contract
Name:
Location :

Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road, K1026+38
Section ID: S00079LT, Villaba, Leyte
Villaba, Leyte
BILL OF QUANTITIES
Part No.

Part Description: OTHER GENERAL REQUIREMENTS

(Vol. II, Series of 2004 DPWH Standard Specifications for Highways, Bridges and Airports)
Item #

Description

Unit

Quantity

(1)

(2)

(3)

(4)

SPCL II

DPWH Standard Project Billboard

Unit Price (Pesos)


(5)
In words : Pesos

In words : Pesos

#VALUE!

#VALUE!

2.00

Pc.

3,060.19

In Figures: PhP

SPCL IV

Construction, Safety and Health

Traffic Management

In words : Pesos

#VALUE!

#VALUE!

1.00

L.s.

399,821.18

Mobilization and Demobilization

In Figures: PhP

In words : Pesos

In words : Pesos

#VALUE!

#VALUE!

1.00

L.s.

143,023.10

In Figures: PhP

SPCL V

In Figures: PhP

In words : Pesos

In Figures: PhP

SPCL III

Amoun

1.00

L.S.

In Figures: PhP

In words : Pesos

In words : Pesos

#VALUE!

#VALUE!

346,528.00

In Figures: PhP

In Figures: PhP

SUB-TOTAL PART NO. B =


#VALUE!
Part No.

Part Description: EARTHWORKS

(Vol. II, Series of 2004 DPWH Standard Specifications for Highways, Bridges and Airports)
Item #

Description

Unit

Quantity

(1)

(2)

(3)

(4)

103(1)a

Structure Excavation

Cu.m.

Unit Price (Pesos)

Amoun

(5)
In words : Pesos

In words : Pesos

#VALUE!

#VALUE!

1,350.00

256.62

In Figures: PhP

In Figures: PhP

SUB-TOTAL PART NO. C =


#VALUE!

Part No.

Part Description: SURFACE COURSE

(Vol. II, Series of 2004 DPWH Standard Specifications for Highways, Bridges and Airports)
Item #

Description

Unit

Quantity

(1)

(2)

(3)

(4)

311(1)

Portland Cement Concrete


Pavement (T=200mm)

Unit Price (Pesos)


In words : Pesos

Portland Cement Concrete


Pavement (T=280mm)

In words : Pesos

#VALUE!
Sq.m.

#VALUE!

8,076.00
In Figures: PhP
In words : Pesos

311(2)

(5)

#VALUE!
Sq.m.

Amoun

1,457.16

In Figures: PhP
In words : Pesos
#VALUE!

14,479.00

2,009.37
In Figures: PhP
SUB-TOTAL PART NO. E =

In Figures: PhP

#VALUE!

Part No.

Part Description: DRAINAGE & SLOPE PROTECTION STRUCT


(Vol. II, Series of 2004 DPWH Standard Specifications for Highways, Bridges and Airports)

Item #

Description

Unit

Quantity

(1)

(2)

(3)

(4)

Unit Price (Pesos)


In words : Pesos

(5)

In words : Pesos

#VALUE!

Spcl 1

CHB Lined Canal

L.M.

Amoun

#VALUE!

1,208.50

3,600.52

In Figures: PhP

In Figures: PhP

SUB-TOTAL PART NO. G =


#VALUE!

Part No.

Part Description: MISCELLANEOUS STRUCTURES

(Vol. II, Series of 2004 DPWH Standard Specifications for Highways, Bridges and Airports)
Item #

Description

Unit

Quantity

(1)

(2)

(3)

(4)

Unit Price (Pesos)


In words : Pesos

(5)

In words : Pesos

#VALUE!

Reflectorized Thermoplastic
pavement markings (white)

612(1)

Sq.m

#VALUE!

505.00

846.44

In Figures: PhP
In words : Pesos
#VALUE!

620(a)

Chevron Directional Signs (457 x


610mm)

Each

Amoun

In Figures: PhP
In words : Pesos
#VALUE!

