Vous êtes sur la page 1sur 37

DESAIN PONDASI TANGKI

550 M3 TAHAN GEMPA


DENGAN BANTUAN PROGRAM AFES 3.0
DAPI SYAMSUDIN. ST

FOUNDATION CALCULATION SHEET


One-Stop Solution for Foundation

TITLE

DESCRIPTION

PROJECT/JOB NO.

DP ENGINEERING

PROJECT/JOB NAME

TANGKI 550 M3

CLIENT NAME

SITE NAME

DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME

PROYEK TANKI 550 M3

LOAD COMBINATION GROUP NAME


REV

DATE

Copyright (c) GS E&C. All Rights Reserved

DESCRIPTION

PREP'D

CHK'D

APPR'D

APPR'D

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Foundation

Project No. : DP ENGINEERING


Client : -

FOUNDATION LISTS
Group Name

No.

TANK600M3

Description
F1

Copyright (c) GS E&C. All Rights Reserved

No.

Description

Page 1

11/13/2014

Calculation Sheet
of
Foundation

CONTENTS
1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING DATA
3.2 PIER DATA
3.3 SECTION DATA
3.4 LOAD CASE
3.5 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 RING WALL DESIGN
5.3 REQUIRED REINFORCEMENT
5.4 ONE WAY SHEAR FORCE
5.5 TWO WAY SHEAR FORCE
5.6 PILE PUNCHING SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved

Project Na. : TANGKI 550 M3


Project No. : DP ENGINEERING
Client : -

Page 2

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Foundation

Project No. : DP ENGINEERING


Client : -

1. GENERAL
1.1 CODE & STANDARD
Items

Description

Design Code

American Concrete Institute (ACI 318) [Metric]

Horizontal Force for Wind

AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-02]

Horizontal Force for Seismic

AMERICAN SOCIETY CIVIL ENGINEERS [ASCE 7-02]

Unit System

Input : MKS,

Output : MKS,

Calculation Unit : IMPERIAL

1.2 MATERIALS & UNIT WEIGHT


Items

Value
2

Concrete (fck : compressive strength)

250.000 kgf/cm

Lean Concrete (Lfck : compressive strength)

150.000 kgf/cm

Reinforcement (10M ~ 16M , yield strength)

2400.000 kgf/cm

Reinforcement (19M ~ , yield strength)

3900.000 kgf/cm

Rs (Soil unit weight)

1.800 ton/m

Rc (Concrete unit weight)

2.400 ton/m

Es (Steel Modulus of Elasticity)

2.000 106 kgf/cm

Ec (Concrete Modulus of Elasticity)

235000.000 kgf/cm

2
2
2

3
3
2
2

- Pile Capacity
Items

Value

Pile Name

Industry Water Tank 500 m3

Footing List

F1

Diameter

350 mm

Length

17 m

Thick

350 mm

Shape

Square

Capacity ( Ha , Ua , Va )

6 , 16 , 55 tonf

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items

Description

Allowable Increase of Soil (Wind)

0%

Allowable Increase of Soil (Seismic)

0%

Allowable Increase of Soil (Test)

0%

Allowable Increase of Pile Horizontal (Wind)

0%

Allowable Increase of Pile Horizontal (Seismic)

0%

Allowable Increase of Pile Horizontal (Test)

0%

Allowable Increase of Pile Vertical (Wind)

0%

Allowable Increase of Pile Vertical (Seismic)

0%

Allowable Increase of Pile Vertical (Test)

0%

Copyright (c) GS E&C. All Rights Reserved

Page 3

11/13/2014

Calculation Sheet
of
Foundation
Allowable Increase of Pile Uplift (Wind)

0%

Allowable Increase of Pile Uplift (Seismic)

0%

Allowable Increase of Pile Uplift (Test)

0%

Safety factor against overturning for OVM1(FO1)

Safety factor against overturning for OVM2(FO2)

Safety factor against overturning for OVM3(FO3)

Safety factor against overturning for OVM4(FO4)

Safety factor against sliding for the SL1(FS1)

Safety factor against sliding for the SL2(FS2)

Safety factor against sliding for the SL3(FS3)

Safety factor against sliding for the SL4(FS4)

Friction factor (m)

0.35

1.4 LOAD COMBINATION


Comb . ID

Load Combination for stability

10

1.0 SW + 1.0 Empty

11

1.0 SW + 1.0 WL + 1.0 Empty

12

1.0 SW + 1.0 SL2 + 1.0 Empty

21

1.0 SW + 1.0 Operation

22

1.0 SW + 1.0 WL + 1.0 Operation

23

1.0 SW + 1.0 SL2 + 1.0 Operation

31

1.0 SW + 1.0 Test

32

1.0 SW + .25 WL + 1.0 Empty

Comb . ID

Load Combination for Reinforcement

100

1.4 SW + 1.4 Empty

101

.9 SW + 1.3 WL + .9 Empty

102

.9 SW + 1.43 SL2 + .9 Empty

110

1.4 SW + 1.4 Empty

111

1.4 SW + 1.7 WL + 1.4 Test

112

1.4 SW + 1.4 SL2 + 1.4 Empty

121

1.4 SW + .425 WL + 1.4 Test

Copyright (c) GS E&C. All Rights Reserved

Project Na. : TANGKI 550 M3


Project No. : DP ENGINEERING
Client : -

Page 4

11/13/2014

Calculation Sheet
of
Foundation

2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH

Copyright (c) GS E&C. All Rights Reserved

Project Na. : TANGKI 550 M3


Project No. : DP ENGINEERING
Client : -

Page 5

11/13/2014

Page 6

REFERENCE DWGS
A01

NO.

DWG NO.

DWG TITLE

NOTES
* OUTPUT UNIT : mm

01
TANGKI 550 M3 PROJECT

1
F1

SQUAD CHECK

FOUNDATION LOCATION PLAN


PROYEK TANKI 550 M3

PROCESS PIPING VESSELS STRUCT.

SCALE

JOB NO.

AS SHOWN DP ENGINEERING

Copyright (c) GS E&C. All Rights Reserved

ELEC.

