Académique Documents
Professionnel Documents
Culture Documents
1.
2.
3.
In-House model wise/ defect wise Rejection Status for Nov - 2015.
4.
5.
6.
7.
8.
Nov Date
:
2015
HOD
02.12.15/QA
DIV.HEA
D
MD
P/Name
Qty
Problem Details
Action Taken
Resp Status
FI
FI
W&V
05E
05E
05E
W&V
05E
FG
05E
P/Name
Qty
Problem Details
2FS GPD
55
2FS GPD
44
2FS AD
95
2FS AD
75
rust
2FS AD
89
damaged
Action Taken
Resp
Status
PE
In
progress
PE
In
progress
In
actions taken were not effective, Informed to sun
Sun flag progress
flag and waiting for their response.
Informed to sun flag and waiting for the action
plan from sun flag.
During loading in the truck , fall down from the fg
bins, care to be taken
Sun flag
PPC
In
progress
In
progress
Activities
Plan
Actua
l
Gap
20 19
ISO TS activities
Office 5S
Factory 5S
Kaizen implementation
Suggestions given
Trainings(OJT, knowledge
improvement,)
Audits
Countermeasure
Countermeasure
Status
Year to
date
Nov - 15
5+4
KAIZEN
Department: Quality
No: 049
Start :
02.11.2015
Date
End : 02.11.2015
Date
Area : Fibre
flow testing
Name : Monica
Analysis:
Action :
Result
Before
After
Nil
Category
M
Format No: KPI/G/F/001,Rev:0, Rev.date :
01/12/2014
KAIZEN
Department: Quality
No: 050
Start :
23.11.2015
Date
End : 24.11.2015
Date
Area :
Production
office
Name : Monica
Analysis:
Action :
Result
Cost :
Before
After
Nil
Category
M
Format No: KPI/G/F/001,Rev:0, Rev.date :
01/12/2014
KAIZEN
Department: Quality
No: 051
Start :
23.11.2015
Date
End : 24.11.2015
Date
Area : QA lab
Name : Monica
Analysis:
Action :
Result:
Cost :
Before
After
Nil
Category
M
Format No: KPI/G/F/001,Rev:0, Rev.date :
01/12/2014
KAIZEN
Department: Quality
No: 052
Start :
24.11.2015
Date
Area : Press
Table2
Name : Nathiya
Analysis:
Action :
Result:
Proper 5S.
End : 24.11.2015
Date
Cost :
Before
After
Nil.
Category
P
M
Format No: KPI/G/F/001,Rev:0, Rev.date :
01/12/2014