350.00
In Figures: PhP

10,774.16

SUB-TOTAL PART NO. H =


#VALUE!

TOTAL COST (ALL PARTS)

#VALUE!

Submitted by :

Ruben G. Santos
(Name and Signature of Bidder's Representative)

President/AMO
( Position)

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.


(Name of Bidder)

In Figures: PhP

a Road, K1026+3882 K1026+5901,

nd Airports)

Amount (Pesos)
(6)
#VALUE!

6,120.39
#VALUE!

399,821.18
#VALUE!

143,023.10
#VALUE!

346,528.00

895,492.67

nd Airports)

Amount (Pesos)
(6)
#VALUE!

346,437.00

346,437.00

nd Airports)

Amount (Pesos)
(6)
#VALUE!

11,768,027.54
#VALUE!

29,093,667.47

40,861,695.01

E PROTECTION STRUCTURES

nd Airports)

Amount (Pesos)
(6)
#VALUE!

4,351,227.10

4,351,227.10

nd Airports)

Amount (Pesos)
(6)
#VALUE!

427,449.82
#VALUE!

3,770,954.46

4,198,404.28

50,653,256.06

16.49

16.49

62.13

2.70

842.64

32.31

32.31

10,326.38

ABC=

68,208,112.48

DETAILED ESTIMATES

15IO0061

Contract I.D. No.:

Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road, K10
K1026+5901, Section ID: S00079LT, Villaba, Leyte

Project Name :

Location

Villaba, Leyte

Item No.:
103(1)a
Item Description: Structure Excavation (Common Soil)
Cu.m.
Unit:
OUTPUT/DAY =
Quantity:
1,350.00
Output per hour:
DESIGNATION

20.00

NUMBER of DAYS =
No. of Person

No. of Days

Construction Foreman

8.00

Daily Rate
565.00

Unskilled Laborer

8.00

295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

Dump Truck (10 Cu.M.)

8.00

10,900.00

Backhoe (0.80 Cu.M.) w/ Breaker

8.00

Name and Capacity

12,000.00
Sub-Total

Name and Specification

Unit

Quantity

Unit Cost

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.17% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0061

Contract I.D. No.:

Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road, K1026+3882
Section ID: S00079LT, Villaba, Leyte

Project Name :
Location

Villaba, Leyte

Item No.:
311(1)
Item Description: Portland Cement Concrete Pavement (T=200mm)
Sq.m.
Unit:
OUTPUT/DAY =
Quantity:
8,076.00

80.50
DESIGNATION

NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

Construction Foreman

12.00

565.00

Skilled Laborer

12.00

415.00

12

12.00

Laborer

295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

Transit Mixer (5 cu.m.)

12.00

10,000.00

Concrete Vibrator

12.00

1,330.00

Water Truck (1000 gal)

12.00

8,600.00

Concrete Screeder (5.5 Hp)

12.00

1,680.00

Payloader (1.50 cu.m.), LX80-2C

12.00

13,500.00

Concrete Saw, Blade 14" (7.5 Hp)

12.00

1,330.00

Batching Plant (30 cu.m.)

12.00

9,500.00

3.00

1,700.00

Name and Capacity

Bar Cutter, Single Phase

Sub-Total

Name and Specification


Asphalt Sealant

Unit

Quantity

lit.

970.00

88.00

1,616.00

1,400.00

kg.

3,150.00

44.00

lit.

2,343.00

78.00

l.m.

3,715.00

62.00

cu.m.

890.00

1,300.00

Portland Cement

bag

15,345.00

292.00

Concrete Saw (diamond blade 14")

pc.

2.00

9,900.00

l.m.

70.00

95.00

lit.

46.00

305.00

Reinforcing Steel Bar


Curing Compound
Steel Forms (Rental)
Sand

Pipe Sleeve, 2" dia.


Grease/Tar

Unit Cost

cu.m.

