ATM Cost-Eectiveness (ACE) 2012 Benchmarking Report with 2013-2017 outlook

EUROCONTROL

REPORT COMMISSIONED BY THE PERFORMANCE REVIEW COMMISSION

ATM Cost-Eectiveness (ACE)


2012 Benchmarking Report
with 2013-2017 outlook

Prepared by the Performance Review Unit (PRU)


with the ACE Working Group

COPYRIGHT NOTICE AND DISCLAIMER


European Organisation for the Safety of Air Navigation (EUROCONTROL)
This document is published by the Performance Review Commission in the interest of the exchange of information.
It may be copied in whole or in part providing that the copyright notice and disclaimer are included. The information contained in this document may not be modified
without prior written permission from the Performance Review Commission.
The view expressed herein do not necessarily reflect the ocial views or policy of EUROCONTROL which makes no warranty, either implied or express, for the information
contained in this document, neither does it assume any legal liability or responsibility for the accuracy completeness or usufulness of this information.
Printed by EUROCONTROL 96, rue de la Fuse, B-1130 Brussels, Belgium. Tel: +32 2 729 3956. Fax: +32 2 729 9108.

Cover ACE Layout A3 2012.indd 1

May 2014

23/05/14 11:21

BACKGROUND
This report has been commissioned by the Performance Review Commission (PRC).
The PRC was established in 1998 by the Permanent Commission of EUROCONTROL, in accordance with the ECAC Institutional
Strategy (1997).
One objective in this Strategy is to introduce strong, transparent and independent performance review and target setting to facilitate
more eective management of the European ATM system, encourage mutual accountability for system performance and provide a better
basis for investment analyses and, with reference to existing practice, provide guidelines to States on economic regulation to assist them
in carrying out their responsibilities.
The PRCs website address is http://www.eurocontrol.int/prc
In September 2010, EUROCONTROL accepted the designation by the European Commission as the SES Performance Review Body
(PRB) acting through its Performance Review Commission supported by the Performance Review Unit.

NOTICE
The Performance Review Unit (PRU) has made every eort to ensure that the information and analysis contained in this document
are as accurate and complete as possible. Should you find any errors or inconsistencies we would be grateful if you could please
bring them to the PRUs attention.
The PRUs e-mail address is pru@eurocontrol.int

Page 2 ACE 2012.indd 1

23/05/14 11:24

Reportcommissionedbythe
PerformanceReviewCommission

ATMCostEffectiveness(ACE)
2012BenchmarkingReportwith2013
2017outlook

PreparedbythePerformanceReviewUnit(PRU)
withtheACE2012WorkingGroup

FinalReport
May2014

BACKGROUND
ThisReporthasbeencommissionedbythePerformanceReviewCommission(PRC).
ThePRC wasestablishedin1998bythePermanentCommission ofEUROCONTROL,inaccordancewiththe ECACInstitutionalStrategy
(1997).
OneobjectiveinthisStrategyis"tointroducestrong,transparentandindependentperformancereviewandtargetsettingtofacilitate
moreeffectivemanagementoftheEuropeanATMsystem,encouragemutualaccountabilityforsystemperformanceandprovideabetter
basisforinvestmentanalysesand,withreferencetoexistingpractice,provideguidelinestoStatesoneconomicregulationtoassistthem
incarryingouttheirresponsibilities."
InSeptember2010,EUROCONTROLacceptedthedesignationbytheEuropeanCommissionastheSESPerformanceReviewBodyacting
throughitsPerformanceReviewCommissionsupportedbythePerformanceReviewUnit.
ThePRCswebsiteaddressishttp://www.eurocontrol.int/prc

NOTICE
ThePerformanceReviewUnit(PRU)hasmadeeveryefforttoensurethattheinformationandanalysiscontainedinthisdocumentareas
accurateandcompleteaspossible.Shouldyoufindanyerrorsorinconsistencieswewouldbegratefulifyoucouldpleasebringthemto
thePRUsattention.
ThePRUsemailaddressispru@eurocontrol.int

COPYRIGHTNOTICEANDDISCLAIMER
EuropeanOrganisationfortheSafetyofAirNavigation(EUROCONTROL)
EUROCONTROL,96,ruedelaFuse,B1130Brussels,Belgium
http://www.eurocontrol.int
Thisdocumentispublishedintheinterestoftheexchangeofinformationandmaybecopiedinwholeorinpart
providingthatthecopyrightnoticeanddisclaimerareincluded.Theinformationcontainedinthisdocumentmay
notbemodifiedwithoutpriorwrittenpermissionfromthePerformanceReviewUnit.
TheviewsexpressedhereindonotnecessarilyreflecttheofficialviewsorpolicyofEUROCONTROL,whichmakes
nowarranty,eitherimpliedorexpress,fortheinformationcontainedinthisdocument,neitherdoesitassumeany
legalliabilityorresponsibilityfortheaccuracy,completenessorusefulnessofthisinformation.

ACE2012BenchmarkingReportwith20132017outlook

DOCUMENTIDENTIFICATIONSHEET
DOCUMENTDESCRIPTION
DocumentTitle

ATMCostEffectiveness(ACE)2012 BenchmarkingReport
with20132017outlook
DOCUMENTREFERENCE

EDITION:

ACE2012

Finalreport

EDITIONDATE:
May2014

Abstract
This report is the twelfth in a series of annual reports based on mandatory information disclosure provided by 37 Air
NavigationServicesProviders(ANSPs)totheEUROCONTROLPerformanceReviewCommission(PRC).Thisreportcomprises
factualdataandanalysisoncosteffectivenessandproductivity for37ANSPsfortheyear2012,includinghighleveltrend
analysis for the years 20092012. The scope of the report is both enroute and terminal navigation services (i.e. gateto
gate).ThemainfocusisontheATM/CNSprovisioncostsasthesecostsareunderthedirectcontrolandresponsibilityofthe
ANSP. Costs borne by airspace users for less than optimal quality of service are also considered. The report describes a
performance framework for the analysis of costeffectiveness. The framework highlights 3 key performance drivers
contributing to costeffectiveness (productivity, employment costs and support costs). The report also analyses forward
looking information for the years 20132017, inferring on future financial costeffectiveness performance at system level,
anddisplaysinformationonfuturecapitalexpenditures.

Keywords
EUROCONTROL Performance Review Commission Economic information disclosure Benchmarking Target setting
Exogenous factors Complexity metrics ATM/CNS costeffectiveness comparisons European Air Navigation Services
Providers(ANSPs)FunctionalAirspaceBlocks(FABs)GatetogateEnrouteandTerminalANSInputsandoutputsmetrics
PerformanceframeworkQualityofservice2012dataTrafficdownturnFactualanalysisHistorictrendanalysisCosts
driversProductivityEmploymentcostsSupportcostsAreaControlCentres(ACCs)productivitycomparisonsCurrent
andfuturecapitalexpendituresATMsystemsFiveyearsforwardlookingtrendanalysis(20132017).

CONTACT:

PerformanceReviewUnit,EUROCONTROL,96RuedelaFuse,B1130Brussels,Belgium.
Tel:+3227293956,email:pru@eurocontrol.inthttp://www.eurocontrol.int/articles/performance
reviewcommission

DOCUMENTINFORMATION
TYPE
PerformanceReviewReport
ReportcommissionedbythePRC
PRUTechnicalNote

STATUS

Draft
ProposedIssue
ReleasedIssue

ACE2012BenchmarkingReportwith20132017outlook

DISTRIBUTION

GeneralPublic
EUROCONTROLOrganisation
Restricted

ACE2012BenchmarkingReportwith20132017outlook

TABLEOFCONTENTS
READERSGUIDE....................................................................................................................................I
EXECUTIVESUMMARY..........................................................................................................................II
1
INTRODUCTION............................................................................................................................1
1.1
Organisationofthereport............................................................................................................1
1.2
OverviewofparticipatingANSPs..................................................................................................2
1.3
Datasubmission............................................................................................................................3
1.4
Dataanalysis,processingandreporting.......................................................................................4
1.5
ANSPsAnnualReports.................................................................................................................5
1.6
ANSPbenchmarkingandtheSESPerformanceScheme..............................................................7
PARTI:PANEUROPEANSYSTEMCOSTEFFECTIVENESSPERFORMANCEIN2012ANDOUTLOOKFOR
20132017.............................................................................................................................................9
2
PANEUROPEANSYSTEMCOSTEFFECTIVENESSPERFORMANCEIN2012WITH20132017
OUTLOOK............................................................................................................................................11
PARTII:COSTEFFECTIVENESSPERFORMANCEFOCUSATANSPLEVEL.................................................37
3
FOCUSONANSPSINDIVIDUALCOSTEFFECTIVENESSPERFORMANCE.........................................39
3.1
Objectiveofthischapter.................................................................................................................39
3.2
Historicaldevelopmentofcosteffectivenessperformance,20092012........................................39
3.3
ANSPscosteffectivenesswithinthecomparatorgroup,20092012............................................40
3.4
Historicalandforwardlookinginformationoncapitalinvestmentprojects..................................41
3.5
CosteffectivenessperformancefocusatANSPlevel.....................................................................42
ANNEX1STATUSOFANSPSYEAR2012ANNUALREPORTS...............................................................119
ANNEX2PERFORMANCEINDICATORSUSEDFORTHECOMPARISONOFANSPS................................121
ANNEX3PERFORMANCERATIOS.....................................................................................................123
ANNEX4TRAFFICCOMPLEXITYANDTRAFFICVARIABILITYINDICATORS...........................................125
ANNEX5COSTOFCAPITALREPORTEDBYANSPS.............................................................................129
ANNEX6EXCHANGERATES,INFLATIONRATESANDPURCHASINGPOWERPARITIES(PPPS)2012DATA
..........................................................................................................................................................131
ANNEX7KEYDATA..........................................................................................................................133
ANNEX8PERFORMANCEINDICATORSATFABLEVEL........................................................................141
ANNEX9INDIVIDUALANSPFACTSHEETS........................................................................................143
GLOSSARY..........................................................................................................................................183

ACE2012BenchmarkingReportwith20132017outlook

TABLES

Table1.1:StatesandANSPsparticipatinginACE2012......................................................................................3
Table1.2:IFRSreportingstatus..........................................................................................................................6
Table2.1:Keysystemdatafor2011and2012,realterms..............................................................................11
Table2.2:ComparisonofATM/CNSprovisioncostsandcompositeflighthoursatsystemlevel(figures
providedinNov.2011versusactualdata)(2012).................................................................................19
Table3.1:ANSPscomparatorgroups...............................................................................................................41
Annex1Table0.1:StatusonANSPs2012AnnualReports.........................................................................119
Annex2Table0.1:Economiccosteffectivenessindicator,2012................................................................122
Annex3Table0.1:Thecomponentsofgatetogatecosteffectiveness,2012...........................................123
Annex4Table0.1:TrafficcomplexityindicatorsatANSPlevel,2012.........................................................125
Annex4Table0.2:TrafficcomplexityindicatorsatACClevel,2012............................................................126
Annex4Table0.3:TrafficvariabilityindicatorsatANSPlevel,2012...........................................................127
Annex5Table0.1:CommentsoncostofcapitalreportedbyANSPs,2012................................................130
Annex6Table0.1:2012Exchangerates,inflationratesandPPPsdata......................................................131
Annex7Table0.1:BreakdownoftotalANSrevenues(enroute,terminalandgatetogate),2012..........133
Annex7Table0.2:BreakdownoftotalANScosts(enroute,terminalandgatetogate),2012.................134
Annex7Table0.3:BreakdownofATM/CNSprovisioncosts(enroute,terminalandgatetogate),2012 135
Annex7Table0.4:BalanceSheetdataatANSPlevel,2012........................................................................136
Annex7Table0.5:TotalstaffandATCOsinOPSdata,2012.......................................................................137
Annex7Table0.6:Operationaldata(ANSPandStatelevel),2012.............................................................138
Annex7Table0.7:OperationaldataatACClevel,2012..............................................................................139
Annex8Table0.1:BreakdownofcosteffectivenessatFABlevel,2012.....................................................141

ACE2012BenchmarkingReportwith20132017outlook

FIGURES

Figure0.1:HighleveltimeframeforRP2Unionwidetargetsettingprocess....................................................ii
Figure0.2:Changesinuniteconomiccosts,20092012(realterms)................................................................iii
Figure0.3:ChangesinATM/CNSprovisioncostsandtrafficvolumes,20112012(realterms)........................iv
Figure0.4:Changesinthefinancialcosteffectivenessindicator,20112012(realterms)...............................iv
Figure0.5:ForwardlookingcosteffectivenessatEuropeansystemlevel(20122017,realterms).................v
Figure0.6:ForwardlookingcapitalexpendituresatPanEuropeansystemlevel(20092016,realterms)......v
Figure1.1:Progresswithsubmissionof2012data............................................................................................4
Figure1.2:Dataanalysis,processingandreporting...........................................................................................5
Figure1.3:Statusof2012AnnualReports.........................................................................................................6
Figure1.4:HighleveltimeframeforRP2Unionwidetargetsettingprocess....................................................7
Figure2.1:BreakdownofATM/CNSprovisioncosts,2012..............................................................................12
Figure2.2:ExogenousfactorsmeasuredbythePRU,2012.............................................................................12
Figure2.3:DistributionofATM/CNSprovisioncostsin2012..........................................................................13
Figure2.4:Changesinuniteconomiccosts,20092012(realterms)..............................................................14
Figure2.5:ChangesineconomiccosteffectivenessbyANSP,20092012(realterms)...................................15
Figure2.6:ATM/CNSprovisioncostspercompositeflighthour,2012...........................................................16
Figure2.7:AdjustmentofthefinancialcosteffectivenessindicatorforANSPsoperatingintheFourStates
airspace,2012..........................................................................................................................................17
Figure2.8:ChangesinATM/CNSprovisioncostsandtrafficvolumes,20112012(realterms)......................18
Figure2.9:Comparisonof2012actualATM/CNSprovisioncostsandtrafficwithACE2010plans(realterms)
.................................................................................................................................................................20
Figure2.10:ACEperformanceframework,2012.............................................................................................21
Figure2.11:Changesinthefinancialcosteffectivenessindicator,20112012(realterms)...........................21
Figure2.12:ChangesinATCOhourproductivity,20092012..........................................................................22
Figure2.13:ChangesinaverageATCOhoursonduty,20092012..................................................................22
Figure2.14:AnnualchangesinATCOhourproductivity,compositeflighthoursandATCOhoursonduty,
20112012................................................................................................................................................23
Figure2.15:ATCOhourproductivity(gatetogate),2012..............................................................................24
Figure2.16:SummaryofproductivityresultsatACClevel,2012....................................................................25
Figure2.17:ACCsectorproductivityandstaffingpersector,2012.................................................................26
Figure2.18:ChangesinATCOemploymentcostsperATCOhour,20092012(realterms)............................27
Figure2.19:ATCOemploymentcostsperATCOhour(gatetogate),2012....................................................28
Figure2.20:EmploymentcostsperATCOhourwithandwithoutPPPs,2012................................................29
Figure2.21:ConvergenceinATCOemploymentcostsforANSPsoperatinginEasternandWesternEuropean
countries,20092012(realterms)...........................................................................................................29
Figure2.22:Changesinsupportcostspercompositeflighthour,20092012(realterms).............................30
Figure2.23:Frameworkforsupportcostsanalysis,2012................................................................................30
Figure2.24:Changesinthecomponentsofsupportcosts,20112012(realterms).......................................31
Figure2.25:Differencebetweenactualandplannedcapexfor2012(realterms)..........................................32
Figure2.26:SupportcostspercompositeflighthouratANSPlevel,2012......................................................33
Figure2.27:SupportcostspercompositeflighthouratFABlevel,2012........................................................34
Figure2.28:ForwardlookingcosteffectivenessatEuropeansystemlevel(20122017,realterms).............35
Figure2.29:ForwardlookingcapitalexpendituresatPanEuropeansystemlevel(20092016,realterms)..35

ACE2012BenchmarkingReportwith20132017outlook

READERSGUIDE
Thistableindicateswhichchaptersofthereportarelikelytobeofmostinteresttoparticularreadersand
stakeholders.
Executivesummary

All stakeholders with an interest in ATM who want to know what


thisreportisabout,orwantanoverviewofthemainfindings.

Chapter1:

Thosewantingashortoverviewofthestructureofthereport,the
list of participating ANSPs, and the process to analyse the data
comprisedinthisreport.

Introduction

PartI:PanEuropeansystemcosteffectivenessperformancein2012andoutlookfor20132017
Chapter2:
PanEuropean system cost
effectiveness performance in
2012with20132017outlook

Allthosewhoareinterestedinahighlevelanalysisofeconomicand
financial costeffectiveness performance in 2012 at PanEuropean
systemandANSPlevel.Thischapteralsoincludesatrendanalysisof
ATM/CNS costeffectiveness performance over the 20092012
period,andananalysisfocusingonitsthreemaineconomicdrivers
(productivity,employmentcostsandsupportcosts).
Finally, this chapter comprises a forwardlooking analysis of
ATM/CNSperformanceoverthe20132017period,includingcapital
investmentprojections.
This chapter is particularly relevant to ANSPs management,
regulators and NSAs in order to identify best practices, areas for
improvement, and to understand how costeffectiveness
performancehasevolvedovertime.

PartII:CosteffectivenessperformancefocusatANSPlevel
Chapter3:
FocusonANSPsindividualcost
effectivenessperformance

All those who are interested in obtaining an independent and


comparableanalysisofindividualANSPhistoricperformance(2009
2012)intermsofeconomicandfinancialcosteffectiveness.
This chapter is particularly relevant to ANSPs management,
airspace users, regulators and NSAs in order to identify how cost
effectiveness performance has evolved and which have been the
sourcesofimprovement.Thischapteralsoincludesinformationon
ANSPshistoricandplannedcapitalinvestments.
ThischaptershouldprovideusefulinsightsandinformationtoNSAs
forthedrawingupofRP2performanceplansduringthefirsthalfof
2014. Inparticular, it includes a benchmarking analysis of financial
costeffectivenesswithasetofcomparatorsforeachANSP.

Annexes:

Withaviewtoincreasetransparency,thisreportcomprisesseveral
annexesincludingthedatausedinthereport.

Readersguide

ACE2012BenchmarkingReportwith20132017outlook

EXECUTIVESUMMARY
ThisATMCostEffectiveness(ACE)2012BenchmarkingReport,thetwelfthintheseries,presentsa
reviewandcomparisonofATMcosteffectivenessfor37AirNavigationServiceProviders(ANSPs)
in Europe. The ACE benchmarking work is carried out by the Performance Review Commission
(PRC)supportedbythePerformanceReviewUnit(PRU)andisbasedoninformationprovidedby
ANSPs in compliance with Decision No. 88 of the Permanent Commission of EUROCONTROL on
economic information disclosure and in the context of Annex IV 2.1(a) of EC Regulation
N691/2010(PerformanceScheme)recentlyamendedbyECRegulationN390/2013.
The data processing, analysis and reporting were conducted with the assistance of the ACE
Working Group, which comprises representatives from participating ANSPs, airspace users,
regulatoryauthoritiesandthePerformanceReviewUnit(PRU).Thisenabledparticipantstoshare
experiences and gain an improved common understanding of underlying assumptions and
limitationsofthedata.
ACE 2012 presents information on performance indicators relating to costeffectiveness and
productivity for the year 2012, and how they changed over time (20092012). It examines both
individual ANSPs and the PanEuropean ATM/CNS system as a whole. In addition, ACE 2012
analyses forwardlooking information covering the 20132017 period based on information
providedbyANSPsinNovember2013.
TheACEfactualandindependentbenchmarkinghassetthefoundationforanormativeanalysisto
quantifythepotentialscopeofcostefficiencyimprovementsforANSPs.TheACEdataanalysisand
thegatheringofintelligenceonANSPscostefficiencyperformancedirectlyfeedcoreprocesses
of the Single European Sky (SES) performance scheme. In September 2013, after an extensive
public consultation, the PRB published recommendations to the EC for the Unionwide targets
coveringRP2(20152019).ANSPbenchmarkingwasoneofthekeyevidencesusedtoassessthe
scopeforfutureperformanceimprovementsatUnionwidelevelandtobuilduptheproposalfor
thecostefficiencytargets.
Unionwide performance targets for RP2 were adopted during the Single Sky Committee adhoc
meeting held on the 4th February 2014. These targets imply a 3.3% annual decrease in the en
route Unionwide determined unit costs over 20152019. These targets were based on the
following assumptions: a planned decrease in enroute determined costs (2.1% p.a.) and an
expectedtrafficgrowth(intermsofserviceunits)of+1.2%p.a.between2014and2019.

Figure0.1:HighleveltimeframeforRP2Unionwidetargetsettingprocess
AsindicatedinFigure0.1above,NationalSupervisoryAuthorities(NSAs)willdrawupPerformance
PlansforRP2duringthefirsthalfof2014.Inthiscontext,theinformationdisclosedinPartIIofthe
Executivesummary

ACE2012BenchmarkingReportwith20132017outlook

ii

ACE 2012 Benchmarking Report (already available in the first draft released in December 2013)
provided useful insight and information to interested parties, including the consultations of the
PerformancePlanwithairspaceuserswhicharetakingplacebetweenFebruaryandJune2014.
Another important milestone in the Unionwide costefficiency target setting process will be the
assessment of the Performance Plans for RP2 during the Summer 2014. The ACE 2012 data
analysiswillbeanimportantinputtobeconsideredinthiscontext.
ForANSPsoperatinginSESStates,theyear2012marksthestartofRP1andtheendofthefull
costrecovery mechanism for enroute ANS. Over RP1, SES States/ANSPs operate under the
determined costs method which comprises specific risksharing arrangements aiming at
incentivisingANSPseconomicperformance.ThePRBreleasedinSeptember2013areportonthe
monitoring of SES performance targets for the first year of RP1 (2012) based on information
provided in June 2013. This ACE 2012 Benchmarking Report complements the PRB monitoring
activity by providing a detailed benchmarking of costeffectiveness performance at ANSP level
including a trend analysis of three main economic drivers (productivity, employment costs and
supportcosts)overthe20092012period.
ThePRCintroducedinitsACEBenchmarkingReportstheconceptofeconomiccosteffectiveness
KPI. This indicator is defined as gatetogate ATM/CNS provision costs plus the costs of ground
ATFM delays for both enroute and airport, all expressed per composite flighthour (a metric
combiningenrouteflighthoursandairportmovements).Thiseconomicperformanceindicatoris
meanttocapturetradeoffsbetweenATCcapacityandcosts.
In 2012, ATM/CNS provision costs remained fairly constant (0.2%) while composite flighthours
decreasedby1.9%,resultinginanincreaseinunitATM/CNSprovisioncosts(+1.7%)comparedto
2011.Inthemeantime,forthesecondyearinarow,theunitcostsofATFMdelayssignificantlyfell
(39.3%)contributingtothesubstantialdecreaseinuniteconomiccostsobservedin2012(4.8%).
Asaresult,uniteconomiccostsamountedto492in2012.Thisislowerthanthelevelachieved
beforethefinancialcrisisandsubsequenteconomicrecession(i.e.uniteconomiccostsamounted
to544in2008).

percompositeflighthour(2012prices)

ATM/CNSprovisioncostspercompositeflighthour

600

UnitcostsofenrouteATFMdelays

UnitcostsofairportATFMdelays

ATM/CNSprovisioncosts

5.0%
10.1%

500

4.8%

Compositeflighthours

UnitcostsofATFMdelays

77.4%

40%

20%

400

+2.1%

+1.9% +3.9%

0%

300

0.2%

4.3%

200

20%

100

40%
200910

201011

37.6%

1.9%

201112

39.3%

0
2009

2010

2011

2012

Figure0.2:Changesinuniteconomiccosts,20092012(realterms)
ThechartontherighthandsideofFigure0.2showsthatafterareboundin2010(+2.1%)and2011
(+3.9%), traffic growth was negative in 2012 at PanEuropean system level (1.9%) mainly
reflectingtheuncertaintiesaffectingtheEuropeaneconomiesandtheEurozoneinparticular.
In2012,22outof37ANSPscouldreduceATM/CNSprovisioncostscomparedto2011.For18of
these ANSPs, the lower ATM/CNS costs were associated with a reduction in traffic volumes. In
most of the cases, the reduction in ATM/CNS provision costs could compensate for the fall in
trafficandthereforetheseANSPscouldavoidanincreaseinunitcosts.Atfacevalue,thisindicates
fortheseANSPsacertaindegreeofreactivityinadjustingcostsdownwardsinacontextoftraffic
decrease.
Executivesummary

ACE2012BenchmarkingReportwith20132017outlook

iii

On the other hand, Figure 0.3 shows that between 2011 and 2012 ATM/CNS provision costs
increasedbymorethan+5.0%forsixANSPsincludingARMATS(+8.5%),DFS(+5.6%),LFV(+12.8%),
MoldATSA(+14.5%),MUAC(+6.4%)andROMATSA(+20.5%).Themaindriversforthesesubstantial
increasesinATM/CNSprovisioncostsareprovidedinPartIofthisreport.

ChangesinATM/CNSprovisioncosts(20112012)

25%
20%

IncreaseinunitATM/CNS
provisioncosts

ROMATSA

15%

MoldATSA
LFV

10%

ARMATS
MUAC

5%

LPS

DFS

Skyguide
OroNavigacija
DCACCyprus NATS(Continental)
CroatiaControl
Finavia
NAVIAIR
AustroControl DSNA
Belgocontrol
BULATSA
HCAA
Aena
ENAV
LVNL
SloveniaControl
ANSCR
LGS
HungaroControl
NAVPortugal(Continental)
NATAAlbania

0%
5%

SMATSA

10%

Avinor(Continental)
PANSA

EANS

DHMI

UkSATSE

IAA
MNAV

MATS

15%

DecreaseinunitATM/CNS
provisioncosts

20%
10%

5%

0%

5%

10%

15%

Changesincompositeflighthours(20112012)

Figure0.3:ChangesinATM/CNSprovisioncostsandtrafficvolumes,20112012(realterms)
Figure 0.4 shows that the increase in unit ATM/CNS provision costs observed at PanEuropean
systemlevelin2012(+1.7%)ispartlyduetothefactthatemploymentcostsperATCOhourrose
by +1.3% while ATCOhour productivity remained fairly constant (+0.3%). Overall, in 2012 Pan
European ANSPs could limit the impact of the traffic decrease on productivity through a more
effectiveuseofavailableATCcapacityandexistingresources.Inthemeantime,unitsupportcosts
roseby+2.0%mainlyreflectingthefactthatatPanEuropeansystemlevelsupportcostswerenot
adjusted downwards compared to 2011 (+0.1%) while the number of composite flighthours
reducedby1.9%.
Weight
30%

+1.3%

Increasein
unitATM/CNS
provisioncosts
20112012
+1.7%

Weight
70%
+2.0%

+1.0%

+0.3%
ATCOhour Employment
productivity costsper
ATCOhour

"Traffic
effect"

+0.1%
ATCO
employment
costsper
compositeflight
hour

Supportcostsper
compositeflight
hour

"Supportcosts
effect"
1.9%

Figure0.4:Changesinthefinancialcosteffectivenessindicator,20112012(realterms)

Executivesummary

ACE2012BenchmarkingReportwith20132017outlook

iv

Gatetogate unit ATM/CNS provision


costs are then expected to increase in
2015(+0.8%)andtodecreasein2016(
1.9%) and 2017 (2.6%). Overall, unit
costsareplannedtodecreaseby0.8%
p.a.overthe20122017period.

ATM/CNSprovisioncostspercompositeflighthour

ATM/CNSprovisioncostsindex

Compositeflighthoursindex

600

120

500

+2.8%

115
2.9%

+0.8%

1.9%

2.6%

400

110

300

105

200

100

100

95

Indexofcostsandtraffic

percompositeflighthour(2012prices)

At European system level, after the


+1.7% increase in 2012, gatetogate
unit ATM/CNS provision costs are
plannedtofurtherriseby+2.8%in2013
andthentodecreaseby2.9%in2014.
Overall, gatetogate unit ATM/CNS
provision costs are expected to remain
fairlyconstantbetween2012and2014.

90
2012

2013P

2014P

2015P

2016P

2017P

Figure0.5:Forwardlookingcosteffectivenessat
Europeansystemlevel(20122017,realterms)

For most of the ANSPs, the planned enroute costs data reported in their ACE 2012 data
submission are based on the information provided in June 2013 in the context of the Enlarged
Committee for Route Charges. The enroute determined costs provided in the RP2 Performance
Plans which will be submitted end of June 2014 are likely to be based on different planning
assumptions.
In2012,ANSPscapitalexpendituresamountedtosome1075M.TherighthandsideofFigure0.6
comparesthecapexplannedinACE2011withtheplansprovidedinACE2012.Figure0.6shows
that 2012 actual capital expenditures are some 16% lower than planned in ACE 2011 for 2012.
This mainly reflects the postponement of noncrucial investment projects to future years, in
particular2015and2016.
1500

2.0

1%

1300
1%

4%
16%

3%

1.6

6%
+2%

1.2

900

+4%

600

0.8

300

0.4

0.0
2009

2010
Capex(M)

2011

2012

2013

Depreciation(M)

2014

2015

Gatetogatecapex(M)

+1%

+4% +23%

+2%

10%

Capextodepreciationratio

18%

1200

1400

2016

Capextodepreciationratio

1200
3.5%

1100
1000

16.5%

9.2%

2012

2013P

+3.6%

+3.4%

900
800
700
600
Plannedcapex(ACE2011)

2014P

2015P

2016P

Plannedcapex(ACE2012)

Figure0.6:ForwardlookingcapitalexpendituresatPanEuropeansystemlevel
(20092016,realterms)
Overall, the cumulative capex planned for the period 20132016amounts to some 4488M and
represents 50% of the 2012 total ANS revenues. A significant proportion of these investments
relatetomajorupgradesortothereplacementofexistingATMsystems.

Executivesummary

ACE2012BenchmarkingReportwith20132017outlook

INTRODUCTION
TheAirTrafficManagementCostEffectiveness(ACE)2012BenchmarkingReportcommissionedby
EUROCONTROL'sindependentPerformanceReviewCommission(PRC)isthetwelfthinaseriesof
reports comparing the ATM costeffectiveness of EUROCONTROL Member States Air Navigation
ServiceProviders(ANSPs)1.
In September 2010, the PRC, supported by the EUROCONTROL Performance Review Unit (PRU),
wasdesignatedPerformanceReviewBody(PRB)oftheEuropeanCommission(EC).
TheACEbenchmarkingworkiscarriedoutbythePRCinthecontextofArticles3.3(i),3.6(b)(c),and
3.8 of EC regulation N691/2010 (Performance Scheme) recently amended by EC Regulation
N390/2013.
ThereportisbasedoninformationprovidedbyANSPsincompliancewithDecisionNo.88ofthe
Permanent Commission of EUROCONTROL, which makes annual disclosure of ANS information
mandatory, according to the Specification for Economic Information Disclosure2 (SEID), in all
EUROCONTROLMemberStates.
Since these services are outside the PRCs terms of reference, this report does not address
performancerelatingto:
oceanicANS;
servicesprovidedtomilitaryoperationalairtraffic(OAT);or,
airport(landside)managementoperations.
The focus of this report is primarily on a crosssectional analysis of ANSPs for the year 2012.
However, the aviation community is also interested in measuring how costeffectiveness and
productivityattheEuropeanandANSPlevelsvariesovertime,andinunderstandingthereasons
whyvariationsoccur.Hence,thisreportmakesuseofpreviousyearsdatafrom2009onwardsto
examinechangesovertime,whererelevantandvalid.Itisparticularlyrelevanttohaveamedium
termperspectivegiventhecharacteristicsoftheANSindustrywhichrequiresalongleadtimeto
develop ATC capacity and infrastructure. In 2009, the economic recession affected the aviation
industry with an unprecedented 7% traffic decrease at system level, basically cancelling three
yearsoftrafficgrowth.Itisthereforeinterestingtolookatthechangesinperformanceoverthe
20092012 period to understand how the ATM industry reacted to this sharp decrease in traffic
demand.

1.1

Organisationofthereport

This report follows a different structure than the ACE 2011 report. This year, it was decided to
streamline the Report and to focus on ANSPs individual costeffectiveness performance. It is
expected that this piece of analysis will be particularly informative for the ATM stakeholders
involvedinthesettingupofperformanceplansforthesecondReferencePeriod(RP2)oftheSingle
EuropeanSky(SES)PerformanceScheme.
The structure of the present ACE 2012 Benchmarking Report is made of two parts and three
chapters:

PreviousreportsintheseriesfromACE2001(Sept.2003)toACE2011(April2013)canbefoundonthePRC
websiteathttp://www.eurocontrol.int/articles/prcandprbpublications.
2
PRCSpecificationforEconomicInformationDisclosureVersion2.6,December2008,canbefoundonthe
PRCwebsite.

Introduction
ACE2012BenchmarkingReportwith20132017outlook

Chapter1providesanoverviewoftheparticipatingANSPsandoutlinestheprocessesinvolvedin
theproductionofthisreport.
Part I and Chapter 2 provide a high level analysis of economic and financial costeffectiveness
performancein2012atPanEuropeansystemandANSPlevel.Thischapteralsoanalyseschanges
inATM/CNScosteffectivenessperformancebetween2009and2012.Aparticularfocusisputon
the three main economic drivers of costeffectiveness (productivity, employment costs and
supportcosts).Itshouldbenotedthatthisyearaspecialemphasisismadeonspecificproductivity
analysis at ACC level. Finally, Chapter 2 comprises a forwardlooking analysis of ATM/CNS
performanceoverthe20132017period,includingcapitalinvestmentprojections.
Part II and Chapter 3 provide a twopage summary for each ANSP. This summary includes an
individual trend analysis of ANSPs costeffectiveness performance between 2009 and 2012, and
comprises a benchmarking analysis of each ANSPs financial costeffectiveness with a set of
comparators.ItalsoexaminesthecapitalexpenditureplannedbyeachANSPfortheperiod2013
2017.ThischaptershouldprovideusefulinsightsandinformationtoNSAsforthedrawingupof
RP2performanceplansduringthefirsthalfof2014.Thisinformationcouldalsobeusedtosupport
theconsultationprocessoftheRP2PerformancePlanswithairspaceusers.
Finally,thisreportalsocomprisesseveralannexeswhichincludestatisticaldatausedinthereport,
and individual ANSP Fact Sheets comprising a factual description of the governance and
institutionalarrangementsinwhichtheANSPoperates.
1.2

OverviewofparticipatingANSPs

Intotal,37ANSPsreported2012dataincompliancewiththerequirementfromDecisionNo.88of
thePermanentCommissionofEUROCONTROL(seeTable1.1).InadditiontotheEUROCONTROL
MemberStates,theenrouteANSPofEstoniaprovideddataincompliancewiththePerformance
Scheme Regulation. All the reported information relates to the calendar year 2012. Table1.1
shows the list of participating ANSPs, describing both their organisational and corporate
arrangements,andthescopeofANSservicesprovided.
Table1.1belowindicates(colouredyellow)whichANSPswereat1January2012partoftheSES,
and hence subject to relevant SES regulations and obligations3. In addition to SES members, a
numberofStates(colouredblue)arecommitted,followingthesigningofanagreementrelatingto
theestablishmentofaEuropeanCommonAviationArea(ECAA)4,tocooperateinthefieldofATM,
withaviewtoextendingtheSESregulations5totheECAAStates.Hence,inprinciplealltheen
route ANSPs of EUROCONTROL States and other States disclosing information to the PRC are
coveredbytheSESregulations,exceptArmenia,Moldova,TurkeyandUkraine.

ItshouldbenotedthatCroatiajoinedtheEuropeanUnioninJuly2013.
Decision2006/682/ECpublishedon16October2006intheOfficialJournaloftheEuropeanUnion.States
whichhavesignedthisAgreementbutarenotyetEUmemberscomprisetheRepublicofAlbania,Bosniaand
Herzegovina, the former Yugoslav Republic of Macedonia, the Republic of Iceland, the Republic of
Montenegro,theKingdomofNorway,andtheRepublicofSerbia.
5
ThisincludesthesecondpackageofSESregulations(ECNo1070/2009),theamendedPerformanceScheme
Regulation(ECNo390/2013)andamendedChargingSchemeRegulation(ECNo391/2013).
4

Introduction
ACE2012BenchmarkingReportwith20132017outlook

36 SMATSA
37 UkSATSE

ES
CZ
AM
AT
NO
BE
BG
HR
CY
DE
TR
FR
EE
IT
FI
GR
HU
IE
SE
LV
SK
NL
MT
MK
MD

AL
UK
PT
DK
LT
PL
RO
CH
SI
RS
ME
UA

Spain
CzechRepublic
Armenia
Austria
Norway
Belgium
Bulgaria
Croatia
Cyprus
Germany
Turkey
France
Estonia
Italy
Finland
Greece
Hungary
Ireland
Sweden
Latvia
SlovakRepublic
Netherlands
Malta
F.Y.R.Macedonia
Moldova

Albania
UnitedKingdom
Portugal
Denmark
Lithuania
Poland
Romania
Switzerland
Slovenia
Serbia
Montenegro
Ukraine

Stateenterprise
Stateenterprise
Jointstockcompany(Stateowned)
Jointstockcompany(Stateowned)
Jointstockcompany(Stateowned)
Stateenterprise
Stateenterprise
Jointstockcompany(Stateowned)
Statebody
Limitedliabilitycompany(Stateowned)
Statebody(autonomousbudget)
Statebody(autonomousbudget)
Jointstockcompany(Stateowned)
Jointstockcompany(Stateowned)
Stateenterprise
Statebody
Stateenterprise
Jointstockcompany(Stateowned)
Stateenterprise
Jointstockcompany(Stateowned)
Stateenterprise
Independentadministrativebody
Jointstockcompany(Stateowned)
Jointstockcompany(Stateowned)
Stateenterprise
Internationalorganisation
Jointstockcompany(Stateowned)
Jointstockcompany(partprivate)
Stateenterprise
Stateenterprise
Stateenterprise
Statebody(actingasalegalentitywithanautonomousbudget)
Stateenterprise
Jointstockcompany(partprivate)
Stateenterprise
Limitedliabilitycompany

MUAC

DelegatedATM

Oceanic

Organisational&CorporateArrangements

InternalMET

Aena
ANSCR
ARMATS
AustroControl
Avinor
Belgocontrol
BULATSA
CroatiaControl
DCACCyprus
DFS
DHM
DSNA
EANS
ENAV
Finavia
HCAA
HungaroControl
IAA
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC
NATAAlbania
NATS
NAVPortugal
NAVIAIR
OroNavigacija
PANSA
ROMATSA
Skyguide
SloveniaControl

Country

Ownershipand
managementof
airports

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

Code

OATServices

ANSP

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

Stateenterprise

StatescoveredbytheSESRegulations
StatespartoftheECAA
StatesnotcoveredbytheSESRegulations

Table1.1:StatesandANSPsparticipatinginACE2012
Table1.1 also shows the extent to which the ANSPs incur costs relating to services that are not
provided by all ANSPs. In order to enhance costeffectiveness comparison across ANSPs, such
costs, relating to oceanic ANS, military operational air traffic6 (OAT), airport management
operationsandpaymentfordelegationofATMservices7wereexcludedtothemaximumpossible
extent.
1.3

Datasubmission

The SEID (see footnote 2) requires that participating ANSPs submit their information to the
PRC/PRU by 15 July in the year following the year to which it relates. The SEID became also
mandatoryaspartoftheSESIIlegislation.TheACE2012datahavebeensubmittedintheSEID
Version2.6whichhasbeenusedsinceACE2008.