INST.

MICROFILM NO.

11/13/2014

Page 7

2.2 DETAIL SKETCH

OUTPUT UNIT : mm
Copyright (c) GS E&C. All Rights Reserved

11/13/2014

Page 8

REFERENCE DWGS
TOP

DWG NO.

DWG TITLE

13M@150

500 500

13M@150

7000

4500x2

500 500

NO.

50
TYP.

CL FOOTING
BOTTOM

9000

NOTES
4500x2

13M@150

* PILE
21-350 Industry Water Tank 500 m3
( i = 360, 360 )
( PCD = 7300, 4800 )
* ANCHOR BOLT
1X4-M12 ANC. BOLTS (TYPE TYPE L)

13M@150

75 PROJ.

FOOTING REINF. PLAN


CL PED.

* OUTPUT UNIT : mm

19M

50
2-13M
70

8000
3750

3750

500

500

TANGKI 550 M3 PROJECT

3750

500

800

3750

300

100

TOG EL. + 400

30 GROUT

FOUNDATION PLAN

LEAN CONC. 100 THK

SECTION

REBAR

3M 50(T

YP

.)

SQUAD CHECK

PEDESTAL

PROCESS PIPING VESSELS STRUCT.

ELEC.

INST.

2-1

0
50

FOUNDATION DETAIL FOR


F1

19M@200
SCALE

PEDESTAL REBAR ARRANGEMENT


REV. DATE

Copyright (c) GS E&C. All Rights Reserved

DESCRIPTION

DRWNCHKDAPPDAPPDAPPD

JOB NO.

AS SHOWN DP ENGINEERING

MICROFILM NO.

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Foundation

Project No. : DP ENGINEERING


Client : -

Page 9

3. FOUNDATION DATA
3.1 FOOTING DATA
Unit : mmFt. Name
Ft. Type

TANK 1

Area

63.617 m

Ft. Thickness

800.00 mm

Ft. Volume

50.894 m

Ft. Weight

122.146 tonf

Outer Soil Height

-300.00 mm

Soil Volume

0.000 m

Soil Weight

0.000 tonf

Buoyancy

Not Consider

Self Weight (except Pr.SW)

122.146 tonf

800

300

100

9000

F1

The Origin coordinate


The Center of Gravity & Pile (0,0) mm

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
2
Unit( Length : mm , Weight : tonf , Area : m )

Ft.Name

Pr.Name

Shape

F1

CircleWall

Copyright (c) GS E&C. All Rights Reserved

Pl
8000.000

Pw
7000.000

Ph
100.000

Area
11.781

Weight
9.755

Off X
0.000

Off Y
0.000

11/13/2014

Calculation Sheet
of
Foundation

Project Na. : TANGKI 550 M3


Project No. : DP ENGINEERING
Client : -

Page 10

3.3 SECTION DATA


Ft.Name / Sec.Name

F1 / S1
Unit : mm

9000

Direction

All Direct

F.Volume

50.894 m

Section Area

63.617 m

F.Weight

122.146 tonf

S.Volume

0.000 m

S.Weight

0.000 tonf

Pier Wt

9.755 tonf

Total Weight

131.900 tonf

3.4 LOAD CASE


Fz
Fy

Mz

Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
based on the right hand rule.

My
Fx
Mx

Index

Load Case Name

SW

Empty

Operation

Test

WL

SL2

Unit( tonf , tonf-m )

Ft.Name

F1

Pr.Name

Load Case

Fx

Fy

Fz

Mx

My

0.000

0.000

-9.755

0.000

0.000

0.000

0.000

-20.000

0.000

0.000

0.000

0.000

-550.000

0.000

0.000

0.000

0.000

-600.000

0.000

0.000

12.280

0.000

0.000

0.000

70.590

92.650

0.000

0.000

0.000

532.760

0.000

0.000

-122.146

0.000

0.000

Footing SW

Copyright (c) GS E&C. All Rights Reserved

11/13/2014

Calculation Sheet
of
Foundation

Project Na. : TANGKI 550 M3


Project No. : DP ENGINEERING
Client : -

Page 11

3.5 LOAD COMBINATION


In Pier Top
without Self Weight

In Footing Bottom
with Pier Self Weight,
But without Footing Self Weight,

In Footing Bottom Center


with Pier & Footing Self Weight & Soil Weight,
Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.5.1 Load Combination in Pier Top (Without SW)


Ft.Name

F1

Unit( tonf , tonf-m )

SFx

SFy

SFz

SMx

10

0.000

0.000

-20.000

0.000

0.000

11

12.280

0.000

-20.000

0.000

70.590

12

92.650

0.000

-20.000

0.000

532.760

21

0.000

0.000

-550.000

0.000

0.000

22

12.280

0.000

-550.000

0.000

70.590

23

92.650

0.000

-550.000

0.000

532.760

31

0.000

0.000

-600.000

0.000

0.000

32

3.070

0.000

-20.000

0.000

17.647

100

0.000

0.000

-28.000

0.000

0.000

101

15.964

0.000

-18.000

0.000

91.767

102

132.490

0.000

-18.000

0.000

761.847

110

0.000

0.000

-28.000

0.000

0.000

111

20.876

0.000

-840.000

0.000

120.003

112

129.710

0.000

-28.000

0.000

745.864

121

5.219

0.000

-840.000

0.000

30.001

Pr.Name L.Comb.

3.5.2 Load Combination in Footing Bottom (With Pier SW)


Ft.Name

Unit( tonf , tonf-m )

SFx

SFy

SFz

SMx

SMy

10

0.000

0.000

-29.755

0.000

0.000

11

12.280

0.000

-29.755

0.000

81.642

12

92.650

0.000

-29.755

0.000

616.145

21

0.000

0.000

-559.755

0.000

0.000

22

12.280

0.000

-559.755

0.000

81.642

23

92.650

0.000

-559.755

0.000

616.145

31

0.000

0.000

-609.755

0.000

0.000

32

3.070

0.000

-29.755

0.000

20.410

100

0.000

0.000

-41.656

0.000

0.000

101

15.964

0.000

-26.779

0.000

106.135

102

132.490

0.000

-26.779

0.000

881.087

110

0.000

0.000

-41.656

0.000

0.000

111

20.876

0.000

-853.656

0.000

138.791

112

129.710

0.000

-41.656

0.000

862.603

Pr.Name L.Comb.