Gravel

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.17% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=
Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0061

Contract I.D. No.:

Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road, K1026+3882
Section ID: S00079LT, Villaba, Leyte

Project Name :
Location

Villaba, Leyte

Item No.:
311(2)
Item Description: Portland Cement Concrete Pavement (T=280mm)
Sq.m.
Unit:
OUTPUT/DAY =
Quantity: 14,479.00

57.50
DESIGNATION

NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

Construction Foreman

31.00

565.00

Skilled Laborer

31.00

415.00

12

31.00

Laborer

295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

Transit Mixer (5 cu.m.)

31.00

10,000.00

Concrete Vibrator

31.00

1,330.00

Water Truck (1000 gal)

31.00

8,600.00

Concrete Screeder (5.5 Hp)

31.00

1,680.00

Payloader (1.50 cu.m.), LX80-2C

31.00

13,500.00

Concrete Saw, Blade 14" (7.5 Hp)

31.00

1,330.00

Batching Plant (30 cu.m.)

31.00

9,500.00

4.00

1,700.00

Name and Capacity

Bar Cutter, Single Phase

Sub-Total

Name and Specification

Unit

Quantity

lit.

1,738.00

88.00

Portland Cement

bags

38,515.00

292.00

kg.

7,240.00

44.00

lit.

4,200.00

78.00

l.m.

6,660.00

62.00

Sand

cu.m.

2,230.00

1,300.00

Gravel

cu.m.

4,055.00

1,400.00

pc.

2.20

9,900.00

l.m.

113.00

95.00

lit.

113.00

305.00

Curing Compound
Steel Forms (Rental)

Concrete Saw (diamond blade 14")


Pipe Sleeve, 2" dia.
Grease/Tar

Unit Cost

Asphalt Sealant
Reinforcing Steel Bar

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.17% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=
Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0061

Contract I.D. No.:

Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road, K1026+3882
Section ID: S00079LT, Villaba, Leyte

Project Name :
Location

Villaba, Leyte

Item No.:
612(1)
Item Description: Reflectorized Thermoplastic pavement markings (white)
Sq.m
Unit:
OUTPUT/DAY =
Quantity:
505.00
Output per hour:

25.00

NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

Construction Foreman

2.50

565.00

Skilled Laborer

2.50

415.00

Laborer

2.50

DESIGNATION

295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

Cargo Truck/Stake Truck

1.00

7,400.00

Applicator Machine

1.00

750.00

Kneading Machine

1.00

1,200.00

Name and Capacity

Sub-Total

Name and Specification

Unit

Quantity

Unit Cost

Thermoplastic Paint, White

bag

165.00

1,645.00

Glass Beads

bags

17.00

850.00

Primer

Gal.

61.00

550.00

LPG (50kg.)

Cylinder

2.00

3,490.00

LPG (12kg.)

Cylinder

1.00

835.00

Calsumine

kg.

64.00

3.00
Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.17% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0061

Contract I.D. No.:

Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road, K1026+3882
Section ID: S00079LT, Villaba, Leyte

Project Name :
Location

Villaba, Leyte

Item No.:
620(a)
Item Description: Chevron Directional Signs (457 x 610mm)
Each
Unit:
OUTPUT/DAY =
Quantity:
350.00
Output per hour:

1.00

NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

Construction Foreman

42.00

565.00

Skilled Laborer

42.00

415.00

Laborer

42.00

DESIGNATION

295.00

Sub-Total

Name and Capacity


Cargo Truck/Stake Truck

No. of
Units

No. of Days

Daily Rate

42.00

7,400.00

Sub-Total

Name and Specification


Chevron Directional Sign, 3mm thick Alum. Sheet (457mm x
610mm)
Portland Cement

Unit

Quantity

Unit Cost

Pc.

700.00

2,600.00

bag

168.00

292.00

Sand

cu.m.

9.00

1,300.00

Gravel

cu.m.

17.50

1,400.00

Good Lumber

Sq.M.

2,800.00

600.00

CW Nails, Assorted

kgs.

28.00

68.00

75mm dia. G.I Pipe

L.M.

