Académique Documents
Professionnel Documents
Culture Documents
VERSIN 01
JULIO DE 2013
CONTROL DE REVISIN
VERSIN
No.
No.
PAGINAS
FECHA
ELABOR
APROB
ENERO DE
2013
JULIO DE
2013
ngela
Muoz
ngela
Muoz
Alex
Garzn
Alex
Garzn
DESCRIPCIN DE LA REVISIN
Versin inicial del Documento
Versin ajustada conforme a
observaciones del MVCT
CONTROL DE COPIAS
COPIA No.
AUTORIZADA POR:
EMITIDA PARA:
RESPONSABLE:
ORIGINAL
Gerencia
CONTROL
Coordinador S.G.C.
1
Gerencia
DIFUSIN
Representante Legal
PREPAR: ngela Muoz
REVIS: Alex Garzn
APROB: Mercedes Garzn
PROYECTO :
NOMBRE:
FIRMA :
FECHA
.
.
GENERALIDADES__________________________________________________15
1.1
INTRODUCCIN________________________________________________15
1.2
ANTECEDENTES_______________________________________________15
1.3
1.4
NORMATIVIDAD APLICADA_______________________________________17
INFORMACION DISPONIBLE_________________________________________18
2.1
INFORMACION SECUNDARIA____________________________________18
2.1.1
Descripcin Fsica:___________________________________________18
2.1.2
2.1.3
2.1.4
Caractersticas generales_____________________________________22
INFORMACIN PRIMARIA________________________________________25
2.2.1
3
Topografa_________________________________________________24
CALIDAD DE AGUA_________________________________________25
DEMANDA DE AGUA_______________________________________________27
1
PROYECCIONES DE POBLACIN_________________________________27
3.1.1
Mtodo Aritmtico___________________________________________28
3.1.2
Mtodo Geomtrico__________________________________________30
3.1.3
Mtodo Exponencial_________________________________________31
3.1.4
Proyecciones DANE_________________________________________34
3.2
3.3
PERIODO DE DISEO___________________________________________37
3.4
3.5
3.5.1
Dotacin Neta______________________________________________39
3.5.2
DOTACIN BRUTA__________________________________________39
3.6
CLCULO DE LA DEMANDA______________________________________40
3.6.1
3.6.2
3.6.3
3.6.4
OFERTA HDRICA__________________________________________________45
FUENTES DE ABASTECIMIENTO__________________________________51
5.1.1
5.2
Descripcin general__________________________________________51
CAPTACINES_________________________________________________51
5.3.1
DESARENADOR________________________________________________85
5.4.1
5.5.1
Cmara de aquietamiento_____________________________________89
5.5.2
Mezcla rpida_______________________________________________90
5.5.3
Floculacin_________________________________________________92
5.5.4
Sedimentadores_____________________________________________94
5.5.5
Filtros_____________________________________________________95
5.5.6
5.6
TANQUES DE ALMACENAMIENTO_________________________________98
5.7
RED DE DISTRIBUCIN________________________________________103
5.7.1
Criterios de diseo__________________________________________103
5.7.1.1 Presiones_______________________________________________103
5.7.1.2 Dimetros_______________________________________________104
5.7.2
5.7.3
5.7.4
5.7.5
5.8
5.8.1
CONTINUIDAD____________________________________________121
5.8.2
5.8.3
CONCESIN DE AGUAS________________________________________121
CONDUCCIN CAJAMARCA___________________________________________122
6.1
DESCRIPCIN DE ALTERNATIVAS________________________________122
6.1.1
ALTERNATIVA SELECCIONADA__________________________________125
DISEO HIDRULICO_____________________________________________126
7.1
OBRAS DE TOMA______________________________________________126
7.1.1
Criterios de diseo__________________________________________126
Resultados obtenidos_______________________________________128
PRETRATAMIENTO____________________________________________131
7.2.1
Criterios de diseo__________________________________________131
Resultados obtenidos_______________________________________133
ADUCCIN Y CONDUCCIN____________________________________133
7.3.1
Criterios de diseo__________________________________________133
Resultados obtenidos_______________________________________135
PLANTA DE TRATAMIENTO______________________________________155
7.4.1
Mezcla hidrulica.__________________________________________156
7.4.2
Floculacin._______________________________________________156
7.4.3
Sedimentacin.____________________________________________156
7.4.4
Filtracin._________________________________________________156
7.4.5
Desinfeccin.______________________________________________157
7.4.6
Tratamiento de Lodos._______________________________________158
7.5
ALMACENAMIENTO____________________________________________160
7.6
RED DE DISTRIBUCIN________________________________________163
7.6.1
Criterios de diseo__________________________________________163
Resultados obtenidos_______________________________________166
PRESUPUESTO___________________________________________________191
REFERENCIAS___________________________________________________193
10
ANEXOS_______________________________________________________194
NDICE DE TABLAS
10
12
13
14
GENERALIDADES
INTRODUCCIN
1.2
ANTECEDENTES
Las Empresa de Acueducto, Alcantarillado y Aseo del Tolima S.A. E.S.P. (EDAT)
realizar el seguimiento, supervisin y control de la ejecucin de todas y cada una de
las actividades de la Consultora objeto del presente Concurso de Mritos por
intermedio de una firma o Ingeniero Interventor, quien ser su representante para todos
los efectos de estos estudios y a travs de quien el Consultor deber tratar todos los
asuntos relacionados con el contrato que se celebre.
1.3
Recopilacin de Informacin.
Diagnstico Situacional.
Presupuestos de Obra.
Programa de Obras.
Especificaciones tcnicas.
Documentos de Contratacin.
1.4
NORMATIVIDAD APLICADA
17
2.1
INFORMACION DISPONIBLE
INFORMACION SECUNDARIA
18
19
Puntos cardinales
Norte
Sur
Oriente
Occidente
Municipios
Ibagu
Roncesvalles y Rovira
Ibagu
Departamento del Quindo
21
23
Establecimientos educativos
Alumnos
Preescolar
Establecimiento
s
Primaria
Alumnos
Establecimiento
s
Secundaria y media
Alumnos
Establecimiento
s
Total
Alumnos
Establecimiento
s
2008
374
2009
319
2010
291
2494
2340
2391
2553
2697
2651
5421
5353
5333
22
22
22
24
INFORMACIN PRIMARIA
RESOLUCIO
ANALISIS
UNIDADES
ENTRADA
N 2115 DE
pH
Acidez
Alcalinidad
Cloruros
Color Real
Dureza total
Hierro total
UN
mg/CaCO3
mg/CaCO3
mg/Cr
UPC
mg/CaCO3
mg/Fe
LA PTAP
7.38
4
50
<2.0
22
40
0.9
2007
6.5 - 9
N.A
200
250
15
300
0.30
25
RESOLUCIO
ANALISIS
UNIDADES
ENTRADA
N 2115 DE
Sulfatos
Turbiedad
Nitritos
Conductividad
Coliformes Totales
Coliformes fecales
mg/SO3
NTU
g/L
mhos/cm
UFC/100ml
UFC/100ml
LA PTAP
29
3.5
<0.023
122
18.2x103
311
2007
250
2.0
0.1
1000
0
0
Con base en la tabla de comparacin, se determin que para las dos fuentes de
abastecimiento los parmetros de Hierro total, turbiedad, color, coliformes totales y
coliformes fecales, no cumplen con la normatividad vigente. Por lo tanto se requiere la
adicin de coagulantes y dosificar cloro para regular la concentracin de estos
parmetros.
Con base en la prueba de tratabilidad realizada a el agua a la entrada de la planta, se
determin que el Sulfato de Aluminio grado B y Cal, presentan los mejores resultados
con una dosis ptima de 70 mg/l y 30 mg/l respectivamente.
DEMANDA DE AGUA
26
PROYECCIONES DE POBLACIN
Poblacin
Variacin
porcentual anual
Total
Cabecera
Resto
1964
16947
6188
10759
1973
15687
6508
9179
0,57%
1985
19325
7694
18701
7876
19789
9361
Promedio
11631
10825
10428
1,52%
0,30%
1,57%
0,99%
1993
2005
X
X
X
Puc P ci
( T f T uc )
T uc T ci
[1]
Dnde:
Pf = Poblacin (habitantes) correspondiente al ao para el que se quiere proyectar la
poblacin.
Puc = Poblacin (habitantes) correspondiente al ltimo ao censado con informacin.
Pci = Poblacin (habitantes) correspondiente al censo inicial con informacin.
Tuc = Ao correspondiente al ltimo censo con informacin.
Tci = Ao correspondiente al censo inicial con informacin.
Tf = Es el ao al cual se requiere proyectar la informacin.
28
93616188
( T f 2005 )
20051964
Esta ltima expresin se utilizar para proyectar la poblacin a partir del 2012 hasta el
ao de proyeccin que establezca el RAS 2000 (ao 2038). Los resultados de la
poblacin proyectada se presentan en la Tabla 6.
Tabla 6. Poblacin Cajamarca, periodo de diseo, mtodo aritmtico.
Ao
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
3.1.2
Poblaci
n
Cabecer
a
9902
9980
10057
10134
10212
10289
10367
10444
10521
10599
10676
10754
10831
10908
Ao
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
Poblaci
n
Cabecer
a
10986
11063
11140
11218
11295
11373
11450
11527
11605
11682
11760
11837
11914
Mtodo Geomtrico
De acuerdo con el RAS 2000 este mtodo es til en poblaciones que muestren una
importante actividad econmica, de modo que generan un importante desarrollo. La
29
T f T uc )
[2]
Dnde:
Pf = Poblacin (habitantes) correspondiente al ao para el que se quiere proyectar la
poblacin.
Puc = Poblacin (habitantes) correspondiente al ltimo ao censado con informacin.
Tuc = Ao correspondiente al ltimo censo con informacin.
Tf = Es el ao al cual se requiere proyectar la informacin.
r = Es la tasa de crecimiento anual y se calcula usando la siguiente ecuacin (ver
Ecuacin 3):
P
r= uc
Pci
( )
( T uc T ci )
[3]
De esta manera, usando la Ecuacin 3 y los valores de los censos realizados por el
Dane, se obtiene el valor de la tasa de crecimiento (r) como se muestra a continuacin:
r=
P uc
Pci
( )
( T uc T ci )
1=
9361
6188
( )
1
( 20051964 )
1=0.0101
T f 2005 )
30
Ao
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Poblaci
n
Cabecer
a
10046
10148
10251
10355
10460
10566
10673
10782
10891
11002
11113
11226
11340
11455
Ao
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
Poblaci
n
Cabecer
a
11571
11689
11807
11927
12048
12170
12294
12419
12545
12672
12801
12930
13062
31
Pf =Pci e
[4]
Dnde:
Pf = Poblacin (habitantes) correspondiente al ao para el que se quiere proyectar la
poblacin.
Pci = Poblacin (habitantes) correspondiente al censo inicial con informacin.
Tci = Ao correspondiente al censo inicial con informacin.
k = Es la tasa de crecimiento anual y se calcula usando la siguiente ecuacin (ver
Ecuacin 5):
k=
ln ( P cp )ln (Pca )
[5]
T cp T ca
Donde Pcp es la poblacin del censo posterior, Pca es la poblacin del censo anterior, Tcp
es el ao correspondiente al censo posterior y Tca es el ao del censo anterior.
Teniendo en cuenta las convenciones establecidas por el RAS 2000 para calcular la
tasa de crecimiento (k) para cada par de datos censales conocidos, se seleccionaron
como aos de referencia 1973, 1985 y 2005. No se tiene en cuenta los censos de los
aos 1964 y 1993, el primero porque entre 1964 - 1973 se presenta un bajo crecimiento
de la poblacin, del orden de 0.56%; y el de 1993 porque al proyectar 1993-2005 se
obtiene la misma tasa de crecimiento de la poblacin (0.98% anual) que al proyectar
1985-2005, mientras que 1985-1993 se obtiene el valor ms bajo de tasa de
crecimiento, del orden de 0.29%. El censo inicial corresponder entonces al de 1973.
Con estos datos de censos se obtiene dos valores de K que se presentan a
continuacin:
K 1=
ln ( 7694 ) ln(6508)
=0.014
19851973
32
ln ( 9361 )ln(7694)
=0.0098
20051985
K 1+ K2
=0.0119=1.19
2
0.0119 ( T f 1973 )
Esta ltima expresin se utilizar para proyectar la poblacin a partir del 2012 hasta el
ao de proyeccin que establezca el RAS 2000 (ao 2038). Los resultados de la
poblacin proyectada mediante el mtodo exponencial se presentan en la Tabla 8.
Tabla 8. Poblacin Cajamarca, periodo de diseo, mtodo exponencial.
Ao
Poblacin
Cabecera
Ao
Poblacin
Cabecera
2012
10343
2026
12214
2013
10466
2027
12360
2014
10591
2028
12508
2015
10718
2029
12657
2016
10846
2030
12808
2017
10976
2031
12961
2018
11107
2032
13116
2019
11239
2033
13273
2020
11374
2034
13431
2021
11510
2035
13592
2022
11647
2036
13754
2023
11786
2037
13919
2024
11927
2038
14085
2025
12070
33
Ao
Poblaci
n
Cabecer
a
Ao
Poblaci
n
Cabecer
a
2005
9361
2013
9896
2006
9452
2014
9935
9968
2007
9535
2015
2008
9612
2016
9996
2009
9682
2017
10021
2010
9744
2018
10042
9801
2019
10060
9852
2020
10074
2011
2012
Ao
Poblaci Variaci
n
n
Cabecer Porcent
Ao
Poblaci Variaci
n
n
Cabecer Porcent
34
2005
9361
2006
2007
9452
9535
2008
9612
2009
9682
2010
9744
2011
9801
2012
9852
ual
0,97%
0,88%
0,81%
0,73%
0,64%
0,58%
0,52%
2013
9896
2014
2015
9935
9968
2016
9996
2017
10021
2018
10042
2019
10060
2020
10074
ual
0,45%
0,39%
0,33%
0,28%
0,25%
0,21%
0,18%
0,14%
Calculando el promedio del crecimiento poblacional segn las estimaciones del DANE
se obtiene, un crecimiento medio del 0.49%. Una vez obtenido este valor, se determin,
de igual manera, el promedio de la tasa de crecimiento de los valores histricos
censados en aos anteriores por el DANE. El incremento porcentual promedio anual
obtenido para los valores censados, fue del 0.99%. Haciendo uso de los promedios en
el incremento porcentual del 0.49% (proyectado por el DANE) y el 0.99% (histrico), se
determin el promedio de estos dos valores obteniendo un crecimiento promedio total
del 0.74%. Este ltimo valor se utiliz como tasa de crecimiento anual, para proyectar la
poblacin en el periodo correspondiente a los aos del 2021 al 2038. Los resultados
obtenidos se presentan en la siguiente tabla:
Tabla 11. Poblacin proyectada usando una tasa de crecimiento del 0.74% a partir del ao 2021.
Ao
2021
2022
Poblaci
n
Cabecer
a
10149
10224
Ao
2030
2031
Poblaci
n
Cabecer
a
10845
10926
35
Poblaci
n
10299
Cabecer
10376
10453
10530
10608
10686
10766
Ao
2032
2033
2034
2035
2036
2037
2038
Poblaci
n
11007
Cabecer
11088
11170
11253
11336
11420
11505
Mtodo
Aritmtico
Geomtrico
Exponencial
Proyeccin
DANE
Promedio
Poblacin
2038)
11914
13062
14085
11505
12641
Observando la Tabla 12 se puede ver que el mtodo establecido por el RAS 2000 que
ms se acerca a las estimaciones del DANE es el mtodo aritmtico. Adicionalmente, la
poblacin en el ao 2038 obtenida por el mtodo aritmtico (11914 habitantes) es la que
se encuentra ms cerca del promedio poblacional (12641 habitantes) de los cuatro
mtodos de estimacin utilizados. Teniendo en cuenta lo anterior se escogi como
36
3.2
Nivel
Bajo
Medio
Medio alto
Alto
Poblacin
(habitantes)
< 2500
2501 12500
12501 60000
> 60000
Capacidad
econmica
Baja
Baja
Media
Alta
3.3
PERIODO DE DISEO
Periodo de diseo
37
mximo
25 aos
Alto
30 aos
Para el casco urbano del municipio de Cajamarca, teniendo en cuenta que el nivel de
complejidad definido de acuerdo al RAS 2000 es Medio, se utilizar un periodo de
diseo de 25 aos.
3.4
38
Dotacin neta
mxima para
poblaciones con
clima fro o
templado,
(L/habda).
90
115
125
140
Dotacin neta
mxima para
poblaciones con
clima Clido,
(L/habda )
100
125
135
150
Fuente. Resolucin nmero 2320 de 2009. Ministerio de ambiente, vivienda y desarrollo territorial.
Dado que Cajamarca se encuentra ubicado a 1800 m.s.n.m. y definiendo como clima
fro o templado aquellas poblaciones ubicadas a una altura superior a 1.000 metros
sobre el nivel del mar y por poblaciones con clima clido aquellas ubicadas a una altura
inferior o igual a 1.000 metros sobre el nivel del mar, se obtiene que la dotacin neta es
de 115 L/hab-da para el casco urbano.
3.5.2 DOTACIN BRUTA
La dotacin bruta para el diseo de cada uno de los componentes que conforman un
sistema de acueducto, indistintamente del nivel de complejidad, se debe calcular
conforme a la Ecuacin 6:
Dbruta=
D neta
( 1%p )
[6]
Dnde:
D bruta: Dotacin bruta
D Neta: Dotacin neta (115 L/hab-da)
39
3.6
115
=153 L/hab /da
( 10.25 )
CLCULO DE LA DEMANDA
P D bruta
86400
[7]
Dnde:
Qmd: Caudal medio diario (l/s)
P: Poblacin proyectada 2038 (hab.)
D bruta: Dotacin bruta (l/hab. - da)
Remplazando en la Ecuacin 7 se obtiene que el caudal medio diario para el casco
urbano de Cajamarca para el ao 2038 es de 21.1L/s, como se muestra a continuacin:
40
11914 153
=21.1 L/s
86400
[8]
Dnde:
QMD: Caudal mximo diario (l/s).
k1: Coeficiente de consumo mximo diario.
Qmd: Caudal medio diario.
k1
1,3
1,3
1,2
1,2
41
[9]
Dnde:
QMH: Caudal Mximo Horario (l/s).
k2: Coeficiente de consumo mximo horario con relacin al consumo mximo diario.
El coeficiente de consumo mximo horario con relacin al consumo mximo diario, k2,
puede calcularse, para el caso de ampliaciones de sistema de acueducto, como la
relacin entre el caudal mximo horario (QMH) y el caudal mximo diario (QMD)
registrados durante un perodo mnimo de un ao, sin incluir los das en que ocurran
fallas relevantes en el servicio. En el caso de sistemas de acueductos nuevos, el
coeficiente de consumo mximo horario con relacin al consumo mximo diario, k2, es
42
Nivel de
complejidad
Bajo
Medio
Medio alto
Alto
Red menor de
distribucin
1,6
1,6
1,5
1,5
Red
secundaria
1,5
1,45
1,45
Red matriz
1,4
1,4
Ao
2012
2013
2014
2015
Mtodo Aritmtico
Habitant
Qmd
QMD
es
L/s
9902
17,6
22,8
9980
17,7
23,0
10057
17,8
23,2
10134
18,0
23,4
QMH
36,6
36,8
37,1
37,4
43
Ao
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
Mtodo Aritmtico
Habitant
Qmd
QMD
es
L/s
10212
18,1
23,6
10289
18,3
23,7
10367
18,4
23,9
10444
18,5
24,1
10521
18,7
24,3
10599
18,8
24,5
10676
18,9
24,6
10754
19,1
24,8
10831
19,2
25,0
10908
19,4
25,2
10986
19,5
25,3
11063
19,6
25,5
11140
19,8
25,7
11218
19,9
25,9
11295
20,0
26,1
11373
20,2
26,2
11450
20,3
26,4
11527
20,5
26,6
11605
20,6
26,8
11682
20,7
27,0
11760
20,9
27,1
11837
21,0
27,3
11914
21,1
27,5
QMH
37,7
38,0
38,3
38,6
38,8
39,1
39,4
39,7
40,0
40,3
40,6
40,8
41,1
41,4
41,7
42,0
42,3
42,6
42,8
43,1
43,4
43,7
44,0
OFERTA HDRICA
44
Cdigo:
2121728
A.S.N.M:
1735 m.
Corriente: Bermelln
45
Anual
Dic.
Nov.
Oct.
Sept.
Agosto
Julio.
Junio.
Mayo.
Abril.
Marzo
Feb.
Enero
Tabla 19. Valores de Caudales Medios Mensuales Multianuales. Estacin Hidromtrica Puente
Bolvar
Medios 1,95 2,06 2,12 2,19 2,61 2,96 3,34 3,14 2,53 2,32 2,37 2,27 2,49
Max.
3,52 3,58 3,85 3,04 3,56 4,84 5,62 6,06 3,05 2,83 3,11 3,16 6,06
Min.
1,6
46
% Q Medios
mensuales
respecto al
medio anual
% Q Mximos
mensuales
respecto al
medio anual
% Q Mnimos
mensuales
respecto al
medio anual
Ener
o
Febre
ro
Marz
o
Abril.
Mayo
.
Junio. Julio.
Agos
to
Sept.
Oct.
Nov.
Dic.
78%
83%
85%
88%
105
%
119
%
134
%
126
%
102
%
93%
95%
91%
141
%
144
%
155
%
122
%
143
%
194
%
226
%
243
%
122
%
114
%
125
%
127
%
33%
32%
38%
46%
74%
77%
64%
40%
65%
54%
49%
43%
Tabla 21. Valores de Caudales Medios Mensuales Multianuales. Quebrada Chorros blancos
Enero Feb.
Marz
o
Mayo
.
Abril.
Junio. Julio.
Agost
o
Sept.
Oct.
Nov.
Dic.
Anual
Medi
os
171,1
5
180,8
0
186,0
7
192,2
1
229,0
7
259,7
9
293,1
4
275,5
9
222,0
5
203,6
2
208,0
1
199,2
3
218,5
4
Max.
308,9
4
314,2
1
337,9
0
266,8
1
312,4
5
424,7
9
493,2
5
531,8
7
267,6
9
248,3
8
272,9
6
277,3
4
531,8
7
Min.
72,85
69,34
83,38
100,9
3
162,3
7
167,6
4
140,4
3
87,77
141,3
0
118,4
9
107,0
8
94,79
69,34
27,5
45,3
5
45,3
5
100
%
Feb.
27,5
41,8
4
41,8
4
100
%
Marz
o
27,5
55,8
8
55,8
8
100
%
Mayo
Abril. .
Junio.
Julio.
Agost
o
Sept.
27,5
27,5
27,5
27,5
27,5
27,5
73,4 134,8 140,1 112,9
113,8
3
7
4
3 60,27
0
73,4 134,8 140,1 112,9
113,8
3
7
4
3 60,27
0
100
100% 100% 100% 100% 100%
%
Oct.
27,5
90,9
9
90,9
9
100
%
Nov.
27,5
79,5
8
79,5
8
100
%
Dic.
27,5
67,2
9
67,2
9
100
%
47
Feb.
Marz Abril
o
.
May
o.
Junio
Agos
.
Julio. to
Sept
.
Oct.
Nov.
Anua
l
Dic.
Medi
os
41,51 43,85 45,12 46,61 55,55 63,00 71,09 66,84 53,85 49,38 50,45 48,32
Max.
Min.
17,67 16,82 20,22 24,48 39,38 40,65 34,06 21,29 34,27 28,73 25,97 22,99 16,82
53,0
Feb.
Mar
zo
Abri
l.
May
o.
Juni
o.
Oct.
Nov. Dic.
QMD
27,5
27,5
27,5
27,5
27,5
27,5
27,5
27,5
27,5
27,5
27,5
27,5
Caudal ecolgico
0,00
0,00
0,00
0,00
11,8
8
13,1
5
6,56
0,00
6,77
1,23
0,00
0,00
-9,83
10,6
8
7,28
3,02
11,8
8
13,1
5
6,56
-6,21
6,77
1,23
1,53 -4,51
64%
61%
74%
89%
100
100
100
77%
100
100
Deficit-superhabit
Porcentaje
94%
84%
48
Con base en los resultados obtenidos en el anlisis, se puede observar que para la
Quebrada Chorros Blancos el comportamiento de los caudales medios mensuales
multianuales mnimos es bimodal, con mayor disponibilidad de agua hacia los
meses de Junio presenta un valor mximo de 167,64 l/s y en el mes de febrero
presenta el valor mnimo de 69.34 l/s.
Teniendo un caudal mximo diario de abastecimiento a la poblacin de 27.5 l/s se
puede observar que con los caudales mnimos obtenidos para la quebrada Chorros
Blancos, es posible garantizar un abastecimiento del 100% del caudal demandado
para la poblacin durante todo el ao, con un caudal ecolgico mnimo de 41.84 l/s
para el mes de febrero y mximo de 140.14 l/s para el mes de Junio, lo cual permite
49
CAPTACINES
50
[ 10 ]
m
0.30 m
s2
m3
L
=393
s
s
[ 11 ]
50
4.1.2.2 Evaluacin
El sistema funciona como una bocatoma de fondo con cara anterior vertical, la cual
garantiza un nivel mnimo constante de la lmina del agua sobre la rejilla, la cual a su
vez opera como un orificio sumergido. De esta manera haciendo uso de la ecuacin:
Q captado=Cd A neta 2 gH
[ 12 ]
Se obtiene:
Qcaptado=0.6 ( 0.5 m 0.3 ) 2 9.81 m/s 2 0.30 m
3
Qcaptado=0.218
m
L
=218
s
s
51
[ 13 ]
4.2.1.1.1 Evaluacin
Con el fin de evaluar el comportamiento hidrulico del canal, se emplea la Ecuacin 14
de Manning la cual se expresa a continuacin:
52
[ 14 ]
Dnde:
V= Velocidad del agua (m/s)
R= Radio hidrulico = rea mojada / Permetro mojado
S= pendiente del fondo del canal
n= Coef. De rugosidad de Manning (0.015 para concreto)
En funcin a la disposicin topogrfica del canal, se determin que cuenta con una
pendiente promedio de S=0.008=0.8%
Con esta informacin, y las mediciones en campo se puede determinar la velocidad del
agua en el canal mediante la ecuacin de Manning como se muestra a continuacin:
rea mojada: Haciendo uso de las mediciones en campo se determina el rea mojada
del canal:
A m =b h=0.9 m 0.32m=0.288 m2
Donde b corresponde al ancho del canal y h a la profundidad del agua.
