MONEDA
FECHA
DOLARES AMERICANOS
28/07/2015
FORMATO A
TEM
DESCRIPCIN
1.0 OBRAS PROVISIONAL
1.1 Movilizacin y Desmovilizacin de Personal, Equipos y Materiales
1.2 Trazo y Replanteo.
UNIDAD
CANT.
PRECIO
UNITARIO
PARCIAL (U$)
Glb
Glb
1.00
1.00
3,313.33
901.72
3,313.33
901.72
glb
1.00
1,867.99
1,867.99
glb
1.00
6,300.80
6,300.80
glb
1.00
1,616.49
1,616.49
glb
1.00
1,048.46
1,048.46
glb
1.00
2,597.55
2,597.55
glb
1.00
2,710.09
2,710.09
glb
1.00
2,718.67
2,718.67
glb
1.00
1,737.42
1,737.42
glb
1.00
2,652.36
2,652.36
2.10
kg
4,175.11
5.37
22,426.97
2.11
ml
86.00
89.97
7,737.47
glb
1.00
3,346.01
3,346.01
95,409.31
SUBTOTAL
US$
4,215.05
TOTAL US$
99,624.36
MONEDA
FECHA
DOLARES AMERICANOS
28/07/2015
FORMATO A
TEM
DESCRIPCIN
UNIDAD
CANT.
PRECIO
UNITARIO
PARCIAL (U$)
ml
50.00
89.97
4,498.53
kg
6,644.21
5.14
34,150.48
SUBTOTAL
US$
TOTAL US$
1
2
3
4
5
6
15.00%
10.00%
99,624.36
14,943.65
9,962.44
124,530.45
CONDICIONES COMERCIALES.
La presente cotizacin no inclye IGV
El proyecto se entregar en 45 das calendario despus de la aprovacin de la orden de compra.
ITCM proporcionar materiales estructurales y equipos para los trabajos.
MILPO proporcionar el ambiente necesario para la instalacin de equipos, energa elctrica para los trabajos.
MILPO proporcionar tuberas HDPE y acero, mangueras y accesorios para las tuberas.
MILPO proporcionar cables elctricos y tuberas conduits para los trabajos elctricos.
Documento:
Postor:
Fecha:
TRABAJOS PRELIMINARES
ITCM SRL
28/07/2015
Item
1
1.10
Descripcin
Frecuencia
Cantidad de
Costo Unitario
meses/das
Total
3,313.33
Movilizacin de equipos
1,806.67
1.02
1.02.01
1.02.02
Movilizacion de personal.
Movilizacion Pasco-Milpo
Movilizacion de supervision de proyecto Pasco-Milpo
1.03
1.03.01
1.03.02
Movilizacion de maquinaria
Movilizacin de camin gra de 20 Ton
Movilizacion de andamios
1.04.01
Cantidad
TRABAJOS PRELIMINARES
1.01
1.01.01
1.01.02
1.04
Unidad
Fletes
Fletes
1
1
0.1
0.1
Pasajes
Pasajes
8
2
1
1
Fletes
Fletes
1
1
0.5
30.00
4.00
266.67
266.67
933.33
26.67
26.67
1.50
10.00
440.00
360.00
80.00
300.00
133.33
366.67
300.00
66.67
66.67
Und
0.5
133.33
66.67
3 de 14
Documento:
Postor:
Fecha:
TRABAJOS PRELIMINARES
ITCM SRL
28/07/2015
Item
1.20
Descripcin
1.02
1.02.01
1.02.02
Movilizacion de personal.
