Division-1 Preliminaries
BOQ No.
Description
Charges for PPEs for all workers, Administration and visitors (Refer to requirements Annexed in
Annexure 11 ("HSE Requirments") and Appecdix 11A, specific reference to entirety of the contract
as applicable
Transition Phase: Four (4) months in house support from the Supplier to the Purchaser, shadowed
by Purchaser's nominated team starting from the date of certified Provisional Acceptance of all
equipment and services in the project phase.
Qty
Unit
L.S
JOB
L.S
JOB
Amount
B
0
B3 - 1
BOQ No.
Description
prime WebAccess (pWA) software to cover all the security requirements as detailed in the
Annexure 1 - Definitions and Scope of Work. As the Telenor Group already has a corporate licence
for this software, the costs here are for:
1,000 user licences
10 concurrent system user licences
local installation of the pWA software
local installation of the user/system user licences
parametrisation of the software
1a
Material
Cost ()
Installation Cost
()
Rate
Total Cost ()
Govt. Taxes at
Services
10%
Material Unit
rate with Taxes
Services Unit
rate with tax
Total Unit
Price in PKR
Total Price in
PKR
Qty
Unit
Set
5,310
3,750
5,310
3,750
100%
9,060
531
375
5,841
4,125
9,966
1,195,920
1,195,920
Set
5,000
15,000
100%
15,000
500
5,500
5,500
660,000
1,980,000
5,100
10,000
5,100
10,000
100%
15,100
510
1,000
5,610
11,000
16,610
1,993,200
1,993,200
5,000
15,000
100%
15,000
500
5,500
5,500
660,000
1,980,000
100%
psm2200 Command Centre software as the integration platform for the security elements of the
system. These include:
Access control (primion)
CCTV (Milestone)
Intrusion detection system (Paradox)
Perimeter protection (Optex)
Barrier control
As the Telenor Group already has a corporate licence for this psm2200 software, the costs here are
for:
1500 datapoint licences
5 concurrent system user licences
Iocal installation and customising of the psm2200 software
local installation of the datapoint/system user licences
creation of datapoints and assignment of datapoints to
floorplan graphics
the import of the floorplan graphics
the definition and creation of alarm workflows according
to operational requirements
1
Set
2a
Set
Set
Set
5,000
10,000
100%
10,000
500
5,500
5,500
660,000
1,320,000
Set
11,200
1,250
11,200
1,250
100%
12,450
1,512
125
12,712
1,375
14,087
1,690,440
1,690,440
Set
5,000
5,000
100%
5,000
500
5,500
5,500
660,000
660,000
3a
4a
GVT
6
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
7
1,000
Nos
7.50
7,500
4,160
100%
11,660
76
89
96
56
Nos.
Nos.
Nos.
Nos.
420
490
55
130
15
30
10
25
31,920
43,610
5,280
7,280
1,140
2,670
960
1,400
100%
100%
100%
100%
33,060
46,280
6,240
8,680
1
0
42
49
6
13
0
0
2
3
1
3
9
0
462
539
61
143
5
0
17
33
11
28
13
0
479
572
72
171
1,584
0
57,420
68,640
8,580
20,460
1,584,120
0
4,363,920
6,108,960
823,680
1,145,760
Nos
19
190
44
1
1
1
29
Nos.
Nos.
Nos.
Set
Nos.
Nos.
Nos.
4,830
19
12
30
250
10
5
10
33,810
361
2,280
1,320
1,750
190
950
440
100%
100%
100%
100%
35,560
551
3,230
1,760
1,449
6
4
3
25
1
1
1
6,279
25
16
33
275
11
6
11
6,554
36
21
44
5,505,360
81,396
481,080
232,320
0
0
0
1,110,120
300
Rm
240
50
6,960
1,450
100%
8,410
24
264
55
319
786,480
4,284
2,532
5,280
0
0
0
38,280
27,844
35,409
161,931
75,110
18
237,041
4,149
3,541
31,992
38,950
70,943
8,513,100
GVT
GVT
GVT
GVT
Difference
31,361,520
894,756
BOQ No.
Description
Supply & Installation of IP66 weather Proof fixed type box camera True Day / Night with IR
Illuminator complete with housing, mounting brackets, enclosure for power supply etc as per drawing
& specification & schedule of camera complete in all respects
Qty
Unit
Nos.
Material
Cost ()
Installation Cost
()
Rate
Total Cost ()
0
2
Supply & Installation of IP66 weather Proof fixed type box camera True Day / Night with with
housing, mounting brackets, enclosure for power supply, 12ft MS pole silver painted, as per drawing
& specification & schedule of camera complete in all respects
41
Nos.
B3 - 2
Supply & Installation of IP66 weather Proof RAYLUX-50 White security lights, mounting brackets,
power supply, to be installed with the camrea as per drawing & specification complete in all respects
41
Nos.
Supply & Installation of IP66 weather Proof RAYMAX-50 IR light, mounting brackets, power supply,
to be installed with the camrea as per drawing & specification complete in all respects
41
Nos.
Supply & Installation of IP66 weather Proof PTZ type Thermal camera with with mounting brackets
enclosure for power supply etc as per drawing & specification & schedule of camera complete in all
respects
Nos.
0
0
5
0
6
Supply & Installation of IP66 weather Proof PTZ camera with True Day / Night and 27X Zoom,
complete with housing, mounting brackets, enclosure for power supply etc as per drawing &
specification & schedule of camera complete in all respects
Nos.
28
Nos.
Nos.