F1

SMy

Copyright (c) GS E&C. All Rights Reserved

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Foundation
121

5.219

0.000

Project No. : DP ENGINEERING


Client : -

Page 12

-853.656

0.000

34.698

3.5.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
: PileType
- C.G. of Load is coordinate from left bottom. Unit : mm
p

Ft.Name

F1 p

L.Comb.

SFx

Unit( tonf , tonf-m )

SFy

SFz

SMx

SMy

C.G. of Loads

10

0.000

0.000

-151.900

0.000

0.000

4500.0 , 4500.0

11

12.280

0.000

-151.900

0.000

81.642

4500.0 , 4500.0

12

92.650

0.000

-151.900

0.000

616.145

4500.0 , 4500.0

21

0.000

0.000

-681.900

0.000

0.000

4500.0 , 4500.0

22

12.280

0.000

-681.900

0.000

81.642

4500.0 , 4500.0

23

92.650

0.000

-681.900

0.000

616.145

4500.0 , 4500.0

31

0.000

0.000

-731.900

0.000

0.000

4500.0 , 4500.0

32

3.070

0.000

-151.900

0.000

20.411

4500.0 , 4500.0

Load Combination of Ultimate Condition


: PileType
- C.G. of Load is coordinate from left bottom. Unit : mm
p

Ft.Name

Sec.Nam L.Comb.
100

F1 p

S1

SFx

Unit( tonf , tonf-m )

SFy

SFz

SMx

SMy

C.G. of Loads

0.000

0.000

-41.656

0.000

0.000

4500.0 , 4500.0

101

15.964

0.000

-26.779

0.000

106.135

4500.0 , 4500.0

102

132.490

0.000

-26.779

0.000

881.087

4500.0 , 4500.0

110

0.000

0.000

-41.656

0.000

0.000

4500.0 , 4500.0

111

20.876

0.000

-853.656

0.000

138.791

4500.0 , 4500.0

112

129.710

0.000

-41.656

0.000

862.603

4500.0 , 4500.0

121

5.219

0.000

-853.656

0.000

34.698

4500.0 , 4500.0

Copyright (c) GS E&C. All Rights Reserved

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Foundation

Project No. : DP ENGINEERING


Client : -

Page 13

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION (Bi-Axial)
4.1.1 Formula
if footing is checked in Buoyancy SFz means SFz - Fb
SFz
SMy X
SMx Y
a. Vertical - Bi Axial : R =
2
2
Np
S Xi
S Yi
- Ru = Rmax
- Uf = Min[ 0 , Rmin ]
- Ru < Va => OK
2
2
(SHxi + SHyi )
b. Horizontal - Hmax =
< Ha => OK
Np
c. Uplift - Uf < Ua => OK
Ver. / Uf. = Vertical / Uplift

4.1.2 Check of Vertical & Uplift Reaction


Ft.Name

Np(EA)

Fl (mm)

Fw (mm)

SXi (m )

SYi (m )

F1

21

9000

9000

105.86

105.85

Unit( tonf )

Ft.Name
F1

L.Comb.

Pile

R Max

R Min

Ru

Uf

Ra

Ua

Result

23

Industry

53.717

11.226

53.717

55

16

OK

4.1.3 Check Of Horizontal Reaction


Ft.Name
F1

L.Comb.

Pile

Hmax (tonf)

Ha (tonf)

Result

23

Industry
Water

4.412

OK

Copyright (c) GS E&C. All Rights Reserved

11/13/2014

Calculation Sheet
of
Foundation

Project Na. : TANGKI 550 M3


Project No. : DP ENGINEERING
Client : -

Page 14

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

5.1.1 Data

Unit( mm , tonf , tonf-m )

Ft.Name Sec.Nam
F1

Dir.

L.Comb.

Fl or Fw

Sl or Sw

SFz

100

9000.00

9000.00

101

9000.00

9000.00

102

9000.00

110

S1

S1

SM

SQ

41.656

0.00

41.656

26.779

106.13

26.779

9000.00

26.779

881.09

26.779

9000.00

9000.00

41.656

0.00

41.656

111

9000.00

9000.00

853.656

138.79

853.656

112

9000.00

9000.00

41.656

862.60

41.656

121

9000.00

9000.00

853.656

34.70

853.656

100

9000.00

9000.00

41.656

0.000

41.656

101

9000.00

9000.00

26.779

0.000

26.779

102

9000.00

9000.00

26.779

0.000

26.779

110

9000.00

9000.00

41.656

0.000

41.656

111

9000.00

9000.00

853.656

0.000

853.656

112

9000.00

9000.00

41.656

0.000

41.656

121

9000.00

9000.00

853.656

0.000

853.656

5.1.2 Design Parameters


Yield Strength - 10M ~ 16M : fy1 , 19M ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
fp_clb : Clear Cover for bottom of footing reinforcement (Pile Foundation)
Loc. : Location of Critical Point from left side of footing
2