Permetro mojado: El permetro mojado se calcula haciendo uso la siguiente expresin:
Pm=b2 h=0.9 m+ ( 2 0.32m )=1.54 m
Conociendo el permetro mojado y el rea mojada es posible calcular el radio hidrulico:
Am 0.288 m2
R= =
=0.187 m
P m 1.54 m
53
54
55
FRICCIN UNITARIA
PRDIDA DE ENERGA
(pg
)
(m)
(lps)
(m/m)
(m)
K0+000.00
K0+000.0
0
K0+004.3
9
K0+010.6
6
K0+024.8
9
K0+036.3
5
K0+004.39
4.39
K0+010.66
6.26
K0+024.89
14.2
3
K0+036.35
11.46
K0+042.95
6.60
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
VELOCIDAD
CAUDAL DE DISEO
Inicial
PRESIN ESTTICA
LONGITUD
Final
ABSCISA
PRESIN DISPONIBLE
DIMETRO NOMINAL
Tabla 25 Simulacin hidrulica lnea de conduccin Q. Chorros Blancos Entre Bocatoma y Cmara
Intermedia o de confluencia (Q= 27.5 L/s)
Final
(m)
(m)
(m/s)
2178.94
0.80
0.80
0.81
COTAS (msnm)
PIEZOMTRICA
Inicial
Final
BATEA
Inicial
2178.94
Final
TERRENO
Inicial
2177.92
0.00303
0.0176
2178.94
2178.92
2177.92
2174.81
2178.94
2175.92
3.90
3.91
0.81
0.00303
0.0227
2178.92
2178.90
2174.81
2171.94
2175.92
2173.16
6.74
6.79
0.81
0.00303
0.0517
2178.90
2178.85
2171.94
2165.41
2173.16
2166.50
13.21
13.31
0.81
0.00303
0.0416
2178.85
2178.81
2165.41
2160.16
2166.50
2161.18
18.43
18.56
0.81
0.00303
0.0249
2178.81
2178.78
2160.16
2156.44
2161.18
2157.57
22.12
22.28
0.81
56
K0+211.34
K0+212.3
0
K0+232.4
0
K0+247.3
9
K0+270.6
5
K0+278.1
8
K0+287.1
7
K0+300.3
6
K0+300.5
1
K0+311.91
K0+325.4
9
K0+327.3
5
K0+351.5
3
K0+357.3
3
K0+369.9
3
K0+373.3
2
FRICCIN UNITARIA
PRDIDA DE ENERGA
(lps)
(m/m)
(m)
K0+062.61
K0+089.03
K0+091.86
2.81
16.8
5
26.4
2
2.84
25.4
2
12.2
9
K0+117.28
K0+129.57
K0+141.09
11.52
K0+147.74
6.65
K0+149.18
1.45
K0+168.87
19.6
8
K0+178.26
9.39
K0+211.34
33.0
8
K0+212.30
0.96
20.1
0
14.9
8
23.2
6
K0+232.40
K0+247.39
K0+270.65
K0+278.18
7.53
K0+287.17
8.99
K0+300.36
13.1
9
K0+300.51
0.16
K0+311.91
11.40
K0+325.49
13.5
8
K0+327.35
1.86
K0+351.53
24.1
8
K0+357.33
5.81
K0+369.93
12.6
0
K0+373.32
3.39
12.4
6
K0+385.78
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
VELOCIDAD
K0+129.5
7
K0+141.0
9
K0+147.7
4
K0+149.1
8
K0+168.8
7
K0+178.2
6
(m)
PRESIN ESTTICA
K0+117.28
K0+045.76
(pg
)
PRESIN DISPONIBLE
K0+042.9
5
K0+045.7
6
K0+062.6
1
K0+089.0
3
K0+091.8
6
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
Inicial
Final
Inicial
Final
Inicial
Final
(m)
(m)
(m/s)
0.00303
0.0106
2178.78
2178.77
2156.44
2154.86
2157.57
2156.17
23.70
23.87
0.81
0.00303
0.0596
2178.77
2178.71
2154.86
2148.47
2156.17
2149.46
30.03
30.25
0.81
0.00303
0.0934
2178.71
2178.62
2148.47
2138.45
2149.46
2139.80
39.95
40.27
0.81
0.00303
0.0100
2178.62
2178.61
2138.45
2137.38
2139.80
2138.51
41.01
41.34
0.81
0.00303
0.0991
2178.61
2178.51
2137.38
2121.01
2138.51
2122.23
57.28
57.72
0.81
0.00303
0.0479
2178.51
2178.46
2121.01
2113.09
2122.23
2114.31
65.15
65.63
0.81
0.00303
0.0387
2178.46
2178.42
2113.09
2111.45
2114.31
2112.70
66.75
67.27
0.81
0.00303
0.0229
2178.42
2178.40
2111.45
2109.58
2112.70
2110.90
68.60
69.14
0.81
0.00303
0.0050
2178.40
2178.39
2109.58
2109.17
2110.90
2110.32
69.00
69.55
0.81
0.00303
0.0699
2178.39
2178.32
2109.17
2101.46
2110.32
2102.65
76.65
77.26
0.81
0.00303
0.0320
2178.32
2178.29
2101.46
2099.27
2102.65
2100.39
78.81
79.45
0.81
0.00323
0.1205
2178.29
2178.17
2099.27
2091.54
2100.39
2092.73
86.41
87.18
0.83
0.00323
0.0035
2178.17
2178.17
2091.54
2091.34
2092.73
2092.53
86.61
87.38
0.83
0.00323
0.0729
2178.17
2178.10
2091.34
2087.10
2092.53
2088.30
90.78
91.62
0.83
0.00323
0.0543
2178.10
2178.04
2087.10
2083.94
2088.30
2085.12
93.88
94.78
0.83
0.00323
0.0843
2178.04
2177.96
2083.94
2079.03
2085.12
2080.27
98.70
99.69
0.83
0.00323
0.0273
2177.96
2177.93
2079.03
2077.45
2080.27
2078.88
100.26
101.28
0.83
0.00323
0.0329
2177.93
2177.90
2077.45
2079.78
2078.88
2080.86
97.90
98.94
0.83
0.00323
0.0471
2177.90
2177.85
2079.78
2081.26
2080.86
2082.53
96.37
97.47
0.83
0.00323
0.0006
2177.85
2177.85
2081.26
2081.27
2082.53
2082.52
96.36
97.45
0.83
0.00323
0.0406
2177.85
2177.81
2081.27
2080.48
2082.52
2081.68
97.11
98.24
0.83
0.00323
0.0483
2177.81
2177.76
2080.48
2080.08
2081.68
2081.58
97.46
98.64
0.83
0.00323
0.0066
2177.76
2177.75
2080.08
2080.03
2081.58
2081.29
97.51
98.69
0.83
0.00323
0.0868
2177.75
2177.67
2080.03
2076.35
2081.29
2077.46
101.10
102.37
0.83
0.00323
0.0208
2177.67
2177.65
2076.35
2075.47
2077.46
2076.76
101.96
103.25
0.83
0.00323
0.0463
2177.65
2177.60
2075.47
2071.96
2076.76
2073.07
105.42
106.76
0.83
0.00350
0.0135
2177.60
2177.59
2071.96
2071.01
2073.07
2072.29
106.35
107.71
0.86
0.00350
0.0492
2177.59
2177.54
2071.01
2068.11
2072.29
2069.44
109.21
110.61
0.86
COTAS (msnm)
PIEZOMTRICA
BATEA
TERRENO
57
K0+499.11
K0+514.3
7
K0+514.5
1
K0+523.4
8
K0+523.5
3
K0+534.6
7
K0+537.4
8
K0+538.6
7
K0+547.6
1
K0+548.6
3
K0+594.7
5
K0+617.7
6
K0+620.0
0
K0+642.4
9
K0+642.5
0
K0+647.6
2
FRICCIN UNITARIA
PRDIDA DE ENERGA
(lps)
(m/m)
(m)
0.59
K0+400.19
13.8
2
K0+401.16
0.97
K0+421.97
20.8
1
K0+426.11
4.14
K0+442.07
15.9
6
K0+442.40
0.33
K0+462.09
19.6
8
K0+462.09
0.00
K0+490.91
28.8
3
K0+490.92
0.01
K0+499.11
8.19
K0+514.37
15.2
6
K0+514.51
0.13
K0+523.48
8.98
K0+523.53
0.05
K0+534.67
11.14
K0+537.48
2.80
K0+538.67
1.20
K0+547.61
8.94
K0+548.63
1.02
46.1
2
23.0
1
K0+594.75
K0+617.76
K0+620.00
2.24
K0+642.49
22.4
9
K0+642.50
0.01
K0+647.62
5.12
18.8
9
K0+666.51
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
VELOCIDAD
K0+442.0
7
K0+442.4
0
K0+462.0
9
K0+462.0
9
K0+490.9
1
K0+490.9
2
(m)
PRESIN ESTTICA
K0+426.11
K0+386.37
(pg
)
PRESIN DISPONIBLE
K0+385.7
8
K0+386.3
7
K0+400.1
9
K0+401.1
6
K0+421.9
7
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
Inicial
Final
Inicial
Final
Inicial
Final
(m)
(m)
(m/s)
0.00350
0.0023
2177.54
2177.53
2068.11
2067.97
2069.44
2069.22
109.34
110.75
0.86
0.00350
0.0563
2177.53
2177.48
2067.97
2063.00
2069.22
2064.11
114.25
115.72
0.86
0.00350
0.0040
2177.48
2177.47
2063.00
2062.65
2064.11
2063.84
114.60
116.07
0.86
0.00350
0.0830
2177.47
2177.39
2062.65
2056.92
2063.84
2058.05
120.25
121.80
0.86
0.00350
0.0165
2177.39
2177.37
2056.92
2055.78
2058.05
2057.13
121.37
122.94
0.86
0.00350
0.0615
2177.37
2177.31
2055.78
2055.58
2057.13
2056.71
121.51
123.14
0.86
0.00350
0.0013
2177.31
2177.31
2055.58
2055.58
2056.71
2056.75
121.51
123.14
0.86
0.00350
0.0765
2177.31
2177.24
2055.58
2058.29
2056.75
2059.46
118.72
120.43
0.86
0.00350
0.0000
2177.24
2177.24
2058.29
2058.29
2059.46
2059.46
118.72
120.43
0.86
0.00350
0.1113
2177.24
2177.12
2058.29
2056.54
2059.46
2057.73
120.36
122.18
0.86
0.00350
0.0000
2177.12
2177.12
2056.54
2056.54
2057.73
2057.73
120.36
122.18
0.86
0.00350
0.0325
2177.12
2177.09
2056.54
2058.59
2057.73
2059.85
118.28
120.13
0.86
0.00350
0.0595
2177.09
2177.03
2058.59
2060.98
2059.85
2062.31
115.83
117.74
0.86
0.00350
0.0005
2177.03
2177.03
2060.98
2060.98
2062.31
2062.34
115.83
117.74
0.86
0.00350
0.0346
2177.03
2177.00
2060.98
2061.15
2062.34
2062.31
115.62
117.57
0.86
0.00350
0.0002
2177.00
2177.00
2061.15
2061.14
2062.31
2062.31
115.64
117.58
0.86
0.00350
0.0449
2177.00
2176.95
2061.14
2057.58
2062.31
2059.17
119.15
121.14
0.86
0.00350
0.0113
2176.95
2176.94
2057.58
2056.68
2059.17
2057.76
120.04
122.04
0.86
0.00350
0.0048
2176.94
2176.94
2056.68
2056.30
2057.76
2057.58
120.42
122.42
0.86
0.00350
0.0348
2176.94
2176.90
2056.30
2054.93
2057.58
2056.31
121.75
123.79
0.86
0.00350
0.0040
2176.90
2176.90
2054.93
2054.78
2056.31
2056.04
121.90
123.94
0.86
0.00350
0.1835
2176.90
2176.71
2054.78
2042.46
2056.04
2043.75
134.03
136.26
0.86
0.00350
0.0892
2176.71
2176.62
2042.46
2040.02
2043.75
2041.44
136.39
138.70
0.86
0.00350
0.0087
2176.62
2176.62
2040.02
2039.78
2041.44
2041.08
136.62
138.94
0.86
0.00386
0.0966
2176.62
2176.52
2039.78
2036.25
2041.08
2037.42
140.04
142.47
0.89
0.00386
0.0000
2176.52
2176.52
2036.25
2036.25
2037.42
2037.42
140.05
142.47
0.89
0.00386
0.0218
2176.52
2176.50
2036.25
2035.91
2037.42
2037.25
140.37
142.81
0.89
0.00386
0.0805
2176.50
2176.42
2035.91
2037.65
2037.25
2038.78
138.55
141.07
0.89
COTAS (msnm)
PIEZOMTRICA
BATEA
TERRENO
58
PRDIDA DE ENERGA
(lps)
(m/m)
(m)
0.02
K0+677.38
10.8
5
K0+677.40
0.02
K0+691.32
13.9
2
K0+696.58
5.26
K0+712.91
16.3
3
K0+713.12
0.21
22.2
3
17.7
5
K0+735.36
K0+753.10
K0+761.40
8.30
K0+761.40
0.00
K0+769.10
7.70
K0+777.40
8.30
K0+777.40
0.00
K0+781.52
4.12
K0+788.30
6.79
K0+829.67
41.3
6
K0+836.56
6.90
K0+895.55
58.9
9
K0+895.65
0.10
K0+913.75
18.1
0
K0+922.61
8.86
K0+929.35
6.74
32.8
5
12.3
2
K0+962.20
K0+974.52
K0+976.27
1.75
K0+999.59
23.3
1
K1+000.28
0.69
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
VELOCIDAD
FRICCIN UNITARIA
(m)
PRESIN ESTTICA
K0+666.52
(pg
)
PRESIN DISPONIBLE
K0+666.5
1
K0+666.5
2
K0+677.3
8
K0+677.4
0
K0+691.3
2
K0+696.5
8
K0+712.9
1
K0+713.1
2
K0+735.3
6
K0+753.1
0
K0+761.4
0
K0+761.4
0
K0+769.1
0
K0+777.4
0
K0+777.4
0
K0+781.5
2
K0+788.3
0
K0+829.6
7
K0+836.5
6
K0+895.5
5
K0+895.6
5
K0+913.7
5
K0+922.6
1
K0+929.3
5
K0+962.2
0
K0+974.5
2
K0+976.2
7
K0+999.5
9
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
Inicial
Final
Inicial
Final
Inicial
Final
(m)
(m)
(m/s)
0.00386
0.0001
2176.42
2176.42
2037.65
2037.65
2038.78
2038.79
138.55
141.08
0.89
0.00386
0.0463
2176.42
2176.37
2037.65
2036.59
2038.79
2037.79
139.56
142.13
0.89
0.00386
0.0001
2176.37
2176.37
2036.59
2036.58
2037.79
2037.78
139.57
142.14
0.89
0.00386
0.0617
2176.37
2176.31
2036.58
2032.19
2037.78
2033.34
143.90
146.53
0.89
0.00386
0.0233
2176.31
2176.29
2032.19
2030.53
2033.34
2031.74
145.54
148.20
0.89
0.00386
0.0716
2176.29
2176.21
2030.53
2026.11
2031.74
2027.19
149.88
152.61
0.89
0.00386
0.0009
2176.21
2176.21
2026.11
2026.05
2027.19
2027.17
149.94
152.67
0.89
0.00386
0.0951
2176.21
2176.12
2026.05
2023.12
2027.17
2024.23
152.78
155.60
0.89
0.00386
0.0759
2176.12
2176.04
2023.12
2020.78
2024.23
2021.39
155.04
157.94
0.89
0.00386
0.0355
2176.04
2176.01
2020.78
2019.68
2021.39
2019.90
156.10
159.04
0.89
0.00386
0.0000
2176.01
2176.01
2019.68
2019.68
2019.90
2019.90
156.10
159.04
0.89
0.00386
0.0327
2176.01
2175.97
2019.68
2019.83
2019.90
2018.53
155.93
158.89
0.89
0.00386
0.0352
2175.97
2175.94
2019.83
2019.98
2018.53
2020.20
155.74
158.74
0.89
0.00386
0.0000
2175.94
2175.94
2019.98
2019.98
2020.20
2020.20
155.74
158.74
0.89
0.00386
0.0177
2175.94
2175.92
2019.98
2020.66
2020.20
2021.03
155.04
158.06
0.89
0.00386
0.0292
2175.92
2175.89
2020.66
2021.78
2021.03
2023.02
153.89
156.94
0.89
0.00386
0.1821
2175.89
2175.71
2021.78
2033.78
2023.02
2035.13
141.71
144.94
0.89
0.00386
0.0304
2175.71
2175.68
2033.78
2035.78
2035.13
2036.93
139.68
142.94
0.89
0.00350
0.2341
2175.68
2175.44
2035.78
2050.95
2036.93
2052.10
124.28
127.78
0.86
0.00350
0.0004
2175.44
2175.44
2050.95
2050.95
2052.10
2052.12
124.27
127.77
0.86
0.00350
0.0699
2175.44
2175.37
2050.95
2052.06
2052.12
2053.19
123.09
126.66
0.86
0.00350
0.0344
2175.37
2175.34
2052.06
2050.87
2053.19
2052.18
124.25
127.85
0.86
0.00350
0.0262
2175.34
2175.31
2050.87
2049.96
2052.18
2051.08
125.13
128.76
0.86
0.00350
0.1282
2175.31
2175.19
2049.96
2044.51
2051.08
2045.68
130.45
134.21
0.86
0.00350
0.0483
2175.19
2175.14
2044.51
2042.12
2045.68
2043.25
132.80
136.60
0.86
0.00350
0.0069
2175.14
2175.13
2042.12
2041.78
2043.25
2043.10
133.13
136.94
0.86
0.00350
0.0902
2175.13
2175.04
2041.78
2039.61
2043.10
2040.88
135.21
139.11
0.86
0.00350
0.0027
2175.04
2175.04
2039.61
2039.54
2040.88
2040.71
135.27
139.18
0.86
COTAS (msnm)
PIEZOMTRICA
BATEA
TERRENO
59
(lps)
(m/m)
(m)
K1+011.89
11.61
K1+011.89
K1+018.05
6.15
K1+048.82
30.7
7
K1+049.03
0.21
K1+018.0
5
K1+048.8
2
K1+049.0
3
K1+071.5
5
K1+082.3
5
K1+082.3
5
K1+113.33
K1+133.6
6
K1+164.1
5
K1+166.2
4
K1+211.96
K1+229.5
3
K1+229.5
9
K1+266.9
7
K1+279.7
0
K1+309.7
7
K1+311.09
K1+378.8
5
K1+379.7
5
K1+387.6
1
K1+414.8
0
K1+414.8
0
K1+071.55
K1+082.35
K1+082.35
K1+113.33
K1+133.66
K1+164.15
K1+166.24
K1+211.96
K1+229.53
K1+229.59
22.5
2
10.8
0
0.00
30.9
8
20.3
3
30.4
8
2.09
45.7
2
17.5
7
0.06
37.3
8
12.7
3
30.0
6
K1+266.97
K1+279.70
K1+309.77
K1+311.09
1.32
K1+378.85
67.7
6
K1+379.75
0.91
K1+387.61
7.85
K1+414.80
27.1
9
K1+414.80
0.00
10.9
9
K1+425.79
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
VELOCIDAD
(m)
K1+000.2
8
PRESIN ESTTICA
PRDIDA DE ENERGA
(pg
)
PRESIN DISPONIBLE
FRICCIN UNITARIA
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
Inicial
Final
Inicial
Final
Inicial
Final
(m)
(m)
(m/s)
0.00386
0.0505
2175.04
2174.99
2039.54
2036.81
2040.71
2037.98
137.95
141.91
0.89
0.00386
0.0267
2174.99
2174.96
2036.81
2035.51
2037.98
2036.66
139.23
143.21
0.89
0.00386
0.1333
2174.96
2174.83
2035.51
2028.98
2036.66
2030.22
145.63
149.74
0.89
0.00386
0.0009
2174.83
2174.83
2028.98
2028.93
2030.22
2030.22
145.67
149.79
0.89
0.00386
0.0956
2174.83
2174.73
2028.93
2028.87
2030.22
2029.15
145.64
149.85
0.89
0.00386
0.0458
2174.73
2174.68
2028.87
2028.84
2029.15
2030.56
145.62
149.88
0.89
0.00386
0.0000
2174.68
2174.68
2028.84
2028.84
2030.56
2030.56
145.62
149.88
0.89
0.00386
0.1353
2174.68
2174.55
2028.84
2020.96
2030.56
2022.11
153.37
157.76
0.89
0.00386
0.0884
2174.55
2174.46
2020.96
2016.20
2022.11
2017.43
158.05
162.53
0.89
0.00386
0.1348
2174.46
2174.33
2016.20
2006.83
2017.43
2008.07
167.28
171.89
0.89
0.00386
0.0091
2174.33
2174.32
2006.83
2006.29
2008.07
2007.54
167.81
172.43
0.89
0.00386
0.1999
2174.32
2174.12
2006.29
1994.45
2007.54
1995.66
179.45
184.27
0.89
0.00386
0.0747
2174.12
2174.04
1994.45
1993.45
1995.66
1994.66
180.37
185.27
0.89
0.00386
0.0003
2174.04
2174.04
1993.45
1993.44
1994.66
1994.66
180.38
185.28
0.89
0.00386
0.1625
2174.04
2173.88
1993.44
1984.76
1994.66
1985.99
188.90
193.96
0.89
0.00386
0.0545
2173.88
2173.82
1984.76
1982.95
1985.99
1984.21
190.65
195.77
0.89
0.00386
0.1288
2173.82
2173.70
1982.95
1978.70
1984.21
1980.01
194.78
200.03
0.89
0.00386
0.0057
2173.70
2173.69
1978.70
1978.51
1980.01
1979.75
194.96
200.21
0.89
0.00386
0.2919
2173.69
2173.40
1978.51
1966.19
1979.75
1967.34
206.99
212.53
0.89
0.00386
0.0039
2173.40
2173.39
1966.19
1966.03
1967.34
1967.25
207.15
212.69
0.89
0.00386
0.0335
2173.39
2173.36
1966.03
1965.34
1967.25
1966.64
207.81
213.38
0.89
0.00386
0.1155
2173.36
2173.25
1965.34
1966.49
1966.64
1967.51
206.54
212.23
0.89
0.00386
0.0000
2173.25
2173.25
1966.49
1966.49
1967.51
1967.51
206.54
212.23
0.89
0.00386
0.0484
2173.25
2173.20
1966.49
1969.68
1967.51
1970.70
203.30
209.04
0.89
COTAS (msnm)
PIEZOMTRICA
BATEA
TERRENO
61
62
(m/m)
(m)
Inicial
117.7
8
VELOCIDAD
K0+000.0
0
(lps)
PRESIN
ESTTICA
(m)
PIEZOMTRICA
PRESIN
DISPONIBLE
(pg)
PRDIDA DE ENERGA
Inicial
FRICCIN UNITARIA
LONGITUD
Final
ABSCISA
CAUDAL DE DISEO
DIMETRO NOMINAL
Final
(m)
(m)
(m/s
)
2178.9
4
0.80
0.80
3.45
COTAS (msnm)
Final
2178.9
4
BATEA
Inicial
Final
2177.9
2
TERRENO
Inicial
63
DIMETRO NOMINAL
CAUDAL DE DISEO
FRICCIN UNITARIA
PRDIDA DE ENERGA
PRESIN
DISPONIBLE
LONGITUD
PRESIN
ESTTICA
VELOCIDAD
PIEZOMTRICA
Inicial
Final
(pg)
(m)
(lps)
(m/m)
(m)
Inicial
Final
Inicial
Final
Inicial
Final
(m)
(m)
(m/s
)
K0+000.0
0
K0+004.3
9
4.39
117.7
8
0.0447
4
0.260
4
2178.9
4
2178.6
8
2177.9
2
2174.8
1
2178.9
4
2175.9
2
3.65
3.91
3.45
K0+004.3
9
K0+010.6
6
6.26
117.7
8
0.0447
4
0.336
4
2178.6
8
2178.3
4
2174.8
1
2171.9
4
2175.9
2
2173.1
6
6.19
6.79
3.45
K0+010.6
6
K0+024.8
9
14.2
3
117.7
8
0.0447
4
0.764
2
2178.3
4
2177.5
8
2171.9
4
2165.4
1
2173.1
6
2166.5
0
11.95
13.31
3.45
K0+024.8
9
K0+036.3
5
11.4
6
117.7
8
0.0447
4
0.615
2
2177.5
8
2176.9
6
2165.4
1
2160.1
6
2166.5
0
2161.1
8
16.58
18.56
3.45
K0+036.3
5
K0+042.9
5
6.60
117.7
8
0.0447
4
0.368
7
2176.9
6
2176.6
0
2160.1
6
2156.4
4
2161.1
8
2157.5
7
19.94
22.28
3.45
K0+042.9
5
K0+045.7
6
2.81
117.7
8
0.0447
4
0.157
0
2176.6
0
2176.4
4
2156.4
4
2154.8
6
2157.5
7
2156.1
7
21.36
23.87
3.45
K0+045.7
6
K0+062.6
1
16.8
5
117.7
8
0.0447
4
0.881
8
2176.4
4
2175.5
6
2154.8
6
2148.4
7
2156.1
7
2149.4
6
26.87
30.25
3.45
K0+062.6
1
K0+089.0
3
26.4
2
117.7
8
0.0447
4
1.382
0
2175.5
6
2174.1
7
2148.4
7
2138.4
5
2149.4
6
2139.8
0
35.50
40.27
3.45
K0+089.0
3
K0+091.8
6
2.84
117.7
8
0.0447
4
0.148
5
2174.1
7
2174.0
3
2138.4
5
2137.3
8
2139.8
0
2138.5
1
36.43
41.34
3.45
K0+091.8
6
K0+117.2
8
25.4
2
117.7
8
0.0447
4
1.466
1
2174.0
3
2172.5
6
2137.3
8
2121.0
1
2138.5
1
2122.2
3
51.33
57.72
3.45
K0+117.2
8
K0+129.5
7
12.2
9
117.7
8
0.0447
4
0.709
1
2172.5
6
2171.8
5
2121.0
1
2113.0
9
2122.2
3
2114.3
1
58.54
65.63
3.45
K0+129.5
7
K0+141.0
9
11.5
2
117.7
8
0.0447
4
0.572
2
2171.8
5
2171.2
8
2113.0
9
2111.4
5
2114.3
1
2112.7
0
59.61
67.27
3.45
K0+141.0
9
K0+147.7
4
6.65
117.7
8
0.0447
4
0.338
7
2171.2
8
2170.9
4
2111.4
5
2109.5
8
2112.7
0
2110.9
0
61.14
69.14
3.45
K0+147.7
4
K0+149.1
8
1.45
117.7
8
0.0447
4
0.073
8
2170.9
4
2170.8
7
2109.5
8
2109.1
7
2110.9
0
2110.3
2
61.47
69.55
3.45
K0+149.1
8
K0+168.8
7
19.6
8
117.7
8
0.0447
4
1.033
9
2170.8
7
2169.8
3
2109.1
7
2101.4
6
2110.3
2
2102.6
5
68.15
77.26
3.45
K0+168.8
7
K0+178.2
6
9.39
117.7
8
0.0447
4
0.473
8
2169.8
3
2169.3
6
2101.4
6
2099.2
7
2102.6
5
2100.3
9
69.87
79.45
3.45
K0+178.2
6
K0+211.3
4
33.0
8
117.7
8
0.0477
9
1.781
5
2169.3
6
2167.5
8
2099.2
7
2091.5
4
2100.3
9
2092.7
3
75.82
87.18
3.55
K0+211.3
4
K0+212.3
0
0.96
117.7
8
0.0477
9
0.051
1
2167.5
8
2167.5
3
2091.5
4
2091.3
4
2092.7
3
2092.5
3
75.97
87.38
3.55
ABSCISA
COTAS (msnm)
BATEA
TERRENO
64
DIMETRO NOMINAL
LONGITUD
CAUDAL DE DISEO
FRICCIN UNITARIA
PRDIDA DE ENERGA
PRESIN
DISPONIBLE
PRESIN
ESTTICA
VELOCIDAD
Inicial
Final
(pg)
(m)
(lps)
(m/m)
(m)
Inicial
Final
Inicial
Final
Inicial
Final
(m)
(m)
(m/s
)
K0+212.3
0
K0+232.4
0
20.1
0
117.7
8
0.0477
9
1.078
1
2167.5
3
2166.4
5
2091.3
4
2087.1
0
2092.5
3
2088.3
0
79.13
91.62
3.55
K0+232.4
0
K0+247.3
9
14.9
8
117.7
8
0.0477
9
0.803
3
2166.4
5
2165.6
4
2087.1
0
2083.9
4
2088.3
0
2085.1
2
81.49
94.78
3.55
K0+247.3
9
K0+270.6
5
23.2
6
117.7
8
0.0477
9
1.247
3
2165.6
4
2164.4
0
2083.9
4
2079.0
3
2085.1
2
2080.2
7
85.14
99.69
3.55
K0+270.6
5
K0+278.1
8
7.53
117.7
8
0.0477
9
0.403
8
2164.4
0
2163.9
9
2079.0
3
2077.4
5
2080.2
7
2078.8
8
86.33
101.2
8
3.55
K0+278.1
8
K0+287.1
7
8.99
117.7
8
0.0477
9
0.486
5
2163.9
9
2163.5
1
2077.4
5
2079.7
8
2078.8
8
2080.8
6
83.51
98.94
3.55
K0+287.1
7
K0+300.3
6
13.1
9
117.7
8
0.0477
9
0.697
2
2163.5
1
2162.8
1
2079.7
8
2081.2
6
2080.8
6
2082.5
3
81.33
97.47
3.55
K0+300.3
6
K0+300.5
1
0.16
117.7
8
0.0477
9
0.008
6
2162.8
1
2162.8
0
2081.2
6
2081.2
7
2082.5
3
2082.5
2
81.31
97.45
3.55
K0+300.5
1
K0+311.9
1
11.4
0
117.7
8
0.0477
9
0.600
2
2162.8
0
2162.2
0
2081.2
7
2080.4
8
2082.5
2
2081.6
8
81.50
98.24
3.55
K0+311.9
1
K0+325.4
9
13.5
8
117.7
8
0.0477
9
0.714
0
2162.2
0
2161.4
9
2080.4
8
2080.0
8
2081.6
8
2081.5
8
81.18
98.64
3.55
K0+325.4
9
K0+327.3
5
1.86
117.7
8
0.0477
9
0.097
5
2161.4
9
2161.3
9
2080.0
8
2080.0
3
2081.5
8
2081.2
9
81.14
98.69
3.55
K0+327.3
5
K0+351.5
3
24.1
8
117.7
8
0.0477
9
1.284
1
2161.3
9
2160.1
0
2080.0
3
2076.3
5
2081.2
9
2077.4
6
83.53
102.3
7
3.55
K0+351.5
3
K0+357.3
3
5.81
117.7
8
0.0477
9
0.308
2
2160.1
0
2159.8
0
2076.3
5
2075.4
7
2077.4
6
2076.7
6
84.11
103.2
5
3.55
K0+357.3
3
K0+369.9
3
12.6
0
117.7
8
0.0477
9
0.685
3
2159.8
0
2159.1
1
2075.4
7
2071.9
6
2076.7
6
2073.0
7
86.93
106.7
6
3.55
K0+369.9
3
K0+373.3
2
3.39
117.7
8
0.0518
3
0.200
1
2159.1
1
2158.9
1
2071.9
6
2071.0
1
2073.0
7
2072.2
9
87.68
107.7
1
3.67
K0+373.3
2
K0+385.7
8
12.4
6
117.7
8
0.0518
3
0.727
7
2158.9
1
2158.1
8
2071.0
1
2068.1
1
2072.2
9
2069.4
4
89.85
110.6
1
3.67
K0+385.7
8
K0+386.3
7
0.59
117.7
8
0.0518
3
0.034
7
2158.1
8
2158.1
5
2068.1
1
2067.9
7
2069.4
4
2069.2
2
89.96
110.7
5
3.67
K0+386.3
7
K0+400.1
9
13.8
2
117.7
8
0.0518
3
0.832
9
2158.1
5
2157.3
2
2067.9
7
2063.0
0
2069.2
2
2064.1
1
94.09
115.7
2
3.67
K0+400.1
9
K0+401.1
6
0.97
117.7
8
0.0518
3
0.058
6
2157.3
2
2157.2
6
2063.0
0
2062.6
5
2064.1
1
2063.8
4
94.38
116.0
7
3.67
K0+401.1
6
K0+421.9
7
20.8
1
117.7
8
0.0518
3
1.226
9
2157.2
6
2156.0
3
2062.6
5
2056.9
2
2063.8
4
2058.0
5
98.89
121.8
0
3.67
ABSCISA
COTAS (msnm)
PIEZOMTRICA
BATEA
TERRENO
65
DIMETRO NOMINAL
LONGITUD
CAUDAL DE DISEO
FRICCIN UNITARIA
PRDIDA DE ENERGA
PRESIN
DISPONIBLE
PRESIN
ESTTICA
VELOCIDAD
Inicial
Final
(pg)
(m)
(lps)
(m/m)
(m)
Inicial
Final
Inicial
Final
Inicial
Final
(m)
(m)
(m/s
)
K0+421.9
7
K0+426.1
1
4.14
117.7
8
0.0518
3
0.244
1
2156.0
3
2155.7
9
2056.9
2
2055.7
8
2058.0
5
2057.1
3
99.79
122.9
4
3.67
K0+426.1
1
K0+442.0
7
15.9
6
117.7
8
0.0518
3
0.909
7
2155.7
9
2154.8
8
2055.7
8
2055.5
8
2057.1
3
2056.7
1
99.07
123.1
4
3.67
K0+442.0
7
K0+442.4
0
0.33
117.7
8
0.0518
3
0.019
2
2154.8
8
2154.8
6
2055.5
8
2055.5
8
2056.7
1
2056.7
5
99.06
123.1
4
3.67
K0+442.4
0
K0+462.0
9
19.6
8
117.7
8
0.0518
3
1.132
0
2154.8
6
2153.7
3
2055.5
8
2058.2
9
2056.7
5
2059.4
6
95.21
120.4
3
3.67
K0+462.0
9
K0+462.0
9
0.00
117.7
8
0.0518
3
0.000
0
2153.7
3
2153.7
3
2058.2
9
2058.2
9
2059.4
6
2059.4
6
95.21
120.4
3
3.67
K0+462.0
9
K0+490.9
1
28.8
3
117.7
8
0.0518
3
1.646
2
2153.7
3
2152.0
8
2058.2
9
2056.5
4
2059.4
6
2057.7
3
95.32
122.1
8
3.67
K0+490.9
1
K0+490.9
2
0.01
117.7
8
0.0518
3
0.000
5
2152.0
8
2152.0
8
2056.5
4
2056.5
4
2057.7
3
2057.7
3
95.32
122.1
8
3.67
K0+490.9
2
K0+499.1
1
8.19
117.7
8
0.0518
3
0.480
0
2152.0
8
2151.6
0
2056.5
4
2058.5
9
2057.7
3
2059.8
5
92.78
120.1
3
3.67
K0+499.1
1
K0+514.3
7
15.2
6
117.7
8
0.0518
3
0.879
6
2151.6
0
2150.7
2
2058.5
9
2060.9
8
2059.8
5
2062.3
1
89.52
117.7
4
3.67
K0+514.3
7
K0+514.5
1
0.13
117.7
8
0.0518
3
0.007
8
2150.7
2
2150.7
1
2060.9
8
2060.9
8
2062.3
1
2062.3
4
89.51
117.7
4
3.67
K0+514.5
1
K0+523.4
8
8.98
117.7
8
0.0518
3
0.512
1
2150.7
1
2150.2
0
2060.9
8
2061.1
5
2062.3
4
2062.3
1
88.83
117.5
7
3.67
K0+523.4
8
K0+523.5
3
0.05
117.7
8
0.0518
3
0.002
6
2150.2
0
2150.2
0
2061.1
5
2061.1
4
2062.3
1
2062.3
1
88.84
117.5
8
3.67
K0+523.5
3
K0+534.6
7
11.1
4
117.7
8
0.0518
3
0.664
0
2150.2
0
2149.5
3
2061.1
4
2057.5
8
2062.3
1
2059.1
7
91.74
121.1
4
3.67
K0+534.6
7
K0+537.4
8
2.80
117.7
8
0.0518
3
0.166
9
2149.5
3
2149.3
7
2057.5
8
2056.6
8
2059.1
7
2057.7
6
92.46
122.0
4
3.67
K0+537.4
8
K0+538.6
7
1.20
117.7
8
0.0518
3
0.071
5
2149.3
7
2149.2
9
2056.6
8
2056.3
0
2057.7
6
2057.5
8
92.78
122.4
2
3.67
K0+538.6
7
K0+547.6
1
8.94
117.7
8
0.0518
3
0.515
2
2149.2
9
2148.7
8
2056.3
0
2054.9
3
2057.5
8
2056.3
1
93.63
123.7
9
3.67
K0+547.6
1
K0+548.6
3
1.02
117.7
8
0.0518
3
0.058
6
2148.7
8
2148.7
2
2054.9
3
2054.7
8
2056.3
1
2056.0
4
93.72
123.9
4
3.67
K0+548.6
3
K0+594.7
5
46.1
2
117.7
8
0.0518
3
2.713
4
2148.7
2
2146.0
1
2054.7
8
2042.4
6
2056.0
4
2043.7
5
103.3
3
136.2
6
3.67
K0+594.7
5
K0+617.7
6
23.0
1
117.7
8
0.0518
3
1.318
6
2146.0
1
2144.6
9
2042.4
6
2040.0
2
2043.7
5
2041.4
4
104.4
5
138.7
0
3.67
ABSCISA
COTAS (msnm)
PIEZOMTRICA
BATEA
TERRENO
66
DIMETRO NOMINAL
LONGITUD
CAUDAL DE DISEO
FRICCIN UNITARIA
PRDIDA DE ENERGA
PRESIN
DISPONIBLE
PRESIN
ESTTICA
VELOCIDAD
Inicial
Final
(pg)
(m)
(lps)
(m/m)
(m)
Inicial
Final
Inicial
Final
Inicial
Final
(m)
(m)
(m/s
)
K0+617.7
6
K0+620.0
0
2.24
117.7
8
0.0518
3
0.128
5
2144.6
9
2144.5
6
2040.0
2
2039.7
8
2041.4
4
2041.0
8
104.5
6
138.9
4
3.67
K0+620.0
0
K0+642.4
9
22.4
9
117.7
8
0.0570
7
1.428
0
2144.5
6
2143.1
3
2039.7
8
2036.2
5
2041.0
8
2037.4
2
106.6
6
142.4
7
3.82
K0+642.4
9
K0+642.5
0
0.01
117.7
8
0.0570
7
0.000
6
2143.1
3
2143.1
3
2036.2
5
2036.2
5
2037.4
2
2037.4
2
106.6
6
142.4
7
3.82
K0+642.5
0
K0+647.6
2
5.12
117.7
8
0.0570
7
0.322
5
2143.1
3
2142.8
1
2036.2
5
2035.9
1
2037.4
2
2037.2
5
106.6
8
142.8
1
3.82
K0+647.6
2
K0+666.5
1
18.8
9
117.7
8
0.0570
7
1.190
0
2142.8
1
2141.6
2
2035.9
1
2037.6
5
2037.2
5
2038.7
8
103.7
5
141.0
7
3.82
K0+666.5
1
K0+666.5
2
0.02
117.7
8
0.0570
7
0.001
1
2141.6
2
2141.6
2
2037.6
5
2037.6
5
2038.7
8
2038.7
9
103.7
5
141.0
8
3.82
K0+666.5
2
K0+677.3
8
10.8
5
117.7
8
0.0570
7
0.684
3
2141.6
2
2140.9
3
2037.6
5
2036.5
9
2038.7
9
2037.7
9
104.1
3
142.1
3
3.82
K0+677.3
8
K0+677.4
0
0.02
117.7
8
0.0570
7
0.001
1
2140.9
3
2140.9
3
2036.5
9
2036.5
8
2037.7
9
2037.7
8
104.1
3
142.1
4
3.82
K0+677.4
0
K0+691.3
2
13.9
2
117.7
8
0.0570
7
0.912
6
2140.9
3
2140.0
2
2036.5
8
2032.1
9
2037.7
8
2033.3
4
107.6
1
146.5
3
3.82
K0+691.3
2
K0+696.5
8
5.26
117.7
8
0.0570
7
0.344
7
2140.0
2
2139.6
7
2032.1
9
2030.5
3
2033.3
4
2031.7
4
108.9
3
148.2
0
3.82
K0+696.5
8
K0+712.9
1
16.3
3
117.7
8
0.0570
7
1.058
7
2139.6
7
2138.6
2
2030.5
3
2026.1
1
2031.7
4
2027.1
9
112.2
9
152.6
1
3.82
K0+712.9
1
K0+713.1
2
0.21
117.7
8
0.0570
7
0.013
7
2138.6
2
2138.6
0
2026.1
1
2026.0
5
2027.1
9
2027.1
7
112.3
3
152.6
7
3.82
K0+713.1
2
K0+735.3
6
22.2
3
117.7
8
0.0570
7
1.406
9
2138.6
0
2137.2
0
2026.0
5
2023.1
2
2027.1
7
2024.2
3
113.8
5
155.6
0
3.82
K0+735.3
6
K0+753.1
0
17.7
5
117.7
8
0.0570
7
1.123
2
2137.2
0
2136.0
7
2023.1
2
2020.7
8
2024.2
3
2021.3
9
115.0
7
157.9
4
3.82
K0+753.1
0
K0+761.4
0
8.30
117.7
8
0.0570
7
0.525
1
2136.0
7
2135.5
5
2020.7
8
2019.6
8
2021.3
9
2019.9
0
115.6
4
159.0
4
3.82
K0+761.4
0
K0+761.4
0
0.00
117.7
8
0.0570
7
0.000
0
2135.5
5
2135.5
5
2019.6
8
2019.6
8
2019.9
0
2019.9
0
115.6
4
159.0
4
3.82
K0+761.4
0
K0+769.1
0
7.70
117.7
8
0.0570
7
0.484
0
2135.5
5
2135.0
6
2019.6
8
2019.8
3
2019.9
0
2018.5
3
115.0
2
158.8
9
3.82
K0+769.1
0
K0+777.4
0
8.30
117.7
8
0.0570
7
0.521
1
2135.0
6
2134.5
4
2019.8
3
2019.9
8
2018.5
3
2020.2
0
114.3
4
158.7
4
3.82
K0+777.4
0
K0+777.4
0
0.00
117.7
8
0.0570
7
0.000
0
2134.5
4
2134.5
4
2019.9
8
2019.9
8
2020.2
0
2020.2
0
114.3
4
158.7
4
3.82
ABSCISA
COTAS (msnm)
PIEZOMTRICA
BATEA
TERRENO
67
DIMETRO NOMINAL
LONGITUD
CAUDAL DE DISEO
FRICCIN UNITARIA
PRDIDA DE ENERGA
PRESIN
DISPONIBLE
PRESIN
ESTTICA
VELOCIDAD
Inicial
Final
(pg)
(m)
(lps)
(m/m)
(m)
Inicial
Final
Inicial
Final
Inicial
Final
(m)
(m)
(m/s
)
K0+777.4
0
K0+781.5
2
4.12
117.7
8
0.0570
7
0.261
4
2134.5
4
2134.2
8
2019.9
8
2020.6
6
2020.2
0
2021.0
3
113.4
0
158.0
6
3.82
K0+781.5
2
K0+788.3
0
6.79
117.7
8
0.0570
7
0.431
5
2134.2
8
2133.8
5
2020.6
6
2021.7
8
2021.0
3
2023.0
2
111.8
5
156.9
4
3.82
K0+788.3
0
K0+829.6
7
41.3
6
117.7
8
0.0570
7
2.693
9
2133.8
5
2131.1
6
2021.7
8
2033.7
8
2023.0
2
2035.1
3
97.16
144.9
4
3.82
K0+829.6
7
K0+836.5
6
6.90
117.7
8
0.0570
7
0.449
2
2131.1
6
2130.7
1
2033.7
8
2035.7
8
2035.1
3
2036.9
3
94.71
142.9
4
3.82
K0+836.5
6
K0+895.5
5
58.9
9
117.7
8
0.0518
3
3.462
9
2130.7
1
2127.2
4
2035.7
8
2050.9
5
2036.9
3
2052.1
0
76.08
127.7
8
3.67
K0+895.5
5
K0+895.6
5
0.10
117.7
8
0.0518
3
0.005
7
2127.2
4
2127.2
4
2050.9
5
2050.9
5
2052.1
0
2052.1
2
76.07
127.7
7
3.67
K0+895.6
5
K0+913.7
5
18.1
0
117.7
8
0.0518
3
1.033
5
2127.2
4
2126.2
0
2050.9
5
2052.0
6
2052.1
2
2053.1
9
73.92
126.6
6
3.67
K0+913.7
5
K0+922.6
1
8.86
117.7
8
0.0518
3
0.509
0
2126.2
0
2125.7
0
2052.0
6
2050.8
7
2053.1
9
2052.1
8
74.61
127.8
5
3.67
K0+922.6
1
K0+929.3
5
6.74
117.7
8
0.0518
3
0.387
2
2125.7
0
2125.3
1
2050.8
7
2049.9
6
2052.1
8
2051.0
8
75.13
128.7
6
3.67
K0+929.3
5
K0+962.2
0
32.8
5
117.7
8
0.0518
3
1.896
0
2125.3
1
2123.4
1
2049.9
6
2044.5
1
2051.0
8
2045.6
8
78.68
134.2
1
3.67
K0+962.2
0
K0+974.5
2
12.3
2
117.7
8
0.0518
3
0.714
8
2123.4
1
2122.7
0
2044.5
1
2042.1
2
2045.6
8
2043.2
5
80.36
136.6
0
3.67
K0+974.5
2
K0+976.2
7
1.75
117.7
8
0.0518
3
0.101
6
2122.7
0
2122.6
0
2042.1
2
2041.7
8
2043.2
5
2043.1
0
80.60
136.9
4
3.67
K0+976.2
7
K0+999.5
9
23.3
1
117.7
8
0.0518
3
1.334
7
2122.6
0
2121.2
6
2041.7
8
2039.6
1
2043.1
0
2040.8
8
81.43
139.1
1
3.67
K0+999.5
9
K1+000.2
8
0.69
117.7
8
0.0518
3
0.039
9
2121.2
6
2121.2
2
2039.6
1
2039.5
4
2040.8
8
2040.7
1
81.46
139.1
8
3.67
K1+000.2
8
K1+011.8
9
11.6
1
117.7
8
0.0570
7
0.747
1
2121.2
2
2120.4
7
2039.5
4
2036.8
1
2040.7
1
2037.9
8
83.44
141.9
1
3.82
K1+011.8
9
K1+018.0
5
6.15
117.7
8
0.0570
7
0.394
4
2120.4
7
2120.0
8
2036.8
1
2035.5
1
2037.9
8
2036.6
6
84.35
143.2
1
3.82
K1+018.0
5
K1+048.8
2
30.7
7
117.7
8
0.0570
7
1.970
8
2120.0
8
2118.1
1
2035.5
1
2028.9
8
2036.6
6
2030.2
2
88.91
149.7
4
3.82
K1+048.8
2
K1+049.0
3
0.21
117.7
8
0.0570
7
0.013
7
2118.1
1
2118.0
9
2028.9
8
2028.9
3
2030.2
2
2030.2
2
88.94
149.7
9
3.82
K1+049.0
3
K1+071.5
5
22.5
2
117.7
8
0.0570
7
1.413
7
2118.0
9
2116.6
8
2028.9
3
2028.8
7
2030.2
2
2029.1
5
87.59
149.8
5
3.82
ABSCISA
COTAS (msnm)
PIEZOMTRICA
BATEA
TERRENO
68
DIMETRO NOMINAL
LONGITUD
CAUDAL DE DISEO
FRICCIN UNITARIA
PRDIDA DE ENERGA
PRESIN
DISPONIBLE
PRESIN
ESTTICA
VELOCIDAD
Inicial
Final
(pg)
(m)
(lps)
(m/m)
(m)
Inicial
Final
Inicial
Final
Inicial
Final
(m)
(m)
(m/s
)
K1+071.5
5
K1+082.3
5
10.8
0
117.7
8
0.0570
7
0.678
1
2116.6
8
2116.0
0
2028.8
7
2028.8
4
2029.1
5
2030.5
6
86.94
149.8
8
3.82
K1+082.3
5
K1+082.3
5
0.00
117.7
8
0.0570
7
0.000
0
2116.0
0
2116.0
0
2028.8
4
2028.8
4
2030.5
6
2030.5
6
86.94
149.8
8
3.82
K1+082.3
5
K1+113.3
3
30.9
8
117.7
8
0.0570
7
2.001
0
2116.0
0
2114.0
0
2028.8
4
2020.9
6
2030.5
6
2022.1
1
92.82
157.7
6
3.82
K1+113.3
3
K1+133.6
6
20.3
3
117.7
8
0.0570
7
1.308
2
2114.0
0
2112.6
9
2020.9
6
2016.2
0
2022.1
1
2017.4
3
96.28
162.5
3
3.82
K1+133.6
6
K1+164.1
5
30.4
8
117.7
8
0.0570
7
1.994
2
2112.6
9
2110.7
0
2016.2
0
2006.8
3
2017.4
3
2008.0
7
103.6
5
171.8
9
3.82
K1+164.1
5
K1+166.2
4
2.09
117.7
8
0.0570
7
0.135
3
2110.7
0
2110.5
6
2006.8
3
2006.2
9
2008.0
7
2007.5
4
104.0
6
172.4
3
3.82
K1+166.2
4
K1+211.9
6
45.7
2
117.7
8
0.0570
7
2.956
5
2110.5
6
2107.6
1
2006.2
9
1994.4
5
2007.5
4
1995.6
6
112.9
4
184.2
7
3.82
K1+211.9
6
K1+229.5
3
17.5
7
117.7
8
0.0570
7
1.104
4
2107.6
1
2106.5
0
1994.4
5
1993.4
5
1995.6
6
1994.6
6
112.8
3
185.2
7
3.82
K1+229.5
3
K1+229.5
9
0.06
117.7
8
0.0570
7
0.004
0
2106.5
0
2106.5
0
1993.4
5
1993.4
4
1994.6
6
1994.6
6
112.8
4
185.2
8
3.82
K1+229.5
9
K1+266.9
7
37.3
8
117.7
8
0.0570
7
2.404
0
2106.5
0
2104.1
0
1993.4
4
1984.7
6
1994.6
6
1985.9
9
119.1
2
193.9
6
3.82
K1+266.9
7
K1+279.7
0
12.7
3
117.7
8
0.0570
7
0.806
5
2104.1
0
2103.2
9
1984.7
6
1982.9
5
1985.9
9
1984.2
1
120.1
2
195.7
7
3.82
K1+279.7
0
K1+309.7
7
30.0
6
117.7
8
0.0570
7
1.904
6
2103.2
9
2101.3
8
1982.9
5
1978.7
0
1984.2
1
1980.0
1
122.4
7
200.0
3
3.82
K1+309.7
7
K1+311.0
9
1.32
117.7
8
0.0570
7
0.083
9
2101.3
8
2101.3
0
1978.7
0
1978.5
1
1980.0
1
1979.7
5
122.5
7
200.2
1
3.82
K1+311.0
9
K1+378.8
5
67.7
6
117.7
8
0.0570
7
4.317
2
2101.3
0
2096.9
8
1978.5
1
1966.1
9
1979.7
5
1967.3
4
130.5
7
212.5
3
3.82
K1+378.8
5
K1+379.7
5
0.91
117.7
8
0.0570
7
0.057
6
2096.9
8
2096.9
3
1966.1
9
1966.0
3
1967.3
4
1967.2
5
130.6
8
212.6
9
3.82
K1+379.7
5
K1+387.6
1
7.85
117.7
8
0.0570
7
0.494
8
2096.9
3
2096.4
3
1966.0
3
1965.3
4
1967.2
5
1966.6
4
130.8
7
213.3
8
3.82
K1+387.6
1
K1+414.8
0
27.1
9
117.7
8
0.0570
7
1.708
8
2096.4
3
2094.7
2
1965.3
4
1966.4
9
1966.6
4
1967.5
1
128.0
2
212.2
3
3.82
K1+414.8
0
K1+414.8
0
0.00
117.7
8
0.0570
7
0.000
0
2094.7
2
2094.7
2
1966.4
9
1966.4
9
1967.5
1
1967.5
1
128.0
2
212.2
3
3.82
K1+414.8
0
K1+425.7
9
10.9
9
117.7
8
0.0570
7
0.716
3
2094.7
2
2094.0
1
1966.4
9
1969.6
8
1967.5
1
1970.7
0
124.1
1
209.0
4
3.82
ABSCISA
COTAS (msnm)
PIEZOMTRICA
BATEA
TERRENO
69
70
Una vez el agua sale del desarenador, es conducida por tubera hasta una cmara
intermedia o de confluencia, en la cual se unifica los aportes de las quebradas Chorros
Blancos y Dos Quebradas.
