Académique Documents
Professionnel Documents
Culture Documents
DT022/3
16739 PRFD3111
14985 PRFD3111
BACHELOR OF ENGINEERING
IN MECHANICAL ENGINEERING
&
BACHELOR OF ENGINEERING
IN MANUFACTURING & DESIGN ENGINEERING
_________
THIRD YEAR: JANUARY 2013
SEMESTER 1
__________
PROFESSIONAL DEVELOPMENT
John Lawlor MSc
Robert Simpson MSc
David Kennedy PhD
Mark McGrath MEng, M.I.E.I.
Anne Marie McCarrick MSc
Arthur Henry
XXXX Jan 2013, XXXX p.m.
Answer 4 of the following 6 questions, at least 2 from Section A and at least 1 from Section B.
Please use separate answer books for each section.
All questions carry equal marks.
2013 DIT
[P.T.O.
DT023/3
DT022/3
16739 PRFD3111
14985 PRFD3111
Section A
Question 1
(a)
(15 Marks)
Trait theory
Style theory
Contingency theory
(b)
(10 Marks)
(a)
(15 Marks)
(b)
(10 Marks)
(8 Marks)
(13 Marks)
Question 2
Question 3
(a)
(b)
(c )
2013 DIT
(4 Marks)
[P.T.O.
DT023/3
DT022/3
16739 PRFD3111
14985 PRFD3111
Question 4
(a)
(10 Marks)
(b)
(10 Marks)
Critical path
Float (or slack)
Using table 4.1 below, draw the network diagram, calculate float for
each task and determine the following:
i)Total project duration
ii) Critical path
Activity/Task
A
B
C
D
E
F
G
H
Predecessor
A
B
B
B
C,D
D
E,G
Table 4.1
(c)
2013 DIT
Calculate the probability that the project shown in table 4.1 above
will be completed in 50 days or less. (10 marks)
(5 marks)
[P.T.O.
DT023/3
DT022/3
16739 PRFD3111
14985 PRFD3111
Section B
Question 5
(a)
(b)
(10 Marks)
Direct
Indirect
Variable
Fixed
Mixed
Step
Question 6
Write notes on the following:
(15 Marks)
2013 DIT
(10 Marks)
[P.T.O.