Notethat sincethe10February2014,LPSisnotresponsibletoprovideOATservicestomilitaryflights.
Thecolumn'DelegatedATM'inTable1.1relatestothedelegationofATMservicestoorfromotherANSPs,
basedonfinancialagreements.
7

Introduction
ACE2012BenchmarkingReportwith20132017outlook

A Version 3.0 of this Specification has been prepared following the formal EUROCONTROL
RegulatoryandAdvisoryFramework(ERAF),afterconsultationandfullinvolvementoftheadhoc
ACEWorkingGroupusinglessonslearntfromtheuseoftheSEIDV2.6overatrialperiod.TheSEID
V3.0alsoreflectsrecentdevelopmentsarisingfromthesecondpackageoftheSESregulationsin
2009,thePerformanceSchemeRegulationandtheamendedChargingSchemeRegulation.
TheSEIDV3.0shallbeusedtoreport 2014datain July2015.ThiswillallowANSPstohavethe
required time during 2014 to smoothly introduce the changes into their reporting systems. This
transition period should ease the administrative burden on the ANSPs and ensure effective and
completeimplementationofallthenewaspectsoftheSEIDV3.0by2015.
Figure1.1indicatesthat28outof37ANSPsprovidedACE2012dataontime(comparedto25for
ACE2011).ItisimportantthatthistimelysubmissionofACEdataissustainedandimproved.The
ACE benchmarking analysis must be seen as timely since several stakeholders, most notably
ANSPsmanagement,regulatoryauthorities(e.g.NSAs)andairspaceusers,haveakeeninterestin
receiving the information in the ACE reports as early as possible. Clearly, the timescale for the
production of the ACE Benchmarking Report is inevitably delayed if data are not submitted on
time.
08102012

16092013

16092012

26082013

26082012

04082013

04082012

14072013

14072012

22062013

22062012

01062013

01062012

ACE2011dataprovidedon:

SubmissionofACE2011data

AustroControl
NAVIAIR
UkSATSE
MoldATSA
Finavia
IAA
OroNavigacija
HungaroControl
Belgocontrol
MUAC
LFV
ANSCR
LVNL
SloveniaControl
ROMATSA
Avinor
MATS
Skyguide
DFS
ENAV
LPS
NATS
NAVPortugal
PANSA
MNAV
EANS
Aena
BULATSA
LGS
ARMATS
CroatiaControl
DHMI
DSNA
SMATSA
DCACCyprus
HCAA
NATAAlbania

ACE2012dataprovidedon:

SubmissionofACE2012data
08102013

Figure1.1:Progresswithsubmissionof2012data
ThegeneralandgradualimprovementinthequalityandthetimingoftheACEdatasubmissionis
marredbysomeproblemsrelatingtofewindividualANSPs.Forinstance,eventhoughthequality
ofHCAAdatasubmissionshasrecentlyimproved,therearestillissuestobeaddressed.HCAAis
still not in a position to provide complete balancesheet data, although capitalrelated costs are
charged to airspace users. Similarly, the quality of the operational data provided by HCAA (in
particularstaffnumbersandworkinghours)isnotsatisfactory.
1.4

Dataanalysis,processingandreporting

ThePRUissupportedbyanACEWorkingGroup(WG),includingANSPs,regulatoryauthoritiesand
airspace users representatives. The process leading to the production of the ACE report,which
comprisesdataanalysisandconsultation,issummarisedinFigure1.2below.
Introduction
ACE2012BenchmarkingReportwith20132017outlook

2012ACEdata
submissions
providedbyANSPs
(Jul.2013)

Dataanalysis
andprocessing

Validationagainst:
previousdata
CRCOdata
AnnualReports
ConsultationofANSPs
fordataclarification
purposes

Firstdraft
ofACEreport
(Dec.2013)

Seconddraft
ACEreport
(April2014)

ACEconsultation
meetingsand
comments
ondraftreport

Submission
toPRC
(April2014)

FinalACE
Report
(May2014)

Including
twoweeksperiod
forwritten
consultation

EUROCONTROL/PRU2013

Figure1.2:Dataanalysis,processingandreporting
InordertoensurecomparabilityamongANSPsandqualityofanalysis,theinformationsubmitted
by the ANSPs is subject to a thorough analysis which makes extensive use of ANSPs Annual
Reportsandoftheirstatutoryfinancialaccounts.
Duringthisprocessanumberofissuesemerged:
AnnualReportswithdisclosureoffinancialaccountsarenotavailableforsomeANSPs(see
Section1.5below).Thisremovesonemeansofvalidatingthefinancialdatasubmitted;
ANSPswhichareinvolvedinnonANSactivities(suchasairportownershipandmanagement,
see Table1.1) do not necessarily disclose separate accounts for their ANS and nonANS
activities. This means that the financial data submitted for the ANS activities cannot be
validatedwiththeinformationprovidedintheAnnualReport;
Except for afew ANSPs,Annual Reports do not disclose the separate costs for the various
segmentsofANS(suchasenrouteandterminalANS)whichmeansthatthecostbreakdown
submittedcannotbereconciled.
As ANSPs progressively comply with the SES Regulation on Service Provision, which requires
publicationofAnnualReportsincludingstatutoryaccounts,andseparationofANSfromnonANS
activity in ANSPs internal accounts, some of these shortcomings are expected to be gradually
overcome(seealsoSection1.5below).
Inmostcases,datarecordedintheNetworkManager(NM)databasehavebeenusedasthebasis
fortheoutputmetricsusedintheACEdataanalysis,andthispracticehasbeengenerallyaccepted,
includingincaseswhereinpreviousyearstherehadbeendiscrepancies.
1.5

ANSPsAnnualReports

ANSPs Annual Reports provided a valuable means of validating the 2012 information disclosure
data.
TheSESServiceProvisionRegulation(SPR)(ECNo550/2004)cameintoforceon20April2004and
is applicable to 2012 Financial Accounts in all EU Member States (plus Switzerland and Norway)
andtoassociatedANSPs.ThisRegulationisalsoapplicabletoStateswhichhavesignedtheECAA
Agreement (see Section 1.2), although the timing of its implementation is not yet decided for
individualStates.Amongotherprovisions,theSPRrequiresthatANSPsmeetcertainstandardsof
informationdisclosure(transparency)andreporting,andinparticularthat:
ANSPsshoulddrawup,submittoauditandpublishtheirFinancialAccounts(Art.12.1);
in all cases, ANSPs should publish an Annual Report and regularly undergo an independent
audit(Art12.2);
Introduction
ACE2012BenchmarkingReportwith20132017outlook

ANSPs should, in their internal accounting, identify the relevant costs and income for ANS
brokendowninaccordancewithEUROCONTROLsprinciplesforestablishingthecostbasefor
route facility charges and the calculation of unit rates and, where appropriate, shall keep
consolidatedaccountsforother,nonairnavigationservices,astheywouldberequiredtodoif
the services in question were provided by separate undertakings (Art 12.3). The latter
requirement is particularly relevant for the ANSPs which are part of an organisation which
owns,managesandoperatesairports,suchasAena8,Avinor,Finavia,HCAA,andDHMI9.
Figure 1.3 displays the status of ANSPs 2012 Annual Reports and indicates that 30 out of 37
participatingANSPshavepublishedanAnnualReportfortheyear2012.
Itisgenerallyconsideredthatan
Annual
Report
produced
according to best practice
should comprise three main
components:

Aena*

HungaroControl*

ANSCR*

IAA*

AustroControl*

LFV*

Avinor*

LGS*

Belgocontrol*

LPS*

ARMATS

MNAV

MUAC*

DCACCyprus*

MoldATSA

Croatia
Control**

PANSA*

DSNA*

NATAAlbania**

ROMATSA*

HCAA*

AnnualFinancialAccounts
withrelevantbusiness
segmentationand
explanatorynotes;and,

DFS*

SloveniaControl*

DHMI

SMATSA**

EANS*

UkSATSE

anindependentAudit
Report.

LVNL*

NATS*

MATS*

NAVPortugal*

NAVIAIR*

OroNavigacija*

BULATSA*

aManagementReport;

Atthetimeofwritingthisreport,
seven ANSPs10 (including three
which are subject to SES
Regulations) have not published
AnnualReportsfor2012.

2012AnnualReportnot
publiclyavailable

ENAV*
Finavia*

Separatedisclosureof
revenuesandcostsforen
routeandterminalANS

Skyguide*
*ANSPscoveredbytheSESRegulations
**ANSPsoperatinginStatesmemberofECAA

ANSPs Annual Accounts are drafted in


accordance with specific accounting
principles. Often, (national) General
Accepted Accounting Principles (GAAP)
areused.InthecontextoftheSES,Article
12 of the SPR prescribes that ANSPs
Annual Accounts shall comply, to the
maximum
extent
possible,
with
International
Financial
Reporting
Standards (IFRS). Table 1.2 shows the 24
ANSPswhose2012AnnualAccountswere
partly or fully prepared according to
IFRS11.

Figure1.3:Statusof2012AnnualReports
ANSPsreportingaccordingtoIFRS
in2012
Aena
ARMATS
ANSCR
AustroControl
Avinor
BULATSA
CroatiaControl
DFS
EANS
LGS
LPS
LVNL

MATS
MUAC
NATAAlbania
NATS
NAVIAIR
NAVPortugal
OroNavigacija
PANSA
ROMATSA
Skyguide
SMATSA
UkSATSE

Table1.2:IFRSreportingstatus

In2011,Aenawentthrougharestructurationprocessrelatingtotheseparationoftheairportdivisionof
Aena(creationofanewcompanyAenaAeropuertosS.A.)fromtheANSdepartment.
9
AlthoughitshouldbenotedthatDHMIisnotcoveredbytheSESregulations.
10
Atthetimeofwritingthisreport,DSNAwhichreleasedAnnualReportsinthepreviousyears,hasnotyet
publishedanAnnualReportfortheyear2012.
11
SkyguideAnnualAccountsarepreparedaccordingtotheSwissGAAPwhichareclosetoIFRS.

Introduction
ACE2012BenchmarkingReportwith20132017outlook

Itshouldbenotedthatinsomecases,theimplementationofIFRSmayhaveasignificantimpact
onanANSPscostbase12(suchasdifferenttreatmentofcostsrelatedtothepensionscheme,and
changesindepreciationrules),henceitisveryimportanttoidentifyandunderstandtheimpactof
changesintheaccountingprinciplesusedtodrawthefinancialaccounts.
1.6

ANSPbenchmarkingandtheSESPerformanceScheme

The SES Performance Scheme includes EUwide performance targets which are transposed into
bindingnational/FABtargetsforwhichclearaccountabilitiesmustbeassignedwithinperformance
plans. Following the PRB recommendations, EUwide targets for CostEfficiency, Capacity and
Environment were adopted by the EC on 3 December 2010 for RP1 (20122014). It should be
notedthattheEUwideCostEfficiencytargetisexpressedintermsofenroutedeterminedcosts
perserviceunit,andiscomputedatChargingzonelevel(i.e.includingANSPs,MET,EUROCONTROL
andNSAscosts).
TheACEfactualandindependentbenchmarkinghassetthefoundationforanormativeanalysisto
quantify the potential scope of costefficiency improvements for ANSPs. Findings from the ACE
Benchmarking analysis and the gathering of intelligence on ANSPs costefficiency performance
directlyfeedthreecoreprocessesoftheSESPerformanceScheme:
1. EUwidecostefficiencytargetsetting;
2. AssessmentofthecostefficiencypartofFABs/NationalPerformancePlans;and,
3. MonitoringofthecostefficiencyperformanceduringaReferencePeriod.
Figure1.4belowpresentsthehighleveltimeframefortheUnionwidetargetsettingprocessfor
RP2. In September 2013, after an extensive public consultation, the PRB published
recommendations to the EC for the Unionwide targets covering RP2 (20152019). ANSP
benchmarking was one of the key evidences used to assess the scope for future performance
improvementsatUnionwidelevelandtobuilduptheproposalfortheUnionwidecostefficiency
targets.UnionwideperformancetargetsforRP2wereadoptedduringtheSingleSkyCommittee
adhocmeetingheldonthe4thFebruary2014.

Figure1.4:HighleveltimeframeforRP2Unionwidetargetsettingprocess
AsindicatedinFigure1.4above,NSAswilldrawupPerformancePlansforRP2duringthefirsthalf
of2014.Inthiscontext,theinformationdisclosedinPartIIoftheACE2012BenchmarkingReport
12

From 2007 onwards, this has been thecase for the German ANSP,DFS, whose cost base includes costs
recognised only since the conversion to IFRS. These costs, mainly due to the revaluation of DFS pension
obligations,havebeenspreadoveraperiodof15years.

Introduction
ACE2012BenchmarkingReportwith20132017outlook

(already available in the first draft released in December 2013) provided useful insight and
information to interested parties, including the consultations of the Performance Plan with
airspaceuserswhicharetakingplacebetweenFebruaryandJune2014.
Another important milestone in the Unionwide costefficiency target setting process will be the
assessmentofPerformancePlansforRP2duringtheSummer2014.TheACE2012dataanalysis
willbeanimportantinputtobeconsideredinthiscontext.
ForANSPsoperatinginSESStates,theyear2012marksthestartofRP1andtheendofthefull
costrecoverymechanismforenrouteANS.Underthefullcostrecoverymechanism,alltherisks
are borne by the airspace users. Moreover, it is considered that ANSPs are not sufficiently
incentivised to deliver a better costefficiency performance since they have to return any over
recoveries,evenifthesearetheresultofcostsavings.OverRP1,SESStates/ANSPsoperateunder
the determined costs method which comprises specific risksharing arrangements aiming at
incentivisingANSPseconomicperformance.ThefirstyearofRP1canbeconsideredasastress
testforthePerformanceSchemesinceatUnionwidelevelactualtrafficintermsofserviceunits
was some 6.5% lower than planned for 2012. The first PRB monitoring report on SES targets
released in September 2013 showed that at Unionwide level, actual enroute costs were 3.3%
thanplannedandthereforethatSESStatesshowedacertaindegreeofreactivitytoadjustcosts
downwardsinordertoadapttothelowertrafficvolumes.
This ACE 2012 Benchmarking Report complements the PRB monitoring activity by providing a
detailedcomparisonofcosteffectivenessperformanceatANSPlevelincludingatrendanalysisof
three main economic drivers (productivity, employment costs and support costs) over the 2009
2012period.

Introduction
ACE2012BenchmarkingReportwith20132017outlook

PARTI:PANEUROPEANSYSTEMCOSTEFFECTIVENESS
PERFORMANCEIN2012ANDOUTLOOKFOR20132017

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

10

2 PANEUROPEANSYSTEMCOSTEFFECTIVENESSPERFORMANCEIN2012
WITH20132017OUTLOOK
The PanEuropean ANS system analysed in this report comprises 37 participating ANSPs,
excludingelementsrelatedtoservicesprovidedtomilitaryoperationalairtraffic(OAT),oceanic
ANS,andlandsideairportmanagementoperations.ThePanEuropeanANSsystemalsoincludes
National Supervisory Authorities (NSAs) and other regulatory and governmental authorities,
nationalMETprovidersandtheEUROCONTROLAgency.In2012,totalANScostswerearound
9200M(seeTable2.1below),ofwhichsome8100Mrelateddirectlytotheprovisionofgate
togateATM/CNS.

2011
37ANSPs

GatetogateANSrevenues(notadjustedbyover/under
9176
recoveries)(inM):

EnrouteANSrevenues

TerminalANSrevenues

7287
1889

GatetogateANScosts(inM):
9145

ATM/CNSprovisioncosts

METcosts

EUROCONTROLAgencycosts
PaymenttonationalauthoritiesandirrecoverableVAT

8078
439
469
159

GatetogateATM/CNScosts(inM):
8078

EnrouteATM/CNScosts

TerminalATM/CNScosts

6241
1837

GatetogateANSstaff:
ATCOsinOPS
ACCATCOs
APPs+TWRsATCOs

2012
37ANSPs
8915

12/11
37ANSPs
2.8%

7025
1890
9153

3.6%
0.1%
0.1%

8059
439
489
167
8059

0.2%
0.1%
4.3%
4.5%
0.2%

6271
1788

0.5%
2.7%

0.1%
57942
58003
17208
17362
0.9%
9573
9709
1.4%
7635
7653
0.2%

NBVofgatetogatefixedassets(inM)

7759

7612

1.9%

Gatetogatecapex(inM)

1052

1075

2.2%

Outputs(inM)
Distancecontrolled(km)
Totalflighthourscontrolled
ACCflighthourscontrolled
IFRairportmovementscontrolled
IFRflightscontrolled
GatetogateATFMdelays('000min.)

10092
14.5
12.8
15.4
9.8
17823

9899
14.2
12.7
15.0
9.5
10610

1.9%
1.7%
1.0%
2.4%
2.4%
40.5%

Table2.1:Keysystemdatafor2011and2012,realterms
TotalANSrevenuesin2012amountedtosome8900M.TheEuropeanANSPsemployedsome
58000staff,whichisslightlylargerthantheworkforceatAirbusworldwide(55000employees).
Some17400staff(30%)wereATCOsworkingonoperationalduty,comparedtosome13300in
the United States13. On average, 2.3 additional staff are required for every ATCO in OPS in
Europe.
ACE also analyses indicators derived from ANSP balance sheets and capital expenditures. The
totalNetBookValue(NBV)offixedassetsusedbythePanEuropeanANSPstoprovideATM/CNS
servicesisvaluedatsome7600M,whichmeansthatoverall0.85offixedassetsarerequired
to generate 1 of revenue, an indication of relative capital intensity (this ratio is about 2 for
airlines and about 3 for main airports operators). Fixed assets mainly relate to ATM/CNS

13

SeethePRCreportontheU.S.EuropecontinentalcomparisonofANScostefficiencytrends20022011
(November 2013) available at http://www.eurocontrol.int/publications/20022011USeurope
continentalcomparisonanscostefficiencytrends.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

11

systems and equipment in operation or under construction. In 2012, the total ANSP capex at
PanEuropeansystemlevelamountedtosome1100M.
2012
GatetogateANScosts(Europeanlevel)
~9153M
EnrouteANScosts
TerminalANScosts
(Europeanlevel)
(Europeanlevel)
~7252M
~1901M
ATM/CNS

ATM/CNS

~6271M

~1788M

MET

MET

~348M

~91M

Paymentto
regulatory&
governmental
authorities
~144M

Paymentto
regulatory&
governmental
authorities
~22M

EUROCONTROL
~489M

Figure2.1:BreakdownofATM/CNS
provisioncosts,2012

From a methodological point of view, ACE 2012 first


considers the total costs at State level for providing
ANS, however, since some elements of ANS provision
are outside the control of individual ANSPs, it then
focuses on the specific costs of providing gatetogate
ATM/CNS(8059M).Theserepresent88%oftotalANS
costs.OtherANScostsincludethecostsofaeronautical
meteorology services (5%), the costs of the
EUROCONTROLAgency(5%)andthecostsassociatedto
regulatoryandgovernmentalauthorities(2%).
Table2.1aboveindicatesthatwhileATM/CNSprovision
costs remained fairly constant (0.2%) in 2012,
EUROCONTROL costs increased by +4.3%. It should be
noted that the level of 2011 EUROCONTROL costs was
exceptionally low reflecting the impact of a oneoff
exceptional reduction (62M) mainly relating to the
implementationofIFRSbudgeting.

Despitetheexistenceofcommongeneralprinciples,thereareinevitablydiscrepanciesincost
allocation between enroute and terminal ANS across the European ANSPs. This lack of
consistency might distort performance comparisons carried out separately for enroute and
terminalANS.Forthisreason,thefocusofthecosteffectivenessbenchmarkinganalysisinthis
reportisgatetogateANS.
ANSPsATM/CNSprovisioncostsarethendivided byanoutputmetrictoobtainameasureof
performance the financial costeffectiveness indicator. The output metric is the composite
flighthour,agatetogatemeasurewhichcombinesbothenrouteflighthourscontrolledand
IFRairportmovementscontrolled.
Many factors contribute to observed differences in unit costs between ANSPs. Some of these
factors are measurable; others (such as regulatory constraints) are less obviously quantifiable.
Currently,threerelevantfactorsthatareoutsideANSPscontrolareconsistentlymeasuredinthe
ACEBenchmarkingReports.AsshowninFigure2.2below,theseincludethetrafficcomplexity
andtheseasonaltrafficvariability.Thethirdfactoristhecostoflivingprevailinginthedifferent
countrieswhereANSPsoperate.

Traffic complexity score

Traffic variability

<= 2

<= 1.15

>2

> 1.15

>4

> 1.25

>6
>8

> 1.35
Lower Airspace

> 1.45

Lower Airspace

Figure2.2:ExogenousfactorsmeasuredbythePRU,2012

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

12

Ideally,sincethe37ANSPsoperateinverydiverseenvironmentsacrossEurope,allthefactors
affecting performance should be taken into account in making fair performance comparisons,
especiallysincemanyofthesefactorsareoutsidethedirectcontrolofanANSP.Asinprevious
years,theanalysisundertakenisapurelyfactualanalysisofthecosteffectivenessindicators
measuringwhattheindicatorsare.
Around56%totalEuropeangatetogateATM/CNSprovisioncostsarebornebyfiveANSPs
(Aena,DFS,DSNA,ENAVandNATS).
TheimpactofsizeonANSPsperformanceisanimportantpolicyissuegiventheinfrastructure
characteristicsoftheANSsector.
GatetogateATM/CNSprovisioncosts(inM)

CumulativeshareATM/CNSprovisioncosts

1200

100%

1080

90%

960

80%

840

70%
60%

720
600

50%

36.2%oftotalEuropeangatetogateATM/CNS
provisioncosts

480
360

40%
7.7%oftotalEuropeangatetogateATM/CNS
provisioncosts

240

30%
20%
10%

120

0%

0
DSNA
DFS
Aena
NATS(Continental)
ENAV
DHMI
Skyguide
UkSATSE
LFV
Avinor(Continental)
AustroControl
ROMATSA
LVNL
HCAA
Belgocontrol
PANSA
MUAC
NAVPortugal(Continental)
ANSCR
NAVIAIR
IAA
HungaroControl
CroatiaControl
SMATSA
BULATSA
Finavia
LPS
DCACCyprus
SloveniaControl
OroNavigacija
LGS
NATAAlbania
EANS
MATS
MNAV
MoldATSA
ARMATS

The five largest ANSPs


bear some 56% of total
European gatetogate
ATM/CNS
provision
costs, while their share
of traffic is 51%. At first
sight,
this
result
contrasts with the
expectation of some
form of increasing
returns to scale in the
provision of ANS (the
performance of larger
ANSPs might benefit
fromtheirlargersize).

56.0%oftotalEuropean
gatetogateATM/CNS
provisioncosts

Figure2.3:DistributionofATM/CNSprovisioncostsin2012

Itshouldbenotedthat:
UnderthefullcostrecoveryregimethatappliedtomostANSPsuntilDecember2011,there
waslittleincentivetofullyexploitscaleeffects,hencethedifficultytoobservethem;
Larger ANSPs tend to develop bespoke ATM systems internally which can be more costly
thanacommercialofftheshelf(COTS)solution;and,
SizeisnottheonlyfactorthathasanimpactonANSPscosts.
ItisexpectedthatwiththeregulatoryregimeintroducedbytheSESIIPerformanceSchemeand
the incentive scheme embedded in the Charging Scheme regulation, ANSPs will have stronger
incentivestoexploitscaleeffectsinfutureyears.
BecauseoftheirweightinthePanEuropeansystemandtheirrelativelysimilaroperationaland
economic characteristics (size, scope of service provided, economic conditions, presence of
major hubs), this ACE report places a particular focus on the results of the five largest ANSPs
(Aena,DFS,DSNA,ENAVandNATS).
In2012,theslightincreaseinunitATM/CNSprovisioncostswasmorethancompensatedby
a substantial decrease in ATFM delays. As a result, 2012 unit economic costs were
substantiallylowerthanprerecessionlevelsin2008.
AnassessmentofANSperformanceshouldtakeintoaccountthedirectcosts(usercharges)and
indirect costs (delays, additional flight time and fuel burn) borne by airspace users, while
checkingthatANSsafetystandardsaremet.
ThePRCintroducedinitsACEBenchmarkingReportstheconceptofeconomiccosteffectiveness
KPI.ThisindicatorisdefinedasgatetogateATM/CNSprovisioncostsplusthecostsofground

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

13

ATFM delays14 for both enroute and airport, all expressed per composite flighthour. This
economicperformanceindicatorismeanttocapturetradeoffsbetweenATCcapacityandcosts.
UnitcostsofairportATFMdelays

UnitcostsofenrouteATFMdelays

percompositeflighthour(2012prices)

ATM/CNSprovisioncostspercompositeflighthour

600

ATM/CNSprovisioncosts

5.0%
10.1%

500

Compositeflighthours

UnitcostsofATFMdelays

77.4%

40%

4.8%
20%

400
+2.1%

+1.9% +3.9%

0%

300

0.2%

4.3%

200

20%

100

40%
200910

201011

37.6%

1.9%

201112

39.3%

0
2009

2010

2011

2012

Figure2.4:Changesinuniteconomiccosts,20092012(realterms)
The level of the unit economic costs in 2009 reflects the substantial impact of the economic
recession on the ATM industry, when composite flighthours sharply reduced by 6.7%
comparedto2008andATM/CNSprovisioncostsroseby+1.3%.
In 2010, composite flighthours rose by +2.1% while ATM/CNS provision costs fell by 4.3% in
realterms.ThereductioninATM/CNSprovisioncostsreflectedtheimpactofcostcontainment
measuresimplementedbyseveralEuropeanANSPs.However,thisperformanceimprovement
atsystemlevelwasoutweighedbyasharpincreaseintheunitcostsofATFMdelaysforalimited
numberofANSPsandoverall,uniteconomiccostsroseby+5.0%in2010.
In2011,compositeflighthoursincreasedfaster(+3.9%)thanATM/CNSprovisioncosts(+1.9%),
resultingina2.0%decreaseinunitATM/CNS provisioncostscomparedto2010.Inaddition,
since the unit costs of ATFM delays significantly reduced (37.6%), unit economic costs
substantiallydecreasedin2011(10.1%).
In2012,ATM/CNSprovisioncostsremainedfairlyconstant(0.2%)whilecompositeflighthours
decreasedby1.9%,resultinginanincreaseinunitATM/CNSprovisioncosts(+1.7%)compared
to 2011. In the meantime, for the second year in a row, the unit costs of ATFM delays
significantly fell (39.3%) contributing to the substantial decrease in unit economic costs
observed in 2012 (4.8%). As a result, unit economic costs amounted to 492 in 2012. This is
lowerthanthelevelachievedbeforetheeconomiccrisis(i.e.uniteconomiccostsamountedto
544in2008).
Figure 2.5 below shows that between 2011 and 2012, economic gatetogate costs per
compositeflighthourfellfor20ANSPs.FortenoftheseANSPs,themaindriverforthedecrease
ineconomicgatetogateunitcostwasareductioninATFMdelays(seeredportionofthebar).
ThisisparticularlythecaseforAena,HCAAandNATAAlbania.

14

ThecostofATFMdelays(85perminutein2012)isbasedonthefindingsofthestudyEuropeanairline
delaycostreferencevaluesrealisedbytheUniversityofWestminsterinMarch2011.Furtherdetailson
thecomputationoftheeconomiccostspercompositeflighthouratANSPandPanEuropeansystemlevel
areavailableinAnnex2ofthisreport.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

14

100

200

300

400

500

600

700

800

900

1000

DCACCyprus

UkSATSE

MNAV
Avinor
(Continental)
MoldATSA
ARMATS

15

NAVIAIR
BULATSA
Finavia
OroNavigacija
PANSA
IAA

Figure2.5:ChangesineconomiccosteffectivenessbyANSP,20092012(realterms)

NAVPortugal
(Continental)
HCAA
DHMI

LVNL

LFV

DFS

2008
2009
2010
2011
2012

2008
2009
2010
2011
2012

Skyguide

NATAAlbania

LPS

2008
2009
2010
2011
2012

2008
2009
2010
2011
2012

Belgocontrol

ROMATSA

MUAC

SMATSA

Croatia
Control

Hungaro
Control

ANSCR

NATS
(Continental)

ENAV

Slovenia
Control

DSNA

AustroControl

Aena

2008
2009
2010
2011
2012

100

2008
2009
2010
2011
2012

200

2008
2009
2010
2011
2012

300

2008
2009
2010
2011
2012

400

2008
2009
2010
2011
2012

500

2008
2009
2010
2011
2012

600

2008
2009
2010
2011
2012

700

2008
2009
2010
2011
2012

800

2008
2009
2010
2011
2012

ATFMdelayscostspercompositeflighthour

2008
2009
2010
2011
2012

ATM/CNSprovisioncostspercompositeflighthour

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

percompositeflighthour

2008
2009
2010
2011
2012

900

2008
2009
2010
2011
2012

percompositeflighthour

2008
2009
2010
2011
2012

1000

2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012
2008
2009
2010
2011
2012

LGS

2008
2009
2010
2011
2012

EANS

2008
2009
2010
2011
2012

MATS

2008
2009
2010
2011
2012

The quality of service improvement observed for Aena mainly reflects a substantial reduction of
theenrouteATFMdelaysgeneratedbytheSpanishACCs.In2011,ATFMdelaysrepresented25%
of Aena economic costs which was substantially higher than the PanEuropean system average
(16%). These ATFM delays were partly due to (a) social tensions following the transition period
that was ongoing Spain in 2010 and 2011, and (b) to the unexpected impact of the Arab Spring
eventsonthetrafficdemandwhichexceededthecapacityavailable(i.e.thiswasparticularlythe
case for Barcelona, Palma and Canarias ACCs). In 2012, the share of ATFM delays in Aena unit
economic costs reduced to a level (10%) close to those observed in 2008 and 2009. This is an
indication that the capacity issues observed for Aena in 2010 and 2011 have been addressed in
2012.
ThesubstantialreductioninATFMdelaysforHCAAcontributedtothedecreaseobservedatPan
Europeansystemlevel.TheshareofATFMdelaysinHCAAeconomiccostswasexceptionallyhigh
in2011(57%)mainlyduetosocialtensions.In2012,itappearsthatthisissuewasaddressedsince
theshareofATFMdelaysinHCAAeconomiccostsreducedto10%inlinewiththePanEuropean
systemaverage.
Ontheotherhand,fortwoANSPs(DCACCyprusandNAVPortugal)theshareofATFMdelaysin
economiccostsaccountsformorethan20%in2012.DCACCyprushashadrecurrentATCcapacity
issues for several years. The implementation of capacity enhancement measures contributed to
reduceATFMdelaysin20112012comparedtopreviousyears.However,itshouldbenotedthat
theshareofATFMdelaysinDCACCyprusuniteconomiccostsremainsveryhighatsome50%in
2012.ThehigherunitcostsofATFMdelaysforNAVPortugalin2012mainlyreflectanincreasein
ATFMdelaysinthelastmonthsoftheyearmainlyduetoATCstaffingissues.
ThereisawiderangeofunitATM/CNSprovisioncostsamongstANSPsin2012.
In 2012, unit ATM/CNS provision costs range from 732 (Belgocontrol) to 174 (EANS), a factor
greater than four. Although the five largest ANSPs operate in relatively similar economic and
operationalenvironments,thereisasubstantialvariationinunitATM/CNSprovisioncosts,ranging
fromDFS(552)toNATS(434).

640

400
300

552

521

483

443

434

400
588

565 552

521

502 499 489

200
483
451 449 443 443443 438438 434

409 393 393

0
371 368363 357

NATS
(Continental)

500

600

DSNA

percompositeflighthour

609

600

GatetogateATM/CNS

ENAV

700

Europeansystemaverage:443

Aena

732

DFS

800

354 349 332


308302

293

265 252

245
193
174

200

Belgocontrol
Skyguide
LPS
LVNL
UkSATSE
DFS
Aena
ROMATSA
SloveniaControl
AustroControl
ENAV
NATAAlbania
MNAV
LFV
DSNA
MoldATSA
ANSCR
HungaroControl
NATS(Continental)
ARMATS
Avinor(Continental)
NAVIAIR
BULATSA
OroNavigacija
CroatiaControl
NAVPortugal(Continental)
IAA
Finavia
SMATSA
HCAA
PANSA
DHMI
DCACCyprus
MUAC
LGS
MATS
EANS

100

Figure2.6:ATM/CNSprovisioncostspercompositeflighthour,2012
PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

16

BelgocontrolandLVNLareamongsttheANSPswiththehighestunitcosts,rankingfirstandfourth
inFigure2.6above.ItshouldbenotedthatbothANSPsexclusivelyprovideATCservicesinlower
airspace and own infrastructure which is made available to MUAC. To better assess the cost
effectiveness of ATM/CNS provided in each of the Four States (Belgium, Germany, the
Netherlands,andLuxembourg)nationalairspaces,MUACcostsandoutputsareconsolidatedwith
thecostsandoutputsofthenationalproviders.ThisadjustmentispresentedinFigure2.7below.
732

600

563

552

588
517
441

400
318
255
190

200

MUAC
Flighthoursallocatedto:
Costsallocatedto:

MUAC
Netherlands

Dutch
airspace

LVNL

MUAC
Germany

German
airspace

DFS

MUAC
Belgium

Belgian
airspace

0
Belgocontrol

ThetopofFigure2.7providesaview
of this consolidated ATM/CNS
provision costs per composite flight
hour in the airspace of Belgium, the
Netherlands and Germany (see blue
bars).

800

percompositeflighthour

The bottom of Figure2.7 shows the


figureswhichhavebeenusedforthis
adjustment. The costs figures are
based on the cost allocation keys
usedtoestablishtheFourStatescost
base,whiletheflighthoursarebased
on those controlled by MUAC in the
threeFIRs(Belgium,Netherlandsand
Germany).

Belgium
141400

Germany
257400

Netherlands
161600

44.9M

65.6M

30.7M

Figure2.7:Adjustmentofthefinancialcosteffectiveness
indicatorforANSPsoperatingintheFourStatesairspace,
2012

Figure2.6indicatesthatin2012theunitATM/CNSprovisioncostsofvariousANSPsoperatingin
Central and Eastern European countries (e.g. LPS, UkSATSE, ROMATSA, Slovenia Control, NATA
AlbaniaandMNAV)arehigherthanthePanEuropeansystemaverageandinthesameorderof
magnitudeastheunitcostsofANSPsoperatinginWesternEuropeancountrieswherethecostof
living is much higher. For most of these ANSPs, the relatively higher unit costs mainly reflect
relatively lower ATCOhour productivity (see Figure 2.15 on p.24) and/or relatively higher unit
supportcosts(seeFigure2.26onp.33).
In2012,22 ANSPscould reduceATM/CNSprovisioncostscomparedto2011actuals,mostof
them in a context of traffic decrease. This shows a certain degree of reactivity in adjusting
costsdownwardsinordertoadapttothelowertrafficvolumes.
At PanEuropean system level, the unit ATM/CNS provision costs reduced by 6.6% compared to
2009andamountto443in2012.Thisindicatesthatthreeyearsafterthesharptrafficdecrease
experiencedin2009,unitATM/CNSprovisioncostsreachedin2012alevelclosetothatachieved
beforetheeconomiccrisis(i.e.436in2008).
Figure2.8providesadetailedanalysisofthechangesincosteffectivenessatANSPlevelbetween
2011and2012,identifyingthecostandthetrafficeffects.Figure2.8showsthat22ANSPscould
reducetheirATM/CNSprovisioncostsbetween2011and2012(seelowerpartofthechart).For
18ANSPs,thelowerATM/CNScostswereassociatedwithareductionintrafficvolumes.Inmostof
the cases, the reduction in ATM/CNS provision costs could compensate for the fall in traffic and
thereforetheseANSPscouldavoidanincreaseinunitcosts.Atfacevalue,thisindicatesforthese
ANSPsacertaindegreeofreactivityinadjustingcostsdownwardsinacontextoftrafficdecrease.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

17

ChangesinATM/CNSprovisioncosts(20112012)

25%
20%

IncreaseinunitATM/CNS
provisioncosts

ROMATSA

15%

MoldATSA
LFV

10%

ARMATS
MUAC

5%

DFS

LPS

Skyguide
OroNavigacija
DCACCyprus NATS(Continental)
CroatiaControl
Finavia
NAVIAIR
AustroControl DSNA
Belgocontrol
BULATSA
HCAA
Aena
ENAV
LVNL
SloveniaControl
ANSCR
LGS
HungaroControl
NAVPortugal(Continental)
NATAAlbania

0%
5%

SMATSA

10%

Avinor(Continental)
PANSA

EANS

DHMI

UkSATSE

IAA
MNAV

MATS

15%
20%
10%

DecreaseinunitATM/CNS
provisioncosts
5%

0%

5%

10%

15%

Changesincompositeflighthours(20112012)

Figure2.8:ChangesinATM/CNSprovisioncostsandtrafficvolumes,20112012(realterms)
Figure 2.8 also shows that four ANSPs (DHMI, IAA, MATS and UkSATSE) could reduce ATM/CNS
provisioncostsinacontextoftrafficincreasein2012.
Out of the five largest ANSPs, Aena (2.8%), ENAV (4.5%) and DSNA (1.4%) could achieve a
reductioninATM/CNSprovisioncostsin2012inacontextoftrafficdecrease(8.5%,4.4%and
0.8%, respectively). For Aena, this performance improvement was not sufficient to avoid an
increase in unit ATM/CNS provision costs in 2012 (+6.3%). In 2012, unit costs also increased for
DFS(+8.3%)andNATS(+2.6%).ForDFS,theincreaseinunitcostsreflectsanincreaseinATM/CNS
provisioncosts(+5.6%)mainlyduetohigherstaffcosts(+10%or+63.8M)whiletrafficdecreased
by2.5%.TheincreaseinDFSstaffcostsobservedfortheyear2012mainlyreflects(a)anincrease
in pension costs consecutive to a change in the discount rate for occupational pensions, and (b)
highergrosswagesandsalariesreflectingthecollectiveagreementssignedinOctober2011.For
NATS,theincreaseinunitATM/CNSprovisioncostsmainlyresultsfromhigherATM/CNSprovision
costs(+1.6%),andinparticularhigherdepreciationcosts(+19%)whiletrafficdecreasedby1.0%.
ThehigherdepreciationcostsforNATSin2012mainlyreflectthefirstfullyearofdepreciationof
iFACTSandtheimplementationoftheElectronicFlightDatafeatureintheFDPsystem.
Figure2.8alsoindicatesthatbetween2011and2012,ATM/CNSprovisioncostsincreasedbymore
than+5.0%forsixANSPs(includingDFS):
ForMUAC,theincreaseinATM/CNSprovisioncosts(+6.4%)mainlyreflectshigherstaffcosts
whicharedueto(a)thepaymentofabonustothestaffforachievingperformanceobjectives,
and(b)toretroactivesalaryadjustmentsaccordingtoIAS.
The increase in ATM/CNS provision costs for MoldATSA (+14.5%) is due to higher operating
costsanddepreciationcostswhiletrafficincreasedby+4.6%.
For ARMATS, ATM/CNS provision costs substantially increased in 2012 (+8.5%) while traffic
volumes reduced by 2.5%. The rise in ATM/CNS provision costs mainly reflects higher staff
costsandcapitalrelatedcosts.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

18

The significant increase in ROMATSA 2012 gatetogate ATM/CNS provision costs (+20.5%)
mainlyreflectsthereportingofexceptionalcostsrelatingtoaprovisionforemployeebenefits.
Excluding those exceptional costs, ROMATSA 2012 ATM/CNS provision costs would have
remainedfairlyconstant(+0.2%)comparedto2011.
LFVATM/CNSprovisioncostsroseby+12.8%in2012whiletrafficfellby3.4%.Theincrease
in LFV ATM/CNS provision costs mainly reflects significantly higher pension related costs
associatedwiththeincreaseoffuturepensionobligations.
MoredetailsonthechangesinunitATM/CNSprovisioncostsforindividualANSPsareprovidedin
PartIIofthisReport.
In a context of lower traffic growth than expected, actual 2012 ATM/CNS provision costs are
some3%lowerthanplannedinNovember2011.ThisisalsothecaseformostoftheSESANSPs:
an indication that the financial incentives embedded within the charging scheme already
providedsomeresultsforthefirstyearofRP1.
Another complementary analysis to assess the degree of ANSPs reactivity to adjust costs
downwards in response to the decrease in traffic is to compare the actual 2012 ATM/CNS
provisioncostswiththeplanspreparedinNovember2011(andreportedaspartoftheACE2010
datacycle)15.Fortheyears20122014whichcorrespondtotheSESPerformanceSchemeRP1,the
costsandtrafficinformationprovidedinACE2010bytheANSPsoperatinginSESStatesisinline
withtheinformationdisclosedinadoptedNationalPerformancePlans.
Table2.2indicatesthatin2012,theactualnumberofcompositeflighthoursis5.1%lowerthan
plannedinACE2010(November2011).Table2.2alsoshowsthatactual2012ATM/CNSprovision
costsare235M(or3.1%)lowerthanplanned,whichisanoteworthyachievementfortheANS
industry, although this was not sufficient to compensate for the lower traffic and therefore to
avoidhigherthanplannedunitATM/CNSprovisioncosts(+2.1%).
Europeansystemlevel
PlannedcompositeflighthoursinNov.2011(M)
Actualcompositeflighthours(M)
Differencebetweenactualandplannedcompositeflighthours(%)

2012
17.3
16.5
5.1%

PlannedATM/CNSprovisioncostsinNov.2011(M2012)
ActualATM/CNSprovisioncosts(M2012)
Differencebetweenactualandplannedcosts(M2012)
Differencebetweenactualandplannedcosts(%)

7533
7298
235
3.1%

Table2.2:ComparisonofATM/CNSprovisioncostsandcompositeflighthoursatsystemlevel
(figuresprovidedinNov.2011versusactualdata)(2012)
Figure 2.9 below shows that for 30 ANSPs, the actual 2012 traffic was lower than planned in
November2011.ForeightANSPs,theactual2012trafficwasatleast10%belowACE2010plans.
It should be noted that in November 2011 some of these ANSPs planned for a rather optimistic
traffic growth which did not materialise in 2012. This is the case for Croatia Control which
expectedatrafficincreaseof+10%in2012.
For MATS, the actual 2012 traffic was +49.2% higher than planned in November 2011. This
substantialdeviationisduetothefactthatin2012,followingthecivilwar,partofLibyanairspace
was closed and flights that used to cross from East to West through the Libyan airspace were
passingthroughtheairspacecontrolledbyMATS.

15

Note that the planned enroute costs provided by NATS in its ACE 2010 submission reflect the figures
reportedintheUKPerformancePlanforRP1.ThisisdifferentfromthemethodologyusedbyNATStoreport
historicandactualATM/CNSprovisioncostswhicharebasedonIFRSaccounting.Forthisreason,NATSis
notincludedinthisanalysis.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

19


Figure2.9:Comparisonof2012actualATM/CNSprovisioncostsandtrafficwithACE2010
plans(realterms)
Figure2.9showsthatfor28ANSPs,actual2012costswerelowerthanplannedinNovember2011.
AmongthefivelargestANSPs,2012actualcostswerelowerthanplannedforAena(6.6%),DSNA
(4.8%) and ENAV (9.4%). Given their weight in the European system, these ANSPs significantly
contributedtoreduceactual2012ATM/CNSprovisioncostsby3.1%comparedtoACE2010plans.
Ontheotherhand,DFS2012actualcostswereslightlyhigherthanplanned(i.e.+1.1%).
ForsixANSPs,2012actualcostsaremorethan10%lowerthanplannedinNovember2011(i.e.
MATS (24.4%), MNAV (17.7%), DCAC Cyprus (16.9%), IAA (10.6%), DHMI (10.6%) and NATA
Albania(10.2%).Itshouldbenoted,however,thattheseANSPs(exceptDCACCyprusandMNAV)
wereplanningforsignificantcostsincreasescomparedtotheir2010levels.
TherighthandsideofFigure2.9showsthatforeightANSPs,actual2012costswerehigherthan
planned in November 2011. For four of them, NAV Portugal (+6.2%), ROMATSA (+9.6%), LFV
(+13.7%)andUkSATSE(+22.9%)actualcostsweremorethan+5%higherthanplanned.
ForANSPsoperatinginSESStates,theyear2012marksthestartofRP1withthedeterminedcosts
methodandtheendofthefullcostrecoverymechanismforenrouteANS.Figure2.9shows
that for most of the SES ANSPs, ATM/CNS provision costs are lower than planned in November
2011 plans. This is an indication that the financial incentives embedded within the charging
schemealreadyprovidedsomeresultsforthefirstyearofRP1.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

20

At PanEuropean system level, ATCOemployment costs increased while productivity remained


fairlyconstantandunitsupportcostsroseinacontextoftrafficdecrease.Asaresult,financial
costeffectivenessperformanceslightlydeterioratedin2012.
In2012atPanEuropeansystemlevel,theaverageATM/CNSprovisioncostpercompositeflight
hour is 443. Figure 2.10 shows the analytical framework which is used in the ACE analysis to
breakdownthefinancialcosteffectivenessindicatorintobasiceconomicdrivers.

Compositeflight
hours
18.2M

Key drivers for the financial


costeffectiveness performance
include:

ATCOhour
Productivity
0.80
ATCOsemployment
costsper
unitofoutput
133

ATCOinOPS
hoursonduty
22.8M
ATCOemployment
costsperATCOhour
106

Financial
costeffectiveness
indicator
443

Employment
costsfor
ATCOsinOPS
2417M

Supportcostsper
unitofoutput
310

a) ATCOhour
productivity
(0.80 composite flight
hoursperATCOhour);
b) ATCO employment costs
perATCOhour(106);and,

Supportcosts
5642M

Supportcostratio
3.3

c) support costs per unit


output(310).