La aduccin est conformada por tubera PVC de 6 de dimetro y tiene una longitud
total de 910 m.
Para llevar a cabo el diagnstico del comportamiento hidrulico del sistema se utiliz la
ecuacin de prdidas de Hazen-Williams, empleando un coeficiente C de 140.
Se definieron dos escenarios de operacin de la aduccin para los cuales se realiz la
simulacin hidrulica. El primero contempla la tubera transportando el caudal de
diseo, correspondiente al QMD= 27.5 L/s para el ao horizonte de diseo, mientras
que el segundo escenario contempla el caudal mximo que es posible transportar a
travs de la tubera, generando una cabeza hidrulica sobre la tubera, mayor a 4 mca.
De esta manera se encontr que para el escenario No 1, la tubera tiene la capacidad
de transportar los 27.5 L/s, a una velocidad de 1.37 m/s, encontrndose que la presin
71
72
73
K0+171.7
7
K0+180.9
2
K0+181.4
9
K0+185.5
1
K0+200.4
6
K0+224.7
1
K0+235.2
2
K0+240.5
7
K0+256.0
9
K0+259.0
1
K0+289.1
0
K0+337.5
5
K0+338.1
2
K0+365.2
1
K0+376.3
8
K0+376.3
9
FRICCIN UNITARIA
PRDIDA DE ENERGA
(lps)
(m/m)
(m)
6
6
32.7
9
4.40
0.64
6
6
21.8
6
32.0
6
1.76
K0+118.83
25.3
1
K0+119.77
0.94
52.0
0
9.16
K0+171.7
7
K0+180.9
2
K0+181.4
9
K0+185.5
1
K0+200.4
6
K0+224.7
1
K0+235.2
2
K0+240.5
7
K0+256.0
9
K0+259.0
1
K0+289.1
0
K0+337.5
5
K0+338.1
2
K0+365.2
1
K0+376.3
8
K0+376.3
9
K0+376.4
0
0.56
4.02
6
6
6
14.9
5
24.2
5
10.5
0
5.35
15.5
2
2.92
6
6
30.0
9
48.4
5
0.56
27.1
0
11.17
0.01
0.01
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.400
4
0.053
7
0.007
9
0.268
3
0.389
6
0.021
4
0.309
1
0.0114
0.631
4
0.1111
0.006
9
0.048
8
0.181
5
0.294
4
0.130
5
0.065
0
0.187
1
0.035
2
0.362
2
0.588
8
0.006
9
0.335
9
0.137
5
0.000
1
0.000
1
Inicial
Final
2055.7
8
2055.3
8
2055.3
2
2055.3
1
2055.0
5
2054.6
6
2054.6
3
2054.3
3
2054.3
1
2053.6
8
2053.5
7
2053.5
6
2053.5
2
2053.3
3
2053.0
4
2052.9
1
2052.8
4
2052.6
6
2052.6
2
2052.2
6
2051.6
7
2051.6
6
2051.3
3
2051.1
9
2051.1
9
2055.7
8
2055.3
8
2055.3
2
2055.3
1
2055.0
5
2054.6
6
2054.6
3
2054.3
3
2054.3
1
2053.6
8
2053.5
7
2053.5
6
2053.5
2
2053.3
3
2053.0
4
2052.9
1
2052.8
4
2052.6
6
2052.6
2
2052.2
6
2051.6
7
2051.6
6
2051.3
3
2051.1
9
2051.1
9
2051.1
9
BATEA
Inicial
Final
2054.4
6
2048.5
3
2047.7
4
2047.6
2
2043.0
0
2038.2
5
2037.9
9
2033.3
4
2033.2
1
2025.8
5
2024.5
5
2024.4
8
2023.9
2
2021.8
7
2018.5
4
2015.6
9
2014.9
3
2014.0
1
2013.8
3
2012.8
3
2005.6
6
2005.5
8
1998.5
2
1995.9
8
1995.9
8
2054.4
6
2048.5
3
2047.7
4
2047.6
2
2043.0
0
2038.2
5
2037.9
9
2033.3
4
2033.2
1
2025.8
5
2024.5
5
2024.4
8
2023.9
2
2021.8
7
2018.5
4
2015.6
9
2014.9
3
2014.0
1
2013.8
3
2012.8
3
2005.6
6
2005.5
8
1998.5
2
1995.9
8
1995.9
8
1995.9
8
TERRENO
Inicial
Final
2055.7
8
2049.8
0
2048.8
2
2048.7
1
2044.0
8
2039.3
8
2039.0
6
2034.5
4
2034.4
0
2026.9
2
2025.6
8
2025.6
0
2025.0
6
2023.0
3
2019.7
0
2016.7
9
2016.0
6
2015.0
7
2014.9
7
2013.9
6
2006.9
4
2006.8
0
1999.6
1
1996.9
5
1996.9
5
2055.7
8
2049.8
0
2048.8
2
2048.7
1
2044.0
8
2039.3
8
2039.0
6
2034.5
4
2034.4
0
2026.9
2
2025.6
8
2025.6
0
2025.0
6
2023.0
3
2019.7
0
2016.7
9
2016.0
6
2015.0
7
2014.9
7
2013.9
6
2006.9
4
2006.8
0
1999.6
1
1996.9
5
1996.9
5
1996.9
5
VELOCIDAD
K0+119.77
(m)
PIEZOMTRICA
PRESIN ESTTICA
K0+118.83
K0+000.0
0
K0+032.7
9
K0+037.1
9
K0+037.8
3
K0+059.7
0
K0+091.7
6
K0+093.5
2
(pg
)
COTAS (msnm)
PRESIN DISPONIBLE
K0+000.0
0
K0+032.7
9
K0+037.1
9
K0+037.8
3
K0+059.7
0
K0+091.7
6
K0+093.5
2
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
Tabla 27 Simulacin hidrulica lnea de conduccin Q. Dos Quebradas Entre Bocatoma y Cmara
Intermedia o de Confluencia (Q= 27.5 L/s)
(m)
(m)
(m/s)
1.15
1.15
1.37
6.67
7.07
1.37
7.42
7.87
1.37
7.52
7.99
1.37
11.87
12.60
1.37
16.24
17.36
1.37
16.48
17.62
1.37
20.81
22.26
1.37
20.93
22.40
1.37
27.66
29.76
1.37
28.85
31.05
1.37
28.92
31.13
1.37
29.42
31.68
1.37
31.30
33.74
1.37
34.33
37.07
1.37
37.05
39.92
1.37
37.74
40.68
1.37
38.48
41.60
1.37
38.62
41.78
1.37
39.26
42.78
1.37
45.84
49.94
1.37
45.92
50.03
1.37
52.64
57.09
1.37
55.04
59.63
1.37
55.04
59.63
1.37
55.04
59.63
1.37
74
K0+672.11
K0+677.0
1
K0+728.9
6
K0+738.3
6
K0+743.4
1
K0+798.8
0
K0+857.7
0
K0+865.2
0
K0+672.11
K0+677.0
1
K0+728.9
6
K0+738.3
6
K0+743.4
1
K0+798.8
0
K0+857.7
0
K0+865.2
0
K0+909.5
9
6
6
(m/m)
(m)
Inicial
Final
Inicial
Final
Inicial
Final
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.0109
4
0.308
6
0.412
6
0.000
1
0.000
1
0.619
4
0.128
6
0.752
2
0.418
0
0.322
2
0.000
4
0.000
0
0.123
5
0.809
0
0.000
3
0.070
0
0.725
8
0.132
1
0.070
4
0.771
2
0.865
8
2051.1
9
2050.8
8
2050.4
7
2050.4
7
2050.4
7
2049.8
5
2049.7
2
2048.9
7
2048.5
5
2048.2
3
2048.2
3
2048.2
3
2048.1
0
2047.3
0
2047.3
0
2047.2
3
2046.5
0
2046.3
7
2046.3
0
2045.5
3
2044.6
6
2044.5
5
2050.8
8
2050.4
7
2050.4
7
2050.4
7
2049.8
5
2049.7
2
2048.9
7
2048.5
5
2048.2
3
2048.2
3
2048.2
3
2048.1
0
2047.3
0
2047.3
0
2047.2
3
2046.5
0
2046.3
7
2046.3
0
2045.5
3
2044.6
6
2044.5
5
2043.8
5
1995.9
8
1991.6
4
1985.8
3
1985.8
3
1985.8
3
1972.7
6
1970.2
2
1956.9
2
1949.5
2
1944.2
7
1944.2
6
1944.2
6
1942.1
7
1928.4
5
1928.4
5
1927.2
5
1922.6
4
1921.2
0
1921.1
5
1920.5
8
1941.5
2
1945.0
5
1991.6
4
1985.8
3
1985.8
3
1985.8
3
1972.7
6
1970.2
2
1956.9
2
1949.5
2
1944.2
7
1944.2
6
1944.2
6
1942.1
7
1928.4
5
1928.4
5
1927.2
5
1922.6
4
1921.2
0
1921.1
5
1920.5
8
1941.5
2
1945.0
5
1969.7
3
1996.9
5
1980.6
1
1986.7
9
1986.7
9
1986.7
9
1973.9
3
1971.6
4
1958.2
1
1950.8
0
1945.2
4
1945.2
3
1945.2
3
1939.8
5
1929.4
2
1929.4
2
1928.3
2
1923.7
5
1922.3
5
1922.3
1
1921.6
8
1942.7
6
1946.2
8
1980.6
1
1986.7
9
1986.7
9
1986.7
9
1973.9
3
1971.6
4
1958.2
1
1950.8
0
1945.2
4
1945.2
3
1945.2
3
1939.8
5
1929.4
2
1929.4
2
1928.3
2
1923.7
5
1922.3
5
1922.3
1
1921.6
8
1942.7
6
1946.2
8
1970.7
0
0.01
0.01
49.9
4
9.72
6
6
6
57.1
9
31.7
9
22.5
9
0.03
0.00
8.64
56.6
2
0.01
4.90
51.9
5
9.39
5.05
6
6
PRDIDA DE ENERGA
(lps)
55.3
9
58.9
1
7.50
44.3
9
FRICCIN UNITARIA
(m)
25.3
1
33.8
4
0.01167
0.01167
0.01167
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.1144
0.698
9
BATEA
TERRENO
VELOCIDAD
K0+401.7
1
K0+435.5
5
K0+435.5
6
K0+435.5
7
K0+485.5
1
K0+495.2
3
K0+552.4
2
K0+584.2
1
K0+606.8
0
K0+606.8
3
K0+606.8
3
K0+615.4
8
K0+672.1
0
PIEZOMTRICA
PRESIN ESTTICA
K0+376.4
0
K0+401.7
1
K0+435.5
5
K0+435.5
6
K0+435.5
7
K0+485.5
1
K0+495.2
3
K0+552.4
2
K0+584.2
1
K0+606.8
0
K0+606.8
3
K0+606.8
3
K0+615.4
8
K0+672.1
0
(pg
)
COTAS (msnm)
PRESIN DISPONIBLE
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
(m)
(m)
(m/s)
59.08
63.97
1.37
64.47
69.78
1.37
64.47
69.78
1.37
64.48
69.78
1.37
76.92
82.84
1.37
79.33
85.39
1.40
91.88
98.69
1.40
98.86
106.0
8
1.40
111.34
1.45
111.35
1.45
111.35
1.45
113.44
1.45
103.7
9
103.8
0
103.8
0
105.7
7
118.67
118.68
119.81
123.6
9
124.9
9
124.9
8
124.7
8
102.9
7
127.1
6
127.1
6
128.3
6
132.9
6
134.4
0
134.4
6
135.0
3
1.45
1.45
1.45
1.45
1.45
1.45
1.45
114.09
1.45
99.33
110.56
1.45
73.95
85.88
1.45
76
77
K0+119.77
K0+171.7
7
K0+180.9
2
K0+181.4
9
K0+185.5
1
K0+200.4
6
K0+224.7
1
K0+235.2
2
K0+240.5
7
K0+256.0
9
K0+259.0
1
K0+289.1
0
K0+337.5
5
K0+338.1
2
K0+365.2
6
6
32.7
9
4.40
0.64
6
6
21.8
6
32.0
6
1.76
K0+118.83
25.3
1
K0+119.77
0.94
52.0
0
9.16
K0+171.7
7
K0+180.9
2
K0+181.4
9
K0+185.5
1
K0+200.4
6
K0+224.7
1
K0+235.2
2
K0+240.5
7
K0+256.0
9
K0+259.0
1
K0+289.1
0
K0+337.5
5
K0+338.1
2
K0+365.2
1
K0+376.3
0.56
4.02
6
6
6
14.9
5
24.2
5
10.5
0
5.35
15.5
2
2.92
6
6
6
6
6
30.0
9
48.4
5
0.56
27.1
0
11.17
PRDIDA DE ENERGA
(lps)
(m/m)
(m)
Inicial
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
2.714
4
0.364
1
0.053
4
1.819
2
2.641
7
0.145
4
2.095
9
0.077
1
4.280
8
0.753
5
0.046
7
0.330
8
1.230
4
1.995
8
0.884
8
0.440
5
1.268
2
0.238
8
2.455
6
3.992
3
0.046
7
2.277
6
0.932
PRESIN
DISPONIBLE
FRICCIN UNITARIA
(m)
Final
2055.7
8
2053.0
6
2052.7
0
2052.6
4
2050.8
2
2048.1
8
2048.0
4
2045.9
4
2045.8
6
2041.5
8
2040.8
3
2040.7
8
2040.4
5
2039.2
2
2037.2
3
2036.3
4
2035.9
0
2034.6
3
2034.3
9
2031.9
4
2027.9
5
2027.9
0
2025.6
2055.7
8
2053.0
6
2052.7
0
2052.6
4
2050.8
2
2048.1
8
2048.0
4
2045.9
4
2045.8
6
2041.5
8
2040.8
3
2040.7
8
2040.4
5
2039.2
2
2037.2
3
2036.3
4
2035.9
0
2034.6
3
2034.3
9
2031.9
4
2027.9
5
2027.9
0
2025.6
2
2024.6
BATEA
Inicial
Final
2054.4
6
2048.5
3
2047.7
4
2047.6
2
2043.0
0
2038.2
5
2037.9
9
2033.3
4
2033.2
1
2025.8
5
2024.5
5
2024.4
8
2023.9
2
2021.8
7
2018.5
4
2015.6
9
2014.9
3
2014.0
1
2013.8
3
2012.8
3
2005.6
6
2005.5
8
1998.5
2054.4
6
2048.5
3
2047.7
4
2047.6
2
2043.0
0
2038.2
5
2037.9
9
2033.3
4
2033.2
1
2025.8
5
2024.5
5
2024.4
8
2023.9
2
2021.8
7
2018.5
4
2015.6
9
2014.9
3
2014.0
1
2013.8
3
2012.8
3
2005.6
6
2005.5
8
1998.5
2
1995.9
VELOCIDAD
K0+118.83
K0+000.0
0
K0+032.7
9
K0+037.1
9
K0+037.8
3
K0+059.7
0
K0+091.7
6
K0+093.5
2
(pg
)
PIEZOMTRICA
COTAS (msnm)
PRESIN
ESTTICA
K0+000.0
0
K0+032.7
9
K0+037.1
9
K0+037.8
3
K0+059.7
0
K0+091.7
6
K0+093.5
2
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
Tabla 28 Simulacin hidrulica lnea de conduccin Q. Dos Quebradas Entre Bocatoma y Cmara
Intermedia o de Confluencia (Q= 77 L/s)
(m)
(m)
(m/s)
1.15
1.15
3.84
4.36
7.07
3.84
4.79
7.87
3.84
4.85
7.99
3.84
7.65
12.60
3.84
9.77
17.36
3.84
9.88
17.62
3.84
22.26
3.84
22.40
3.84
29.76
3.84
31.05
3.84
31.13
3.84
31.68
3.84
33.74
3.84
37.07
3.84
39.92
3.84
40.68
3.84
41.60
3.84
41.78
3.84
42.78
3.84
49.94
3.84
50.03
3.84
57.09
3.84
59.63
3.84
TERRENO
Inicial
Final
2055.7
8
2049.8
0
2048.8
2
2048.7
1
2044.0
8
2039.3
8
2039.0
6
2034.5
4
2034.4
0
2026.9
2
2025.6
8
2025.6
0
2025.0
6
2023.0
3
2019.7
0
2016.7
9
2016.0
6
2015.0
7
2014.9
7
2013.9
6
2006.9
4
2006.8
0
1999.6
2055.7
8
2049.8
0
2048.8
2
2048.7
1
2044.0
8
2039.3
8
2039.0
6
2034.5
4
2034.4
0
2026.9
2
2025.6
8
2025.6
0
2025.0
6
2023.0
3
2019.7
0
2016.7
9
2016.0
6
2015.0
7
2014.9
7
2013.9
6
2006.9
4
2006.8
0
1999.6
1
1996.9
12.4
3
12.4
8
15.5
6
16.11
16.1
4
16.3
6
17.1
8
18.5
2
20.4
9
20.8
0
20.4
6
20.3
9
18.9
4
22.11
22.1
5
26.9
3
28.5
78
K0+672.11
K0+677.0
1
K0+728.9
6
K0+738.3
6
K0+743.4
1
K0+798.8
0
K0+857.7
0
K0+865.2
0
K0+672.11
K0+677.0
1
K0+728.9
6
K0+738.3
6
K0+743.4
1
K0+798.8
0
K0+857.7
0
K0+865.2
0
K0+909.5
9
0.01
6
6
25.3
1
33.8
4
0.01
0.01
49.9
4
9.72
6
6
6
57.1
9
31.7
9
22.5
9
0.03
0.00
8.64
56.6
2
0.01
4.90
51.9
5
9.39
5.05
6
6
55.3
9
58.9
1
7.50
44.3
9
(m/m)
(m)
Inicial
PRESIN
DISPONIBLE
0.01
PRDIDA DE ENERGA
(lps)
Final
BATEA
Inicial
VELOCIDAD
8
K0+376.3
9
K0+376.4
0
K0+401.7
1
K0+435.5
5
K0+435.5
6
K0+435.5
7
K0+485.5
1
K0+495.2
3
K0+552.4
2
K0+584.2
1
K0+606.8
0
K0+606.8
3
K0+606.8
3
K0+615.4
8
K0+672.1
0
(m)
PIEZOMTRICA
COTAS (msnm)
PRESIN
ESTTICA
1
K0+376.3
8
K0+376.3
9
K0+376.4
0
K0+401.7
1
K0+435.5
5
K0+435.5
6
K0+435.5
7
K0+485.5
1
K0+495.2
3
K0+552.4
2
K0+584.2
1
K0+606.8
0
K0+606.8
3
K0+606.8
3
K0+615.4
8
K0+672.1
0
(pg
)
FRICCIN UNITARIA
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
(m)
(m/s)
59.63
3.84
59.63
3.84
63.97
3.84
69.78
3.84
69.78
3.84
69.78
3.84
82.84
3.84
85.39
3.95
98.69
3.95
106.08
3.95
111.34
4.08
111.35
4.08
111.35
4.08
113.44
4.08
127.16
4.08
127.16
4.08
128.36
4.08
132.96
4.08
134.40
4.08
134.46
4.08
135.03
4.08
114.09
4.08
110.56
4.08
85.88
4.08
TERRENO
Final
Inicial
Final
(m)
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
77.3
0
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0741
6
0.0791
4
0.0791
4
0.0791
4
0.0858
1
0.0858
1
0.0858
1
0.0858
1
0.0858
1
0.0858
1
0.0858
1
0.0858
1
0.0858
1
0.0858
1
0.0858
1
0.0858
1
0.0858
1
0.0858
1
0.000
7
0.000
7
2.092
2
2.797
5
0.000
7
0.000
7
4.199
2
0.872
1
5.099
9
2.834
1
2.184
6
0.002
6
0.000
0
0.837
5
5.484
8
0.001
7
0.474
5
4.921
0
0.895
8
0.477
1
5.228
2
5.870
1
0.775
7
4.738
3
2024.6
9
2024.6
9
2024.6
9
2022.6
0
2019.8
0
2019.8
0
2019.8
0
2015.6
0
2014.7
3
2009.6
3
2006.7
9
2004.6
1
2004.6
1
2004.6
1
2003.7
7
1998.2
8
1998.2
8
1997.8
1
1992.8
9
1991.9
9
1991.5
1
1986.2
8
1980.4
1
1979.6
4
2024.6
9
2024.6
9
2022.6
0
2019.8
0
2019.8
0
2019.8
0
2015.6
0
2014.7
3
2009.6
3
2006.7
9
2004.6
1
2004.6
1
2004.6
1
2003.7
7
1998.2
8
1998.2
8
1997.8
1
1992.8
9
1991.9
9
1991.5
1
1986.2
8
1980.4
1
1979.6
4
1974.9
0
1995.9
8
1995.9
8
1995.9
8
1991.6
4
1985.8
3
1985.8
3
1985.8
3
1972.7
6
1970.2
2
1956.9
2
1949.5
2
1944.2
7
1944.2
6
1944.2
6
1942.1
7
1928.4
5
1928.4
5
1927.2
5
1922.6
4
1921.2
0
1921.1
5
1920.5
8
1941.5
2
1945.0
5
1995.9
8
1995.9
8
1991.6
4
1985.8
3
1985.8
3
1985.8
3
1972.7
6
1970.2
2
1956.9
2
1949.5
2
1944.2
7
1944.2
6
1944.2
6
1942.1
7
1928.4
5
1928.4
5
1927.2
5
1922.6
4
1921.2
0
1921.1
5
1920.5
8
1941.5
2
1945.0
5
1969.7
3
1996.9
5
1996.9
5
1996.9
5
1980.6
1
1986.7
9
1986.7
9
1986.7
9
1973.9
3
1971.6
4
1958.2
1
1950.8
0
1945.2
4
1945.2
3
1945.2
3
1939.8
5
1929.4
2
1929.4
2
1928.3
2
1923.7
5
1922.3
5
1922.3
1
1921.6
8
1942.7
6
1946.2
8
1996.9
5
1996.9
5
1980.6
1
1986.7
9
1986.7
9
1986.7
9
1973.9
3
1971.6
4
1958.2
1
1950.8
0
1945.2
4
1945.2
3
1945.2
3
1939.8
5
1929.4
2
1929.4
2
1928.3
2
1923.7
5
1922.3
5
1922.3
1
1921.6
8
1942.7
6
1946.2
8
1970.7
0
28.5
4
28.5
4
30.7
9
33.8
0
33.8
0
33.8
0
42.6
7
44.3
4
52.5
4
57.1
0
60.1
7
60.1
8
60.1
8
61.4
3
69.6
6
69.6
6
70.3
9
70.0
7
70.6
2
70.1
9
65.5
4
38.7
3
34.4
2
5.00
79
81
Grfica 7. Perfil Hidrulico Lnea de conduccin entre cmara intermedia y PTAP Escenario No 1
82
K0+122.8
5
K0+123.2
0
K0+125.2
3
K0+157.7
0
K0+160.0
0
K0+176.0
8
K0+180.0
0
K0+194.7
1
K0+213.2
2
K0+215.0
9
K0+233.6
5
K0+252.1
6
K0+252.3
2
K0+270.6
9
K0+289.2
2
K0+289.4
7
K0+298.4
5
K0+307.8
4
FRICCIN UNITARIA
PRDIDA DE
ENERGA
(lps)
(m/m)
(m)
8
8
20.0
0
0.72
26.9
1
1.02
26.4
5
1.47
26.0
9
0.45
19.7
4
0.35
2.03
32.4
7
2.30
16.0
8
8
8
8
8
8
8
8
8
8
3.92
14.7
1
18.5
1
1.86
18.5
6
18.5
1
0.16
18.3
6
18.5
4
0.25
8.97
9.40
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
VELOCIDAD
K0+122.8
5
K0+123.2
0
K0+125.2
3
K0+157.7
0
K0+160.0
0
K0+176.0
8
K0+180.0
0
K0+194.7
1
K0+213.2
2
K0+215.0
9
K0+233.6
5
K0+252.1
6
K0+252.3
2
K0+270.6
9
K0+289.2
2
K0+289.4
7
K0+298.4
5
K0+103.11
(m)
PRESIN ESTTICA
K0+103.11
K0+000.0
0
K0+020.0
0
K0+020.7
2
K0+047.6
3
K0+048.6
5
K0+075.1
0
K0+076.5
7
K0+102.6
6
(pg
)
PRESIN
DISPONIBLE
K0+000.0
0
K0+020.0
0
K0+020.7
2
K0+047.6
3
K0+048.6
5
K0+075.1
0
K0+076.5
7
K0+102.6
6
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
Tabla 29 Simulacin hidrulica lnea de conduccin Entre Cmara Intermedia y PTAP (Q= 27.5 L/s)
(m)
(m)
(m/s)
1.20
1.20
0.81
5.76
5.83
0.81
5.92
5.99
0.81
10.37
10.53
0.81
10.54
10.70
0.81
13.34
13.60
0.81
13.50
13.76
0.81
15.38
15.73
0.81
15.42
15.76
0.81
14.32
14.73
0.81
14.37
14.78
0.81
14.62
15.04
0.81
14.66
15.19
0.81
14.66
15.20
0.81
15.58
16.17
0.81
15.81
16.41
0.81
17.23
17.88
0.81
19.01
19.72
0.81
19.19
19.91
0.81
20.98
21.76
0.81
22.76
23.61
0.81
22.78
23.62
0.81
22.01
22.91
0.81
21.23
22.20
0.81
21.22
22.19
0.81
20.43
21.43
0.81
19.60
20.63
0.81
COTAS (msnm)
0.068
2
0.002
5
0.090
7
0.003
4
0.088
5
0.004
9
0.087
1
0.001
5
0.065
8
0.001
2
0.006
8
0.108
1
0.007
7
0.053
6
0.013
1
0.049
2
0.061
9
0.006
2
0.062
0
0.061
9
0.000
5
0.0611
0.061
7
0.000
8
0.029
9
0.031
4
PIEZOMTRICA
Inicial
1970.7
0
1970.6
3
1970.6
3
1970.5
4
1970.5
4
1970.4
5
1970.4
4
1970.3
6
1970.3
6
1970.2
9
1970.2
9
1970.2
8
1970.1
7
1970.1
7
1970.11
1970.1
0
1970.0
5
1969.9
9
1969.9
8
1969.9
2
1969.8
6
1969.8
6
1969.8
0
1969.7
4
1969.7
3
1969.7
0
Final
1970.7
0
1970.6
3
1970.6
3
1970.5
4
1970.5
4
1970.4
5
1970.4
4
1970.3
6
1970.3
6
1970.2
9
1970.2
9
1970.2
8
1970.1
7
1970.1
7
1970.11
1970.1
0
1970.0
5
1969.9
9
1969.9
8
1969.9
2
1969.8
6
1969.8
6
1969.8
0
1969.7
4
1969.7
3
1969.7
0
1969.6
7
BATEA
Inicial
Final
1969.2
8
1964.6
6
1964.4
9
1959.9
5
1959.7
8
1956.8
9
1956.7
3
1954.7
5
1954.7
2
1955.7
5
1955.7
0
1955.4
4
1955.2
9
1955.2
8
1954.3
1
1954.0
7
1952.6
1
1950.7
6
1950.5
7
1948.7
2
1946.8
8
1946.8
6
1947.5
7
1948.2
9
1948.3
0
1949.0
6
1969.2
8
1964.6
6
1964.4
9
1959.9
5
1959.7
8
1956.8
9
1956.7
3
1954.7
5
1954.7
2
1955.7
5
1955.7
0
1955.4
4
1955.2
9
1955.2
8
1954.3
1
1954.0
7
1952.6
1
1950.7
6
1950.5
7
1948.7
2
1946.8
8
1946.8
6
1947.5
7
1948.2
9
1948.3
0
1949.0
6
1949.8
6
TERRENO
Inicial
Final
1970.7
0
1965.7
6
1965.6
5
1961.2
0
1961.0
9
1958.0
4
1957.9
3
1955.8
6
1955.8
9
1956.8
9
1956.9
0
1956.5
4
1956.5
4
1956.4
3
1955.6
6
1955.2
9
1953.9
0
1952.0
8
1951.8
9
1949.9
8
1948.0
0
1948.0
1
1948.8
2
1949.3
7
1949.4
0
1950.2
2
1970.7
0
1965.7
6
1965.6
5
1961.2
0
1961.0
9
1958.0
4
1957.9
3
1955.8
6
1955.8
9
1956.8
9
1956.9
0
1956.5
4
1956.5
4
1956.4
3
1955.6
6
1955.2
9
1953.9
0
1952.0
8
1951.8
9
1949.9
8
1948.0
0
1948.0
1
1948.8
2
1949.3
7
1949.4
0
1950.2
2
1950.9
7
83
18.8
1
0.25
8
8
8
(m/m)
(m)
Inicial
Final
Inicial
Final
Inicial
Final
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
3
0.0030
0.000
1
0.063
0
0.000
8
0.062
0
0.063
7
0.062
7
0.000
5
0.061
2
0.004
1
0.057
3
0.000
3
0.063
3
0.000
2
0.066
4
0.002
7
0.072
1
0.000
2
0.072
5
0.001
8
0.067
7
0.002
1
0.065
9
0.003
8
0.063
0
0.000
8
0.067
2
0.006
7
0.060
6
0.000
1969.6
7
1969.6
7
1969.6
1
1969.6
1
1969.5
5
1969.4
8
1969.4
2
1969.4
2
1969.3
6
1969.3
6
1969.3
0
1969.3
0
1969.2
3
1969.2
3
1969.1
7
1969.1
6
1969.0
9
1969.0
9
1969.0
2
1969.0
2
1968.9
5
1968.9
5
1968.8
8
1968.8
8
1968.8
2
1968.8
2
1968.7
5
1968.7
4
1968.6
1969.6
7
1969.6
1
1969.6
1
1969.5
5
1969.4
8
1969.4
2
1969.4
2
1969.3
6
1969.3
6
1969.3
0
1969.3
0
1969.2
3
1969.2
3
1969.1
7
1969.1
6
1969.0
9
1969.0
9
1969.0
2
1969.0
2
1968.9
5
1968.9
5
1968.8
8
1968.8
8
1968.8
2
1968.8
2
1968.7
5
1968.7
4
1968.6
8
1968.6
1949.8
6
1949.8
6
1947.5
9
1947.5
6
1943.7
6
1939.8
6
1936.0
1
1935.9
9
1934.5
0
1934.4
0
1933.7
0
1933.6
9
1929.3
1
1929.3
0
1921.4
3
1949.8
6
1947.5
9
1947.5
6
1943.7
6
1939.8
6
1936.0
1
1935.9
9
1934.5
0
1934.4
0
1933.7
0
1933.6
9
1929.3
1
1929.3
0
1921.4
3
1950.9
7
1950.9
7
1948.7
7
1948.7
2
1944.8
5
1940.9
0
1937.2
3
1937.2
2
1935.7
2
1935.6
7
1934.9
3
1934.9
1
1930.5
3
1930.5
1
1922.5
3
1922.2
6
1914.7
8
1914.7
5
1906.1
3
1905.9
8
1899.7
6
1899.6
6
1896.4
6
1896.3
7
1894.8
9
1894.8
5
1891.5
5
1891.3
0
1889.0
1950.9
7
1948.7
7
1948.7
2
1944.8
5
1940.9
0
1937.2
3
1937.2
2
1935.7
2
1935.6
7
1934.9
3
1934.9
1
1930.5
3
1930.5
1
1922.5
3
1922.2
6
1914.7
8
1914.7
5
1906.1
3
1905.9
8
1899.7
6
1899.6
6
1896.4
6
1896.3
7
1894.8
9
1894.8
5
1891.5
5
1891.3
0
1889.0
2
1889.11
18.2
9
18.7
9
18.4
9
0.14
18.3
5
1.23
17.2
0
0.08
18.5
7
0.06
18.4
9
0.75
20.4
7
0.06
20.1
7
0.49
19.5
1
0.60
19.5
8
1.13
18.8
9
0.24
19.9
4
2.01
8
8
18.0
8
0.23
VELOCIDAD
0.02
(lps)
PRESIN ESTTICA
(m)
PRESIN
DISPONIBLE
K0+307.8
7
K0+326.6
8
K0+326.9
4
K0+345.2
2
K0+364.0
2
K0+382.5
0
K0+382.6
4
K0+400.9
9
K0+402.2
2
K0+419.4
2
K0+419.5
0
K0+438.0
8
K0+438.1
4
K0+456.6
3
K0+457.3
8
K0+477.8
5
K0+477.9
1
K0+498.0
8
K0+498.5
7
K0+518.0
8
K0+518.6
8
K0+538.2
7
K0+539.4
0
K0+558.2
8
K0+558.5
3
K0+578.4
6
K0+580.4
7
K0+598.5
6
K0+598.7
PRDIDA DE
ENERGA
K0+307.8
4
K0+307.8
7
K0+326.6
8
K0+326.9
4
K0+345.2
2
K0+364.0
2
K0+382.5
0
K0+382.6
4
K0+400.9
9
K0+402.2
2
K0+419.4
2
K0+419.5
0
K0+438.0
8
K0+438.1
4
K0+456.6
3
K0+457.3
8
K0+477.8
5
K0+477.9
1
K0+498.0
8
K0+498.5
7
K0+518.0
8
K0+518.6
8
K0+538.2
7
K0+539.4
0
K0+558.2
8
K0+558.5
3
K0+578.4
6
K0+580.4
7
K0+598.5
(pg
)
FRICCIN UNITARIA
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
(m)
(m)
(m/s)
19.59
20.62
0.81
21.80
22.89
0.81
21.83
22.92
0.81
25.57
26.72
0.81
29.41
30.63
0.81
33.19
34.47
0.81
33.22
34.50
0.81
34.64
35.98
0.81
34.74
36.08
0.81
35.38
36.79
0.81
35.38
36.79
0.81
39.70
41.17
0.81
39.71
41.18
0.81
47.52
49.06
0.81
47.84
49.38
0.81
55.23
56.84
0.81
55.25
56.86
0.81
63.83
65.52
0.81
64.04
65.72
0.81
70.06
71.81
0.81
70.24
72.00
0.81
73.30
75.12
0.81
73.47
75.30
0.81
74.85
76.73
0.81
74.86
76.75
0.81
78.09
80.05
0.81
78.42
80.38
0.81
80.56
82.58
0.81
80.59
82.61
0.81
COTAS (msnm)
PIEZOMTRICA
BATEA
1921.11
1913.6
4
1913.6
2
1904.9
7
1904.7
6
1898.6
7
1898.4