Movilizacion Milpo -Pasco
Movilizacion de supervision de proyecto Pasco-Milpo
1.03
1.03.01
1.03.02
Movilizacion de maquinaria
Movilizacin de camin gra de 20 Ton
Movilizacion de andamios
1.04
2
2.01
Cantidad
Frecuencia
Cantidad de
Costo Unitario
meses/das
266.67
266.67
933.33
26.67
26.67
1.50
10.00
440.00
360.00
80.00
0.5
200.00
133.33
66.67
0.00
66.67
0.5
133.33
66.67
0.00
0.00
0.00
Fletes
Fletes
1
1
0.1
0.1
Pasajes
Pasajes
8
2
1
1
Fletes
Fletes
0
1
Und
CAMIONETA
Alquiler de Camioneta 4 x 4
Glb
30.00
4.00
66.67
Total
1,506.67
Desmovilizacin de equipos
1.01
1.01.01
1.01.02
1.04.01
Unidad
4 de 14
Desarrollo y Proyectos
ANLISIS DE COSTOS
Proyecto:
Cliente:
Partida:
Fecha:
28/07/15
Unidad de Medida:
Jornada Laboral:
Und
Rendimiento:
8 h/da
Descripcin
Item
1.00
1.10
1.20
1.30
MANO DE OBRA
Supervisor Mecanico
Topografo
Oficial
2.00
2.01
2.02
MATERIALES
Pintura Spray
Otros
3.00
3.01
3.02
Nivel
0.07 Und/da
Costo Unitario:
Unidad
Cuadrilla
HH
HH
HH
0.20
1.00
2.00
Totales
unid
glb
%MO
dia/equip
dia/equip
1.00
1.00
Cantidad
0.00833333 Und/HH
901.72 US $/Und
Precio
Unitario
Costo
Parcial
30.0000
30.0000
30.0000
11.18
9.24
5.81
692.88
67.08
277.20
348.60
x unidad
3.0000
1.0000
7.85
10.00
33.55
23.55
10.00
10.00%
3.0000
2.0000
692.88
27.00
12.50
175.29
69.29
81.00
25.00
5 de 14
www.itcmsrl.com.pe
Elaborado: SIG
RUC: 20528939091
Revisado: G.O.
jgalarza@itcmsrl.com.pe
Aprobado : G.G.
COD COT:
PROYECTO:
PARTIDA:
ELABORADO:
J GALARZA
FECHA:
28/07/2015
ITEM
CODIGO:
ANL-IT004
CLIENTE:
S/. 3.14
Pag. 1
MAT.
DESCRIPCION
UNID.
CANT.
PESO
PU. MAT.
PU.MAT
AREA
P. UNIT.
PR. TOT.
KG.
$/KG
US$
m2
US$
US$
long
ancho
esp
desarrollo
kg/metro
0.09975
3.14
3.500
ISO 65
kg
1.00
10.99
1.20
0.35
13.19
1.000
0.100
0.00635
A-36
kg
1.00
4.98
1.20
0.20
5.98
0.150
0.060
0.00953
A-36
0.67
1.20
0.02
0.81
A-53
kg
1.00
UNID.
2.00
1.25
UNID.
2.00
0.25
16.65
DESPERDICIOS
5%
0.83
PESO BRUTO
2.50
0.50
0.22
1.20
1.00
17.48
0.23
1.2 CONSUMIBLES
6.07
SOLDADURA
15.873016 31.746032
5.00%
17.48
3.45
3.02
OXIACETILENO
0.8465608 1.6931217
0.00%
17.48
10.20
0.00
0.973545 1.9470899
5.00%
17.48
3.50
3.06
ABRASIVO
23.98
1.3 SERVICIOS
1.59
Maquinado agujeros
0.00
0.75
0.00
4.000
mils
1.00
0.23
0.23
2.000
mils
1.70
0.23
0.39
PINTADO DE BASE
4.000
mils
2.00
0.23
0.46
PINTADO ACABADO
2.000
mils
2.00
0.23
0.46
0.00
0.23
0.00
ARENADO
TINTE PENETRANTE
JGO
0.00
36.00
LIMPIEZA MECANICA
0.25
PRECIO MO SERVICIOS US$
0.02
0.03
COSTO SUMINISTRO
US$
9.60
C. UNIT SUMINISTRO
US$
0.55
0.00
0.23
0.06
0.06
16.38
INGENIERIA Y SUPERVISION
17.48
17.48
SOLDADO
17.48
17.48
CONTROL DE CALIDAD
Kg.
Kg/Hh
8
Kg.
Kg/Hh
0.05
0.87
0.40
6.99
0.45
7.87
0.03
0.44
0.02 dias
0.21
COSTO FABRICACION
US$
16.40
C. UNIT FABRICACION
US$
0.94
1.5 TRANSPORTE
3.50
17.48
0.200
3.50
17.48
0.10
1.75
17.48
2.00
2 INSTALACION Y MONTAJE
38.46
INSTALACION Y DESINSTALACION
MONTAJE
ANDAMIOS NORMADOS
CAMION GRUA DE 15 TON
EQUIPOS MENORES Y HERRAMIENTAS PARA INSTALACIN
COSTO MONTAJE
US$
38.46
C. UNIT MONTAJE
US$
2.20
34.96
cuerpo
0.0
1.00
937.50
0.00
h-eq
0.0
110.00
110.00
0.00
glb
1.00
0.05
1.75
COSTO DE PRODUCCION US $.