1,138.00

655.00

G.I Flat bar, 1/2"x 1/8"

kg

1,750.00

43.00

G.I Bolts w/ Nuts & Washer, 5mm dia.

Pc.

1,051.00

20.00

G.I Bolts w/ Nuts & Washer, 2mm dia.

Pc.

4,200.00

20.00

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.17% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0061

Contract I.D. No.:

Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road, K1026+3882
Section ID: S00079LT, Villaba, Leyte

Project Name :
Location

Villaba, Leyte

Item No.:
Spcl 1
Item Description: CHB Lined Canal
L.M.
Unit:
Quantity:
1,208.50
Output per hour:

DESIGNATION
Construction Foreman

OUTPUT/DAY =

1.20

NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

98.00

565.00

Skilled Laborer

98.00

415.00

Laborer

98.00

295.00

Sub-Total

No. of
Units

No. of Days

Daily Rate

Water Truck (Cap. 1000 Gal.)

98.00

8,600.00

Plate Compactor

98.00

1,000.00

Rebar Cutter

9.80

1,700.00

Rebar Bender

9.80

2,758.00

Concrete Mixer, 1.5-2 Bagger

98.00

Name and Capacity

1,400.00

Sub-Total

Name and Specification

Unit

Quantity

CHB, 4" Thick

Pc.

19,336.00

20.00

Portland Cement

bags

1,608.00

292.00

Sand

cu.m.

303.00

1,300.00

Gravel

cu.m.

120.00

1,400.00

Ordinary Plywood, 1/4 Thick

Pc.

241.00

595.00

Reinforcing Steel Bar, Grade 60

kg.

6,925.00

44.00

Tie Wire #16

kgs.

701.00

67.00

Coco Lumber

Bd.ft.

6,042.00

14.00

kg.

96.00

68.00

Cu.M.

96.00

800.00

CW Nails, Assorted
Gravel Bedding

Unit Cost

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.17% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=
Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0061

Contract I.D. No.:

Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road, K1026+3882
Section ID: S00079LT, Villaba, Leyte

Project Name :
Location

Villaba, Leyte

Item No.:
SPCL II
Item Description: DPWH Standard Project Billboard
Pc.
Unit:
Quantity:
2.00
Output per hour:

DESIGNATION
Construction Foreman
Skilled Laborer
Laborer

1.00

OUTPUT/DAY =
NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

1.00

565.00

1.00

415.00

1.00

295.00

Sub-Total

Name and Capacity

No. of
Units

No. of Days

Daily Rate

Minor Tools/Misc. Expenses

Sub-Total

Name and Specification

Unit

Quantity

Unit Cost

Tarpauline

pc.

1.00

870.00

Marine Plywood

pc.

1.00

635.00

Form Lumber, Coco

bd. Ft.

CW Nails, Assorted

kg.

84.00

14.00

2.00

68.00

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.17% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=
Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0061

Contract I.D. No.:

Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road, K1026+3882
Section ID: S00079LT, Villaba, Leyte

Project Name :
Location

Villaba, Leyte

Item No.:
SPCL V
Item Description: Mobilization and Demobilization
L.S.
Unit:
Quantity:
1.00

No. of
Units

No. of Days

8,000.00

2
2
2
2
1
1
2
1
1

Plate Compactor

1
1
3
1
1
2
4
1
1
1
1
2
2
1
2
2
1
2

12,000.00
9,500.00
16,950.00
11,100.00
10,900.00
13,500.00
10,000.00
8,600.00
5,000.00
750.00
1,200.00
1,700.00
2,758.00
1,680.00
1,330.00
450.00
1,400.00
1,000.00