Unit(kgf/cm ,mm)

f(Flexure)

f(Shear)

fck

fy1

fy2

f_cl

f_clt

fp_clb

0.9

0.75

250.00

2400.00

3900.00

50.0

50.0

150.0

Copyright (c) GS E&C. All Rights Reserved

11/13/2014

Calculation Sheet
of
Foundation
5.2 RING WALL DESIGN
5.2.1 Ring Wall Formula
Definitions,
W : Weight of tank shell plus the tributary weight
of a cone roof per feet of circumference (tonf/m)
N : Thickness of tank shell plate
BPT : Bottom Plate Thickness
D : Tank diameter
f : Angle of internal friction of soil
H : Height of tank (Height of liquid)
h : Height of ring wall
h1,h2 : Filling material height of ring wall
3
gs1,gs2 : Unit weight of soil under tank (ton/m )
gs1 h1 + gs2 h2
gs =
h1 + h2
3
q = Unit weight of tank fluid (ton/m )
3
gc = Unit weight of concrete (ton/m )
F = Radial outward force on ringwall
T = Axial tension in ring
Ko = Rest Earth Pressure Coefficient
Minimum required thickness of ringwall
The center-to-center diameter of ring wall is equal to the nominal tank diameter.
The tank diameter is 4572mm or more
If above assumptions are not applicable, an alternate foundation type shall be used.
EmptyLoad - Bottom Plate Weight
(tonf/m)
p tank diameter
3
Bottom Plate Weight = 7.85(tonf/m ) Bottom Plate Thickness Bottom Plate Area
2 W
t.cal =
q H - 2 h (gc - gs)
t.min = Minimum wall thickness = 12 in
t.used = User input wall thickness (mm)
W=

Copyright (c) GS E&C. All Rights Reserved

Project Na. : TANGKI 550 M3


Project No. : DP ENGINEERING
Client : -

Page 15

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Foundation

T
q
a

Client : -

Page 16

h1

Project No. : DP ENGINEERING

H
kgPu
s1 2

Horizontal reinforcement of ringwall


Pu1 = ko ( h1 + h2 ) q H
Pu2 = 1/2 ko gs1 h1
Pu3 = ko gs1 h1 * h2
Pu4 = 1/2 ko gs2 h22
F = Pu1 + Pu2 + Pu3 + Pu4
T = 1/2 F D , the F(horizontal force) causes a hoop tension in the ring wall
2

h2

Pu1

gs2

Pu3 Pu4

T
, f = 0.9
f fy
Req'd As must not be less than that required for temperature
& shrinkage reinforcement.
fac : Shrinkage And Temperature Factor
Reinforcement is more than 60000 psi and 10M ~ 16M..............fac = 0.002
else case......................................................................................fac = 0.0025
As.Min = factors (By Design Code) ringwall cross section area
Req'd As = Required steel area to resist entire axial tension
Req'd As = Load Factor

T
F
T

Vertical reinforcement of ringwall


Mu = Load Factor ( Pu1 1/2 ( h1 + h2 ) + Pu2 (1/3 h1 + h2 ) + Pu3 1/2 h2 + Pu4 1/3 h2 )
200
3 fck
Selected As = Max ( fac b h , r.req b d , Min ( 1.333 r.req b d , Max (
bd,
bd)))
fy
fy
fac : Shrinkage And Temperature Factor
Reinforcement is more than 60000 psi and 10M ~ 16M..............fac = 0.0012
else case......................................................................................fac = 0.0015
Mu
0.85 fck
2Rn
Rn =
, r.req =
1- 12 , f = 0.9
fbd
fy
0.85fck
Asmax = 0.75 rb b d
fck
0.003 Es
rb = 0.85 b 1
fy 0.003 Es + fy
If Selected As < Using As < Asmax , then OK!!
When Fdn type is block, Selected As = fac b h

5.2.2 Check of Minimum required Thickness & Reinforcement of ringwall


Footing Name : F1
Input Data

GroupType : Tank_1

Dia (mm )

h (mm )

Hor. Bar

Ver. Bar

9000.00

800.00

13M @ 200 mm

19M @ 200 mm

Hor. fy (kgf/cm

Ver. fy (kgf/cm

2400.00

rc (ton/m

3900.00

Ko

Load F.

0.500

1.4

2.40

Input Equipment Data

Dia (mm )

H (mm )

N (mm )

BPT (mm )

h1 (m )

h2 (m )

gs1 (ton/m )

gs2 (ton/m )

q (ton/m )

7500

8000.00

10.00

16.00

0.100

0.100

1.60

1.60

1.00

Result of Thickness

W (tonf/m )

t.Cal (mm )

t.Min (mm )

t.Used (mm )

Result

0.19

48.19

304.80

500.00

OK

Result of Hooptension
2

F (tonf/m )

T (tonf )

Tu (tonf )

As.req (cm )

As.Min (cm )

As.Used (cm )

Result

0.816

3.060

4.284

1.983

1.250

2.655

OK

Result of Vertical Reinforcement


2

b(mm)

d(mm)

F(tonf)

Mu(tonf-m)

As.Used (cm )

As.Selected (cm )

As.Max (cm )

Result

1000.00

440.50

0.42

0.06

14.18

3.75

92.73

OK

Copyright (c) GS E&C. All Rights Reserved

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Foundation

Project No. : DP ENGINEERING


Client : -

Page 17

5.3 REQUIRED REINFORCEMENT


5.3.1 Reinforcement Formula
- Shrinkage And Temperature Reinforcement
---- ACI CODE 7.12.2
As As1 = fac b h
, fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used ........................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used....................................0.0018
(c) Slabs where reinforcement with yield stress exceeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used .......................................................................................................
fy
- Required Reinforcement by Analysis
As As2 = r.req b d
- At every section of flexural members where tensile reinforcement is required
3 fck
200
As (As5 =
bw d) (As4 =
b d)
---- ACI Eq (10-3)
fy
fy
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis
---- ACI CODE 10.5.3
As3 = 1.333 r.req b d
Asmax = 0.75 rb b d
fck
0.003 Es
rb = 0.85 b 1
fy
0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!
Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu
0.85 fck
2Rn
Rn =
, r.req =
1- 12 , f = 0.9
fbd
fy
0.85fck

5.3.2 Check of Footing Reinforcement


Footing Name : F1
GroupType : Tank_1
- X direction (Unit Width)

Sec.Name

L.Comb.

Loc. (m)

Width b (m)

d (cm)

As (cm )

102

top

6.67 - 13M @ 150

0.955

1.000

74.350

8.853

111

botom

6.67 - 13M @ 150

8.045

1.000

64.350

8.853

S1

Sec.Name

L.Comb.

Mu (tonf-m)

Rn

r.Req

102

top

0.583

0.117

0.0000

111

bottom

0.911

0.244

0.0001

S1

Sec.Name

Using Bar (mm)

L.Comb.

