Académique Documents
Professionnel Documents
Culture Documents
FOR APPROVAL
Rev
Description
CONTRACTOR
7/12/2012
WD
NYI
NKW
Date
Prepared
Checked
Approved
Doc No.
DR1412-00-C-CS-0001-18
Konsorsium PP
Page No:
1 of 15
REV
JOB NO: -
DOC NO:
DR1412-00-C-CS-0001-18
Date
Description
Page 2 of 15
DATE
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
REV
JOB NO: -
REV
DOC NO:
DR1412-00-C-CS-0001-18
DATE
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
TABLE OF CONTENTS
1. GENERAL
10
Page 3 of 15
JOB NO: -
REV
DOC NO:
DR1412-00-C-CS-0001-18
DATE
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
1. GENERAL
1.1. Outline of Structure
Project name
Client
Location
Facility
Foundation Type
:
:
:
:
:
PLTMG Duri
PT. PLN (Persero)
Duri, Sumatera
Water Treatment Container
Shallow Foundation
1.4. Materials
Classification and engineering properties of major material to be used for this foundation are listed below :
1. Reinforcing Steel Bar :
2
4000 kg/cm
Yield strength of Deformed bar, fy
2
Yield strength of Plain bar, fy
2400 kg/cm
2. Concrete :
2
Concrete Grade for Structure, fc'
300 kg/cm
3
Unit weight of concrete, c
2400 kg/m
3. Soil:
3
Unit weight of soil, soil
1600 kg/m
Borehole reference (refer to Attachment B)
BH-2
Page 4 of 15
JOB NO: -
Length,
Width,
Height,
2.2 Foundation Layout
y
LT =
WT =
HT =
REV
DOC NO:
DR1412-00-C-CS-0001-18
DATE
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
6050 mm
2440 mm
2590 mm
x
z
2200
5800
PLAN
Lx =
Lz =
Perimeter, P =
150
GL +0.000
5800
6050 (CONTAINER LENGTH)
SECTION
2200
2440
(CONTAINER WIDTH)
SECTION
Page 5 of 15
5.8 m
2.2 m
16 m
TOC +0.150
JOB NO: -
REV
DOC NO:
DR1412-00-C-CS-0001-18
DATE
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
BP
SOIL
CUT
hS = 300 mm
TOC +0.200
hF = 300 mm
TOC -0.100
BF
LF
BF =
LF =
BP =
hP =
hS =
hF =
1000 mm
1000 mm
300 mm
300 mm
300 mm
300 mm
3. LOADING
3.1 Dead Load
W E, W M
WF
0.5WS
0.5WS
WE =
2400 kg
W OP =
5000 kg
Weight of foundation,
W F = c*[(BF*P*hF)+(BP*P*(hP+hS))]
=
18432 kg
W S = soil*[((BF*P)-(BP*P))*hS]
=
DE = W E+W F+W S
=
26208 kg
D = W OP+W F+W S
=
qLL
5376 kg
28808 kg
qLL =
200 kg/m2
(for operators & tools)
Total live load in container
L = qLL*LT*W T
=
2952 kg
Page 6 of 15
JOB NO: -
REV
DOC NO:
DR1412-00-C-CS-0001-18
DATE
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
W = Q*G*C*A
q = velocity pressure
2
2
(N/m )
= 0.613Kz*Kzt*Kd*V *I
Kz = velocity pressure exposure coefficient evaluated at height z
=
0.85 (for exposure C, z = 0-4.6 m, Table 6-3 ASCE7-05)
Kzt = topographic tactor
1.0
=
Kd = wind directionality factor
=
V=
=
I=
=
G=
=
Cp =
0.95 (for structure type: round chimneys, tanks, and similar structures, Table 6-4 ASCE7-05)
basic wind speed
40 km/h =
11.11 m/s
importance factor
1.00
gust effect factor
0.85
pressure coefficient
=
Q=
0.70
2
43 N/m
2
4.36 kg/m
W x = Q*W T*HT
=
28 kg
W z = Q*LT*HT
=
432 kg
Page 7 of 15
JOB NO: -
DOC NO:
DR1412-00-C-CS-0001-18
at short period
at 1 sec period
Site coefficient,
Design spectral acceleration parameters.