Cargo Truck/Stake Truck


Jack Hammer
Cutting Outfit
Concrete Vibrator

1
1
1
1

CIVIL WORKS W/ EQUIPMENT


Low Bed Trailer
Backhoe (0.80 Cu.M.) w/ Breaker
Batching Plant (30 Cu.M.)
Road Grader
Road Roller, Vibratory
Dump Truck (10 Cu.M.)
Payloader, (1.5 Cu.M.)
Transit Mixer (5 Cu.M.)
Water Truck (Cap. 1000 Gal.)
Vibro Hammer w/ Hydraulic Power Pack
Applicator Machine
Kneading Machine
Rebar Cutter
Rebar Bender
Concrete Screeder
Concrete Saw
Chainsaw
Concrete Mixer, 1.5-2 Bagger

Daily Rate

_
_
_
_
_
_
_
_
_
_

7,400.00
1,600.00
300.00
1,330.00

_
_
_

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0061

Contract I.D. No.:

Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road, K1026+3882
Section ID: S00079LT, Villaba, Leyte

Project Name :
Location

Villaba, Leyte

Item No.:
SPCL III
Item Description: Traffic Management
L.s.
Unit:
Quantity:
1.00

DESIGNATION
Unskilled Laborer

No. of
Person

No. of Days

90.00

Daily Rate
295.00

Sub-Total

Name and Capacity

No. of
Units

No. of Days

Daily Rate

Incidental/Misc. Expenses

Sub-Total

Name and Specification


Warning Devices, Barricades, Signages, etc.

Unit

Quantity

Unit Cost

L.s.

1.00

10,100.00

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.08% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0061

Contract I.D. No.:

Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road, K1026+3882
Section ID: S00079LT, Villaba, Leyte

Project Name :
Location

Villaba, Leyte

Item No.:
SPCL IV
Item Description: Construction, Safety and Health
L.s.
Unit:
Quantity:
1.00

DESIGNATION

No. of
Person

No. of Days

Daily Rate

First Aider

220.00

765.00

Part-time Safety Practitioner

120.00

855.00

Sub-Total

Name and Capacity

No. of
Units

No. of Days

Daily Rate

Incidental/Misc. Expenses

Sub-Total

Name and Specification

Unit

Quantity

Unit Cost

Safety Helmets, Safety Shoes and Safety Gloves

set

12.00

4,550.00

First Aid Kit

set

1.00

3,560.00

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.08% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

ok Consuegra Road, K1026+3882


laba, Leyte

160.00

8.44
Amount
4,520.00
7,080.00

11,600.00

Amount
174,400.00
96,000.00

270,400.00

Amount

0.00

282,000.00
64,437.00
47,940.00
16,497.00

346,437.00
256.62

suegra Road, K1026+3882 K1026+5901,


yte

644.00

12.54
Amount
6,780.00
19,920.00
42,480.00

69,180.00

Amount
480,000.00
31,920.00
103,200.00
20,160.00
162,000.00
15,960.00
114,000.00
5,100.00

932,340.00

Amount
85,360.00
2,262,400.00
138,600.00
182,754.00
230,330.00
1,157,000.00
4,480,740.00
19,800.00
6,650.00
14,030.00

8,577,664.00

9,579,184.00
2,188,843.54
1,628,461.28
560,382.26

11,768,027.54
1,457.16

suegra Road, K1026+3882 K1026+5901,


yte

460.00

31.48
Amount
17,515.00
51,460.00
109,740.00

178,715.00

Amount
1,240,000.00
82,460.00
266,600.00
52,080.00
418,500.00
41,230.00
294,500.00
6,800.00

2,402,170.00

Amount
152,944.00
11,246,380.00
318,560.00
327,600.00
412,920.00
2,899,000.00
5,677,000.00
21,780.00
10,735.00
34,465.00

21,101,384.00

23,682,269.00
5,411,398.47
4,025,985.73
1,385,412.74

29,093,667.47
2,009.37

suegra Road, K1026+3882 K1026+5901,


yte

200.00

2.53
Amount
1,412.50
3,112.50
6,637.50

11,162.50

Amount
7,400.00
750.00
1,200.00

9,350.00

Amount
271,425.00
14,450.00
33,550.00
6,980.00
835.00
192.00

327,432.00

347,944.50
79,505.32
59,150.57
20,354.75

427,449.82
846.44

suegra Road, K1026+3882 K1026+5901,


yte

8.00

43.75
Amount
23,730.00
17,430.00
24,780.00

65,940.00

Amount
310,800.00

310,800.00

Amount
1,820,000.00
49,056.00
11,700.00
24,500.00
1,680,000.00
1,904.00
745,390.00
75,250.00
21,020.00
84,000.00