As1(cm )

As2(cm )

As3(cm )

As4(cm )

As5(cm )

Asmax(cm )

102

top

8.000

0.363

0.484

43.561

38.964

299.764

111

bottom

8.000

0.656

0.874

37.702

33.723

259.446

S1

Sec.Name

L.Comb.

Using As(cm )

Select As(cm )

Result

102

top

8.853

8.000

OK

111

bottom

8.853

8.000

OK

S1

Copyright (c) GS E&C. All Rights Reserved

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Foundation

Project No. : DP ENGINEERING


Client : -

Page 18

- Y direction (Unit Width)

Sec.Name

L.Comb.

Loc. (m)

Width b (m)

d (cm)

As (cm )

121

top

6.67 - 13M @ 150

4.500

1.000

73.050

8.853

121

botom

6.67 - 13M @ 150

8.045

1.000

63.050

8.853

S1

Sec.Name

Mu (tonf-m)

Rn

r.Req

121

top

121

bottom

0.815

0.228

0.0001

L.Comb.

S1

Sec.Name

Using Bar (mm)

L.Comb.

As1(cm )

As2(cm )

As3(cm )

As4(cm )

As5(cm )

Asmax(cm )

121

top

8.000

42.799

38.282

294.523

121

bottom

8.000

0.599

0.798

36.940

33.042

254.205

S1

Sec.Name

L.Comb.

Using As(cm )

Select As(cm )

Result

121

top

8.853

8.000

OK

121

bottom

8.853

8.000

OK

S1

Copyright (c) GS E&C. All Rights Reserved

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Foundation

Project No. : DP ENGINEERING


Client : -

Page 19

5.4 ONE WAY SHEAR FORCE


5.4.1 One-Way Shear Formula
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- f Vc = 0.75 2 fck B'w d
(eq 11-3)
- Vu <= f Vc , then OK!!

5.4.2 Check of One-Way Shear


Footing Name : F1

GroupType : Tank_1

PileType : True
Unit : mm

8945

9000

8945

- X direction One-Way Shear (Unit Width)

Sec.Name L.Comb.
S1

100

Loc. (mm)

d (mm)

Bw (mm)

fVc (tonf)

Vu (tonf)

Result

8945

643.5

1000

40.467

OK

Loc. (mm)

d (mm)

Bw (mm)

fVc (tonf)

Vu (tonf)

Result

8945

630.5

1000

39.65

OK

- Y direction One-Way Shear (Unit Width)

Sec.Name L.Comb.
S1

100

Copyright (c) GS E&C. All Rights Reserved

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Foundation

Project No. : DP ENGINEERING


Client : -

Page 20

5.5 TWO WAY SHEAR FORCE


5.5.1 Two-Way Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.75 2 (1 + 2/b c) fck bo d
(eq 11-33) <- Vc1
(b) f Vc2 = 0.75 2 (1 + as d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c) f Vc3 = 0.75 4 fck bo d
(eq 11-35) <- Vc3
f Vc = Min(f Vc1 , f Vc2 , f Vc3)
ACI 318-05 CODE 11.12.2.1
Vu f Vc , then OK
where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

5.5.2 Check of Two-WayShear


Ft.Name
9000

F1 Punching Area

Pr.Name

1 Pile effect

585829.500 cm

0 / 21

CircleWall f Vc1

3295.253 tonf

121 f Vc2

1619.229 tonf

Pl

8000 mm f Vc3

2196.835 tonf

Pw

8000 mm f Vc

1619.229 tonf

Shape
L.Comb.

bo / d

27143.47 / 643.5 mm Vu

bc / as

5.6 PILE PUNCHING SHEAR FORCE


5.6.1 Pile Punching Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.75 2 (1 + 2/bc)

fck bo d

(b) f Vc2 = 0.75 2 (1 + as d / 2 bo)


(c) f Vc3 = 0.75 4

fck bo d

f Vc = Min(f Vc1 , f Vc2 , f Vc3)


Vu

(eq 11-33)

fck bo d (eq 11-34)


(eq 11-35)

<- Vc1
<- Vc2

<- Vc3

ACI 318-05 CODE 11.12.2.1

f Vc , then OK

where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
b o = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

Copyright (c) GS E&C. All Rights Reserved

1 / 40 Result

0.000 tonf

OK

11/13/2014

Calculation Sheet
of
Foundation

Project Na. : TANGKI 550 M3


Project No. : DP ENGINEERING
Client : -

Page 21

5.6.2 Check of Pile Punching Shear

9000

Ft.Name

F1 Punching Area

Pile No.

10 bc / as

Shape
1

13

14

12
21

15

20

16
5

10

L.Comb.
PileName

19
17

11

18
7

Diameter

9870.423 cm

1 / 40

Square f Vc1

482.449 tonf

111 f Vc2

681.628 tonf

Industry Water Tank


f Vc3
500 m3

321.633 tonf

350mm f Vc

321.633 tonf

Copyright (c) GS E&C. All Rights Reserved

bo

3974mm Vu

643.5mm Result

53.579 tonf

OK

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Foundation

Project No. : DP ENGINEERING


Client : -

Page 1

SUMMARY REPORT FOR FOUNDATION DESIGN


Project Information
Project Name

TANGKI 550 M3

Structure Name

PROYEK TANKI 550 M3

1. Check of Pile Reaction (Bi-Axial)


1.1 Check of Vertical

Ft.Name

F1

(Unit : tonf)

# L/C

Pile

Ru

Uf

Ra

Ua

Result

10

Industry

7.233

55

16

OK

11

Industry

10.048

55

16

OK

12

Industry

28.479

-14.012

55

16

OK

21

Industry

32.471

55

16

OK

22

Industry

35.287

55

16

OK

23

Industry

53.717

55

16

OK

31

Industry

34.852

55

16

OK

32

Industry

7.937

55

16

OK

1.2 Check of Horizontal

Ft.Name

(Unit : tonf)