9
1895.3
7
1895.1
9
1893.7
5
1893.7
3
1890.4
4
1890.1
0
1887.9
1921.11
1913.6
4
1913.6
2
1904.9
7
1904.7
6
1898.6
7
1898.4
9
1895.3
7
1895.1
9
1893.7
5
1893.7
3
1890.4
4
1890.1
0
1887.9
0
1887.8
TERRENO
84
(lps)
(m/m)
(m)
PIEZOMTRICA
Inicial
Final
BATEA
Inicial
TERRENO
Final
Inicial
2
K0+606.5
4
K0+606.5
4
K0+614.5
2
K0+619.2
4
K0+619.4
6
K0+628.4
8
K0+628.8
1
K0+630.7
1
K0+649.1
4
K0+649.3
3
K0+670.1
3
K0+675.2
2
K0+691.0
3
K0+703.5
0
K0+704.8
6
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
0.0030
3
0.0030
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0032
3
0.0035
0
0.0035
0
0.0035
0
0.0035
0
0.0035
0
0.0035
0
0.027
3
0.000
0
0.032
1
0.019
0
0.000
8
0.035
4
0.001
3
0.006
9
0.067
3
0.000
7
0.074
2
0.018
1
0.056
3
0.044
4
0.004
9
0.025
3
0.035
6
0.038
3
0.073
8
0.001
2
0.074
7
0.007
2
0.073
2
1968.6
8
1968.6
5
1968.6
5
1968.6
2
1968.6
0
1968.6
0
1968.5
7
1968.5
6
1968.5
6
1968.4
9
1968.4
9
1968.4
1
1968.4
0
1968.3
4
1968.3
0
1968.2
9
1968.2
7
1968.2
3
1968.1
9
1968.1
2
1968.1
2
1968.0
4
1968.0
3
1967.9
6
1967.8
8
1967.8
8
1967.8
4
1967.8
4
1968.6
5
1968.6
5
1968.6
2
1968.6
0
1968.6
0
1968.5
7
1968.5
6
1968.5
6
1968.4
9
1968.4
9
1968.4
1
1968.4
0
1968.3
4
1968.3
0
1968.2
9
1968.2
7
1968.2
3
1968.1
9
1968.1
2
1968.1
2
1968.0
4
1968.0
3
1967.9
6
1967.8
8
1967.8
8
1967.8
4
1967.8
4
1967.8
0
1887.8
7
1890.7
1
1890.7
1
1886.2
8
1883.6
5
1883.5
5
1879.1
3
1878.9
7
1878.5
0
1873.9
0
1873.8
6
1872.3
1
1871.9
3
1870.9
9
1870.2
4
1870.1
5
1869.8
6
1869.4
5
1868.7
4
1867.3
6
1867.3
2
1865.0
4
1864.8
3
1863.0
9
1861.1
6
1861.1
5
1858.9
3
1858.8
8
1890.7
1
1890.7
1
1886.2
8
1883.6
5
1883.5
5
1879.1
3
1878.9
7
1878.5
0
1873.9
0
1873.8
6
1872.3
1
1871.9
3
1870.9
9
1870.2
4
1870.1
5
1869.8
6
1869.4
5
1868.7
4
1867.3
6
1867.3
2
1865.0
4
1864.8
3
1863.0
9
1861.1
6
1861.1
5
1858.9
3
1858.8
8
1857.6
4
K0+711.98
K0+721.9
9
K0+732.7
4
K0+753.4
5
K0+753.8
0
K0+774.7
1
K0+776.7
1
K0+795.6
3
K0+816.6
0
K0+816.6
4
K0+826.8
7
K0+827.0
6
K0+711.98
K0+721.9
9
K0+732.7
4
K0+753.4
5
K0+753.8
0
K0+774.7
1
K0+776.7
1
K0+795.6
3
K0+816.6
0
K0+816.6
4
K0+826.8
7
K0+827.0
6
K0+837.2
3
7.75
0.01
7.98
4.72
0.21
9.02
0.32
1.91
18.4
2
0.19
20.8
1
5.08
8
8
15.8
1
12.4
7
1.37
7.12
8
8
8
10.0
1
10.7
5
20.7
1
0.35
20.9
1
2.00
8
8
18.9
2
20.9
7
0.04
10.2
3
0.19
10.1
6
(m)
(m)
(m/s)
77.72
79.77
0.81
77.73
79.78
0.81
82.12
84.21
0.83
84.73
86.83
0.83
84.83
86.94
0.83
89.22
91.35
0.83
89.37
91.51
0.83
89.84
91.99
0.83
94.37
96.58
0.83
94.41
96.63
0.83
95.88
98.17
0.83
96.24
98.55
0.83
97.14
99.50
0.83
COTAS (msnm)
K0+598.7
9
K0+606.5
4
K0+606.5
4
K0+614.5
2
K0+619.2
4
K0+619.4
6
K0+628.4
8
K0+628.8
1
K0+630.7
1
K0+649.1
4
K0+649.3
3
K0+670.1
3
K0+675.2
2
K0+691.0
3
K0+703.5
0
K0+704.8
6
VELOCIDAD
(m)
PRESIN ESTTICA
PRDIDA DE
ENERGA
(pg
)
PRESIN
DISPONIBLE
FRICCIN UNITARIA
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
0.0811
0.000
1
0.040
3
0.000
7
0.039
4
1889.11
1891.8
6
1891.8
6
1887.4
6
1884.8
6
1884.7
4
1880.2
0
1880.1
2
1879.6
5
1875.0
3
1875.0
2
1873.4
3
1873.2
0
1872.4
8
1871.3
6
1871.3
3
1871.1
6
1870.6
0
1869.9
9
1868.5
2
1868.4
9
1866.2
0
1866.0
3
1864.4
3
1862.2
6
1862.2
5
1860.0
5
1860.0
3
Final
1891.8
6
1891.8
6
1887.4
6
1884.8
6
1884.7
4
1880.2
0
1880.1
2
1879.6
5
1875.0
3
1875.0
2
1873.4
3
1873.2
0
1872.4
8
1871.3
6
1871.3
3
1871.1
6
1870.6
0
1869.9
9
1868.5
2
1868.4
9
1866.2
0
1866.0
3
1864.4
3
1862.2
6
1862.2
5
1860.0
5
1860.0
3
1858.8
5
97.84
97.92
98.18
98.56
99.24
100.5
4
100.5
7
102.7
8
102.9
9
104.6
6
106.5
0
106.5
1
108.7
0
108.7
4
109.9
4
100.2
5
100.3
3
100.6
2
101.0
3
101.7
5
103.1
2
103.1
6
105.4
4
105.6
6
107.4
0
109.3
3
109.3
3
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.86
0.86
0.86
111.56
0.86
111.60
0.86
112.84
0.86
85
(lps)
(m/m)
(m)
Inicial
Final
Inicial
Final
Inicial
Final
13.2
3
0.04
1967.8
0
1967.7
5
1967.7
5
1967.6
5
1967.6
5
1967.6
1
1967.5
8
1967.5
6
1967.5
6
1967.5
6
1967.5
1
1967.3
5
1967.2
1
1967.1
3
1967.1
3
1967.1
3
1966.9
8
1966.9
8
1966.7
2
1966.7
2
1966.5
3
1966.5
3
1966.1
7
1966.1
6
1965.7
9
1965.7
9
1965.5
7
1965.5
7
1965.4
1967.7
5
1967.7
5
1967.6
5
1967.6
5
1967.6
1
1967.5
8
1967.5
6
1967.5
6
1967.5
6
1967.5
1
1967.3
5
1967.2
1
1967.1
3
1967.1
3
1967.1
3
1966.9
8
1966.9
8
1966.7
2
1966.7
2
1966.5
3
1966.5
3
1966.1
7
1966.1
6
1965.7
9
1965.7
9
1965.5
7
1965.5
7
1965.4
5
1965.4
1857.6
4
1856.0
2
1855.9
8
1835.0
9
1835.0
9
1831.8
1
1828.8
1
1827.6
7
1827.6
6
1827.6
6
1827.7
2
1827.7
4
1827.7
6
1827.7
7
1827.7
7
1827.7
7
1835.8
1
1835.8
6
1843.6
4
1843.6
8
1848.2
9
1848.4
6
1860.5
7
1860.7
0
1878.1
7
1878.2
8
1886.2
8
1886.2
9
1887.3
1856.0
2
1855.9
8
1835.0
9
1835.0
9
1831.8
1
1828.8
1
1827.6
7
1827.6
6
1827.6
6
1827.7
2
1827.7
4
1827.7
6
1827.7
7
1827.7
7
1827.7
7
1835.8
1
1835.8
6
1843.6
4
1843.6
8
1848.2
9
1848.4
6
1860.5
7
1860.7
0
1878.1
7
1878.2
8
1886.2
8
1886.2
9
1887.3
9
1887.4
1858.8
5
1857.2
6
1857.2
5
1857.2
6
1857.2
5
0.0035
0
0.0035
0
0.0035
0
0.0035
0
0.0035
0
0.0038
6
0.0038
6
0.0038
6
0.0038
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
0.051
4
0.000
2
17.3
1
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
8
8
0.00
8.21
7.52
4.83
0.03
0.00
3.09
10.2
6
9.17
5.11
0.12
0.00
5.96
0.03
15.4
0
0.07
11.19
0.42
23.2
0
0.25
21.3
0
0.13
13.3
7
0.02
8.91
0.18
VELOCIDAD
(m)
PRESIN ESTTICA
(pg
)
PRESIN
DISPONIBLE
K0+850.4
6
K0+850.5
0
K0+867.8
0
K0+867.8
0
K0+876.0
1
K0+883.5
3
K0+888.3
6
K0+888.3
9
K0+888.3
9
K0+891.4
8
K0+901.7
4
K0+910.9
1
K0+916.0
2
K0+916.1
4
K0+916.1
4
K0+922.1
0
K0+922.1
4
K0+937.5
3
K0+937.6
1
K0+948.7
9
K0+949.2
1
K0+972.4
2
K0+972.6
7
K0+993.9
7
K0+994.0
9
K1+007.4
6
K1+007.4
8
K1+016.3
9
K1+016.5
PRDIDA DE
ENERGA
K0+837.2
3
K0+850.4
6
K0+850.5
0
K0+867.8
0
K0+867.8
0
K0+876.0
1
K0+883.5
3
K0+888.3
6
K0+888.3
9
K0+888.3
9
K0+891.4
8
K0+901.7
4
K0+910.9
1
K0+916.0
2
K0+916.1
4
K0+916.1
4
K0+922.1
0
K0+922.1
4
K0+937.5
3
K0+937.6
1
K0+948.7
9
K0+949.2
1
K0+972.4
2
K0+972.6
7
K0+993.9
7
K0+994.0
9
K1+007.4
6
K1+007.4
8
K1+016.3
FRICCIN UNITARIA
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
(m)
(m)
(m/s)
111.51
114.46
0.86
111.55
114.51
0.86
132.3
3
132.3
3
135.5
8
138.5
5
139.6
7
139.6
8
139.6
8
139.6
2
139.4
5
139.2
9
139.2
0
139.2
0
139.1
9
131.0
0
130.9
5
122.9
1
122.8
8
105.4
3
105.3
0
135.3
9
135.3
9
138.6
7
141.6
7
142.8
1
142.8
2
142.8
2
142.7
6
142.7
4
142.7
3
142.7
2
142.7
2
142.7
1
134.6
7
134.6
2
126.8
5
126.8
1
122.2
0
122.0
2
109.9
1
109.7
8
87.45
92.31
1.45
87.34
92.21
1.45
79.12
84.20
1.45
79.11
84.19
1.45
77.89
83.10
1.45
77.87
83.08
1.45
COTAS (msnm)
0.1011
0.000
0
0.033
9
0.034
2
0.021
0
0.000
1
0.000
0
0.047
5
0.157
5
0.140
7
0.078
6
0.001
8
0.000
1
0.148
1
0.000
8
0.262
4
0.001
3
0.184
6
0.007
0
0.360
6
0.003
9
0.375
6
0.002
3
0.214
1
0.000
4
0.124
9
0.002
PIEZOMTRICA
BATEA
TERRENO
1836.11
1836.11
1832.8
5
1829.8
3
1827.9
0
1827.8
8
1827.8
8
1827.2
5
1826.7
0
1826.5
0
1827.7
5
1827.9
4
1827.9
4
1837.0
0
1837.0
2
1844.7
5
1844.7
8
1849.4
0
1849.6
2
1861.6
6
1861.8
7
1879.3
1
1879.3
9
1887.3
9
1887.4
0
1888.4
1836.11
1836.11
1832.8
5
1829.8
3
1827.9
0
1827.8
8
1827.8
8
1827.2
5
1826.7
0
1826.5
0
1827.7
5
1827.9
4
1827.9
4
1837.0
0
1837.0
2
1844.7
5
1844.7
8
1849.4
0
1849.6
2
1861.6
6
1861.8
7
1879.3
1
1879.3
9
1887.3
9
1887.4
0
1888.4
7
1888.5
118.08
117.90
0.86
0.86
0.86
0.89
0.89
0.89
0.89
1.51
1.51
1.51
1.51
1.51
1.51
1.51
1.51
1.51
1.51
1.51
1.51
1.45
1.45
86
(lps)
(m/m)
(m)
PIEZOMTRICA
Inicial
Final
BATEA
Inicial
TERRENO
Final
Inicial
Final
K1+019.6
0
K1+019.6
9
K1+028.9
1
K1+029.0
8
K1+042.2
4
K1+042.4
6
K1+051.2
6
K1+051.2
9
K1+056.3
6
K1+056.4
2
K1+058.6
3
K1+066.0
1
K1+082.0
5
K1+082.0
7
K1+088.7
3
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
27.5
0
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0126
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.0139
6
0.044
9
0.001
3
0.128
5
0.002
4
0.209
7
0.003
4
0.127
4
0.000
4
0.078
2
0.001
0
0.035
3
1965.4
4
1965.4
0
1965.4
0
1965.2
7
1965.2
7
1965.0
6
1965.0
5
1964.9
3
1964.9
3
1964.8
5
1964.8
5
1964.8
1
1964.7
0
1964.4
5
1964.4
5
1965.4
0
1965.4
0
1965.2
7
1965.2
7
1965.0
6
1965.0
5
1964.9
3
1964.9
3
1964.8
5
1964.8
5
1964.8
1
1964.7
0
1964.4
5
1964.4
5
1964.3
5
1887.4
1
1888.5
8
1888.6
2
1889.0
3
1889.0
4
1896.7
5
1896.8
8
1899.5
1
1899.5
2
1900.0
2
1900.0
0
1899.3
3
1898.9
1
1900.8
6
1900.8
6
1888.5
8
1888.6
2
1889.0
3
1889.0
4
1896.7
5
1896.8
8
1899.5
1
1899.5
2
1900.0
2
1900.0
0
1899.3
3
1898.9
1
1900.8
6
1900.8
6
1899.6
3
1888.5
4
1889.6
7
1889.6
8
1890.1
2
1890.2
3
1897.9
9
1898.0
6
1900.7
2
1900.7
3
1901.0
9
1901.0
9
1900.3
7
1899.9
9
1901.9
5
1901.9
5
1889.6
7
1889.6
8
1890.1
2
1890.2
3
1897.9
9
1898.0
6
1900.7
2
1900.7
3
1901.0
9
1901.0
9
1900.3
7
1899.9
9
1901.9
5
1901.9
5
1900.6
0
3.03
0.09
9.22
0.18
13.1
6
0.22
8.80
0.03
5.07
0.06
2.21
7.38
16.0
4
0.03
6.66
(m)
(m)
(m/s)
76.65
81.90
1.45
76.61
81.87
1.45
76.07
81.46
1.45
76.06
81.45
1.45
68.14
73.73
1.45
68.01
73.61
1.45
65.25
70.97
1.45
65.24
70.96
1.51
64.66
70.47
1.51
64.68
70.48
1.51
65.31
71.16
1.51
65.62
71.57
1.51
63.42
69.62
1.51
63.42
69.63
1.51
64.54
70.85
1.51
COTAS (msnm)
K1+016.5
7
K1+019.6
0
K1+019.6
9
K1+028.9
1
K1+029.0
8
K1+042.2
4
K1+042.4
6
K1+051.2
6
K1+051.2
9
K1+056.3
6
K1+056.4
2
K1+058.6
3
K1+066.0
1
K1+082.0
5
K1+082.0
7
VELOCIDAD
(m)
PRESIN ESTTICA
PRDIDA DE
ENERGA
(pg
)
PRESIN
DISPONIBLE
FRICCIN UNITARIA
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
0.1135
0.248
1
0.000
4
0.103
7
87
FRICCIN UNITARIA
PRDIDA DE
ENERGA
(pg
)
(m)
(lps)
(m/m)
(m)
K0+000.0
0
97.2
1
VELOCIDAD
CAUDAL DE DISEO
Inicial
PRESIN ESTTICA
LONGITUD
Final
ABSCISA
PRESIN
DISPONIBLE
DIMETRO NOMINAL
Tabla 30 Simulacin hidrulica lnea de conduccin Entre Cmara Intermedia y PTAP (Q= 97 L/s)
Final
(m)
(m)
(m/s)
1970.7
0
1.20
1.20
2.85
COTAS (msnm)
PIEZOMTRICA
Inicial
Final
1970.7
0
BATEA
Inicial
Final
1969.2
8
TERRENO
Inicial
88
(lps)
(m/m)
(m)
Inicial
Final
Inicial
Final
Inicial
Final
20.0
0
0.72
26.9
1
1.02
26.4
5
1.47
26.0
9
0.45
1970.7
0
1970.0
0
1969.9
7
1969.0
3
1969.0
0
1968.0
8
1968.0
3
1967.1
2
1970.0
0
1969.9
7
1969.0
3
1969.0
0
1968.0
8
1968.0
3
1967.1
2
8
8
19.7
4
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
0.706
4
0.025
4
0.940
0
0.035
7
0.917
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1969.2
8
1964.6
6
1964.4
9
1959.9
5
1959.7
8
1956.8
9
1956.7
3
1954.7
5
1954.7
2
1955.7
5
1955.7
0
1955.4
4
1955.2
9
1955.2
8
1954.3
1
1954.0
7
1952.6
1
1950.7
6
1950.5
7
1948.7
2
1946.8
8
1946.8
6
1947.5
7
1948.2
9
1948.3
0
1949.0
6
1949.8
6
1949.8
6
1947.5
1964.6
6
1964.4
9
1959.9
5
1959.7
8
1956.8
9
1956.7
3
1954.7
5
1954.7
2
1955.7
5
1955.7
0
1955.4
4
1955.2
9
1955.2
8
1954.3
1
1954.0
7
1952.6
1
1950.7
6
1950.5
7
1948.7
2
1946.8
8
1946.8
6
1947.5
7
1948.2
9
1948.3
0
1949.0
6
1949.8
6
1949.8
6
1947.5
9
1947.5
1970.7
0
1965.7
6
1965.6
5
1961.2
0
1961.0
9
1958.0
4
1957.9
3
1955.8
6
1955.8
9
1956.8
9
1956.9
0
1956.5
4
1956.5
4
1956.4
3
1955.6
6
1955.2
9
1953.9
0
1952.0
8
1951.8
9
1949.9
8
1948.0
0
1948.0
1
1948.8
2
1949.3
7
1949.4
0
1950.2
2
1950.9
7
1950.9
7
1948.7
1965.7
6
1965.6
5
1961.2
0
1961.0
9
1958.0
4
1957.9
3
1955.8
6
1955.8
9
1956.8
9
1956.9
0
1956.5
4
1956.5
4
1956.4
3
1955.6
6
1955.2
9
1953.9
0
1952.0
8
1951.8
9
1949.9
8
1948.0
0
1948.0
1
1948.8
2
1949.3
7
1949.4
0
1950.2
2
1950.9
7
1950.9
7
1948.7
7
1948.7
0.35
2.03
32.4
7
2.30
16.0
8
3.92
8
8
8
8
8
8
8
8
14.7
1
18.5
1
1.86
18.5
6
18.5
1
0.16
18.3
6
18.5
4
0.25
8.97
9.40
0.02
8
8
18.8
1
0.25
VELOCIDAD
K0+122.8
5
K0+123.2
0
K0+125.2
3
K0+157.7
0
K0+160.0
0
K0+176.0
8
K0+180.0
0
K0+194.7
1
K0+213.2
2
K0+215.0
9
K0+233.6
5
K0+252.1
6
K0+252.3
2
K0+270.6
9
K0+289.2
2
K0+289.4
7
K0+298.4
5
K0+307.8
4
K0+307.8
7
K0+326.6
K0+122.8
5
K0+123.2
0
K0+125.2
3
K0+157.7
0
K0+160.0
0
K0+176.0
8
K0+180.0
0
K0+194.7
1
K0+213.2
2
K0+215.0
9
K0+233.6
5
K0+252.1
6
K0+252.3
2
K0+270.6
9
K0+289.2
2
K0+289.4
7
K0+298.4
5
K0+307.8
4
K0+307.8
7
K0+326.6
8
K0+326.9
(m)
PRESIN ESTTICA
K0+103.11
K0+103.11
(pg
)
PRESIN
DISPONIBLE
K0+020.0
0
K0+020.7
2
K0+047.6
3
K0+048.6
5
K0+075.1
0
K0+076.5
7
K0+102.6
6
PRDIDA DE
ENERGA
K0+000.0
0
K0+020.0
0
K0+020.7
2
K0+047.6
3
K0+048.6
5
K0+075.1
0
K0+076.5
7
K0+102.6
6
FRICCIN UNITARIA
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
(m)
(m)
(m/s)
5.12
5.83
2.85
5.26
5.99
2.85
8.86
10.53
2.85
9.00
10.70
2.85
10.97
13.60
2.85
11.08
13.76
2.85
12.15
15.73
2.85
12.17
15.76
2.85
10.46
14.73
2.85
10.49
14.78
2.85
10.69
15.04
2.85
9.71
15.19
2.85
9.64
15.20
2.85
10.06
16.17
2.85
10.16
16.41
2.85
11.12
17.88
2.85
12.32
19.72
2.85
12.44
19.91
2.85
13.65
21.76
2.85
14.86
23.61
2.85
14.87
23.62
2.85
13.53
22.91
2.85
12.17
22.20
2.85
12.15
22.19
2.85
11.08
21.43
2.85
9.95
20.63
2.85
9.95
20.62
2.85
11.57
22.89
2.85
11.59
22.92
2.85
COTAS (msnm)
0.0511
0.902
4
0.015
4
0.681
6
0.012
2
0.070
5
1.120
0
0.079
3
0.555
6
0.135
5
0.509
8
0.641
5
0.064
6
0.643
1
0.641
2
0.005
6
0.633
7
0.639
6
0.008
8
0.310
4
0.325
1
0.000
9
0.653
1
0.008
PIEZOMTRICA
1967.11
1966.4
3
1966.4
2
1966.3
5
1965.2
3
1965.1
5
1964.5
9
1964.4
5
1963.9
4
1963.3
0
1963.2
4
1962.6
0
1961.9
5
1961.9
5
1961.3
2
1960.6
8
1960.6
7
1960.3
6
1960.0
3
1960.0
3
1959.3
1967.11
1966.4
3
1966.4
2
1966.3
5
1965.2
3
1965.1
5
1964.5
9
1964.4
5
1963.9
4
1963.3
0
1963.2
4
1962.6
0
1961.9
5
1961.9
5
1961.3
2
1960.6
8
1960.6
7
1960.3
6
1960.0
3
1960.0
3
1959.3
8
1959.3
BATEA
TERRENO
89
(lps)
(m/m)
(m)
18.2
9
18.7
9
18.4
9
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.0313
5
0.643
1
0.660
6
0.650
0
0.004
7
0.634
6
0.042
6
0.593
9
0.002
8
0.656
6
0.002
2
0.688
2
0.027
9
0.747
5
0.002
2
0.751
3
0.018
2
0.702
0
0.021
6
0.683
2
0.039
5
0.653
1
0.008
5
0.696
1
0.069
9
0.628
0
0.008
2
0.283
1
0.000
3
1959.3
7
1958.7
3
1958.0
6
1957.4
1
1957.4
1
1956.7
8
1956.7
3
1956.1
4
1956.1
4
1955.4
8
1955.4
8
1954.7
9
1954.7
6
1954.0
1
1954.0
1
1953.2
6
1953.2
4
1952.5
4
1952.5
2
1951.8
4
1951.8
0
1951.1
4
1951.1
3
1950.4
4
1950.3
7
1949.7
4
1949.7
3
1949.4
5
1958.7
3
1958.0
6
1957.4
1
1957.4
1
1956.7
8
1956.7
3
1956.1
4
1956.1
4
1955.4
8
1955.4
8
1954.7
9
1954.7
6
1954.0
1
1954.0
1
1953.2
6
1953.2
4
1952.5
4
1952.5
2
1951.8
4
1951.8
0
1951.1
4
1951.1
3
1950.4
4
1950.3
7
1949.7
4
1949.7
3
1949.4
5
1949.4
5
1947.5
6
1943.7
6
1939.8
6
1936.0
1
1935.9
9
1934.5
0
1934.4
0
1933.7
0
1933.6
9
1929.3
1
1929.3
0
1921.4
3
1943.7
6
1939.8
6
1936.0
1
1935.9
9
1934.5
0
1934.4
0
1933.7
0
1933.6
9
1929.3
1
1929.3
0
1921.4
3
1948.7
2
1944.8
5
1940.9
0
1937.2
3
1937.2
2
1935.7
2
1935.6
7
1934.9
3
1934.9
1
1930.5
3
1930.5
1
1922.5
3
1922.2
6
1914.7
8
1914.7
5
1906.1
3
1905.9
8
1899.7
6
1899.6
6
1896.4
6
1896.3
7
1894.8
9
1894.8
5
1891.5
5
1891.3
0
1889.0
2
1944.8
5
1940.9
0
1937.2
3
1937.2
2
1935.7
2
1935.6
7
1934.9
3
1934.9
1
1930.5
3
1930.5
1
1922.5
3
1922.2
6
1914.7
8
1914.7
5
1906.1
3
1905.9
8
1899.7
6
1899.6
6
1896.4
6
1896.3
7
1894.8
9
1894.8
5
1891.5
5
1891.3
0
1889.0
2
8
8
8
8
0.14
18.3
5
1.23
17.2
0
0.08
18.5
7
0.06
18.4
9
0.75
20.4
7
0.06
20.1
7
0.49
19.5
1
0.60
19.5
8
1.13
18.8
9
0.24
19.9
4
2.01
18.0
8
0.23
8
8
7.75
0.01
VELOCIDAD
(m)
PRESIN ESTTICA
(pg
)
PRESIN
DISPONIBLE
4
K0+345.2
2
K0+364.0
2
K0+382.5
0
K0+382.6
4
K0+400.9
9
K0+402.2
2
K0+419.4
2
K0+419.5
0
K0+438.0
8
K0+438.1
4
K0+456.6
3
K0+457.3
8
K0+477.8
5
K0+477.9
1
K0+498.0
8
K0+498.5
7
K0+518.0
8
K0+518.6
8
K0+538.2
7
K0+539.4
0
K0+558.2
8
K0+558.5
3
K0+578.4
6
K0+580.4
7
K0+598.5
6
K0+598.7
9
K0+606.5
4
K0+606.5
4
PRDIDA DE
ENERGA
8
K0+326.9
4
K0+345.2
2
K0+364.0
2
K0+382.5
0
K0+382.6
4
K0+400.9
9
K0+402.2
2
K0+419.4
2
K0+419.5
0
K0+438.0
8
K0+438.1
4
K0+456.6
3
K0+457.3
8
K0+477.8
5
K0+477.9
1
K0+498.0
8
K0+498.5
7
K0+518.0
8
K0+518.6
8
K0+538.2
7
K0+539.4
0
K0+558.2
8
K0+558.5
3
K0+578.4
6
K0+580.4
7
K0+598.5
6
K0+598.7
9
K0+606.5
4
FRICCIN UNITARIA
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
(m)
(m)
(m/s)
14.74
26.72
2.85
17.99
30.63
2.85
21.18
34.47
2.85
21.20
34.50
2.85
22.06
35.98
2.85
22.11
36.08
2.85
22.22
36.79
2.85
22.22
36.79
2.85
25.95
41.17
2.85
25.96
41.18
2.85
33.14
49.06
2.85
33.44
49.38
2.85
40.15
56.84
2.85
40.17
56.86
2.85
48.07
65.52
2.85
48.26
65.72
2.85
53.65
71.81
2.85
53.81
72.00
2.85
56.25
75.12
2.85
56.39
75.30
2.85
57.17
76.73
2.85
57.18
76.75
2.85
59.78
80.05
2.85
60.04
80.38
2.85
61.62
82.58
2.85
61.64
82.61
2.85
58.52
79.77
2.85
58.52
79.78
2.85
COTAS (msnm)
PIEZOMTRICA
Inicial
Final
BATEA
Inicial
1921.11
1913.6
4
1913.6
2
1904.9
7
1904.7
6
1898.6
7
1898.4
9
1895.3
7
1895.1
9
1893.7
5
1893.7
3
1890.4
4
1890.1
0
1887.9
0
1887.8
7
1890.7
1
TERRENO
Final
1921.11
1913.6
4
1913.6
2
1904.9
7
1904.7
6
1898.6
7
1898.4
9
1895.3
7
1895.1
9
1893.7
5
1893.7
3
1890.4
4
1890.1
0
1887.9
0
1887.8
7
1890.7
1
1890.7
1
Inicial
1889.11
1891.8
6
Final
1889.11
1891.8
6
1891.8
6
90
K0+711.98
K0+721.9
9
K0+732.7
4
K0+753.4
5
K0+753.8
0
K0+774.7
1
K0+776.7
1
K0+795.6
3
K0+816.6
0
K0+816.6
4
K0+826.8
7
K0+827.0
6
K0+837.2
3
K0+850.4
6
K0+850.5
K0+711.98
K0+721.9
9
K0+732.7
4
K0+753.4
5
K0+753.8
0
K0+774.7
1
K0+776.7
1
K0+795.6
3
K0+816.6
0
K0+816.6
4
K0+826.8
7
K0+827.0
6
K0+837.2
3
K0+850.4
6
K0+850.5
0
K0+867.8
4.72
0.21
9.02
0.32
1.91
18.4
2
0.19
20.8
1
5.08
8
8
(m/m)
(m)
Inicial
Final
Inicial
Final
Inicial
Final
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0334
9
0.0363
2
0.0363
2
0.0363
2
0.0363
2
0.0363
2
0.0363
2
0.0363
2
0.0363
2
0.0363
0.332
2
0.196
9
0.008
7
0.366
7
0.013
1
0.072
0
0.697
6
0.007
4
0.768
6
0.187
9
0.583
4
0.460
2
0.050
6
0.262
6
0.369
1
0.396
9
0.764
6
0.012
7
0.774
6
0.074
3
0.758
8
0.840
9
0.001
5
0.417
4
0.007
6
0.408
7
0.532
5
0.002
2
1.048
1949.4
5
1949.1
2
1948.9
2
1948.9
1
1948.5
4
1948.5
3
1948.4
6
1947.7
6
1947.7
5
1946.9
9
1946.8
0
1946.2
1
1945.7
5
1945.7
0
1945.4
4
1945.0
7
1944.6
7
1943.9
1
1943.9
0
1943.1
2
1943.0
5
1942.2
9
1941.4
5
1941.4
5
1941.0
3
1941.0
2
1940.6
1
1940.0
8
1940.0
1949.1
2
1948.9
2
1948.9
1
1948.5
4
1948.5
3
1948.4
6
1947.7
6
1947.7
5
1946.9
9
1946.8
0
1946.2
1
1945.7
5
1945.7
0
1945.4
4
1945.0
7
1944.6
7
1943.9
1
1943.9
0
1943.1
2
1943.0
5
1942.2
9
1941.4
5
1941.4
5
1941.0
3
1941.0
2
1940.6
1
1940.0
8
1940.0
8
1939.0
1890.7
1
1886.2
8
1883.6
5
1883.5
5
1879.1
3
1878.9
7
1878.5
0
1873.9
0
1873.8
6
1872.3
1
1871.9
3
1870.9
9
1870.2
4
1870.1
5
1869.8
6
1869.4
5
1868.7
4
1867.3
6
1867.3
2
1865.0
4
1864.8
3
1863.0
9
1861.1
6
1861.1
5
1858.9
3
1858.8
8
1857.6
4
1856.0
2
1855.9
1886.2
8
1883.6
5
1883.5
5
1879.1
3
1878.9
7
1878.5
0
1873.9
0
1873.8
6
1872.3
1
1871.9
3
1870.9
9
1870.2
4
1870.1
5
1869.8
6
1869.4
5
1868.7
4
1867.3
6
1867.3
2
1865.0
4
1864.8
3
1863.0
9
1861.1
6
1861.1
5
1858.9
3
1858.8
8
1857.6
4
1856.0
2
1855.9
8
1835.0
1891.8
6
1887.4
6
1884.8
6
1884.7
4
1880.2
0
1880.1
2
1879.6
5
1875.0
3
1875.0
2
1873.4
3
1873.2
0
1872.4
8
1871.3
6
1871.3
3
1871.1
6
1870.6
0
1869.9
9
1868.5
2
1868.4
9
1866.2
0
1866.0
3
1864.4
3
1862.2
6
1862.2
5
1860.0
5
1860.0
3
1858.8
5
1857.2
6
1857.2
1887.4
6
1884.8
6
1884.7
4
1880.2
0
1880.1
2
1879.6
5
1875.0
3
1875.0
2
1873.4
3
1873.2
0
1872.4
8
1871.3
6
1871.3
3
1871.1
6
1870.6
0
1869.9
9
1868.5
2
1868.4
9
1866.2
0
1866.0
3
1864.4
3
1862.2
6
1862.2
5
1860.0
5
1860.0
3
1858.8
5
1857.2
6
1857.2
5
1836.11
15.8
1
12.4
7
1.37
7.12
8
8
8
10.0
1
10.7
5
20.7
1
0.35
20.9
1
2.00
8
8
18.9
2
20.9
7
0.04
10.2
3
0.19
8
8
10.1
6
13.2
3
0.04
17.3
VELOCIDAD
7.98
(lps)
PRESIN ESTTICA
(m)
PRESIN
DISPONIBLE
K0+614.5
2
K0+619.2
4
K0+619.4
6
K0+628.4
8
K0+628.8
1
K0+630.7
1
K0+649.1
4
K0+649.3
3
K0+670.1
3
K0+675.2
2
K0+691.0
3
K0+703.5
0
K0+704.8
6
PRDIDA DE
ENERGA
K0+606.5
4
K0+614.5
2
K0+619.2
4
K0+619.4
6
K0+628.4
8
K0+628.8
1
K0+630.7
1
K0+649.1
4
K0+649.3
3
K0+670.1
3
K0+675.2
2
K0+691.0
3
K0+703.5
0
K0+704.8
6
(pg
)
FRICCIN UNITARIA
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