2,692,820.00

3,069,560.00
701,394.46
521,825.20
179,569.26

3,770,954.46
10,774.16

suegra Road, K1026+3882 K1026+5901,


yte

9.60

125.89
Amount
55,370.00
81,340.00
202,370.00

339,080.00

Amount
842,800.00
98,000.00
16,660.00
27,028.40
137,200.00

1,121,688.40

Amount
386,720.00
469,536.00
393,900.00
168,000.00
143,395.00
304,700.00
46,967.00
84,588.00
6,528.00
76,800.00

2,081,134.00

3,541,902.40
809,324.70
602,123.41
207,201.29

4,351,227.10
3,600.52

suegra Road, K1026+3882 K1026+5901,


yte

1.00

1.00
Amount
565.00
415.00
590.00

1,570.00

Amount
595.00

595.00

Amount
870.00
635.00
1,176.00
136.00

2,817.00

4,982.00
1,138.39
846.94
291.45

6,120.39
3,060.19

suegra Road, K1026+3882 K1026+5901,


yte

Estimated Direct
Cost
16,000.00
24,000.00
19,000.00
101,700.00
22,200.00
10,900.00
27,000.00
80,000.00
8,600.00
_
_
_
_
_
_
_
_
_
_
_
_
_
_
309,400.00

37,128.00

346,528.00
346,528.00

suegra Road, K1026+3882 K1026+5901,


yte

Amount
106,200.00

106,200.00

Amount
1,940.00
1,940.00

Amount
10,100.00

10,100.00

118,240.00
24,784.10
9,459.20
15,323.90

143,023.10
143,023.10

suegra Road, K1026+3882 K1026+5901,


yte

Amount
168,300.00
102,600.00

270,900.00

Amount
1,480.00

1,480.00

Amount
54,600.00
3,560.00

58,160.00

330,540.00
69,281.18
26,443.20
42,837.98

399,821.18
399,821.18

#VALUE! GRAND TOTAL

50,653,256.06
273.35

###

BID AMOUNT=

0.120

969.12

0.200

1,615.20

0.390

3,149.64

0.290

2,342.04

0.460

3,714.96

0.110

888.36

1.900

15,344.40

0.00015

1.21

0.00860

69.45

0.00560

45.23

50,653,256.06
1,484.81

BID AMOUNT=

0.120

1,737.48

2.660

38,514.14

0.500

7,239.50

0.290

4,198.91

0.460

6,660.34

0.154

2,229.77

0.280

4,054.12

0.00015

2.17

0.00780

112.94

0.0078

112.94

50,653,256.06
2,071.83

310.00
0.33

164.13

3,225.00

0.03

16.67

3,750.00

0.12

60.60

3,325.00

0.00

2.02

0.00

1.01

0.13

63.13

50,653,256.06
847.20

310.00
2.00

700.00

0.480

0.080

168.00
8.75
17.50
2,800.00
28.00

3.250

1,137.50

5.000

1,750.00

3.000

1,050.00

12.000

4,200.00

0.025
0.050
8.000

50,653,256.06
11,323.07

3,225.00
3,750.00
3,325.00

310.00
16.000

19,336.00

1.330

1,607.31

3,225.00

0.250

302.13

3,750.00

0.100

120.85

0.200

241.70

5.730

6,924.71

0.580

700.93

5.000

6,042.50

0.080

96.68

0.080

96.68

50,653,256.06
3,004.31

3,325.00

3,084.75

227,455.20

76.00

174,060.84

#VALUE!

#VALUE!

#VALUE!
#VALUE!

#REF!
#VALUE!