# L/C

Pile

H Max

Ha

Result

10

Industry

OK

11

Industry

0.6

OK

12

Industry

4.4

OK

21

Industry

OK

22

Industry

0.6

OK

23

Industry

4.4

OK

31

Industry

OK

32

Industry

0.1

OK

F1

2. DESIGN OF FOOTING
2.1 Check of Reinforcement

(Unit : cm )

Ft.Name

Sec.Nam

S1 (X)
F1

# L/C

Req.As top / bottom

Used.As top / bottom

Result

100

8.00 / 8.00

8.85 / 8.85

OK / OK

101

8.00 / 8.00

8.85 / 8.85

OK / OK

102

8.00 / 8.00

8.85 / 8.85

OK / OK

110

8.00 / 8.00

8.85 / 8.85

OK / OK

111

8.00 / 8.00

8.85 / 8.85

OK / OK

112

8.00 / 8.00

8.85 / 8.85

OK / OK

121

8.00 / 8.00

8.85 / 8.85

OK / OK

100

8.00 / 8.00

8.85 / 8.85

OK / OK

101

8.00 / 8.00

8.85 / 8.85

OK / OK

S1 (Y)

Copyright (c) GS E&C. All Rights Reserved

11/13/2014

Calculation Sheet
of
Foundation

Project Na. : TANGKI 550 M3


Project No. : DP ENGINEERING
Client : -

Page 2

102

8.00 / 8.00

8.85 / 8.85

OK / OK

110

8.00 / 8.00

8.85 / 8.85

OK / OK

111

8.00 / 8.00

8.85 / 8.85

OK / OK

112

8.00 / 8.00

8.85 / 8.85

OK / OK

121

8.00 / 8.00

8.85 / 8.85

OK / OK
2

(Unit : mm,cm )

Ft.Name

Sec.Nam

# L/C

T.Used(Wall) / T.min(Wall)

Used As(Wall) / Req.As(Wall)

Result

F1

Wall

500.00 / 304.80

2.65 / 1.98

OK / OK

2.2 Check of One Way Shear


Ft.Name

Sec.Nam

S1 (X)

(Unit : tonf)

# L/C

fVc

Vu

Result

100

40.47

0.00

OK

101

40.47

0.00

OK

102

40.47

0.00

OK

110

40.47

0.00

OK

111

40.47

0.00

OK

112

40.47

0.00

OK

121

40.47

0.00

OK

100

39.65

0.00

OK

101

39.65

0.00

OK

102

39.65

0.00

OK

110

39.65

0.00

OK

111

39.65

0.00

OK

112

39.65

0.00

OK

121

39.65

0.00

OK

F1

S1 (Y)

2.3 Check of Two Way Shear


Ft.Name

F1

(Unit : tonf)

# L/C

Ct. Pr.Name

fVc

Vu

Result

100

1619.229

0.000

OK

101

1619.229

0.000

OK

102

1619.229

0.000

OK

110

1619.229

0.000

OK

111

1619.229

0.000

OK

112

1619.229

0.000

OK

121

1619.229

0.000

OK

# L/C

Ct. PL.Name

fVc

Vu

Result

100

321.633

10.127

OK

101

10

321.633

10.170

OK

102

10

321.633

36.891

OK

110

321.633

10.127

OK

2.4 Check of Pile Punching


Ft.Name

(Unit : tonf)

F1

Copyright (c) GS E&C. All Rights Reserved

11/13/2014

Calculation Sheet
of
Foundation

Project Na. : TANGKI 550 M3


Project No. : DP ENGINEERING
Client : -

Page 3

111

10

321.633

53.579

OK

112

10

321.633

39.870

OK

121

10

321.633

49.990

OK

Copyright (c) GS E&C. All Rights Reserved

11/13/2014

COLUMN CALCULATION SHEET


One-Stop Solution for Column

TITLE

DESCRIPTION

PROJECT/JOB NO.

DP ENGINEERING

PROJECT/JOB NAME

TANGKI 550 M3

CLIENT NAME

SITE NAME

DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME

PROYEK TANKI 550 M3

GROUP NAME
LOADCOMBINATION GROUP NAME
REV

DATE

Copyright (c) GS E&C. All Rights Reserved

DESCRIPTION

PREP'D

CHK'D

APPR'D

APPR'D

11/13/2014

Calculation Sheet
of
Pier

CONTENTS
1. INPUT DATA
1.1 GENERAL
1.2 PIER DATA
1.3 LOADING DATA

2. PM DIAGRAM
2.1 FORMULA
2.2 PM DIAGRAM & ANALYSIS
2.3 ANALYSIS & RESULT
2.4 DETAIL PM DIAGRAM

3. ONE-WAY SHEAR
3.1 FORMULA
3.2 ONE-WAY SHEAR

Copyright (c) GS E&C. All Rights Reserved

Project Na. : TANGKI 550 M3


Project No. : DP ENGINEERING
Client : -

Page 1

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Pier

Project No. : DP ENGINEERING


Client : -

Page 2

1. INPUT DATA
1.1 General
Design Code

American Concrete Institute (ACI 318) [Metric]

Input Unit

MKS

f Bending

Output Unit

f Axial

f Sprial reinf.

0.9

fck

0.9

fy (10M ~ 16M)
2

250 kgf/cm

Es
2

3900 kgf/cm

f Shear

0.65

Ec
2

2400 kgf/cm

f Tied reinf.