89.97
REND. SIN UTILIDAD $/Kg.
5.15
GASTOS GENERALES
0%
0.00
UTILIDAD
0%
0.00
REND
$/kg
5.15
0.00
89.97
17.48 Kg
35 Kg/Hh
10 Horas/da
2 cuadrilla
4 personas x cuadrilla
0.02497154 das
Desarrollo y Proyectos
ANLISIS DE COSTOS
Proyecto:
Cliente:
Partida:
Und
Rendimiento:
10 h/da
Descripcin
0.07 Und/da
Costo Unitario:
Unidad
1.00
1.10
1.20
1.30
1.40
1.50
MANO DE OBRA
Supervisor Mecanico
Montajista
Soldador
Electricista
Oficial
HH
HH
HH
HH
HH
2.00
2.01
2.02
MATERIALES
Soldadura
Pintura
Material Estructural
otros
kg
gal
kg
glb
2.03
3.00
3.01
3.02
Cuadrilla
0.20
1.00
1.00
1.00
2.00
Totales
Cantidad
%MO
HM
Descripcin
Unidad
MANO DE OBRA
Supervisor Mecanico
Montajista
Soldador
Electricista
Albail
Oficial
HH
HH
HH
HH
HH
HH
2.00
2.01
2.02
MATERIALES
Soldadura
Pintura
Material Estructural
Revestimiento
otros
kg
gal
kg
m2
glb
3.00
3.01
3.02
3.02
Precio
Unitario
1.00
Cuadrilla
0.20
1.00
1.00
1.00
1.00
2.00
Totales
1,514.64
89.44
260.00
440.40
260.00
464.80
x unidad
5.0000
1.0000
60.0000
1.0000
3.45
22.14
1.13
5.00
111.89
17.25
22.14
67.50
5.00
10.00%
20.0000
1,514.64
4.50
241.46
151.46
90.00
Cantidad
0.00666667 Und/HH
6,300.80 US $/Und
Precio
Unitario
%MO
HM
Heq
1.00
1.00
Costo
Parcial
50.0000
50.0000
50.0000
50.0000
20.0000
50.0000
11.18
6.50
11.01
6.50
6.50
5.81
2,023.30
111.80
325.00
550.50
325.00
130.00
581.00
x unidad
25.00
3.00
1,500.00
13.50
1.00
3.45
22.14
1.13
150.00
5.00
3,870.17
86.25
66.42
1,687.50
2,025.00
5.00
10.00%
30.0000
20.0000
2,023.30
4.50
3.50
407.33
202.33
135.00
70.00
Costo
Parcial
11.18
6.50
11.01
6.50
5.81
1.00
1.10
1.20
1.30
1.40
1.50
1.60
2.03
0.00666667 Und/HH
1,867.99 US $/Und
40.0000
40.0000
40.0000
40.0000
40.0000
28/07/15
Unidad de Medida:
Jornada Laboral:
Item
Fecha:
7 de 14
Desarrollo y Proyectos
ANLISIS DE COSTOS
Proyecto:
Cliente:
Fecha:
Descripcin
Unidad
1.00
1.10
1.20
1.30
1.50
MANO DE OBRA
Supervisor Mecanico
Montajista
Soldador
Oficial
HH
HH
HH
HH
2.00
2.01
2.02
MATERIALES
Soldadura
Pintura
Material Estructural
Revestimiento
otros
kg
gal
kg
m2
glb
2.03
3.00
3.01
3.02
Cuadrilla
0.20
1.00
1.00
2.00
Totales
Cantidad
%MO
HM
Descripcin
Unidad
MANO DE OBRA
Supervisor Mecanico
Montajista
Soldador
Oficial
HH
HH
HH
HH
2.00
2.01
2.02
MATERIALES
Soldadura
Pintura
Material Estructural
Revestimiento
otros
kg
gal
kg
m2
glb
3.00
3.01
3.02
Precio
Unitario
1.00
Cuadrilla
0.20
1.00
1.00
1.00
Totales
1,254.64
89.44
260.00
440.40
464.80
x unidad
15.00
1.00
60.00
0.00
1.00
3.45
22.14
1.13
150.00
5.00
146.39
51.75
22.14
67.50
0.00
5.00
10.00%
20.0000
1,254.64
4.50
215.46
125.46
90.00
Cantidad
0.00666667 Und/HH