ATM/CNS
provisioncosts
8059M
EUROCONTROL/PRU

Figure2.10:ACEperformanceframework,2012
Around30%ofATM/CNSprovisiondirectlyrelatestoATCOsinOPSemploymentcostswhile70%
relatetosupportfunctionsincludingnonATCOsinOPSemploymentcosts,nonstaffoperating
costsandcapitalrelatedcostssuchasdepreciationcostsandthecostofcapital.
At system level, unit ATM/CNS provision costs rose by +1.7% in real terms between 2011 and
2012. Figure 2.11 shows that in 2012, employment costs per ATCOhour rose by +1.3% while
ATCOhourproductivityremainedfairlyconstant(+0.3%).Inthemeantime,unitsupportcostsrose
by +2.0% mainly reflecting the fact that at PanEuropean system level support costs were not
adjusted downwards compared to 2011 (+0.1%) while the number of composite flighthours
reducedby1.9%.
Weight
30%

+1.3%

Increasein
unitATM/CNS
provisioncosts
20112012
+1.7%

Weight
70%
+2.0%

+1.0%

+0.3%
ATCOhour Employment
productivity costsper
ATCOhour

+0.1%
ATCO
employment
costsper
compositeflight
hour

Supportcostsper
compositeflight
hour

"Traffic
effect"

"Supportcosts
effect"
1.9%

Figure2.11:Changesinthefinancialcosteffectivenessindicator,20112012(realterms)
Adetailedanalysisofthechangesinthekeydriversofcosteffectivenessbetween2009and2012
isprovidedhereafter.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

21

Overall, in 2012 PanEuropean ANSPs could limit the impact of the traffic decrease on
productivitythroughamoreeffectiveuseofavailableATCcapacityandexistingresources.
Overthefouryearsperiod(20092012),ATCOhourproductivityroseby+10.1%atPanEuropean
system level. Figure 2.12 indicates that starting from a low base in 2009 (reflecting the fall in
traffic which resulted from the economic recession), ATCOhour productivity substantially
increased for two consecutive years (+6.7% in 2010 and +2.9% in 2011) and remained fairly
constantin2012(+0.3%).
1.1

6.7%

0.8

2.9%

AverageforANSPsabovethemedianofthesample
PanEuropeansystemaverage
AverageforANSPsbelowthemedianofthesample

1.0

0.3%
ATCOhourperflighthour

CompositeflighthourperATCO
houronduty

1.0

0.6
0.4

0.9

0.88

0.8

0.88

0.77

0.89

0.89

0.80

0.80

0.66

0.66

0.73
0.7
0.61

0.2

0.6
0.53

0.0

0.5

2009

2010

2011

2012

2009

2010

2011

2012

Figure2.12:ChangesinATCOhourproductivity,20092012
The increases in ATCOhour productivity observed at PanEuropean system level over the 2009
2012 period mainly reflect improvements in ANSPs with relatively lower ATCOhour productivity
levels(seegreenlineintherighthandchartofFigure2.12),whiletheATCOhourproductivityof
ANSPswithhigherproductivitylevelsremainedrelativelyconstant.
Strong productivity increases were mainly achieved by Central and Eastern Europe ANSPs
benefiting from higher traffic growth. However, significant improvements in productivity were
alsoachievedbysomeANSPswhichstartedfromahigherbasein2009(e.g.IAA).

Figure2.13 shows that the reduction


ofATCOhoursondutybetween2009
and 2012 is mainly driven by a
significantdecreaseinovertimehours
(72.0%)overthewholeperiod.

Averageovertimehoursondutyperyear
AverageATCOhourondutyperyear(withoutovertime)

ATCOhoursondutyperATCOperyear

At PanEuropean system level, the


increase in productivity achieved
between 2009 and 2012 (+10.1%) is
mainlyduetothefactthattheoverall
trafficincrease(+4.1%)wasabsorbed
with substantially fewer ATCOhours
onduty(5.4%).

1600
1428

1400

1401

1391

1352

1200

1000

800
2009

2010

2011

2012

Figure2.13:ChangesinaverageATCOhourson
duty,20092012

Theseresultsareheavilyinfluencedbythestructuralchangesimplementedin20102011byAena
followingtheintroductionofLaw9/2010whichwasadoptedinSpainin2010.Thislawintroduced
new working conditions for Spanish ATCOs, rising contractual working hours and significantly
reducing the number of overtime hours, which was one of the main driver for high ATCO
employment costs and relatively lower productivity for Aena in the past. Indeed, between 2009
and2012,AenaATCOhourproductivitysubstantiallyincreasedfrom0.52to0.78(+50%).
Inaddition,asshowninFigure2.14below,26outof37ANSPscouldreduceATCOhoursondutyin
2012.Thisindicatesthatoverall,in2012PanEuropeanANSPscouldlimittheimpactofthetraffic
PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

22

decrease on productivity through a more effective use of available ATC capacity and existing
resources.

EE
CY
LV
TR
MK
IE
NO
MD
UA
FR
HR
PL
DE
ES
AT
RO
SK
UK
SE
PT
SB
AM
SI
LT
CH
CZ
BE
DK
HU
IT
GR
NL
FI
MT
AL
BG

"ATCOhour
effect"

EANS
DCACCyprus
LGS
DHMI
MNAV
IAA
Avinor(Continental)
MoldATSA
UkSATSE
DSNA
CroatiaControl
PANSA
DFS
Aena
MUAC
AustroControl
ROMATSA
LPS
NATS(Continental)
LFV
NAVPortugal(Continental)
SMATSA
ARMATS
SloveniaControl
OroNavigacija
Skyguide
ANSCR
Belgocontrol
NAVIAIR
HungaroControl
ENAV
HCAA
LVNL
Finavia
MATS
NATAAlbania
BULATSA

Country

(C)
"Trafficeffect"

ANSPs

(B)

ChangesinATCO
hourproductivity
20112012

(A)

32.8%
16.6%
15.5%
11.1%
7.9%
7.5%
6.1%
5.6%
4.0%
1.8%
1.0%
0.1%
0.1%
0.3%
0.4%
0.5%
0.6%
0.7%
1.1%
1.2%
1.6%
1.6%
1.7%
2.5%
3.8%
3.9%
3.9%
4.0%
4.2%
4.2%
4.2%
4.7%
5.9%
7.0%
8.0%
8.5%
10.4%

8.5%
2.8%
0.4%
5.1%
9.1%
0.6%
4.5%
4.6%
3.5%
0.8%
0.6%
5.8%
2.5%
8.5%
0.7%
2.9%
1.3%
1.8%
1.0%
3.4%
1.3%
5.0%
2.5%
0.1%
0.1%
1.2%
4.9%
4.6%
5.3%
6.6%
4.4%
4.7%
2.2%
8.6%
14.8%
3.0%
2.4%

18.3%
16.7%
13.8%
5.5%
15.8%
6.4%
1.5%
1.0%
0.5%
2.6%
1.6%
5.6%
2.6%
8.2%
0.3%
2.4%
0.7%
1.1%
0.1%
2.3%
0.3%
3.4%
0.8%
2.5%
4.0%
2.8%
1.0%
0.6%
1.2%
2.5%
0.2%
0.0%
3.9%
1.6%
24.7%
6.0%
8.9%

Positive values in column (A) mean


that productivity improved between
2011and2012.

Positive values in column (B) mean


that traffic volumes rose between
2011and2012.

Positive values in column (C) mean


thatthenumberofATCOhoursrose
between 2011 and 2012. All other
things being equal, a positive value
contributes to lower productivity
(hencethereddot).

Productivityimprovesiftrafficgrows
fasterthantheATCOhoursonduty.

Forexample:IAAs2012productivity
is+7.5%higherthanin2011because
while traffic slightly increased by
+0.6%, the number of ATCOhours
decreasedby6.4%.

Note: By mathematical construction,


the % variation in productivity (A)
can be approximated as the
difference between the traffic
effect (B) and the ATCOhour
effect (C). The larger the %
variations, the less accurate the
approximation. This explains why in
somecases(A)isnotexactlyequalto
(B) (C).

0.3%
1.9%
2.1%
TotalPanEuropeanSystem
Figure2.14:AnnualchangesinATCOhourproductivity,compositeflighthoursandATCOhours
onduty,20112012

In 2012, the ATCOhour productivity of the PanEuropean system as a whole amounted to 0.80
composite flighthours per ATCOhour. The ATCOhour productivity for each ANSP in 2012 is
showninFigure2.15below.ItisimportanttonotethatthemetricofATCOhourproductivityused
inthisreportreflectstheaverageproductivityduringayearforagivenANSPanddoesnotgivean
indicationoftheproductivityatpeaktimeswhichcanbesubstantiallyhigher.
ThereisawiderangeofATCOhourproductivityamongANSPs.TheANSPwiththehighestATCO
hour productivity is MUAC (1.94), which only provides ATC services in upper airspace, while the
PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

23

ANSPwiththelowestATCOhourproductivityisARMATS(0.19),i.e.oneofthesmallestANSPsin
termsoftrafficvolumes.

1.2
1.03 1.03 1.02 1.01

Aena

0.3

0.76

0.69

ENAV

0.78

0.6

1.4

0.8

0.99

0.9

1.6

1.0

1.03

DSNA

1.2

Europeansystemaverage:0.8

NATS
(Continental)

CompositeflighthoursperATCOhour

1.8

1.94

DFS

2.0

0.0
0.99 0.98 0.97 0.94 0.92
0.89 0.89 0.89 0.89 0.84 0.84
0.79 0.78 0.76 0.75

0.71 0.69

0.68 0.67 0.67 0.67 0.66

0.65 0.63

0.6

0.59
0.53

0.4

0.48

0.45
0.34
0.24 0.24

0.2

0.19

MUAC
DFS
Skyguide
IAA
EANS
NATS(Continental)
NAVIAIR
PANSA
AustroControl
NAVPortugal(Continental)
DHMI
ANSCR
LVNL
LGS
DCACCyprus
Avinor(Continental)
HungaroControl
Aena
DSNA
SMATSA
HCAA
ENAV
Belgocontrol
MATS
CroatiaControl
LFV
BULATSA
LPS
Finavia
ROMATSA
NATAAlbania
OroNavigacija
SloveniaControl
UkSATSE
MNAV
MoldATSA
ARMATS

0.0

Figure2.15:ATCOhourproductivity(gatetogate),2012
Figure 2.15 also indicates that there are substantial differences in ATCOhour productivity even
among the five largest ANSPs. Indeed, DFS ATCOhour productivity (1.03) is some +49% higher
thanthatofENAV(0.69).
It is important to mention that significant gains in costeffectiveness could be achieved if the
European average productivity (0.80) was raised to the level of the top quartile in Figure 2.15
(0.92). Most of the ANSPs that achieve orare closeto top quartile ATCOhour productivity (ANS
CR, Austro Control, DFS, LVNL, MUAC, NATS and Skyguide) are among the ANSPs with the most
complex traffic. On the other hand, ARMATS, MNAV, MoldATSA and UkSATSE, which belong to
theANSPswiththeleastcomplextraffic(seeFigure2.2),showanATCOhourproductivitywhichis
lowerthanthebottomquartile.LowproductivityinsomeoftheseANSPsmaybeaconsequence
of their small size, and the consequent difficulty in adapting their available ATC capacity and
existinginfrastructuretolowtrafficvolumesandhighseasonalvariability.
ImprovementsinATCOhourproductivitycanresultfrommoreeffectiveOPSroommanagement
andbymakingabetter useofexistingresources,forexample throughtheadaptationof rosters
(preferably individually based to enhance flexibility) and shift times, effective management of
overtime, and through the adaptation of sector opening times to traffic demand patterns.
Similarly, advanced ATM system functionalities and procedures are drivers for productivity
improvements. It is also expected that SES tools such as FABs, the Network Manager, the
performanceschemeandthetechnologicalpillar(SESAR)contributetoincreaseATCOproductivity
byasignificantfactorwhileensuringsafetystandards.
Latest forecasts indicate that traffic volumes are not expected to be above 2008 levels before
2016. For this reason, there should be an opportunity to maintain the overall amount of ATCO
hoursatPanEuropeansystemleveland,allelseequal,increaseATCOhourproductivitywithout
significantly affecting the quality of service provided and without implementing massive
investmentprogrammes.
PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

24

MoredetailsonthechangesinATCOhourproductivityforindividualANSPsareprovidedinPartII
ofthisReport.
ATCOhour productivity measured at ANSP level reflects an average performance, which can
hide large differences among ACCs even for those operating in the same country/ANSP. It is
thereforeimportanttoanalyseandcompareproductivityatACClevel.
In Figure 2.16, the 63 ACCs part of the ACE 2012 data analysis are grouped in clusters based on
threeoperationalcharacteristics:(1)theircomplexityscores,(2)theaverageusedflightlevels,and
(3)theirnumberofsectors.Moreinformationonthedefinitionoftheseclusterscanbefoundin
previousACEreports16.
Cluster2

Cluster1
2.0

0.0

Ljubljana

Padova

Geneva

Reims

Paris

Zurich

Chisinau

Skopje

Yerevan

Dnipropetrovs'k

Tirana

0.4

Simferopol

Malta

Vilnius

Riga

Stavanger

Bodo

Tampere

Brindisi

0.8

Average= 0.78
Nicosia

1.2

Bratislava

1.6

Tallinn

2.0

Odesa

0.4

2.4

L'viv

0.8

FlighthoursperATCOhour

1.2

Average = 1.12

Stockholm

1.6

Cluster3b(ACCs<7sectors)
2.8

Kyiv

2.0

Ankara
Shannon
Brest
Athinai+Macedonia
Sofia
Bordeaux
Budapest
Kobenhavn
Roma
Prestwick
Beograd
Malmo
Canarias
Bucuresti
Istanbul
Madrid
Sevilla
Marseille
Barcelona
Oslo

2.4

Lisboa
Zagreb

FlighthoursperATCOhour

2.8

Warszawa

Cluster3a(ACCs 7sectors)

LondonAC

0.0
Maastricht

Palma

Dublin

Milano

Brussels

Amsterdam

Bremen

LondonTC

0.0

0.4
Munchen

0.4

0.8

Karlsruhe

0.8

1.2

Wien

Average= 0.69

1.2

Average= 1.11

1.6

Praha

FlighthoursperATCOhour

1.6

Langen

FlighthoursperATCOhour

2.0

0.0

Figure2.16:SummaryofproductivityresultsatACClevel,2012
Sofar,noclearcutstatisticalrelationshipbetweenATCOproductivity,trafficcomplexityandtraffic
variabilitycouldbeinferredbecausetherelationshipsandpotentialtradeoffsbetweenallthese
metrics are not straightforward. Nevertheless, it is useful to compare the ATCO productivity of
ACCsthatsharesimilaroperationalcharacteristics.Eachclusterisbrieflydescribedbelow:
Cluster 1 (ACCs serving predominantly lower airspace with relatively high structural
complexity)hasthelowestaverageproductivityofanyoftheclusters(0.69flighthourper
ATCOhour).Palma,withthelowestproductivity,hasthehighestseasonaltrafficvariability
inCluster1.
Cluster 2 (ACCs serving dense upper airspace) has an average productivity of 1.11 flight
hour per ATCOhour. Within this cluster, Maastricht has significantly higher productivity
(1.94flighthoursperATCOhour,some+75%abovetheaverageinCluster2).
Cluster 3a (ACCs with 7 sectors or more and serving airspace with relatively low
complexity) has an average productivity of 1.12 flighthour per ATCOhour. Within this
cluster,Warszawahassignificantlyhigherproductivity(2.23flighthoursperATCOhour).It

16 SeeforexampletheACE2008BenchmarkingReportonp.104.ReportavailableonthePRCwebsite:
(http://www.eurocontrol.int/articles/prcandprbpublications).

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

25

should also be noted that within this cluster Brest and Bordeaux have the highest overall
complexity,andCanarias,ShannonandOslothelowest.
Cluster3b(ACCswithlessthan7sectorsservingairspacewithrelativelylowcomplexity)
has an average productivity of 0.78 flighthour per ATCOhour. While Chisinau shows the
lowestproductivity,italsohasoneofthelowestoveralltrafficcomplexity.
TheanalysisofATCOhourproductivityatACClevelwouldseemtoindicatethat,whilstcomplexity
measuresarehelpfulinprovidingawayofclusteringACCsintobroadlyconsistentgroups,within
theseclusterstherearestilllargedifferencesinproductivityperformanceacrossindividualACCs.
ATCOhourproductivity,definedasflighthourscontrolledperATCOhouronduty,canbesplitinto
twomaincomponents:
ACC sector productivity: This is the ratio of the output, measured by the flighthours
controlledbytheACC,tosectorhoursopen.Thisindicatorshows,onaverage,howmany
aircraft are simultaneously in a sector for a given ACC. All else being equal, higher sector
productivitywillimproveATCOhourproductivity.
ACCstaffingpersector:ThisistheratioofATCOhoursondutytosectorhoursopen.This
indicator shows, on average, how many ATCOs are used to man a sector. All else being
equal,areductioninthestaffingpersectorwillincreaseATCOhourproductivity.
Figure2.17belowdisplaysthebreakdownofATCOhourproductivityintoACCsectorproductivity
andACCstaffingpersectorforeachcluster.ItalsodisplaysalineshowingtheaverageATCOhour
productivityachievedbytheACCsinthecluster:thegreatertheslopeoftheline,thehigherthe
average ATCOhour productivity. ACCs below the line have a worse than average ATCOhour
productivity for the cluster and ACCs above the line have a better than average ATCOhour
productivity.
10.0

10.0

Cluster1

Maastricht

8.0

AverageATCOhour
productivity

7.0
6.0
5.0
4.0
Langen

3.0

Milano

Amsterdam

LondonTC

1.0

8.0
7.0

Praha

6.0

LondonAC

Wien

5.0

Karlsruhe

4.0

Paris

Munchen

3.0

Brussels

Bremen

2.0

Padova

Geneva
Zurich
Reims

Ljubljana

2.0

Dublin
Palma

1.0

0.0

0.0
0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

0.0

1.0

2.0

Staffingpersector
10.0
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
1.0
0.0

Cluster3a(ACCs7sectors)

Warszawa
Budapest

Athinai+Macedonia
Ankara
Zagreb
Sofia
Roma
AverageATCOhour
Brest Kobenhavn Beograd
Lisboa
productivity
Malmo
Shannon
Bucuresti
Bordeaux Sevilla Canarias
Barcelona
Prestwick Madrid
Istanbul
Marseille
Stockholm
Kyiv
Oslo

0.0

1.0

2.0

3.0
4.0
5.0
Staffingpersector

3.0

4.0

5.0

6.0

7.0

8.0

Staffingpersector

6.0

Sectorproductivity

Sectorproductivity

AverageATCOhour
productivity

Cluster2

9.0

Sectorproductivity

Sectorproductivity

9.0

7.0

8.0

10.0
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
1.0
0.0

Cluster3b(ACCs<7sectors)
AverageATCOhour
Tallinn
Riga

Stavanger

Nicosia

Bratislava

Brindisi

Malta

Tampere
Vilnius
Tirana
L'viv
Simferopol
Dnipropetrovs'k

Bodo

Chisinau

0.0

1.0

2.0

Odesa

Skopje

Yerevan

3.0
4.0
5.0
Staffingpersector

6.0

7.0

8.0

Figure2.17:ACCsectorproductivityandstaffingpersector,2012
Figure2.17indicatesthatinCluster2,thegreaterATCOhourproductivityinMaastrichtismainly
the result of significantly higher sector productivity (more than eight aircraft on average

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

26

simultaneouslypresentinasector).ItisnoteworthythatMUACsectorproductivityistwotothree
timestheproductivityachievedbyACCswithasimilarstaffingpersectorinCluster2.
On the other hand, the graphs for Cluster 3a and Cluster 3b show that in these clusters, similar
levels of ACC sector productivity are achieved with very different staffing configuration and
practices, or alternatively similar levels of ACC staffing are delivering a wide range of sector
productivity.
Several factors are likely to affect ATCO productivity. Low productivity might be due to spare
capacityandlowutilisationoftheavailableresources,especiallyinthelessdense/complexACCs.
Anotherexplanationmightbeduetohigherseasonaltrafficvariability.
Otherfactorsasyetunidentified(andnotmeasured)suchastheimpactofdifferentoperational
concepts and processes, the operational flexibility, could also affect ATCO productivity
performance. There may also be cultural and managerial differences. These elements would
deserve further analysis in order to provide some explanation of the differences in ATCO
productivityandidentifybestpractice.
ATCOemploymentcostsarecatchingupinmanyCentralandEasternEuropeanANSPs.

Figure 2.18 shows that this is


drivenby:
a significant decrease for the
year2010(5.0%);and,
employment costs per ATCO
hourincreasesin2011(+2.6%)
and2012(+1.3%).

140

perATCOhouronduty(2012prices)

At PanEuropean system level,


ATCO employment costs per
ATCOhour slightly decreased
between2009and2012(1.3%or
0.4%p.a.).

37ANSPs

36ANSPs(excl.Aena)

120
5.0%
100

2.6%
2.1%

4.8%

1.3%

2.9%

80
60
40
20
0
2009

2010

2011

2012

Figure2.18:ChangesinATCOemploymentcostsperATCO
hour,20092012(realterms)
Figure2.18showsthatthisoverallchangeissignificantlyaffectedbythedecreaseinAenaATCO
employmentcostsovertheyears2009and2010.IndeedexcludingAena,ATCOemploymentcosts
haveincreasedinrealtermsby+2.1%in2010,+4.8%in2011and+2.9%in2012.
In2012,theaverageunitATCOemploymentcostsinthePanEuropeansystemamountto106per
ATCOhour.Figure2.19showsthevaluesforthisindicatorforalltheANSPs.
ThereisawiderangeofATCOhouremploymentcostsacrossANSPs,whichisnotsurprisinggiven
theheterogeneityinthesocialandeconomicenvironmentsacrossEurope.
In 2012, MUAC ATCO employment costs per ATCOhour (197) are the highest in Europe, above
DFS (172). MUAC ATCO employment costs per ATCOhour significantly increased in 2012
(+21.9%) mainly reflecting the payment of a bonus to the staff for achieving performance
objectives,andretroactivesalaryadjustments.DFSemploymentcostsperATCOhouralsorosein
2012, albeit in a lower proportion (+9.7%), following the implementation of the new collective
agreementssignedinOctober2011.
Ontheotherhand,AenaemploymentcostsperATCOhourwhichwerethehighestin2011,rank
fifth(160)anddecreasedforthethirdconsecutiveyearin2012(5.1%afterreductionsof13.3%
and6.4%in2010and2011,respectively).
PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

27

120
100
80
60
40

160

150
163 161 160160

152

120

108
97

100
135 131

120
108 103

50
97 97 97
95

89

DSNA

140

172

172

ENAV

perhour

160

200

NATS
(Continental)

180

Europeansystemaverage:106

197

DFS

200

Aena

220

0
81 81 80 79 79

73

66 63

55 53 51 49
40 39

32 29 28
25
14 11

20

MUAC
DFS
LVNL
Skyguide
Aena
AustroControl
NAVPortugal(Continental)
Belgocontrol
Avinor(Continental)
NATS(Continental)
ENAV
IAA
DSNA
PANSA
NAVIAIR
LFV
HungaroControl
CroatiaControl
ANSCR
SloveniaControl
LPS
HCAA
Finavia
DCACCyprus
ROMATSA
BULATSA
EANS
SMATSA
DHMI
LGS
OroNavigacija
MNAV
UkSATSE
NATAAlbania
MATS
MoldATSA
ARMATS

Figure2.19:ATCOemploymentcostsperATCOhour(gatetogate),2012
Amajorexogenousfactorthatunderliesdifferencesinunitemploymentcostsisthedifferencein
prevailing market wage rates in the national economies in general. This is also associated with
differences in the cost of living. To assess the influence of these exogenous differences,
employmentcostsperATCOhourhavebeenexaminedinthecontextofPurchasingPowerParity
(PPP).Therearesomelimitations17inherenttotheuseofPPPsandforthisreasontheACEdata
analysis does not put a significant weight on results obtained with PPPs adjustments. PPPs are
neverthelessausefulanalyticaltoolinthecontextofinternationalbenchmarking.
Figure 2.20 below shows the ATCO employment costs per ATCOhour both before and after
adjustment for PPP. The adjustment reduces the dispersion of this indicator. After PPP
adjustment, the average unit employment costs per ATCOhour amounts to 112 (compared to
106 without adjustment). For many Central and Eastern European ANSPs (ANS CR, BULATSA,
Croatia Control, HungaroControl, LPS, PANSA, ROMATSA, Slovenia Control and SMATSA) the PPP
adjustmentbringstheunitemploymentcostsclosetothoseinWesternEurope.

17

For instance, it is possible that, for a given country, the cost of living in regions where the ANSP
headquarterandothermainbuildings(e.g.ACCs)arelocatedishigherthantheaveragevaluecomputedat
nationallevel.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

28

220
200
180

ATCOemploymentcostsperATCOhourin adjustedforPPPs

188
179 175

ATCOemploymentcostsperATCOhourin
167 167
155

160

148 145
129

perhour

140

124 123 122

120

117 115

112

107106
105

100

99 95
88 87 84 82
81

80

75 75
71 71

65 65

60

61

57
42

40

33
25 22

ARMATS

MoldATSA

LGS

MATS

Finavia

UkSATSE

NATAAlbania

OroNavigacija

LFV

NAVIAIR

EANS

DCACCyprus

DHMI

MNAV

DSNA

Avinor(Continental)

IAA

HCAA

Skyguide

SloveniaControl

ENAV

NATS(Continental)

SMATSA

LPS

ANSCR

BULATSA

Belgocontrol

ROMATSA

CroatiaControl

LVNL

AustroControl

DFS

HungaroControl

Aena

PANSA

MUAC

NAVPortugal(Continental)

20

Figure2.20:EmploymentcostsperATCOhourwithandwithoutPPPs,2012
160
WesternEuropeanANSPs

ATCOemploymentcostperATCOhour

Figure 2.21 shows the changes in ATCO


employment costs per ATCOhour for
ANSPs operating in Central, Eastern and
WesternEuropeancountries18.
SignificantincreasesinATCOemployment
costs per ATCOhour are observed for
ANSPs operating in Central and Eastern
European countries and which started
fromarelativelylowbasein2009.
Thisillustratesthegradualconvergenceof
employment costs in Central and Eastern
European economies following the
strengtheningoftheeconomicintegration
andenhancedlabourmobility.

140

Europeanaverage

CentralandEasternEuropeanANSPs

131

124

126

125

120
107

102

105

106

54

55

100
80
60
43

47

40
20

Figure2.21:ConvergenceinATCOemployment
costsforANSPsoperatinginEasternandWestern
Europeancountries,20092012(realterms)
2009

2010

2011

2012

Employment costs are typically subject to complex bargaining agreements between ANSPs
managementandstaffwhichusuallyareembeddedintoacollectiveagreement.Thedurationof
thecollectiveagreement,thetermsandmethodsforrenegotiationgreatlyvaryacrossANSPs.In
some cases salary conditions are negotiated every year. High ATCO employment costs may be
compensatedforbyhighproductivity(e.g.MUAC).Therefore,inthecontextofstaffplanningand
contractrenegotiation,itisimportantforANSPstomanageATCOsemploymentcostseffectively
andtosetquantitativeobjectivesforATCOproductivity.
MoredetailsonthechangesinATCOhouremploymentcostsforindividualANSPsareprovidedin
PartIIofthisReport.

18

InFigure2.21,theCentralandEasternEuropeancountriesarethosethatjoinedtheEuropeanUnionfrom
2004onwardsplusAlbania,Armenia,Croatia,F.Y.RMacedonia,Moldova,TurkeyandUkraine.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

29

After two years of consecutive reductions in 2010 (4.1%) and 2011 (2.7%), unit support costs
roseby+2.0%in2012mainlyreflectingtheimpactofthetrafficshortfall(1.9%).

Figure 2.22 shows that unit support


costsconsecutivelyreducedin2010(
4.1%)and2011(2.7%)reflectingthe
impact of the costcontainment
measures implemented by European
ANSPs. In 2012, unit support costs
rose by +2.0%. This mainly reflects
the decrease in traffic (1.9%), while
support costs remained fairly
constant(+0.1%).

350

percompositeflighthour(2012
prices)

As indicated in Figure 2.22, support


costs per composite flighthours
reduced (4.9% in real terms)
between 2009 and 2012 at Pan
Europeansystemlevel.

4.1%

2.7%

2.0%

2010

2011

2012

300
250
200
150
100
50
0
2009

Figure2.22:Changesinsupportcostspercomposite
flighthour,20092012(realterms)

Contrary to ATCO employment costs, support costs encompass a variety of cost items which
requirespecificanalysis.ThereisageneralacknowledgementthatthePanEuropeansystemhas
excessivesupportcostsduetoitshighlevelofoperational,organisational,technicalandregulatory
fragmentation.
Composite
flighthours
18.2M

ATCOsemployment
costsper
unitofoutput
133

ATCOinOPS
hourson
duty
22.8M

Employment
costsfor
ATCOsinOPS
2417M

Employmentcosts
pernonATCOinOPSstaff

Supportcostsper
unitofoutput
310
unitofoutput

NonATCOinOPS
employment
costsperunitofoutput
(48.4%)

Supportcosts
5642M

ATCOhour
Productivity
0.80

ATCOemployment
costsperATCOhour
106

Financial
costeffectiveness
indicator
443

Supportcostratio
3.3

ATM/CNS
provision
costs
8059M

NonATCOinOPSstaff
perunitofoutput

EUROCONTROL/PRU

Nonstaffoperating
costsperunitofoutput
(23.8%)

Depreciationcosts
perunitofoutput

Exceptional
costsperunitofoutput
(2.1%)

Capitalrelated
costsperunitofoutput
(25.7%)
Costofcapital
perunitofoutput

Figure2.23:Frameworkforsupportcostsanalysis,2012

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

30

AsshowninFigure2.23,supportcostscanbebrokendownintofourseparatecomponentsthat
providefurtherinsightintothenatureofsupportcosts:
a) Employment costs for nonATCO in OPS staff; these cover ATCOs on other duties, trainees,
technical support and administrative staff (48.4% of total support costs). These costs can be
affectedbythefollowingfactors:
Outsourcing of noncore activities (such as maintenance of technical equipment, and
professionaltraining)couldtransfercostsfromthiscategorytononstaffcosts.
Research & development policies may involve ATM systems either being developed in
house,orpurchasedofftheshelf.Inprinciple,eithersolutioncouldleadtothemostcost
effective outcome, depending on circumstances; this would depend on whether there
were,forexample,significanteconomiesofscale,ormajortransactioncosts.
ArrangementsrelatingtothecollectiveagreementandthepensionschemefornonATCOs
inOPS.
b) Nonstaffoperatingcostsmostlycompriseexpensesforenergy,communications,contracted
services, rentals, insurance, and taxes (23.8% of total support costs). These costs can be
affectedbythefollowingfactors:
Thetermsandconditionsofcontractsforoutsourcedactivities.
EnhancementofthecooperationwithotherANSPstoachievesynergiesinthecontextofa
FAB(sharingtrainingofATCOs,jointmaintenance,andothermatters).
c) Capitalrelated costs, comprising depreciation and financing costs for the capital employed
(25.7%oftotalsupportcosts).Thesecostscanbeaffectedbythefollowingfactors:
Themagnitudeoftheinvestmentprogramme.
Theaccountinglifeoftheassets.
Thedegreetowhichassetsareownedorrented.
d) Exceptionalcostswhichrepresentsome2.1%oftotalsupportcosts.
200
150
+4.2%
100

Million

Figure2.24showsthechangesinthe
different components of support
costs (see the support costs effect
bar on the righthand side of Figure
2.11)between2011and2012.
In 2012, increases in employment
costs for support staff (+109M) and
exceptional costs (+56M) were
compensated by reductions in non
staff operating costs (85M),
depreciation costs (26M), and in
thecostofcapital19(51M).

+86.6%
50
0
2.8%

50
100

8.6%
6.0%
Nonstaff
Employment
operatingcosts
costsfor
supportstaff

Depreciation
costs

Costofcapital

Exceptional
costs

Figure2.24:Changesinthecomponentsofsupport
costs,20112012(realterms)

19

It should be noted that the cost of capital originally reported by DFS in its 2012 data submission was
significantly lower (38M or 51%) than in 2011. This difference wasmainly due tothe use of a negative
return on equity (i.e. 3.16%) to compute the enroute cost of capital in 2012. It is understood that this
negative rate of return on equity reflects the actual return (expost) taking into account the revenue loss
incurredonDFSenrouteactivity.However,forthepurposesoftheACEbenchmarkinganalysis,andinorder
toensureconsistencywiththedataprovidedbytheotherANSPs,areturnonequityof7.75%hasbeenused
tocomputeDFSenroutecostofcapital.Thisfigurecorrespondstothereturnonequitythatwasplanned
for2012intheNationalPerformancePlanforRP1.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

31

The significant decrease observed for the cost of capital (51M) is mainly due to a substantial
decreaseinthecostofcapitalreportedbyUkSATSE(50M).Itshouldbenotedthatthecostof
capital reported by UkSATSE includes the total amount of capital expenditures spent during the
year,andthatparticularlyhighcapexwerespentin2011.ExcludingUkSATSE,thecostofcapitalat
PanEuropean level in 2012 would be similar to that of 2011 (0.4M) and 2012 support costs
wouldbe+0.6%higherthanin2011(comparedto+0.1%whenUkSATSEisincluded).
The reductions achieved in 2012 in
terms of nonstaff operating costs (
6.0%) and depreciation costs (2.8%)
mainly reflect the impact of the cost
containment measures implemented
by a majority of the PanEuropean
ANSPsinordertoadapttolowertraffic
levels. The lower depreciation costs in
2012 are mainly due to the
postponement
of
noncrucial
investment projects to future years.
Figure2.25showsthatforamajorityof
ANSPs, actual capital expenditures
were lower than planned in ACE 2011
fortheyear2012.

Difference in actual and planned (ACE 2011) capex for 2012


< -50%
< -25%
< 0%
>= 0%
> 50%

Lower Airspace

Data not available

Figure2.25:Differencebetweenactualandplanned
capexfor2012(realterms)

Ontheotherhand,Figure2.25indicatesthatforafewANSPs(e.g.Aena,Avinor,MNAVandOro
Navigacija)actual2012capexishigherthanplanned.
Thesubstantialincreaseinemploymentcostsforsupportstaff(+109M)ismainlydrivenbyhigher
staffcostsobservedforAena(+53M)andDFS(+43M)comparedto2011.
ForAena,theincreaseinsupportstaffcostsmainlyreflectscostsassociatedwiththeSocialPlan
forVoluntaryLayoffs(SPVL)fornonATCOstaff(i.e.32M)whichwasimplementedin2012.For
DFS,theseincreasesaremainlydueto(a)higherpensionrelatedcostsconsecutivetoachangein
thediscountrateforoccupationalpensionsand(b)highergrosswagesandsalariesreflectingthe
collectiveagreementssignedinOctober2011,coveringtheperiodJune2011October2012.
Employment costs can be significantly affected by the type of pension arrangements, and
particularly whether the pension scheme is based on defined benefits or defined
contributions. Some ANSPs have already taken decisive actions to deal with future pension
obligations, notably changing the pension scheme for new recruits and moving away from
definedbenefitspensionplans.
ArevisedversionofIAS19(i.e.employeebenefits)wasimplementedinJanuary2013.Oneof
themainrevisionsofIAS19relatestothedeparturefromthecorridorapproach.Thisimplies
that from 2013 onwards, for ANSPs operating under a defined benefits pension scheme, any
actuarialgainsandlossesarisingfromachangeinactuarialassumptionswillhavetobereported
in the Balance Sheet financial statements. For those ANSPs, which in the past applied the
corridorapproachtoreducetheimpactofthechangesinactuarialassumptionsonANScharges,
therevisionofIAS19willalreadyaffect2013costs.
Several ANSPs, like Austro Control and DFS have explicitly flagged this issue as they would be
significantly impacted by the implementation of the amended IFRS 19. This issue requires the
utmost attention given the long term consequences of pensionsrelated decisions and their
magnitudeinthecostbasesandimpactonchargeableunitrates.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

32

There is a wide range in unit support costs among ANSPs, i.e. a factor greater than four in
2012. Whencomputed at FAB level, differences are becoming less marked since unit support
costsrangefrom356fortheDanubeFABto212fortheBalticFAB.
At PanEuropean system level, support costs per composite flighthour amount to 310 in 2012.
Figure2.26showsthatthelevelofunitsupportcostsvariessignificantlyacrossANSPsafactor
greaterthanfourbetweenBelgocontrolwhichhasthehighestsupportcostpercompositeflight
hourin2012(532)andEANS(121).
600

314

313

100

353 348
301 294 287

286
264 253 242

238237
233

200

202 200 197

NATS
(Continental)

300

DSNA

327 325 321319 317 315 314313

Aena

385383

ENAV

397

DFS

percompositeflighthour

317

200

405 397

400

327

300

487484
479

500

385

400

Europeansystemaverage:310

532

192 187
156 151
121

100

Employmentcosts(excl.ATCOsinOPS)percompositeflighthour

Nonstaffoperatingcostspercompositeflighthour

Capitalrelatedcostspercompositeflighthour

Exceptionalcostspercompositeflighthour

EANS

MATS

MUAC

DCACCyprus

HCAA

NAVPortugal(Continental)

LGS

PANSA

Finavia

DHMI

Avinor(Continental)

IAA

CroatiaControl

SMATSA

BULATSA

OroNavigacija

LFV

NAVIAIR

DSNA

NATS(Continental)

Aena

MNAV

AustroControl

SloveniaControl

ENAV

HungaroControl

ANSCR

ARMATS

DFS

MoldATSA

ROMATSA

LVNL

NATAAlbania

UkSATSE

LPS

Skyguide

Belgocontrol

20

Figure2.26:SupportcostspercompositeflighthouratANSPlevel ,2012
Figure 2.26 indicates that there are significant differences in the composition of support costs
amongst the 37 ANSPs, and in particular in the proportion of employment costs (blue bar) and
nonstaffoperatingcosts(orangebar).Thechoicebetweenprovidingsomeimportantoperational
supportfunctionsinternallyorexternallyhasclearlyanimpactontheproportionofsupportcosts
thatisclassifiedasemploymentcosts,nonstaffoperatingcosts,orcapitalrelatedcosts.Insome
cases,themaintenanceofATMsystemsisoutsourcedandthecorrespondingcostsarereportedas
nonstaffoperatingcosts.ForotherANSPs,theseactivitiesarerathercarriedoutbyinternalstaff
andtherelatingcostsappearasemploymentcostsorascapitalrelatedcostswhen,accordingto
IFRS, the employment costs of staff working on R&D projects can be capitalised in the balance
sheet.
MoredetailsonthelevelandchangesinsupportcostsforindividualANSPsareprovidedinPartII
ofthisReport.
Figure 2.27 shows the unit support costs computed at FAB level21. ANSPs which are not
participatingtotheACE2012dataanalysisornotformallypartofaFABinitiativearenotincluded
inFigure2.27.

20

ItshouldbenotedthatthecostofcapitalreportedbyANSCRinitsACE2012datasubmissionsishigher
thanthecostschargedtoairspaceusers.Indeed,ANSCRdidnotchargeanycostofcapitaltoterminalANS
users.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

33

400
356

percompositeflighthour

350

Europeansystemaverage:310
346

325

304

299

296

300

279

250

222

212

200
150
100
50

BalticFAB

NEFAB

BLUEMEDFAB

SWFAB

DKSEFAB

UKIrelandFAB

FABCE

FABEC

DanubeFAB

Exceptionalcostspercompositeflighthour

Capitalrelatedcostspercompositeflighthour

Nonstaffoperatingcostspercompositeflighthour

Employmentcosts(excl.ATCOsinOPS)percompositeflighthour

Figure2.27:SupportcostspercompositeflighthouratFABlevel,2012
WhencomputedatFABlevel,unitsupportcostsrangefrom356fortheDanubeFABto212for
theBalticFAB,amuchlowerdispersionthanwhenunitsupportcostsarecomputedatANSPlevel.
TheDanubeFAB(356),FABEC(346)andtheFABCE(325)showunitsupportcostsabovethe
PanEuropeansystemaverage(310).
It should be noted that some 15% of Danube FAB unit support costs relate to exceptional costs
associatedwithemployeebenefitsbornebyROMATSAin2012.Excludingthoseexceptionalcosts,
theunitsupportcostsofDanubeFABwouldamountto303.
FABEC ANSPs show the second highest unit support costs in 2012 (346). There is a very wide
range in terms of unit support costs within FABEC (from 532 for Belgocontrol to 151 for
MUAC22). This reflects a variety of situations with very large ANSPs and smaller ones, some of
whichexclusivelyoperateinlowerairspace(BelgocontrolandLVNL).
TheunitsupportcostsforFABCEamountto325whichishigherthantheUKIrelandFAB(304)
andDKSEFAB(299)despitethefactthatthecostoflivingwithintheFABCEareatendstobe
lowerthaninthe UKIrelandFABand theDKSE FAB.Forinstance,Figure2.26indicatesthatfor
ANSPs part of FAB CE (LPS (487), ANS CR (348), HungaroControl (325) and Slovenia Control
(321)),unit supportcostsarehigherthanthoseofAena(317),DSNA(314),NATS (313)and
NAVIAIR (294). Further analysis would be required to understand the main drivers underlying
thesedifferences.
Supportcostsamountto70%oftotalATM/CNSprovisioncosts.Effectivemanagementofthese
costs has therefore a major impact on ANSPs costeffectiveness performance. In this context,
initiatives towards joint procurement and maintenance of ATM infrastructure as well as the
rationalisationofinvestmentprogrammeswithinFABsareencouraged.Forinstance,reducingthe
unitsupport costsofthe PanEuropeansystem(310)bysome 10%toreachalevelinlinewith
thatoftheBlueMedFABwouldgeneratesavingsofsome560M.
21

TheunitsupportcostsatFABleveldisplayedinFigure2.27areobtainedbysummingthesupportcostsof
all the ANSPs that are part of the FAB initiative and dividing them by the corresponding total number of
compositeflighthours.TheresultofthiscomputationistheweightedaverageofANSPsunitsupportcosts
atFABlevel.
22
It should also benoted that MUAC support costs do not includethecosts relating to the infrastructure
whichismadeavailableforjointuseandprovidedfreeofchargesbytheANSPsoperatingintheFourStates
airspace.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

34

Afteranincreaseof+1.7%in2012,unitATM/CNSprovisioncostsareplannedtoslightly
decreaseuntil2017(0.8%p.a.).

Gatetogate unit ATM/CNS provision


costs are then expected to increase in
2015 (+0.8%) and to decrease in 2016 (
1.9%) and 2017 (2.6%). Overall, unit
costs are planned to decrease by 0.8%
p.a.over20122017.

ATM/CNSprovisioncostspercompositeflighthour

ATM/CNSprovisioncostsindex

Compositeflighthoursindex

600

120

500

+2.8%

115
2.9%

+0.8%

1.9%

2.6%

400

110

300

105

200

100

100

95

Indexofcostsandtraffic

percompositeflighthour(2012prices)

At European system level, after the


+1.7%increasein2012,gatetogateunit
ATM/CNS provision costs are planned to
furtherriseby+2.8%in2013andthento
decrease by 2.9% in 2014. As a result,
gatetogate unit ATM/CNS provision
costs are expected to remain fairly
constantbetween2012and2014.