0.7

fy (19M ~)

MKS

235000 kgf/cm

2000000 kgf/cm

0.75

Steel Db

Cover

ASTM A615 (M)

50 mm

1.2 Pier Data


500

8000

50

Pier Name

Ver Bar

10M, 118 2 EA

Pier Shape

CircleWall

Tie Bar

13M @ 200 mm

Width

8000 mm

Fck

250 kgf/cm

Length

8000 mm

fy

3900 kgf/cm

Height

100 mm

Using As

669.13 cm

dx
Main Bar
Bar Check

dy

7927.5 mm
2

7927.5 mm
2

118 2 =236 , Area = 669.128cm , Amin (1%) = 1178.1cm , Amax (2%) = 2356.2cm
Reinforcrment Area is too small

1.3 Loading Data


1.3.1 Load Case
Pier Name

Unit( tonf , tonf-m )

Name

Fx

Fy

Mx

My

-9.755

Empty

-20

Operation

-550

Test

-600

WL

12.28

70.59

SL2

92.65

532.76

1.3.2 Load Combination List


Comb . ID

Fz

SW

Load Combination for Reinforcement

100

1.4 SW + 1.4 Empty

101

.9 SW + 1.3 WL + .9 Empty

102

.9 SW + 1.43 SL2 + .9 Empty

110

1.4 SW + 1.4 Empty

111

1.4 SW + 1.7 WL + 1.4 Test

112

1.4 SW + 1.4 SL2 + 1.4 Empty

121

1.4 SW + .425 WL + 1.4 Test

Copyright (c) GS E&C. All Rights Reserved

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Pier

Project No. : DP ENGINEERING


Client : -

Page 3

1.3.3 In Pier Top


P. Name

Unit( tonf , tonf-m )

LC#

SFx

SFy

SFz

SMx

SMy

100

-28

101

15.964

-18

91.767

102

132.49

-18

761.847

110

-28

111

20.876

-840

120.003

112

129.71

-28

745.864

121

5.219

-840

30.001

1.3.4 In Pier Bottom


P. Name

Unit( tonf , tonf-m )

SFx

SFy

SFz

SMx

100

41.656

101

15.964

26.779

80.592

102

132.49

26.779

669.104

110

41.656

111

20.876

853.656

105.39

112

129.71

41.656

655.067

121

5.219

853.656

26.347

LC#

Copyright (c) GS E&C. All Rights Reserved

SMy

11/13/2014

Calculation Sheet
of
Pier

2. ONE-WAY SHEAR
2.1 FORMULA
1) Maximum Axial Load Strength
- Po = 0.85 fck (Ag-Ast) + S fy Ast
- Pnmax = f1 Po ( f1 = Axial Strenth Resuction Factiors)
- Mnmax = The Value of diagram, When P is Pn.
- Pumax = f2 Pnmax
f2 = Sprial or Tied Reinforcement Reduction Factor

2) Balanced Strain Condition


A balanced Strain condition exists at a cross-setion
when the maximum strain at the extreme
compression fiber just reaches eu = 0.003 simultaneously
with the first yield strain of es = fy/Es in the tension reinforcement.
The ratio of neutral axis depth cb is shown below
Cb
eu
=
d
eu + ey
eu = 0.003
fc = 0.85 fck

3) Strength for Combined Flexure and Axial Load


Maximum usable strain at extreme
concrete compression fiber shall
be assumed equal to eu = 0.003
if c that is neutral axis is supposed,
Pn and Mn can be calculated as below
fPn = f0.85 fck ( Acomp - S(1 to 11) Ast ) + S(1 to 28) fs Ast
fMn = f0.85 fck ( Acomp - S(1 to 11) Ast ) ( h/2 - c + yc )
+ S(1 to 28) fs Ast ( h/2 - c + ys )
fs(i) = e(i) Es , - fy fs(i) fy
Sprial or Tied Reinforcement Reduction Factor
Pa = 0.1 fck Ag
Acomp is Area from top to a (b 1c)
b 1c = 0.85 - 0.05 ( fck - 4000 ) / 1000

0.65

f = 0.9 - 0.2

Pn
Pa

0.9

(psi)

4) Slenderness Effects
dns =

Cm
1-Pu/0.75Pc

p EI
2
(klu)
2

Pc =

5) Shear
fVc = f 2

fck bw d

, fVs =

fVsmax = f 8 fck bw d (psi)


fVn = fVc + fVs

Copyright (c) GS E&C. All Rights Reserved

f fy Av d
(psi)
s

EI =

0.2EcIg + EsIse
1+b d

Project Na. : TANGKI 550 M3


Project No. : DP ENGINEERING
Client : -

Page 4

11/13/2014
Project Na. : TANGKI 550 M3

Calculation Sheet
of
Pier

Project No. : DP ENGINEERING


Client : -

Page 5

2.2 PM DIAGRAM & ANALYSIS


2.2.1 Pier Name : 1
(tonf , tonf-m )

25000

Pnmax

20000
fPnmax
Balanced

15000
10000
5000

Mx

0
10000

20000

30000

25000

Pnmax

20000
fPnmax
Balanced

15000
10000
5000
0

My
10000

20000

X - Axis (All comb.)

Po

26497.860 tonf

Pn / fPn

23848.070 tonf / 16693.650 tonf

Mn / fMn

11130.48 tonf-m / 7791.33 tonf-m

Pb / fPb

15148.660 tonf / 10604.060 tonf

Mb / fM

31493.76 tonf-m / 22045.63 tonf-m

c(Balanced)

5662.5 mm

emin

255.24 mm

klu / rx

0.1

Slender

Neglect

Axis

Y - Axis (All comb.)

Po

26497.860 tonf

Pn / fPn

23848.070 tonf / 16693.650 tonf

Mn / fMn

11223 tonf-m / 7791.33 tonf-m

Pb / fPb

15151.030 tonf / 10604.060 tonf

Mb / fM

31491.63 tonf-m / 22045.63 tonf-m

c(Balanced)

5662.5 mm

emin

255.24 mm

klu / rx

0.1

Slender

Neglect

40000

(tonf , tonf-m )

Axis

30000

40000

2.3 ANALYSIS & RESULT


2.3.1 Moment Check
Pier

unit (tonf-m )

L/C#

dx

dy

SdMux

SdMuy

fMnx

fMny

Result

100

10.63

10.63

3977.08

3977.84

OK

101

6.84

80.59

480.19

5556.89

OK

102

6.84

669.1

71.19

5577.41

OK

110

10.63

10.63

3977.08

3977.84

OK

111

217.89

217.89

5804.31

5805.21

OK

112

10.63

655.07

142.59

5623.11

OK

Copyright (c) GS E&C. All Rights Reserved

11/13/2014

Calculation Sheet
of
Pier
121

217.89

217.89

Project Na. : TANGKI 550 M3


Project No. : DP ENGINEERING
Client : 5804.31

Page 6
OK

5805.21

2.3.2 Force Check


Pier

unit (tonf )