247,117.88

Contract ID.:

Contract
Name.:
Location .:

15IO0061
Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road,
K1026+3882 K1026+5901, Section ID: S00079LT, Villaba, Leyte

Villaba, Leyte

EQUIPMENT
Grinder
Electric Drill
Bulldozer
Truck Mounted Crane (45T)
Low Bed Trailer
Backhoe (0.80 Cu.M.) w/ Breaker
Batching Plant (30 Cu.M.)
Road Grader
Road Roller, Vibratory
Crawler Crane (45T)
Crane w/ Bucket
Truck Mounted Crane (45T)
High Bed Trailer
Dump Truck (10 Cu.M.)
Payloader, (1.5 Cu.M.)
Transit Mixer (5 Cu.M.)
Water Truck (Cap. 1000 Gal.)
Vibro Hammer w/ Hydraulic Power Pack
Applicator Machine
Kneading Machine
Rebar Cutter
Rebar Bender
Concrete Screeder
Drop Hammer w/ Accessories
Welding Machine
Wood/Steel Ladder
Generator Set
Water Pump
Vibro Hammer
Diesel Hammer
Electric Grinder
Air Compressor (42 Hp)
Concrete Vibrator
Oxygen Outfit
Acetylene Outfit
Concrete Saw
Chainsaw
Concrete Mixer, 1.5-2 Bagger
Welding Outfit
Concrete Cart
Plate Compactor
Concrete Bucket
Stressing (Jack) Machine
Drop Hammer w/ Accessories
Grouting Machine
Boom Truck
Cargo Truck/Stake Truck
Jack Hammer
Cutting Outfit
Concrete Vibrator
Electric Grinder

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DAILY RATE
228.00
220.00
18,150.00
12,900.00
8,000.00
12,000.00
9,500.00
16,950.00
11,100.00
12,580.00
11,954.00
11,500.00
7,900.00
10,900.00
13,500.00
10,000.00
8,600.00
5,000.00
750.00
1,200.00
1,700.00
2,758.00
1,680.00
1,230.00
860.00
770.00
1,860.00
1,340.00
11,280.00
1,000.00
850.00
1,450.00
1,330.00
500.00
500.00
1,330.00
450.00
1,400.00
500.00
210.00
1,000.00
500.00
76,880.00
1,430.00
3,900.00
5,900.00
7,400.00
1,600.00
300.00
1,330.00
550.00

Contract ID.:
Contract
Name.:
Location .:

15IO0061
Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road, K1026+3882
K1026+5901, Section ID: S00079LT, Villaba, Leyte

Villaba, Leyte
MATERIALS DESCRIPTION

Personal Protective Equipment (Safety Helmets, & Gloves)

Firs Aid Kit


Tarpauline
Marine Plywood
Ordinary Plywood, 1/4 Thick
Good Lumber
Coco Lumber
Form Lumber, Coco
CW Nails, Assorted
Rope, 1" diameter
Common Borrow
Tie Wire #16
Portland Cement
Sand
Gravel
CHB, 4" Thick
Aggregate Subbase Course
Reinforcing Steel Bar, Grade 60
Curing Compound
Gravel Bedding
Concrete Saw Blade
Asphalt Sealant
Steel Forms
Pipe Sleeve, 2" dia.

Grease/Tar
Boulders
R.C. Pipes (910mm dia.)
Sand Bedding/Selected Sandy Soil

Filter Cloth
PVC Pipe 2" dia.
LPG (50kg.)
LPG (12kg.)
Glass Beads
Calsumine
Primer
Thermoplastic Paint, White
Thermoplastic Paint, Yellow
75mm dia. G.I Pipe
G.I Flat bar, 1/2"x 1/8"
G.I Bolts w/ Nuts & Washer, 5mm dia.
G.I Bolts w/ Nuts & Washer, 2mm dia.
Chevron Directional Sign, 3mm thick Alum. Sheet
(457mm x 610mm)
PVC pipe 101m dia.
PVC Coupling 101m dia. w/ O-ring

UNIT

set
set

pc.
pc.
Pc.
Bd.ft.
Bd.ft.