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
IV
1.5
SE
(see attachment C)
SS =
0.4
(see attachment C)
S1 =
0.25
2.02
3
0.54
(see attachment C)
SDS = (2/3)*Fa*SS
Fa =
Fv =
SDS =
SD1 = (2/3)*Fv*S1
SD1 =
Cs = SDS/(R/I)
Seismic load,
V = Cs*Wt
R=
0.50
2
Cs =
0.404
(see attachment C)
(see attachment C)
(see attachment C)
V = 0.404*Wt
Empty condition,
Wt = W E+L
=
5352 kg
VEX =
2162 kg
V
x
Operating condition,
Wt = W OP+L
=
7952 kg
VOX =
3213 kg
Seismic Load in X Direction
Empty condition,
Wt = W E+L
=
5352 kg
VEZ =
2162 kg
Operating condition,
Wt = W OM+L
=
7952 kg
VOZ =
3213 kg
Page 8 of 15
DATE
REV
JOB NO: -
REV
DOC NO:
DR1412-00-C-CS-0001-18
DATE
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
For design of concrete structure (Ultimate Strength Design Method) shall refer to ACI 318
D=
L=
T0 =
R0 =
C=
P0 =
M0 =
E=
W=
H=
Dead Load
Live Load
Temperatur/Thermal*
Reaction of Piping + Pipe Hanger, Cable Tray, and Vibration*
Crane Load*
Equipment*
Lane Load, Soil Pressure, Ground Water, or Impact*
Seismic Load = VX0.3VZ and VZ0.3VX
Wind Load
Hydrostatic Load*
Page 9 of 15
JOB NO: -
DOC NO:
DR1412-00-C-CS-0001-18
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
x
z
2200
5800
PLAN
Perimeter, P =
Normal condition
16 m
qD(e) = DE/P
= 26208/16
=
1638 kg/m
=
16.1 kN/m
qD(o) = D/P
= 28808/16
= 1800.5 kg/m
=
17.7 kN/m
qL = L/P
= 2952/16
=
184.5 kg/m
=
1.8 kN/m
Page 10 of 15
DATE
4. STRUCTURAL ANALYSIS
4.1 Support Reactions
y
REV
JOB NO: -
DOC NO:
DR1412-00-C-CS-0001-18
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
Wx
0.5hT
Lx = 5.8m
qwx = [(Wx*0.5hT)/Lx]/Lz
= (28*0.5*2.59/5.8)/2.2
=
2.8 kg/m
=
0.03 kN/m
Z-Direction
Wz
0.5hT
Lz = 2.2m
qwz = [(Wz*0.5hT)/Lz]/Lx
= (432*0.5*2.59/2.2)/5.8
=
43.8 kg/m
=
0.43 kN/m
4.1.4 Seismic Load
X-Direction
ym
Lx = 5.8m
ym = center of mass from Dead Load & Live Load where seismic load works
yD = center of mass from Dead Load only, = 0.5hT
=
1.295 m
yL = center of mass from Live Load only, = 0 m (on floor)
=
0m
ym = (D*yD + L*yL)/(D+L)
=
1.175 m
qvx = [(Vx*ym)/Lx]/Lz
= (3213*1.17/5.8)/2.2
=
295.8 kg/m
=
2.90 kN/m
Page 11 of 15
DATE
Vx
REV
JOB NO: -
REV
DOC NO:
DR1412-00-C-CS-0001-18
DATE
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
Z-Direction