L/C#

SFz

fPs

fPnmax

Result

100

-1440.75

16693.65

41.66

OK

101

-1442.37

16693.65

26.78

OK

102

-1442.37

16693.65

26.78

OK

110

-1440.75

16693.65

41.66

OK

111

-1352.2

16693.65

853.66

OK

112

-1440.75

16693.65

41.66

OK

121

-1352.2

16693.65

853.66

OK

3. ONE-WAY SHEAR
3.1 FORMULA
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- Vc = 2 fck Bw d
(eq 11-3)
Av f y d
- Vs =
(eq 11-15)
s
- Vu <= f Vc + f Vs , f = 0.75 (eq 11-1)
- When, Value of f Vs shall not exceed f 8 fck Bw d (Vs max)

3.2 ONE-WAY SHEAR


P. Name

Dir.

Unit(tonf)

LC#

fVc

fVs

fVs max

Vu

Result

100

3161.573

94.7

12646.29

OK

101

3161.573

94.7

12646.29

15.964

OK

102

3161.573

94.7

12646.29

132.49

OK

110

3161.573

94.7

12646.29

OK

111

3161.573

94.7

12646.29

20.876

OK

112

3161.573

94.7

12646.29

129.71

OK

121

3161.573

94.7

12646.29

5.219

OK

100

3161.573

94.7

12646.29

OK

101

3161.573

94.7

12646.29

OK

102

3161.573

94.7

12646.29

OK

110

3161.573

94.7

12646.29

OK

111

3161.573

94.7

12646.29

OK

112

3161.573

94.7

12646.29

OK

121

3161.573

94.7

12646.29

OK

Copyright (c) GS E&C. All Rights Reserved

Summary
Project
Name

Project
Unit

DP ENGINEERING MKS
Member

Concrete

Structure Name

Sector
No
1

Excavation

Back Fill

Disposal

50.66

12.117

38.543

Total
Normal
Struct.

50.66
Super Struct.

12.117
Grout.

38.543
Form Work

PROYEK TANKI 550 M3


Lean Conc. Crush Stone

F1

52.072

6.734

1.178

0.353

27.627

Total

52.072

6.734

1.178
Size
(mm)
Dia 24
350 x 350
Area

0
Length
(mm)
400
17000

0.353
Number
(Ea)
4
21

27.627

Item Name

Material Type

Anchor Bolt
Pile

ANCHOR BOLT M12 - TYPE L


Driven Prestressed High Concrete Piles

Item Name

Material Type

COAL TAR EPOXY


Protection 1
68.801
PRIMER COAT & FINISH COAT
Protection 2
74.456
ADHESIVE WATER PROOF MEMBRANE63.617
ProtectionSELF
3
Weight
Reinforced Bar Size
Item Name
(kg/m)
13M (fy=2400 kgf/cm2)
1.043
19M (fy=3900 kgf/cm2)
2.229

Remark

Total Len.
(m)
2039.059
252.25

Total WT.
(kg)
2127.301
562.148

Reinforced Bar
TOTAL WEIGHT (TON)

Remark

2.689

Remark

DPE ( DESAIN PRIVATE ENGINEERING )


Bagi anda yang berkecimpung dalam dunia Teknik Sipil/ Civil Engineering
baik Mahasiswa lulusan D3 atau S1, yang berdomisili dijakarta dan
dikarawang yang ingin untuk belajar ( Private ) Software Teknik Sipil :
1.
STAADPro 2007 ( Desain Struktur Beton atau Struktur Baja )
2.
AFES 3.0 ( Desain Fondasi Dangkal atau Fondasi Dalam )
Untuk pelatihan ( Private ) Desain struktur civil dengan biaya training Rp
3.000.000,- total session 18 jam ( 3jamx6 pertemuan ).
Lokasi di jakarata barat : Perumahan Taman kencana blok A1 No 20 rt
/rw 02/012 kelurahan tegal alur kota jakarta Barat
untuk waktu pelatihan Hari Sabtu dan Minggu dan waktu bisa
ditentukan kemudian.
Laptop di sediakan ( TERSEDIA 4 ORANG/ lebih).
BISA BAWA LAPTOP Nanti Untuk sofware STAADPro2007 dan AFES
3.0 yang belum ada bisa langsung di install.
Bisa hubungi langsung DAPI - 085878353335.

DESAIN PRIVATE STRUKTUR STAADPro 2007


DALAM SETIAP PERTEMUAN AKAN
DIBERIKAN PEMODELAN/ STRUKTUR YANG
BERBEDA DARI DESAIN STRUKTUR BAJA
DAN STRUKTUR BETON MULAI DARI
PABRIK, MAIN HOUSE, SAMPAI DESAIN
BANGUNAN 7 LANTAI.
DIBERIKAN SOFT COPY MATERI
PERHITUNGAN PEMBEBANAN ( BEBAN
MATI, BEBAN HIDUP, BEBAN ANGIN DAN
BEBAN GEMPA ), (MS Excel).
DIBERIKAN SOFT COPY MATERI BEBAN
GEMPA 2002 DAN 2012 (MS Excel).
DIBERIKAN SOFT COPY MATERI
PERHITUNGAN GEMPA STATIS DAN GEMPA
DINAMIS (MS Excel).
DESAIN STAADPRO SANGAT MUDAH DAN
CEPAT DALAM MENDESAIN STRUKTUR.

DESAIN PONDASI AFES 3.0

Diberikan soft copy materi


perhitungan daya dukung tanah
untuk pondasi dangkal (MS Excel).
Diberikan soft copy materi
perhitungan daya dukung tiang
pancang (MS Excel).
Diberikan soft copy materi
aplikasi penggunaan AFES 3.0
untuk desain Pondasi Dangkal.
Diberikan soft copy materi
aplikasi penggunaan AFES 3.0
untuk desain Pondasi Tiang
Pancang.
Diberikan materi desain pondasi
Tanki 500m3.

Vous aimerez peut-être aussi