1,048.46 US $/Und
Precio
Unitario
%MO
HM
1.00
Costo
Parcial
30.0000
30.0000
30.0000
30.0000
11.18
6.50
11.01
5.81
766.68
67.08
195.00
330.30
174.30
x unidad
8.00
1.00
35.00
0.00
1.00
3.45
22.14
1.13
150.00
8.00
97.12
27.60
22.14
39.38
0.00
8.00
10.00%
24.0000
766.68
4.50
184.67
76.67
108.00
Costo
Parcial
11.18
6.50
11.01
5.81
1.00
1.10
1.20
1.30
1.50
2.03
0.00666667 Und/HH
1,616.49 US $/Und
40.0000
40.0000
40.0000
40.0000
28/07/15
8 de 14
Desarrollo y Proyectos
ANLISIS DE COSTOS
Proyecto:
Cliente:
Fecha:
Descripcin
Unidad
1.00
1.10
1.20
1.30
1.40
1.60
MANO DE OBRA
Supervisor Mecanico
Montajista
Soldador
Electricista
Oficial
HH
HH
HH
HH
HH
2.00
2.01
2.02
2.03
2.04
2.05
MATERIALES
Soldadura
Pintura
Material Estructural
Revestimiento
otros
kg
gal
kg
m2
glb
3.00
3.01
3.02
3.03
Cuadrilla
0.20
1.00
1.00
1.00
3.00
Totales
%MO
HM
Heq
1.00
1.00
Cantidad
Descripcin
Unidad
1.00
1.10
1.20
1.30
1.40
1.60
MANO DE OBRA
Supervisor Mecanico
Montajista
Soldador
Electricista
Oficial
HH
HH
HH
HH
HH
2.00
2.01
2.02
2.03
2.04
2.05
MATERIALES
Soldadura
Pintura
Material Estructural
Revestimiento
Mona
kg
gal
kg
m2
glb
3.00
3.01
3.02
3.03
Cuadrilla
0.20
1.00
1.00
0.00
2.00
Totales
%MO
HM
Heq
1.00
1.00
0.00666667 Und/HH
2,597.55 US $/Und
Precio
Unitario
Costo
Parcial
50.0000
50.0000
50.0000
50.0000
50.0000
11.18
6.50
11.01
6.50
5.81
2,183.80
111.80
325.00
550.50
325.00
871.50
x unidad
8.00
1.00
45.00
0.00
1.00
3.45
22.14
1.13
150.00
5.00
105.37
27.60
22.14
50.63
0.00
5.00
10.00%
20.0000
10.0000
2,183.80
4.50
3.50
308.38
218.38
90.00
35.00
28/07/15
Cantidad
0.00666667 Und/HH
2,710.09 US $/Und
Precio
Unitario
Costo
Parcial
50.0000
50.0000
50.0000
50.0000
50.0000
11.18
6.50
11.01
6.50
5.81
1,568.30
111.80
325.00
550.50
0.00
581.00
x unidad
8.00
1.00
662.42
0.00
1.00
3.45
22.14
1.13
150.00
55.00
849.96
27.60
22.14
745.22
0.00
55.00
10.00%
30.0000
14.0000
1,568.30
4.50
3.50
291.83
156.83
135.00
49.00
9 de 14
Desarrollo y Proyectos
ANLISIS DE COSTOS
Proyecto:
Cliente:
Fecha:
28/07/15
2.70 Actividad N 7, Cambio de bomba horizontal 3X3 a una 6X6 en la zona de la bombeo 3A
Partida:
Unidad de Medida:
Und
Rendimiento:
0.07 Und/da
0.00666667 Und/HH
Jornada Laboral:
10 h/da
Costo Unitario:
2,718.67 US $/Und
Item
Descripcin
Unidad
1.00
1.10
1.20
1.30
1.40
1.60
MANO DE OBRA
Supervisor Mecanico
Montajista
Soldador
Electricista
Oficial
HH
HH
HH
HH
HH
2.00
2.01
2.02
2.03
2.04
2.05
MATERIALES
Soldadura
Pintura
Material Estructural
Revestimiento
otros
kg
gal
kg
m2
glb
3.00
3.01
3.02
3.03
Cuadrilla
0.20
1.00
1.00
1.00
3.00
Totales
%MO
HM
Heq
1.00