Bd.ft.
kg.
L.m.
Cu.M.
kgs.
bags
cu.m.
cu.m.
Pc.
Cu.M.
kg.
ltr.
Cu.M.
Pcs.
ltr.
L.M.
L.m.

ltr.
Cu.M.

pc.
cu.m.
Sq.M.
L.m.
Cylinder
Cylinder
bags
kg.
Gal.
bags
bags
L.M.
kg
Pc.
Pc.
Pc.
Sq.M.
Pc.

Lamp Post, 9.5M Height Post w/ double Arm


Lamp Post, 9.5M Height Post w/ Single Arm
Tie Wire #16
Warning Devices, Barricades, Signages, etc.

Set
Set
kgs.
L.s.

Submitted by :

Ruben G. Santos
MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

nok Consuegra Road, K1026+3882


llaba, Leyte

72,565,621.13

UNIT COST

4,550.00
3,560.00
870.00
635.00
595.00
66.00
14.00

14.00
68.00
6.00
305.00
67.00
292.00
1,300.00
1,400.00
20.00
640.00
44.00
78.00
800.00
9,900.00
88.00
62.00
95.00

305.00
900.00
3,740.00
590.00
180.00
96.00
3,490.00
835.00
850.00
3.00
550.00
1,645.00
1,690.00
655.00
43.00
20.00
20.00
2,600.00
600.00
72.00

-5.71

ETE PRODUCTS INC.

36,398.00
32,388.00
67.00
10,100.00

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve, 2" dia.

16IO0001

Contract ID.:

Contract Name.:

Location .:

IMPROVEMENT/WIDENING OF NATIONAL ROAD ALONG DAANG MAHARLIKA, KO903+198KO904+000, KO904+000-KO904+342' KO905+200-KO907+184, S00002LT, Tacloban City

Villaba, Leyte

PERSONNEL

Construction Foreman
Skilled Laborer
Unskilled Laborer
Safety Officer
First Aider

Submitted by :
Ruben G. Santos
(Name and Signature of Bidder's Representative)
President/AMO
( Position)

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.


(Name of Bidder)

DAANG MAHARLIKA, KO903+19807+184, S00002LT, Tacloban City

DUCTS INC.

RATE/DAY

565.00
415.00
295.00
855.00
765.00

71.02

568.16

51.51

412.08

39.73

317.84

tract ID

: 16IO0001

Contract
Road Upgrading (Unpaved to Paved) along Cabunga-an Tabunok Consuegra Road, K1026+3882 K1026+5901, Section ID: S00079LT, V
Name :
Location : Villaba, Leyte

CASH FLOW BY QUARTER AND PAYMENT SCHEDULE


Y

PARTICULARS

2016

1ST QTR

Project Duration

90 Calendar Days

Y
2ND QTR
90 Calendar Days

3RD QTR
30 Calendar Days

Accomplishment, (%)

40.91%

40.91%

13.64%

Cash Flow, (Php)

20,721,786.57

20,721,786.57

6,907,262.19

Cumulative Accomplishment, (%)

45.45%

86.36%

100.00%

Cumulative Cash Flow, (Php)

23,024,207.30

43,745,993.87

50,653,256.06

Submitted by :

Ruben G. Santos
(Name and Signature of Bidder's Representative)
President/AMO
( Position)

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.


(Name of Bidder)

2015

tion ID: S00079LT, Villaba, Leyte

2015
4TH QTR
10 Calendar Days
4.55%

2,302,420.73
4.55%

2,302,420.73

15
15

25
40

50,653,256.06

2,302,420.73

4.55%

20,721,786.57

40.91%

20,721,786.57

40.91%

6,907,262.19

13.64%

50,653,256.06

100.00%

50,653,256.06
10
90
90
30
220

BID AMOUNT

4TH QTR
1ST QTR
2ND QTR
3RD QTR
DURATION