90
2012

2013P

2014P

2015P

2016P

2017P

Figure2.28:Forwardlookingcosteffectivenessat
Europeansystemlevel(20122017,realterms)

For most of the ANSPs, the planned enroute costs data reported in their ACE 2012 data
submission are based on the information provided in June 2013 in the context of the Enlarged
Committee for Route Charges. The enroute determined costs provided in the RP2 Performance
Plans which will be submitted end of June 2014 are likely to be based on different planning
assumptions.
In 2012, ANSPs capital expenditures amounted to some 1075M. The right handside of Figure
2.29comparesthecapexplannedinACE2011withtheplansprovidedinACE2012fortheANSPs
thatconsistentlyreportedforwardlookingfiguresoverthisperiod23.Figure2.29showsthat2012
actualcapitalexpendituresare16%lowerthanplannedinACE2011for2012.Thismainlyreflects
thepostponementofnoncrucialinvestmentprojectstofutureyears,inparticular2015and2016.
1500

2.0

1%

1300
1%

4%
16%

3%

1.6

6%
+2%

1.2

900

+4%

600

0.8

300

0.4

0.0
2009

2010
Capex(M)

2011

2012

2013

Depreciation(M)

2014

2015

2016

Capextodepreciationratio

Gatetogatecapex(M)

+1%

+4% +23%

+2%

10%

Capextodepreciationratio

18%

1200

1400

1200

1000

+3.6%

3.5%

1100
16.5%

9.2%

2012

2013P

+3.4%

900
800
700
600
Plannedcapex(ACE2011)

2014P

2015P

2016P

Plannedcapex(ACE2012)

Figure2.29:ForwardlookingcapitalexpendituresatPanEuropeansystemlevel
(20092016,realterms)
Overall, the cumulative capex planned for the period 20132016amounts to some 4488M and
represents 50% of the 2012 total ANS revenues. A significant proportion of these investments
relatetomajorupgradesortothereplacementofexistingATMsystems.
AdditionaldetailsonthenatureofthemajorinvestmentprojectsforeachANSPsareprovidedin
PartIIofthisReport.

23

Notethatthedecreasesinplannedcapexanddepreciationcostsobservedin2015areduetothefactthat
AenaandHCAAdidnotprovidecompleteforwardlookingdataintheirACE2012datasubmissions.

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

35

PanEuropeansystemcosteffectivenessperformancein2012with201317outlook
ACE2012BenchmarkingReportwith20132017outlook

36

PARTII:COSTEFFECTIVENESSPERFORMANCEFOCUSAT
ANSPLEVEL

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

37

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

38

FOCUSONANSPSINDIVIDUALCOSTEFFECTIVENESSPERFORMANCE

3.1

Objectiveofthischapter

This chapter comprises two pagers for each ANSP participating to the ACE 2012 analysis. These
two pagers include an analysis of the historical development of the financial costeffectiveness
indicatoranditsmaincomponentsoverthe20092014period.IndividualANSPcosteffectiveness
performance is also examined in the context of a group of ANSPs which operate in relatively
similar operational and economic environments (comparator groups). Finally, these two pagers
comprise historical information and projections about capital expenditures provided by each
ANSP.
This chapter should provide useful insights and information to NSAs for the drawing up of the
performanceplansforRP2duringthefirsthalfof2014.
3.2

Historicaldevelopmentofcosteffectivenessperformance,20092012

Thefirstpagepresents,foreachANSP,anassessmentofitscosteffectivenessperformance,and
howithasdevelopedoverthefouryearperiod20092012.Itexaminestheoveralleconomiccost
effectivenessindicatoranditstwocomponents(ATM/CNScostspercompositeflighthour,ATFM
delaycostspercompositeflighthour),andtheirevolutionovertheperiod(topleft).Itputsthese
in the context of the traffic growth observed in the ANSPs airspace (top right). In this page,
financialdataareallexpressedinrealterms(2012prices).
Developments in the components of financial costeffectiveness (ATCOhour productivity, ATCO
employmentcostsperATCOhour,andsupportcostspercompositeflighthour)arealsoexamined
(middleleft),tohelpunderstandtheunderlyingcausesofchangesinoverallcosteffectiveness.
The charts on the middle right provide additional information in order to better understand the
drivers behind the changes in the three components of financial costeffectiveness. First, the
changesinATCOhourproductivityareexaminedinthelightofchangesincompositeflighthours,
number of FTE ATCOs in OPS and corresponding hours on duty. A second chart focuses on the
changesinATCOhoursonduty,andinparticularonovertimehours.Thethirdchartpresentsthe
changes in support costs are broken down into employment costs of staff other than ATCOs in
OPS; nonstaff operating costs; capitalrelated costs (depreciation and the cost of capital); and
exceptionalitems,wherepresent.
The bottom set of graphs examine how the changes in the components over the whole period
contributetothechangeintheoverallfinancialcosteffectivenessindicator.Thelefthandgraphs
relate to ATCOs in OPS; the righthand graphs to other elements of cost (support costs). The
lefthand graphs show how the change in ATCO productivity combines with the change in unit
ATCOemploymentcoststomakeachangeinATCOemploymentcostsperunitoutput.Theright
handgraphsshowhowthechangeinsupportcostscombineswithtrafficgrowthtomakeachange
insupportcostspercompositeflighthour.Therelativecontributionofthesetwoeffectstothe
change in the financial costeffectiveness indicator depends on the relative weight of ATCO
employment costs, on the one hand, and support costs, on the other, in the overall ATM/CNS
provisioncost.

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

39

Thepresentationoffinancialtimeseriesdata
Presentationandcomparisonofhistoricalseriesoffinancialdatafromdifferentcountriesposesproblems,
especiallywhendifferentcurrenciesareinvolved,andinflationratesdiffer.Thereisadangerthattime
series comparisons can be distorted by transient variations in exchange rates which happened to be
particularlythecasein2009inthewakeofthefinancialcrisis.Inthischapter,thefocusisonthehistorical
developmentoffinancialperformanceindicatorsinagivenANSP.
For this reason, the following approach has been adopted for allowing for inflation and exchange rate
variation.Thefinancialelementsofperformanceareassessed,foreachyear,innationalcurrency.They
are then converted to national currency in 2012 prices using national inflation rates. Finally, for
comparisonpurposesin2012,allnationalcurrenciesareconvertedtoeurosusingthe2012exchangerate.
ThisapproachhasthevirtuethatanANSPsperformancetimeseriesisnotdistortedbytransientchanges
inexchangeratesovertheperiod.Itdoesmean,however,thattheperformancefiguresforanyANSPina
givenyearpriorto2012arenotthesameasthefiguresinthatyearsACEreport,andcannotlegitimately
becomparedwithanotherANSPsfiguresforthesameyear.Crosssectionalcomparisonusingthefigures
inthisreportisonlyappropriatefor2012data.
The historical inflation figures used in this analysis were obtained from EUROSTAT or from the
InternationalMonetaryFund.Fortheprojections,theANSPsownassumptionsconcerninginflationrates
wereused.Detailsofthemonetaryparametersusedfor2012aregiveninAnnex6tothisreport.

3.3

ANSPscosteffectivenesswithinthecomparatorgroup,20092012

Thetopchartsofthesecondpagepresentthefinancialcosteffectivenessindicatoranditsmain
components for individual ANSPs in comparison with their respective comparator group. The
approachistoconsidereachANSPinthecontextofagroupofotherANSPs(comparators)which
operateinrelativelysimilaroperationalandeconomicenvironments.
The chartonthetopleft showstheleveland changesinunitATM/CNSprovisioncostsoverthe
20092012periodforeachANSPpartofthecomparatorgroup.Thechartonthetoprightshows
for each ANSP the deviations in unit ATM/CNS provision costs, ATCOhour productivity,
employment costs per ATCOhour and unit support costs from the average of the comparator
groupatthestart(2009)andattheend(2012)oftheperiodconsidered.
The ANSP comparator groups used for the benchmarking analysis are presented in the table
below. These comparator groups were determined for the purposes of the RP2 costefficiency
targetsetting process using a twostep approach combining the use of statistical tools (cluster
analysis)withexpertjudgement.Forafulldescriptionoftheprocess,methodologyandresultssee
AnnexI.CofthePRBreportonRP2EUWideTargetsRanges24releasedinMay2013.
Nine groups of comparators have been identified, some comprising a relatively large number of
ANSPs and others only comprising two organisations. Due to the unique nature of its airspace
(upper airspace only, across four States), it was determined that Maastricht (MUAC) should be
considered separately and therefore this ANSP was not included in the comparator group
benchmarkinganalysis.Finally,twogroupshavebeendesignedfortheANSPsnotoperatinginSES
States. It should be noted that the names of these groups have been chosen for mnemonic
purposesonly.

24

This document is available at: http://ec.europa.eu/transport/media/consultations/doc/20130703


sesrp2/report.pdf.

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

40

ComparatorGroups

FiveLargest

CentralEurope

SouthEasternEurope

SouthMed

WesternEurope

Atlantic

BalticStates

NordicStates

BelNed
NonSES1

NonSES2

Members
Aena
DFS
DSNA
ENAV
NATS(Continental)
ANSCR
HungaroControl
LPS
SloveniaControl
CroatiaControl
PANSA
HCAA
BULATSA
ROMATSA
DCACCyprus
MATS
AustroControl
NAVIAIR
Skyguide
NAVPortugal(Continental)
IAA
EANS
LGS
OroNavigacija
Avinor(Continental)
LFV
Finavia
Belgocontrol
LVNL
DHMI
UkSATSE
ARMATS
MNAV
MoldATSA
NATAAlbania
SMATSA

Table3.1:ANSPscomparatorgroups
3.4

Historicalandforwardlookinginformationoncapitalinvestmentprojects

Thechartswhicharedisplayedinthemiddleandthebottomofthesecondpageprovidehistorical
informationandprojectionsaboutcapitalexpendituresprovidedbyeachANSP.
The chart on the middle of the page shows the historical and planned evolution of capital
expenditure and depreciation, highlighting the ANSPs investment cycles and their magnitude,
acrosstime.Theratioofthesequantities(usuallygreaterthanone)isanindicationoftherateat
whichtheoverallassetbaseisbeingexpanded.
FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

41

Finally,twotablespresentinformationonthenatureofthemainANSPscapexprojectsbetween
2006 and 2017. The first table provides a highlevel overview of the magnitude of capital
expendituresbyarea(i.e.ATM,Communication,Surveillance,etc.)overthe20062017periodand
oftheupgrade/replacementcyclesofthemainATMsystemsforeachACC.Thelasttableprovides
detailed information on the top 5 capex projects in monetary terms including the domain, the
financialamountandthetimeperiodoftheproject.
3.5

CosteffectivenessperformancefocusatANSPlevel

Tofacilitatethereadingofthissection,thetablebelowdisplaysthepagenumberoftheindividual
benchmarkinganalysisforeachANSP.
ANSPname
Aena
ANSCR
ARMATS
AustroControl
Avinor(Continental)
Belgocontrol
BULATSA
CroatiaControl
DCACCyprus
DFS
DHM
DSNA
EANS
ENAV
Finavia
HCAA
HungaroControl
IAA
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC
NATAAlbania
NATS(Continental)
NAVPortugal(Continental)
NAVIAIR
OroNavigacija
PANSA
ROMATSA
Skyguide
SloveniaControl
SMATSA
UkSATSE

Country
Spain
CzechRepublic
Armenia
Austria
Norway
Belgium
Bulgaria
Croatia
Cyprus
Germany
Turkey
France
Estonia
Italy
Finland
Greece
Hungary
Ireland
Sweden
Latvia
SlovakRepublic
Netherlands
Malta
F.Y.R.Macedonia
Moldova

Albania
UnitedKingdom
Portugal
Denmark
Lithuania
Poland
Romania
Switzerland
Slovenia
SerbiaandMontenegro
Ukraine

Page
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
86
88
90
92
94
96
98
100
102
104
106
108
110
112
114
116

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

42

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

43

Aena(Spain)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:SpainiswithintheEUROZone
Aenarepresents11.1%ofEuropeansystemgatetogateATM/CNSprovision
Max
Min

costs

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

900

820

800

758

20%

655
577

10%

500
400
300

728

543

490

54.6%

+132.7%

30%

700
600

Compositeflighthours

+3.9%

+3.0%

0%

521

2.8%

6.1%

10%

200

8.5%

20%

100
0

30%
2009

2010

2011

23.4%

23.2%
200910

2012

65.8%
201112

201011

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity
0.9
+44.7%

+4.2%

120

0.3%

Index(2009=100)

0.8
0.7
0.6
0.5
0.4

0.52

0.75

0.78

0.78

110
100
90
80
70

0.3

60

0.2

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour

200

13.3%

6.4%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

250

5.1%

150
207

180

168

160

100
50

1900
1700

2010

2011

2012

1600

1595

2010

2011

2012

1300
1100
900
700
500
2009

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
60

350

+14.9%

7.7%

300

40

9.3%

250

+18.0%

20
Million

percompositeflighthour(2012prices)

1608

1500

0
2009

1684

200
150
100

20

50

40

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

+13.9%

0
4.8%
69.0%

60

2012

32.3%
Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
41%

Increaseinunit
ATM/CNSprovision
costs20112012

Weight
59%
+14.9%

ATCOhour Employmentcosts
perATCOhour
productivity

ATCOemployment
costspercomposite
flighthour

+6.3%

0.3%
5.1%

4.8%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

+5.1%
Supportcosts
percomposite
flighthour

"Traffic
effect"

"Supportcosts
effect"
8.5%

44

Aena(Spain)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
750

Deviationfromcomparators'weightedaverage

700

+49.0%

650

+39.4%
+25.5%

600
+7.7%

550
500

2.3% 4.1%

5.9%

450
30.9%

400
2009
Aena

2010
DFS

2011

DSNA

ENAV

2012

ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

350
NATS(Continental)

2009

2012

1.5

160

1.2

120

0.9

200

80

0.6

40

0.3
0.0

0
2009

2010

2011
Capex(M)

2012

2013

2014

2015

Depreciation(M)

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
FDPS
ATM

COM

NAV

SUR

Building

Other

Years

RDPS

HMI

VCS
C:2000(AllACCs
TMA)
2002(AllACCsEn
route)*

C:2006
(allACCs)*

C:2006
(allACCs)*

C:2006
(allACCs)*

AllACCs

AllACCs

AllACCs

2006
2007
2008
2009

Canarias,Palma

2010
2011

Barcelona
Madrid,Sevilla

2012

AllACCs

AllACCs

AllACCs

AllACCs

AllACCs

AllACCs

2013
2014

Canarias

2015

Madrid

2016
2017

Barcelona

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Note that the capex provided by Aena for the purposes of the ACE 2012 benchmarking analysis only
includedinformationrelatingtothecapexspentin2012.Furthermore,themonetaryamountsprovided
forthefivemaincapexin2012onlyrepresentssome12%ofthetotalcapexspentduringthatyear.Aena
wasnotinapositiontoprovideinformationonthefivemaincapexprojectsplannedforthe20132017
period. It is expected that in future submissions, more comprehensive actual and planned capex
informationisprovidedbyAenaforthepurposesoftheACEbenchmarkinganalysis.

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

45

ANSCR(CzechRepublic)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:1EUR=25.102CZK
ANSCRrepresents1.4%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Seasonaltrafficvariability:
Max

Min

Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

600

30%
520

500
400

Compositeflighthours

454

489

446

453

440

446

438

20%
10%

300

0%

200

10%

100

20%

+0.7% +2.5%

6.6% 4.9%

30%

0
2009

2010

2011

+1.2% +1.1%

77.9%
201112

83.9%
201011

35.2%
200910

2012

1.0

+0.3%

1.1%

0.9

106

3.9%
Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.8
0.7
0.6
0.5

0.94

0.94

0.93

0.89

0.4
0.3

104
102
100
98

0.2

2009

2010

2011

2012

0.1
0.0
2009

2010

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+8.6%

90

+0.4%
12.6%

80
70

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

100

85

92

93

81

60
50
40
30
20
10

1500

2010

2011

2012

1523

1541

1534

1495

2009

2010

2011

2012

1300
1100
900
700
500

0
2009

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
4

400

4.4%

350

0.3%

+0.3%

300

+35.4%
+1.5%

250

Million

percompositeflighthour(2012prices)

1700

200
150

2
13.8%

100
50

6
23.8%

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

#DIV/0!

Changesinfinancialcosteffectiveness(20112012)
Weight
22%

ATCOhour Employmentcosts
perATCOhour
productivity

Decreaseinunit
ATM/CNSprovision
costs20112012

ATCOemployment
costspercomposite
flighthour

+0.3%
1.8%

3.9%
12.6%

Weight
78%

9.0%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

"Traffic
effect"

4.6%

4.9%

46

ANSCR(CzechRepublic)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
650

Deviationfromcomparators'weightedaverage

600
550

+23.2% +23.4%

+22.0%

500

+15.0%

450

+12.4%

+11.1%

+10.7%

400
350
300
2009

2010

ANSCR
LPS

2011

2012

CroatiaControl
PANSA

6.9%
ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

250
HungaroControl
SloveniaControl

2009

2012

40

2.4

35

2.1

30

1.8

25

1.5

20

1.2

15

0.9

10

0.6

0.3

0.0
2009

2010

2011
Capex(M)

2012

2013

2014

2015

Depreciation(M)

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements

ATM

COM

NAV

SUR

Building

Other

Years

FDPS

RDPS

HMI

VCS

C:1994*

C:2000*

C:2007*

C:2007*

2006
2007
2008
2009
2010
5.1M

22.0M

2011
2012

102.0M
(20082019)

2.9M

2013

15.4M
(20112019)

2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
ReplacementofRDPandFDPsystemsinPrahaACC
(Neopteryx)
UpgradeofRDPandFDPsystems
TB2007Projectinvolvingthecompleterenovationofthe
TechnicalBlockBuildingatPragueairport
Replacementofradiocommunicationequipmentand
ReplacementofVCS
BuildingofthesecuritycentreinOstravaairport

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM

48.1

2011

2019

ATM

38.0

2010

2016

Buildings

13.0

2008

2011

COM

10.3

2012

2017

Buildings

5.9

2011

2015

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

47

ARMATS(Armenia)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:1EUR=515.287AMD
ARMATSrepresents0.1%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

500

446

Compositeflighthours

15%
413

400
300

ATM/CNSprovisioncosts

+11.4%

+10.4%

409

+8.5%

368
446

413

368

5%

409

+2.3%
0.9%

200

2.5%

5%

100

15%

0
2009

2010

2011

200910

2012

201011

201112

+38.3%

0.20

0.15

0.10

1.7%

130

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

+20.6%

0.12

0.14

0.19

0.19

120
110
100
90
80
70

0.05

2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

0.00
2009

2010

2012

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+45.0%

12

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

14

17.5%

10

+37.1%

8
6

13

11

4
2

1500

2010

2011

2012

2010

2011

2012

900
700
500

Changesincomponentsofsupportcosts(20092012)

13.9%

+20.9%

0.4

250

Million

percompositeflighthour(2012prices)

2009

1100

0.6

300

1468

+17.4%

10.4%

350

1480

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour
400

1478

1300

0
2009

1479

200
150

0.2
+12.2%
+1.8%

100

Thepercentage
variationisnot
applicablesinceno
exceptionalcosts
wererecordedin
2012

0.0

50

4.1%

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

0.2

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)

ATCOhour Employmentcosts
productivity
perATCOhour

Weight
16%

Increaseinunit
ATM/CNSprovision
costs20112012

ATCOemployment
costspercomposite
flighthour

+11.3%

1.7%
17.5%

16.1%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Weight
84%

+17.4%

+14.4%

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

48

"Traffic
effect"
2.5%

ARMATS(Armenia)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
550

Deviationfromcomparators'weightedaverage

500

+28.4%

+22.1%
+11.4%

+18.4%

450
400
62.0%

350

74.8%

2009
ARMATS

2010
MNAV

2011

MoldATSA

2012

NATAAlbania

SMATSA

69.2%

ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

300

77.1%

2009

2012

2.5

3.5

2.0

2.8

1.5

2.1

1.0

1.4

0.5

0.7
0.0

0.0
2009

2010

2011
Capex(M)

2012

2013

2014

2015

Depreciation(M)

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements

ATM

COM

NAV

SUR

Building

Other

Years

FDPS

RDPS

HMI

VCS

C:2000

C:2000

C:2000

C:2000

2006
2007
2008
2009
2010
2011
0.2M
1.2M
3.7M

2012
2013

1.3M

4.2M

2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
ModernisationofATCcentre/ATCautomatedsystem,
VCSS
ModernisationofsecondaryenrouteradarTRLK11
Acquisitionofamonopulseradar
ModernisationofP3Dsystem
Replacementoftheenrouteradarantenna

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM

2.4

2012

2013

SUR
SUR
ATM
SUR

1.8
1.6
1.0
0.9

2011
2016
2014
2015

2012
2017
2015
2016

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

49

AustroControl(Austria)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:AustriaiswithintheEUROZone
AustroControlrepresents2.3%ofEuropeansystemgatetogateATM/CNS
Max
Min

provisioncosts

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

800
700

791

30%

713
569

600

54.6%

+27.3%

20%
550
10%

500

+1.6%

400
300

Compositeflighthours

0%
463

473

481

+1.6%
0.2%

0.5%

489

1.2% 2.9%

10%

200
20%

100

30%

0
2009

2010

2011

72.3%
201011

200910

2012

30.3%
201112

1.0

+1.3%

2.0%

0.5%

0.96

0.94

0.94

110

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.8
0.6

0.95

0.4

105
100
95
90

0.2

2009

0.0
2009

2010

2011

2010

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
1.9%

160

+1.5%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

180
0.3%

140
120

161

158

160

160

100
80
60
40
20

1700
1536

1389

1100
900
700
500
2009

2009

2010

2011

2012

+5.2%

300

+0.7%

2011

2012

Changesincomponentsofsupportcosts(20092012)
4

350

2010

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

1486

1300

+2.5%

250

+16.2%
+4.3%

2
Million

percompositeflighthour(2012prices)

1486

1500

200
150

100

50

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

+15.1%

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

#DIV/0!

6.3%

2012

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
35%

ATCOhour Employmentcosts
productivity
perATCOhour
0.5%

0.3%

+0.2%

Increaseinunit
ATM/CNSprovision
costs20112012

+1.7%

ATCOemployment
costspercomposite
flighthour

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Weight
65%

+2.5%

"Supportcosts
effect"

Supportcosts
percomposite
flighthour

0.5%

"Traffic
effect"
2.9%

50

AustroControl(Austria)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
700

Deviationfromcomparators'weightedaverage

650
+16.6%
+11.0%

600
550
500
450
9.5%

400

4.5% 4.7%

7.0%

16.1%
21.3%
ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

350
ATM/CNSprovision
costspercomposite
flighthour

300
2009

2010

2011

AustroControl

2012

NAVIAIR

ATCOhour
productivity

Skyguide

2009

2012

50

2.5

40

2.0

30

1.5

20

1.0

10

0.5
0.0

0
2009

2010

2011

2012

Capex(M)

2013

2014

2015

Depreciation(M)

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements

ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:1986*

C:1986*

C:1986*

C:1996*

Years
2007
2008
2009
2010
2011

13.6M

2012

36.1M
4.3M

5.2M

10.9M

108.4M

2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5
6

Nameoftheproject

Domain

CommissioningoftheATMSystemNewGeneration
ConstructionofthenewtowerinSalzburg(LOWS)airport
ExpendituresinSurveillanceinfrastructure
ExpendituresinNavigation
Communication
Othercapex

ATM
Building
SUR
NAV
COM
Other

Capexspent
betweenstartand
enddates(M)
36.1
13.6
6.7
5.2
4.3
108.4

Startdate

Enddate

2010
2010
2011
2011
2013
2011

2015
2013
2015
2015
2013
2015

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

51

AvinorContinental(Norway)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:1EUR=7.474NOK
AvinorContinentalrepresents2.6%ofEuropeansystemgatetogate
ATM/CNSprovisioncosts

Seasonaltrafficvariability:
Max

Min

Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

500
450
400
350
300
250
200
150
100
50
0

435

442

439

Compositeflighthours

+39.8%

+194.1%

30%

446

20%
414

429

401

10%

393

+5.3%

+7.3%
+1.6%

+0.1%

0%

+2.4% +4.5%

10%
20%
30%
2009

2010

2011

36.1%
200910

2012

201011

201112

1.0

115

0.8
0.6

3.4%

0.78

0.75

+4.7%

0.79

+6.1%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.84

0.4

110
105
100
95

0.2

2009

0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+7.7%
+13.7%

120
100

104

118

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

140
+3.1%

121

131

80
60
40
20

1900
1700

2010

2011

2012

2009

2010

1634

1573

1300
1100
900
700
500
2011

2012

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
8

300

3.1%

+7.4%
9.6%

250

4.1%

+13.6%

200

Million

percompositeflighthour(2012prices)

1684

1500

0
2009

1668

150
100
50

0.5%

4
8
#DIV/0!

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

12

2012

22.8%
Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
39%

+6.1%

Decreaseinunit
ATM/CNSprovision
costs20112012

+7.7%
+1.5%

ATCOhour Employmentcosts
productivity perATCOhour

ATCOemployment
costspercomposite
flighthour

1.9%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Weight
61%

Supportcosts
percomposite
flighthour

+0.2%

4.1%

"Supportcosts
effect"

+4.5%

52

"Traffic
effect"

AvinorContinental(Norway)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
500

Deviationfromcomparators'weightedaverage

+25.3%

450
+15.8%
+12.6%

400

+11.3%

+7.5%

+4.6%

350

3.9%
10.5%
ATM/CNSprovision
costspercomposite
flighthour

300
2009

2010

2011

Avinor(Continental)

2012

Finavia

ATCOhour
productivity

LFV

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

60

4.8

50

4.0

40

3.2

30

2.4

20

1.6

10

0.8
0.0

0
2009

2010

2011
Capex(M)

2012

2013

2014

2015

Depreciation(M)

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

C:1996(Oslo)
2004(Stav.)
2008(Bodo)*

C:1996(Oslo)
2004(Stav.)
2008(Bodo)*

2008

Bodo

Bodo

2009

Oslo

Oslo

Stavanger

Stavanger

Years

HMI

VCS
C:2007(Bodo)
2009(Oslo)*

2006
2007

Bodo

Oslo

2010
2011
176.9M
(20082024)

2012
37.6M
(20102018)

Oslo

2013

Bodo

2014

Stavanger

2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
ReplacementofATMsystems
RVT(RemoteandVirtualTowers,willreplacethe
traditionalATC/AFISTWRwitharemotelyoperated
solution)
NORWAM(ReplaceexistingradarswithWAMandADSB
technology)
SNAP(SouthernNorwayAirspaceProject)project
TCI(TargetConceptImplementation,willextendlifeof
existingATMsystemandimplementgovernment
requirementsrelatedtoDatalinkandFreeRouteAir
Space)

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM

111.7

2012

2021

ATM

27.7

2015

2024

SUR

26.6

2013

2018

ATM

17.2

2008

2014

ATM

15.9

2013

2016

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

53

Belgocontrol(Belgium)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Exchangerate:BelgiumiswithintheEUROZone
Belgocontrolrepresents1.9%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Aggregatedcomplexityscore:

Seasonaltrafficvariability:
Max

Min

Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

1000

923

600

797

30%

897

800
767

766

771

716

732

20%
10%

400

4.0%

10%

200

20%

30%
2010

2011

+5.6%

+2.9%

0%

2009

Compositeflighthours

0.2%

1.4%

4.6%

22.4%

61.4%
201011

200910

2012

2.5%

201112

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity
0.8
+1.1%

106
4.0%

Index(2009=100)

+2.4%

0.7
0.6
0.68

0.5

0.70

0.70

0.68

0.4

104
102
100

0.3

98

0.2

96

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+0.8%

140

3.7%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

160
+0.8%

120
138

100

139

134

135

80
60
40
20

1500

1332

2010

2011

2012

2011

2012

700
500
2010

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

1377

900

2009

2009

1388

1100

Changesincomponentsofsupportcosts(20092012)
6

700
4.6%

600

+96.4%

4
7.2%

+1.2%

500

Million

percompositeflighthour(2012prices)

1391

1300

400
300

3.2%

12.0%

200

99.5%

100

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

10

2012

11.6%
Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
27%

ATCOhour
productivity
4.0%

+5.1%
+0.8%

Employmentcosts
perATCOhour

Increaseinunit
ATM/CNSprovision
costs20112012

+2.2%

ATCOemployment
costspercomposite
flighthour

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Weight
73%

+1.2%

"Supportcosts
effect"

"Traffic
effect"

Supportcosts
percomposite
flighthour

3.5%

4.6%

54

Belgocontrol(Belgium)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
850

Deviationfromcomparators'weightedaverage

800
+16.0%

+12.8%

750
+5.5%

+2.3%

700

+1.4%

650
9.5%

600

14.3% 13.9%
ATM/CNSprovision
costspercomposite
flighthour

550
2009

2010

2011

Belgocontrol

2012

ATCOhour
productivity

LVNL

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

25

1.5

20

1.2

15

0.9

10

0.6

0.3
0.0

0
2009

2010

2011
Capex(M)

2012

2013

2014

2015

Depreciation(M)

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2009*

C:2003*

C:2009*

C:20082009*

Years
2006
2007
2008

(20082009)

2009
2010
2011
2.4M
13.5M

2012

27.8M

2013

10.4M
(20102018)

2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject

ATM
NAV
SUR

Capexspent
betweenstartand
enddates(M)
13.1
7.3
6.5

SUR

5.6

2010

2013

SUR

5.4

2010

2012

Domain

Canac2A/SRFC
ReplacementandoverhaulofVORandDMEequipment
PurchaseofPSR/ModeSradars
ReplacementandupgradeofapproachradarsatCharleroi
(EBCI)airport
ReplacementandupgradeofapproachradarsatOstende
(EBOS)airport

Startdate

Enddate

2011
2010
2010

2017
2018
2012

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

55

BULATSA(Bulgaria)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:1EUR=1.955BGN
BULATSArepresents0.9%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Seasonaltrafficvariability:
Max

Min

Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

500

30%

451
407

400
300

451

Compositeflighthours

407

388

373

375

371

20%
+7.0%

10%
+2.4% +0.0%
0%
1.5%

200

10%

100

+0.0%

7.5%

3.3% 2.4%

20%
30%

0
2009

2010

2011

200910

2012

89.8%
201112

201011

0.8

+14.7%

112

1.6%

0.7

10.4%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.6
0.65

0.5

0.75

0.74

0.66

0.4

108
104
100
96

0.3

92

0.2

88

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

perATCOhouronduty(2012prices)

2.3%

2.3%

ATCOhoursondutyperATCOperyear

TrendingatetogateemploymentcostsperATCOhour
60

+5.3%

50
40

55

54

53

55

30
20
10

1400

2010

2011

2012

1287

1288

2009

2010

2011

2012

950
800
650
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
0

400
8.5%

350

9.5%

300

5.3%

250

Million

percompositeflighthour(2012prices)

1306

1100

0
2009

1320

1250

200
150

1.9%

18.9%

100

50

29.7%

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

35.9%

#DIV/0!

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
21%

Decreaseinunit
ATM/CNSprovision
costs20112012

+17.6%
ATCOhour
productivity
10.4%

+5.3%

Employmentcosts
perATCOhour

ATCOemployment
costspercomposite
flighthour

0.9%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Weight
79%

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

5.3%

7.6%

56

"Traffic
effect"
2.4%

BULATSA(Bulgaria)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
550

Deviationfromcomparators'weightedaverage

500
+16.9%

+13.9%

450
+4.4%

400

+3.2%

+0.3%
2.9%

350
300

18.9% 19.2%
ATM/CNSprovision
costspercomposite
flighthour

250
2009

2010

BULATSA

2011

2012

HCAA

ATCOhour
productivity

ROMATSA

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

16

1.6

12

1.2

0.8

0.4

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2005*

C:2005*

C:2005*

C:2003*

Years
2006
2007
2008
2009
2010
2011

19.6M
8.7M

6.1M

4.0M

9.4M

1.2M

2012
2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject

Domain

NewenroutePSRandMSSRs
ExtensionandupgradeoftheSACTASsystem
NewtoweratSofiaairportanditsadjacentstructure
NewTMAPSRandMSSRatSofiaAirport
ASMGCSatSofiaairport

SUR
ATM
Building
SUR
SUR

Capexspent
betweenstartand
enddates(M)
10.2
8.7
8.1
4.1
4.1

Startdate

Enddate

2011
2009
2009
2011
2011

2012
2015
2013
2012
2012

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

57

CroatiaControl(Croatia)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:1EUR=7.515HRK
CroatiaControlrepresents1.0%ofEuropeansystemgatetogateATM/CNS
Max
Min

provisioncosts

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

600
500

475

+58.0%

30%

543
466

Compositeflighthours

20%
+11.8%
+6.3%

414
400

10%

300

+5.4% +6.5%

0%
350

347

365

1.1% 0.6%

363

200

10%

100

20%
48.3%
201011

30%

0
2009

2010

2011

200910

2012

49.5%
201112

0.7

+0.8%

+4.7%

+1.0%

0.67

0.67

115

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.6
0.5

0.63

0.64

0.4
0.3
0.2

110
105
100
95

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

perATCOhouronduty(2012prices)

+23.3%

80

ATCOhoursondutyperATCOperyear

TrendingatetogateemploymentcostsperATCOhour
90

4.2%

+6.0%

70
60
50

65

69

85

81

40
30
20
10

1500

2010

2011

2012

1394

2009

2010

2011

2012

700
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Changesincomponentsofsupportcosts(20092012)
3

300

+10.7%
3.6%

250

0.5%

+2.0%

+26.7%

200

Million

percompositeflighthour(2012prices)

1404

900

Trendinsupportcostspercompositeflighthour

1384

1100

0
2009

1383

1300

150
100
50

+48.2%

1
0
1

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

#DIV/0!

9.8%

2012

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
34%

+1.0%

Employmentcosts
perATCOhour

ATCOemployment
costspercomposite
flighthour

ATCOhour
productivity

4.2%

5.2%

Decreaseinunit
ATM/CNSprovision
costs20112012

0.5%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Weight
66%

+2.0%

+1.4%

"Traffic
effect"

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

0.6%

58

CroatiaControl(Croatia)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
650

Deviationfromcomparators'weightedaverage

600
550
500
6.4%

6.9%

450
400

11.3%

350
18.0%

300
ATM/CNSprovision
costspercomposite
flighthour

250
2009

2010

ANSCR
LPS

2011

2012

CroatiaControl
PANSA

ATCOhour
productivity

HungaroControl
SloveniaControl

14.2%

15.2%

16.4%

16.2%

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

25

2.5

20

2.0

15

1.5

10

1.0

0.5
0.0

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2005*

2005*

C:2005*

C:2005*

Years
2006
2007
2008
2009

3.9M

2010

3.4M

2011
3.3M

2.3M

47.6M

2012
2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

CroATMS/COOPANSUpgrade
CroATM(FMTP)UpgradeandExtensiontoRegionalATC
CentresPhase1

ATM

Capexspent
betweenstartand
enddates(M)
35.1

ATM

8.1

ModernisationandReplacementofVCCsandRedundantVCSs

ATM

4.4

2011

2015

4
5

PlesoRadarStationconstruction
ReplacementandupgradeoftheNAVSystems

SUR
NAV

3.9
3.4

2009
2008

2011
2014

Project
number
1
2

Nameoftheproject

Domain

Startdate

Enddate

2011

2014

2009

2011

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

59

DCACCyprus(Cyprus)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Exchangerate:CyprusiswithintheEUROZone
DCACCyprusrepresents0.5%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Aggregatedcomplexityscore:

Seasonaltrafficvariability:
Max

Min

Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

874

900
800
700

54.6%

+49.2%

20%

72.3%

712

10%

600

+7.0%

529

521

500

+0.1%

0%

400

0.2%

2.7%

300
200

Compositeflighthours

323

294

2.8%

10%

265

258

+0.1%

12.5%

100

20%

0
2009

2010

2011

54.6%
201011

200910

2012

201112

0.9

+16.6%

130

+2.8%

0.8

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

7.7%

0.7
0.6
0.5

0.76

0.78

0.72

0.84

0.4

120
110
100
90

0.3

80

0.2

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+17.4%

60

+15.9%
+0.3%

50
40

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

70

48

49

56

66

30
20
10

3000

2457
2024

2000
1500
1000
500
2009

0
2009

2010

2011

2012

2010

2011

2012

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
0

300
250
200

8.4%

10.6%
22.5%

+4.0%

Million

percompositeflighthour(2012prices)

2697

2675
2500

150
100
50

32.3%
50.2%

3
4

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

21.5%

#DIV/0!

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
30%

+16.6%

Increaseinunit
ATM/CNSprovision
costs20112012

Weight
70%

+17.4%

+0.7%
ATCOhour Employmentcosts
productivity perATCOhour

+3.0%

ATCOemployment
costspercomposite
flighthour

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

+4.0%
Supportcosts
percomposite
flighthour

+1.0%
"Supportcosts
effect"

60

"Traffic
effect"
2.8%

DCACCyprus(Cyprus)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
350

Deviationfromcomparators'weightedaverage

+31.3%

300
+22.7%

250

+15.9%
+9.9%

200

+8.2%

+5.7%

+2.2%
ATM/CNSprovision
costspercomposite
flighthour

150
2009

2010

2011

DCACCyprus

+1.3%

2012

ATCOhour
productivity

MATS

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

1.2

0.9

0.6

0.3

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

C:2000*

C:2000*

HMI

VCS

Years
C:1998*

2006
2007
8.9M

2008
2009

23.8M
(20032013)

2010
2011

4.6M

2012
7.9M

1.6M
2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
ImplementationofnewATMsystemsandpurchaseofnew
equipmentinNicosiaACC(LEFCO)
NewAirTrafficControlBuildinginNicosia
ReplacementofVHF/UHFRadios
NewSSRRadarsinLaraandPafos
CommittmentofnewgroundtoairTx/Rx

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM

20.5

2003

2010

Building
COM
SUR
COM

8.9
3.0
2.8
2.4

2006
2011
2013
2012

2010
2013
2014
2014

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

61

DFS(Germany)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:GermanyiswithintheEUROZone
DFSrepresents13.1%ofEuropeansystemgatetogateATM/CNSprovision
Max
Min

costs

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

800
700

740
650

+74.2%

30%
691

650

20%

600

+8.7%

10%

500
504

484

510

+5.6%

+3.3%

+1.6%

400
300

Compositeflighthours

0%

552

2.3%

10%

2.5%

200

20%

100

30%

0
2009

2010

2011

29.0%
201011

200910

2012

45.9%
201112

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity
1.2

106
+0.3%

+0.1%

Index(2009=100)

+2.7%
1.0
0.8
1.00

1.03

1.03

1.03

0.6

104
102
100

0.4

98

2009

0.2
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
perATCOhouronduty(2012prices)

160

+5.1%

ATCOhoursondutyperATCOperyear

+9.7%

180
+3.3%

140
120
100

145

152

157

172

80
60
40
20

1200

2010

2011

2012

6.3%

350

+6.2%

2010

2011

1079

800
700
600
500
2012

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour
400

1143

900

2009

2009

1129

1000

Changesincomponentsofsupportcosts(20092012)
120

+7.8%

+33.7%

80

300
250

Million

percompositeflighthour(2012prices)

1134

1100

200
150
100

40

50

6.0%

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

11.2%

13.1%

9.5%

40

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)

+9.7%

Weight
30%

Increaseinunit
ATM/CNSprovision
costs20112012

+9.6%

+8.3%

Weight
70%

+7.8%

+5.1%

+0.1%
ATCOhour Employmentcosts
productivity perATCOhour

ATCOemployment
costspercomposite
flighthour

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

62

"Traffic
effect"
2.5%

DFS(Germany)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
750

Deviationfromcomparators'weightedaverage

700
650

+35.5%

+32.9%

600

+24.0%

550

+16.4%

+14.1%

500

+6.4%

+4.1%

450
3.6%

400

ATM/CNSprovision
costspercomposite
flighthour

350
2009
Aena

2010
DFS

2011

DSNA

2012

ENAV

ATCOhour
productivity

NATS(Continental)

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

1.6

120

1.2

80

0.8

40

0.4

160

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

Years

2006

FDPS

RDPS

HMI

VCS

C:2011(Karl.)
2004(Bremen)
1999(Langen)
1999(Mnchen)*

C:2011(Karl.)
2004(Bremen)
1999(Langen)
1999(Mnchen)*

C:2011(Karl.)
2004(Bremen)
1999(Langen)
1999(Mnchen)*

C:2009(Karl.)
2003(Bremen)
2002(Langen)
2002(Mnchen)*

Karlsruhe

2007
Bremen,Langen,
Mnchen

2008

Langen

2009

Karlsruhe

2010
298.9M
(20042020)

114.2M
(20072020)

77.2M
(20062020)

179.3M
(20022018)

Bremen

2011

Karlsruhe

Karlsruhe

Karlsruhe

2012
36.3M

Mnchen

2013
2014
2015

Langen
(20122013)
Mnchen
(20132014)

Langen(20152016)
Langen(20152016)
Langen(20152016)
Mnchen(20162017) Mnchen(20162017) Mnchen(20162017)
Bremen(20172018) Bremen(20172018) Bremen(20172018)

2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
ProgrammeiCAS
P2ATCASRehosting
Rasum8.33kHz
TechnikzentrumCampusLangen
ExtensionofMnchenACC

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM
ATM
COM
Buildings
Buildings

159.3
75.2
68.8
58.2
52.8

2006
2007
2007
2009
2008

2020
2019
2020
2016
2014

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

63

DHMI(Turkey)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:1EUR=2.313TRY
DHMIrepresents4.4%ofEuropeansystemgatetogateATM/CNSprovision
Max
Min

costs

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

450

354

350
300
250
200
150

+27.1%

30%

416

400

365

20%

338

Compositeflighthours

+14.1%

+11.7%

10%
318

274

293

312

+5.1%

0%

100

1.2%

1.7%

10%
20%

50
0

17.0%

18.3%

30%
2009

2010

2011

32.6%
201011

200910

2012

201112

+11.1%

0.9

140

+8.4%

0.8

+18.4%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.7
0.6
0.5

0.63

0.74

0.81

0.89

0.4

130
120
110
100

0.3

90

0.2

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
50

+38.0%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

55
+4.5%

45
40
+25.4%

35
30
25
20

27

34

47

49

15
10
5

1900

1637

1700

1376

1300
1100
900
700
500
2009

2009

2010

2011

2012

40

17.0%

2011

2012

Changesincomponentsofsupportcosts(20092012)

300
250

2010

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour
+11.1%

1561

1500

+50.6%

30

5.9%

20

200

Million

percompositeflighthour(2012prices)

1858

150
100

+13.9%
10
+7.1%
0

50

10

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

20.9%

#DIV/0!