Set
0
7
8
Supply & Installation of fixed type Dome camera True Day / Night as per drawing & specification &
schedule of camera complete in all respects
Supply & Installation of fixed type Vandal Resistant IP 66 weather proof Dome camera True Day /
Night, with IR Illuminator as per drawing & specification & schedule of camera complete in all
respects
0
9
Supply & Installation of NVR to accommodate all the cameras and storage capacity of 30 days at
high quality, 25FPS and adjustable noise ratio as per drawing & specificaiton complete in all respect
0
10
Supply & Installation of Cisco Certified PoE switches for 1G network to interconnect Building IP
nodes, including Fiber terminal (SFP) to integrate with Fiber network Infrastructure.
a.
b.
24 port
48 port
9
5
Nos.
Nos.
11
Providing & Fixing of Fiber optic Encoder and Decorder set with termination & housing for each
outdoor camera from nearest copper switch as per drawing & specifications complete in all respects.
Set
12
Supply & Installation of Video Console complete with LCDs for point monitoring & over all
surveillance of the project.
0
0
0
0
Set
Nos.
0
13
13a
Supply & Installation of Integration Platform (Milestone) to Integrate IP Surveillance system with
other security systems as per drawings & specificaitons complete with necessary software and
hardware provisions.
Manufacturer services for Item 13 (CCTV):
training and commissioning
project management and consultancy
Set
5,000
5,000
5,000
5,000
100%
BOQ No.
Description
500
5,000
5,000
500
5,500
0
5,500
0
0
0
Qty
Unit
No.
Supply & Installation of Baggage Scanner 700 x 500mm Tunnel size complete in all
respects to be integrated with Security Integration Platform as per drawings and
specifications. (As per new BOQ)
No.
No.
Material
Cost
Installation Cost
Rate
Total Cost
0
2
Material
Cost
Installation Cost
0
0
0
BOQ No.
Description
Supply & Installation of Terrain Blocker as certified set of automatic rising bollards,
remote manual override switch in guard post, to cover the full lane with wiring,
conduiting, civil works complete in all respects to be integrated with Security Integration
Platform as per drawings and specifications.
Qty
Unit
Set
Set
Rate
Total Cost
0
2
Supply & Installation of Terrain Blocker as fixed bollards, having same finish as item # 1
to permanently restrict vehicle movement in an area complete in all respects as per
drawings and specifications.
0
3
Supply & Installation of Terrain Blocker as certified large automatic rising road blocker,
remote manual override in guard post, to cover the full lane with wiring, conduiting, civil
works complete in all respects to be integrated with Security Integration Platform as per
drawings and specifications.
Nos
Nos.
0
4
Supply & Installation of mechanical tyre shredder to restrict one way traffic with civil
works complete in all respect.
Total for Terrain Blocker
Material
Cost
Installation Cost
Material
Cost
Installation Cost
Material
Cost ()
Installation Cost
()
0
0
0
BOQ No.
Description
Qty
Unit
Supply & Installation of Arm Barrier to cover the full lane complete in all respects with
remote override switch in guard post as well as integration of Access Control Long
Range RFID Reader as per drawings and specifications.
Nos
Rate
Total Cost
0
0
0
BOQ No.
Description
Qty
Unit
Supply & Installation of Intercom at all Public Entry points (outdoor) complete in all
respects as per drawings and specifications.
Set
Rate
Total Cost
0
0
0
BOQ No.
Description
Qty
Supply & Installation of Door Contacts to sense intrusion complete in all respects as per
drawings and specifications.
148
Unit
Rate
Total Cost ()
0
0
B3 - 3
Supply & Installation of Alarm Sounders IP 54 (Green Color) complete in all respects as
per drawings and specifications.
Supply & Installation of Outdoor type high noise hooter (Green Color) complete in all
respects as per drawings and specifications.
Supply & Installation of Ceiling type 360 degree motion sensor complete in all respects
as per drawings and specifications.
30
Supply & Installation of Arm Disarm panels with keypad to configure / reconfigure the
systems and activate sequence of security complete in all respects as per drawings and
specifications.
Supply & Installation of Duress Panic Buttons at various locations for intruder alarm
complete in all respects as per drawings and specifications.
Bosch Connetix box for the integration of the IDS system into psm2200 for the Operations Centre.
Plus interface adapter plug-in board for connection of alarm panel.
26
0
0
0
0
6
0
7
0
8
Supply & Installation of Networked Intrusion detection panel with monitoring zones as per Item #1
and control zones as per item # 2, all configurable with Control panel, and GUI and to be integrated
with Security Integration Platform complete in all respects as per drawings and specifications. IP and
GPRS communication for backup of SMS and remote control.
0
8a
Set
0
0
5,000
5,000
5,000
Material
Cost ()
Installation Cost
()
5,000
100%
500
5,000
5,000
500
5,500
0
5,500
0
0
0
BOQ No.
Description
Qty
Unit
Supply & Installation of Laser beam Transmitter/ reciever to sense intrusion from
perimeter complete in all respects as per drawings and specifications.
21
Pair
Supply & Installation of Perimeter Security Control Panel with highly accurate intrusion
detection, to be integrated with Security Integration Platform complete in all respects as
per drawings and specifications.
Nos.
1
5,270
Set
Rm
Rate
Total Cost ()
0
2
0
2a
5,000
27,844
0
0
0
5,000
50,409
5,000
161,931
0
5,000
90,110
100%
500
5,000
0
5,000
500
5,500
0
5,500
0
0
0
252,041
B3 - 4