1.00
Cantidad
Descripcin
Unidad
1.00
1.10
1.20
1.30
1.40
1.60
MANO DE OBRA
Supervisor Mecanico
Montajista
Soldador
Electricista
Oficial
HH
HH
HH
HH
HH
2.00
2.01
2.02
2.03
2.04
2.05
MATERIALES
Soldadura
Pintura
Material Estructural
Revestimiento
otros
kg
gal
kg
m2
glb
3.00
3.01
3.02
3.03
Cuadrilla
0.20
1.00
1.00
0.00
2.00
Totales
%MO
HM
Heq
1.00
1.00
Costo
Parcial
50.0000
50.0000
50.0000
50.0000
50.0000
11.18
6.50
11.01
6.50
5.81
2,183.80
111.80
325.00
550.50
325.00
871.50
x unidad
8.00
1.00
150.00
0.00
1.00
3.45
22.14
1.13
150.00
8.00
226.49
27.60
22.14
168.75
0.00
8.00
10.00%
20.0000
10.0000
2,183.80
4.50
3.50
308.38
218.38
90.00
35.00
Precio
Unitario
Cantidad
0.00666667 Und/HH
1,737.42 US $/Und
Precio
Unitario
Costo
Parcial
40.0000
40.0000
40.0000
40.0000
40.0000
11.18
6.50
11.01
6.50
5.81
1,254.64
89.44
260.00
440.40
0.00
464.80
x unidad
10.00
0.50
150.00
0.00
1.00
3.45
22.14
1.13
150.00
8.00
222.32
34.50
11.07
168.75
0.00
8.00
10.00%
30.0000
20.0000
1,254.64
4.50
3.50
260.46
125.46
135.00
70.00
10 de 14
Desarrollo y Proyectos
ANLISIS DE COSTOS
Proyecto:
Cliente:
Fecha:
28/07/15
Item
1.00
1.10
1.20
Unidad
1.30
MANO DE OBRA
Supervisor Mecanico
Montajista
Soldador
Oficial
HH
HH
HH
HH
2.00
2.01
2.02
2.03
MATERIALES
Chanfercord
Oxigeno
Acetileno
kg
m3
kg
3.00
3.01
3.02
Cuadrilla
0.20
1.00
1.00
4.00
Totales
%MO
dia/cuerpo
HM
3.00
24.00
Cantidad
Descripcin
1.00
1.10
1.20
Unidad
1.30
MANO DE OBRA
Supervisor Mecanico
Montajista
Soldador
Oficial
HH
HH
HH
HH
2.00
2.01
2.02
2.03
MATERIALES
Chanfercord
Oxigeno
Acetileno
kg
m3
kg
3.00
3.01
3.02
Cuadrilla
0.20
2.00
1.00
4.00
Totales
%MO
dia/cuerpo
hm
HM
3.00
1.00
1.00
Costo
Parcial
40.0000
40.0000
40.0000
40.0000
11.18
6.50
11.01
5.81
1,719.44
89.44
260.00
440.40
929.60
x unidad
5.0000
10.0000
5.0000
4.50
3.49
11.11
112.98
22.50
34.92
55.56
10.00%
1.0000
1.0000
1,719.44
180.00
4.50
819.94
171.94
540.00
108.00
Precio
Unitario
Cantidad
0.00666667 Und/HH
3,346.01 US $/Und
Precio
Unitario
Costo
Parcial
30.0000
30.0000
30.0000
30.0000
11.18
6.50
11.01
5.81
1,484.58
67.08
390.00
330.30
697.20
x unidad
15.0000
10.0000
5.0000
4.50
3.49
11.11
157.98
67.50
34.92
55.56
10.00%
1.0000
8.0000
30.0000
1,484.58
180.00
110.00
4.50
1,703.46
148.46
540.00
880.00
135.00
11 de 14
Desarrollo y Proyectos
ANLISIS DE COSTOS
Proyecto:
Cliente:
Fecha:
28/07/15
12 de 14
www.itcmsrl.com.pe
Elaborado: SIG
RUC: 20528939091
Revisado: G.O.
jgalarza@itcmsrl.com.pe
Aprobado : G.G.
COD COT:
PROYECTO:
PARTIDA:
CODIGO:
ANL-IT004
CLIENTE:
S/. 3.14
Pag. 1
2.10
ELABORADO:
J GALARZA
FECHA:
28/07/2015
ITEM
MAT.