20

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
19%

+11.1%
+4.5%
ATCOhour Employmentcosts
productivity perATCOhour

Decreaseinunit
ATM/CNSprovision
costs20112012

ATCOemployment
costspercomposite
flighthour
6.0%

Weight
81%

Supportcosts
percomposite
flighthour
5.9%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

"Supportcosts
effect"
1.2%

5.9%

64

+5.1%
"Traffic
effect"

DHMI(Turkey)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
650

Deviationfromcomparators'weightedaverage

600
+43.5%

550

+29.7%

500

+28.1%

+24.3%

450
400
350

13.2%

300
2010

2011

DHMI

2012

UkSATSE

21.3%

ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

250
2009

14.9%

19.9%

2009

2012

5.4
4.8
4.2
3.6
3.0
2.4
1.8
1.2
0.6
0.0

180
160
140
120
100
80
60
40
20
0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2008(AllACCs)*

C:2008(AllACCs)*

C:2008(AllACCs)*

C:2005(AllACCs)*

AllACCs

AllACCs

AllACCs

AllACCs

AllACCs

AllACCs

Istanbul

AllACCs

AllACCs

AllACCs

AllACCs

Years
2006
2007
2008
2009
2010
2011

93.4M
105.5M
40.6M

93.3M

15.8M

Ankara

2012
2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
Replacement of existing radars and procurement of
additionalradars
ATCtrainingcomplex
Purchase of new Radar Data Processing and Flight Data
Processing systems, new Human Machine Interface and
ControllerWorkingPositions
Air navigation communication and terminal systems
periodicmodernisation
CentralAnkaraACCandATCComplexes

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

SUR

44.3

2008

2014

Building

43.2

2011

2016

ATM

41.4

2009

2013

COM

40.6

2010

2015

ATM

38.6

2008

2014

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

65

DSNA(France)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:FranceiswithintheEUROZone
DSNArepresents14.5%ofEuropeansystemgatetogateATM/CNSprovision
Max
Min

costs

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

800
700

20%

600
500

507

494

400
300

+553.4%

30%

721

Compositeflighthours

454

461

446

510

+8.1%

10%
0%

443

+2.6%

+0.3%

1.4% 0.8%

0.7%

1.3%
10%

200

20%

100

30%

0
2009

2010

2011

76.4%
201011

200910

2012

201112

0.8

2.1%

+1.2%

+1.8%

104

0.7

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.6
0.5

0.75

0.73

0.74

0.76

0.4

103
102
101
100

0.3

99

0.2

98

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
1.9%

100

1.0%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

120
+2.9%

80
60

97

96

95

97

40
20

1400

2010

2011

2012

2009

2010

2011

800
650
500
2012

Changesincomponentsofsupportcosts(20092012)
20

3.7%

1258

950

1.3%

+6.9%

10

300

+1.3%

+15.5%

250

Million

percompositeflighthour(2012prices)

+2.2%

1304

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour
350

1304

1100

0
2009

1304

1250

200
150
100

10
20
30

50

40

#DIV/0!

8.2%

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

50

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
29%

+1.8%

Decreaseinunit
ATM/CNSprovision
costs20112012

+2.9%

ATCOhour Employmentcosts
productivity perATCOhour

+1.0%
ATCOemployment
costspercomposite
flighthour

0.6%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Weight
71%

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

1.3%

2.0%

66

"Traffic
effect"
0.8%

DSNA(France)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
750

Deviationfromcomparators'weightedaverage

700
650

0.6%
4.1% 5.0%

600

8.4%

550

9.2%

13.1%

500
23.6%

450
30.0%

400
2009
Aena

2010
DFS

2011

DSNA

ENAV

2012

ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

350
NATS(Continental)

2009

2012

2.0

160

1.6

120

1.2

200

80

0.8

40

0.4
0.0

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
FDPS
COM

ATM

NAV

SUR

Building

Other**

RDPS

HMI

VCS

C:2000*

C:2000(Marseille)
2000/2003(Brest)
2002/2005(Reims)
2002/2006(Paris)
2003(Bordeaux)*

Years
C:1982*

C:1982*

2006

Paris(2002/2006)

2007

AllACCs

2008
2009

AllACCs

2010
780M
805M
(20032021)

142.0M
(20052016)

2011
2012
2013
50.0M
(20122017)

2014
2015
Marseille,
Reims
Paris

2016
2017

Marseille,
Reims
Paris

* C = Commissioning

**Theamountprovidedunder"Other"(i.e.50.0M)relatestothenewairportNotre
DamedeLandesinNantesandincludescapexrelatingtoATMC/N/Sandbuilding

Upgrade

Marseille,
Reims
Paris

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject

ATM
ATM

Capexspent
betweenstartand
enddates(M)
705.0
75100

COM

92.0

2005

2015

Other
COM

50.0
50.0

2012
2012

2017
2016

Domain

4FLIGHT,includingCOFLIGHT(EFDP)andERATO(MTCD)
SYSAT:NewATMsystemforAPPandTWRoperationalunits
CSSIP:RenewalofLANandWANtouseIPstandard
(integratestheformerprojectISOCRATE)
NotreDameDesLandes(NewairportforNantes)
VCS:VoiceCommunicationSystems(FABECcooperation)

Startdate

Enddate

2003
2012

2019
2021

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

67

EANS(Estonia)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:EstoniaiswithintheEUROZone
EANSrepresents0.2%ofEuropeansystemgatetogateATM/CNSprovision
Max
Min

costs

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

250
200

+879.8%

30%
184

195

196

187

20%

183

189

182

174

+359.5%
+15.5%
+11.6%

10%

150

Compositeflighthours

+6.3%

+8.5%

+3.2%

+3.5%

0%

100

10%

50

20%
30%

0
2009

2010

2011

28.0%
201011

200910

2012

201112

1.2

160
+32.8%

1.0

6.8%
15.4%

0.8
0.6

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.97

0.90

0.76

1.01

150
140
130
120
110
100

0.4

90

2009

0.2

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

0.0
2009

2010

2012

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

60
+35.1%
50
3.7%
9.6%

40
30

45

44

39

53

20
10

1900
1700

2010

2011

2012

1680

1671

2009

2010

2011

2012

1300
1100
900
700
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
1.00

160

+2.9%

140

6.9%

120

0.75

7.2%

+28.4%
+24.5%

0.50

100

Million

percompositeflighthour(2012prices)

1680

1500

0
2009

1680

80

+15.9%

0.25

60

0.00

40
20

0.25
13.2%

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

#DIV/0!

0.50

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
29%
+32.8%

Decreaseinunit
ATM/CNSprovision
costs20112012

Weight
71%

+35.1%

+1.8%
ATCOhour Employmentcosts
productivity perATCOhour

ATCOemployment
costspercomposite
flighthour

4.6%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Supportcosts
percomposite
flighthour

+0.7%

7.2%

"Supportcosts
effect"

+8.5%

68

"Traffic
effect"

EANS(Estonia)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
450

Deviationfromcomparators'weightedaverage

400
+59.6%

350

+36.0%

+36.5%

+24.8%

300
250
200
34.2% 31.6%

150

ATM/CNSprovision
costspercomposite
flighthour

100
2009

2010

EANS

2011
LGS

2012

39.0% 38.3%
ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

ATCOhour
productivity

OroNavigacija

2009

2012

3.0

2.5

2.0

1.5

1.0

0.5
0.0

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2012*

C:2002*

C:2012*

C:2012*

Years
2006
2007
2008
2009
2010

9.0M
0.2M

2011
2012

2.7M

2.5M

2.9M

2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
ReplacementEUROCATATMsysteminTallinnACC
(includingnewATCOHMI)
ExpensesinSurveillance*
Communication*,including:
0.3McapexrelatedtothenewVCS
0.5MimplementationofAeronauticalMessageHandling
System(AMHS)
ExpensesinNavigation*
NewTallinnTWRATMsystem

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM

8.0

2009

2012

SUR

2.9

2011

2015

COM

2.7

2010

2015

NAV
ATM

1.5
1.0

2012
2009

2015
2010

*Source: Estonia National Performance Plan (NPP, June 2011).

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

69

ENAV(Italy)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:ItalyiswithintheEUROZone
ENAVrepresents7.9%ofEuropeansystemgatetogateATM/CNSprovision
Max
Min

costs

Seasonaltrafficvariability:

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

600
500
400

Compositeflighthours

30%
509

486

485

494

489

471

483

483

20%
10%

300

0%

200

10%

100

20%

30%

+0.7%

+4.0%

+2.1%
0.4%

4.5% 4.4%

21.3%
2009

2010

2011

38.9%
200910

2012

37.8%
201112

201011

0.8

+8.2%

3.5%

0.7

110

4.2%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.6
0.5

0.69

0.75

0.72

0.69

0.4

105
100
95

0.3

90

0.2

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

perATCOhouronduty(2012prices)

+4.1%

+2.5%

ATCOhoursondutyperATCOperyear

TrendingatetogateemploymentcostsperATCOhour
120

1.8%

100
80

103

107

110

108

60
40
20

1500

2010

2011

2012

+0.9%

1330

2010

2011

2012

1100
900
700
500
2009

Changesincomponentsofsupportcosts(20092012)
10

1.3%

+5.8%

300

250

Million

percompositeflighthour(2012prices)

2.8%

1358

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour
350

1391

1300

0
2009

1450

200
150

0
61.8%
5
3.7%

13.7%

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

100

10

50
0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

15

2012

8.8%
Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Changesinfinancialcosteffectiveness(20112012)
Weight
32%

ATCOhour Employmentcosts
productivity perATCOhour
4.2%

1.8%

Decreaseinunit
ATM/CNSprovision
costs20112012

Supportcosts
percomposite
flighthour

+2.5%
ATCOemployment
costspercomposite
flighthour

Weight
68%

0.1%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

1.3%

"Supportcosts
effect"

"Traffic
effect"

5.6%

4.4%

70

ENAV(Italy)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
750

Deviationfromcomparators'weightedaverage

700

+0.0%

650

0.2%

600

1.2%

6.9%

8.3%

550
500

15.4%

17.0%

450
26.1%

400
2009
Aena

2010
DFS

2011

DSNA

ENAV

2012

ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

350
NATS(Continental)

2009

2012

300

2.4

250

2.0

200

1.6

150

1.2

100

0.8

50

0.4

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
FDPS
ATM

COM

NAV

SUR

Building

Other

Years

RDPS

C:1999
(AllACCs)*

C:1999
(AllACCs)*

HMI

VCS

C:1999
(AllACCs)*

C:2000(Roma)
2001(Padova)
2005(Brindisi,Mil.)*

2006

Roma

2007
2008

Brindisi,Milano,
Padova

2009

Roma

2010
2011
272.4M

87.5M

64.7M

10.6M

200.8M

27.8M

2012
2013
2014
2015

AllACCs

AllACCs

AllACCs

2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number

1
2
3
4
5

Nameoftheproject
Developmentofanintegratedplatformforthe
managementofATMproceduresandaeronauticaldata
(program4FLIGHT)
Realisationofcivilinfrastructures
Modernisationoftheradioassistanceequipment
Automationoftheoperatingsystem
Implementationofthenewairspacedesignsystem

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM

156.4

2009

2015

Building
NAV
ATM
ATM

146.8
64.7
64.1
51.9

2009
2009
2009
2009

2015
2015
2015
2015

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

71

Finavia(Finland)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:FinlandiswithintheEUROZone
Finaviarepresents0.8%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Seasonaltrafficvariability:
Max

Min

Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

450
400
350
300
250

401
359

359

352

346

326

+502.4%

+85.7%

30%
371

Compositeflighthours

20%
+11.6%
+5.0%

10%

349

+0.5%

0%

200

1.0%

2.0%

10%

150
100

8.6%

20%

50

30%

0
2009

2010

2011

200910

2012

70.9%
201112

201011

0.7

+6.3%

+3.9%

115

7.0%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.6
0.5
0.61

0.65

0.68

0.63

0.4
0.3
0.2

110
105
100
95
90

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+14.2%

80

7.1%

+0.7%

73

73

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

90

70
60
50

68

78

40
30
20
10

1700
1500

2010

2011

2012

2011

2012

900
700
500
2009

2010

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Changesincomponentsofsupportcosts(20092012)
4

300

+27.0%

250

5.8%

3.5%

+6.6%

200

Million

percompositeflighthour(2012prices)

1496

1100

Trendinsupportcostspercompositeflighthour

1496
1399

1300

0
2009

1480

150
100

+7.6%

0
1

50

42.0%

2
0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

2012

#DIV/0!

11.3%
Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
33%

ATCOhour
productivity

+0.7%

7.0%

Employmentcosts
perATCOhour

+8.3%

Increaseinunit
ATM/CNSprovision
costs20112012

+7.2%

ATCOemployment
costspercomposite
flighthour

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Weight
67%

+6.6%

"Supportcosts
effect"

Supportcosts
percomposite
flighthour

2.5%

72

"Traffic
effect"
8.6%

Finavia(Finland)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
500

Deviationfromcomparators'weightedaverage

450
8.2%

11.2%
14.5%

400

11.5% 12.9%

11.9%

350

26.4%
29.9%
ATM/CNSprovision
costspercomposite
flighthour

300
2009

2010

2011

Avinor(Continental)

2012

Finavia

ATCOhour
productivity

LFV

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

25

4.0

20

3.2

15

2.4

10

1.6

0.8

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2012*

C:2012*

C:2012*

C:2009*

Years

2006
2007
2008
2009
2010
2011
2012
2013
2014

6.8M
7.0M

14.7M

2015

4.5M

2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
InvestmentstoWideareamultilaterationtechnology
ILS/DMErenewal(allairports)
VHFradiostations(8,33kHzchannelspacing)>FL195
EFHKRadarrenewal:PSR
MSSRrenewal

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

SUR
NAV
COM
SUR
SUR

7.8
7.0
4.5
3.5
3.4

2013
2014
2015
2017
2015

2015
2017
2017
2017
2016

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

73

HCAA(Greece)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:GreeceiswithintheEUROZone
HCAArepresents1.9%ofEuropeansystemgatetogateATM/CNSprovision
Max
Min

costs

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

800
600

20%

588

10%

474

500

+2.2%

400

0%

343

300
200

+160.5%

30%

713

700

6.0%

10%
369

318

306

308

30%

0
2010

2011

2.3%

4.1% 4.7%

11.9%

20%

100
2009

Compositeflighthours

28.7%
200910

2012

91.4%
201112

201011

0.8

+7.9%
+2.2%

0.7

104

4.7%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.6
0.5
0.4

0.68

0.69

0.74

0.71

0.3

100
96
92
88

0.2

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
4.5%

80

+0.6%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

90
1.0%

70
60
50
40

83

79

80

79

30
20
10

1700
1500

2010

2011

2012

1470

2009

2010

2011

2012

900
700
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Changesincomponentsofsupportcosts(20092012)
10

300

250

+7.4%

0
17.4%

200

2.1%

1.0%

12.8%

5
Million

percompositeflighthour(2012prices)

1470

1100

Trendinsupportcostspercompositeflighthour

1470

1300

0
2009

1470

150
100

8.1%

10
15

#DIV/0!

20
25

50

30

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

35

2012

33.2%
Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
36%

ATCOhour Employmentcosts
productivity perATCOhour
1.0%
4.7%

Increaseinunit
ATM/CNSprovision
costs20112012

+3.9%
+0.7%
ATCOemployment
costspercomposite
flighthour

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Weight
64%

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

"Traffic
effect"

5.7%

4.7%

1.0%

74

HCAA(Greece)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
550

Deviationfromcomparators'weightedaverage

500

+22.0%
+15.0%

+17.9%

450

+7.6%

400
350

14.6%
19.4%

21.5%
29.2%
ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

300
ATM/CNSprovision
costspercomposite
flighthour

250
2009

2010

BULATSA

2011
HCAA

2012

ATCOhour
productivity

ROMATSA

2009

2012

20

2.4

15

1.8

10

1.2

0.6

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2000*

C:2000*

C:2000*

C:1999*

Years
2006
2007
2008
2009
2010
2011

10.7M

9.3M

2012

15.1M
2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number

Nameoftheproject

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

PurchaseofVCS/RCSsystemsforAthinai/MakedoniaACC

COM

8.5

2013

2015

UpgradeofPALLASsystem(FDPS,RDPS,ODS,HMI)
Purchaseofasurfaceradar(SMR/ASMGCS)at
Thessaloniki/MakedoniaInternationalairports
PurchaseofMultilateration/WAMequipment
PurchaseofVCS/RCSsystemsfor5mainairports

ATM

8.0

2013

2015

SUR

3.8

2009

2013

SUR
COM

3.1
2.9

2013
2013

2015
2015

3
4
5

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

75

HungaroControl(Hungary)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:1EUR=288.876HUF
HungaroControlrepresents1.1%ofEuropeansystemgatetogateATM/CNS
Max
Min

provisioncosts

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

500
400

437

438

Compositeflighthours

+419.5%

30%

438

+18.8%

20%

383

10%

300
368

437

438

438

+0.1%

0%

200

0.1% 0.4%

10%

100

6.6% 6.6%

20%
30%

0
2009

2010

2011

95.5%
200910

2012

86.5%
201011

201112

0.9
5.4%

0.8

+3.6%

110

4.2%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.7
0.6
0.5

0.84

0.79

0.82

0.79

0.4

105
100
95

0.3

90

0.2

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+42.9%

100

20.1%
0.7%

80
60

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

120

79

78

112

89

40
20

1700

2010

2011

2012

1551

1594

2009

2010

2011

2012

1100
900
700
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
7

400

+29.1%
+23.4%

350

10.6%

300

+7.3%

250

Million

percompositeflighthour(2012prices)

1551

1300

0
2009

1551

1500

200
150

+21.0%

3
1

100

50
0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

18.6%

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

42.8%

#DIV/0!
Depreciation Costofcapital Exceptional
costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
28%

ATCOhour Employmentcosts
productivity perATCOhour

Decreaseinunit
ATM/CNSprovision
costs20112012

ATCOemployment
costspercomposite
flighthour

+7.3%
+0.3%
0.1%

4.2%
20.1%

Weight
72%

16.7%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

76

"Traffic
effect"
6.6%

HungaroControl(Hungary)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
650

Deviationfromcomparators'weightedaverage

600
550

+15.2%

+12.3%

500

+9.4%

450

+2.5% +2.5%

400
350

1.9%
6.8%

300
250
2009

2010

ANSCR
LPS

2011

CroatiaControl
PANSA

7.0%

ATM/CNSprovision
costspercomposite
flighthour

2012

ATCOhour
productivity

HungaroControl
SloveniaControl

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

35

3.5

30

3.0

25

2.5

20

2.0

15

1.5

10

1.0

0.5

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

Years

FDPS

RDPS

HMI

VCS

C: 1998*

C: 1998*

C: 1998*

C: 2009*

2006
2007
2008
2009
2010
28.6M

2011
23.3M

2012
2.0M

1.5M

20.6M

2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
MATIASSWandHWupgrade(ANSIIIproject)
CPDLCimplementation
ANSIIIBuilding(ANSIIIproject)
ANSIIITechnology(ANSIIIproject)
G/GCOMinfrastructuredeployment

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM
COM
Building
ATM
COM

18.4
15.1
14.7
7.2
6.2

2009
2012
2010
2010
2010

2012
2014
2012
2012
2012

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

77

IAA(Ireland)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Exchangerate:IrelandiswithintheEUROZone
IAArepresents1.4%ofEuropeansystemgatetogateATM/CNSprovision
costs

Aggregatedcomplexityscore:

Seasonaltrafficvariability:
Max

Min

Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

450
400
350
300
250

386

356

347
341

377

392

+110.7%

+56.4%

30%

393

Compositeflighthours

20%
+7.1%

10%

354

+6.8%

+2.8%

+0.6%

0%

200

3.0%

10%

150
100

9.1%

20%

50

30%

0
2009

2010

2011

88.7%
201011

200910

2012

201112

1.2

105

1.0

+6.1%

+3.0%

+7.5%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.8
0.6

0.87

0.92

0.95

1.02

100
95
90
85

0.4

80

2009

0.2
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
100

+5.5%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

120
+7.1%

+5.6%

80
60

87

91

97

103

40
20

1700

2010

2011

2012

1526

2009

2010

2011

2012

900
700
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Changesincomponentsofsupportcosts(20092012)
4

350
300

+15.0%

+4.4%

+10.6%

12.9%

250

+24.6%

2
Million

percompositeflighthour(2012prices)

1569

1100

Trendinsupportcostspercompositeflighthour

1573

1300

0
2009

1578

1500

200
150

100

50

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

+1.3%

9.2%

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

#DIV/0!

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
27%

+7.5%

+7.1%

ATCOhour Employmentcosts
productivity perATCOhour

Decreaseinunit
ATM/CNSprovision
costs20112012

ATCOemployment
costspercomposite
flighthour

Weight
73%

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

0.4%
9.6%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

12.9%

12.3%

78

+0.6%
"Traffic
effect"

IAA(Ireland)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
500

Deviationfromcomparators'weightedaverage

450

+14.5%
+6.0%

400

0.5%

2.7%
9.1%

13.1%

350

23.5%
ATM/CNSprovision
costspercomposite
flighthour

300
2009

2010

2011

IAA

2012

ATCOhour
productivity

NAVPortugal(Continental)

20.6%

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

30

1.8

25

1.5

20

1.2

15

0.9

10

0.6

0.3

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2003(AllACCs)*

C:2003(AllACCs)*

C:2003(AllACCs)*

C:2003(AllACCs)*

AllACCs

AllACCs

AllACCs

2011

AllACCs

AllACCs

AllACCs

2012

AllACCs

Years
2006
2007
2008
2009

23.0M

2010
67.0M
0.8M
12.0M

AllACCs

2013
AllACCs

2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
COOPANS(BUILD1)initiative,includingthereplacement
ofthecurrentFDPandRDPsystems
RadarReplacement
CommissioningofVoiceCommunicationsSystemSwitch
COOPANS(BUILD2)initiative
COOPANS(BUILD3)initiative

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM

49.0

2006

2012

SUR
COM
ATM
ATM

20.0
12.0
8.0
8.0

2006
2010
2010
2013

2011
2016
2014
2016

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

79

LFV(Sweden)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Exchangerate:1EUR=8.700SEK
LFVrepresents3.0%ofEuropeansystemgatetogateATM/CNSprovision
costs

Aggregatedcomplexityscore:

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

500
450
400
350
300
250
200
150
100
50
0

456
401

395

396
435

380

+235.7%

30%

455

Compositeflighthours

20%

+12.8%

+9.7%

10%

443

0%

+7.5%
0.2%

3.4%

6.2%

10%
20%

21.0%
30%
2009

2010

2011

200910

2012

28.0%
201112

201011

+9.5%

0.7

1.2%

108

5.9%
0.6

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.5
0.4

0.66

0.62

0.68

0.67

0.3

106
104
102
100

0.2

98

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+14.5%
+6.5%

100

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

120

17.2%

80
60

94

100

115

95

40
20

1700

2010

2011

2012

1627

1628

2009

2010

2011

2012

1100
900
700
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
15

350
+43.5%

300
250

23.0%

200
150

100

50

10

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

+19.6%

10

+8.2%
Million

percompositeflighthour(2012prices)

1627

1300

0
2009

1630

1500

7.9%

21.0%

37.1%

Thepercentage
variationisnot
applicablesinceno
exceptionalcosts
wererecordedin
2009

15

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
38%

ATCOhour Employmentcosts
productivity perATCOhour

ATCOemployment
costspercomposite
flighthour

Increaseinunit
ATM/CNSprovision
costs20112012

+43.5%

+38.6%
"Traffic
effect"

+16.8%

1.2%
17.2%

Weight
62%

16.2%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

80

3.4%

LFV(Sweden)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
500

Deviationfromcomparators'weightedaverage
+13.9%

450
+8.4%
+1.1%

400
0.3%
5.2%

350
ATM/CNSprovision
costspercomposite
flighthour

300
2009

2010

2011

Avinor(Continental)

2012

Finavia

3.8%
7.5%

8.9%

ATCOhour
productivity

LFV

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

50

2.5

40

2.0

30

1.5

20

1.0

10

0.5

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

Years

FDPS

RDPS

HMI

VCS

C:2012(Malmo)
2013(Stokholm)*

C:2012(Malmo)
2013(Stokholm)*

C:2012(Malmo)
2013(Stokholm)*

C:2010(AllACCs)*

2006
2007
2008
11.6M

2009
2010

89.9M

9.9M
(20072018)

AllACCs

2011

6.4M

2012

Malmo

Malmo

Malmo

2013

Stockholm

Stockholm

Stockholm

2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

COOPANS
TrainingandsupportbuildinginMalmo
RemoteTowerCentre(RTC)
SurveillanceUpgradeProgram(WAM)
VHFRadio/UHF/8,33kHz

ATM
Buildings
ATM
SUR
COM

78.6
11.6
7.1
6.4
6.1

2006
2007
2010
2009
2007

2017
2011
2014
2014
2018

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

81

LGS(Latvia)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Exchangerate:1EUR=0.703LVL
LGSrepresents0.3%ofEuropeansystemgatetogateATM/CNSprovision
costs

Aggregatedcomplexityscore:

Seasonaltrafficvariability:
Max

Min

Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

300

276

ATM/CNSprovisioncosts

30%

283
259

245

250
200

276

283

Compositeflighthours

259

20%
10%

245

150

0%

100

10%

50

20%

+14.7%
+6.1%

+4.9%

+3.5%

0.4%
5.8%

30%

0
2009

2010

2011

200910

2012

201011

201112

1.0

125

+15.5%

0.9

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

+14.1%

0.8
+7.4%

0.7
0.6
0.5

0.63

0.67

0.77

0.89

0.4
0.3

115
105
95
85
75

0.2

2009

2010

2011

2012

0.1
0.0
2009

2010

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+28.5%

40
+18.2%

30
20

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

50

24

28

+10.0%

31

40

10

1700

1268

1300
1100
900
700
500
2009

2009

2010

2011

2012

2.5

200

2.0

8.5%
Million

100

+31.8%

1.0
0.5
0.0
4.6%

0.5

50

1.0

Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

2012

1.5

150

2009

2011

Changesincomponentsofsupportcosts(20092012)

+1.3%
9.3%

2010

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour
250

1508

1464

1500

percompositeflighthour(2012prices)

1686

23.7%

35.8%

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

1.5

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

#DIV/0!

Changesinfinancialcosteffectiveness(20112012)
Weight
17%

Decreaseinunit
ATM/CNSprovision
costs20112012

Weight
83%

+28.5%
+15.5%

ATCOhour Employmentcosts
productivity perATCOhour

Supportcosts
percomposite
flighthour

+11.2%
ATCOemployment
costspercomposite
flighthour

5.4%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

"Supportcosts
effect"

"Traffic
effect"
0.4%

8.5%

8.9%

82

LGS(Latvia)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
450

Deviationfromcomparators'weightedaverage

400
+19.1%

350
300

+6.2%

+2.8%
1.1%

250

3.8%

+1.5%

7.2%

200
150

28.9%
ATM/CNSprovision
costspercomposite
flighthour

100
2009

2010

EANS

2011
LGS

2012

ATCOhour
productivity

OroNavigacija

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

9
8
7
6
5
4
3
2
1
0

1.8
1.6
1.4
1.2
1.0
0.8
0.6
0.4
0.2
0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:1999*

C:1999*

C:1999*

C:2004*

Years
2006
2007
2008

2.3M
2009
2010
12.6M

2011

13.8M

2012
2.1M
2013
3.7M
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
ModernizationofsurveillancesystemforprovisionofATSin
Latvia(MSSALproject)3radarsexchange
PBNImplementation
ModernizationofAutomatedATCsystem(ATRACC)
ModernizationofVHF"AirGround"communicationsystem
ILS/DMERWY18Riga

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

SUR

9.2

2007

2009

ATM
ATM
COM
NAV

4.1
3.9
2.3
2.3

2013
2010
2012
2008

2016
2013
2013
2009

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

83

LPS(SlovakRepublic)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Exchangerate:SlovakRepubliciswithintheEUROZone
LPSrepresents0.7%ofEuropeansystemgatetogateATM/CNSprovision
costs

Aggregatedcomplexityscore:

Seasonaltrafficvariability:
Max

Min

Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

700
600

601

609

569

582

576

569

72.3%

20%

500
400

54.6%

+85.6%

30%

609

Compositeflighthours

10%

609

+4.4% +5.6%

300

+5.0%

+0.9% +2.0%

0%
10%

200

#DIV/0!
1.8%

20%

100

100.0%

30%

0
2009

2010

2011

200910

2012

201011

201112

0.7
+6.6%

+5.6%

0.7%

110

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.6
0.5
0.4
0.58

0.62

0.66

0.65

0.3
0.2

105
100
95
90

2009

0.1
0.0
2009

2010

2011

2010

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
80

+13.0%

+2.8%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

90
+3.9%

70
60
50
40

66

74

76

79

30
20
10

1500

2010

2011

2012

1465

1456

1496

2009

2010

2011

2012

1100
900
700
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

1461

1300

0
2009

Changesincomponentsofsupportcosts(20092012)
5

600
500

2.9%

0.7%

+7.5%

+23.9%

400

Million

percompositeflighthour(2012prices)

1700

300
200

+11.7%

1
0

0.7%

100

1
0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

26.8%

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

#DIV/0!

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
20%

ATCOhour
productivity
0.7%

+3.9%

+4.6%

Employmentcosts
perATCOhour

ATCOemployment
costspercomposite
flighthour

Increaseinunit
ATM/CNSprovision
costs20112012

+6.9%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Weight
80%

+7.5%

Supportcosts
percomposite
flighthour

+5.6%
"Supportcosts
effect"

84

"Traffic
effect"
1.8%

LPS(SlovakRepublic)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
650

Deviationfromcomparators'weightedaverage

600
550
+47.5%

500

+72.9%
+59.3%

+56.1%

450
400
350
14.4%

23.9% 18.8%

300
2009

2010

ANSCR
LPS

2011

2012

CroatiaControl
PANSA

ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

250
HungaroControl
SloveniaControl

8.8%

2009

2012

40

5.6

35

4.9

30

4.2

25

3.5

20

2.8

15

2.1

10

1.4

0.7

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:1999*

C:2005*

C:1999*

C:2009*

Years
2006
2007
2008
2009
2010

34.2M
2.2M

5.1M

2011
2012
2013

23.5M
(20102018)

2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ConstructionofthenewACCinBratislava
E2000Upgrade
ConstructionofinfrastructurerelatedtothenewMSSRin
Monik
Upgradeofcommunicationsystem
UpgradeoftheE2000PLCAsystem

Building
ATM

30.0
20.0

2007
2015

2012
2018

Building

4.2

2009

2015

COM
ATM

2.2
2.2

2012
2010

2012
2012

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

85

LVNL(Netherlands)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:NetherlandsiswithintheEUROZone
LVNLrepresents2.0%ofEuropeansystemgatetogateATM/CNSprovision
Max
Min

costs

Seasonaltrafficvariability:

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

900
800

771

792

744

710

+7.9%

10%

724

645

+1.1%

+0.3%

0%

588

605

72.3%

20%

500
400
300

54.6%

+207.1%

30%

700
600

Compositeflighthours

200

5.0%

5.2%

10%

2.2%

10.5%

12.2%

20%

100
0

30%

2009

2010

2011

200910

2012

201011

201112

1.0

1.0%

0.9

+4.7%

115

5.9%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.8
0.7
0.6
0.5

0.91

0.90

0.95

0.89

0.4
0.3

110
105
100
95

0.2

2009

2010

2011

2012

0.1
0.0
2009

2010

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

IndexnumberofATCOsinOPS

perATCOhouronduty(2012prices)

ATCOhoursondutyperATCOperyear

TrendingatetogateemploymentcostsperATCOhour
180

+16.1%

160
+7.5%

140

0.8%

120
100
80

131

141

163

140

60
40
20

1700

2010

2011

2012

1592

1578

2009

2010

2011

2012

1100
900
700
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
10

600
15.7%

500

6.6%

11.2%

11.3%

400

+20.0%

0
24.2%

10
Million

percompositeflighthour(2012prices)

1604

1300

0
2009

1628

1500

300
200

20
30

100

40

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

50

2012

#DIV/0!

39.2%
Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
28%

Decreaseinunit
ATM/CNSprovision
costs20112012

Weight
72%

+23.4%
+16.1%

Supportcosts
percomposite
flighthour

ATCOhour
productivity
5.9%

Employmentcosts
perATCOhour

ATCOemployment
costspercomposite
flighthour

"Supportcosts
effect"

2.2%

2.8%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

"Traffic
effect"

11.3%

13.3%

86

LVNL(Netherlands)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
850

Deviationfromcomparators'weightedaverage

800
+14.9% +13.5%

750

+9.3%

700
650

1.1%

2.4%

4.3%

600

9.4%

2009

2010

2011

Belgocontrol

11.8%

2012

ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

550
LVNL

2009

2012

80

5.6

70

4.9

60

4.2

50

3.5

40

2.8

30

2.1

20

1.4

10

0.7

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:1998*

C:1998*

C:1998*

C:1988/upgradedin
1995*

Years
2006
2007
2008
2009
2010

6.0M

2011
51.4M

130.6M
(20092018)

9.8M

83.0M

2012
2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
ReplacementAAA
NewBuilding/OPSroom
Otherinvestments
VoiceCommunicationsystem
Adjustmentfacilities

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM
Building
Other
ATM
Building

96.0
50.0
47.9
25.0
25.0

2011
2014
2009
2009
2015

2018
2016
2015
2014
2015

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

87

MATS(Malta)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:MaltaiswithintheEUROZone
MATSrepresents0.2%ofEuropeansystemgatetogateATM/CNSprovision
Max
Min

costs

Seasonaltrafficvariability:

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

350
300

54.6%

30%

+23.9%

299
266

20%

256

250

+12.7%
+0.8%

0%
297

266

256

+14.8%

+10.4%
+6.3%

10%

193

200
150

Compositeflighthours

193

10%

100

13.5%

20%

50

19.6%
95.2%
200910

30%

0
2009

2010

2011

2012

201011

201112

0.8

+33.0%
8.0%

0.7
0.6

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

+16.4%

0.5
0.4

0.47

0.55

0.73

0.67

0.3
0.2

150
140
130
120
110
100
90
80
70

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

perATCOhouronduty(2012prices)

ATCOhoursondutyperATCOperyear

TrendingatetogateemploymentcostsperATCOhour
35

+20.7%

30
+10.1%

22.4%

25
20
15

24

26

32

25

10
5

2000

2010

2011

2012

1825

2009

2010

1737

1500
1250
1000
750
500
2011

2012

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
0.75

300

+64.4%

0.50

250

11.5%

2.5%

0.25

200

Million

percompositeflighthour(2012prices)

1851

1750

0
2009

2165

2250

26.5%

150
100

0.00

+0.4%

0.25
0.50

50

26.3%

0.75

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

#DIV/0!

14.4%

1.00

2012

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
18%

ATCOhour Employmentcosts
productivity perATCOhour
8.0%
22.4%

Decreaseinunit
ATM/CNSprovision
costs20112012

ATCOemployment
costspercomposite
flighthour
15.6%

Weight
82%

Supportcosts
percomposite
flighthour

24.6%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

"Supportcosts
effect"
15.6%

26.5%

88

+14.8%
"Traffic
effect"

MATS(Malta)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
350

Deviationfromcomparators'weightedaverage

300

3.7%

6.1%

11.6%

13.3%
20.2%

250

27.9%
39.7%

200

51.2%

2009

2010

2011

2012

DCACCyprus

ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

150
MATS

2009

2012

3.5

3.0

2.5

2.0

1.5

1.0

0.5

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:1996*

C:1996*

C:1996*

C:1996*

Years
2006
2007
2008
2009
2010
2011

4.8M
8.2M

0.26M

1.7M

2012
2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number

1
2
3
4
5

Nameoftheproject

Domain

ATSsystemupgrade
PurchaseandinstallationofMSSR(1)
PurchaseandinstallationofMSSR(2)
VCSsystemupgrade
Extensiontotechnicalworkshops

ATM
SUR
SUR
ATM
Building

Capexspent
betweenstartand
enddates(M)
7.2
2.4
2.4
1.0
1.0

Startdate

Enddate

2011
2009
2010
2013
2010

2014
2013
2014
2014
2014

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

89

MNAV(F.Y.R.Macedonia)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:1EUR=61.231MKD
MNAVrepresents0.1%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Seasonaltrafficvariability:

Trendingatetogateeconomiccosteffectiveness(allfinancial datain2012prices)

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

478

500

465

ATM/CNSprovisioncosts

Compositeflighthours

54.6%

469

72.3%

15%

449

10%

400
300

478

465

5%

449

469

0%
200

2.0%

5%

100

10%

15%
2009

2010

2011

3.1%

4.7%

3.7%
9.1%

200910

2012

12.9%
201112

201011

0.30

110
+3.4%

0.25

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

+7.9%
12.7%

0.20
0.25

0.26

0.24

0.22

0.15

105
100
95
90
85

0.10

80

2009

0.05
0.00
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+11.0%

+6.8%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

35

8.0%

30
25
20

30

32

32

29

15
10
5

1500

2010

2011

2012

1415

1100
900
700
500
2009

2009

1464

1408

1300

2010

2011

2012

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
0.00

400
4.7%

350

1.0%

0.25

6.9%

300

2.3%
25.7%

0.50

250

Million

percompositeflighthour(2012prices)

1464

200
150

40.6%

0.75
1.00

100
50

1.25

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

1.50

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

#DIV/0!

69.1%
Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
29%

+7.9%

Decreaseinunit
ATM/CNSprovision
costs20112012

Supportcosts
percomposite
flighthour

+11.0%

ATCOhour Employmentcosts
productivity perATCOhour

+2.9%
ATCOemployment
costspercomposite
flighthour

Weight
71%

4.2%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

"Supportcosts
effect"

6.9%
15.4%

90

"Traffic
effect"
9.1%

MNAV(F.Y.R.Macedonia)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
550

Deviationfromcomparators'weightedaverage

500

+30.9%
+22.2%

+18.1%
+5.5%

+4.5%

450

6.5%

400
350

46.2%

2009
ARMATS

2010
MNAV

2011

MoldATSA

2012

NATAAlbania

51.9%
ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

300
SMATSA

ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

2009

2012

9.1

7.8

6.5

5.2

3.9

2.6

1.3

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2002*

C:2002*

C:2002*

C:2002*

Years
2006
2007
2008
2009
2010
2011
2012
2013

1.1M
7.9M

2.9M

1.1M

2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
ProcurementofnewATCsystems
ModeSenhancedsurveillancegroundstation
implementation
ConstructionofnewbuildingforANSPheadquarters
PurchaseofnewVHFradiosystemandMWlink
UpgradeofMSSRtoenhanceModeSradar

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM

6.0

2014

2016

SUR

2.2

2014

2015

Building
COM
SUR

0.8
0.8
0.7

2013
2014
2014

2015
2015
2015

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

91

MoldATSA(Moldova)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:1EUR=15.503MDL
MoldATSArepresents0.1%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

600

543

ATM/CNSprovisioncosts

54.6%
30%

300

543

512

+17.1%

20%

443

404

+14.5%
+8.2%

10%

404

443

72.3%

+24.1%

512

500
400

Compositeflighthours

+4.6%

0%

200

10%

100

20%

14.6%

30%

0
2009

2010

2011

200910

2012

201011

201112

0.25

+25.9%

+5.6%

+1.7%

145

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.20
0.15

0.18

0.22

0.23

0.24

0.10

135
125
115
105
95

0.05

2009

0.00
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

perATCOhouronduty(2012prices)

+17.3%

14

ATCOhoursondutyperATCOperyear

TrendingatetogateemploymentcostsperATCOhour
16

+10.3%
6.8%

12
10
8

12

14

14

13

6
4
2

1700
1500

2010

2011

2012

1495

1507

2009

2010

2011

2012

1100
900
700
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
0.75

500

5.5%

400

+46.5%
+22.7%

22.8%

0.50

+10.3%

300

Million

percompositeflighthour(2012prices)

1482

1300

0
2009

1477

200
100

0.25
+0.9%

0.00
0.25

16.2%

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

0.50

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

#DIV/0!

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
14%

Increaseinunit
ATM/CNSprovision
costs20112012

Weight
86%

+9.5%

+10.3%

+15.4%
+5.6%

+10.3%

ATCOhour Employmentcosts
productivity perATCOhour

+4.6%

+4.4%
ATCOemployment
costspercomposite
flighthour

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

92

"Traffic
effect"

MoldATSA(Moldova)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
550

Deviationfromcomparators'weightedaverage
+56.5%

+48.5%

500

+28.3%

+20.5%

450
400
350

61.5%

2009
ARMATS

2010
MNAV

2011

MoldATSA

2012

NATAAlbania

58.1% 58.6%
ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

300

52.3%

SMATSA

2009

2012

3.5

3.0

3.0

2.5

2.5

2.0

2.0

1.5

1.5

1.0

1.0

0.5

0.5

3.5

0.0

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:1998*

C:1998*

C:1998*

C:2001*

Years
2006
2007
2008
2009
2010
2011

1.1M
0.9M**

2012

4.2M
2013
1.0M
1.5M

2014
5.0M
(20132020)

2015
2016
2017

* C = Commissioning

**Partoftheamountprovidedunder"Other"(i.e.0.5M)relatestoMET

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
ConstructionandmodernisationTowerbuildingin
Chisinau
ReplacementofFDP,RDPandHMIsystems(SiATM
Sweden)
Implementationofmultilaterationequipment
CommissioningofDVOR/DMEunits
DigitalphonestationPABX

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

Buildings

5.0

2013

2020

ATM

2.9

2011

2013

SUR
NAV
COM

1.5
0.6
0.6

2012
2013
2012

2017
2014
2013

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

93

MUAC(Maastricht)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:MaastrichtiswithintheEUROZone
MUACrepresents1.8%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Seasonaltrafficvariability:
Max

Min

Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

300

281

281
245

250
200

269

269

235

261

10%

252

10%

50

20%

30%

+6.4%

+3.9%

+2.2% +2.1%

100

2011

72.3%

20%

0%

2010

54.6%

30%

150

2009

Compositeflighthours

0.7%

3.5%
9.3%

5.5%

17.2%
200910

2012

201011

201112

2.5

115

2.0

+1.0%

+5.7%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.4%

1.5
1.83

1.85

1.95

1.94

1.0

110
105
100
95
90

0.5

2009

0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
perATCOhouronduty(2012prices)

+5.5%
160

ATCOhoursondutyperATCOperyear

+21.9%

200
1.8%

120
156

164

161

197

80
40

1500
1344

2010

2011

1168

900
700
500
2009

2009

1206

1100

2010

2011

2012

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

2012

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
0

200

2.0%
15.4%

150

1.1%

62.4%
2
Million

percompositeflighthour(2012prices)

1248

1300

100

3
4

50

19.0%
5.9%

5
0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

#DIV/0!

35.3%

2012

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
38%

+21.9%

+22.4%

ATCOhour
productivity
0.4%

Employmentcosts
perATCOhour

Increaseinunit
ATM/CNSprovision
costs20112012

+7.2%
ATCOemployment
costspercomposite
flighthour

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Weight
62%

Supportcosts
percomposite
flighthour
1.1%

"Supportcosts
effect"

"Traffic
effect"

1.8%

0.7%

94

MUAC(Maastricht)(2012)
ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup

Due to the unique nature of its airspace (upper airspace only, across four States), it was determined
thatMaastricht(MUAC)shouldbeconsideredseparatelyandthereforethisANSPisnotincludedinthe
comparatorgroupbenchmarkinganalysis

2.5

20

2.0

15

1.5

10

1.0

0.5

25

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2008*

C:2008*

C:2002*

C:1995*

Years
2006
2007
2008
2009
2010

115.1M
(20032016)

2011

17.1M

2012
2013
30.7M

2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
ProcurementofnewFDPS
Other
ImplementationofthenewCWPsystem
Renewalofinfrastructure
ReplacementoftheVCSsystem

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM
Other
ATM
Building
ATM

50.0
30.7
22.3
13.5
13.3

2003
2012
2012
2012
2011

2011
2016
2016
2014
2016

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

95

NATAAlbania(Albania)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Exchangerate:1EUR=139.837ALL
NATAAlbaniarepresents0.3%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Aggregatedcomplexityscore:

Seasonaltrafficvariability:

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

593

600
500

463

470

422

424

472

+12.5%
+10.8%
+11.2%

20%
10%

422

54.6%
+272.0%

30%

400
300

Compositeflighthours

451

+7.4% +7.8%

+3.6%

0%

200

10%

100

20%

3.0%

30%

0
2009

2010

2011

200910

2012

87.4%
201112

201011

0.7

145

0.6

1.4%

+1.9%

0.57

0.58

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

8.5%

0.5
0.4

0.57

0.53

0.3
0.2

135
125
115
105
95

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+31.2%

0.6%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

30
25
+95.6%
20
15
10

11

22

29

28

1750

1707

2010

2011

2012

500
2010

Changesincomponentsofsupportcosts(20092012)
1.5

3.4%

2012

750

500
4.3%

2011

1000

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

400

1573

1250

2009

2009

1599

1500

+6.6%

+44.6%
+31.2%

1.0

300

Million

percompositeflighthour(2012prices)

1705

200

0.5
+1.6%
0.0

100

0.8%
0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

#DIV/0!

