Académique Documents
Professionnel Documents
Culture Documents
Feature ID:ZWF23-05-001
Version: V3.11.10
ZTE CORPORATION
NO. 55, Hi-tech Road South, ShenZhen, P.R.China
Postcode: 518057
Tel: +86-755-26771900
Fax: +86-755-26770801
URL: http://ensupport.zte.com.cn
E-mail: support@zte.com.cn
LEGAL INFORMATION
Copyright 2012 ZTE CORPORATION.
The contents of this document are protected by copyright laws and international treaties. Any reproduction or
distribution of this document or any portion of this document, in any form by any means, without the prior written
consent of ZTE CORPORATION is prohibited.
Revision History
Revision No.
Revision Date
Revision Reason
R1.0
2012-6-18
First eition
SJ-20120802112720-192|2012-06-18 (R1.0)
Contents
Chapter 1 Functional Description ............................................................. 1-1
Chapter 2 Preparations .............................................................................. 2-1
Chapter 3 Data configuration .................................................................... 3-1
Chapter 4 Testing ....................................................................................... 4-1
4.1 Test Purpose...................................................................................................... 4-1
4.2 Steps for Test..................................................................................................... 4-1
4.3 Expected Results ............................................................................................... 4-3
I
SJ-20120802112720-192|2012-06-18 (R1.0)
II
SJ-20120802112720-192|2012-06-18 (R1.0)
Chapter 1
Functional Description
RNC maps RAB QoS parameters from CN to the basic priority used in the UTRAN. And
RNC maps basic priority to Scheduling Priority Indicator (SPI)for HSDPA service
For subscribers connected to the cell, RNC allocates the radio resources based on the
priorities. The configuration of ARP depends on the following factors: ARP assigned by
core network in the service establishment phase, traffic class, THP of I services, radio
channel type, and real-time rate of the subscriber.
The priority used by the RNC is acquired by the mapping of the QoS parameters in the
RAB assignment by the CN. Input parameters are:
l
l
l
Traffic Class
THP
ARP
The RNC maps these parameters to logical channel priority, BP, SP, and AP. For the
general mapping scheme, see the following figure.(Note: C indicates conversation service,
S indicates streaming service, I indicates interactive service, and B indicates background
service.)
1-1
SJ-20120802112720-192|2012-06-18 (R1.0)
Note:
Frame Handling Priority (FHP), Scheduling Priority Indicator, and Common Transport
Channel Priority Indicator on the lur/lub interface adopt the mapping results of BP directly,
that is, the FHP, SPI and BP are the same for aRB. Where, the FHP is the priority of
Node B. It indicates the priority of data scheduling and resource allocation in the resource
congestion. The SPI is used for the queue data scheduling of HSPA. It is an important
basis for packet scheduling and resource allocation of Node B.
The following table is the summary of scenarios applied for basic priority(BP), scheduling
priority(SP) and application priority(AP).
Priority
Function
Scenarios
Basic Priority(BP)
Admission Control
based on BP.
(2) For HSDPA, when resources
for HSDPA are shared by
multiple users, RAN (Node B)
will allocate the code and power
resources to different HSDPA
mobiles according to SPI which
is equal to BP.
(3) For HSUPA, when resources
for HSUPA are shared by
multiple users, RAN (Node B)
will allocate the grant to different
HSUPA mobiles according to
SPI which is equal to BP.
SP of RNC(SP)
Congestion Control
1-2
SJ-20120802112720-192|2012-06-18 (R1.0)
Priority
Function
Scenarios
Application Priority(AP)
Congestion Control
OverLoad Control
downgrading is performed
because of resource
congestion, RNC will select
users to perform downgrading
based on AP.
When overload happens, RNC
will select users to decrease
load based on AP.
1-3
SJ-20120802112720-192|2012-06-18 (R1.0)
1-4
SJ-20120802112720-192|2012-06-18 (R1.0)
Chapter 2
Preparations
License
Feature
License
Service
Hardware Requirement
Hardware requirement is shown in Table 2-1.
Table 2-1 Hardware Requirement
NE
Requirement
RNC
None
NodeB
None
Software Requirement
Software requirement is shown in Table 2-2.
Table 2-2 Software Requirement
NE
Involved
Version
Requirement
UE
YES
UMTS FDD
Number: 1
Category: Any
Release : R6
2-1
SJ-20120802112720-192|2012-06-18 (R1.0)
NE
Involved
Version
Requirement
NodeB
YES
V4.11.10.14
RNC
YES
V3.11.10.11
MSCS
YES
V3.10.20.P6.B1
ZTE equipment
MGW
YES
V3.10.20.P4.B3
ZTE equipment
SGSN
YES
V3.10.10.P2.B5N
ZTE equipment
GGSN
NO
HLR
NO
Topology
Topology is shown in Figure 2-1.