DESCRIPCION
UNID.
CANT.
PESO
PU. MAT.
PU.MAT
AREA
P. UNIT.
PR. TOT.
KG.
$/KG
US$
m2
US$
US$
desarrollo
kg/metro
C 6 x 8.2 lbs
40.000
long
ancho
esp
0.56
12.2
A-36
kg
2.00
976.00
1.12
44.80
1,093.12
C 6 x 8.2 lbs
0.900
0.56
12.2
A-36
kg
27.00
296.46
1.12
13.61
332.04
C 6 x 8.2 lbs
1.410
0.56
12.2
A-36
kg
14.00
240.83
1.12
11.05
269.73
C 6 x 8.2 lbs
1.600
0.56
12.2
A-36
kg
4.00
78.08
1.12
3.58
87.45
2.000
0.203
4.75
A-36
kg
27.00
256.50
1.12
10.97
287.28
0.250
0.1524
4.75
26.60
A-36
kg
20.00
23.75
1.12
0.76
0.150
0.150
0.00953
A-36
kg
41.00
68.98
1.12
1.85
77.25
0.100
0.100
0.00953
A-36
kg
240.00
179.45
1.12
4.80
200.99
40.000
0.900
50
A-36
m2
36.00
1,800.00
3.45
0.900
0.250
50
A-36
m2
1.13
56.25
3.45
6,210.00
194.06
UNID.
240.00
1.25
300.00
UNID.
56.00
3.00
168.00
Resina epoxica
UNID.
56.00
6.50
3,976.30
DESPERDICIOS
5%
198.81
PESO BRUTO
364.00
91.43
1.12
222.67
4,175.11
96.00
1.2 CONSUMIBLES
723.65
SOLDADURA
1.75%
4,175.11
3.45
252.07
OXIACETILENO
0.85%
4,175.11
10.20
361.98
ABRASIVO
0.75%
4,175.11
3.50
109.60
1.3 SERVICIOS
9833.19
961.18
Maquinado agujeros
296.00
0.75
222.00
4.000
mils
1.00
96.00
96.00
2.000
mils
1.70
96.00
163.20
PINTADO DE BASE
4.000
mils
2.00
96.00
192.00
PINTADO ACABADO
2.000
mils
2.00
96.00
192.00
0.00
96.00
ARENADO
TINTE PENETRANTE
JGO
2.00
LIMPIEZA MECANICA
0.25
PRECIO MO SERVICIOS US$
9.60
14.40
COSTO SUMINISTRO
US$
#REF!
C. UNIT SUMINISTRO
US$
#REF!
0.00
36.00
72.00
96.00
24.00
24.00
3911.68
INGENIERIA Y SUPERVISION
4,175.11
4,175.11
SOLDADO
4,175.11
4,175.11
CONTROL DE CALIDAD
Kg.
Kg/Hh
8
Kg.
Kg/Hh
0.05
208.76
0.40
1,670.04
0.45
1,878.80
0.03
104.38
5.96 dias
49.70
COSTO FABRICACION
US$
3921.28
C. UNIT FABRICACION
US$
0.94
1.5 TRANSPORTE
417.51
4,175.11
0.100
417.51
4,175.11
0.10
417.51
4,175.11
1.10
2 INSTALACION Y MONTAJE
6579.76
INSTALACION Y DESINSTALACION
MONTAJE
ANDAMIOS NORMADOS
CAMION GRUA DE 15 TON
EQUIPOS MENORES Y HERRAMIENTAS PARA INSTALACIN
COSTO MONTAJE
US$
6579.76
C. UNIT MONTAJE
US$
1.58
4,592.62
cuerpo
8.0
7.00
20.00
1,120.00
h-eq
1.0
2.00
110.00
220.00
glb
1.00
0.05
229.63
COSTO DE PRODUCCION US $.
22426.97
REND. SIN UTILIDAD $/Kg.
5.37
GASTOS GENERALES
0%
0.00
UTILIDAD
0%
0.00
REND
$/kg
5.37
0.00
22426.97
4,175.11 Kg
35 Kg/Hh
10 Horas/da
2 cuadrilla
4 personas x cuadrilla
5.96444322 das
www.itcmsrl.com.pe
Elaborado: SIG
RUC: 20528939091
Revisado: G.O.
jgalarza@itcmsrl.com.pe
Aprobado : G.G.