0.5

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
12%

ATCOhour Employmentcosts
productivity perATCOhour
0.6%
8.5%

+8.6%

Increaseinunit
ATM/CNSprovision
costs20112012

Weight
88%

+6.8%

+6.6%

ATCOemployment
costspercomposite
flighthour

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Supportcosts
percomposite
flighthour

+3.4%

"Traffic
effect"

"Supportcosts
effect"

3.0%

96

NATAAlbania(Albania)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
550

Deviationfromcomparators'weightedaverage
+32.5% +33.0%
+24.0%
+22.7%
+15.5%
+4.7%

500
450

18.4%

400
350
61.0%

2009
ARMATS

2010
MNAV

2011

MoldATSA

2012

NATAAlbania

ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

300
SMATSA

2009

2012

18

15

12

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2004*

C:2004*

C:2004*

C:2008*

Years
2006
2007
2008
2009

17.7M

2.0M
1.6M

13.8M

0.3M

2010
2011
2012
2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
PurchaseofanewATMsystem
NewjointACC/APP/TWRbuildinglocatednearMother
TeresaAirport
Remoteradiofacility(RXTXradioforVHF)
PurchaseofaVoiceCommunicationSystem
PurchaseandinstallationoftheILSequipment.

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM

14.5

2008

2012

Buildings

13.5

2008

2011

COM
ATM
NAV

2.0
1.8
1.6

2008
2008
2010

2012
2011
2011

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

97

NATSContinental(UnitedKingdom)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:1EUR=0.811GBP
NATSContinentalrepresents9.4%ofEuropeansystemgatetogate
ATM/CNSprovisioncosts

Seasonaltrafficvariability:
Max

Min

Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

600
519

470

482

423

434

20%

400

10%
466

300

463

10%

100

20%

30%
2010

2011

+6.6%

+3.4%

+2.3%

+1.6%

0%

200

2009

54.6%

30%

519

500

Compositeflighthours

4.9% 4.2%

1.0%

5.5%
17.7%

200910

2012

201011

201112

1.2

101
2.0%

1.0

+0.5%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

1.1%

0.8
1.01

0.99

1.00

0.99

0.6

100
99
98
97
96

0.4

95

2009

0.2
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
5.1%

120

2.4%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

140
+3.2%

100
80

125

119

116

120

60
40
20

1300

2010

2011

2012

2009

2010

2011

2012

700
500

Changesincomponentsofsupportcosts(20092012)
20

10.6%

+2.0%

+8.2%

10
0

250

Million

percompositeflighthour(2012prices)

1246

900

+0.1%

300

1246

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour
350

1234

1100

0
2009

1247

200
150
100

1.0%

10

1.4%

20
30

50

40

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

85.1%
15.0%

85.1%

50

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
28%

+3.2%

+4.3%

Employmentcosts
perATCOhour

ATCOemployment
costspercomposite
flighthour

ATCOhour
productivity
1.1%

Increaseinunit
ATM/CNSprovision
costs20112012

Weight
72%

+2.6%

+2.0%

+1.0%

"Traffic
effect"

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

1.0%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

98

NATSContinental(UnitedKingdom)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
750

Deviationfromcomparators'weightedaverage

700

+34.5%

650
+18.7%

600
550

+1.5%

500
450

10.0%

10.7% 10.3%

400
2009
Aena

2010
DFS

2011

DSNA

2012

ENAV

ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

350
NATS(Continental)

5.4%

5.9%

2009

2012

2.0

150

1.5

200

100

1.0

50

0.5

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements

ATM

COM

NAV

SUR

Other

Building

Years

FDPS

RDPS

HMI

VCS

C:2001
(LondonAC,LondonTCand
Prest.)*

C:1996(Lon.AC)
2007(Lon.TC)
2009(Prest.)*

C:2001(Lon.AC)
2007(Lon.TC)
2009(Prest.)*

C:2002(Lon.AC)
2007(Lon.TC)
2008(Prest.)*

LondonTC

LondonTC

2006
2007

LondonTC
LondonAC
Prestwick

2008
2009

18.0M
751.9M
(20032019)

2010

Prestwick

2011

LondonACandLondonTC

LondonAC
Prestwick

Prestwick

LondonTC

LondonTC
LondonAC

2012

LondonTC

LondonAC

2013
2014

LondonTCandPrestwick

LondonTCandPrestwick

2015

126.6M
(20152019)

110.6M
(20152019)

2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number

1
2
3
4
5

Nameoftheproject

Domain

ACCsystemssoftwaredevelopment
iTEC
iFACTS
CNSinfrastructure
Othercapex

ATM
ATM
ATM
ATM
Other

Capexspent
betweenstartand
enddates(M)
239.7
209.3
191.0
126.6
103.7

Startdate

Enddate

2015
2015
2003
2015
2015

2019
2019
2011
2019
2019

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

99

NAVPortugalContinental(Portugal)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:PortugaliswithintheEUROZone
NAVPortugalContinentalrepresents1.6%ofEuropeansystemgatetogate
Max
Min

ATM/CNSprovisioncosts

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

500

455
380

400

416

450

385

+200.0%

20%
10%

368

54.6%
+147.1%

30%

300
442

Compositeflighthours

357

+5.4%

+9.2%
+4.5%

+1.7%

0%
1.3%

200

10%

100

8.3%

12.3%

20%
30%

0
2009

2010

2011

200910

2012

201011

201112

1.0

+1.2%

+0.4%

112

1.6%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.8
0.6

0.92

0.93

0.93

0.92

0.4

110
108
106
104
102
100
98

0.2

2009

0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

perATCOhouronduty(2012prices)

ATCOhoursondutyperATCOperyear

TrendingatetogateemploymentcostsperATCOhour
180

+32.0%

160

7.5%

140

11.5%

120
100
80

140

124

164

152

60
40
20

1900

2010

2011

2012

1788

1811

2009

2010

2011

2012

1500

1100
900
700
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
5

300
250

+12.4%

19.1%
10.8%

200

8.1%

Million

percompositeflighthour(2012prices)

1775

1300

0
2009

1772

1700

150
100
50

85.1%

27.5%

5
10

51.6%

15
23.4%

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

#DIV/0!

20

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
46%

ATCOhour Employmentcosts
productivity perATCOhour

Decreaseinunit
ATM/CNSprovision
costs20112012

ATCOemployment
costspercomposite
flighthour

Weight
54%

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

8.1%

9.3%

"Traffic
effect"
1.3%

1.6%
7.5%

6.0%

7.1%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

100

NAVPortugalContinental(Portugal)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
500

Deviationfromcomparators'weightedaverage
+24.0%

450

+16.6%

+12.7%

+8.8%

400

+2.7%

+0.4%

4.8%

350

13.0%
ATM/CNSprovision
costspercomposite
flighthour

300
2009

2010
IAA

2011

2012

ATCOhour
productivity

NAVPortugal(Continental)

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

4.5

20

3.6

15

2.7

10

1.8

0.9

25

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2001*

C:2001*

C:2001*

C:1999*

Years
2006

2007
2008
2009
2010
2011
2012
2013
55.5M

7.1M

6.9M

16.1M

7.6M
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
ATMsystemsprogram(mainlyincludingtheevolutionof
theLISATMsystemintoLISATMiTEC)
SURVEILLANCEprogram(mainlyincludingNewMLAT
equipmentFIRLisboaandSantaMaria,newMSSRs,
replacementofLisboaradar)
Buildingprogram(mainlyincludingnewTowerCentrein
Horta)
Communicationprogram(mainlyincludingnewVCS
systemandpurchaseortaperecorders)
NAVAIDSprogram(mainlyincludingnewDMEsand
PRNAV,ReplacementofVORs,TACANandDMEs,precision
approachsysteminOportoandFaroandGBAS)

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM

55.5

2011

2016

SUR

16.1

2011

2016

Building

7.6

2011

2016

COM

7.1

2011

2016

NAV

6.9

2011

2016

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

101

NAVIAIR(Denmark)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:1EUR=7.442DKK
NAVIAIRrepresents1.4%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

500

438

400
300

423

Compositeflighthours

54.6%

30%
408

391

385

396

376

393

20%

+12.9%

10%

+3.7%

+3.0%

0%
200

10%

100

0.9%

4.3%

1.0%

5.3%

20%
30%

0
2009

2010

2011

68.6%
201112

47.2%
201011

200910

2012

1.2

108
+2.9%

1.0

+6.1%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

4.2%

0.8
0.94

0.6

0.96

0.98

1.02

106
104
102
100
98

0.4

96

2009

0.2
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
2.8%

+0.7%

+1.5%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

100
80
60
97

40

94

97

96

20

1700

2010

2011

2012

2009

2010

1506

1507

2011

2012

1300

900
700
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
6

350
8.4%

300

3.6%

+4.3%

+43.3%

250

2
Million

percompositeflighthour(2012prices)

1555

1100

0
2009

1567

1500

200
150

85.1%

100

50

4.2%

16.7%
#DIV/0!

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

2012

24.6%
Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)

ATCOhour
productivity
4.2%

Weight
25%

Increaseinunit
ATM/CNSprovision
costs20112012

Weight
75%

+5.1%

+4.5%

+4.3%

"Supportcosts
effect"

Supportcosts
percomposite
flighthour

1.2%

+0.7%

Employmentcosts
perATCOhour

ATCOemployment
costspercomposite
flighthour

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

"Traffic
effect"
5.3%

102

NAVIAIR(Denmark)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
700

Deviationfromcomparators'weightedaverage

650

0.5%

600

5.7%

550
500

14.3%

17.3%

450

22.6%

25.3%
29.5%

400

32.8%

350
2009

2010

2011

AustroControl

2012

NAVIAIR

ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

300
Skyguide

2009

2012

Plannedcapitalexpendituresanddepreciationcosts
20

1.2

15

0.9
10
0.6
5

0.3

Capextodepreciationratio

1.5

0.0

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2007*

C:2007*

C:2007*

C:2007*

Years
2006
2007
2008
2009
2010
2011
2012
2013

27.7M

7.7M

0.2M

4.3M

11.7M

9.8M

2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

NAVIAIRdidnotprovidethelistofmainprojectsrelatingtothecapexfortheperiod20122017

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

103

OroNavigacija(Lithuania)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:1EUR=3.453LTL
OroNavigacijarepresents0.3%ofEuropeansystemgatetogateATM/CNS
Max
Min

provisioncosts

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

ATM/CNSprovisioncosts

54.6%

500

15%

400
300

395

389

395

389

Compositeflighthours

+10.3%
361

368

361

368

+11.9%
+9.6%

5%

200

+2.0%

+1.5%

+0.1%

5%

100

15%

0
2009

2010

2011

200910

2012

201011

201112

+11.5%

0.5

3.8%

125

+8.0%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.4
0.3

0.41

0.44

0.48

0.49

0.2

120
115
110
105
100
95

0.1

2009

0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+0.6%

+0.4%

+4.7%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

40
35
30
25
20

37

37

39

39

15
10
5

1700

2010

2011

2012

2009

2010

7.8%

2011

2012

900
700
500

Changesincomponentsofsupportcosts(20092012)
1.6

300

1568

1100

350
+0.2%

1539

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

+49.0%

+1.2%

1.2

250

Million

percompositeflighthour(2012prices)

1589

1300

0
2009

1563

1500

200
150
100

+20.1%

0.8

0.4

50

+1.0%

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

+1.7%

0.0

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

#DIV/0!
85.1%

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
22%

ATCOhour
productivity
3.8%

+4.4%
+0.4%

Employmentcosts
perATCOhour

Increaseinunit
ATM/CNSprovision
costs20112012

+1.9%

ATCOemployment
costspercomposite
flighthour

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Weight
78%

+1.2%

+1.3%

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

104

+0.1%
"Traffic
effect"

OroNavigacija(Lithuania)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
450

Deviationfromcomparators'weightedaverage
+45.2%
+36.5%

+41.8% +44.6%

400
350

+10.5%

300
250

8.8%

200
32.4%

150
ATM/CNSprovision
costspercomposite
flighthour

100
2009

2010

EANS

2011
LGS

2012

36.0%

ATCOhour
productivity

OroNavigacija

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

12

10

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2005*

C:2005*

C:2005*

C:2005*

(20162018)

(20162018)

(20162018)

(20162018)

Years
2006
2007
2008
2009
2010

16.6M

2011

3.2M

2012

13.0M
2013
3.3M

1.4M
8.7M

2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
NewACC/administrativecentre
NewATCsystem
Replacementofradar(Kaunas)
Replacementofradar(Palanga)
Replacementofradar(Vilnius2007/2008)

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

Building
ATM
SUR
SUR
SUR

8.7
7.2
4.8
4.8
3.7

2014
2016
2008
2008
2007

2017
2017
2010
2010
2008

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

105

PANSA(Poland)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:1EURO=4.179PLN
PANSArepresents1.8%ofEuropeansystemgatetogateATM/CNSprovision
Max
Min

costs

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

600

54.6%

30%

535

500

Compositeflighthours

20%

447
397

400

10%

363

300

+11.0%
+9.1%

+5.7%

+5.8%
+0.9%

0%
337

200

311

302

316

2.7%

10%
20%

100

30%

0
2009

2010

2011

41.1%
201011

31.0%
200910

2012

23.1%
201112

1.0

+4.3%

+6.5%

+0.1%

125

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.8
0.6

0.88

0.91

0.97

0.97

0.4

120
115
110
105
100
95

0.2

2009

0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+18.1%

1.5%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

100
+1.4%
80
60
82

40

83

98

97

20

1300
1194

2010

2011

2012

2012

+11.9%

2.0

6.0%

1.5

150

Million

percompositeflighthour(2012prices)

2011

500

2.5

200

2010

700

Changesincomponentsofsupportcosts(20092012)

250
2.1%

1132

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour
9.8%

1120

900

2009

0
2009

1145

1100

100

1.0
0.5

+0.2%

85.1%

0.0

50

4.1%

0.5

#DIV/0!

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

1.0

2012

7.2%
Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
32%

+0.1%

Employmentcosts
perATCOhour

ATCOhour
productivity

1.5%

Decreaseinunit
ATM/CNSprovision
costs20112012

ATCOemployment
costspercomposite
flighthour
1.7%

Weight
68%

Supportcosts
percomposite
flighthour
4.6%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

"Supportcosts
effect"
0.5%

6.0%

106

+5.8%
"Traffic
effect"

PANSA(Poland)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
650

Deviationfromcomparators'weightedaverage

600

+21.3%
+14.2%

550

+7.0%

+11.3%

500
450
400

14.6%

350

17.3%

22.6%
28.2%

300
250
2009

2010

ANSCR
LPS

2011

2012

CroatiaControl
PANSA

ATCOemployment Supportcostsper
compositeflight
costsperATCO
hour
hour

ATCOhour
productivity

ATM/CNSprovision
costspercomposite
flighthour

HungaroControl
SloveniaControl

2009

2012

35

3.5

30

3.0

25

2.5

20

2.0

15

1.5

10

1.0

0.5

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2001*

C:2001*

C:2001*

C:2001*

Years
2006
2007
2008
2009

4.6M

2010
2011

37.4M

2012
14.4M

18.1M

24.0M

26.5M
2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
PurchaseofnewPSRMSSRradarsatWarszawa,Pozna,
Krakw,Wrocaw,andNorthEastPoland
ReplacementoftheATMsystems(FDP,RDP,HMIand
VoIP)withthenewPEGASUS21system
TWRsinLodz,Rzeszow,PoznanandKrakwLand
purchase,constructionanddesignprocess
Modernizationanddevelopofthenavigation
infrastructureinFIRWarsaw(modernization4DMEand2
DVOR/DME;develop9DMEand5DVOR/DME)
Constructionof17groundstations

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

SUR

23.1

2009

2016

ATM

23.0

2008

2013

Building

18.0

2009

2015

NAV

11.6

2010

2014

COM

10.5

2009

2013

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

107

ROMATSA(Romania)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:1EUR=4.454RON
ROMATSArepresents2.0%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Seasonaltrafficvariability:
Max

Min

Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

600

ATM/CNSprovisioncosts

54.6%
30%

529

500

503
447

400

+20.5%

20%

411

10%
529

300

Compositeflighthours

446

502

411

+7.1%
+0.8%

0%

1.3%
200

10%

100

20%

7.1%

9.6%

30%

0
2009

2010

2011

200910

2012

201011

201112

0.7

120
+9.2%

0.6

0.6%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

+27.1%

0.5
0.4
0.43

0.55

0.60

0.59

0.3
0.2

110
100
90
80
70

2009

0.1
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

perATCOhouronduty(2012prices)

ATCOhoursondutyperATCOperyear

TrendingatetogateemploymentcostsperATCOhour
70

+9.8%

60

6.9%

+7.8%

50
40
57

30

53

57

63

20
10

1500

1372

2010

2011

2012

1254

900
700
500
2009

2009

1296

1100

2010

2011

2012

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
25

450
400

+194.2%

+25.7%

15

11.8%

350
300

9.7%

+12.3%
Million

percompositeflighthour(2012prices)

1397

1300

250
200
150
100
50

+2.4%
6.1%

5
15
44.9%

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

+194.2%

25

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
22%

ATCOhour
productivity
0.6%

+9.8%

Employmentcosts
perATCOhour

Increaseinunit
ATM/CNSprovision
costs20112012

Weight
78%

+22.1%

+25.7%

+24.0%
"Traffic
effect"

+10.4%
ATCOemployment
costspercomposite
flighthour

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

108

1.3%

ROMATSA(Romania)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
550

Deviationfromcomparators'weightedaverage

500
450

+22.3%

+42.6%
+26.5%

+31.4%

400
9.9%

350

16.4%

24.9%

300

ATM/CNSprovision
costspercomposite
flighthour

250
2009

2010

2011

BULATSA

ATCOhour
productivity

8.7%

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2012

HCAA

2009

ROMATSA

2012

40

2.4

35

2.1

30

1.8

25

1.5

20

1.2

15

0.9

10

0.6

0.3

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2003*

C:2003*

C:2003*

C:2004*

Years
2006
2007
2008
2009
2010

1.2M

2011

0.4M
64.4M
(20082020)

2012
8.3M

3.4M

17.3M

2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
ATMSystemROMATSA2015+PhaseI
ATMSystemROMATSA2015+PhaseII
ATMSystemROMATSA2015+PhaseIII
ModeSradarsinstallation
VCSSReplacement

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM
ATM
ATM
SUR
COM

35.8
15.8
10.5
7.5
6.5

2011
2015
2017
2011
2012

2015
2018
2020
2015
2014

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

109

Skyguide(Switzerland)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:1EUR=1.205CHF
Skyguiderepresents3.6%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

900

772

800

794
725

755

609

640

20%

600

10%
609

400

616

54.6%

30%

700
500

Compositeflighthours

+8.9%

+0.5%

0%

+2.7% +4.0%

+3.9%
1.2% 0.5%

0.6%

10%

300
200

20%

100

30%

0
2009

2010

2011

34.8%
201011

200910

2012

201112

1.2

+0.2%

115

0.9%

3.9%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

1.0
0.8
1.08

1.08

1.03

1.07

0.6

110
105
100

0.4

95

2009

0.2
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
160

+3.4%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

180
+7.1%

+0.2%

140
120
100

145

150

150

161

80
60
40
20

1300

2010

2011

2012

1246

1227

2009

2010

2011

2012

900
700
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
30

600

+20.1%
+0.6%

500

1.9%

+3.2%

20

400

Million

percompositeflighthour(2012prices)

1264

1100

0
2009

1279

300
200

10
+4.5%
0
18.8%

100

95.1%

10
20.0%

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

95.1%

20

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
24%

ATCOhour
productivity
3.9%

+7.1%

Employmentcosts
perATCOhour

Increaseinunit
ATM/CNSprovision
costs20112012

Weight
76%

+5.1%

+3.2%

+2.0%

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

+11.4%

ATCOemployment
costspercomposite
flighthour

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

110

"Traffic
effect"
1.2%

Skyguide(Switzerland)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
700

Deviationfromcomparators'weightedaverage

650
600
+27.5% +27.4%

550
+19.2%

500

+21.7%

450

+11.9%

+8.6%

400
350

ATM/CNSprovision
costspercomposite
flighthour

300
2009

2010

2011

AustroControl

2012

NAVIAIR

+5.2%

+4.6%

ATCOhour
productivity

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

Skyguide

2012

60

2.4

50

2.0

40

1.6

30

1.2

20

0.8

10

0.4

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

Years

FDPS

RDPS

HMI

VCS

C:1999(Geneva)
2007(Zurich)*

C:2004
(AllACCs)*

C:2003/06(AllACCs)*

C:2004/05(AllACCs)*

2006

Geneva

2007

Zurich

AllACCs

2008
2009

9.0M
(20052013)

2010
2011
6.4M**
2012

58.7M
3.6M

AllACCs

AllACCs

AllACCs

AllACCs

2013
2014
2015

AllACCs

2016
2017

* C = Commissioning

**ExpensesrelatingtoAIS

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject

ATM

Capexspent
betweenstartand
enddates(M)
30.8

ATM

18.8

Domain

Implementationofstriplessenvironment
TACO(TowerApproachCommunication)system
integrationintothenewFDPinZurich
RealisationofwebPortalIBS
MESANGE(implementationofAeronauticalMessageHandling
Service)
ImplementationofLINK2K+/CPDLC(ControllerPilotDataLink
Communications)

Startdate

Enddate

2011

2017

2008

2014

Other

6.4

2010

2013

COM

4.5

2005

2010

COM

4.5

2011

2013

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

111

SloveniaControl(Slovenia)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions

Aggregatedcomplexityscore:
Exchangerate:SloveniaiswithintheEUROZone
SloveniaControlrepresents0.3%ofEuropeansystemgatetogateATM/CNS
Max
Min

provisioncosts

Seasonaltrafficvariability:
Max

Min

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

600
500
400

512

503

510

508

528

527

499

20%
+10.0%

10%

499

0%

200

10%

100

20%

+4.4% +3.3%

2011

+6.0%
0.1%
5.5%

30%

0
2010

54.6%

30%

300

2009

Compositeflighthours

38.3%
201112

41.5%
201011

83.8%
200910

2012

0.5

+12.7%

115

2.5%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

+2.9%
0.4
0.3

0.40

0.41

0.46

0.45

0.2

110
105
100
95
90

0.1

2009

0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

perATCOhouronduty(2012prices)

+4.6%

80

+6.0%

ATCOhoursondutyperATCOperyear

TrendingatetogateemploymentcostsperATCOhour
90

5.2%

70
60
50

76

79

84

80

40
30
20
10

1500

2010

2011

2012

+0.8%

1419

2009

2010

2011

2012

1100
900
700
500

Changesincomponentsofsupportcosts(20092012)
2.0

6.9%

+148.6%

1.5

300

1.0

250

Million

percompositeflighthour(2012prices)

350

1427

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour
+9.7%

1442

1300

0
2009

1442

200
150
100

+10.9%
+141.1%
+10.5%

0.5
0.0
0.5

50

1.0

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

38.0%

+141.1%

1.5

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
35%

ATCOhour Employmentcosts
productivity perATCOhour
2.5%

5.2%

Decreaseinunit
ATM/CNSprovision
costs20112012

ATCOemployment
costspercomposite
flighthour
2.8%

Weight
65%

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

"Traffic
effect"
0.1%

5.5%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

6.9%

7.0%

112

SloveniaControl(Slovenia)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
650

Deviationfromcomparators'weightedaverage

600

+27.3% +27.9%

550

+14.0%
+5.7%

500
1.0%

450

8.1%

400
48.2% 44.0%

350
300

ATM/CNSprovision
costspercomposite
flighthour

250
2009

2010

ANSCR
LPS

2011

2012

CroatiaControl
PANSA

ATCOhour
productivity

HungaroControl
SloveniaControl

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

12

12

10

10

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements
ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2007*

C:2000*

C:2000*

C:1998*

Years
2006
2007
2008
2009

18.4M
2010
2011

12.2M

2012
2.7M

2.3M

1.5M

2013
2014
2015
2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2
3
4
5

Nameoftheproject
NewATCCbuildinginLjubljana(includinggeneral
equipment)
NewATCCtechnicalsystems
UpgradeofFDPsystem,includingsimulator
Changinglocationofradars
ImplementationofDatalink/CPDLC

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

Buildings

18.4

2006

2013

ATM
ATM
SUR
COM

8.7
3.5
1.5
1.5

2006
2008
2011
2013

2013
2017
2015
2015

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

113

SMATSA(SerbiaandMontenegro)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:1EUR=112.961RSD
SMATSArepresents0.9%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Seasonaltrafficvariability:

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

400
350

326

349

353

20%

300
250

326

347

343

54.6%
+425.9%

+142.9%

30%
333

Compositeflighthours

+11.5%
+4.7%

10%

332

200

+0.5% +1.6%

0%

150

10%

7.9%

100

5.0%

20%

50

30%

0
2009

2010

2011

200910

2012

96.5%
201112

201011

0.9
+4.9%

0.8

112
2.0%

1.6%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.7
0.6
0.75

0.5

0.78

0.77

0.75

0.4

110
108
106
104
102
100

0.3

98

0.2

2009

2010

2011

2012

0.1
0.0
2009

2010

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
+5.8%

50

1.5%

ATCOhoursondutyperATCOperyear

perATCOhouronduty(2012prices)

60
+4.9%

40
30

47

50

49

51

20
10

1500
1339
1300

2011

2012

500

2012

Changesincomponentsofsupportcosts(20092012)
4

1.5%

5.3%

+21.0%

250

200

Million

percompositeflighthour(2012prices)

+7.9%

2011

700

AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour
300

2010

1224

900

2009

2010

1273

1100

0
2009

1290

150
100

+5.8%
+3.3%

50

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

3.7%
12.1%

2012

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

Nonstaff
operating
costs

+3.3%

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
19%

ATCOhour
productivity
1.6%

+4.9%

Employmentcosts
perATCOhour

Decreaseinunit
ATM/CNSprovision
costs20112012

Supportcosts
percomposite
flighthour

+6.6%
ATCOemployment
costspercomposite
flighthour

Weight
81%

3.1%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

5.3%

"Supportcosts
effect"
10.0%

114

"Traffic
effect"
5.0%

SMATSA(SerbiaandMontenegro)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
550

Deviationfromcomparators'weightedaverage

500

+64.6%

+61.2%
+49.6%

+47.6%

450
400
10.9% 9.5%

350
300
2009
ARMATS

2010
MNAV

2011

MoldATSA

2012

NATAAlbania

13.6% 11.4%

ATM/CNSprovision
costspercomposite
flighthour

ATCOhour
productivity

SMATSA

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

35

3.5

30

3.0

25

2.5

20

2.0

15

1.5

10

1.0

0.5

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements

ATM

COM

NAV

SUR

Building

Other

FDPS

RDPS

HMI

VCS

C:2011

C:2011

C:2011

C:2011

Years
2006
2007
2008
2009
2010

19.8M

44.3M

2011
8.5M

0.5M
2012
2.3M
2013
2014
2015
2016

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1
2

Nameoftheproject
NewATMSystemforBelgradeACCandSMATSA
communicationsnetwork
NewATCCinBelgrade

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

ATM

30.9

2009

2011

Building

17.6

2009

2010

AircraftequippedwithAutomaticFlightInspectionSystem

ATM

10.0

2008

2010

4
5

VHFandUHFradiosystemforairgroundcommunication
ProcurementandinstallationofVHF/UHFgrounair

COM
COM

4.9
3.3

2008
2012

2010
2015

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

115

UkSATSE(Ukraine)CosteffectivenessKPIs(2012)
Contextualeconomicinformation

Operationalconditions
Aggregatedcomplexityscore:

Exchangerate:1EUR=10.270UAH
UkSATSErepresents3.1%ofEuropeansystemgatetogateATM/CNS
provisioncosts

Seasonaltrafficvariability:

Trendingatetogateeconomiccosteffectiveness(allfinancialdatain2012prices)
ATM/CNSprovisioncosts
UnitcostsofATFMdelays

percompositeflighthour(2012prices)

ATFMdelaycostspercompositeflighthour
ATM/CNSprovisioncostspercompositeflighthour

700

637
566

600
500
400

493
490

20%

477
471

+13.2%
+8.8%

10%
637

565

54.6%

+44.7%

+94.9%

30%

Compositeflighthours

72.3%

#DIV/0!
+3.5%

+7.0%

0%

300

10%

200

8.3%

20%

100

100.0%

30%

0
2009

2010

2011

200910

2012

201011

201112

0.4

130
0.2%

0.3
0.30

0.30

+4.0%

+7.7%

Index(2009=100)

CompositeflighthourperATCOhouronduty

TrendingatetogateATCOhourproductivity

0.34

0.33

0.2

125
120
115
110
105
100
95

0.1

2009
0.0
2009

2010

2011

2011

Indexcompositeflighthours
IndexATCOsinOPShoursonduty

2012

2010

2012

IndexnumberofATCOsinOPS

TrendingatetogateemploymentcostsperATCOhour
perATCOhouronduty(2012prices)

ATCOhoursondutyperATCOperyear

+20.2%

30
+13.3%

25
+56.9%
20
15
10

14

22

29

24

1500
1300

2011

2012

2010

2011

2012

700
500
AverageovertimehoursperATCOinOPSperyear
ATCOhoursondutyperATCOperyear(withoutovertime)

Trendinsupportcostspercompositeflighthour

Changesincomponentsofsupportcosts(20092012)
40

600

+149.4%

+40.6%

30

15.0%

500
10.0%

400

+35.5%

20
Million

percompositeflighthour(2012prices)

1299

900

2009

2010

1319

1100

0
2009

1331
1231

300
200

+89.0%

10
0

91.3%

100

10

0
2009
Exceptionalcosts
Nonstaffoperatingcosts

2010

2011

Employment
costsfor
supportstaff

Capitalrelatedcosts
Employmentcosts(excl.ATCOsinOPS)

91.3%

28.3%

20

2012

Nonstaff
operating
costs

Depreciation Costofcapital Exceptional


costs
costs

Changesinfinancialcosteffectiveness(20112012)
Weight
13%

+20.2%

Decreaseinunit
ATM/CNSprovision
costs20112012

+15.6%

+4.0%
ATCOhour Employmentcosts
productivity perATCOhour

ATCOemployment
costspercomposite
flighthour

11.4%

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

Weight
87%

Supportcosts
percomposite
flighthour

"Supportcosts
effect"

15.0%

12.0%

116

+3.5%
"Traffic
effect"

UkSATSE(Ukraine)(2012)
UnitATM/CNSprovisioncosts(2012)

ChangesinunitgatetogateATM/CNSprovisioncostswithincomparatorgroup
650

Deviationfromcomparators'weightedaverage

600
+58.1%

+54.4%

550

+38.0%

+33.8%

500
450
400
36.9%

350
300

ATM/CNSprovision
costspercomposite
flighthour

250
2009

2010

2011

DHMI

2012

35.0%

45.3%

ATCOhour
productivity

UkSATSE

25.3%

ATCOemployment Supportcostsper
costsperATCO
compositeflight
hour
hour

2009

2012

9.0

100

7.5

80

6.0

60

4.5

40

3.0

20

1.5

120

Capextodepreciationratio

Plannedcapitalexpendituresanddepreciationcosts

0.0

0
2009

2010

2011

Capex(M)

2012

2013

Depreciation(M)

2014

2015

2016

2017

Capextodepreciationratio

InformationonmajorcapexprojectsandATMsystemsupgrades/replacements

ATM

COM

NAV

SUR

Building

Other

Years

FDPS

RDPS

HMI

VCS

C:1997(L'viv)
2000(Odesa,Kyiv)
2007(Simf.,Kyiv,
Dnip.)*

C:1997(L'viv)
2000(Odesa,Kyiv)
2007(Simf.,Kyiv,
Dnip.)*

C:1997(L'viv)
2000(Odesa,Kyiv)
2007(Simf.,Kyiv,
Dnip.)*

C:2003(Odesa,L'viv)
2006(Simf.,Dnip.)
2011(Kyiv)*

S,K,D

S,K,D

S,K,D

L,O

L,O

L,O

2006
2007

S,D

2008
2009
17.0M

2010

42.6M
2.8M

2011

9.5M
10.4M

2012
2013
2014

2015

2016
2017

* C = Commissioning

Upgrade

Replacement

Focusonthetopfivecapexprojects

Project
number
1

3
4
5

Nameoftheproject
BuildingofnewTOWERs:DonetskTWR,Zhuliany(Kyiv)TWR,
KharkivTWR,DnipropetrovskTWR,BorispilTWRand
reconstructingofLvivTWR
UpgradeofATMsystemsforLvivACC/APP/TWR,Kyiv
ACC/APP/TWR,DonetskAPP/TWR,KharkivAPP/TWR,
DnipropetrovskTWR
UpgradeofradioequipmentforDnipropetrovskACC,Lviv
ACC,KyivACC,OdesaACC,Zhuliany(Kyiv)TWR,Donetsk
APP/TWR
UpgradeofsurveillancesystemsinBorispil,Lviv,Kharkiv,
Simferopol,Donetsk,OdesaandDnipropetrovsk
4standaloneWeatherRadars(Lviv,KharkivandSimferopol,
Donetsk)

Domain

Capexspent
betweenstartand
enddates(M)

Startdate

Enddate

Building

42.6

2008

2013

ATM

17.0

2008

2013

COM

10.4

2010

2014

SUR

9.5

2010

2013

Other

2.8

2010

2012

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

117

FocusonANSPsindividualcosteffectivenessperformance
ACE2012BenchmarkingReportwith20132017outlook

118

No

AustroControl
Avinor

Belgocontrol

BULATSA
CroatiaControl

No

No

No

DFS

DHM

DSNA

No

No

EANS
ENAV
Finavia
HCAA
HungaroControl
IAA
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC

No

No
No

No

No
No

NATAAlbania

No

No

NATS

NAVPortugal

NAVIAIR

OroNavigacija

DCACCyprus

PANSA
ROMATSA

Skyguide

SloveniaControl
SMATSA

UkSATSE

Informationprovided
inEnglish

No

ARMATS

Separatedisclosureof
enrouteandterminal
ANScosts

Aena
ANSCR

Independentaudited
accounts

Availabilityof
ManagementReport

AvailabilityofAnnual
Accounts

Availabilityofapublic
AnnualReport(AR)

ANNEX1STATUSOFANSPSYEAR2012ANNUALREPORTS

No
No
No

No

No

No

No
No
No

No
No
No

No

No

No

No
No

No

No

No

No
No
No
No
No
No
No
No
No
No

No

No

No
No
No

No
No

No
No
n/appl

No
No

No

No

No
No

No
No

No

PRUcomments

PRUreceivedanextractofthefinancialstatements
comprisinganIncomeandaBalanceSheetstatement.

Auditperformedbytheboardofauditors.Nocashflow
statement.

DCACannuallydisclosesareportwhichincludessome
financialinformationfromRouteChargesDocumentbut
notFinancialStatements.
Separateaccountsareusedforinternalreportingpurposes
andchargescalculation.
Includesairportactivities.
Atthetimeofwritingthisreport,DSNAhadnotyet
releaseditsAnnualReportcomprisingthefinancial
statementsfortheyear2012.

DetailedaccountsonlyavailablefortotalFinavia.

SeparateIncomeStatementforenrouteandterminalANS
SeparateIncomeStatementforenrouteandterminalANS.

PRUreceivedanextractoftheFinancialStatements.

Atthetimeofwritingthisreport,NATAAlbaniahadonly
releasedadocumentcomprisingitsFinancialStatements,
butnotaManagementReportfortheyear2012.
SeveralARsforindividualgroupcompanies.
Separatedisclosureofaggregatedrevenuesandcostsfor
enrouteandterminalANS.

Totalrevenuesandcostsprovidedforbothenrouteand
terminalANS.

Separateaccountsforenroute,terminalandmilitaryOAT
services.

AnnualReportdoesnotincludeaFinancialStatements.
UkSATSEprovidedaseparatedocumentwhichcomprises
FinancialStatements.

Annex1Table0.1:StatusonANSPs2012AnnualReports
Annex1StatusonANSPsAnnualReports
ACE2012BenchmarkingReportwith20132017outlook

119

Annex1StatusonANSPsAnnualReports
ACE2012BenchmarkingReportwith20132017outlook

120

ANNEX2PERFORMANCEINDICATORSUSEDFORTHECOMPARISONOF
ANSPS
TheoutputmeasuresforANSprovisionare,forenroute,theenrouteflighthourscontrolled25
and, for terminal ANS, the number of IFR airport movements controlled. In addition to those
outputmetrics,itisimportanttoconsidera"gatetogate"perspective,becausetheboundaries
used to allocate costs between enroute and terminal ANS vary between ANSPs and might
introduceabiasinthecosteffectivenessanalysis26.
For this reason, an indicator combining the two separate output measures for enroute and
terminal ANS provision has been calculated. The "composite gatetogate flighthours" are
determinedbyweightingtheoutputmeasuresbytheirrespectiveaveragecostoftheservicefor
thewholePanEuropeansystem.Thisaverageweightingfactorisbasedonthetotalmonetary
valueoftheoutputsovertheperiod20022012andamountsto0.27.
Thecompositegatetogateflighthoursareconsequentlydefinedas:
Compositegateto
gateflighthours

Enroute
flighthours

(0.27xIFRairportmovements)

In the ACE 20012006 Reports, two different weighting factors were used to compute ANSPs
costeffectiveness: one for the year under study and another to examine changes in
performance across time. As the ACE data sample became larger in terms of years, the
differencebetweenthesetwoweightingfactorsbecameinsignificant.Forthesakeofsimplicity,
it was therefore proposed in the ACE 2007 Benchmarking Report to use only one weighting
factor to analyse ANSPs performance for the year and to examine historical changes in cost
effectiveness.
Although the composite gatetogate output metric does not fully reflect all aspects of the
complexityoftheservicesprovided,itisneverthelessthebestmetriccurrentlyavailableforthe
analysisofgatetogatecosteffectiveness27.
ThequalityofserviceprovidedbyANSPshasanimpactontheefficiencyofaircraftoperations,
which carry with them additional costs that need to be taken into consideration for a full
economic assessment of ANSP performance. In this ACE Benchmarking Report, an indicator of
economiccosteffectivenessiscomputedatANSPandPanEuropeansystemlevelsbyadding
theATM/CNSprovisioncostsandthecostsofATFMgrounddelay,allexpressedpercomposite
flighthour.ThiscomputationisshownintheTablebelow(seecolumn10).

25

ControlledflighthoursarecalculatedbytheNetworkManager(NM)asthedifferencebetweentheexit
time and entry time of anygiven flight inthecontrolled airspace of an operationalunit. Three types of
flighthours are currently computed by the NM (filed model, regulated model and current model). The
data used for the costeffectiveness analysis is based on the current model (Model III or CFTM) and
includesflighthourscontrolledintheACC,APPandFISoperationalunitswhicharedescribedintheNM
environment.
26
SeealsoworkingpaperonCosteffectivenessandProductivityKeyPerformanceIndicators,available
onthePRCwebsiteatwww.eurocontrol.int/prc.
27
Further details on the theoretical background to producing composite indicators can be found in a
working paper on Total Factor Productivity of European ANSPs: basic concepts and application" (Sept.
2005).

Annex2PerformanceindicatorsusedforthecomparisonofANSPs
ACE2012BenchmarkingReportwith20132017outlook

121

Economiccostpercomposite
flighthour

(10)=(8)+(9)

Costofdelaypercomposite
flighthour

(9)=(6)/(7)

Financialgatetogatecost
effectiveness

(8)=(1)/(7)

Compositeflighthours(in'000)

(7)

CostsofATFMdelays(in'000)

(6)=(4)x85

%shareinEuropeansystem
ATFMdelays

(5)

TotalATFMdelays('000
minutes)

(4)=(2)+(3)

AirportATFMdelays('000
minutes)

(3)

EnrouteATFMdelays('000
minutes)

(2)

GatetogateATM/CNSprovision
costs(in'000)

(1)

Aena
ANSCR
ARMATS
BULATSA
AustroControl
Avinor(Continental)
Belgocontrol
CroatiaControl
DCACCyprus
DFS
DHMI
DSNA
EANS
ENAV
Finavia
HCAA
HungaroControl
IAA
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC
NATAAlbania
NATS(Continental)
NAVPortugal(Continental)
NAVIAIR
OroNavigacija
PANSA
ROMATSA
Skyguide
SloveniaControl
SMATSA
UkSATSE

897063
115303
8041
73948
182771
207082
150490
78159
37981
1055191
352411
1164622
13573
638374
63052
154296
91324
112881
245432
22232
55738
163460
13504
9389
9145
141228
20934
760374
127260
113103
23202
147243
165091
292730
28166
75420
248611

802
2
0
0
118
164
15
129
428
1411
145
1535
20
0
3
97
1
0
27
0
0
92
0
0
0
59
12
155
281
0
0
352
0
172
0
1
0

337
2
0
3
152
165
79
1
15
796
489
520
0
103
43
110
0
8
50
0
0
307
0
0
0
n/appl
0
829
108
10
0
2
1
448
0
0
10

1139
5
0
3
270
328
94
130
444
2207
634
2055
20
104
46
206
1
8
77
0
0
399
0
0
0
59
12
984
390
10
0
355
1
620
0
1
10

10.7%
0.0%
0.0%
0.0%
2.5%
3.1%
0.9%
1.2%
4.2%
20.8%
6.0%
19.4%
0.2%
1.0%
0.4%
1.9%
0.0%
0.1%
0.7%
0.0%
0.0%
3.8%
0.0%
0.0%
0.0%
0.6%
0.1%
9.3%
3.7%
0.1%
0.0%
3.3%
0.0%
5.8%
0.0%
0.0%
0.1%

96807
401
0
268
22946
27905
8006
11046
37729
187587
53881
174675
1687
8804
3925
17530
97
707
6538
21
0
33939
9
0
0
5016
1003
83605
33110
824
0
30141
57
52662
30
79
823

1721
263
20
199
374
527
206
215
143
1912
1203
2628
78
1322
181
501
209
319
554
91
92
278
70
21
21
560
46
1752
356
288
63
488
329
457
56
227
440

521
438
409
371
489
393
732
363
265
552
293
443
174
483
349
308
438
354
443
245
609
588
193
449
443
252
451
434
357
393
368
302
502
640
499
332
565

56
2
0
1
61
53
39
51
264
98
45
66
22
7
22
35
0
2
12
0
0
122
0
0
0
9
22
48
93
3
0
62
0
115
1
0
2

577
440
409
373
550
446
771
414
529
650
338
510
196
489
371
343
438
356
455
245
609
710
193
449
443
261
472
482
450
396
368
363
503
755
499
333
566

TotalEuropeanSystem

8058826

6022

4589

10610

100%

901858 18210

443

50

492

ANSPs

Annex2Table0.1:Economiccosteffectivenessindicator,2012
The cost of ATFM delay is based on the findings of the study European airline delay cost
reference values by the University of Westminster in March 2011. The cost of ground ATFM
delaysamountsto85perminutein2012(applicabletoallATFMdelays),whichisclosetothe
83usedintheACE2011report28.