Figure 2-1 Topology
2-2
SJ-20120802112720-192|2012-06-18 (R1.0)
Chapter 3
Data configuration
SGSN/GGSN - ZTE
SGSN should be configured to send the allocationOrRetentionPriority
indication, and then UE can get its priority from HLR. , Please check the IE in
RAB_AssignmentRequestMsg message from SGSN to RNC to make sure the
parameter is configured correctly. It should be as below:
TRANAP_Message.RAB_AssignmentRequestMsg.rAB_SetupOrModifyList.elem[0].rAB_
SetupOrModifyItemFirst.rAB_Parameters.m.allocationOrRetentionPriorityPresent = 1
MSC/MGW - ZTE
N/A
HLR ZTE
l
UE1 :UE1 supports Background service. Set the allocation or retention priority
parameter in HLR by select an index among the SGSN configuration.
RANAP_Message.RAB_AssignmentRequestMsg.rAB_SetupOrModifyList.elem[0].r
AB_SetupOrModifyItemFirst.rAB_Parameters.trafficClass = eRANAP_TrafficClass
_background
TRANAP_Message.RAB_AssignmentRequestMsg.rAB_SetupOrModifyList.elem[0].r
AB_SetupOrModifyItemFirst.rAB_Parameters.maxBitrate.elem[0] = 8192000
TRANAP_Message.RAB_AssignmentRequestMsg.rAB_SetupOrModifyList.elem[0].r
AB_SetupOrModifyItemFirst.rAB_Parameters.maxBitrate.elem[1] = 2048000
TRANAP_Message.RAB_AssignmentRequestMsg.rAB_SetupOrModifyList.elem[0].
rAB_SetupOrModifyItemFirst.rAB_Parameters.allocationOrRetentionPriority.priority
Level = 2
UE2 :UE2 supports Background service. Set the allocation or retention priority
parameter in HLR by select an index among the SGSN configuration.
RANAP_Message.RAB_AssignmentRequestMsg.rAB_SetupOrModifyList.elem[0].r
AB_SetupOrModifyItemFirst.rAB_Parameters.trafficClass = eRANAP_TrafficClass
_background
TRANAP_Message.RAB_AssignmentRequestMsg.rAB_SetupOrModifyList.elem[0].r
AB_SetupOrModifyItemFirst.rAB_Parameters.maxBitrate.elem[0] = 8192000
TRANAP_Message.RAB_AssignmentRequestMsg.rAB_SetupOrModifyList.elem[0].r
AB_SetupOrModifyItemFirst.rAB_Parameters.maxBitrate.elem[1] = 2048000
3-1
SJ-20120802112720-192|2012-06-18 (R1.0)
TRANAP_Message.RAB_AssignmentRequestMsg.rAB_SetupOrModifyList.elem[0].r
AB_SetupOrModifyItemFirst.rAB_Parameters.allocationOrRetentionPriority.priorityL
evel = 11
The UE1s priority is higher than UE2s
RNC
l
Path: View > Configuration Management > RNC Managed Element > RNC Radio
Resource Management > QOS Relevance Configuration > QOS Configuration >
QOS Configuration > ARP Segment Number
l
3-2
SJ-20120802112720-192|2012-06-18 (R1.0)
Path: View > Configuration Management > RNC Managed Element > RNC Radio
Resource Management > QOS Relevance Configuration > QOS Configuration >
QOS Configuration > THP Segment Number
l
BP Segment
Path: View > Configuration Management > RNC Managed Element > RNC Radio
Resource Management > QOS Relevance Configuration > QOS Configuration >
QOS Configuration > Basic Priority Segment Number
l
Basic Priority
UE1:ARP Segment=1,corresponding Basic Priority=7
UE2:ARP Segment=3,corresponding Basic Priority=0
Path: View > Configuration Management > RNC Managed Element > RNC Radio
Resource Management > QOS Relevance Configuration > QOS Configuration >
QOS Configuration > Basic Priority Management > Basic Priority
l
SPI
3-3
SJ-20120802112720-192|2012-06-18 (R1.0)
For HSDPA ,RNC maps the basic priority to Scheduling Priority Indicator (SPI),so the
SPI of UEs are:
UE1:BP=7 > SPI=7
UE1:BP=0 > SPI=0
NodeB
N/A
3-4
SJ-20120802112720-192|2012-06-18 (R1.0)
Chapter 4
Testing
Table of Contents
Test Purpose ..............................................................................................................4-1
Steps for Test .............................................................................................................4-1
Expected Results .......................................................................................................4-3
4-1
SJ-20120802112720-192|2012-06-18 (R1.0)
4-2
SJ-20120802112720-192|2012-06-18 (R1.0)
Chapter 4 Testing
5. After UE2 starts FTP downloading,compare the downloading rate of UE1 with UE2.
The average downloading rate of UE1 is higher than that of UE2.
4-3
SJ-20120802112720-192|2012-06-18 (R1.0)
4-4
SJ-20120802112720-192|2012-06-18 (R1.0)
Chapter 5
Counter List
C310080055
C310080197
C310080210
C310251478
C310040070
C310030491
C310010160
C310010299
C310800028
C310454513
C310504782
5-1
SJ-20120802112720-192|2012-06-18 (R1.0)