3.1 All Engineering drawings and specifications prepared and signed by
a Registered Engineer on the National Professional Engineers
Register (N.P.E.R.)
3.2 Engineering drawings signed and checked by an experienced
designer (Not the certifier i.e. not person signing 3.1 above)
Page 2 of 22
Yes
N/A
Yes
N/A
Yes
N/A
LOCALITY PLAN
5.1 North point and scale noted
5.2 Major Road names and adjacent localities
5.3 Development Area outlined and shade or crosshatched
Page 3 of 22
Yes
N/A
Roadworks
7.1 Road layout conforms with Council Road hierarchy classifications
7.2 Road geometry conforms to designated speed environments
7.3 Road hierarchy classification and speed environment layout
included
7.4 Preliminary pavement design (using 4 day soaked CBR) included
7.5 Sight distance diagrams for intersections (long sect and plan) and
crests included
7.6 Traffic Impact Study prepared
7.7 Traffic Control Devices Certificate of Approval
Stormwater
7.8 Major/Minor systems conform with Councils stormwater strategy
7.9 Checked, and provided to Council the extent of flooding/backup
7.10 Other drainage and catchment calculations not detailed on
stormwater calculation sheet included. i.e. Slope area graphs,
discharge formulae and complete culvert design details etc.
Water supply and sewerage
7.11 Layouts conforms with Councils strategy
7.12 Network analysis included
7.13 Design to cater for future extensions
7.14 Existing systems have necessary capacity
Imported Fill
7.15 Fill source and nature ascertained, details included
7.16 Transport route for imported fill included
7.17 Suitable spoil location details included
7.18 Existing and finished surface contours
Miscellaneous
7.19 Checked conflicts with existing services
7.20 Any relocation of existing services and details included
7.21 Non-conforming design report included
Page 4 of 22
EARTHWORKS
Yes
N/A
Yes
N/A
ROADWORKS DRAWINGS
Drafting Drawings Include:2.1 Approved road names and road reserve boundaries
2.2 Allotment boundaries, numbers, easements
2.3 Centreline or construction line showing:
Chainages
Bearings
Curve radii
Arc length
Tangent length
Page 5 of 22
Yes
N/A
Page 6 of 22
Yes
N/A
Page 7 of 22
Yes
N/A
Page 8 of 22
C STORMWATER DRAINAGE
1
Yes
N/A
Yes
N/A
Yes
N/A
Page 9 of 22
Yes
N/A
SIDE Entry Pit connection details (may be in table form except where
conflicting with other services or total length of branch > 25 metres)
Longitudinal section for each line containing:4.1 Chainages
4.2 Existing Natural surface levels and design finished surface levels
4.3 Maintenance Shaft and headwall chainages together with surface
levels and inlet and outlet invert levels
4.4 Distances between Maintenance Shafts / Side Entry Pits / headwalls
4.5 Grade of each pipe section
4.6 Diameter, class and material of each pipe section
4.7 Hydraulic grade lines (HGLs with design storm frequency label
4.8 Drain line and Maintenance Shaft number
4.9 Maintenance Shaft diameters and / or reference to separate detail
drawing
4.10 Road Names where applicable
4.11 Low flow details
4.12 Location and size of all major crossing services
Open / outlet channels:4.13 Open channel longitudinal sections to show Q100, Q10 and Q2
HGLs
4.14 Cross sections at each peg chainage (usually 20m intervals)
4.15 Plan view showing earthworks extents
4.16 Open channel details
4.17 Details of drop structures, energy dissipaters etc. (including top
view, section views, etc.)
Page 10 of 22
Yes
N/A
Yes
N/A
Calculations table:5.1 Stormwater calculations shall be submitted for the design storms in
a DRAINS readable format
Design complies with Councils design manual:5.2 Legal point of discharge identified
5.3 Tailwater conditions
5.4 Maximum allowed ponding not exceeded
5.5 Maximum flow x velocity not exceeded
5.6 Calculations provided for major and minor systems
5.7 Blockage factors to Side Entry Pits for major systems
Page 11 of 22
Yes
N/A
Yes
N/A
Page 12 of 22
Yes
N/A
Page 13 of 22
Reservoirs
Capacity
Control settings
Yes
N/A
Horizontal geometry
Earthworks
Contours
Water levels
Valve details
Page 14 of 22
Yes
N/A
Valve details
Pump description
Telemetry
Security fencing
Landscaping
Flow, head
Page 15 of 22
SEWERAGE RETICULATION
Yes
N/A
Longitudinal section for each line containing:1.1 Approved road names and road reserve boundaries
1.2 Allotment boundaries and numbers
1.3 Easements (if applicable)
1.4 Proposed and existing contours (interval 0.5m < 2% slope & 1m >
2%)
1.5 North point
1.6 Proposed sewer mains including:
1.7 Flow arrows on each allotment and control lots clearly marked
1.8 House connection invert levels on each allotment including house
connection type
1.9 Service information
Page 16 of 22
Yes
N/A
Drop types
Diameter
Invert level
Junction type
Page 17 of 22
Yes
N/A
Yes
N/A
Valve detail
Pump description
Telemetry
Page 18 of 22
Flow
Head
Page 19 of 22
MISCELLANEOUS
Yes
N/A
Yes
N/A
Yes
N/A
RETAINING WALLS
2.1 Approved road names
2.2 Plan layout extent
2.3 Typical cross section
2.4 Foundation details
2.5 Drainage details
2.6 Design certified by registered professional engineer
OTHERS
Drafting - drawings include:3.1 All bike paths and footpaths clearly shown
3.2 Chicanes provided to each end of all pathways
3.3 Access ramps shown where bike paths and footpaths link to kerb
3.4 Bikeways clearly shown with widths as per approval
Design complies with Councils design guidelines:3.5 > Maximum grade
Page 20 of 22
STREET LIGHTING
Yes
N/A
Yes
N/A
Drafting drawings include:1.1 Location of all light poles and service conduits
1.2 Location of all other cross road conduits
1.3 Type and wattage of lighting
1.4 Traffic calming devices
1.5 Additional plans for roundabouts and major roads
1.6 Details of variations to normal alignment
1.7 Computer printout of lighting levels
Design complies at / with:1.8 Intersections
1.9 Traffic calming devices including mid-block devices
1.10 Pathways lighting at each end
1.11 General lighting (most economical design for replacement and maintenance)
1.12 Check conflict with other services / conduits / reticulation