Vz
ym
Lz = 2.2m
qvz = [(Vz*ym)/Lz]/Lx
= (3213*1.17/2.2)/5.8
=
295.8 kg/m
=
2.90 kN/m
4.1.5 Unfactored Load Combination at Foundation no 1
Loading Condition Load Combination
DE+L
Empty/Construction
1
DE+L+W x
2
Test
Normal
Severe
3
4
5
q (kN/m)
17.9
17.9
DE+L+W z
D+L
D+L
D+L+Vx+0.3Vz
D+L-Vx-0.3Vz
D+L+Vz+0.3Vx
D+L-Vz-0.3Vx
0.7D+Vx+0.3Vz
0.7D-Vx-0.3Vz
0.7D+Vz+0.3Vx
18.3
19.5
19.5
23.2
15.7
23.2
15.7
15.0
8.6
15.0
0.7D-Vz-0.3Vx
D+Wx
D+Wz
8.6
17.7
18.1
qmax =
23.2 kN/m
qmin =
8.6 kN/m
qmax =
27.8 kN/m
qmin =
10.6 kN/m
2
3
4
6
7
q (kN/m)
20.1
1.1DE+1.3L+1.3Wz
1.1D+1.3L
1.4D+1.7L
1.1D+1.3L+1.4(Vx+0.3Vz)
1.1D+1.3L+1.4(-Vx-0.3Vz)
1.1D+1.3L+1.4(Vz+0.3Vx)
1.1D+1.3L+1.4(-Vz-0.3Vx)
0.9D+1.4(Vx+0.3Vz)
0.9D+1.4(-Vx-0.3Vz)
0.9D+1.4(Vz+0.3Vx)
0.9D+1.4(-Vz-0.3Vx)
1.1D+1.3L+1.3Wx
20.6
21.8
27.8
27.1
16.5
27.1
16.5
21.2
10.6
21.2
10.6
21.8
1.1D+1.3L+1.3Wz
22.3
15.9
16.5
0.9D+1.3Wx
0.9D+1.3Wz
Page 12 of 15
JOB NO: -
REV
DOC NO:
DR1412-00-C-CS-0001-18
DATE
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
BH-2
qall =
=
I=
q'all =
50 kPa
5.10 ton/m2
1.33
66.50 kPa
5. FOUNDATION STABILITY
5.1 Soil Bearing Capacity
q'max = qmax/BF
=
23.2 kPa
< qall
[OK]
q'min = qmin/BF
=
8.6 kPa
>0
[OK]
62 > 2.0
[ OK ]
1.175 m
SF =
[ OK ]
=
0.3
H = max(W x, W z, Vx, Vz)
=
31.5 kN
R = (D+L)*
=
93.5 kN
SF =
3.0 > 2.0
[OK]
JOB NO: -
REV
DOC NO:
DR1412-00-C-CS-0001-18
DATE
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
6. FOOTING REINFORECEMENT
6.1 Main Reinforcement (Perpendicular to Footing Direction)
From factored laod combination,
q'max = qmax/BF
2
q'max =
27.8 kN/m
a = 0.5*(BF-BP)
=
0.35 m
Mu
9.73 kNm/m
qmax
Reinforcement Design
Footing thickness
concrete cover,
t=
cov =
d = t - cov =
b=
width,
Rn = Mult/(0.8*b*d2)
Rn =
f c' =
fy =
0.85 fc `
2Rn
1 1
fy
0.85 fc
max =0.75
300
75
225
1000
mm
mm
mm
mm
0.240
30.6 MPa
407.7 MPa
0.059%
max =
2.420%
min =
0.18%
"Exceed maximum"
req'd =
req'd =
ASreq'd =
min
(4/3)min
0.5min
0.090%
2
202.5 mm
Page 14 of 15
JOB NO: -
Reinforcement,
diameter
spacing
=
=
As =
13 mm
200 mm2
664 mm
DOC NO:
DR1412-00-C-CS-0001-18
BY
CHKD
APVD
6/19/2012
WD
NYI
NKW
[ OK ]
Reinforcement,
diameter
spacing
0.18%
2
405 mm
=
=
As =
13 mm
200 mm2
664 mm
300
300
300
Page 15 of 15
[ OK ]
DATE
min =
Asreq'd =
REV