(m)
(m)
(m/s)
62.62
84.21
2.93
65.05
86.83
2.93
65.14
86.94
2.93
69.19
91.35
2.93
69.34
91.51
2.93
69.74
91.99
2.93
73.64
96.58
2.93
73.68
96.63
2.93
74.45
98.17
2.93
74.64
98.55
2.93
75.01
99.50
2.93
COTAS (msnm)
PIEZOMTRICA
BATEA
TERRENO
75.30
75.33
75.36
75.40
75.72
76.33
76.35
77.86
78.00
78.98
80.07
80.08
100.2
5
100.3
3
100.6
2
101.0
3
101.7
5
103.1
2
103.1
6
105.4
4
105.6
6
107.4
0
109.3
3
109.3
3
2.93
2.93
2.93
2.93
2.93
2.93
2.93
2.93
2.93
3.03
3.03
3.03
81.88
111.56
3.03
81.92
111.60
3.03
82.75
112.84
3.03
83.84
114.46
3.03
83.88
114.51
3.03
103.7
135.3
3.03
91
K0+867.8
0
K0+867.8
0
K0+876.0
1
K0+883.5
3
K0+888.3
6
K0+888.3
9
K0+888.3
9
K0+891.4
8
K0+901.7
4
K0+910.9
1
K0+916.0
2
K0+916.1
4
K0+916.1
4
K0+922.1
0
K0+922.1
4
K0+937.5
3
K0+937.6
1
K0+948.7
9
K0+949.2
1
K0+972.4
2
K0+972.6
7
K0+993.9
7
K0+994.0
9
K1+007.4
6
K1+007.4
8
K1+016.3
9
K1+016.5
7
K1+019.6
0
K0+867.8
0
K0+876.0
1
K0+883.5
3
K0+888.3
6
K0+888.3
9
K0+888.3
9
K0+891.4
8
K0+901.7
4
K0+910.9
1
K0+916.0
2
K0+916.1
4
K0+916.1
4
K0+922.1
0
K0+922.1
4
K0+937.5
3
K0+937.6
1
K0+948.7
9
K0+949.2
1
K0+972.4
2
K0+972.6
7
K0+993.9
7
K0+994.0
9
K1+007.4
6
K1+007.4
8
K1+016.3
9
K1+016.5
7
K1+019.6
0
K1+019.6
9
(lps)
(m/m)
(m)
1
8
8
0.00
8.21
7.52
4.83
0.03
0.00
3.09
10.2
6
9.17
5.11
0.12
0.00
5.96
0.03
15.4
0
0.07
11.19
0.42
23.2
0
0.25
21.3
0
0.13
13.3
7
0.02
8.91
0.18
3.03
0.09
PIEZOMTRICA
Inicial
Final
BATEA
Inicial
TERRENO
Final
Inicial
5
0.0363
2
0.0363
2
0.0400
0
0.0400
0
0.0400
0
0.0400
0
0.1447
2
0.1447
2
0.1447
2
0.1447
2
0.1447
2
0.1447
2
0.1447
2
0.1447
2
0.1447
2
0.1447
2
0.1447
2
0.1447
2
0.000
0
0.350
9
0.354
0
0.217
6
0.001
2
0.000
0
0.492
0
1.632
4
1.458
8
0.814
8
0.018
8
0.001
4
1.535
5
0.008
7
2.719
3
0.013
0
1.913
2
0.072
4
3.737
4
0.040
7
3.893
5
0.023
6
2.219
6
0.003
9
1.294
8
0.026
2
0.465
7
0.013
1
1939.0
3
1939.0
3
1938.6
8
1938.3
3
1939.0
3
1938.6
8
1938.3
3
1835.0
9
1835.0
9
1831.8
1
1828.8
1
1827.6
7
1827.6
6
1827.6
6
1827.7
2
1827.7
4
1827.7
6
1827.7
7
1827.7
7
1827.7
7
1835.8
1
1835.8
6
1843.6
4
1843.6
8
1848.2
9
1848.4
6
1860.5
7
1860.7
0
1878.1
7
1878.2
8
1886.2
8
1886.2
9
1887.3
9
1887.4
1
1888.5
8
1835.0
9
1831.8
1
1828.8
1
1827.6
7
1827.6
6
1827.6
6
1827.7
2
1827.7
4
1827.7
6
1827.7
7
1827.7
7
1827.7
7
1835.8
1
1835.8
6
1843.6
4
1843.6
8
1848.2
9
1848.4
6
1860.5
7
1860.7
0
1878.1
7
1878.2
8
1886.2
8
1886.2
9
1887.3
9
1887.4
1
1888.5
8
1888.6
2
0.13118
0.13118
0.13118
0.13118
0.13118
0.13118
0.13118
0.13118
0.13118
(m)
(m)
(m/s)
COTAS (msnm)
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
0.13118
VELOCIDAD
(m)
PRESIN ESTTICA
PRDIDA DE
ENERGA
(pg
)
PRESIN
DISPONIBLE
FRICCIN UNITARIA
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
1938.11
1938.11
1938.11
1938.11
1938.11
1938.11
1937.6
2
1935.9
8
1934.5
2
1933.7
1
1933.6
9
1933.6
9
1932.1
5
1932.1
4
1929.4
3
1929.4
1
1927.5
0
1927.4
3
1923.6
9
1923.6
5
1919.7
6
1919.7
3
1917.5
1
1917.5
1
1916.2
1
1916.1
9
1915.7
2
1937.6
2
1935.9
8
1934.5
2
1933.7
1
1933.6
9
1933.6
9
1932.1
5
1932.1
4
1929.4
3
1929.4
1
1927.5
0
1927.4
3
1923.6
9
1923.6
5
1919.7
6
1919.7
3
1917.5
1
1917.5
1
1916.2
1
1916.1
9
1915.7
2
1915.7
1
1836.11
1836.11
1832.8
5
1829.8
3
1827.9
0
1827.8
8
1827.8
8
1827.2
5
1826.7
0
1826.5
0
1827.7
5
1827.9
4
1827.9
4
1837.0
0
1837.0
2
1844.7
5
1844.7
8
1849.4
0
1849.6
2
1861.6
6
1861.8
7
1879.3
1
1879.3
9
1887.3
9
1887.4
0
1888.4
7
1888.5
4
1889.6
7
Final
1836.11
1832.8
5
1829.8
3
1827.9
0
1827.8
8
1827.8
8
1827.2
5
1826.7
0
1826.5
0
1827.7
5
1827.9
4
1827.9
4
1837.0
0
1837.0
2
1844.7
5
1844.7
8
1849.4
0
1849.6
2
1861.6
6
1861.8
7
1879.3
1
1879.3
9
1887.3
9
1887.4
0
1888.4
7
1888.5
4
1889.6
7
1889.6
8
103.7
2
106.6
5
109.3
0
135.3
9
138.6
7
141.6
7
142.8
1
142.8
2
142.8
2
142.7
6
142.7
4
142.7
3
142.7
2
142.7
2
142.7
1
134.6
7
134.6
2
126.8
5
126.8
1
122.2
0
122.0
2
109.9
1
109.7
8
110.22
110.22
110.22
109.7
3
108.0
7
106.6
0
105.7
7
105.7
6
105.7
5
96.17
96.12
85.62
85.57
79.04
78.80
62.95
62.78
3.03
3.03
3.15
3.15
3.15
3.15
5.34
5.34
5.34
5.34
5.34
5.34
5.34
5.34
5.34
5.34
5.34
5.34
5.13
5.13
41.42
92.31
5.13
41.29
92.21
5.13
31.06
84.20
5.13
31.05
84.19
5.13
28.66
83.10
5.13
28.61
83.08
5.13
26.97
81.90
5.13
26.92
81.87
5.13
92
9.22
0.18
13.1
6
0.22
8.80
0.03
5.07
0.06
2.21
7.38
16.0
4
0.03
6.66
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
97.2
1
(m)
Inicial
Final
Inicial
Final
Inicial
Final
1.331
5
0.024
9
2.173
7
0.035
4
1.321
0
0.004
3
0.810
4
0.010
1
0.366
1
1.176
6
2.571
7
0.004
3
1.075
3
1915.7
1
1914.3
8
1914.3
5
1912.1
8
1912.1
4
1910.8
2
1910.8
2
1910.0
1
1910.0
0
1909.6
3
1908.4
5
1905.8
8
1905.8
8
1914.3
8
1914.3
5
1912.1
8
1912.1
4
1910.8
2
1910.8
2
1910.0
1
1910.0
0
1909.6
3
1908.4
5
1905.8
8
1905.8
8
1904.8
0
1888.6
2
1889.0
3
1889.0
4
1896.7
5
1896.8
8
1899.5
1
1899.5
2
1900.0
2
1900.0
0
1899.3
3
1898.9
1
1900.8
6
1900.8
6
1889.0
3
1889.0
4
1896.7
5
1896.8
8
1899.5
1
1899.5
2
1900.0
2
1900.0
0
1899.3
3
1898.9
1
1900.8
6
1900.8
6
1899.6
3
1889.6
8
1890.1
2
1890.2
3
1897.9
9
1898.0
6
1900.7
2
1900.7
3
1901.0
9
1901.0
9
1900.3
7
1899.9
9
1901.9
5
1901.9
5
1890.1
2
1890.2
3
1897.9
9
1898.0
6
1900.7
2
1900.7
3
1901.0
9
1901.0
9
1900.3
7
1899.9
9
1901.9
5
1901.9
5
1900.6
0
0.13118
0.13118
0.13118
0.13118
0.13118
0.1447
2
0.1447
2
0.1447
2
0.1447
2
0.1447
2
0.1447
2
0.1447
2
0.1447
2
VELOCIDAD
(m/m)
PRESIN ESTTICA
(lps)
PRESIN
DISPONIBLE
K1+028.9
1
K1+029.0
8
K1+042.2
4
K1+042.4
6
K1+051.2
6
K1+051.2
9
K1+056.3
6
K1+056.4
2
K1+058.6
3
K1+066.0
1
K1+082.0
5
K1+082.0
7
K1+088.7
3
(m)
PRDIDA DE
ENERGA
K1+019.6
9
K1+028.9
1
K1+029.0
8
K1+042.2
4
K1+042.4
6
K1+051.2
6
K1+051.2
9
K1+056.3
6
K1+056.4
2
K1+058.6
3
K1+066.0
1
K1+082.0
5
K1+082.0
7
(pg
)
FRICCIN UNITARIA
Final
CAUDAL DE DISEO
Inicial
LONGITUD
ABSCISA
DIMETRO NOMINAL
(m)
(m)
(m/s)
25.18
81.46
5.13
25.15
81.45
5.13
15.26
73.73
5.13
15.10
73.61
5.13
11.14
70.97
5.13
11.13
70.96
5.34
9.82
70.47
5.34
9.83
70.48
5.34
10.13
71.16
5.34
9.37
71.57
5.34
4.85
69.62
5.34
4.85
69.63
5.34
5.00
70.85
5.34
COTAS (msnm)
PIEZOMTRICA
BATEA
TERRENO
4.2.3.2 Evaluacin
Como se puede observar en los dos escenarios anteriores, la tubera tiene una
capacidad de transporte considerablemente mayor a la requerida en funcin al caudal
de diseo del horizonte de proyeccin del proyecto. Igualmente se observ en la
inspeccin de campo que esta lnea no cuenta con ningn tipo de estructura de quiebre
de presiones, las cuales requiere para que se pueda garantizar su ptimo
funcionamiento hidrulico, y se puedan reducir las presiones a valores adecuados, en
funcin al RDE de la tubera instalada.
93
DESARENADOR
Espesor de pared
Largo efectivo
Profundidad efectiva a la entrada
Profundidad efectiva a la salida
Ancho
Relacin
0.2 m
16.2 m
2.0 m
2.45 m
4.0 m
4:1
94
4.3.1.2 Evaluacin
Considerando un caudal equivalente al QMD de 27.5 L/s, con una velocidad del agua a
la entrada de 1.66 m/s, una temperatura de 20C, una partcula a remover del orden de
0.05 mm.
La velocidad de sedimentacin estimada a partir de la ley de Stokes es de 0.223 cm/s,
en funcin del dimetro de la partcula a remover se ha estimado una velocidad de
arrastre u horizontal de 0.378 cm/s, considerando un factor de seguridad de 3 se estima
una velocidad de traslacin horizontal (la que se espera se presente a lo largo del
desarenador) cercana a 4.46 cm/s, que resulta ser menor que la velocidad mxima
recomendada por la Norma RAS de 17 cm/s.
Bajo estas condiciones el rea superficial mnima requerida para el proceso de
sedimentacin sera de 39.51m2. Las dimensiones asociadas a esta condicin son
12.75 m de largo y ancho de 3.19 m. De acuerdo con las dimensiones del desarenador
existente, se dispondra de suficiente espacio para que el proceso de sedimentacin se
presente, adems condiciones como la relacin largo altura recomendadas por la
Norma RAS se presentan de manera aproximada.
95
Espesor de pared
Largo efectivo
Ancho efectivo
Profundidad efectiva a la entrada
Profundidad efectiva a la salida
Profundidad tabique deflector
Ancho
Relacin
0.22 m
6.5 m
1.63 m
1.98 m
2.2 m
0.8 m
1.6 m
4:1
96
4.3.2.2 Evaluacin
Con base en el QMD de 27.5 L/s y la tubera de entrada de 8, se estim una velocidad
del agua a la entrada de 0.93 m/s, una temperatura de 20C, una partcula a remover
del orden de 0.05 mm. La velocidad de sedimentacin estimada a partir de la ley de
Stokes es de 0.223 cm/s, en funcin del dimetro de la partcula a remover se ha
estimado una velocidad de arrastre u horizontal de 0.945 cm/s, considerando un factor
de seguridad de 3 se estima una velocidad de traslacin horizontal de 4.46 cm/s, la cual
resulta ser menor a la recomendada por la Norma RAS de 17 cm/s.
Bajo estas condiciones el rea superficial requerida sera de 40.65m 2. Las dimensiones
asociadas a esta condicin son 12.75 m de largo y ancho de 3.19 m. De acuerdo con
las dimensiones del desarenador existente (rea superficial de 10.59 m 2) se puede decir
que no cumple con las condiciones para que se presente el proceso de sedimentacin
de las partculas. En funcin a las caractersticas geomtricas de conformacin del
desarenador existente, este tiene una capacidad de 9.6 L/s.
Se recomienda la construccin de un nuevo desarenador con mayores dimensiones
que cumpla con el proceso de sedimentacin.
97
Esta planta cuenta con tres procesos de tratamiento que son: Floculacin,
Sedimentacin, Filtracin y posterior Cloracin. En el levantamiento de la estructura se
pudo observar que se encuentra en buen estado, no hay desgaste fsico de la
estructura y la capacidad de la planta es suficiente para los caudales que se demandan.
La PTAP de Cajamarca aunque tiene suficiente capacidad, no est en constante
operacin debido a falta de insumos para realizar los diferentes procesos.
4.4.1 Cmara de aquietamiento
A la entrada se encuentra una cmara de aquietamiento en la cual llega el agua
proveniente de las Quebradas chorros blancos y Dos quebradas, las cuales se unifican
en una cmara de confluencia localizada 1089 m atrs de la PTAP , En la Tabla 33 se
presentan las caractersticas de la cmara de aquietamiento con su respectivo
diagnstico.
Tabla 33. Diagnstico cmara de aquietamiento
CAMARA DE AQUIETAMIENTO
UNID
DESCRIPCION
VALOR
AD
Ancho (W)
m
1,0
Largo (L)
m
1,2
Altura (H)
m
2,51
dimetro de las tuberas de
llegada
m
0,2048
dimetro de las tuberas de
llegada
pulg
8
QMD
m/s
0,0275
velocidad a la entrada
Altura de energa para disipar
velocidad corregida
Fuerza
m/s
m
m/s
N
ECUACION
Medido
Medido
Medido
Medido
Proyectado
0,829
11
asumido
14,691
403,997
98
rea
CAMARA DE AQUIETAMIENTO
UNID
DESCRIPCION
VALOR
AD
m
1,44
velocidad de ascenso
Volumen
Tiempo de retencin
m/s
M3
S
0,0190
3,027
110,075
ECUACION
A= L*L
V= W*L*H
Tr= V/Q
Ancho de la
garganta (W)
Viscosidad ()
Td
c
n
Ha
Sumergencia (S)
Hb
Hp
P
Gradiente de
velocidad
152,4
mm
Kg/m*
0,000106
s
1
s
0,0069
1,58
187,821
mm
0,600
112,692
mm
75,128
mm
Kg*m/
75,128
s
841,877
s-1
Luego de pasar la mezcla rpida el agua es conducida hacia el floculador por medio de
un canal con las caractersticas que se encuentran descritas en la Tabla 35.
Con base en el diagnstico se determin que el gradiente de velocidad no supera los
100 s-1, por lo tanto, cumple con las caractersticas geomtricas para ingresar a las
unidades de floculacin.
Tabla 35. Diagnstico canal de entrada
Q diseo
ancho
longitud
altura
altura lmina del
0,027
5 m3/s
0,5
m
3,5
m
0,6
m
0,45
m
100
15
2920,
01
3
0,225
0,122
0,161
0,000
21,40
7
m2
m/s
m
m
s-1
4.4.3 Floculacin
Luego el agua es dirigida por medio de un canal hacia dos floculadores hidrulico tipo
COX los cuales cuentan con 12 cmaras cada uno, la estructura se encuentra en buen
estado aunque falta de mantenimiento.
Luego de los floculadores el agua es conducida hacia los sedimentadores por medio de
un canal con las siguientes caractersticas:
Tabla 37. Caractersticas canal de conduccin hacia sedimentadores.
Q diseo
ancho
altura
altura lamina del
0,0275
0,58
1,7
0,3
m3/s
m
m
m
102
15
2920,01
0,013
0,174
0,158
0,147
m2
m/s
m
8,600
s-1
Con base en los resultados obtenidos se determin que el canal garantiza un gradiente
de velocidad menor al de la ltima cmara del floculador, lo que quiere decir que los
flocs formados no se van a romper al entrar al sedimentador donde se precipitan.
4.4.4 Sedimentadores
Luego del floculador, pasa hacia los sedimentadores, los cuales se encuentran en
buenas condiciones y cuentan con suficiente capacidad hidrulica.
Fotografa 9. Sedimentadores
Tabla 38. Diagnstico sedimentadores
m3/s
0,0275
103
m
m
m
m2/s
m2
m3/m2dia
m3
cm/s
hora
4
17,8
2,9
0,000001
14
71,20
33,37
206,48
0,23707
2,09
Caudal
m3/s
0,0275
104
m3/m2*s
0,001544
m3/m2*s
m
m
m
m2
m2
m3
und
und
m
m3/m2*d
a
Kg/m3
Kg/m3
0,00232
3,25
4,3
1,37
4,4525
17,81
76,58
2
4
17,81
133,41
2,6
2,65
1,5
0,5
0,4
0,2
1,1
4,90
0,50
1,60
1,00
1,60
769,00
0,08
13,33
0,06
82,50
0,05
0,36
105
m
m
m
0,10
0,089
0,59
m2
0,0054
Con base en el diagnstico realizado, se determin que los filtros tienen suficiente
capacidad para el caudal proyectado y requiere un cambio del lecho filtrante para
garantizar su ptimo funcionamiento.
106
4.5
TANQUES DE ALMACENAMIENTO
107
250
200
Volumen acumulado (m3)
150
100
50
0
0 2
4 6
8 10 12 14 16 18 20 22 24
La curva de aportes est representada por la lnea recta que une el punto inicial (hora
0) y el punto final (hora 24) de la curva de consumos, y corresponde al gasto promedio
del da de consumo mximo diario. Desde la hora 0 hasta la hora 5 el agua llegara a
los tanques en cantidad mayor a la consumida, permitiendo que la diferencia se
almacene; a partir de la hora 5 se observa un cambio en la pendiente, donde la curva
de consumos crece a una mayor tasa que la recta, lo que indica que la demanda
109
2 A h
m a 2 g
Donde A es el rea superficial del tanque, h la altura bruta, entre el fondo y la parte
inferior de la placa cubierta, m es un coeficiente de descarga (m=0.55) y a es el rea
transversal de la tubera. Haciendo uso de esta ecuacin se encuentra que actualmente
todos los tanques cumplen con el tiempo mnimo de vaciado. En la siguiente tabla se
resumen los resultados para cada tanque:
110
Dimetro Tub.
Lavado
"
m
Tanque Alto
0.20
Tanque Altos de la
Virgen
0.15
Tanque El Bosque
0.10
Secci
n
m2
0.0324
3
0.0182
4
0.0081
1
Altura,
h
m
rea
superficial
m2
Tiempo
Vaciado
Horas
2.10
76.0
0.8
1.31
133.3
1.9
2.15
11.3
0.5
Como se puede observar en la Tabla 40, todos los tanques presentan un tiempo de
vaciado inferior a las 8 horas recomendadas por el RAS y el tanque que ms tarda en
vaciarse es el tanque de Altos de la Virgen, el cual tarda 2 horas en su vaciado.
Actualmente todos los tanques cuentan con sistema de ventilacin de tuberas de tres
pulgadas que permiten la entrada del aire para mantener la presin interna igual a la
atmosfrica.
Todos los tanques de almacenamiento cuentan con tuberas de rebose, a continuacin
se hace una descripcin de los sistemas de rebose de los tres tanques:
-
Tanque Alto: Este tanque presenta un esquema de rebose compuesto por dos
tuberas, una de 4 y otra de 6. La tubera de 4 funciona como un vertedero
circular en los casos en que el nivel del agua no logra cubrir toda el rea
transversal de la tubera. Cuando el nivel del agua en el tanque cubre toda la
seccin transversal de la tubera de 4, esta se comporta como un vertedero de
orificio y en casos que el nivel del agua sea demasiado alto, operar tambin la
tubera de 6 la cual se comporta como un vertedero tipo Morning glory. De esta
manera, si se tiene un nivel demasiado alto en el tanque los caudales de
descarga en las tuberas de rebose sern en total de 26 L/s.
Tanque Altos de la Virgen: Al igual que en el tanque alto, se tienen dos tuberas
de rebose. La primera es una tubera tipo vertedero de AC de 6, que con niveles
111
Tanque El Bosque: Este tanque cuenta nicamente con una tubera de rebose, la
cual se comportar como un vertedero libre o un orificio de acuerdo con el nivel
que se tenga en el tanque. Para niveles en el tanque superiores a 1.93 m la
tubera funcionar como un orificio y su caudal mximo de rebose ser de 15 L/s
cuando el tanque est totalmente lleno. Cuando la tubera opere como un
vertedero su capacidad ser de 1.42 L/s.
Como puede observarse, todos los tanques cuentan con sistemas de rebose, con
capacidad suficiente para regular el almacenamiento en cada uno de ellos. El tanque
con mayor capacidad de rebose es el tanque de Altos de la Virgen.
4.6
RED DE DISTRIBUCIN
A continuacin se presenta los criterios de diseo tenidos en cuenta para las redes de
distribucin del municipio de Cajamarca.
4.6.1 Criterios de diseo
4.6.1.1 Presiones
Para el diseo de la red de conduccin y distribucin deben tenerse en cuenta los
siguientes requerimientos de presiones. La presin mnima requerida en los nudos de la
red depende del nivel de complejidad del sistema y se obtienen usando la Tabla B.7.4
del RAS 2000:
Tabla 41. Presiones mnimas en la red de distribucin. Fuente RAS 2000
112
PRESIN
MNIMA (KPA)
PRESIN MNIMA
(METROS)
Bajo
98.10
10.0
Medio
98.10
10.0
Medio alto
147.20
15.0
Alto
147.20
15.0
Las presiones mnimas establecidas se deben tener en cuenta cuando por la red de
distribucin est circulando el caudal de diseo para la poblacin actual y futura, y para
el caso del municipio de Cajamarca, la presin mnima requerida es de 10 mca dado su
nivel de complejidad medio.
El valor de la presin mxima para el diseo de las redes de distribucin, para todos los
niveles de complejidad del sistema, debe ser de 588.60 kPa (60 mca).
La presin mxima establecida en este numeral corresponde a los niveles estticos, es
decir, cuando no haya flujo en movimiento a travs de la red de distribucin y est
actuando la mxima cabeza producida por los tanques de abastecimiento o por
estaciones elevadoras de presin.
4.6.1.2 Dimetros
4.6.1.2.1 Mnimos en redes menores
El valor del dimetro mnimo de las redes menores de distribucin depende del nivel de
complejidad del sistema y de usos del agua, tal como se muestra a continuacin.
Tabla 42. Dimetros mnimos de la red menor de distribucin Fuente: RAS 2000
NIVEL DE COMPLEJIDAD
DEL SISTEMA
Bajo
Medio
Medio alto
DIMETRO MNIMO
38.1
mm
50
mm
100
mm
63.5
(1.5 pulgadas)
(2.0 pulgadas)
(4.0 pulgadas)
(2 pulgadas)
113
Alto
DIMETRO MNIMO
mm
150
mm
75
mm
(6 pulgadas)
(3 pulgadas)
Para el caso del municipio de Cajamarca se obtiene que el dimetro mnimo que debe
existir en la red de distribucin, es un dimetro de 2 pulgadas.
Actualmente el municipio de Cajamarca cuenta con un sistema de distribucin
compuesto por un conjunto de tuberas de PVC y asbesto cemento (AC) que se
encargan de llevar el agua a los diferentes nudos de consumo que contempla el casco
urbano del municipio. Las tuberas de AC se encuentran instaladas hace
aproximadamente 42 aos y las de PVC tienen una edad promedio de 15 aos. El agua
que fluye a travs de las diferentes tuberas es una mezcla del agua captada de las
quebradas de Chorros Blancos y Dos Quebradas. El lquido se almacena y distribuye
haciendo uso de cuatro sistemas que establecen los sectores hidrulicos de la red de
distribucin en s. Las cuatro estructuras de almacenamiento son la Planta de
tratamiento de agua potable (PTAP), donde se mejoran las caractersticas de calidad
del lquido, el tanque alto de la PTAP, el tanque de almacenamiento de Altos de la
Virgen y el tanque de almacenamiento del barrio El Bosque. En la siguiente figura se
presenta un esquema general del sistema de distribucin de agua potable:
114
Dimet
ro (in)
AC
1.5
179.124
9.603
252.351
346.148
5808.721
6787.731
1150.478
85.723
465.333
79.607
49.159
1369.002
Total
(m)
7905.166
8677.814
117
Nmero de nudos
con presin:
Menor a 10
mca.
