Académique Documents
Professionnel Documents
Culture Documents
1) First thing! Save two copies on your computer with a unique name for each.
2) In Line 2, Column B, enter the process name. This example is for FMEA process.
3) Enter the owners' name(s) in the cells titled "owner", Line 1.
4) Enter the name of items being evaluated: document names, people, tools, etc in Line 2.
5) In the gray cell (Line 3, Column B) enter a question if you have one, such as: "Sampled in previous audit?"
6) In Column B, list your assessment questions. Notice that this example includes positive findings.
7) Very important! In Column S (Yellow cells) assign a score that reflects how important each question is. In this example, negative
numbers subtract from a possible perfect 100, and positive numbers add to the possible score. This it is possible to score more than
100.
8) The assessment results are entered as numbers reflecting every time a finding was noted for each question in each evaluated item
being sampled.
9) In Line 3 (gray cells) enter a "Y" or "N" to show if the item was sampled in the last audit.
10) results will automatically calculate and show up in the charts below.
Score
Totals
Count
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
1 FMEA owner
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
Average
2 FMEA -
(+) (10) Comment blocks give details that show details and/or
18 how the FMEA has changed with process updates: good example 1 1 20 20
of FMEA as a “living document”
19 Score for FMEA -42 130 -200 100 100 200 -150 -260 -120 -170 -10 200 -280 10 -20 -160 280
Score
Totals
Count
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
1 FMEA owner FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
FMEA name
Average
2 FMEA -
(-) (2) Severity Rating(s) do not align with SP-34075: 6.1.9 and
6 Attachment I. (see DIS #1024) 3 1 1 1 -90 -270
(-) (3) RPN calculation is missing, or does not conform to
7 SP-34075: 8.1.5 0. (see DIS #1024) 3 1 1 1 -80 -240
(-) (4) Classification (C or S) of Potential Failure Mode (PFM) does not
8 conform to SP-34075: 6.1.10 (see DIS #1024) 2 1 1 -80 -160
(+) (10) Comment blocks give details that show details and/or
18 how the FMEA has changed with process updates: good example 2 1 1 20 40
of FMEA as a “living document”
19 Score for FMEA ### 30 -50 30 -110 230 -160 -170 -120 -50 -40 200 -290 -30 10 -160 280
0 1 2 3 4 5 6
f Actions Taken IAW BIQ training. SP-34075 does not specify where to recalculate RPNs, only that it will be done. DIS #1062
(-) (2) Severity Rating(s) do not align with SP-34075: 6.1.9 and Attachment I. (see DIS #1024)
(-) (4) Classification (C or S) of Potential Failure Mode (PFM) does not conform to SP-34075: 6.1.10 (see DIS #1024)
ial Cause of Failure, an Occurrence number, Current Process Control and Delectability Rating for listed Failure Modes as per
nd 6.1.12.
(-) (13) No documented action plan found for RPN >200 as per
SP-34075, 8.1.18. DIS #1062.
(-) (14) Recommended Action does not address the process to reduce RPN as per SP-34075, 6.1.14 DIS #1062
(-) (15) Entries should be added to Actions Taken column when new controls change risk factors that impact RPN.
(-) (5) Missing a Recommended Action and/or completion date for high RPN 10 as per SP-34075: 6.1.14 (see DIS #1025)
(+) (7) Was updated after being listed under QAR #06006, DIS #1024 / #1025
(+) (9) Updated to capture recent learnings: good example of FMEA as a “living document”
(+) (6) Recalculated RPN in right hand columns correctly shows risk abatement from Actions Taken.
ails that show details and/or how the FMEA has changed with process updates: good example of FMEA as a “living document”
200
100
-100
-200
-300
FMEA name N FMEA name N FMEA name N FMEA name N FMEA name Y FMEA name Y FMEA name Y FMEA name
200
100
-100
-100
-200
-300
FMEA name N FMEA name N FMEA name N FMEA name N FMEA name Y FMEA name Y FMEA name Y FMEA name
Count Count
Average Average
(-) (2) Severity Rating(s) do not4 align with 3SP-34075: 6.1.9 and Attachment I. (see DIS #1024)
(-) (3) RPN calculation is missing, or does not conform to
SP-34075: 8.1.5 0. (see DIS #1024)
3 3
(-) (11) Should include a Potential Cause of Failure, an Occurrence number, Current Process Control and Delectability Rating for listed Failure Modes as per
SP-34075: 6.1.6, 6.1.7, 6.1.11 2and 6.1.12.3
(-) (13) No documented action plan found for RPN >200 as per
SP-34075, 8.1.18. DIS #1062.2 1