28

NotethatthecostofoneminuteofATFMdelayshasbeenadjustedtoreflectpricesinflationin2012
(+2.6%fortheEuropeanUnionaccordingtoEUROSTAT).

Annex2PerformanceindicatorsusedforthecomparisonofANSPs
ACE2012BenchmarkingReportwith20132017outlook

122

ANNEX3PERFORMANCERATIOS
The table below summarises the relationship between the three multiplicative components of
financial costeffectiveness (ATCOhour productivity, employment costs per ATCOhour and
support cost ratio) and the two complementary components (ATCO employment costs per
compositeflighthourandthesupportcostpercompositeflighthour),describedinChapter2.
Tofacilitatetheinterpretationoftheresults,theconceptoftheperformanceratiohasbeen
introduced.
The performance ratios represent the relationship between the value for an ANSP of an
indicatorandthevalueofthatindicatorforthePanEuropeansystemasawhole.Performance
ratios are defined such that a value greater than one implies a performance better than the
Europeanaverage,intermsofthepositivecontributionitmakestocosteffectiveness.AnANSP
withthesameperformanceasthePanEuropeansystemwillhaveaperformanceratioofone.

ATCOemploymentcostspercomposite
flighthour*

Supportcostspercompositeflighthour*

AL
UK
PT
DK
LT
PL
RO
CH
SI
RS/ME
UA

Supportcostratio*

ES
CZ
AM
AT
NO
BE
BG
HR
CY
DE
TR
FR
EE
IT
FI
GR
HU
IE
SE
LV
SK
NL
MT
MK
MD

ATCOemploymentcostsperATCOhour*

Country

ATCOhourproductivity

ANSPs
Aena
ANSCR
ARMATS
AustroControl
Avinor(Continental)
Belgocontrol
BULATSA
CroatiaControl
DCACCyprus
DFS
DHMI
DSNA
EANS
ENAV
Finavia
HCAA
HungaroControl
IAA
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC
NATAAlbania
NATS(Continental)
NAVPortugal(Continental)
NAVIAIR
OroNavigacija
PANSA
ROMATSA
Skyguide
SloveniaControl
SMATSA
UkSATSE

Performanceratios

FinancialcosteffectivenessKPIindexes*

Performanceratios

0.85
1.01
1.08
0.91
1.13
0.60
1.19
1.22
1.67
0.80
1.51
1.00
2.54
0.92
1.27
1.44
1.01
1.25
1.00
1.81
0.73
0.75
2.30
0.99
1.00
1.76
0.98
1.02
1.24
1.13
1.20
1.47
0.88
0.69
0.89
1.33
0.78

0.98
1.12
0.24
1.17
1.05
0.85
0.83
0.84
1.05
1.29
1.12
0.95
1.27
0.87
0.79
0.89
0.99
1.28
0.84
1.11
0.82
1.11
0.84
0.30
0.30
2.43
0.66
1.24
1.15
1.23
0.60
1.22
0.74
1.29
0.56
0.94
0.43

0.66
1.31
9.92
0.66
0.81
0.79
1.91
1.30
1.60
0.61
2.17
1.09
1.99
0.98
1.45
1.34
1.19
1.02
1.12
2.67
1.34
0.65
4.31
3.27
7.38
0.54
3.74
0.88
0.70
1.10
2.72
1.10
1.69
0.66
1.33
2.07
3.62

1.31
0.69
0.46
1.16
1.33
0.91
0.75
1.11
0.99
1.01
0.62
0.97
1.01
1.08
1.11
1.20
0.86
0.95
1.07
0.61
0.66
1.04
0.63
1.00
0.45
1.34
0.40
0.93
1.54
0.84
0.74
1.10
0.70
0.81
1.19
0.68
0.51

0.65
1.46
2.38
0.78
0.85
0.67
1.58
1.10
1.69
0.79
2.43
1.03
2.52
0.85
1.14
1.19
1.17
1.31
0.93
2.96
1.09
0.73
3.64
0.99
2.22
1.31
2.47
1.09
0.80
1.35
1.62
1.34
1.26
0.85
0.75
1.95
1.54

0.98
0.89
0.88
0.97
1.31
0.58
1.08
1.28
1.66
0.81
1.30
0.99
2.55
0.95
1.33
1.57
0.95
1.22
1.03
1.55
0.64
0.77
1.98
0.98
0.81
2.06
0.78
0.99
1.61
1.05
1.08
1.53
0.78
0.64
0.96
1.17
0.65

Annex3Table0.1:Thecomponentsofgatetogatecosteffectiveness,201229
TotalEuropeanSystem

1.00

1.00

1.00

1.00

1.00

1.00

29

FortheATCOemploymentcostsperATCOhour,thesupportcostsratio,theATCOemploymentcosts
percompositeflighthourandthesupportcostspercompositeflighthour(asteriskedintheTableabove),

Annex3Performanceratios
ACE2012BenchmarkingReportwith20132017outlook

123

ANSPs for which a given component makes a particularly positive contribution to its cost
effectiveness(morethan1.30)arehighlightedingreenthosewhereagivencomponentmakes
aparticularlylowcontribution(lessthan1/1.30)areinorange.
Some ANSPs more than make up for a relatively low contribution from one component by a
relatively high contribution from another and, as a result, are more costeffective than the
average(costeffectivenessindexgreaterthan1).
Onthelefthandsidethethreeratiosaremultiplicative;theproductoftheratiosforeachofthe
components equals the performance ratio for overall financial costeffectiveness (see financial
costeffectiveness index). The following example for Aena illustrates the interpretation of the
performanceratios:
0.85
=0.98
X0.66
X1.31

AenasgatetogateATM/CNScostspercompositeflighthour are+18%higher(1/0.85
1)thantheEuropeanaverage.
ATCOhourproductivity is2%lower thantheEuropeanaverage.
TheATCOemploymentcostsperATCOhour ofAenaare+51%higher(1/0.661)thanthe
Europeanaverage.
Supportcostratiois23%lower(1/1.311)thantheEuropeanaverage.

On the righthandside, the two complementary performance ratios are normalised using the
Europeanaverage(notethattheseratiosareneithermultiplicativenoradditive):
0.65
0.98

Aenas ATCOs in OPS employment costs per composite flighthour are +54% higher
(1/0.651)thantheEuropeanaverage,while
thesupportcostspercompositeflighthour are+2%higher (1/0.981)thantheEuropean
average.

theinverseratioisused,sincehigherunitemploymentcostsandhighersupportcostsimplylowercost
effectiveness.

Annex3Performanceratios
ACE2012BenchmarkingReportwith20132017outlook

124

ANNEX4TRAFFICCOMPLEXITYANDTRAFFICVARIABILITYINDICATORS
[5]=
[6]=
[2]+[3]+[4] [1]x[5]

Speedinteractions

Structuralcomplexity
indicator

Aggregatedcomplexity
score

[4]

Horizontalinteractions

[3]

Verticalinteractions

ANSPs
Skyguide
DFS
NATS(Continental)
Belgocontrol
MUAC
LVNL
AustroControl
ANSCR
SloveniaControl
DSNA
ENAV
SMATSA
LPS
DHMI
HungaroControl
CroatiaControl
Aena
PANSA
NAVIAIR
ROMATSA
LFV
BULATSA
NATAAlbania
DCACCyprus
MNAV
EANS
HCAA
LGS
Avinor(Continental)
NAVPortugal(Continental)
OroNavigacija
UkSATSE
Finavia
IAA
MoldATSA
MATS
ARMATS

[2]

Adjusteddensity

[1]

10.70
10.28
9.81
7.36
9.93
9.80
8.23
8.54
9.21
9.80
5.20
8.58
6.92
7.49
7.18
7.48
6.54
4.74
3.49
5.44
3.05
6.70
6.28
4.36
4.49
3.69
4.31
3.23
2.12
3.61
3.08
3.22
1.76
4.18
2.13
1.43
1.37

0.28
0.28
0.37
0.41
0.26
0.18
0.19
0.15
0.12
0.15
0.27
0.04
0.10
0.16
0.07
0.05
0.16
0.14
0.18
0.05
0.22
0.06
0.05
0.14
0.10
0.15
0.10
0.09
0.29
0.16
0.07
0.06
0.27
0.07
0.03
0.08
0.08

0.61
0.56
0.44
0.56
0.54
0.43
0.51
0.53
0.54
0.42
0.59
0.49
0.48
0.34
0.45
0.48
0.37
0.52
0.57
0.40
0.49
0.30
0.35
0.36
0.41
0.30
0.38
0.46
0.48
0.37
0.43
0.39
0.35
0.23
0.40
0.37
0.39

0.23
0.25
0.30
0.45
0.17
0.36
0.20
0.19
0.11
0.14
0.18
0.07
0.15
0.15
0.13
0.07
0.13
0.24
0.21
0.12
0.25
0.06
0.04
0.11
0.06
0.24
0.08
0.18
0.26
0.08
0.19
0.19
0.38
0.11
0.22
0.15
0.15

1.12
1.09
1.11
1.42
0.97
0.97
0.91
0.87
0.77
0.71
1.04
0.60
0.73
0.64
0.65
0.61
0.67
0.90
0.96
0.58
0.96
0.42
0.45
0.61
0.57
0.69
0.56
0.73
1.04
0.61
0.69
0.64
1.01
0.40
0.65
0.59
0.62

11.97
11.19
10.92
10.45
9.68
9.47
7.48
7.43
7.08
6.93
5.41
5.14
5.08
4.76
4.67
4.55
4.35
4.26
3.36
3.17
2.93
2.80
2.80
2.67
2.56
2.55
2.41
2.34
2.20
2.20
2.13
2.06
1.78
1.68
1.39
0.85
0.84

7.31
0.20
0.46
0.18
0.84
6.16
Average
Annex4Table0.1:TrafficcomplexityindicatorsatANSPlevel,2012

Annex4Trafficcomplexityandtrafficvariabilityindicators
ACE2012BenchmarkingReportwith20132017outlook

125

Aggregatedcomplexity
score

25.1
10.2
12.1
9.5
11.1
7.4
9.5
9.9
9.8
10.6
11.0
8.7
5.4
8.6
6.5
8.5
9.2
10.8
6.6
9.8
5.3
8.3
4.1
4.4
8.8
7.0
6.6
7.3
5.1
7.7
7.4
4.6
6.2
5.8
5.5
3.3
3.4
6.8
6.3
4.4
4.6
4.5
3.7
2.1
3.1
3.2
3.0
4.4
3.7
4.1
3.1
2.9
2.0
3.4
2.6
2.1
1.4
4.1
2.0
1.3
1.1
1.4
1.4
7.3

0.46
0.39
0.20
0.31
0.22
0.41
0.31
0.26
0.18
0.24
0.19
0.30
0.45
0.14
0.27
0.17
0.12
0.11
0.24
0.08
0.30
0.16
0.31
0.34
0.04
0.10
0.20
0.06
0.23
0.05
0.10
0.10
0.10
0.18
0.05
0.17
0.17
0.06
0.05
0.14
0.10
0.17
0.15
0.35
0.02
0.09
0.15
0.08
0.16
0.02
0.07
0.11
0.27
0.05
0.17
0.03
0.29
0.04
0.04
0.24
0.26
0.07
0.06
0.2

0.52
0.55
0.60
0.60
0.60
0.56
0.50
0.54
0.43
0.34
0.48
0.37
0.63
0.53
0.66
0.51
0.54
0.39
0.40
0.45
0.40
0.42
0.55
0.44
0.49
0.48
0.41
0.45
0.54
0.48
0.35
0.53
0.35
0.24
0.40
0.57
0.51
0.30
0.35
0.36
0.41
0.31
0.30
0.41
0.52
0.46
0.50
0.38
0.37
0.36
0.43
0.35
0.41
0.33
0.26
0.40
0.31
0.21
0.44
0.41
0.44
0.40
0.38
0.5

0.31
0.39
0.17
0.26
0.18
0.45
0.29
0.17
0.36
0.28
0.15
0.24
0.39
0.18
0.18
0.17
0.11
0.08
0.27
0.08
0.42
0.11
0.41
0.42
0.07
0.15
0.12
0.12
0.13
0.07
0.07
0.19
0.13
0.13
0.12
0.19
0.17
0.06
0.04
0.11
0.06
0.09
0.24
0.39
0.22
0.18
0.11
0.06
0.07
0.15
0.19
0.23
0.20
0.15
0.13
0.22
0.36
0.07
0.14
0.19
0.27
0.15
0.14
0.2

1.29
1.33
0.97
1.17
1.00
1.42
1.10
0.97
0.97
0.87
0.82
0.91
1.47
0.86
1.11
0.85
0.77
0.58
0.91
0.61
1.12
0.70
1.27
1.20
0.59
0.73
0.73
0.64
0.91
0.60
0.52
0.82
0.57
0.55
0.58
0.93
0.85
0.41
0.45
0.61
0.57
0.57
0.69
1.16
0.76
0.73
0.76
0.52
0.60
0.53
0.69
0.68
0.88
0.52
0.56
0.65
0.95
0.32
0.63
0.85
0.97
0.61
0.58
0.8

32.5
13.5
11.7
11.1
11.1
10.5
10.4
9.7
9.5
9.3
9.1
7.9
7.9
7.4
7.3
7.2
7.1
6.2
6.0
5.9
5.9
5.8
5.3
5.2
5.2
5.1
4.8
4.7
4.6
4.6
3.9
3.8
3.5
3.2
3.2
3.1
2.9
2.8
2.8
2.7
2.6
2.6
2.6
2.4
2.4
2.3
2.3
2.3
2.2
2.2
2.1
2.0
1.8
1.8
1.5
1.4
1.3
1.3
1.3
1.1
1.1
0.9
0.8
6.0

Averageusedflightlevel

Structuralcomplexity

[5]=
[6]=
[2]+[3]+[4] [1]x[5]

Speedinteractions

[4]

Horizontalinteractions

ACCname
LondonTC
Langen
Rhein
Zurich
Geneva
Brussels
Munchen
Maastricht
Amsterdam
Paris
Reims
LondonAC
Milano
Praha
Padova
Wien
Ljubljana
Bordeaux
Palma
Brest
Dublin
Marseille
Bremen
Prestwick
Beograd
Bratislava
Barcelona
Budapest
Roma
Zagreb
Madrid
Warszawa
Ankara
Istanbul
Bucuresti
Kobenhavn
Malmo
Sofia
Tirana
Nicosia
Skopje
Sevilla
Tallinn
Stockholm
L'viv
Riga
Brindisi
Athinai+Macedonia
Lisboa
Simferopol
Vilnius
Kyiv
Oslo
Dnipropetrovs'k
Canarias
Chisinau
Tampere
Shannon
Odesa
Bodo
Stavanger
Yerevan
Malta

[3]

Verticalinteractions

ANSPs
NATS(Continental)
DFS
DFS
Skyguide
Skyguide
Belgocontrol
DFS
MUAC
LVNL
DSNA
DSNA
NATS(Continental)
ENAV
ANSCR
ENAV
AustroControl
SloveniaControl
DSNA
Aena
DSNA
IAA
DSNA
DFS
NATS(Continental)
SMATSA
LPS
Aena
HungaroControl
ENAV
CroatiaControl
Aena
PANSA
DHMI
DHMI
ROMATSA
NAVIAIR
LFV
BULATSA
NATAAlbania
DCACCyprus
MNAV
Aena
EANS
LFV
UkSATSE
LGS
ENAV
HCAA
NAVPortugal(Continental)
UkSATSE
OroNavigacija
UkSATSE
Avinor(Continental)
UkSATSE
Aena
MoldATSA
Finavia
IAA
UkSATSE
Avinor(Continental)
Avinor(Continental)
ARMATS
MATS
Europeansystemaverage

[2]

Adjusteddensity

[1]

148
175
349
284
311
178
270
343
167
233
334
309
213
326
309
327
324
338
166
351
163
322
182
258
348
329
307
339
311
346
338
340
346
297
342
320
326
348
342
314
329
311
309
244
348
323
316
331
324
350
312
330
273
343
294
329
260
346
337
258
279
324
332
311

Annex4Table0.2:TrafficcomplexityindicatorsatACClevel,2012
Annex4Trafficcomplexityandtrafficvariabilityindicators
ACE2012BenchmarkingReportwith20132017outlook

126

Trafficvariabilityindicators

ANSPs
Aena
ANSCR
ARMATS
AustroControl
Avinor(Continental)
Belgocontrol
BULATSA
CroatiaControl
DCACCyprus
DFS
DHMI
DSNA
EANS
ENAV
Finavia
HCAA
HungaroControl
IAA
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC
NATAAlbania
NATS(Continental)
NAVPortugal(Continental)
NAVIAIR
OroNavigacija
PANSA
ROMATSA
Skyguide
SloveniaControl
SMATSA
UkSATSE

Variability Peakmonth Peakweek


basedonthree /Average /Average
week
month
months
(2012)
periods(2012) (2012)
1.20
1.17
1.05
1.21
1.04
1.10
1.38
1.40
1.16
1.11
1.23
1.17
1.11
1.26
1.06
1.45
1.30
1.12
1.05
1.13
1.33
1.09
1.24
1.54
1.29
1.10
1.39
1.12
1.11
1.04
1.13
1.16
1.30
1.13
1.34
1.38
1.24

1.23
1.20
1.07
1.22
1.10
1.12
1.43
1.46
1.20
1.13
1.24
1.20
1.15
1.29
1.08
1.53
1.35
1.15
1.09
1.16
1.38
1.10
1.28
1.61
1.31
1.12
1.46
1.14
1.13
1.09
1.15
1.21
1.35
1.15
1.39
1.43
1.26

1.24
1.21
1.09
1.23
1.13
1.18
1.44
1.47
1.26
1.14
1.26
1.21
1.16
1.30
1.12
1.55
1.36
1.17
1.15
1.18
1.39
1.12
1.36
1.67
1.38
1.13
1.48
1.15
1.15
1.13
1.16
1.24
1.36
1.17
1.41
1.44
1.32

Annex4Table0.3:TrafficvariabilityindicatorsatANSPlevel,2012

Annex4Trafficcomplexityandtrafficvariabilityindicators
ACE2012BenchmarkingReportwith20132017outlook

127

Annex4Trafficcomplexityandtrafficvariabilityindicators
ACE2012BenchmarkingReportwith20132017outlook

128

ANNEX5COSTOFCAPITALREPORTEDBYANSPS
ANSPs
Aena
ANSCR
ARMATS
AustroControl
Avinor
Belgocontrol
BULATSA
CroatiaControl
DCACCyprus
DFS
DHM
DSNA
EANS
ENAV
Finavia
HCAA
HungaroControl
IAA
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC
NATAAlbania
NATS

Comments
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassetswithanaveragerateof8.38%forenrouteANSand9.21%forterminalANS.
Grosscostofcapitalcomputedastheproductofanaveragerateof7.0%andanassetbase
comprisingtheNBVoffixedassetsandnetcurrentassets.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassetswithanaveragerateof12.0%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassets(excluding
assetsunderconstruction,landandfinancialassets)withanaveragerateof4.5%foren
routeANSand1.49%forterminalANS.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassets(onlyforenroute)withaweightedaveragecostofcapitalof7.6%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassets(onlyforenroute)withanaveragerateof5.73%forenrouteANSand3.0%
forterminalANS.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassetswithanaveragerateof7.0%.
CorrespondstotheproductoftheassetbasecomprisingtheNBVoffixedassetsandcurrent
assetswithanaveragerateof5.2%.
CorrespondstotheproductoftheassetbasecomprisingtheNBVoffixedassetsandcurrent
assetswithanaveragerateof6.0%.
Correspondstotheproductofanassetbasewithanaveragerateof5.26%forenrouteANS
and4.25%forterminalANS.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassetswithanaveragerateof5.7%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassetswithanaveragerateof4.66%forenrouteANSand2.58%forterminalANS.
ComputedastheproductofanassetbasecomprisingtheNBVoffixedassetswithanaverage
rateof8.9%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassetswithanaveragerateof2.70%forenrouteANSand2.31%forterminalANS.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassetswithanaveragerateof3.7%.
Correspondstotheproductofanassetbasewithanaveragerateof3.2%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassetswithareturnonequityof10.5%forenrouteANSand5.8%forterminalANS.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetswithan
averagerateof7.9%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetswithan
averagerateof5.4%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandcurrent
assetswithanaveragerateof6.6%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandcurrent
assetswithanaveragerateof6.3%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandcurrent
assetswithanaveragerateof4.5%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandthenet
currentassetswithanaveragerateof5.2%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetswithan
averagerateof5.5%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandcurrent
assetswithanaveragerateof12.1%,plusapartofthecapitalexpendituresspentduringthe
year.
CorrespondstotheproductoftheactualinterestpaidbyEUROCONTROLtothebanks(0.6%)
withtheproportionofEUROCONTROLNBVassetsbelongingtoMUAC.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassetswithanaveragerateof4.3%.
Economiccostofcapitalcomputedastheproductoftheregulatoryrateofreturn(6.76%)
withtheaverageregulatoryassetbaseforenrouteANSandwiththeaveragecapital
employedforterminalANS.

Annex5CostofcapitalreportedbyANSPs
ACE2012BenchmarkingReportwith20132017outlook

129

NAVPortugal(FIRLisboa)
NAVIAIR
OroNavigacija
PANSA
ROMATSA
Skyguide
SloveniaControl
SMATSA
UkSATSE

CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassetswithanaveragerateof6.76%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandcurrent
assetswithanaveragerateof5.5%.
CorrespondstotheproductofanassetbasecomprisingtheaverageNBVoffixedassetsand
averagecurrentassets(includingstocks,prepaymentsandcontractinprogressand
amountsreceivablewithinoneyear)withanaveragerateof3.0%.
Correspondstotheproductofanassetbasecomprisinglongtermassetsandnetcurrent
assetswithanaveragerateof3.5%forenrouteANSand5.04%forterminalANS.
Correspondstotheproductofanaveragerateof8.0%withanassetbasecomprisingthe
averageNBVoffixedassetsandaveragenetcurrentassets,excludinginterestbearing
accounts.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetswithan
averageWACCcappedat2.5%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassetswithanaveragerateof6.0%.
CorrespondstotheproductofanassetbasecomprisingtheNBVoffixedassetsandnet
currentassetswithanaveragerateof9.57%.
Includestheamountofcapitalexpenditurespentin2012.

Annex5Table0.1:CommentsoncostofcapitalreportedbyANSPs,2012

Annex5CostofcapitalreportedbyANSPs
ACE2012BenchmarkingReportwith20132017outlook

130

ANNEX6EXCHANGERATES,INFLATIONRATESANDPURCHASINGPOWER
PARITIES(PPPS)2012DATA
ANSPs

Countries

Aena

Spain

ANSCR

2012
Exchange
rate(1=)

2012
Inflation
rate(%)

2012
PPPs

Comments

2.4

0.91

CzechRepublic

25.1

3.5

17.70

ARMATS

Armenia

515.3

2.5

253.77

PPPsfromIMFdatabase

AustroControl

Austria

2.6

1.10

Avinor(Continental)

Norway

7.5

0.4

11.67

Belgocontrol

Belgium

2.6

1.11

BULATSA

Bulgaria

2.0

2.4

0.88

CroatiaControl

Croatia

7.5

3.4

4.92

DCACCyprus

Cyprus

3.1

0.88

DFS

Germany

2.1

1.03

DHMI

Turkey

2.3

9.0

1.37

DSNA

France

2.2

1.12

EANS

Estonia

4.2

0.71

ENAV

Italy

3.3

1.00

Finavia

Finland

3.2

1.21

HCAA

Greece

1.0

0.89

HungaroControl

Hungary

288.9

5.7

166.34

IAA

Ireland

1.9

1.09

LFV

Sweden

8.7

0.9

11.58

LGS

Latvia

0.7

2.3

0.66

LPS

SlovakRepublic

3.7

0.68

LVNL

Netherlands

2.8

1.10

MATS

Malta

3.2

0.75

MNAV

F.Y.R.Macedonia

61.2

3.3

24.60

MoldATSA

Moldova

15.5

4.6

9.04

PPPsfromIMFdatabase

MUAC

2.8

1.10

Netherlands PPPs and inflation


rateusedforMUAC

NATAAlbania

Albania

139.8

2.0

61.28

NATS(Continental)

UnitedKingdom

0.8

2.8

0.92

NAVPortugal
(Continental)

Portugal

2.8

0.81

NAVIAIR

Denmark

7.4

2.4

10.16

OroNavigacija

Lithuania

3.5

3.2

2.08

PANSA

Poland

4.2

3.7

2.42

ROMATSA

Romania

4.5

3.4

2.16

Skyguide

Switzerland

1.2

0.7

1.85

SloveniaControl

Slovenia

2.8

0.80

SMATSA

Serbiaand
Montenegro

113.0

7.3

51.46

Data for Serbia only since ACE


dataisprovidedinSerbianDinar

UkSATSE

Ukraine

10.3

0.6

5.24

PPPsfromIMFdatabase

Annex6Table0.1:2012Exchangerates,inflationratesandPPPsdata

Annex6Exchangerates,inflationratesandPPPs2012data
ACE2012BenchmarkingReportwith20132017outlook

131

Presentationandcomparisonofhistoricalseriesoffinancialdatafromdifferentcountriesposes
problems,especiallywhendifferentcurrenciesareinvolved,andinflationratesdiffer.Thereisa
dangerthattimeseriescomparisonscanbedistortedbytransientvariationsinexchangerates.
Forthisreason,thefollowingapproachhasbeenadoptedinthisReportforallowingforinflation
andexchangeratevariation.Thefinancialelementsofperformanceareassessed,foreachyear,
innationalcurrency.Theyarethenconvertedtonationalcurrencyin2012pricesusingnational
inflationrates.Finally,forcomparisonpurposesin2012,allnationalcurrenciesareconvertedto
Eurosusingthe2012exchangerate.
ThisapproachhasthevirtuethatanANSPsperformancetimeseriesisnotdistortedbytransient
changes in exchange rates over the period. It does mean, however, that the performance
figuresforanyANSPinagivenyearpriorto2011arenotthesameasthefiguresinthatyears
ACEreport,andcannotlegitimatelybecomparedwithanotherANSPsfiguresforthesameyear.
Crosssectionalcomparisonusingthefiguresinthisreportisonlyappropriatefor2012data.
TheexchangeratesusedinthisReporttoconvertthe2012datainEurosarethoseprovidedby
theANSPsintheirACEdatasubmission.
ThehistoricalinflationfiguresusedinthisanalysiswereobtainedfromEUROSTAT30orfromthe
International Monetary Fund31 when the information was not available in EUROSTAT website.
For the projections (20132017), the ANSPs own assumptions concerning inflation rates were
used.
Purchasing Power Parities (PPPs) are currency conversion rates that are applied to convert
economic indicators in national currency to an artificial common currency (Purchasing Power
Standard (PPS) for EUROSTAT statistics). The PPPs data used to adjust most of the ANSPs
employmentcostsinChapter2ofthisreportwasextractedfromEUROSTAT.
For three countries (Armenia, Moldova and Ukraine), PPP data was not available in the
EUROSTATdatabase.Inthesecases,theIMFdatabasewasused.SinceintheIMFdatabase,the
PPPsareexpressedinlocalcurrencyperinternationalDollarratherthanPPS,anadjustmenthas
been made so that the figures used for Armenia, MoldATSA and UkSATSE are as consistent as
possible with the data used for the rest of the ANSPs. The assumption underlying this
adjustment is that the difference in PPPs between two countries shall be the same in the
EUROSTATandintheIMFdatabases.
According to the IMF database, there is a factor of 4.68 between the PPPs for Ukraine (4.248
UAH per international dollar in 2012) and the PPPs for France (0.908 Euro per international
Dollar).ThisfactorisappliedtothePPPsforFranceasdisclosedintheEUROSTATdatabase(i.e.
1.12)toexpressthePPPsforUkraineinPPS(5.24=1.124.68).Asimilarmethodologyisused
toexpressMoldovaandArmeniaPPPsinPPS.

30

LatestEUROSTATdatabaseavailableat:
http://epp.eurostat.ec.europa.eu/portal/page/portal/eurostat/home
31
IMFApril2014databaseavailableat:
http://www.imf.org/external/pubs/ft/weo/2014/01/weodata/index.aspx.

Annex6Exchangerates,inflationratesandPPPs2012data
ACE2012BenchmarkingReportwith20132017outlook

132

ANSPs

0
0
0
0
0
0
0
0
0
0
0

19212
714080
90390
85520
20322
141877
140947
140659
30107
62747
208065

Incomefromcharges

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Incomeforairportoperator

691675
101388
4146
172197
108986
163033
73229
59595
47530
753373
290187
1118959
16284
567621
39285
155627
84363
112900
221142
21110
55269
169707
16387
9007
8693

Incomereceivedfromother
StatesfordelegationofANS

0
0
0
0
0
0
0
41831
0
7188
0

0
0
0
0
0
0
0
7176
0
0
0
0
0
0
0
0
0
0
1063
0
0
0
0
0
0

Incomefromthemilitary

Incomeinrespectofexempted
flights

0
0
0
1631
70
677
3268
0
104
0
0

10876
355
4
363
0
0
0
0
0
0
4932
18000
0
12340
0
0
1536
1713
950
0
1154
0
0
0
0

Otherincomefromdomestic
government

0
0
1084
0
0
0
1246
35107
0
0
0

6965
1092
33
1804
0
10847
560
0
0
0
2433
0
0
23439
440
0
769
0
0
0
431
8258
0
0
56

Otherincome

147
3942
0
72
78
235
3204
117
16
3899
0

407
0
0
0
0
20
0
0
0
0
0
0
0
500
0
0
0
0
0
0
8
0
0
0
0

Exceptionalrevenueitem

215
0
0 2005
2625
0
1361
0
191
0
697
0
338 18263
2421
0
195
568
0
0
0
0

493 25551
0
0
0
0
916
0
0
0
114 4370
0
0
0
0
0
0
51950
0
0
0
0 12433
0
0
0 7752
0
0
0
0
4857 2093
305
0
5155
0
6
201
94 1075
38
899
0
0
27
0
5
0

Totalrevenues
19575
716017
94099
88585
20834
143487
167266
220134
30990
73833
208065

735967
102834
4183
175280
108986
178384
73789
66772
47530
805323
297551
1149392
16284
611652
40071
155627
93617
114918
228309
21316
58736
178902
16387
9034
8754

Incomefromcharges
18388
20278
3900
38119
0
25871
8033
7917
0
218257
100487
236529
1472
118210
16454
9724
15891
20771
18625
2817
4241
53600
0
847
1934
n/appl
1105
13718
22317
28501
3987
27683
14208
83799
2862
4884
38337

Incomeforairportoperator
184998
0
0
0
103618
0
0
0
0
0
0
0
0
0
0
0
0
0
14093
0
0
0
0
0
0
n/appl
0
207730
0
3010
0
0
0
0
110
0
0

Incomereceivedfromother
StatesfordelegationofANS
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
n/appl
0
0
0
0
0
0
0
0
0
0
0

Incomefromthemilitary
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
0
n/appl
0
0
0
0
34
0
0
0
212
0
0

Incomeinrespectofexempted
flights
0
44
0
0
0
0
0
0
0
0
0
44263
0
19255
0
0
58
0
0
0
104
0
0
0
0
n/appl
0
0
0
92
184
646
0
0
36
0
0

Financialincome

Otherincomefromdomestic
government
0
104
0
0
0
0
0
510
0
0
0
62
0 1559
0
0
7647
0
0 15050
0
0
0
0
0
0
23106
0
205
0
12073
0
0
915
0
174
0
329
0
4
0
10
0
16
2132
0
0
0
0
0
n/appl n/appl
0
26
0 1221
0
0
0
9
0
16
0
46
0
2
21102
43
0
0
0
821
0
0

Otherincome
13875
0
0
0
4115
4733
797
0
0
0
0
3298
0
1606
1288
0
308
0
0
1005
113
729
0
0
0
n/appl
38
0
961
25
38
135
0
4063
326
0
0

Exceptionalrevenueitem
148
0
0
0
0
13
0
0
0
0
0
0
0
116
0
0
0
0
0
0
1
0
0
0
0
n/appl
0
0
0
0
0
0
0
0
0
2755
0

Totalrevenues
217513
20321
3900
38629
107733
30679
10389
7917
7647
233308
100487
284090
1472
162293
17947
21797
17172
20945
33047
3826
4469
54345
2132
851
1934
n/appl
1169
222669
23278
31638
4260
28511
14210
109007
3546
8460
38337

Incomefromcharges
20317
727798
112707
114022
24310
169560
155155
224457
32969
67631
246402

710063
121666
8046
210316
108986
188904
81262
67513
47530
971630
390674
1355488
17756
685830
55739
165351
100254
133671
239767
23927
59510
223307
16387
9854
10627
0
207730
0
3010
0
0
0
0
110
0
0

184998
0
0
0
103618
0
0
0
0
0
0
0
0
0
0
0
0
0
14093
0
0
0
0
0
0

Incomeforairportoperator

133

Annex7Table0.1:BreakdownoftotalANSrevenues(enroute,terminalandgatetogate),2012

0
0
0
0
172
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
346
0
0
0
0
0
705
0
0
0
0

Financialincome

Annex7Keydata
ACE2012BenchmarkingReportwith20132017outlook

Aena
ANSCR
ARMATS
AustroControl
Avinor(Continental)
Belgocontrol
BULATSA
CroatiaControl
DCACCyprus
DFS
DHMI
DSNA
EANS
ENAV
Finavia
HCAA
HungaroControl
IAA
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC
NATAAlbania
NATS(Continental)
NAVPortugal(Continental)
NAVIAIR
Oronavigacija
PANSA
ROMATSA
Skyguide
SloveniaControl
SMATSA
UkSATSE

Incomereceivedfromother
StatesfordelegationofANS
0
0
0
0
0
0
0
41831
0
7188
0

0
0
0
0
0
0
0
7176
0
0
0
0
0
0
0
0
0
0
1063
0
0
0
0
0
0

0
0
0
0
206
0
0
0
212
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
346
0
0
0
0
0
705
0
0
4
0

Incomefromthemilitary

GatetogateANSrevenues(in'000)

0
0
0
0
0 1084
1724
0
254
0
1323
0
3268 1246
0 56209
140
0
0
0
0
0

10876 6965
398 1092
4
33
363 1804
0
0
0 10847
0
560
0
0
0 7647
0
0
4932 2433
62263
0
0
0
31595 46545
0
645
0 12073
1593
769
1713
0
950
0
0
0
1258
431
0 8258
0 2132
0
0
0
56

Incomeinrespectofexempted
flights

TerminalANSrevenues(in'000)
Otherincomefromdomestic
government

EnrouteANSrevenues(in'000)

Otherincome
173
5164
0
81
94
281
3206
160
16
4720
0

253
0
3587
1386
230
833
338
6484
521
0
0

596 39426
0
0
0
0
1426
0
0 4115
176 9102
1559
797
0
0
0
0
67001
0
0
0
0 15730
0
0
0 9359
0 1288
0
0
5771 2401
479
0
5484
0
10 1205
104 1188
54 1628
0
0
27
0
5
0

Financialincome

ANNEX7KEYDATA

Exceptionalrevenueitem
0
2005
0
0
0
0
18263
0
568
2755
0

555
0
0
0
0
33
0
0
0
0
0
0
0
616
0
0
0
0
0
0
9
0
0
0
0

20743
938687
117377
120223
25094
171997
181477
329141
34537
82293
246402

953480
123155
8084
213909
216720
209063
84178
74689
55177
1038630
398039
1433482
17756
773945
58018
177423
110789
135863
261356
25142
63205
233247
18519
9885
10689

Totalrevenues

ANSPs

ATM/CNSprovisioncosts

660685
93034
4291
149247
93237
97674
63849
69272
33204
827762
269333
926092
12170
525795
37409
135113
75691
91989
210480
16917
50511
113648
11290
8318
7204
141228
17612
583338
100440
81481
19335
125702
140030
194519
24452
62412
195991

METcosts

35085
2219
0
16716
0
7309
5304
4303
4101
32647
22294
62782
109
37539
3115
8581
2596
6541
7769
824
1549
7368
0
687
688
0
392
3
5161
0
513
4104
7243
9516
1241
4566
2533

Paymentforregulatoryand
supervisoryservices

7544
386
0
458
318
1334
472
0
8053
0
2527
7300
0
3158
179
0
1487
1636
463
1059
1083
1734
449
100
79
0
719
5309
620
1381
307
1458
2864
0
441
0
1933

PaymentottheStatefor
provisionofotherservices

Eurocontrolcosts

51843
6677
287
11460
7347
11622
4175
0
2488
0
18107
79661
0
48588
0
11071
5489
7595
0
1197
3212
15903
704
0
414
0
854
0
7854
0
1244
8579
8697
9673
1468
3296
8678

0
0
0
0
0
44592
0
0
0
0
0
48731
0
0
213
0
0
0
0
0
0
31889
0
0
0
0
0
784
0
0
0
740
0
0
0
0
0

Irrecoverablevalueadded
tax(VAT)
0
0
0
0
0
0
2
0
0
0
0
36699
0
0
0
0
0
0
0
0
0
4950
0
0
0
7
0
0
0
0
0
0
0
0
0
0
0

Totalcosts
771037
102316
4577
177881
100902
162531
73801
73575
47846
860409
312261
1161264
12279
615080
40916
154765
85263
109977
218712
19996
56355
165592
12444
9105
8385
141235
19577
589433
118061
82862
21400
140582
158834
213708
27603
70273
209136

ATM/CNSprovisioncosts
236378
22269
3751
33524
113846
52816
10099
8887
4777
227429
83078
238530
1403
112579
25643
19183
15633
20892
34952
5316
5226
49812
2214
1070
1941
n/appl
3322
177036
26819
31622
3867
21542
25061
98211
3714
13008
52621

METcosts
0
606
0
3565
0
4141
1438
0
876
8064
0
23846
88
14114
3262
208
419
1635
0
504
607
1611
0
96
352
n/appl
131
23
0
0
80
3390
1347
4440
499
841
0

Eurocontrolcosts

PaymentottheStatefor
provisionofotherservices

Paymentforregulatoryand
supervisoryservices
0
0
0
72
0
0
0
0
0
110
0
0
562
0
0
716
0
0
150
0
0
0
0
0
1995
0
0
694
0
0
0
0
0
1714
0
0
0
0
0
595
0
0
560
0
0
303
0
0
243
0
0
327
309
0
226
0
0
353
0
0
45
0
0
0
0
0
0
0
0
25
0
0
39
0
0
n/appl n/appl n/appl
0
0
0
3422
0
0
0
0
0
0
0
0
64
0
0
1135
0
0
96
0
0
0
0
0
78
0
0
0
0
0
473
0
0

Paymentsfordelegationof
ANS
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
n/appl
0
0
0
0
0
0
0
207
0
0
0

Irrecoverablevalueadded
tax(VAT)
0
0
0
0
0
0
0
0
0
0
0
9991
0
0
0
0
0
0
0
0
0
2260
0
0
0
n/appl
0
0
0
0
0
0
0
0
0
0
0

Totalcosts
236378
22947
3751
37199
114408
57673
11687
8887
7647
236187
83078
274081
1491
127288
29465
19694
16295
23163
35178
6172
5878
49163
2214
1191
2331
n/appl
3453
180482
26819
31622
4010
26067
26503
102859
4291
13850
53093

ATM/CNSprovisioncosts
897063
115303
8041
182771
207082
150490
73948
78159
37981
1055191
352411
1164622
13573
638374
63052
154296
91324
112881
245432
22232
55738
163460
13504
9389
9145
141228
20934
760374
127260
113103
23202
147243
165091
292730
28166
75420
248611

35085
2825
0
20281
0
11450
6742
4303
4976
40711
22294
86628
197
51653
6377
8789
3014
8176
7769
1328
2156
8979
0
782
1039
0
523
26
5161
0
593
7494
8590
13956
1740
5407
2533

METcosts

134

Annex7Table0.2:BreakdownoftotalANScosts(enroute,terminalandgatetogate),2012

15880
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2216
0
0
0
0
0
0
0
0
0
0
3987
0
0
0
0
0
0
0
0

Paymentsfordelegationof
ANS

Annex7Keydata
ACE2012BenchmarkingReportwith20132017outlook

Aena
ANSCR
ARMATS
AustroControl
Avinor(Continental)
Belgocontrol
BULATSA
CroatiaControl
DCACCyprus
DFS
DHMI
DSNA
EANS
ENAV
Finavia
HCAA
HungaroControl
IAA
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC
NATAAlbania
NATS(Continental)
NAVPortugal(Continental)
NAVIAIR
Oronavigacija
PANSA
ROMATSA
Skyguide
SloveniaControl
SMATSA
UkSATSE

7544
458
0
568
880
2050
622
0
10048
694
2527
9013
0
3753
739
303
1731
1963
689
1411
1128
1734
449
125
118
0
719
8731
620
1381
371
2593
2960
0
519
0
2406

Paymentforregulatoryand
supervisoryservices
15880
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2525
0
0
0
0
0
0
0
0
0
0
3987
0
0
0
0
0
0
0
0

51843
6677
287
11460
7347
11622
4175
0
2488
0
18107
79661
0
48588
0
11071
5489
7595
0
1197
3212
15903
704
0
414
0
854
0
7854
0
1244
8579
8697
9673
1468
3296
8678

Paymentsfordelegationof
ANS
0
0
0
0
0
44592
0
0
0
0
0
48731
0
0
213
0
0
0
0
0
0
31889
0
0
0
0
0
784
0
0
0
740
0
207
0
0
0

GatetogateANScosts(in'000)
PaymentottheStatefor
provisionofotherservices

TerminalANScosts(in'000)

Eurocontrolcosts

EnrouteANScosts(in'000)

Irrecoverablevalueadded
tax(VAT)
0
0
0
0
0
0
2
0
0
0
0
46690
0
0
0
0
0
0
0
0
0
7210
0
0
0
7
0
0
0
0
0
0
0
0
0
0
0

1007415
125263
8328
215080
215310
220204
85488
82462
55493
1096596
395339
1435345
13770
742368
70381
174458
101558
133140
253890
26168
62234
214755
14658
10296
10716
141235
23030
769915
144880
114484
25410
166649
185338
316566
31894
84123
262229