12
Menor a 5
0
118
Nmero de nudos
con presin:
Menor a 10
mca.
13
Menor a 5 mca.
1
Mayor a 60
mca.
9
Mayor a 72
mca.
4
Total nudos
43
119
Dimetr
o (in)
1.5
2
3
4
6
8
Total
(m)
7045.37
Adicional a los nudos de consumo, este sector presenta 3 hidrantes ubicados en la calle
9 con carrera 7, Carrera 8 con Calle 6 y la Calle 6 con Carrera 7, sin embargo no
se tienen hidrantes ubicados en zonas cercanas al hospital, colegios y barrios sobre la
va Anaime y la carrera 7. El modelo correspondiente a este sector hidrulico se
muestra en la siguiente figura:
121
Nmero de nudos
con presin
Menor a 10 mca.
0
Menor a 5 mca.
0
Mayor a 60 mca.
37
Mayor a 72 mca.
2
12
Total nudos
2
De esta manera se puede observar que el nmero de nudos por encima de 60 mca se
reducira de 41 en 2012 a 37 en 2038, sin embargo, 37 nudos por encima de 60 mca
resulta significativo si se tiene en cuenta el deterioro y envejecimiento de la red actual.
Para el ao 2038 es recomendable reducir presiones mediante vlvulas y realizar una
renovacin de redes y mejoramiento de juntas, sobre todo aquellas de AC que en ao
2012 han cumplido su vida til y se presentan fallas en su estructura. Las presiones que
se presentan en el sector 2 no son lo suficientemente grandes para generar fugas en un
sistema de acueducto totalmente nuevo; pero dado que las tuberas del municipio
presentan deterioro ocasionado por envejecimiento, las altas presiones obtenidas se
traducen en importantes prdidas de agua. Teniendo en cuenta la edad de las tuberas
124
125
126
127
128
0 mca.
<
Presin
< 10
mca.
10 mca. < Presin < 30
mca.
30 mca. < Presin < 60
mca.
60 mca. <
Presin < 70
mca.
70 mca. < Presin
d. P
r
e
s
i
o
n
e
s
129
130
CONCESIN DE AGUAS
131
5.1
DESCRIPCIN DE ALTERNATIVAS
133
134
5.2
ALTERNATIVA SELECCIONADA
Acorde con lo anterior, la Alternativa N 3 desde el punto de vista tanto tcnico como
econmico corresponde a la alternativa ms conveniente, puesto que ofrece una mayor
redundancia y confiabilidad del sistema, as como el empleo de la gran mayora de la
infraestructura existente; de esta manera, se selecciona como Solucin ptima para el
servicio de acueducto del rea urbana de Cajamarca.
6
6.1
DISEO HIDRULICO
OBRAS DE TOMA
135
Otros aspectos
o Lejana de fuentes de contaminacin.
o Tratar de aprovechar infraestructura existente.
o Evitar interferencia con navegacin.
o Evitar desvos fluviales.
o Fcil acceso.
o Proteccin con cerramiento.
136
Capacidad
Sin almacenamiento
QMH
Bajo
Con almacenamiento
QMD + % Paduccin + % PT
Medio
1.5 QMD
1.5 QMD
Medio alto
2 QMD
2 QMD
Alto
2 QMD
2 QMD
m3
L
=155
s
s
2 7.5
100=17.74
155
139
140
m3
L
=82
s
s
2 7.5
100=33.54
82
El caudal requerido corresponde al 33.54 % del caudal medio del ro, el 66.46%
restante constituye el caudal ecolgico que debe regresarse al ro.
6.2
PRETRATAMIENTO
En cuanto a localizacin:
o Espacio suficiente para prever ampliacin.
o Sitio seguro, libre de inundaciones.
o Limpieza a gravedad.
o Cerca de sitio de captacin.
141
A la entrada un distribuidor.
143
ADUCCIN Y CONDUCCIN
Mnima
Mxima
En general, se adopta una velocidad mxima de 6 m/s para evitar la degradacin del
material de las tuberas.
6.3.1.4 Profundidad
Para el caso de aduccin la profundidad de instalacin debe hacerse a mnimo 0.8 m al
lomo del conducto.
144
Purgas: en puntos bajos. Deben tener suficiente capacidad de drenaje para agua
contenida en la tubera. El dimetro puede variar entre y 1/3 del dimetro de la
tubera, Para el caso en que la tubera sea menor de 4 o corresponder a 3.
Localizacin de
purgas
Abscisa Dimetro
K0+278.18
K0+442.40
K0+490.92
K0+647.62
K0+761.40
K1+387.61
4"
4"
4"
4"
4"
4"
Localizacin de
ventosas
Abscisa Dimetro
K0+300.51
K0+523.48
K0+666.52
2"
2"
2"
Localizacin de
Cmaras de quiebre
Abscisa
Cota
146
2114.31
2053.19
1995.66
24.3
24.3
PEAD
Con esta nueva disposicin de cmaras de quiebre, la mxima presin dinmica sobre
la tubera corresponde a 92.7 mca en la abscisa K0+761.4, en el tramo de tubera sobre
el paso elevado. Igualmente, se encuentra que la carga hidrulica con que se entregar
el agua a la cmara intermedia es de 25.55 mca, presin que no genera problemas de
erosin y degradacin de la estructura, e igualmente permite la instalacin de un
sistema de control a la entrada (por ejemplo una vlvula de flotador).
La tubera junto con la optimizacin propuesta tiene la capacidad de transportar los 27.5
L/s, a una velocidad de 0.86 m/s, que corresponde a una velocidad que garantiza auto
limpieza y evacuacin de los sedimentos en operacin normal.
147
148
41
70.42
4.39
5.39
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
6.26
14.2
3
11.4
6
6.89
15.6
5
12.6
0
PVC
41
70.42
6.60
7.58
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
2.81
16.8
5
26.4
2
3.22
18.0
2
28.2
5
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
2.84
25.4
2
12.2
9
11.5
2
3.03
30.2
3
14.6
2
11.6
4
PVC
41
70.42
6.65
6.91
PVC
41
70.42
PVC
41
70.42
1.45
19.6
8
1.50
21.1
4
PVC
41
70.42
PVC
41
70.42
9.39
33.0
8
9.65
33.9
7
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
0.96
20.1
0
14.9
8
23.2
6
0.98
20.5
5
15.3
1
23.7
7
PVC
41
70.42
7.53
7.70
PVC
41
70.42
PVC
41
70.42
8.99
13.1
9
9.29
13.2
7
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
0.16
11.4
0
13.5
8
0.16
11.4
3
13.5
9
PVC
41
70.42
PVC
41
70.42
1.86
24.1
8
1.86
24.4
5
PVC
41
70.42
PVC
41
70.42
5.81
12.6
0
5.87
13.0
8
5.82
7.52
17.0
8
13.7
5
8.24
3.51
19.7
1
30.8
9
3.32
32.7
7
15.8
5
12.7
9
7.57
1.65
23.1
1
10.5
9
37.2
8
1.07
22.5
6
16.8
1
26.1
0
8.45
10.1
8
14.5
9
0.18
12.5
6
14.9
4
2.04
26.8
7
6.45
14.3
4
Prdida de Energa
0.017
6
0.022
7
0.051
7
0.041
6
0.024
9
0.010
6
0.059
6
0.093
4
0.010
0
0.099
1
0.047
9
0.038
7
0.022
9
0.005
0
0.069
9
0.032
0
0.112
8
0.003
2
0.068
2
0.050
9
0.079
0
0.025
6
0.030
8
0.044
1
0.000
5
0.038
0
0.045
2
0.006
2
0.081
3
0.019
5
0.043
4
Inicial
Final
2178.9
4
2178.9
2
2178.9
0
2178.8
5
2178.8
1
2178.7
8
2178.7
7
2178.7
1
2178.6
2
2178.6
1
2178.5
1
2114.8
1
2114.7
7
2114.7
5
2114.7
4
2114.6
7
2114.6
4
2114.5
3
2114.5
3
2114.4
6
2114.4
1
2114.3
3
2114.3
0
2114.2
7
2114.2
3
2114.2
3
2114.1
9
2114.1
4
2114.1
4
2114.0
6
2114.0
4
2178.9
4
2178.9
2
2178.9
0
2178.8
5
2178.8
1
2178.7
8
2178.7
7
2178.7
1
2178.6
2
2178.6
1
2178.5
1
2178.4
6
2114.7
7
2114.7
5
2114.7
4
2114.6
7
2114.6
4
2114.5
3
2114.5
3
2114.4
6
2114.4
1
2114.3
3
2114.3
0
2114.2
7
2114.2
3
2114.2
3
2114.1
9
2114.1
4
2114.1
4
2114.0
6
2114.0
4
2113.9
9
Batea
Inicial
Final
2177.9
2
2174.8
1
2171.9
4
2165.4
1
2160.1
6
2156.4
4
2154.8
6
2148.4
7
2138.4
5
2137.3
8
2121.0
1
2113.0
9
2111.4
5
2109.5
8
2109.1
7
2101.4
6
2099.2
7
2091.5
4
2091.3
4
2087.1
0
2083.9
4
2079.0
3
2077.4
5
2079.7
8
2081.2
6
2081.2
7
2080.4
8
2080.0
8
2080.0
3
2076.3
5
2075.4
7
2177.9
2
2174.8
1
2171.9
4
2165.4
1
2160.1
6
2156.4
4
2154.8
6
2148.4
7
2138.4
5
2137.3
8
2121.0
1
2113.0
9
2111.4
5
2109.5
8
2109.1
7
2101.4
6
2099.2
7
2091.5
4
2091.3
4
2087.1
0
2083.9
4
2079.0
3
2077.4
5
2079.7
8
2081.2
6
2081.2
7
2080.4
8
2080.0
8
2080.0
3
2076.3
5
2075.4
7
2071.9
6
Terreno
Inicial
Final
2178.9
4
2175.9
2
2173.1
6
2166.5
0
2161.1
8
2157.5
7
2156.1
7
2149.4
6
2139.8
0
2138.5
1
2122.2
3
2114.3
1
2112.7
0
2110.9
0
2110.3
2
2102.6
5
2100.3
9
2092.7
3
2092.5
3
2088.3
0
2085.1
2
2080.2
7
2078.8
8
2080.8
6
2082.5
3
2082.5
2
2081.6
8
2081.5
8
2081.2
9
2077.4
6
2076.7
6
2178.9
4
2175.9
2
2173.1
6
2166.5
0
2161.1
8
2157.5
7
2156.1
7
2149.4
6
2139.8
0
2138.5
1
2122.2
3
2114.3
1
2112.7
0
2110.9
0
2110.3
2
2102.6
5
2100.3
9
2092.7
3
2092.5
3
2088.3
0
2085.1
2
2080.2
7
2078.8
8
2080.8
6
2082.5
3
2082.5
2
2081.6
8
2081.5
8
2081.2
9
2077.4
6
2076.7
6
2073.0
7
Velocidad
PVC
0.4
4
0.6
3
1.4
2
1.1
5
0.6
6
0.2
8
1.6
8
2.6
4
0.2
8
2.5
4
1.2
3
1.1
5
0.6
6
0.1
4
1.9
7
0.9
4
3.3
1
0.1
0
2.0
1
1.5
0
2.3
3
0.7
5
0.9
0
1.3
2
0.0
2
1.1
4
1.3
6
0.1
9
2.4
2
0.5
8
1.2
6
Total
70.42
Topografa
41
Tramo
Dimetro Nominal
8
(m)
Piezomtrica
Presin esttica
PVC
(m)
COTAS (msnm)
Presin disponible
K0+000.0
0
K0+004.3
9
K0+010.6
6
K0+024.8
9
K0+036.3
5
K0+042.9
5
K0+045.7
6
K0+062.6
1
K0+089.0
3
K0+091.8
6
K0+117.2
8
K0+129.5
7
K0+141.0
9
K0+147.7
4
K0+149.1
8
K0+168.8
7
K0+178.2
6
K0+211.3
4
K0+212.3
0
K0+232.4
0
K0+247.3
9
K0+270.6
5
K0+278.1
8
K0+287.1
7
K0+300.3
6
K0+300.5
1
K0+311.9
1
K0+325.4
9
K0+327.3
5
K0+351.5
3
K0+357.3
3
K0+000.0
0
K0+004.3
9
K0+010.6
6
K0+024.8
9
K0+036.3
5
K0+042.9
5
K0+045.7
6
K0+062.6
1
K0+089.0
3
K0+091.8
6
K0+117.2
8
K0+129.5
7
K0+141.0
9
K0+147.7
4
K0+149.1
8
K0+168.8
7
K0+178.2
6
K0+211.3
4
K0+212.3
0
K0+232.4
0
K0+247.3
9
K0+270.6
5
K0+278.1
8
K0+287.1
7
K0+300.3
6
K0+300.5
1
K0+311.9
1
K0+325.4
9
K0+327.3
5
K0+351.5
3
K0+357.3
3
K0+369.9
3
(pg
)
Longitud (m)
Equivalente (1o%)
Final
Presin de trabajo
Tubera
Inicial
Abscisa
Tipo Tubera
(m)
(m)
(m/s
)
0.80
0.80
0.81
3.90
3.91
0.81
6.74
13.2
1
18.4
3
22.1
2
23.7
0
30.0
3
39.9
5
41.0
1
57.2
8
65.1
5
6.79
13.3
1
18.5
6
22.2
8
23.8
7
30.2
5
40.2
7
41.3
4
57.7
2
65.6
3
0.81
3.10
3.10
0.81
4.95
4.97
0.81
5.35
13.0
0
15.1
6
22.7
7
22.9
7
27.1
4
30.2
5
35.0
8
36.6
4
34.2
7
32.7
5
32.7
3
33.4
9
33.8
4
33.8
9
37.4
9
38.3
5
41.8
2
5.38
13.0
9
15.2
9
23.0
1
23.2
2
27.4
6
30.6
2
35.5
2
37.1
1
34.7
7
33.3
0
33.2
8
34.0
7
34.4
7
34.5
2
38.2
0
39.0
9
42.5
9
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
149
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
PVC
PVC
PVC
PVC
3.39
12.4
6
3.52
12.7
9
0.59
13.8
2
0.61
14.6
8
0.97
20.8
1
1.03
21.5
9
4.14
15.9
6
4.30
15.9
6
0.33
19.6
8
0.33
19.8
7
70.42
0.00
28.8
3
0.00
28.8
8
41
70.42
0.01
0.01
41
70.42
41
70.42
8.19
15.2
6
8.44
15.4
4
41
70.42
0.13
0.13
PVC
41
70.42
8.98
8.98
PVC
41
70.42
PVC
41
70.42
0.05
11.1
4
0.05
11.7
0
PVC
41
70.42
2.80
2.94
PVC
41
70.42
1.20
1.26
PVC
41
70.42
8.94
9.04
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
1.02
46.1
2
23.0
1
1.03
47.7
4
23.1
4
PVC
41
70.42
PVC
41
70.42
2.24
22.4
9
2.25
22.7
7
PVC
41
70.42
0.01
0.01
PVC
41
70.42
PVC
41
70.42
5.12
18.8
9
5.13
18.9
6
PVC
41
70.42
PVC
PVC
8
8
41
41
70.42
70.42
0.02
10.8
5
0.02
0.02
10.9
1
0.02
0.3
4
1.2
5
0.0
6
1.3
8
0.1
0
2.0
8
0.4
1
1.6
0
0.0
3
1.9
7
0.0
0
2.8
8
0.0
0
0.8
2
1.5
3
0.0
1
0.9
0
0.0
0
1.1
1
0.2
8
0.1
2
0.8
9
0.1
0
4.6
1
2.3
0
0.2
2
2.2
5
0.0
0
0.5
1
1.8
9
0.0
0
1.0
9
0.0
3.86
14.0
4
0.67
16.0
7
1.13
23.6
7
4.71
17.5
5
0.37
21.8
4
0.00
31.7
6
0.01
9.26
16.9
7
0.15
9.88
0.05
12.8
1
3.22
1.38
9.94
1.13
52.3
5
25.4
4
2.48
25.0
2
0.01
5.65
20.8
5
0.02
11.9
9
0.02
Prdida de Energa
Total
Topografa
Presin de trabajo
Tubera
PVC
Velocidad
K0+373.3
2
K0+385.7
8
K0+386.3
7
K0+400.1
9
K0+401.1
6
K0+421.9
7
K0+426.1
1
K0+442.0
7
K0+442.4
0
K0+462.0
9
K0+462.0
9
K0+490.9
1
K0+490.9
2
K0+499.1
1
K0+514.3
7
K0+514.5
1
K0+523.4
8
K0+523.5
3
K0+534.6
7
K0+537.4
8
K0+538.6
7
K0+547.6
1
K0+548.6
3
K0+594.7
5
K0+617.7
6
K0+620.0
0
K0+642.4
9
K0+642.5
0
K0+647.6
2
K0+666.5
1
K0+666.5
2
K0+677.3
8
K0+677.4
(m)
Presin esttica
K0+369.9
3
K0+373.3
2
K0+385.7
8
K0+386.3
7
K0+400.1
9
K0+401.1
6
K0+421.9
7
K0+426.1
1
K0+442.0
7
K0+442.4
0
K0+462.0
9
K0+462.0
9
K0+490.9
1
K0+490.9
2
K0+499.1
1
K0+514.3
7
K0+514.5
1
K0+523.4
8
K0+523.5
3
K0+534.6
7
K0+537.4
8
K0+538.6
7
K0+547.6
1
K0+548.6
3
K0+594.7
5
K0+617.7
6
K0+620.0
0
K0+642.4
9
K0+642.5
0
K0+647.6
2
K0+666.5
1
K0+666.5
2
K0+677.3
(pg
)
Presin disponible
Final
%) Equivalente (1o
Inicial
Longitud (m)
Tramo
Abscisa
Dimetro Nominal
Tipo Tubera
(m)
Inicial
Final
Inicial
Final
Inicial
Final
(m)
(m)
(m/s
)
0.011
7
0.042
5
0.002
0
0.048
6
0.003
4
0.071
6
0.014
2
0.053
1
0.001
1
0.066
1
0.000
0
0.096
1
0.000
0
0.028
0
0.051
3
0.000
5
0.029
9
0.000
2
0.038
8
0.009
7
0.004
2
0.030
1
0.003
4
0.158
4
0.077
0
0.007
5
0.075
7
0.000
0
0.017
1
0.063
1
0.000
1
0.036
3
0.000
2113.9
9
2113.9
8
2113.9
4
2113.9
4
2113.8
9
2113.8
9
2113.8
1
2113.8
0
2113.7
5
2113.7
5
2113.6
8
2113.6
8
2113.5
8
2113.5
8
2113.5
6
2113.5
0
2113.5
0
2113.4
7
2113.4
7
2113.4
3
2113.4
3
2113.4
2
2113.3
9
2113.3
9
2113.2
3
2113.1
5
2113.1
4
2113.0
7
2113.0
7
2113.0
5
2112.9
9
2112.9
9
2112.9
2113.9
8
2113.9
4
2113.9
4
2113.8
9
2113.8
9
2113.8
1
2113.8
0
2113.7
5
2113.7
5
2113.6
8
2113.6
8
2113.5
8
2113.5
8
2113.5
6
2113.5
0
2113.5
0
2113.4
7
2113.4
7
2113.4
3
2113.4
3
2113.4
2
2113.3
9
2113.3
9
2113.2
3
2113.1
5
2113.1
4
2113.0
7
2113.0
7
2113.0
5
2112.9
9
2112.9
9
2112.9
5
2112.9
2071.9
6
2071.0
1
2068.1
1
2067.9
7
2063.0
0
2062.6
5
2056.9
2
2055.7
8
2055.5
8
2055.5
8
2058.2
9
2058.2
9
2056.5
4
2056.5
4
2058.5
9
2060.9
8
2060.9
8
2061.1
5
2061.1
4
2057.5
8
2056.6
8
2056.3
0
2054.9
3
2054.7
8
2042.4
6
2040.0
2
2039.7
8
2036.2
5
2036.2
5
2035.9
1
2037.6
5
2037.6
5
2036.5
2071.0
1
2068.1
1
2067.9
7
2063.0
0
2062.6
5
2056.9
2
2055.7
8
2055.5
8
2055.5
8
2058.2
9
2058.2
9
2056.5
4
2056.5
4
2058.5
9
2060.9
8
2060.9
8
2061.1
5
2061.1
4
2057.5
8
2056.6
8
2056.3
0
2054.9
3
2054.7
8
2042.4
6
2040.0
2
2039.7
8
2036.2
5
2036.2
5
2035.9
1
2037.6
5
2037.6
5
2036.5
9
2036.5
2073.0
7
2072.2
9
2069.4
4
2069.2
2
2064.1
1
2063.8
4
2058.0
5
2057.1
3
2056.7
1
2056.7
5
2059.4
6
2059.4
6
2057.7
3
2057.7
3
2059.8
5
2062.3
1
2062.3
4
2062.3
1
2062.3
1
2059.1
7
2057.7
6
2057.5
8
2056.3
1
2056.0
4
2043.7
5
2041.4
4
2041.0
8
2037.4
2
2037.4
2
2037.2
5
2038.7
8
2038.7
9
2037.7
2072.2
9
2069.4
4
2069.2
2
2064.1
1
2063.8
4
2058.0
5
2057.1
3
2056.7
1
2056.7
5
2059.4
6
2059.4
6
2057.7
3
2057.7
3
2059.8
5
2062.3
1
2062.3
4
2062.3
1
2062.3
1
2059.1
7
2057.7
6
2057.5
8
2056.3
1
2056.0
4
2043.7
5
2041.4
4
2041.0
8
2037.4
2
2037.4
2
2037.2
5
2038.7
8
2038.7
9
2037.7
9
2037.7
42.7
5
45.6
1
45.7
5
50.6
7
51.0
1
56.6
7
57.8
0
57.9
4
57.9
5
55.1
7
55.1
7
56.8
2
56.8
2
54.7
4
52.3
1
52.3
0
52.1
0
52.1
2
55.6
4
56.5
2
56.9
0
58.2
4
58.3
9
70.5
5
72.9
1
73.1
4
76.5
9
76.6
0
76.9
2
75.1
2
75.1
2
76.1
5
76.1
43.5
4
46.4
4
46.5
8
51.5
5
51.9
0
57.6
3
58.7
7
58.9
7
58.9
7
56.2
6
56.2
6
58.0
1
58.0
1
55.9
6
53.5
7
53.5
7
53.4
0
53.4
2
56.9
8
57.8
7
58.2
5
59.6
2
59.7
8
72.0
9
74.5
3
74.7
7
78.3
0
78.3
0
78.6
4
76.9
1
76.9
1
77.9
7
77.9
COTAS (msnm)
Piezomtrica
Batea
Terreno
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
150
41
70.42
PVC
70.42
PVC
PVC
PVC
PVC
PEA
D
PEA
D
PEA
D
PEA
D
41
32.
5
32.
5
32.
5
32.
5
17
17
17
PVC
PVC
PVC
17
32.
5
32.
5
32.
5
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
PVC
PVC
PVC
88.03
88.03
88.03
88.03
102.1
1
102.1
1
102.1
1
102.1
1
14.6
0
5.26
16.3
3
5.52
16.9
2
0.21
22.2
3
17.7
5
0.22
22.4
2
17.9
0
8.30
8.37
0.00
0.00
7.70
7.71
8.30
8.30
88.03
0.00
0.02
88.03
4.12
4.17
88.03
6.79
41.3
6
6.88
43.0
7
6.90
58.9
9
7.18
60.9
1
70.42
0.10
18.1
0
0.10
18.1
3
41
70.42
8.86
8.94
41
70.42
41
70.42
PVC
41
70.42
6.74
32.8
5
12.3
2
6.80
33.3
0
12.5
5
PVC
41
70.42
PVC
41
70.42
1.75
23.3
1
1.78
23.4
1
PVC
41
70.42
PVC
41
70.42
0.69
11.6
1
0.70
11.9
3
PVC
41
70.42
PVC
41
70.42
6.15
30.7
7
6.29
31.4
6
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
0.21
22.5
2
10.8
0
0.21
22.5
2
10.8
0
PVC
41
70.42
0.00
0.00
0
1.3
9
0.5
3
1.6
3
0.0
2
2.2
2
1.7
7
0.8
3
0.0
0
0.7
7
0.8
3
0.0
0
0.4
1
0.6
8
4.1
4
0.6
9
5.9
0
0.0
1
1.8
1
0.8
9
0.6
7
3.2
8
1.2
3
0.1
8
2.3
3
0.0
7
1.1
6
0.6
2
3.0
8
0.0
2
2.2
5
1.0
8
0.0
0
15.9
9
6.04
18.5
5
0.24
24.6
5
19.6
8
9.19
0.00
8.48
9.13
0.02
4.58
7.56
47.2
0
7.87
66.8
1
0.11
19.9
4
9.82
7.47
36.5
8
13.7
9
1.96
25.7
5
0.77
13.0
9
6.91
34.5
3
0.24
24.7
7
11.8
8
0.00
Prdida de Energa
Total
Topografa
Presin de trabajo
Tubera
PVC
13.9
2
Velocidad
0
K0+691.3
2
K0+696.5
8
K0+712.9
1
K0+713.1
2
K0+735.3
6
K0+753.1
0
K0+761.4
0
K0+761.4
0
K0+769.1
0
K0+777.4
0
K0+777.4
0
K0+781.5
2
K0+788.3
0
K0+829.6
7
K0+836.5
6
K0+895.5
5
K0+895.6
5
K0+913.7
5
K0+922.6
1
K0+929.3
5
K0+962.2
0
K0+974.5
2
K0+976.2
7
K0+999.5
9
K1+000.2
8
K1+011.8
9
K1+018.0
5
K1+048.8
2
K1+049.0
3
K1+071.5
5
K1+082.3
5
K1+082.3
5
(m)
Presin esttica
8
K0+677.4
0
K0+691.3
2
K0+696.5
8
K0+712.9
1
K0+713.1
2
K0+735.3
6
K0+753.1
0
K0+761.4
0
K0+761.4
0
K0+769.1
0
K0+777.4
0
K0+777.4
0
K0+781.5
2
K0+788.3
0
K0+829.6
7
K0+836.5
6
K0+895.5
5
K0+895.6
5
K0+913.7
5
K0+922.6
1
K0+929.3
5
K0+962.2
0
K0+974.5
2
K0+976.2
7
K0+999.5
9
K1+000.2
8
K1+011.8
9
K1+018.0
5
K1+048.8
2
K1+049.0
3
K1+071.5
5
K1+082.3
5
(pg
)
Presin disponible
Final
%) Equivalente (1o
Inicial
Longitud (m)
Tramo
Abscisa
Dimetro Nominal
Tipo Tubera
(m)
Inicial
Final
Inicial
Final
Inicial
Final
(m)
(m)
(m/s
)
1
0.048
4
0.018
3
0.059
9
0.000
8
0.079
6
0.063
6
0.062
9
0.000
0
0.058
1
0.062
5
0.000
1
0.014
8
0.024
4
0.142
8
0.023
8
0.202
1
0.000
3
0.060
3
0.029
7
0.022
6
0.110
7
0.041
7
0.005
9
0.077
9
0.002
3
0.039
6
0.020
9
0.104
5
0.000
7
0.074
9
0.035
9
0.000
0
5
2112.9
5
2112.9
0
2112.8
9
2112.8
3
2112.8
2
2112.7
5
2112.6
8
2112.6
2
2112.6
2
2112.5
6
2112.5
0
2112.5
0
2112.4
8
2112.4
6
2112.3
2
2112.2
9
2112.0
9
2112.0
9
2053.6
9
2053.6
6
2053.6
3
2053.5
2
2053.4
8
2053.4
8
2053.4
0
2053.4
0
2053.3
6
2053.3
3
2053.2
3
2053.2
3
2053.1
5
2053.1
2
5
2112.9
0
2112.8
9
2112.8
3
2112.8
2
2112.7
5
2112.6
8
2112.6
2
2112.6
2
2112.5
6
2112.5
0
2112.5
0
2112.4
8
2112.4
6
2112.3
2
2112.2
9
2112.0
9
2112.0
9
2112.0
3
2053.6
6
2053.6
3
2053.5
2
2053.4
8
2053.4
8
2053.4
0
2053.4
0
2053.3
6
2053.3
3
2053.2
3
2053.2
3
2053.1
5
2053.1
2
2053.1
2
9
2036.5
8
2032.1
9
2030.5
3
2026.1
1
2026.0
5
2023.1
2
2020.7
8
2019.7
0
2019.7
0
2019.8
5
2020.0
0
2019.9
8
2020.6
6
2021.7
8
2033.7
8
2035.7
8
2050.9
5
2050.9
5
2052.0
6
2050.8
7
2049.9
6
2044.5
1
2042.1
2
2041.7
8
2039.6
1
2039.5
4
2036.8
1
2035.5
1
2028.9
8
2028.9
3
2028.8
7
2028.8
4
8
2032.1
9
2030.5
3
2026.1
1
2026.0
5
2023.1
2
2020.7
8
2019.7
0
2019.7
0
2019.8
5
2020.0
0
2019.9
8
2020.6
6
2021.7
8
2033.7
8
2035.7
8
2050.9
5
2050.9
5
2052.0
6
2050.8
7
2049.9
6
2044.5
1
2042.1
2
2041.7
8
2039.6
1
2039.5
4
2036.8
1
2035.5
1
2028.9
8
2028.9
3
2028.8
7
2028.8
4
2028.8
4
9
2037.7
8
2033.3
4
2031.7
4
2027.1
9
2027.1
7
2024.2
3
2021.3
9
2019.9
0
2019.9
0
2018.5
3
2020.2
0
2020.2
0
2021.0
3
2023.0
2
2035.1
3
2036.9
3
2052.1
0
2052.1
2
2053.1
9
2052.1
8
2051.0
8
2045.6
8
2043.2
5
2043.1
0
2040.8
8
2040.7
1
2037.9
8
2036.6
6
2030.2
2
2030.2
2
2029.1
5
2030.5
6
8
2033.3
4
2031.7
4
2027.1
9
2027.1
7
2024.2
3
2021.3
9
2019.9
0
2019.9
0
2018.5
3
2020.2
0
2020.2
0
2021.0
3
2023.0
2
2035.1
3
2036.9
3
2052.1
0
2052.1
2
2053.1
9
2052.1
8
2051.0
8
2045.6
8
2043.2
5
2043.1
0
2040.8
8
2040.7
1
2037.9
8
2036.6
6
2030.2
2
2030.2
2
2029.1
5
2030.5
6
2030.5
6
5
80.5
0
82.1
4
86.4
9
86.5
5
89.4
0
91.6
8
92.7
1
92.7
1
92.5
1
92.3
0
92.3
0
91.6
0
90.4
6
78.3
2
76.2
9
60.9
3
60.9
2
59.7
5
7
82.3
7
84.0
3
88.4
4
88.5
0
91.4
3
93.7
7
94.8
5
94.8
5
94.7
1
94.5
5
94.5
7
93.8
9
92.7
7
80.7
7
78.7
7
63.6
1
63.6
0
62.4
9
2.57
2.57
0.81
3.45
3.48
0.81
8.79
11.1
4
11.4
8
13.5
7
13.6
3
16.3
2
17.6
1
24.0
3
24.0
8
24.0
6
24.0
6
24.0
6
8.92
11.3
2
11.6
6
13.8
3
13.8
9
16.6
2
17.9
3
24.4
6
24.5
0
24.5
6
24.5
9
24.5
9
0.81
COTAS (msnm)
Piezomtrica
Batea
Terreno
0.81
0.81
0.83
0.83
0.83
0.83
1.13
1.13
1.13
1.13
0.83
0.83
0.83
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
151
31.9
7
20.8
8
31.8
9
2.09
45.7
2
17.5
7
2.16
47.2
3
17.5
9
0.06
37.3
8
12.7
3
30.0
6
0.07
38.3
8
12.8
6
30.3
6
70.42
1.32
67.7
6
1.34
68.8
7
41
70.42
0.91
0.92
41
70.42
41
70.42
7.85
27.1
9
7.88
27.2
2
41
70.42
41
70.42
0.00
10.9
9
0.00
11.4
5
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
70.42
PVC
41
PVC
PVC
PVC
PVC
PVC
3.1
0
2.0
3
3.0
5
0.2
1
4.5
7
1.7
6
0.0
1
3.7
4
1.2
7
3.0
1
0.1
3
6.7
8
0.0
9
0.7
9
2.7
2
0.0
0
1.1
0
35.0
6
22.9
2
34.9
4
2.37
51.8
0
19.3
5
0.07
42.1
2
14.1
3
33.3
7
1.47
75.6
4
1.01
8.67
29.9
4
0.00
12.5
5
Prdida de Energa
Total
Topografa
Presin de trabajo
Tubera
30.9
8
20.3
3
30.4
8
PVC
Velocidad
K1+113.3
3
K1+133.6
6
K1+164.1
5
K1+166.2
4
K1+211.9
6
K1+229.5
3
K1+229.5
9
K1+266.9
7
K1+279.7
0
K1+309.7
7
K1+311.0
9
K1+378.8
5
K1+379.7
5
K1+387.6
1
K1+414.8
0
K1+414.8
0
K1+425.7
9
(m)
Presin esttica
K1+082.3
5
K1+113.3
3
K1+133.6
6
K1+164.1
5
K1+166.2
4
K1+211.9
6
K1+229.5
3
K1+229.5
9
K1+266.9
7
K1+279.7
0
K1+309.7
7
K1+311.0
9
K1+378.8
5
K1+379.7
5
K1+387.6
1
K1+414.8
0
K1+414.8
0
(pg
)
Presin disponible
Final
%) Equivalente (1o
Inicial
Longitud (m)
Tramo
Abscisa
Dimetro Nominal
Tipo Tubera
(m)
Inicial
Final
Inicial
Final
Inicial
Final
(m)
(m)
(m/s
)
0.106
1
0.069
3
0.105
7
0.007
2
0.156
7
0.058
5
0.000
2
0.127
4
0.042
7
0.100
9
0.004
4
0.228
8
0.003
1
0.026
2
0.090
6
0.000
0
0.038
0
2053.1
2
2053.0
1
2052.9
4
2052.8
4
2052.8
3
1996.1
6
1996.1
0
1996.1
0
1995.9
8
1995.9
3
1995.8
3
1995.8
3
1995.6
0
1995.6
0
1995.5
7
1995.4
8
1995.4
8
2053.0
1
2052.9
4
2052.8
4
2052.8
3
2052.6
7
1996.1
0
1996.1
0
1995.9
8
1995.9
3
1995.8
3
1995.8
3
1995.6
0
1995.6
0
1995.5
7
1995.4
8
1995.4
8
1995.4
4
2028.8
4
2020.9
6
2016.2
0
2006.8
3
2006.2
9
1994.4
5
1993.4
5
1993.4
4
1984.7
6
1982.9
5
1978.7
0
1978.5
1
1966.1
9
1966.0
3
1965.3
4
1966.4
9
1966.4
9
2020.9
6
2016.2
0
2006.8
3
2006.2
9
1994.4
5
1993.4
5
1993.4
4
1984.7
6
1982.9
5
1978.7
0
1978.5
1
1966.1
9
1966.0
3
1965.3
4
1966.4
9
1966.4
9
1969.6
8
2030.5
6
2022.1
1
2017.4
3
2008.0
7
2007.5
4
1995.6
6
1994.6
6
1994.6
6
1985.9
9
1984.2
1
1980.0
1
1979.7
5
1967.3
4
1967.2
5
1966.6
4
1967.5
1
1967.5
1
2022.1
1
2017.4
3
2008.0
7
2007.5
4
1995.6
6
1994.6
6
1994.6
6
1985.9
9
1984.2
1
1980.0
1
1979.7
5
1967.3
4
1967.2
5
1966.6
4
1967.5
1
1967.5
1
1970.7
0
31.8
3
36.5
3
45.7
9
46.3
2
58.0
1
32.4
8
37.2
4
46.6
1
47.1
5
58.9
9
2.43
2.43
0.81
2.45
11.0
0
12.7
6
16.9
2
17.1
0
29.1
9
29.3
5
30.0
1
28.7
7
28.7
7
25.5
5
2.45
11.1
3
12.9
3
17.1
9
17.3
8
29.6
9
29.8
6
30.5
5
29.4
0
29.4
0
26.2
1
0.81
COTAS (msnm)
Piezomtrica
Batea
Terreno
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
Localizacin de
153
3"
Localizacin de
Cmaras de quiebre
Cota
Abscisa
(msnm)
K0+365.21
2000
259.63
259.63
PEAD
154
584.66
65.3
649.96
PVC
PEAD-Paso elevado No 2
Con esta nueva disposicin de cmaras de quiebre, la mxima presin dinmica sobre
la tubera corresponde a 72.79 mca en la abscisa K0+738.36. Igualmente, se encuentra
que la carga hidrulica con que se entregar el agua a la cmara intermedia es de
22.04 mca, presin que no genera problemas de erosin y degradacin de la estructura,
e igualmente permite la instalacin de un sistema de control a la entrada (por ejemplo
una vlvula de flotador).