COD COT:
PROYECTO:
PARTIDA:
CODIGO:
ANL-IT004
CLIENTE:
S/. 3.14
Pag. 1
2.14
ELABORADO:
J GALARZA
FECHA:
28/07/2015
ITEM
MAT.
DESCRIPCION
UNID.
CANT.
PESO
PU. MAT.
PU.MAT
AREA
P. UNIT.
PR. TOT.
KG.
$/KG
US$
m2
US$
US$
14430.96
desarrollo
kg/metro
W 6 x 15 lbs
25.000
long
ancho
esp
1.02
22.32
A-36
kg
2.00
1,116.00
1.10
51.00
1,227.60
W 6 x 15 lbs
2.000
1.02
22.32
A-36
kg
13.00
580.32
1.10
26.52
638.35
W 6 x 15 lbs
2.800
1.02
22.32
A-36
kg
13.00
812.45
1.10
37.13
893.69
C 6 x 8.2 lbs
2.000
0.56
12.2
A-36
kg
24.00
585.60
1.10
26.88
644.16
2.000
0.2032
4.75
A-36
kg
24.00
228.00
1.10
9.75
250.80
0.200
0.200
0.00953
A-36
kg
13.00
38.88
1.10
1.04
42.77
0.150
0.100
0.00953
A-36
kg
288.00
323.01
1.10
8.64
355.31
0.100
0.100
0.00953
A-36
kg
192.00
143.56
1.10
3.84
25.000
2.000
A-36
m2
50.00
2,500.00
3.45
UNID.
400.00
1.25
500.00
UNID.
78.00
3.00
234.00
Resina epoxica
UNID.
78.00
6.50
50
6,327.82
34.56
43.2
129.6
6.17143
5%
316.39
PESO BRUTO
157.92
8,625.00
507.00
113.80
1.12
354.36
6,644.21
119.49
1.2 CONSUMIBLES
1141.14
SOLDADURA
2.00%
6,644.21
3.45
458.45
OXIACETILENO
0.75%
6,644.21
10.20
508.28
ABRASIVO
0.75%
6,644.21
3.50
174.41
1.3 SERVICIOS
1210.47
Maquinado agujeros
472.00
0.50
236.00
4.000
mils
1.00
119.49
119.49
2.000
mils
1.70
119.49
203.14
PINTADO DE BASE
4.000
mils
2.00
119.49
238.98
PINTADO ACABADO
2.000
mils
2.00
119.49
238.98
0.00
119.49
ARENADO
TINTE PENETRANTE
JGO
4.00
LIMPIEZA MECANICA
0.25
PRECIO MO SERVICIOS US$
11.95
17.92
COSTO SUMINISTRO
US$
1823.49
C. UNIT SUMINISTRO
US$
0.27
0.00
36.00
144.00
119.49
29.87
29.87
6224.99
INGENIERIA Y SUPERVISION
6,644.21
6,644.21
SOLDADO
6,644.21
6,644.21
CONTROL DE CALIDAD
Kg.
Kg/Hh
8
Kg.
Kg/Hh
0.05
332.21
0.40
2,657.69
0.45
2,989.90
0.03
166.11
9.49 dias
79.10
COSTO FABRICACION
US$
6236.94
C. UNIT FABRICACION
US$
0.94
1.5 TRANSPORTE
664.42
6,644.21
0.100
664.42
6,644.21
0.10
664.42
6,644.21
1.10
2 INSTALACION Y MONTAJE
10478.49
INSTALACION Y DESINSTALACION
MONTAJE
ANDAMIOS NORMADOS
CAMION GRUA DE 15 TON
EQUIPOS MENORES Y HERRAMIENTAS PARA INSTALACIN
COSTO MONTAJE
US$
10478.49
C. UNIT MONTAJE
US$
1.58
7,308.63
cuerpo
8.0
12.00
20.00
1,920.00
h-eq
1.0
2.00
110.00
220.00
glb
1.00
0.05
365.43
COSTO DE PRODUCCION US $.
34150.48
REND. SIN UTILIDAD $/Kg.
GASTOS GENERALES
UTILIDAD
VALOR VENTA UNITARIO US$.
REND
$/kg
5.14
0%
0.00
0%
0.00
5.14
0.00
34150.48
6,644.21 Kg
35 Kg/Hh
10 Horas/da
2 cuadrilla
4 personas x cuadrilla
9.49173248 das