Académique Documents
Professionnel Documents
Culture Documents
dynamic
indoor rower
Rail Assembly
Shuttle
Channel
Handle
Rear Foot
2 20-penny nails
Installation
leader tape
(Located in plastic
bag with manuals)
Page 2
0914
CONCEPT2.COM
photo A
photo C
Shuttle
photo D
Shuttle
photo E
Page 3
0914
CONCEPT2.COM
photo F
photo G
Start all four screws into the threaded holes. Do not fully
tighten the screws until all four screws are in place. See
photo H.
photo H
Seat Bungee
Seat Bungee
Anchor
photo J
Page 4
0914
CONCEPT2.COM
Rail Assembly
photo K
Shuttle Channel
Front Leg/
Monitor
Arm
Assembly
Shuttle
Channel
photo L
Rail Assembly
1
Front Leg/
Monitor Arm
Assembly
Shuttle Channel
2
photo M
photo N
0914
CONCEPT2.COM
photo P
photo Q
photo R
Retainer Clip
Generator
Step 10:
Install the Handle Drive Cord
Push the looped end of the handle drive cord
up through the slot in the bottom of the
shuttle channel so that it is directly behind
the lower pulley. See photo T. Pull all of
the handle drive cord out of the top of the
shuttle channel and rest it on the floor.
photo T
Page 6
0914
CONCEPT2.COM
photo V
photo W
photo X
photo Y
0914
CONCEPT2.COM
Top Pulley
photo Z1
Monitor Arm
Front Leg
End Cap
Insert the front leg end cap over open end of front leg
where monitor arm joins the leg. Insert screws all the
way until the screw head meets the end cap. Even
though the screws will continue to spin, they are as
tight as they need to be. See photo Z2.
photo Z2
Front Leg
Page 8
0914
CONCEPT2.COM
Page 9
0914
CONCEPT2.COM
Front Leg/
Monitor Arm
Assembly
Foot Carriage
Wind Shield
Rail Assembly
Shuttle Channel
Caster Wheel
Front Foot
Leveling Screws
Flywheel
Page 10
0914
CONCEPT2.COM