La tubera junto con la optimizacin propuesta tiene la capacidad de transportar los 27.5
L/s, a una velocidad de 1.37 m/s en la tubera de PVC, y 1.76 m/s en la tubera de
PEAD, que corresponde a una velocidad que garantiza auto limpieza y evacuacin de
los sedimentos en operacin normal.
El perfil hidrulico Optimizado de esta lnea se presenta a continuacin.
Grfica 12. Perfil Hidrulico Optimizado Lnea de aduccin Q. Dos Quebradas
155
K0+037.83
17
17
17
17
Prdida de Energa
Presin de trabajo
102.1
1
102.1
1
102.1
1
102.1
1
32.7
9
33.3
2
4.40
4.47
0.64
0.65
Total
(1%)Equival
3.2
8
0.4
4
0.0
6
36.6
0
4.91
0.72
0.742
0
0.099
5
0.014
6
Inicia
l
2055.7
8
2055.0
3
2054.9
3
Final
2055.7
8
2055.0
3
2054.9
3
2054.9
2
Batea
Inicial
Final
2054.4
7
2048.5
4
2047.7
5
2054.4
7
2048.5
4
2047.7
5
2047.6
3
Velocidad
K0+037.19
(m)
Piezomtrica
Presin esttica
K0+032.79
PEA
D
PEA
D
PEA
D
PEA
D
(m)
COTAS (msnm)
disponiblePresin
K0+000.00
K0+000.0
0
K0+032.7
9
K0+037.1
9
(pg
)
Final
Topografa
Inicial
Longitud (m)
Tramo
Abscisa
Clase de Tubera
Dimetro Nominal
Tipo Tubera
Tabla 58. Simulacin hidrulica Optimizacin lnea de aduccin Q. Dos quebradas Entre Bocatoma
y Cmara Intermedia o de confluencia (Q= 27.5 L/s)
(m)
(m)
(m/s
)
1.15
1.15
1.76
6.33
7.07
1.76
7.03
7.87
1.76
7.13
7.99
1.76
Terreno
Inicia
l
2055.7
8
2049.8
0
2048.8
2
Final
2055.7
8
2049.8
0
2048.8
2
2048.7
1
156
0.94
52.0
0
0.95
52.5
2
9.16
9.25
0.56
0.57
4.02
14.9
5
24.2
5
10.5
0
4.06
15.0
9
24.4
8
10.8
8
5.35
15.5
2
5.41
15.5
5
2.92
30.0
9
48.4
5
2.93
30.1
0
48.9
8
0.56
27.1
0
11.1
7
0.57
28.0
0
11.4
5
0.01
0.01
0.01
25.3
1
33.8
4
0.01
25.6
8
34.3
4
17
PVC
41
70.42
K0+235.22
PVC
41
70.42
K0+240.57
PVC
41
70.42
K0+256.09
PVC
41
70.42
K0+259.01
PVC
41
70.42
K0+289.10
PVC
41
70.42
K0+337.55
PVC
41
70.42
K0+338.12
PVC
41
70.42
K0+365.21
PVC
41
70.42
K0+376.38
41
17
17
17
K0+435.55
PVC
PEA
D
PEA
D
PEA
D
PEA
D
17
70.42
102.1
1
102.1
1
102.1
1
102.1
1
K0+435.56
PVC
41
70.42
0.01
0.01
K0+435.57
PVC
41
70.42
K0+485.51
PVC
41
70.42
0.01
49.9
4
K0+495.23
PVC
41
70.42
K0+552.42
PVC
41
70.42
K0+584.21
PVC
41
70.42
K0+606.80
PVC
PEA
D
41
17
70.42
102.1
1
9.72
57.1
9
31.7
9
22.5
9
0.01
51.6
2
10.0
4
58.7
2
32.6
3
23.2
0
0.03
0.03
K0+118.83
K0+119.77
K0+171.77
K0+180.92
K0+181.49
K0+185.51
K0+376.39
K0+376.40
K0+401.71
K0+606.83
17
17
17
17
17
17
17
17
Velocidad
1.78
25.7
3
K0+224.71
K0+093.52
2.1
9
3.2
1
0.1
8
2.5
3
0.0
9
5.2
0
0.9
2
0.0
6
0.4
0
1.5
0
2.4
3
1.0
5
0.5
4
1.5
5
0.2
9
3.0
1
4.8
5
0.0
6
2.7
1
1.1
2
0.0
0
0.0
0
2.5
3
3.3
8
0.0
0
0.0
0
4.9
9
0.9
7
5.7
2
3.1
8
2.2
6
0.0
0
Presin esttica
1.76
25.3
1
K0+200.46
K0+091.76
17
disponiblePresin
22.3
5
32.4
1
102.1
1
102.1
1
102.1
1
102.1
1
102.1
1
102.1
1
102.1
1
102.1
1
102.1
1
102.1
1
(m)
Inicia
l
Final
Inicial
Final
Inicia
l
Final
(m)
(m)
(m/s
)
0.497
3
0.722
1
0.039
7
0.572
9
0.021
1
1.170
2
0.206
0
0.012
8
0.090
4
0.336
3
0.294
4
0.130
5
0.065
0
0.187
1
0.035
2
0.362
2
0.588
8
0.006
9
0.335
9
0.137
5
0.000
2
0.000
2
0.571
9
0.764
7
0.000
1
0.000
1
0.619
4
0.120
5
0.704
9
0.391
7
0.278
5
0.000
6
2054.9
2
2054.4
2
2053.7
0
2053.6
6
2053.0
9
2053.0
7
2051.9
0
2051.6
9
2051.6
8
2051.5
9
2051.2
5
2050.9
6
2050.8
3
2050.7
6
2050.5
7
2050.5
4
2050.1
8
2049.5
9
2049.5
8
2000.1
1
1999.9
7
1999.9
7
1999.9
7
1999.4
0
1998.6
3
1998.6
3
1998.6
3
1998.0
1
1997.8
9
1997.1
9
1996.7
9
1996.5
2
2054.4
2
2053.7
0
2053.6
6
2053.0
9
2053.0
7
2051.9
0
2051.6
9
2051.6
8
2051.5
9
2051.2
5
2050.9
6
2050.8
3
2050.7
6
2050.5
7
2050.5
4
2050.1
8
2049.5
9
2049.5
8
2049.2
4
1999.9
7
1999.9
7
1999.9
7
1999.4
0
1998.6
3
1998.6
3
1998.6
3
1998.0
1
1997.8
9
1997.1
9
1996.7
9
1996.5
2
1996.5
1
2047.6
3
2043.0
1
2038.2
6
2038.0
0
2033.3
5
2033.2
2
2025.8
6
2024.5
6
2024.4
9
2023.9
3
2021.8
8
2018.5
4
2015.6
9
2014.9
3
2014.0
1
2013.8
3
2012.8
3
2005.6
6
2005.5
8
1998.5
2
1995.9
8
1995.9
9
1995.9
9
1991.6
5
1985.8
4
1985.8
3
1985.8
3
1972.7
6
1970.2
2
1956.9
2
1949.5
2
1944.2
7
2043.0
1
2038.2
6
2038.0
0
2033.3
5
2033.2
2
2025.8
6
2024.5
6
2024.4
9
2023.9
3
2021.8
8
2018.5
4
2015.6
9
2014.9
3
2014.0
1
2013.8
3
2012.8
3
2005.6
6
2005.5
8
1998.5
2
1995.9
8
1995.9
9
1995.9
9
1991.6
5
1985.8
4
1985.8
3
1985.8
3
1972.7
6
1970.2
2
1956.9
2
1949.5
2
1944.2
7
1944.2
7
2048.7
1
2044.0
8
2039.3
8
2039.0
6
2034.5
4
2034.4
0
2026.9
2
2025.6
8
2025.6
0
2025.0
6
2023.0
3
2019.7
0
2016.7
9
2016.0
6
2015.0
7
2014.9
7
2013.9
6
2006.9
4
2006.8
0
1999.6
1
1996.9
5
1996.9
5
1996.9
5
1980.6
1
1986.7
9
1986.7
9
1986.7
9
1973.9
3
1971.6
4
1958.2
1
1950.8
0
1945.2
4
2044.0
8
2039.3
8
2039.0
6
2034.5
4
2034.4
0
2026.9
2
2025.6
8
2025.6
0
2025.0
6
2023.0
3
2019.7
0
2016.7
9
2016.0
6
2015.0
7
2014.9
7
2013.9
6
2006.9
4
2006.8
0
1999.6
1
1996.9
5
1996.9
5
1996.9
5
1980.6
1
1986.7
9
1986.7
9
1986.7
9
1973.9
3
1971.6
4
1958.2
1
1950.8
0
1945.2
4
1945.2
3
11.2
5
15.2
8
15.5
0
19.5
7
19.6
9
25.8
8
26.9
7
27.0
3
27.4
9
29.2
1
32.2
5
34.9
7
35.6
6
36.4
0
36.5
4
37.1
8
43.7
6
43.8
3
50.5
5
12.6
0
17.3
6
17.6
2
22.2
6
22.4
0
29.7
6
31.0
5
31.1
3
31.6
8
33.7
4
37.0
8
39.9
3
40.6
8
41.6
1
41.7
8
42.7
8
49.9
5
50.0
4
57.0
9
3.82
3.82
1.37
3.82
3.81
1.76
3.82
3.81
1.76
7.59
12.6
3
12.6
3
12.6
4
25.0
8
27.5
0
40.1
0
47.1
0
52.0
8
52.0
9
8.15
13.9
6
13.9
7
13.9
7
27.0
4
29.5
8
42.8
8
50.2
8
55.5
3
55.5
3
1.76
Prdida de Energa
21.8
6
32.0
6
PEA
D
PEA
D
PEA
D
PEA
D
PEA
D
PEA
D
PEA
D
PEA
D
PEA
D
PEA
D
K0+059.70
Total
Presin de trabajo
(m)
(1%)Equival
K0+037.8
3
K0+059.7
0
K0+091.7
6
K0+093.5
2
K0+118.8
3
K0+119.7
7
K0+171.7
7
K0+180.9
2
K0+181.4
9
K0+185.5
1
K0+200.4
6
K0+224.7
1
K0+235.2
2
K0+240.5
7
K0+256.0
9
K0+259.0
1
K0+289.1
0
K0+337.5
5
K0+338.1
2
K0+365.2
1
K0+376.3
8
K0+376.3
9
K0+376.4
0
K0+401.7
1
K0+435.5
5
K0+435.5
6
K0+435.5
7
K0+485.5
1
K0+495.2
3
K0+552.4
2
K0+584.2
1
K0+606.8
0
(pg
)
Final
Topografa
Inicial
Longitud (m)
Tramo
Abscisa
Clase de Tubera
Dimetro Nominal
Tipo Tubera
24.5
3
35.6
2
1.96
28.2
6
1.04
57.7
2
10.1
6
0.63
4.46
16.5
9
26.9
1
11.9
3
5.94
17.1
0
3.22
33.1
1
53.8
3
0.63
30.7
1
12.5
7
0.01
0.01
28.2
1
37.7
2
0.01
0.01
56.6
2
11.0
2
64.4
4
35.8
1
25.4
6
0.03
COTAS (msnm)
Piezomtrica
Batea
Terreno
1.76
1.76
1.76
1.76
1.76
1.76
1.76
1.76
1.76
1.76
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.76
1.37
1.37
1.37
1.37
1.37
1.37
1.37
1.76
157
0.01
0.02
88.03
88.03
4.90
51.9
5
5.04
52.1
6
88.03
9.39
9.50
88.03
5.05
55.3
9
58.9
1
5.05
55.3
9
62.5
2
7.50
44.3
9
8.29
50.7
9
K0+677.01
PVC
K0+728.96
PVC
K0+738.36
PVC
K0+743.41
PVC
K0+798.80
PVC
17
32.
5
32.
5
32.
5
32.
5
32.
5
32.
5
K0+857.70
PVC
41
70.42
K0+865.20
PVC
41
70.42
K0+909.59
PVC
41
70.42
17
88.03
0.0
0
0.8
6
5.6
6
0.0
0
0.4
9
5.2
0
0.9
4
0.5
1
5.5
4
5.8
9
0.7
5
4.4
4
Velocidad
88.03
PVC
102.1
1
102.1
1
102.1
1
Presin esttica
8.89
58.2
6
K0+672.11
17
disponiblePresin
8.64
56.6
2
K0+672.10
K0+615.48
(m)
Inicia
l
Final
Inicial
Final
Inicia
l
Final
(m)
(m)
(m/s
)
0.000
0
0.197
9
1.295
9
0.000
2
0.064
6
0.669
5
0.121
9
0.064
9
0.711
2
0.748
3
0.098
9
0.604
1
1996.5
1
1996.5
1
1996.3
2
1995.0
2
1995.0
2
1994.9
6
1994.2
9
1994.1
6
1994.1
0
1993.3
9
1992.6
4
1992.5
4
1996.5
1
1996.3
2
1995.0
2
1995.0
2
1994.9
6
1994.2
9
1994.1
6
1994.1
0
1993.3
9
1992.6
4
1992.5
4
1991.9
4
1944.2
7
1944.2
7
1942.1
8
1928.4
6
1928.4
5
1927.2
5
1922.6
4
1921.2
0
1921.1
5
1920.5
8
1941.5
2
1945.0
5
1944.2
7
1942.1
8
1928.4
6
1928.4
5
1927.2
5
1922.6
4
1921.2
0
1921.1
5
1920.5
8
1941.5
2
1945.0
5
1969.7
3
1945.2
3
1945.2
3
1939.8
5
1929.4
2
1929.4
2
1928.3
2
1923.7
5
1922.3
5
1922.3
1
1921.6
8
1942.7
6
1946.2
8
1945.2
3
1939.8
5
1929.4
2
1929.4
2
1928.3
2
1923.7
5
1922.3
5
1922.3
1
1921.6
8
1942.7
6
1946.2
8
1970.7
0
52.0
9
53.9
8
66.4
0
66.4
0
67.5
4
71.4
7
72.7
9
72.7
8
72.6
4
50.9
5
47.3
2
22.0
4
55.5
3
57.6
2
71.3
4
71.3
5
72.5
5
77.1
6
78.5
9
78.6
5
79.2
2
58.2
8
54.7
5
30.0
7
Prdida de Energa
0.00
PEA
D
PEA
D
PEA
D
K0+606.83
Total
Presin de trabajo
0.00
(m)
(1%)Equival
K0+606.8
3
K0+606.8
3
K0+615.4
8
K0+672.1
0
K0+672.1
1
K0+677.0
1
K0+728.9
6
K0+738.3
6
K0+743.4
1
K0+798.8
0
K0+857.7
0
K0+865.2
0
(pg
)
Final
Topografa
Inicial
Longitud (m)
Tramo
Abscisa
Clase de Tubera
Dimetro Nominal
Tipo Tubera
0.00
9.76
63.9
2
0.02
5.53
57.3
5
10.4
4
5.56
60.9
3
68.4
1
9.04
55.2
2
COTAS (msnm)
Piezomtrica
Batea
Terreno
1.76
1.76
1.76
1.40
1.40
1.40
1.40
1.40
1.40
1.37
1.37
1.37
Localizacin de
purgas
Abscisa Dimetro
K0+103.11
4"
159
4"
4"
4"
Localizacin de
ventosas
Abscisa Dimetro
K0+122.85
K0+307.87
K0+606.54
K1+056.36
2"
2"
2"
2"
Localizacin de
Cmaras de quiebre
Cota
Abscisa
(msnm)
K0+477.85
1913.86
160
161
K0+103.11
K0+122.8
5
K0+123.2
0
K0+125.2
3
K0+157.7
0
K0+160.0
0
K0+176.0
8
K0+180.0
0
K0+194.7
1
K0+213.2
2
K0+215.0
9
K0+233.6
5
K0+252.1
6
K0+252.3
2
K0+270.6
9
K0+289.2
2
K0+289.4
7
K0+298.4
5
K0+307.8
4
K0+307.8
7
K0+326.6
8
K0+326.9
4
K0+345.2
2
K0+103.11
K0+122.8
5
K0+123.2
0
K0+125.2
3
K0+157.7
0
K0+160.0
0
K0+176.0
8
K0+180.0
0
K0+194.7
1
K0+213.2
2
K0+215.0
9
K0+233.6
5
K0+252.1
6
K0+252.3
2
K0+270.6
9
K0+289.2
2
K0+289.4
7
K0+298.4
5
K0+307.8
4
K0+307.8
7
K0+326.6
8
K0+326.9
4
K0+345.2
2
K0+364.0
2
41
PVC
41
PVC
41
PVC
41
PVC
41
PVC
PVC
PVC
PVC
20.00
2.00
0.72
0.73
26.91
27.29
1.02
41
41
8
8
PVC
PVC
Prdida de
Energa
Total
Equival (1%)
20.53
(m)
22.53
0.0682
0.07
0.81
0.0025
2.69
29.98
0.0907
1.04
0.10
1.14
0.0034
26.45
26.61
2.65
29.25
0.0885
1.47
1.48
0.15
1.63
0.0049
41
26.09
26.17
2.61
28.78
0.0871
41
0.45
0.45
0.04
0.49
0.0015
41
19.74
19.77
1.97
21.74
0.0658
41
0.35
0.35
0.04
0.39
0.0012
PVC
41
2.03
2.05
0.20
2.25
0.0068
PVC
41
32.47
32.47
3.25
35.72
0.1081
PVC
41
2.30
2.30
0.23
2.53
0.0077
PVC
41
16.08
16.11
1.61
17.72
0.0536
PVC
41
3.92
3.92
0.39
4.32
0.0131
PVC
41
14.71
14.78
1.47
16.26
0.0492
PVC
41
18.51
18.60
1.85
20.46
0.0619
PVC
41
1.86
1.87
0.19
2.06
0.0062
PVC
41
18.56
18.66
1.86
20.51
0.0620
PVC
41
18.51
18.60
1.85
20.45
0.0619
PVC
41
0.16
0.17
0.02
0.18
0.0005
PVC
41
18.36
18.38
1.84
20.21
0.0611
PVC
41
18.54
18.55
1.85
20.40
0.0617
PVC
41
0.25
0.25
0.03
0.28
0.0008
PVC
41
8.97
9.00
0.90
9.90
0.0299
PVC
41
9.40
9.43
0.94
10.37
0.0314
PVC
41
0.02
0.02
0.00
0.03
0.0001
PVC
41
18.81
18.95
1.88
20.83
0.0630
PVC
41
0.25
0.25
0.03
0.28
0.0008
PVC
41
18.29
18.68
1.83
20.51
0.0620
PVC
41
18.79
19.19
1.88
21.07
0.0637
Inicial
1970.7
0
1970.6
3
1970.6
3
1970.5
4
1970.5
4
1970.4
5
1970.4
4
1970.3
6
1970.3
6
1970.2
9
1970.2
9
1970.2
8
1970.1
7
1970.1
7
1970.11
1970.1
0
1970.0
5
1969.9
9
1969.9
8
1969.9
2
1969.8
6
1969.8
6
1969.8
0
1969.7
4
1969.7
3
1969.7
0
1969.6
7
1969.6
7
1969.6
1
1969.6
1
1969.5
5
Final
1970.7
0
1970.6
3
1970.6
3
1970.5
4
1970.5
4
1970.4
5
1970.4
4
1970.3
6
1970.3
6
1970.2
9
1970.2
9
1970.2
8
1970.1
7
1970.1
7
1970.11
1970.1
0
1970.0
5
1969.9
9
1969.9
8
1969.9
2
1969.8
6
1969.8
6
1969.8
0
1969.7
4
1969.7
3
1969.7
0
1969.6
7
1969.6
7
1969.6
1
1969.6
1
1969.5
5
1969.4
8
Batea
Inicial
Final
1969.2
8
1964.6
6
1964.4
9
1959.9
5
1959.7
8
1956.8
9
1956.7
3
1954.7
5
1954.7
2
1955.7
5
1955.7
0
1955.4
4
1955.2
9
1955.2
8
1954.3
1
1954.0
7
1952.6
1
1950.7
6
1950.5
7
1948.7
2
1946.8
8
1946.8
6
1947.5
7
1948.2
9
1948.3
0
1949.0
6
1949.8
6
1949.8
6
1947.5
9
1947.5
6
1943.7
6
1969.2
8
1964.6
6
1964.4
9
1959.9
5
1959.7
8
1956.8
9
1956.7
3
1954.7
5
1954.7
2
1955.7
5
1955.7
0
1955.4
4
1955.2
9
1955.2
8
1954.3
1
1954.0
7
1952.6
1
1950.7
6
1950.5
7
1948.7
2
1946.8
8
1946.8
6
1947.5
7
1948.2
9
1948.3
0
1949.0
6
1949.8
6
1949.8
6
1947.5
9
1947.5
6
1943.7
6
1939.8
6
Velocidad
PVC
Piezomtrica
Presin esttica
K0+000.0
0
K0+020.0
0
K0+020.7
2
K0+047.6
3
K0+048.6
5
K0+075.1
0
K0+076.5
7
K0+102.6
6
COTAS (msnm)
disponiblePresin
K0+000.0
0
K0+020.0
0
K0+020.7
2
K0+047.6
3
K0+048.6
5
K0+075.1
0
K0+076.5
7
K0+102.6
6
(pg
)
Final
Topografa
Inicial
Longitud (m)
Tramo
Abscisa
Clase de Tubera
Dimetro Nominal
Tipo Tubera
(m)
(m)
(m/s)
1.20
1.20
0.81
5.76
5.83
0.81
Terreno
Inicial
Final
1970.7
0
1965.7
6
1965.6
5
1961.2
0
1961.0
9
1958.0
4
1957.9
3
1955.8
6
1955.8
9
1956.8
9
1956.9
0
1956.5
4
1956.5
4
1956.4
3
1955.6
6
1955.2
9
1953.9
0
1952.0
8
1951.8
9
1949.9
8
1948.0
0
1948.0
1
1948.8
2
1949.3
7
1949.4
0
1950.2
2
1950.9
7
1950.9
7
1948.7
7
1948.7
2
1944.8
5
1970.7
0
1965.7
6
1965.6
5
1961.2
0
1961.0
9
1958.0
4
1957.9
3
1955.8
6
1955.8
9
1956.8
9
1956.9
0
1956.5
4
1956.5
4
1956.4
3
1955.6
6
1955.2
9
1953.9
0
1952.0
8
1951.8
9
1949.9
8
1948.0
0
1948.0
1
1948.8
2
1949.3
7
1949.4
0
1950.2
2
1950.9
7
1950.9
7
1948.7
7
1948.7
2
1944.8
5
1940.9
0
5.92
5.99
0.81
10.37
10.53
0.81
10.54
10.70
0.81
13.34
13.60
0.81
13.50
13.76
0.81
15.38
15.73
0.81
15.42
15.76
0.81
14.32
14.73
0.81
14.37
14.78
0.81
14.62
15.04
0.81
14.66
15.19
0.81
14.66
15.20
0.81
15.58
16.17
0.81
15.81
16.41
0.81
17.23
17.88
0.81
19.01
19.72
0.81
19.19
19.91
0.81
20.98
21.76
0.81
22.76
23.61
0.81
22.78
23.62
0.81
22.01
22.91
0.81
21.23
22.20
0.81
21.22
22.19
0.81
20.43
21.43
0.81
19.60
20.63
0.81
19.59
20.62
0.81
21.80
22.89
0.81
21.83
22.92
0.81
25.57
26.72
0.81
29.41
30.63
0.81
162
41
PVC
41
PVC
41
PVC
41
PVC
PVC
PVC
PVC
18.49
18.88
1.85
0.14
0.14
18.35
18.41
1.23
41
41
8
8
PVC
PVC
Prdida de
Energa
Total
(m)
20.73
0.0627
0.01
0.15
0.0005
1.83
20.24
0.0612
1.24
0.12
1.36
0.0041
17.20
17.22
1.72
18.94
0.0573
0.08
0.08
0.01
0.09
0.0003
41
18.57
19.08
1.86
20.94
0.0633
41
0.06
0.06
0.01
0.07
0.0002
41
18.49
20.10
1.85
21.95
0.0664
41
0.75
0.81
0.07
0.89
0.0027
PVC
41
20.47
21.79
2.05
23.84
0.0721
PVC
41
0.06
0.06
0.01
0.07
0.0002
PVC
41
20.17
21.94
2.02
23.96
0.0725
PVC
41
0.49
0.53
0.05
0.58
0.0018
PVC
41
19.51
20.44
1.95
22.39
0.0677
PVC
41
0.60
0.63
0.06
0.69
0.0021
PVC
41
19.58
19.83
1.96
21.79
0.0659
PVC
41
1.13
1.15
0.11
1.26
0.0038
PVC
41
18.89
18.94
1.89
20.83
0.0630
PVC
41
0.24
0.24
0.02
0.27
0.0008
PVC
41
19.94
20.21
1.99
22.20
0.0672
PVC
41
2.01
2.03
0.20
2.23
0.0067
PVC
41
18.08
18.22
1.81
20.03
0.0606
PVC
41
0.23
0.23
0.02
0.26
0.0008
PVC
41
7.75
8.25
0.77
9.03
0.0273
PVC
41
0.01
0.01
0.00
0.01
0.0000
PVC
41
7.98
9.12
0.80
9.92
0.0300
PVC
41
4.72
5.40
0.47
5.88
0.0178
PVC
41
0.21
0.24
0.02
0.26
0.0008
PVC
41
9.02
10.05
0.90
10.95
0.0331
PVC
41
0.32
0.36
0.03
0.39
0.0012
PVC
41
1.91
1.96
0.19
2.15
0.0065
Batea
Final
Inicial
Final
Inicial
Final
1969.4
8
1969.4
2
1969.4
2
1969.3
6
1969.3
6
1969.3
0
1969.3
0
1969.2
3
1969.2
3
1969.1
7
1969.1
6
1915.2
8
1915.2
7
1915.2
0
1915.2
0
1915.1
3
1915.1
3
1915.0
6
1915.0
6
1915.0
0
1915.0
0
1914.9
3
1914.9
2
1914.8
6
1914.8
6
1914.8
3
1914.8
3
1914.8
0
1914.7
9
1914.7
9
1914.7
5
1914.7
5
1969.4
2
1969.4
2
1969.3
6
1969.3
6
1969.3
0
1969.3
0
1969.2
3
1969.2
3
1969.1
7
1969.1
6
1969.0
9
1915.2
7
1915.2
0
1915.2
0
1915.1
3
1915.1
3
1915.0
6
1915.0
6
1915.0
0
1915.0
0
1914.9
3
1914.9
2
1914.8
6
1914.8
6
1914.8
3
1914.8
3
1914.8
0
1914.7
9
1914.7
9
1914.7
5
1914.7
5
1914.7
5
1939.8
6
1936.0
1
1935.9
9
1934.5
0
1934.4
0
1933.7
0
1933.6
9
1929.3
1
1929.3
0
1921.4
3
1936.0
1
1935.9
9
1934.5
0
1934.4
0
1933.7
0
1933.6
9
1929.3
1
1929.3
0
1921.4
3
1940.9
0
1937.2
3
1937.2
2
1935.7
2
1935.6
7
1934.9
3
1934.9
1
1930.5
3
1930.5
1
1922.5
3
1922.2
6
1914.7
8
1914.7
5
1906.1
3
1905.9
8
1899.7
6
1899.6
6
1896.4
6
1896.3
7
1894.8
9
1894.8
5
1891.5
5
1891.3
0
1889.0
2
1937.2
3
1937.2
2
1935.7
2
1935.6
7
1934.9
3
1934.9
1
1930.5
3
1930.5
1
1922.5
3
1922.2
6
1914.7
8
1914.7
5
1906.1
3
1905.9
8
1899.7
6
1899.6
6
1896.4
6
1896.3
7
1894.8
9
1894.8
5
1891.5
5
1891.3
0
1889.0
2
1921.11
1913.6
4
1913.6
2
1904.9
7
1904.7
6
1898.6
7
1898.4
9
1895.3
7
1895.1
9
1893.7
5
1893.7
3
1890.4
4
1890.1
0
1887.9
0
1887.8
7
1890.7
1
1890.7
1
1886.2
8
1883.6
5
1883.5
5
1879.1
3
1878.9
7
(m)
(m)
(m/s)
33.19
34.47
0.81
33.22
34.50
0.81
34.64
35.98
0.81
34.74
36.08
0.81
35.38
36.79
0.81
35.38
36.79
0.81
39.70
41.17
0.81
39.71
41.18
0.81
47.52
49.06
0.81
47.84
49.38
0.81
55.23
56.84
0.81
Terreno
Inicial
1921.11
1913.6
4
1913.6
2
1904.9
7
1904.7
6
1898.6
7
1898.4
9
1895.3
7
1895.1
9
1893.7
5
1893.7
3
1890.4
4
1890.1
0
1887.9
0
1887.8
7
1890.7
1
1890.7
1
1886.2
8
1883.6
5
1883.5
5
1879.1
3
1878.9
7
1878.5
0
Velocidad
PVC
Piezomtrica
Presin esttica
K0+382.5
0
K0+382.6
4
K0+400.9
9
K0+402.2
2
K0+419.4
2
K0+419.5
0
K0+438.0
8
K0+438.1
4
K0+456.6
3
K0+457.3
8
K0+477.8
5
K0+477.9
1
K0+498.0
8
K0+498.5
7
K0+518.0
8
K0+518.6
8
K0+538.2
7
K0+539.4
0
K0+558.2
8
K0+558.5
3
K0+578.4
6
K0+580.4
7
K0+598.5
6
K0+598.7
9
K0+606.5
4
K0+606.5
4
K0+614.5
2
K0+619.2
4
K0+619.4
6
K0+628.4
8
K0+628.8
1
K0+630.7
1
COTAS (msnm)
disponiblePresin
K0+364.0
2
K0+382.5
0
K0+382.6
4
K0+400.9
9
K0+402.2
2
K0+419.4
2
K0+419.5
0
K0+438.0
8
K0+438.1
4
K0+456.6
3
K0+457.3
8
K0+477.8
5
K0+477.9
1
K0+498.0
8
K0+498.5
7
K0+518.0
8
K0+518.6
8
K0+538.2
7
K0+539.4
0
K0+558.2
8
K0+558.5
3
K0+578.4
6
K0+580.4
7
K0+598.5
6
K0+598.7
9
K0+606.5
4
K0+606.5
4
K0+614.5
2
K0+619.2
4
K0+619.4
6
K0+628.4
8
K0+628.8
1
(pg
)
Equival (1%)
Final
Topografa
Inicial
Longitud (m)
Tramo
Abscisa
Clase de Tubera
Dimetro Nominal
Tipo Tubera
1889.11
1891.8
6
1891.8
6
1887.4
6
1884.8
6
1884.7
4
1880.2
0
1880.1
2
1889.11
1891.8
6
1891.8
6
1887.4
6
1884.8
6
1884.7
4
1880.2
0
1880.1
2
1879.6
5
1.44
1.44
0.81
10.02
10.09
0.81
10.22
10.30
0.81
16.24
16.38
0.81
16.42
16.57
0.81
19.48
19.69
0.81
19.66
19.87
0.81
21.03
21.30
0.81
21.05
21.32
0.81
24.28
24.62
0.81
24.60
24.95
0.81
26.74
27.15
0.81
26.77
27.18
0.81
23.91
24.35
0.81
23.91
24.35
0.81
28.31
28.78
0.81
30.91
31.40
0.81
31.02
31.51
0.81
35.40
35.93
0.81
35.56
36.08
0.81
36.03
36.56
0.81
163
41
PVC
41
PVC
41
PVC
41
PVC
PVC
PVC
PVC
18.42
18.99
1.84
0.19
0.20
20.81
20.87
5.08
41
41
8
8
PVC
PVC
Prdida de
Energa
Total
20.83
0.0630
0.02
0.22
0.0007
2.08
22.95
0.0694
5.10
0.51
5.61
0.0170
15.81
15.84
1.58
17.42
0.0527
12.47
12.49
1.25
13.74
0.0416
41
1.37
1.37
0.14
1.51
0.0046
41
7.12
7.13
0.71
7.84
0.0237
41
10.01
10.02
1.00
11.02
0.0333
41
10.75
10.77
1.07
11.85
0.0358
PVC
41
20.71
20.76
2.07
22.83
0.0691
PVC
41
0.35
0.35
0.03
0.38
0.0011
PVC
41
20.91
21.03
2.09
23.13
0.0700
PVC
41
2.00
2.02
0.20
2.22
0.0067
PVC
41
18.92
19.00
1.89
20.89
0.0632
PVC
41
20.97
21.06
2.10
23.15
0.0700
PVC
41
0.04
0.04
0.00
0.04
0.0001
PVC
41
10.23
10.47
1.02
11.49
0.0348
PVC
41
0.19
0.20
0.02
0.21
0.0006
PVC
41
10.16
10.24
1.02
11.25
0.0340
PVC
41
13.23
13.33
1.32
14.66
0.0443
PVC
41
0.04
0.06
0.00
0.06
0.0002
PVC
41
17.31
27.12
1.73
28.85
0.0873
PVC
41
0.00
0.00
0.00
0.00
0.0000
PVC
41
8.21
8.84
0.82
9.66
0.0292
PVC
41
7.52
8.10
0.75
8.85
0.0268
PVC
41
4.83
4.96
0.48
5.44
0.0165
PVC
41
0.03
0.03
0.00
0.03
0.0001
PVC
41
0.00
0.00
0.00
0.00
0.0000
Acero
Sch 40
3.09
3.09
0.31
3.40
0.0372
Acero
Sch 40
10.26
10.26
1.03
11.28
0.1234
Acero
Sch 40
9.17
9.17
0.92
10.08
0.1103
Velocidad
K0+711.98
K0+721.9
9
K0+732.7
4
K0+753.4
5
K0+753.8
0
K0+774.7
1
K0+776.7
1
K0+795.6
3
K0+816.6
0
K0+816.6
4
K0+826.8
7
K0+827.0
6
K0+837.2
3
K0+850.4
6
K0+850.5
0
K0+867.8
0
K0+867.8
0
K0+876.0
1
K0+883.5
3
K0+888.3
6
K0+888.3
9
K0+888.3
9
K0+891.4
8
K0+901.7
4
K0+711.98
K0+721.9
9
K0+732.7
4
K0+753.4
5
K0+753.8
0
K0+774.7
1
K0+776.7
1
K0+795.6
3
K0+816.6
0
K0+816.6
4
K0+826.8
7
K0+827.0
6
K0+837.2
3
K0+850.4
6
K0+850.5
0
K0+867.8
0
K0+867.8
0
K0+876.0
1
K0+883.5
3
K0+888.3
6
K0+888.3
9
K0+888.3
9
K0+891.4
8
K0+901.7
4
K0+910.9
1
PVC
(m)
(m)
(m/s)
40.56
41.15
0.81
40.61
41.20
0.81
42.08
42.74
0.81
42.44
43.12
0.81
43.34
44.07
0.81
44.04
44.82
0.81
44.12
44.90
0.81
44.39
45.19
0.81
44.77
45.61
0.81
45.45
46.32
0.81
46.75
47.69
0.81
46.79
47.73
0.81
49.00
50.01
0.81
49.21
50.23
0.81
50.89
51.97
0.81
52.75
53.90
0.81
52.75
53.91
0.81
54.94
56.13
0.81
54.98
56.17
0.81
56.19
57.41
0.81
57.77
59.03
0.81
57.81
59.08
0.81
1836.11
78.61
79.96
0.81
1836.11
1832.8
5
1829.8
3
1827.9
0
1827.8
8
1827.8
8
1827.2
5
1826.7
0
1826.5
0
78.61
79.96
0.81
81.86
83.24
0.81
84.83
86.24
0.81
85.96
87.38
0.81
85.97
87.39
0.81
85.97
87.39
0.81
85.92
87.34
1.37
85.78
87.32
1.37
85.65
87.30
1.37
COTAS (msnm)
Piezomtrica
(m)
Presin esttica
K0+649.1
4
K0+649.3
3
K0+670.1
3
K0+675.2
2
K0+691.0
3
K0+703.5
0
K0+704.8
6
disponiblePresin
K0+630.7
1
K0+649.1
4
K0+649.3
3
K0+670.1
3
K0+675.2
2
K0+691.0
3
K0+703.5
0
K0+704.8
6
(pg
)
Equival (1%)
Final
Topografa
Inicial
Longitud (m)
Tramo
Abscisa
Clase de Tubera
Dimetro Nominal
Tipo Tubera
Batea
Terreno
Inicial
Final
Inicial
Final
Inicial
Final
1914.7
5
1914.6
8
1914.6
8
1914.6
1
1914.6
0
1914.5
4
1914.5
0
1914.5
0
1914.4
7
1914.4
4
1914.4
0
1914.3
3
1914.3
3
1914.2
6
1914.2
6
1914.1
9
1914.1
2
1914.1
2
1914.0
9
1914.0
9
1914.0
5
1914.0
1
1914.0
1
1913.9
2
1913.9
2
1913.8
9
1913.8
7
1913.8
5
1913.8
5
1913.8
5
1913.8
1
1913.6
9
1914.6
8
1914.6
8
1914.6
1
1914.6
0
1914.5
4
1914.5
0
1914.5
0
1914.4
7
1914.4
4
1914.4
0
1914.3
3
1914.3
3
1914.2
6
1914.2
6
1914.1
9
1914.1
2
1914.1
2
1914.0
9
1914.0
9
1914.0
5
1914.0
1
1914.0
1
1913.9
2
1913.9
2
1913.8
9
1913.8
7
1913.8
5
1913.8
5
1913.8
5
1913.8
1
1913.6
9
1913.5
8
1878.5
0
1873.9
0
1873.8
6
1872.3
1
1871.9
3
1870.9
9
1870.2
4
1870.1
5
1869.8
6
1869.4
5
1868.7
4
1867.3
6
1867.3
2
1865.0
4
1864.8
3
1863.0
9
1861.1
6
1861.1
5
1858.9
3
1858.8
8
1857.6
4
1856.0
2
1855.9
8
1835.0
9
1835.0
9
1831.8
1
1828.8
1
1827.6
7
1827.6
6
1827.6
6
1827.7
2
1827.7
4
1873.9
0
1873.8
6
1872.3
1
1871.9
3
1870.9
9
1870.2
4
1870.1
5
1869.8
6
1869.4
5
1868.7
4
1867.3
6
1867.3
2
1865.0
4
1864.8
3
1863.0
9
1861.1
6
1861.1
5
1858.9
3
1858.8
8
1857.6
4
1856.0
2
1855.9
8
1835.0
9
1835.0
9
1831.8
1
1828.8
1
1827.6
7
1827.6
6
1827.6
6
1827.7
2
1827.7
4
1827.7
6
1879.6
5
1875.0
3
1875.0
2
1873.4
3
1873.2
0
1872.4
8
1871.3
6
1871.3
3
1871.1
6
1870.6
0
1869.9
9
1868.5
2
1868.4
9
1866.2
0
1866.0
3
1864.4
3
1862.2
6
1862.2
5
1860.0
5
1860.0
3
1858.8
5
1857.2
6
1857.2
5
1875.0
3
1875.0
2
1873.4
3
1873.2
0
1872.4
8
1871.3
6
1871.3
3
1871.1
6
1870.6
0
1869.9
9
1868.5
2
1868.4
9
1866.2
0
1866.0
3
1864.4
3
1862.2
6
1862.2
5
1860.0
5
1860.0
3
1858.8
5
1857.2
6
1857.2
5
1836.11
1836.11
1832.8
5
1829.8
3
1827.9
0
1827.8
8
1827.8
8
1827.2
5
1826.7
0
164
(m)
Batea
Final
Inicial
Final
Inicial
Final
1913.5
8
1913.5
2
1913.5
2
1913.5
2
1913.4
0
1913.4
0
1913.1
9
1913.1
9
1913.0
5
1913.0
4
1912.7
3
1912.7
3
1912.4
0
1912.4
0
1912.2
2
1912.2
1
1913.5
2
1913.5
2
1913.5
2
1913.4
0
1913.4
0
1913.1
9
1913.1
9
1913.0
5
1913.0
4
1912.7
3
1912.7
3
1912.4
0
1912.4
0
1912.2
2
1912.2
1
1827.7
6
1827.7
7
1827.7
7
1827.7
7
1835.8
1
1835.8
6
1843.6
4
1843.6
8
1848.2
9
1848.4
6
1860.5
7
1860.7
0
1878.1
7
1878.2
8
1886.2
8
1886.2
9
1887.3
9
1887.4
1
1888.5
8
1888.6
2
1889.0
3
1889.0
4
1896.7
5
1896.8
8
1899.5
1
1899.5
2
1900.0
2
1900.0
0
1899.3
3
1898.9
1
1900.8
6
1900.8
6
1827.7
7
1827.7
7
1827.7
7
1835.8
1
1835.8
6
1843.6
4
1843.6
8
1848.2
9
1848.4
6
1860.5
7
1860.7
0
1878.1
7
1878.2
8
1886.2
8
1886.2
9
1887.3
9
1887.4
1
1888.5
8
1888.6
2
1889.0
3
1889.0
4
1896.7
5
1896.8
8
1899.5
1
1899.5
2
1900.0
2
1900.0
0
1899.3
3
1898.9
1
1900.8
6
1900.8
6
1899.6
3
1826.5
0
1827.7
5
1827.9
4
1827.9
4
1837.0
0
1837.0
2
1844.7
5
1844.7
8
1849.4
0
1849.6
2
1861.6
6
1861.8
7
1879.3
1
1879.3
9
1887.3
9
1887.4
0
1888.4
7
1888.5
4
1889.6
7
1889.6
8
1890.1
2
1890.2
3
1897.9
9
1898.0
6
1900.7
2
1900.7
3
1901.0
9
1901.0
9
1900.3
7
1899.9
9
1901.9
5
1901.9
5
1827.7
5
1827.9
4
1827.9
4
1837.0
0
1837.0
2
1844.7
5
1844.7
8
1849.4
0
1849.6
2
1861.6
6
1861.8
7
1879.3
1
1879.3
9
1887.3
9
1887.4
0
1888.4
7
1888.5
4
1889.6
7
1889.6
8
1890.1
2
1890.2
3
1897.9
9
1898.0
6
1900.7
2
1900.7
3
1901.0
9
1901.0
9
1900.3
7
1899.9
9
1901.9
5
1901.9
5
1900.6
0
Sch 40
5.11
5.11
0.51
5.63
0.0616
Acero
Sch 40
0.12
0.12
0.01
0.13
0.0014
Acero
Sch 40
0.00
0.01
0.00
0.01
0.0001
Acero
Sch 40
5.96
10.01
0.60
10.61
0.1161
Acero
Sch 40
0.03
0.06
0.00
0.06
0.0007
Acero
Sch 40
15.40
17.25
1.54
18.79
0.2055
Acero
Sch 40
0.07
0.08
0.01
0.09
0.0010
Acero
Sch 40
11.19
12.10
1.12
13.22
0.1446
Acero
Sch 40
0.42
0.46
0.04
0.50
0.0055
Acero
Sch 40
23.20
26.17
2.32
28.49
0.3117
Acero
Sch 40
0.25
0.28
0.02
0.31
0.0034
Acero
Sch 40
21.30
27.55
2.13
29.68
0.3247
Acero
Sch 40
0.13
0.17
0.01
0.18
0.0020
Acero
Sch 40
13.37
15.58
1.34
16.92
0.1851
Acero
Sch 40
0.02
0.02
0.00
0.03
0.0003
Acero
Sch 40
8.91
8.98
0.89
9.87
0.1080
Acero
Sch 40
0.18
0.18
0.02
0.20
0.0022
Acero
Sch 40
3.03
3.25
0.30
3.55
0.0388
Acero
Sch 40
0.09
0.10
0.01
0.10
0.0011
Acero
Sch 40
9.22
9.23
0.92
10.15
0.1110
1912.11
1912.1
0
1912.0
7
1912.0
6
Acero
Sch 40
0.18
0.18
0.02
0.19
0.0021
1911.95
1911.95
Acero
Sch 40
13.16
15.25
1.32
16.57
0.1813
1911.95
1911.77
Acero
Sch 40
0.22
0.25
0.02
0.27
0.0030
1911.77
1911.77
Acero
Sch 40
8.80
9.19
0.88
10.07
0.1102
1911.77
1911.66
Acero
Sch 40
0.03
0.03
0.00
0.03
0.0003
1911.66
1911.66
A.C
5.07
5.09
0.51
5.60
0.0613
1911.66
1911.60
A.C
0.06
0.06
0.01
0.07
0.0008
1911.60
1911.60
A.C
2.21
2.31
0.22
2.53
0.0277
1911.60
1911.57
A.C
7.38
7.39
0.74
8.13
0.0889
1911.57
1911.48
A.C
16.04
16.16
1.60
17.77
0.1944
1911.48
1911.28
A.C
0.03
0.03
0.00
0.03
0.0003
1911.28
1911.28
A.C
6.66
6.77
0.67
7.43
0.0813
1911.28
1911.20
1912.11
1912.1
0
1912.0
7
1912.0
6
1911.95
(m)
(m)
(m/s)
85.58
87.29
1.37
85.58
87.29
1.37
85.58
87.28
1.37
77.42
79.24
1.37
77.37
79.20
1.37
69.39
71.42
1.37
69.35
71.38
1.37
64.59
66.77
1.37
64.41
66.59
1.37
51.99
54.49
1.37
51.86
54.36
1.37
34.06
36.88
1.37
33.95
36.78
1.37
25.77
28.78
1.37
25.75
28.76
1.37
24.55
27.67
1.37
24.53
27.65
1.37
23.32
26.47
1.37
23.28
26.44
1.37
22.76
26.03
1.37
22.75
26.02
1.37
14.85
18.31
1.37
14.72
18.18
1.37
11.98
15.54
1.37
11.97
15.54
1.37
11.41
15.04
1.37
11.43
15.06
1.37
12.07
15.73
1.37
12.40
16.14
1.37
10.25
14.19
1.37
10.26
14.20
1.37
11.40
15.42
1.37
Terreno
Inicial
Acero
Velocidad
Prdida de
Energa
Total
Piezomtrica
Presin esttica
K0+916.0
2
K0+916.1
4
K0+916.1
4
K0+922.1
0
K0+922.1
4
K0+937.5
3
K0+937.6
1
K0+948.7
9
K0+949.2
1
K0+972.4
2
K0+972.6
7
K0+993.9
7
K0+994.0
9
K1+007.4
6
K1+007.4
8
K1+016.3
9
K1+016.5
7
K1+019.6
0
K1+019.6
9
K1+028.9
1
K1+029.0
8
K1+042.2
4
K1+042.4
6
K1+051.2
6
K1+051.2
9
K1+056.3
6
K1+056.4
2
K1+058.6
3
K1+066.0
1
K1+082.0
5
K1+082.0
7
K1+088.7
3
COTAS (msnm)
disponiblePresin
K0+910.9
1
K0+916.0
2
K0+916.1
4
K0+916.1
4
K0+922.1
0
K0+922.1
4
K0+937.5
3
K0+937.6
1
K0+948.7
9
K0+949.2
1
K0+972.4
2
K0+972.6
7
K0+993.9
7
K0+994.0
9
K1+007.4
6
K1+007.4
8
K1+016.3
9
K1+016.5
7
K1+019.6
0
K1+019.6
9
K1+028.9
1
K1+029.0
8
K1+042.2
4
K1+042.4
6
K1+051.2
6
K1+051.2
9
K1+056.3
6
K1+056.4
2
K1+058.6
3
K1+066.0
1
K1+082.0
5
K1+082.0
7
(pg
)
Equival (1%)
Final
Topografa
Inicial
Longitud (m)
Tramo
Abscisa
Clase de Tubera
Dimetro Nominal
Tipo Tubera
165
6.4
PLANTA DE TRATAMIENTO
Floculacin hidrulica
Filtracin
166
Desinfeccin
167
m3
1200 s=33 m3
s
168
L
m
0.10
2.40
0.15
1.30
0.20
0.85
0.25
0.60
0.30
0.46
Fuente: Consultor
Acorde con estos clculos es posible emplear una longitud de vertimiento de 0.5 m con
una carga de aproximadamente 27 cm.
El consumo o inyeccin de cloro necesario para la desinfeccin del agua al inicio del
sistema se estima en 2 mg/L, el cual se determin en la prueba de tratabilidad.
El cloro gaseoso es proporcionado en cilindros metlicos resistentes, de 68 kg cada
uno. Los equipos de inyeccin de cloro gaseoso se fabrican en un rango que vara entre
1.5 y 4500 kg/da. Una vez determinada la cantidad a suministrar en un da o en un
periodo de tiempo, es necesario determinar la capacidad del equipo que se empleara y
el nmero de cilindros a mantener en almacenamiento para su posterior uso.
Para calcular la capacidad del clorador, en kg, se recurre al concepto de flujo de masa
(densidad por caudal).
6.4.6 Tratamiento de Lodos.
Los lodos generados en el proceso de potabilizacin se caracterizan por una
suspensin de residuos en agua, compuesta por hidrxidos metlicos de aluminio y
partculas de arcilla, limo, materia orgnica e inorgnica, que estn presentes en el
agua cruda y que son transferidas al lodo, en concentraciones que exceden 200 veces
su valor original en el agua.
En trminos generales la calidad de los lodos vara dependiendo del tipo de fuente
utilizada, la cantidad de agua cruda tratada, la poca del ao y el acondicionamiento
169
B = 5m
W=9m
170
V
18
=
=0.2 m
A 2(59)
Los lechos de secado deben estar cubiertos con un techo consistente en una
lmina delgada de polietileno transparente que permite el paso de los rayos
solares pero impide el ingreso de aguas lluvias.
6.5
ALMACENAMIENTO
Tanque
Tanque Alto
Tanque Altos de la
Virgen
Tanque El Bosque
Dimetro
Tubera de
Lavado
"
m
8
0.20
rea
Seccin Altura, h superfic
ial
2
m
m
m2
0.03243
2.10
76.0
0.15
0.01824
1.31
133.3
1.9
0.10
0.00811
2.15
11.3
0.5
Tiempo
Vaciado
Horas
0.8
Como se observa en la tabla anterior, todos los tanques cumplen con la hora mnima de
vaciado de 8 horas. Adicional a esto, cada tanque cuenta con tuberas de ventilacin y
rebose que permiten su adecuado funcionamiento. Los caudales de rebose son suficientes
para poder liberar caudales en caso de requerirse.
TANQUE DE LA PTAP
172
Esta estructura se encuentra en buen estado, no presenta filtraciones o fugas, aun cuando
presenta algunas fisuras menores en sus paredes internas y externas. Distribuye al 60% del
centro del Municipio de Cajamarca.
Esta estructura se encuentra en buen estado, no presenta filtraciones o fugas, aun cuando
presenta algunas fisuras menores en sus paredes internas y externas, distribuye al resto
del municipio.
Los tanques que componen la red de distribucin se encuentran en buen estado, y las
nicas mejoras preventivas propuestas corresponden a obras de impermeabilizacin
173
6.6
RED DE DISTRIBUCIN
Mnima
La presin mnima en la red depende del nivel de complejidad del sistema, tal como se
presenta en la Tabla 65, a continuacin.
Tabla 65. Presiones mnimas en la red de distribucin
Nivel de Complejidad del
Sistema
174
98.1
98.1
147.2
147.2
10
10
15
15
Las presiones mnimas deben tenerse cuando por la red de distribucin est circulando
el caudal de diseo.
Mxima
El valor de la presin mxima tenida en cuenta para el diseo de las redes menores de
distribucin, para todos los niveles de complejidad del sistema, es de 60 metros.
La presin mxima establecida en este literal corresponde a los niveles estticos, es
decir, cuando no haya flujo en movimiento a travs de la red de distribucin pero sobre
sta est actuando la mxima cabeza producida por los tanques de abastecimiento o
por estaciones elevadoras de presin.
La presin mxima no debe superar la presin de trabajo mxima de las redes de
distribucin, establecidas en las normas tcnicas correspondientes a cada material.
6.6.1.3 Dimetro
Mnimo
Para aquellos casos de los niveles bajo y medio de complejidad en los cuales exista
una red matriz y para los niveles medio alto y alto de complejidad, los dimetros
mnimos para la red matriz se presenta en la Tabla 66, a continuacin.
Tabla 66. Dimetros mnimos de la red matriz
Nivel de Complejidad del Sistema
Bajo
Medio
Medio alto
Alto
Dimetro mnimo
64 mm (2.5 pulgadas)
100 mm (4 pulgadas)
150 mm (6 pulgadas)
300 mm (12 pulgadas)
mm
38.1 mm
50 mm
Dimetro mnimo
"
(1.5 pulgadas)
(2.0 pulgadas)
100 mm
(4.0 pulgadas)
Zona comercial e
industrial
63.5 mm
(2 pulgadas)
Zona residencial
150 mm
(6 pulgadas)
Zona comercial e
industrial
75 mm
(3 pulgadas)
Zona residencial
Medio alto
Alto
Zona
-
Los clculos hidrulicos de la red de distribucin deben hacerse con los dimetros
reales internos de las tuberas y materiales escogidos.
6.6.1.4 Velocidad
Mnima
Mxima
En general, se adopta una velocidad mxima de 6 m/s para evitar la degradacin del
material de las tuberas.
176
Mnima
Mxima
177
179
Tabla 68. Presiones mximas y mnimas en nudos crticos, Cajamarca 2038, Sector 1 modificado.
ID Nudo
()
165
166
167
168
169
108
109
Presin
Mxima
(mca)
6.88
7.78
8.31
8.72
10.82
10.36
9.37
Presin
Mnima
(mca)
5.39
6.45
7.02
7.52
9.65
9.27
8.28
ID Nudo
()
138
139
172
173
174
177
Presin
Mxima
(mca)
8.99
8.91
7.82
9.38
8.39
8.15
Presin
Mnima
(mca)
7.89
7.80
7.33
8.55
7.61
7.43
ID Nudo
()
165
166
167
168
169
Presin
Mxima
(mca)
6.61
7.55
8.09
8.53
10.63
Presin
Mnima
(mca)
3.80
5.16
5.76
6.41
8.57
ID Nudo
()
138
139
145
172
173
Presin
Mxima
(mca)
8.83
8.83
11.04
7.81
9.36
Presin
Mnima
(mca)
6.96
6.96
9.16
7.38
8.60
180
ID Nudo
()
107
108
109
Presin
Mxima
(mca)
11.16
10.20
9.21
Presin
Mnima
(mca)
9.33
8.35
7.35
ID Nudo
()
174
177
Presin
Mxima
(mca)
8.37
9.38
Presin
Mnima
(mca)
7.66
8.73
Observando la Tabla 68 se puede ver que de mantenerse el esquema actual del sector
1, en el cual el tanque alto abastece de agua algunas zonas sobre el margen izquierdo
de la carrera sptima, el nmero de nudos que presentan presin por debajo de 10 mca
aumentara a 15 y algunos nudos como los nudos 165, 166, 167 y 168 presentaran
presiones por debajo de 6 mca (el nudo 165 llegara a tener presiones inferiores a los 4
mca). Las bajas presiones y el aumento en el nmero de nudos por debajo de 10 mca,
ocurre debido a que las tuberas transportaran el caudal que debe suministrarse en la
carrera sptima con calle 17, 16, 15 y 14 y por lo tanto se presentaran mayores
prdidas de energa por friccin y accesorios, ocasionadas por un mayor caudal
transportado. Por esta razn se opt por definir el Sector 1, tal como se muestra en la
Ilustracin 11 colocando un tapn de 3 que evite el paso del agua a las zonas
ubicadas sobre la carrera sptima, entre calle 17 y 14.
Es importante mencionar que con la topologa propuesta para el Sector 1, se asegura el
abastecimiento de todos los nudos de consumo durante los prximos 25 aos. Las
presiones que se presentan en el sector son suficientes para poder llevar el agua a
cada una de las viviendas que comprenden esta zona, pero es importante recalcar que
se debe dejar de abastecer los nudos de la carrera sptima entre calles 17 y 14, con el
fin de mantener presiones adecuadas en este sector. En la siguiente tabla se muestran
las presiones mximas y mnimas en los nudos que presentarn presiones por debajo
de 10 mca en el ao 2012:
181
Tabla 70. Presiones mximas y mnimas en nudos crticos, Cajamarca 2012, Sector 1 modificado.
ID Nudo
()
165
166
167
168
108
109
Presin
Mxima
(mca)
6.95
7.83
8.37
8.77
10.41
9.42
Presin
Mnima
(mca)
5.90
6.90
7.46
7.93
9.64
8.65
ID Nudo
()
138
139
172
173
174
177
Presin
Mxima
(mca)
9.04
8.95
7.84
9.41
8.42
8.18
Presin
Mnima
(mca)
8.26
8.18
7.50
8.83
7.87
7.67
VRP2
21
VRP1
184
Ilustracin 13. Presiones en red de distribucin Cajamarca Sector 2, 2012, Esquema propuesto.
Dimet
ro (in)
1.5
2
3
4
6
8
Total
(m)
PVC
0
252.35
2604.59
910.40
93.43
0.00
AC
0
228.10
768.99
0.00
79.61
95.85
3860.78
1172.55
Tabla 72. Presiones mximas y mnimas en nudos con presiones superiores a 40 mca, Cajamarca
2038, Sector 2.
ID Nudo
()
51
52
53
Presin Presin
Mxima Mnima
(mca)
(mca)
46.27407 41.29864
84
12
48.89062 43.82706
12
83
52.39289 47.32567
86
6
ID Nudo
()
72
73
74
Presin Presin
Mxima Mnima
(mca)
(mca)
49.22879 44.09531
03
02
49.22822 44.09122
95
85
49.08678 43.93945
05
31
186
ID Nudo
()
54
58
59
60
61
62
63
64
65
66
71
Presin
Mxima
(mca)
52.38782
88
46.90164
95
46.90155
79
47.77914
81
48.34949
11
48.34582
52
50.78918
46
53.48884
58
53.48883
06
56.20820
62
49.48595
05
Presin
Mnima
(mca)
ID Nudo
()
47.28722
41.94300
08
41.94207
38
75
42.79842
43.33666
23
43.31890
87
45.71454
24
48.38829
42
48.38822
17
51.10685
35
44.51350
4
84
76
83
94
190
123
201
202
206
Presin
Mxima
(mca)
51.69847
87
54.69644
17
50.49682
62
53.06924
06
55.24866
1
55.61605
83
57.51274
49
53.48883
06
53.48883
06
53.06942
37
Presin
Mnima
(mca)
46.56443
02
49.56126
02
45.34884
64
47.91819
38
50.09108
73
50.46979
9
52.37675
09
48.38819
5
48.38819
5
47.91837
31
187
188
Dimet
ro (in)
1.5
2
3
4
6
8
Total
(m)
3754.36
190
Carrera 7a
Por otro lado, con el objetivo de aislar el Sector 6 nicamente se requiere cerrar dos
vlvulas que se ubicarn sobre las calles 5 y 4, que permitirn dejar inoperante las
tuberas ubicadas sobre el rea correspondiente al Sector 6. En la siguiente figura se
muestra un esquema de la ubicacin de las vlvulas de corte del Sector 6.
Las 4 vlvulas que se han mencionado para esta zona de presin (una PRV y 3 de
cierre) corresponden a vlvulas de 3 pulgadas. Teniendo en cuenta lo dicho hasta el
191
Presin Presin
ID Nudo Mxima Mnima
()
(mca)
(mca)
18
36.17
34.20
19
38.77
34.97
20
39.33
35.32
24
16.22
13.68
25
20.06
17.59
26
25.10
22.38
30
18.02
15.25
31
20.67
17.90
32
24.45
21.68
34
19.77
16.94
35
21.45
18.63
36
22.77
19.95
37
26.68
23.86
38
28.02
25.19
39
23.05
20.20
40
22.30
19.44
41
22.52
19.65
Presin Presin
ID Nudo Mxima Mnima
()
(mca)
(mca)
70
26.81
22.93
77
18.52
14.65
78
21.34
17.47
79
24.28
20.40
80
24.28
20.39
81
27.67
23.75
82
28.57
24.62
85
16.61
12.67
86
19.25
15.33
87
23.49
19.57
88
25.82
21.89
89
25.82
21.89
90
25.82
21.89
91
27.47
23.53
92
31.83
27.89
93
32.01
28.07
95
17.94
13.99
192
Presin Presin
ID Nudo Mxima Mnima
()
(mca)
(mca)
96
22.64
18.71
97
22.58
18.66
98
25.92
21.99
188
17.22
13.41
189
18.52
14.66
193
16.58
13.81
196
19.67
16.82
192
13.95
11.41
203
46.29
41.42
204
17.22
13.41
205
52.31
24.14
207
17.34
13.47
208
20.67
17.90
Tal como se pudo observar en la tabla anterior y los resultados descritos, es claro que
se logr una reduccin importante en la presin que se presenta en los nudos que
componen los sectores 6 y 7. Como se ha mencionado anteriormente, es importante
lograr una reduccin de presiones en este sector, debido a que el 72% de sus tuberas
son de AC con ms de 40 aos de instalacin y por lo tanto presentan un estado
totalmente deteriorado que permite fugas de agua. Si se tiene en cuenta que con el
esquema actual de la red, la presin promedio en los nudos correspondientes a los
sectores 6 y 7, es de 53.41 mca, con la nueva sectorizacin se logr una reduccin del
46% en la presin en los nudos.
En cuanto a velocidades, la velocidad mxima que se presenta en esta zona de presin
no supera los 3.5 m/s, siendo la mxima velocidad en el sector igual a 3.11 m/s.
Sntesis Zona de Presin VRP 2: A diferencia de los Sectores 1, 2 y 3 esta zona de
presin cuenta en su mayora con tuberas de AC. Con el esquema propuesto las
presiones se reducen de forma considerable de tal forma que se reducen los caudales
193
194
La ilustracin superior muestra la topologa del Sector 4. En color rojo se muestran las
tuberas de AC y en color azul las tuberas de PVC. En la Tabla 75 se resumen las
longitudes de las diferentes tuberas del sector, de acuerdo a su dimetro y material:
195
Dimet
ro (in)
1.5
2
3
4
6
8
Total
(m)
1588.54
Al igual que los Sectores 6 y 7, en este sector se presenta una mayor cantidad de
tuberas en AC y por esta razn es necesario reducir las presiones actuales con el
objetivo de minimizar los caudales de fugas y el constante deterioro de las tuberas de
AC. En la siguiente tabla se presentan las presiones en los nudos de este sector en el
ao 2038:
Tabla 76. Presiones mximas y mnimas en nudos, Cajamarca 2038, Sector 4.
ID
Nudo
()
18
19
20
21
22
23
27
28
29
33
43
44
Presin Presin
Mxima Mnima
(mca)
(mca)
36.17
34.20
38.77
34.97
39.33
35.32
45.20
40.50
48.54
43.36
23.33
23.33
25.00
25.00
25.56
24.99
26.00
26.00
29.09
29.03
44.69
39.86
46.29
41.42
ID
Nudo
()
125
126
127
128
129
130
131
132
133
134
135
136
Presin Presin
Mxima Mnima
(mca)
(mca)
29.39
24.76
29.00
21.41
36.31
26.44
34.17
22.25
36.27
24.33
35.81
22.28
37.95
23.62
47.93
33.50
38.74
23.93
48.58
33.76
37.85
22.79
37.85
22.78
196
Presin Presin
Mxima Mnima
(mca)
(mca)
48.72
42.45
27.08
24.86
ID
Nudo
()
137
198
Presin Presin
Mxima Mnima
(mca)
(mca)
36.64
21.52
19.12
19.12
197
198
Sntesis Zona de Presin Tanque El Bosque: este sector funcionar tal como ocurre
actualmente. La cabeza que le proporciona el tanque es suficiente para poder cumplir
con presiones promedio de 20 mca y no presentar problemas de daos en tuberas ni
bajas presiones.
Una vez se han definido los 7 sectores operativos y 5 zonas de presin, en las
siguientes grficas se muestran los mapas de presiones en toda la red:
200
35 mca. <
Presin < 60
mca.
Hidrantes en la Red
De acuerdo a los planos de la topologa actual de la red de Cajamarca, en la red se
tienen 4 hidrantes ubicados en la calle 9 con carrera 7, Carrera 8 con Calle 6 y la
Calle 6 con Carrera 7. De acuerdo con el RAS 2000 Seccin B.2.8.1. se recomienda
una distancia mnima de 300 metros entre hidrantes y el caudal de descarga de estos
debe ser mnimo de 5 L/s. Para los niveles de complejidad bajo y medio el dimetro
mnimo de los hidrantes debe ser de 3. Dado que los hidrantes para el municipio de
Cajamarca tendrn un caudal inferior a 32 L/s, su color ser Rojo y la presin mnima
requerida en estos (de acuerdo con el RAS 2000 B.7.6.9.6.) ser de 3 mca.
Teniendo en cuenta lo anterior, se busc tener un mnimo de 1 hidrantes instalado en
cada sector, de manera que conservando los que se encuentran instalados
actualmente, se pueda actuar en cualquier zona para combatir los incendios. En la
siguiente tabla se resumen las coordenadas y tubera de conexin a los nuevos
hidrantes del sistema:
Tabla 77. Hidrantes nuevos en el sistema.
Hidrant
e
1
Sector
Norte
Este
Conexi
n
Sector 2 983293.2 850187.3 PVC 3"
11
66
201
Sector 7
Sector 4
Sector 4
Sector 5
Sector 1
Sector 1
982903.6
85
982724.2
36
982491.8
71
982037.8
97
982458.1
79
982518.3
72
850336.2
52
850029.2
14
849790.7
47
849652.6
48
849242.6
31
849100.3
72
AC 3"
AC 3"
AC 3"
AC 3"
PVC 3"
PVC 3"
PVC 3"
Sector
Operativ
Zona de Presin
o
1
Tanque Alto
Elemento de Control
Tanque Alto
202
2
3
4
5
6
7
Tanque Altos de la
Virgen
Tanque Altos de la
Virgen
VRP-1
Tanque El Bosque
VRP-2
VRP-3
VC-1
Tanque Altos de la
Virgen
VRP-1
Tanque El Bosque
VC-2 y VC-3
VC-4
PRESUPUESTO
Para cada uno de los componentes del sistema se realizaron los presupuestos de las
obras que requieren ser ejecutadas, con base en el listado de precios de la Empresa de
Servicios Pblicos.
Las actividades que no se incluyen en el listado de precios disponible, se elaboraron
con base en las listas de precios de fabricantes y cotizaciones vigentes del mercado.
203
ADUCCIONES Y
CONDUCCIONES
OBRAS PRELIMINARES
Subtotal obras preliminares
DESARENADOR-CAMARA INTERMEDIA Q. CHORROS
BLANCOS
DESARENADOR-CMARA INTERMEDIA Q. DOS
QUEBRADAS
PTAP CAJAMARCA
Subtotal estructuras Ptap Cajamarca
Subtotal suministro de tuberas
BOCATOMA DOS QUEBRADAS CAJAMARCA
CAPTACIN
$ 8.379.202,00
$ 8.379.202,00
$47.960.151,40
$54.015.195,81
$15.193.618,68
$ 117.168.965,89
$ 25.895.716,85
$615.565.222,02
$ 615.565.222,02
$ 396.111,00
$325.911.782,18
$ 325.911.782,18
$ 31.425,00
$ 2.357.973,67
$ 37.580.303,85
$ 39.938.277,52
$ 1.605.603,00
$ 49.741.744,36
$ 14.181.116,86
$ 63.922.861,22
$ 3.393.731,00
204
$ 42.946.332,00
%
29%
7%
31.322.586,85
12%
4%
$
$
3.758.710,42
1.403.251,89
2%
$
$
36.484.549,16
34.238.754,92
VALOR
$ 1.213.832.642,82
$
352.011.466,42
$
109.609.087,65
$ 1.675.453.196,89
$ 1.711.937.746,05
$ 1.746.176.500,97
REFERENCIAS
205
ANEXOS
Anexo 1.Topografa
Anexo 2. Concesin de aguas
Anexo 3. Estudio de suelos
Anexo 4. Calidad de aguas
Anexo 5. Memorias hidrulicas
Anexo 6. Diseos estructurales
Anexo 7. Planos
Anexo 8. Costos y presupuestos
206
207