Totalcosts

ANSPs

Staffcosts

3940924

404694
51985
2315
109151
66929
70957
41104
44570
13020
568999
129035
630693
7183
290209
23240
104772
42365
55107
109257
9842
27745
81242
4570
6470
3483
118067
4641
302003
85550
49690
11034
95065
78702
137934
16876
32557
109867

Nonstaffoperatingcosts

Depreciationcosts

734245

106353
17234
500
15599
6031
11198
8914
8962
4840
74016
28306
86941
1438
97326
4203
6907
8141
9995
16772
3172
6512
6706
1400
564
855
9669
3877
97169
5202
11461
3605
9144
8931
30347
1524
7337
13096

454374

55687
9589
619
4006
4368
5915
7166
4024
2249
66944
30697
31876
927
28090
1103
3409
2660
6523
4246
1180
3211
3027
581
337
1268
701
2455
84012
2523
8074
962
4408
10717
4766
1643
8473
45937

Exceptionalitems
105809

6026
0
0
0
0
18
0
0
0
33556
0
0
0
632
0
0
0
0
33472
0
0
0
0
0
0
0
0
5589
0
0
0
0
25596
106
579
134
100

ATM/CNSprovisioncosts
6270754

660685
93034
4291
149247
93237
97674
63849
69272
33204
827762
269333
926092
12170
525795
37409
135113
75691
91989
210480
16917
50511
113648
11290
8318
7204
141228
17612
583338
100440
81481
19335
125702
140030
194519
24452
62412
195991

Staffcosts
1209241

179942
14461
1958
23181
86689
40001
7330
5756
2220
153434
39064
162302
381
53539
16678
13174
10455
9569
30200
2782
3219
35609
1202
783
743
n/appl
2116
123849
23345
20506
2057
16065
15982
70711
2691
6421
30826

Nonstaffoperatingcosts
305197

23128
2924
784
4091
21672
4475
1094
944
1512
31336
22414
47158
247
29419
5407
3978
3212
4164
4752
542
982
9937
505
185
490
n/appl
754
44337
1205
4301
744
2805
4112
11728
270
2660
6930

Depreciationcosts
174209

20105
3060
426
5781
4381
6858
1161
1144
664
18909
14560
24189
371
24732
2834
1266
1430
4390
0
1467
686
2939
267
72
339
n/appl
289
5706
1675
2262
842
1537
1230
13523
97
1631
3385

Costofcapital
84611

11295
1825
583
471
1103
1479
515
1043
380
13989
7040
4882
405
4652
724
765
536
2769
0
525
339
1327
240
30
368
n/appl
163
3229
595
4553
225
1135
1476
2190
45
2268
11446

Exceptionalitems
14814

1907
0
0
0
0
3
0
0
0
9760
0
0
0
238
0
0
0
0
0
0
0
0
0
0
0
n/appl
0
85
0
0
0
0
2260
58
611
28
33

ATM/CNSprovisioncosts
1788072

236378
22269
3751
33524
113846
52816
10099
8887
4777
227429
83078
238530
1403
112579
25643
19183
15633
20892
34952
5316
5226
49812
2214
1070
1941
n/appl
3322
177036
26819
31622
3867
21542
25061
98211
3714
13008
52621
5150165

584636
66446
4273
132332
153618
110958
48433
50326
15241
722434
168099
792995
7564
343748
39918
117946
52820
64676
139458
12624
30964
116851
5772
7253
4227
118067
6757
425852
108895
70196
13091
111130
94684
208645
19567
38978
140693

Staffcosts
1340599

111053
17150
1641
24582
37581
14060
7759
12660
14607
115582
103709
223740
2868
138957
14270
24004
25737
24528
51484
3265
14025
32610
5245
1132
2088
12791
7393
138902
8370
16557
4477
19889
20197
33095
4100
16571
33920

135

Annex7Table0.3:BreakdownofATM/CNSprovisioncosts(enroute,terminalandgatetogate),2012

1035402

87925
14226
857
20491
15909
9585
6665
11716
13095
84246
81295
176582
2621
109538
8863
20026
22525
20364
46732
2723
13043
22673
4740
948
1598
12791
6639
94565
7165
12256
3733
17085
16084
21367
3830
13911
26991

Costofcapital

Annex7Keydata
ACE2012BenchmarkingReportwith20132017outlook

Total

Aena
ANSCR
ARMATS
AustroControl
Avinor(Continental)
Belgocontrol
BULATSA
CroatiaControl
DCACCyprus
DFS
DHMI
DSNA
EANS
ENAV
Finavia
HCAA
HungaroControl
IAA
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC
NATAAlbania
NATS(Continental)
NAVPortugal(Continental)
NAVIAIR
Oronavigacija
PANSA
ROMATSA
Skyguide
SloveniaControl
SMATSA
UkSATSE

Nonstaffoperatingcosts

GatetogateATM/CNScosts(in'000)

908454

126459
20294
926
21380
10412
18056
10075
10105
5504
92926
42866
111130
1809
122057
7037
8173
9572
14385
16772
4639
7198
9645
1666
636
1194
9669
4166
102874
6877
13723
4447
10681
10161
43870
1621
8968
16481

Depreciationcosts

TerminalATM/CNScosts(in'000)

538985

66982
11414
1202
4477
5471
7394
7681
5067
2629
80933
37738
36758
1332
32742
1827
4174
3196
9292
4246
1705
3551
4354
821
367
1636
701
2617
87242
3118
12627
1187
5543
12193
6956
1688
10741
57383

Costofcapital

EnrouteATM/CNScosts(in'000)

Exceptionalitems
120623

7933
0
0
0
0
22
0
0
0
43316
0
0
0
871
0
0
0
0
33472
0
0
0
0
0
0
0
0
5504
0
0
0
0
27857
164
1190
161
133

8058826

897063
115303
8041
182771
207082
150490
73948
78159
37981
1055191
352411
1164622
13573
638374
63052
154296
91324
112881
245432
22232
55738
163460
13504
9389
9145
141228
20934
760374
127260
113103
23202
147243
165091
292730
28166
75420
248611

ATM/CNSprovisioncosts

ANSPs

NBVfixedassetsinoperation
6718070

663063
118869
9036
202137
82527
143682
88736
48092
21610
692307
530195
590802
17985
845731
48715
130469
73304
85504
116095
16315
61111
78394
5194
7301
7322
68623
40829
839321
56074
150814
30584
134437
131432
263681
8656
112945
196181

NBVfixedassetsunder
construction
1754655

176912
20090
985
36852
17048
7210
4851
34685
7713
53253
100457
247557
36
477093
4485
0
1056
6575
42989
5363
2213
28169
1508
61
1379
6585
2012
273814
9441
9398
3068
16373
10401
40113
26782
7989
70137

Longtermfinancialassets
1232448

133422
11573
18
31092
0
487
1292
5444
0
176635
1141
0
0
114699
0
0
13427
0
83105
11
0
0
0
0
44
0
73
487443
89822
11
2027
14557
943
60984
327
0
3871

Currentassets
4323249

237712
58666
2225
85373
0
82234
91971
29441
16228
910904
55937
0
7974
699902
33677
0
65031
121064
358284
8893
35676
38621
9737
6822
6091
45466
19124
590489
133597
71453
13643
77216
128558
142694
3957
31699
102891

Totalassets
14028422

1211109
209198
12265
355454
99575
233613
186851
117662
45551
1833099
687730
838359
25995
2137425
86877
130469
152818
213143
600474
30582
99000
145184
16438
14184
14836
120675
62039
2191066
288933
231675
49322
242584
271334
507472
39721
152633
373079
8121
231941
23370
48742
127489
477252
269
26105
114609
7449
1028
0
75208
20859
1023388
146821
79219
2287
27147
59652
165786
18799
51923
6165

14801
1288897
39790
83081
49763
67358
26833
62747
5201
5119
12385
14225
0
40605
815707
85131
106456
45047
160520
193446
269861
8286
80753
340800

4325127

25926
10026
42140
22825
988511
24574

147732
150630
60044
22726
623148
622668

6285964

240443
10752
867
215433

582246
186641
10165
73555

Longtermliabilities

136

Currentliabilities
2348930

20995
35891
55863
3480
10148
35776
3870
771
610
45466
575
351971
56981
46001
1987
54917
18236
71824
12636
19957
26114

3074
616587
23718

59955
26195
15479
0
221440
40488

388420
11804
1234
66466

Annex7Table0.4:BalanceSheetdataatANSPlevel,2012

Annex7Keydata
ACE2012BenchmarkingReportwith20132017outlook

Total

Aena
ANSCR
ARMATS
AustroControl
Avinor(Continental)
Belgocontrol
BULATSA
CroatiaControl
DCACCyprus
DFS
DHMI
DSNA
EANS
ENAV
Finavia
HCAA
HungaroControl
IAA
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC
NATAAlbania
NATS(Continental)
NAVPortugal(Continental)
NAVIAIR
Oronavigacija
PANSA
ROMATSA
Skyguide
SloveniaControl
SMATSA
UkSATSE

Capitalandreserves

ANSPBALANCESHEETin('000)

12960021

152818
213143
600474
30582
99000
145184
16438
14184
14836
120675
62039
2191066
288933
231675
49322
242584
271334
507472
39721
152633
373079

25996
2137425
86877

233613
186851
117662
45551
1833099
687730

1211109
209198
12265
355454

Totalliabilities

ANSPs

ATCOsinOPS
292
17
0
22
86
28
35
23
10
132
39
397
19
164
32
110
8
33
82
0
25
31
0
21
8
34
6
271
40
80
11
7
97
62
14
60
347

Abinitiotrainees
860

0
11
14
47
25
2
0
14
0
206
55
184
0
44
0
0
11
32
0
12
3
21
8
0
1
27
0
64
0
2
0
36
8
21
0
12
0

Onthejobtrainees
990

0
17
8
23
30
15
5
10
0
215
36
227
0
50
1
0
11
22
25
2
6
29
0
9
3
3
7
28
3
12
0
31
21
56
1
29
55

OPSsupport(nonATCO)

ATCassistants
2364 3890

196
53
96
42
19
15
35
73
139
0
0
64
42
37
43
25
39
0
385
550
35
265
117 1091
5
1
23
16
19
0
0
48
35
50
23
22
33
128
0
38
47
22
61
153
0
0
8
8
5
2
52
87
7
0
435
330
26
61
106
37
0
24
89
267
0
0
97
219
11
5
33
30
104
126

Technicalsupportstafffor
operationalmaintenance
11896

568
118
166
108
173
186
403
106
0
941
1320
1318
28
110
72
470
131
35
84
105
116
115
40
45
68
132
82
841
89
104
66
341
366
132
27
103
2787

Technicalsupportstafffor
planning&development
2630

395
29
0
98
25
31
8
24
0
527
17
409
11
103
10
88
23
20
34
2
11
81
0
0
7
0
0
199
65
37
8
64
0
150
10
106
39

Administration
8864

533
267
54
87
35
156
170
150
35
468
1102
1174
20
527
36
90
180
74
137
94
117
179
24
47
54
56
71
822
170
86
75
325
390
195
33
82
748

Staffforancillaryservices
3055

25
32
28
107
31
90
115
118
27
110
453
243
26
374
68
0
66
15
31
27
29
15
18
50
48
0
36
13
43
15
28
110
196
69
25
154
221

Other
3451

130
70
87
0
17
60
76
0
0
367
1108
0
0
117
0
500
29
1
0
1
0
0
7
24
69
8
44
0
10
0
0
0
0
17
0
0
710

Totalstaff
58003

4002
896
461
887
961
853
1125
743
195
5618
5407
7926
156
2967
429
1786
710
481
1063
362
469
885
145
273
322
646
309
4426
721
673
296
1712
1519
1378
215
855
6131
9709

1064
93
22
123
157
85
102
90
57
1320
475
1417
24
903
53
215
89
141
229
56
49
68
32
38
35
247
39
928
88
86
33
128
221
221
50
155
577

ACCATCOsinOPS

137

Annex7Table0.5:TotalstaffandATCOsinOPSdata,2012

17362 2642

1810
197
70
287
401
221
234
230
84
1717
977
2766
46
1439
192
480
166
204
509
81
94
198
48
61
57
247
56
1423
214
195
85
442
441
362
89
246
994

ATCOsonotherduties

Annex7Keydata
ACE2012BenchmarkingReportwith20132017outlook

Total

Aena
ANSCR
ARMATS
AustroControl
Avinor(Continental)
Belgocontrol
BULATSA
CroatiaControl
DCACCyprus
DFS
DHMI
DSNA
EANS
ENAV
Finavia
HCAA
HungaroControl
IAA
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC
NATAAlbania
NATS(Continental)
NAVPortugal(Continental)
NAVIAIR
Oronavigacija
PANSA
ROMATSA
Skyguide
SloveniaControl
SMATSA
UkSATSE

APPs+TWRsATCOsinOPS

ACCATCOhoursonduty

918546
155646
70464
240096
385624
191488
171072
200620
55944
469254
620472
1696915
36754
744800
209776
389550
121438
96579
448560
32075
70612
205877
31936
32545
33198
n/appl
27880
617754
230580
164399
80633
359875
282920
166526
53983
111384
572958

APPs+TWRsATCOhourson
duty

12499592 7653 10298734

1280888
746
138942
104
32296
48
158670
164
244444
244
112880
136
130356
132
120060
140
114057
27
1383430
397
723900
502
1782453 1349
40128
22
1169149
536
77098
139
316050
265
143178
77
214743
63
380140
280
70616
25
69677
45
106569
131
72000
16
53770
23
52710
22
288523 n/appl
60216
17
1155727
496
156640
126
129657
109
51978
52
140890
314
270283
220
277812
141
71576
38
189720
91
718365
417

2416625

351136
23831
1098
63642
82360
41029
16721
26071
11257
319500
65618
338384
4102
206097
20984
55688
23569
32196
78751
4071
11109
50869
2557
2801
1234
56779
2495
212448
58788
28395
5170
48435
34671
71482
10020
15429
37839

Employmentcostsfor
ATCOsinOPS('000)

ANSPs

Sizeofcontrolled
airspace
2190000
77100
29800
79500
724000
39500
146000
158000
174000
388000
982000
1010000
77102
733000
411000
537000
93000
457000
626000
95300
48700
52200
231000
24700
33900
260000
36000
882000
665000
158000
74700
334000
254000
69700
20400
145566
776442

NumberofACC
operationalunits
63

5
1
1
1
3
1
1
1
1
4
2
5
1
4
1
1
1
2
2
1
1
1
1
1
1
1
1
3
1
1
1
1
1
2
1
1
5

NumberofAPP
operationalunits
260

17
4
2
6
17
4
3
9
2
0
31
12
2
23
7
16
1
3
26
2
2
3
2
2
0
0
1
16
4
7
3
4
3
4
3
8
11

NumberofTWR
operationalunits
425

30
4
2
6
19
5
5
10
2
16
40
81
2
12
19
18
2
3
31
1
5
4
1
2
4
0
1
16
6
6
4
13
16
7
3
7
22
81

0
0
2
0
28
0
0
0
0
0
0
0
0
11
6
15
1
0
1
1
0
0
1
1
3
0
1
0
0
1
0
0
0
0
0
0
9

TotalIFRflights
controlledbytheANSP
1657310
662571
55536
888751
589211
557312
540138
495911
269752
2784011
1032651
2809461
187192
1556741
239486
633008
589203
520650
691404
231937
380017
554281
96948
112549
63856
1605505
195230
2160176
437599
615460
204400
672073
487189
1181800
271661
533087
466104

TotalIFRkmcontrolled
bytheANSP
9899193320

884308817
165529734
10551929
189085681
182961669
54196085
140982268
150026175
98562577
886817210
698377510
1498353372
47492607
714021778
68124159
345635936
141356495
204679262
277823554
53117277
65036077
68363413
44026709
14021583
12504665
458152079
32493453
791250167
212926614
133597013
34453334
291563045
224563906
210329634
35303906
164902941
293700687

Totalflighthours
controlledbytheANSP
14221070

1275470
224495
13988
279393
347816
108640
179176
193518
126759
1379454
947628
2117415
65567
1028353
114641
460892
185247
263793
418354
72741
83776
149594
61297
17983
16453
560102
40982
1291693
284669
201374
51981
401752
289097
326811
48086
208537
383542
14999130

138

1676940
144781
21292
355141
674187
364616
75208
82229
61560
2000877
959739
1921795
46851
1106027
247712
149418
87905
207192
509001
68360
29293
483300
33119
11008
15806
n/appl
20543
1730568
269298
325816
41903
324379
148395
490676
31619
68908
213668

IFRAirportmov
controlledbytheANSP

NumberofAFIS

Annex7Table0.6:Operationaldata(ANSPandStatelevel),2012

Annex7Keydata
ACE2012BenchmarkingReportwith20132017outlook

Total

Aena
ANSCR
ARMATS
AustroControl
Avinor(Continental)
Belgocontrol
BULATSA
CroatiaControl
DCACCyprus
DFS
DHMI
DSNA
EANS
ENAV
Finavia
HCAA
HungaroControl
IAA
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC
NATAAlbania
NATS(Continental)
NAVPortugal(Continental)
NAVIAIR
Oronavigacija
PANSA
ROMATSA
Skyguide
SloveniaControl
SMATSA
UkSATSE
18209781

1721418
262997
19650
373835
527103
205602
199176
215385
143130
1911546
1202851
2628477
78026
1322479
180515
500627
208623
318891
553712
90920
91566
278118
70104
20910
20656
560102
46445
1751902
356283
288018
63124
488014
328560
457296
56494
226862
440362

Compositeflighthours

IFRACCMovements

Sizeofthecontrolled
area

ATCOsinOPS

1.01
0.94
0.97
0.53
0.96
1.43
0.34
1.27
1.34
0.81
1.65
0.66
1.27
1.48
1.05
1.23
0.86
1.16
0.70
1.45
0.99
1.20
0.82
0.97
0.95
1.34
1.48
0.79
0.55
0.67
1.11
0.97
1.28
1.18
0.54
1.37
1.01
0.76
1.03
1.13
0.68
0.74
0.31
0.28
1.94
0.68
1.07
1.11
0.70
1.56
1.15
0.89
2.23
1.00
0.80
0.95
0.64
1.03
0.48
0.53
0.54
0.77
0.32

36
25
33
15
26
18
12
17
22
21
20
8
19
23
27
19
18
16
18
48
26
31
16
22
22
30
20
21
17
17
31
25
40
18
10
33
26
20
17
13
8
33
9
14
21
13
23
17
13
35
17
14
30
34
11
11
10
22
29
24
29
25
18

274155
736671
914991
249445
327204
656262
52697
717690
203092
328712
228774
550174
520304
470630
269752
1429223
1235488
1431461
612539
705662
750139
830222
795741
1200794
999610
854665
179415
295559
607107
674879
945491
177395
612302
558620
179675
393484
497424
388674
231910
367589
509994
96948
112106
62738
1605505
195230
870967
1791217
1239303
421666
515716
199203
630754
478684
605410
743175
268923
525343
230847
156127
197797
177473
98252

1370000
267000
439000
51400
179000
77100
29800
79500
403000
115000
205000
39500
145000
158000
174000
200000
108000
116000
174000
776000
236800
212000
93300
165000
298000
400000
77102
244000
73300
94600
502000
415000
537000
93000
23500
449000
225000
479000
95600
48700
52200
231000
24800
33700
260000
36000
631000
287000
40600
665000
158000
74700
331000
254000
30000
39800
20400
145566
185834
165444
209505
133901
81582

130
261
441
109
123
93
22
123
35
93
29
85
102
90
57
339
423
327
231
258
217
281
211
362
310
253
24
101
238
211
354
53
215
89
36
105
126
103
56
49
68
32
38
35
247
39
254
365
309
88
86
33
128
221
110
111
50
155
190
96
141
76
74

12710213

12499672

1.02

22

35188999

13959234

9709

624
1395
1013
783
574
950
70
900
328
605
270
1054
1183
800
250
1850
1689
1262
1050
295
420
1295
1040
1250
1310
850
269
550
593
375
1600
550
1000
700
441
576
841
828
169
335
1800
121
202
144
1050
36
918
2000
766
663
600
336
1300
1391
1113
960
200
744
883
415
358
202
235

Sumofsectorhours

Averagetransittimein
minutes

161303
330019
520924
120931
147710
138942
32296
158670
54217
144579
45648
112880
130356
120060
114057
360170
429884
336207
257170
393192
330708
353472
265418
455362
389951
318250
40128
129295
316131
287378
436346
77098
316050
143178
54828
159915
209160
170980
70616
69677
106650
72000
53770
52710
288523
60216
316334
454616
384777
156640
129657
51978
140890
270283
138170
139642
71576
189720
236550
119520
175545
94620
92130

Numberofsectors

ATCOhourproductivity

163563
309587
505158
64312
141537
198685
10974
200796
72821
116613
75371
74234
165397
177628
119199
442299
368259
388697
180199
569900
328589
422520
217520
439976
369438
427761
59457
102037
172993
192044
486168
75024
404716
169054
29720
218857
212255
129184
72687
79050
72030
53188
16548
14928
560102
40982
338375
506646
269949
243854
149532
46005
314865
270210
110796
133167
45937
195256
113040
63452
95024
72887
29160

SizeofOPSroomarea
(m)

ATCOhoursonduty

Total

ACCCode
Canarias
Barcelona
Madrid
Palma
Sevilla
Praha
Yerevan
Wien
Bodo
Oslo
Stavanger
Brussels
Sofia
Zagreb
Nicosia
Karlsruhe
Langen
Munchen
Bremen
Ankara
Istanbul
Bordeaux
Reims
Paris
Marseille
Brest
Tallinn
Brindisi
Milano
Padova
Roma
Tampere
Athinai+Macedonia
Budapest
Dublin
Shannon
Malmo
Stockholm
Riga
Bratislava
Amsterdam
Malta
Skopje
Chisinau
Maastricht
Tirana
Prestwick
LondonAC
LondonTC
Lisboa
Kobenhavn
Vilnius
Warszawa
Bucuresti
Geneva
Zurich
Ljubljana
Beograd
Kyiv
Dnipropetrovs'k
Simferopol
L'viv
Odesa

Flighthourscontrolled

ANSPs
Aena
Aena
Aena
Aena
Aena
ANSCR
ARMATS
AustroControl
Avinor(Continental)
Avinor(Continental)
Avinor(Continental)
Belgocontrol
BULATSA
CroatiaControl
DCACCyprus
DFS
DFS
DFS
DFS
DHMI
DHMI
DSNA
DSNA
DSNA
DSNA
DSNA
EANS
ENAV
ENAV
ENAV
ENAV
Finavia
HCAA
HungaroControl
IAA
IAA
LFV
LFV
LGS
LPS
LVNL
MATS
MNAV
MoldATSA
MUAC
NATAAlbania
NATS(Continental)
NATS(Continental)
NATS(Continental)
NAVPortugal(Continental)
NAVIAIR
OroNavigacija
PANSA
ROMATSA
Skyguide
Skyguide
SloveniaControl
SMATSA
UkSATSE
UkSATSE
UkSATSE
UkSATSE
UkSATSE

8
18
25
7
7
8
1
12
5
15
3
7
7
9
4
28
36
33
20
11
11
19
17
19
28
17
3
6
17
12
26
5
12
7
2
9
11
11
4
5
5
2
3
2
20
4
24
19
30
7
7
3
8
11
9
10
4
9
12
5
7
5
5

45904
90164
152577
35544
40737
29904
8784
36454
29000
73326
21800
24512
24893
29000
20155
107246
139480
118990
91854
83220
96360
116825
72571
117657
116343
88874
10710
22585
44633
48254
91644
24820
59400
20912
13542
49410
44348
46720
18402
13336
29493
11680
10144
17520
65808
15054
108563
79799
175158
53746
31208
19520
34005
59220
29486
39874
16048
39377
55240
43920
44510
35800
27180

716

3363242

Annex7Table0.7:OperationaldataatACClevel,2012

Annex7Keydata
ACE2012BenchmarkingReportwith20132017outlook

139

Annex7Keydata
ACE2012BenchmarkingReportwith20132017outlook

140

ANNEX8PERFORMANCEINDICATORSATFABLEVEL
This Annex shows the financial costeffectiveness indicator computed at FAB level for the year
2012 and broken down into it three main components: ATCOhour productivity, ATCO
employmentcostsperATCOhourandsupportcostspercompositeflighthour.Thefiguresshown
atFABlevelintheFigurebelowhavebeencomputedtakingintoaccounttheANSPsparticipating
totheACEanalysisin2012andwhichwereformallypartofaFABinitiative.

Annex8Table0.1:BreakdownofcosteffectivenessatFABlevel,2012

Annex8PerformanceindicatorsatFABlevel
ACE2012BenchmarkingReportwith20132017outlook

141

Annex8PerformanceindicatorsatFABlevel
ACE2012BenchmarkingReportwith20132017outlook

142

ANNEX9INDIVIDUALANSPFACTSHEETS

Annex9ANSPsfactsheets
ACE2012BenchmarkingReportwith20132017outlook

143

Annex9ANSPsfactsheets
ACE2012BenchmarkingReportwith20132017outlook

144

Aena, Spain
Aeropuertos Espaoles y Navegacin Area
www.aena.es

Institutional arrangements and links (2014)


Ministry of
Defence

Ministry of
Public Works and
Transport

Ministry of the
Agriculture, Food and
Environment Affairs

Secretary General
for Transport

Secretary of State
for Environment

Status (2014)
- Business Public Entity attached to Ministry of Development
- A company with specific status (governed by Private Law,
except when acting in its administrative capacity)
- 100% State-owned

National Supervisory Authority (NSA):


CIDEFO

ESPAF
DGAC

Body responsible for:


Safety Regulation

AEMET

AESA

Spanish Civil Aviation Authority - Government


AESA - Government

Aena Group
Air
Navigation

- AESA (Spanish Aviation Safety State Agency) (for AENA)


- Spanish Air Force Staff (for MIL)
- Secretary of State for Environment (for MET)

Airspace Regulation

Aena
Aeropuertos

Spanish Civil Aviation Authority - Government


AESA - Government

Economic Regulation
Government

Corporate governance structure (2014)


BOARD OF DIRECTORS
Chairman + 12 members + Secretary
Chairman is the CEO

Aena (2014)

CHAIRMAN OF THE BOARD OF DIRECTORS:


Jos Manuel Vargas Gmez

DIRECTOR GENERAL (CEO):


Jos Manuel Vargas Gmez

MANAGEMENT COMMITTEE
Chairman + 7 members
Chairman is the CEO

DIRECTOR OF AIR NAVIGATION:


Ignacio Gonzlez Snchez

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)
Gate-to-gate total costs (M)

953

897

Gate-to-gate total ATM/CNS assets(M)

807

Gate-to-gate ANS total capex (M)

128

ATCOs in OPS

1 810

Gate-to-gate total staff

4 002

Total IFR flight-hours controlled by ANSP ('000)

1 275

IFR airport movements controlled by ANSP ('000)

1 677

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

Size
Size of controlled airspace:

2 190 000 km

1 010

Gate-to-gate ATM/CNS provision costs (M)

En-route sectors

5 ACCs (Madrid, Barcelona, Canary Islands, Palma, Sevilla)


17 APPs (3 stand-alone APPs + 14 APPs co-located with TWR
units)
30 TWRs

65
1 139

145

ANS CR, Czech Republic


Air Navigation Services of the Czech Republic
www.rlp.cz

Institutional arrangements and links (2014)


FUA
Level 1
Body for
Strategic ASM

Ministry of Defence
(M of D)
Military Aviation
Department

Ministry of Transport
(M of T)
Civil Aviation
Department

Civil Aviation
Authority (CAA)
!NSA

Status (2014)
- State-enterprise founded under the State Enterprise Act in
1995
- 100% State-owned

National Supervisory Authority (NSA):


Civil Aviation Authority (CAA)

Body responsible for:


Safety Regulation
Civil Aviation Authority

Airspace Regulation
Body for Strategic ASM

Economic Regulation
Airport
Authority

Private Providers
of ATS

Air Navigation Services


of the Czech Republic
(ANS CR)

Ministry of Transport

Corporate governance structure (2014)

ANS CR (2014)

SUPERVISORY BOARD (6 members)


Chairman + 5 members
Members appointed by:
4 M of T
2 ANS CR employees

CHAIRMAN OF THE SUPERVISORY BOARD:


Luk Hampl

DIRECTOR GENERAL (CEO):

DIRECTOR GENERAL
appointed by the M of T

Jan Klas

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

123

Gate-to-gate total costs (M)

125

Gate-to-gate ATM/CNS provision costs (M)

115

Gate-to-gate total ATM/CNS assets(M)

131

Gate-to-gate ANS total capex (M)

Size
Size of controlled airspace:

77 100 km

17

ATCOs in OPS

197

Gate-to-gate total staff

896

Total IFR flight-hours controlled by ANSP ('000)

224

IFR airport movements controlled by ANSP ('000)

145

En-route sectors

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

1 ACC (Praha)
4 APPs (Praha, Karlovy Vary, Brno, Ostrava)
4 TWRs (Praha, Karlovy Vary, Brno, Ostrava)
1 AFIS (located in Praha ACC)

146

ARMATS, Armenia
Armenian Air Traffic Services
www.armats.com

Institutional arrangements and links (2014)

Status (2014)
- Joint-stock company as of 1997
- 100% State-owned

Government

National Supervisory Authority (NSA):


General Department of Civil Aviation (GDCA)
General Department
of Civil Aviation
(GDCA)

Ministry of
Defence

Ministry of
Environment

Body responsible for:


Safety Regulation
General Department of Civil Aviation (GDCA)

Airspace Regulation
General Department of Civil Aviation (GDCA) and Ministry of
Defence
ARMATS

Air Force

Aviation
Meteorological
Centre

Air Defence

Economic Regulation
Tax Authorities

Corporate governance structure (2014)

ARMATS (2014)

CHAIRMAN OF THE SUPERVISORY BOARD:

SUPERVISORY BOARD
Chairman is GDCA DG

Artyom Movsesyan

CHAIRMAN OF THE EXECUTIVE BODY:


EXECUTIVE BODY
Chairman + 5 members appointed by the stockholders
Chairman is ARMATS DG

Artur Gasparyan

DIRECTOR OF AIR TRAFFIC SERVICES:


Artur Papoyan

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

Gate-to-gate total costs (M)

Gate-to-gate ATM/CNS provision costs (M)

Gate-to-gate total ATM/CNS assets(M)


Gate-to-gate ANS total capex (M)
ATCOs in OPS
Gate-to-gate total staff

Size
Size of controlled airspace:

29 800 km

10
2
70
461

Total IFR flight-hours controlled by ANSP ('000)

14

IFR airport movements controlled by ANSP ('000)

21

En-route sectors

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

1 ACC (Yerevan)
2 APPs (Yerevan, Gyumri)
2 TWRs (Shirak, Zvartnots)

147

Austro Control, Austria


sterreichische Gesellschaft fr Zivilluftfahrt mbH
www.austrocontrol.at

Institutional arrangements and links (2014)


Federal Ministry of Defence
(M of D)

Federal Ministry of Transport,


Innovation and Technology
as supreme CAA (M of TIT)
!NSA

Status (2014)
- Private limited company as of 1994
- 100% State-owned (Law makes provision for Austrian
Airports to own up to 49 %)

National Supervisory Authority (NSA):


Federal Ministry of Transport, Innovation and Technology (M
of TIT)

Body responsible for:


Safety Regulation

Air Division

The power for regulatory decisions including safety oversight


lies within the M of TIT

Airspace Regulation
M of TIT, normally on basis of proposals of Austro Control

AUSTRO
CONTROL

Economic Regulation
Covered by the National Supervisory Authority

Corporate governance structure (2014)

Austro Control (2014)

GENERAL ASSEMBLY - M of TIT

SUPERVISORY BOARD (9 members)


Chairman + 8 members
All members are appointed by M of TIT.
Members represent: 1 from M of Finance,1 from M of TIT,
1 from the field of aviation, 1 from the field
of consulting, 1 from the field of transport,
3 from works council.

Dr. Heinz Sommerbauer


Thomas Hoffmann, MSc

Operational ATS units:

Scope of services
Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

214

Gate-to-gate total costs (M)

215

Gate-to-gate ATM/CNS provision costs (M)

183

Gate-to-gate total ATM/CNS assets(M)

184

Gate-to-gate ANS total capex (M)

287

Gate-to-gate total staff

887

Total IFR flight-hours controlled by ANSP ('000)

279

IFR airport movements controlled by ANSP ('000)

355

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

1 ACC (Wien)
6 APPs (Wien, Graz, Innsbruck, Klagenfurt, Linz, Salzburg)
6 TWRs

Size
Size of controlled airspace:

79 500 km

31

ATCOs in OPS

En-route sectors

Dr. Christoph Matznetter

MANAGING BOARD:

MANAGING BOARD
2 members
Members appointed by M of TIT.

GAT
OAT

CHAIRMAN OF THE SUPERVISORY BOARD:

12
270

148

Avinor, Norway
AVINOR
www.avinor.no

Institutional arrangements and links (2014)


Ministry of Transport and Communications (M of TC)

Civil Aviation
Authority Norway
(CAA)
!NSA

Status (2014)
- State owned limited company.
- Civil ANSP and airport owner/ operator
- Independent of CAA

National Supervisory Authority (NSA):

General Assembly

Civil Aviation Authority Norway (CAA)

Body responsible for:


Safety Regulation

AVINOR
Air Navigation
Services

Airports

Civil Aviation Authority Norway

Airspace Regulation
Civil Aviation Authority Norway
Sola Hotel
Vaernes
Flesland
Eiendom AS Eiendom AS Eiendom AS

Oslo Airport
(OSL AS)

Airport Parkings
(APAS)

Economic Regulation
Aeronautic charges are set annually by the Ministry of
Transport and Communications

Oslo Lufthavn
Eiendom
AS (OSLE)

Corporate governance structure (2014)

SUPERVISORY BOARD (10 members)


Chairman + 9 members
Members represent: 6 M of TC, 4 staff

CHAIRMAN OF THE SUPERVISORY BOARD:


Ola Mrkved Rinnan

CHIEF EXECUTIVE OFFICER:

EXECUTIVE BOARD (10 members)


CEO + 9 members
CEO appointed by Supervisory Board

Dag Falk-Petersen

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

- AVINOR owns and operates 46 airports, 12 in association


with Armed Forces

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

217

Gate-to-gate total costs (M)

218

Gate-to-gate ATM/CNS provision costs (M)

207

Gate-to-gate total ATM/CNS assets(M)

98

Gate-to-gate ANS total capex (M)

10

ATCOs in OPS

401

Gate-to-gate total staff

961

Total IFR flight-hours controlled by ANSP ('000)

348

IFR airport movements controlled by ANSP ('000)

674

En-route sectors
Minutes of ATFM delays ('000)

Avinor (2014)

3 ACCs Oslo (ACC + APP), Stavanger (ACC), Bodo (ACC +


APP + Oceanic)
17 APPs (1 APP combined with Oslo ACC + 16 TWRs/APPs)
17 TWRs
28 AFISs

Size
Size of controlled airspace:

23
328
Continental: 724 000 km -

ACE 2012 Benchmarking Report

2 174 000 km

Oceanic:1 450 000 km

149

Belgocontrol, Belgium
Belgocontrol
www.belgocontrol.be

Institutional arrangements and links (2014)


Ministry of Defence
(M of D)

Status (2014)
- Public Autonomous Enterprise as of 1998 under a
management contract
- 100% State-owned

Federal Public Service


Mobility & Transport

National Supervisory Authority (NSA):


Belgian Supervisory Authority - Air Navigation Services (BSAANS)
Belgian
Airspace
Committee
(BELAC)

COMOPS
AIR

Body responsible for:


Safety Regulation

CAA

Civil Aviation Authority


Belgocontrol

Airspace Regulation
Belgian Airspace Committee

Belgian Supervisory
Authority Air
Navigation Services
(BSA-ANS)
!NSA

Economic Regulation
Federal Public Service of Mobility and Transport

Corporate governance structure (2014)

Belgocontrol (2014)

S UP ERVI SORY BOA RD (10 m embers)


Chairman + CEO + 8 members
Members appoint ed by Mi nis try of Mobility
CEO repres ent s s taff .

CHAIRMAN OF THE SUPERVISORY BOARD:


Renaud Lorand

DIRECTOR GENERAL (CEO):

EXE CUTI VE B OARD (6 members )


CEO + 5 members

Johan Decuyper

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

1 ACC (Brussels)
4 APPs (Brussels, Liege, Charleroi, Oostende)
5 TWRs (Brussels, Antwerp, Liege, Charleroi, Oostende)

- Belgocontrol controls lower airspace up to FL 245, including


Luxembourg airspace above FL 145/165
- Upper airspace (> FL 245) is controlled by Maastricht UAC

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

209

Gate-to-gate total costs (M)

220

Gate-to-gate ATM/CNS provision costs (M)

150

Gate-to-gate total ATM/CNS assets(M)

142

Gate-to-gate ANS total capex (M)

221

Gate-to-gate total staff

853

Total IFR flight-hours controlled by ANSP ('000)

109

IFR airport movements controlled by ANSP ('000)

365

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

39 500 km

ATCOs in OPS

En-route sectors

Size
Size of controlled airspace:

7
94

150

BULATSA, Bulgaria
Bulgarian Air Traffic Services Authority
www.atsa.bg

Institutional arrangements and links (2014)


Ministry of Transport,
Information
Technology
and Communications
(MTITC)

Status (2014)
- State enterprise as of April 2001 (Art 53 1 of the Civil
Aviation Law)
- 100% State-owned

Airspace
Management
Board

Ministry of Defence
(M of D)

Civil Aviation
Administration
!NSA

National Supervisory Authority (NSA):


Civil Aviation Administration

Body responsible for:


Safety Regulation
Civil Aviation Administration (Ministry of Transport,
Information Technology and Communications (MTITC))

Airspace Regulation
Airspace Management Board

Economic Regulation
Airport
Operators

Air Traffic Services


Authority of Bulgaria

Ministry of Transport, Information Technology and


Communications (MTITC)

Corporate governance structure (2014)

BULATSA (2014)

CHAIRMAN OF THE MANAGEMENT BOARD:

MANAGEMENT BOARD (3 members)


DG + 2 members

Anton Djadjev

DIRECTOR GENERAL (CEO):

All members appointed by the MTITC.

Tzvetan Dilov

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

1 ACCs (Sofia)
3 APPs (Sofia, Varna, Burgas)
5 TWRs (Sofia, Varna, Burgas, Gorna Oriahovitza, Plovdiv)

- Training of ATCOs

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

84

Gate-to-gate total costs (M)

85

Gate-to-gate ATM/CNS provision costs (M)

74

Gate-to-gate total ATM/CNS assets(M)

91

Gate-to-gate ANS total capex (M)

11

ATCOs in OPS
Gate-to-gate total staff
Total IFR flight-hours controlled by ANSP ('000)
IFR airport movements controlled by ANSP ('000)

Size
Size of controlled airspace:

146 000 km

234
1 125
179
75

En-route sectors

Minutes of ATFM delays ('000)

3
118 000 km plus 28 000 km over the Black Sea.

ACE 2012 Benchmarking Report

151

Croatia Control, Croatia


Croatia Control Ltd, Croatian Air Navigation Services
www.crocontrol.hr

Institutional arrangements and links (2014)


Ministry of Sea
Transport and
Infrastructure
(M of STI)

Directorate Croatian Civil


Accident
General for
Aviation
Investigation
Civil
Agency
Agency
Aviation
!NSA

Status (2014)
- Limited liability company as of 1st January 2000
- 100% State-owned
- Integrated civil/military ANSP

Ministry of
Defence
(M of D)

National Supervisory Authority (NSA):


National
Protection
and Rescue
Directorate
(NPRD)

Croatian Civil Aviation Agency (CCAA)

Body responsible for:


Safety Regulation
Directorate General for Civil Aviation

Airspace Regulation

Croatia
Control Ltd

M of STI

Economic Regulation
State Law and Croatia Control Ltd

Corporate governance structure (2014)

Croatia Control (2014)

ASSEMBLY (3 members)
The President represents Ministry of STI (Minister), the other
Two members represent M of D (Minister) and M of F (Minister).
SUPERVISORY BOARD (5 members)
The Chairman + 4 members
The members represent the M of STI, M of D, M of F, and
employees. They are appointed for a 4-year period. The member
representing the employees is elected and appointed pursuant to
the Company Statute and Labour Relations Act.
MANAGEMENT
Director General
The DG is appointed by the Supervisory Board for a 5-year
period, following an open competition and under the conditions
stipulated by the Company Statute.

Upper Airspace
Lower Airspace

Oceanic ANS
MET

- ATS provision within entire Sarajevo FIR (Bosnia &


Herzegovina) from FL 100 to FL 285 and within western part of
Sarajevo FIR (west of the line: GUBOK-DER-BOSNA-VRANAVELIT) from FL 285 to FL 660

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

75

Gate-to-gate total costs (M)

82

Gate-to-gate ATM/CNS provision costs (M)

78

Gate-to-gate total ATM/CNS assets(M)

81

Gate-to-gate ANS total capex (M)

24

ATCOs in OPS

230

Gate-to-gate total staff

743

Total IFR flight-hours controlled by ANSP ('000)

194

IFR airport movements controlled by ANSP ('000)


En-route sectors
Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

Darko Prebeac

DIRECTOR GENERAL:
Dragan Bila

Operational ATS units:

Scope of services
GAT
OAT

CHAIRMAN OF THE SUPERVISORY BOARD:

1 ACC (Zagreb)
1 APP (Zagreb)
8 APPs/TWRs (Osijek, Rijeka, Pula, Zadar, Split, Dubrovnik,
Bra, Loinj)
2 TWRs (Luko, Zagreb)

Size
Size of controlled airspace:

158 000 km

82
9
130

152

DCAC Cyprus, Cyprus


Department of Civil Aviation of Cyprus
www.mcw.gov.cy

Institutional arrangements and links (2014)


Ministry of
Communications
and Works

Ministry of
Defence

Ministry of
Foreign
Affairs

Ministry of
Finance

Status (2014)
- State body
- 100% State-owned

National Supervisory Authority (NSA):


Department of Civil Aviation

Body responsible for:


Safety Regulation
Department of Civil Aviation of Cyprus
National
Supervisory
Authority
!NSA
Air
Navigation
Services
Department

Cyprus
Telecom.
Authority
(CYTA)

Department of Civil Aviation


(DCA)

Safety
Regulation
Unit

Aviation
Security
Section

Airspace Regulation
Department of Civil Aviation of Cyprus

Economic Regulation
Ministry of Finance

Air
Transport
and Airports
Department

Corporate governance structure (2014)

DCAC Cyprus (2014)

Minister of Communications and Works

DIRECTOR OF DCAC:
Iacovos Demetriou (up to April 2014)

ACTING HEAD OF NSA:


Director DCAC, Head of ANS Section,
Head of T&A Section, Head of Aviation Security Section
and Head of Safety Regulation Unit are nominated by the Civil
Service. The Head of the NSA is nominated by the Council of
Ministers.

Panayiota Demetriou

HEAD OF ANS SECTION (COO):


Nicos Nicolaou (ACC, Airspace, ATFM)
Persephone Papadopoulou (APPs, TWRs, AIS, Training)

ACTING HEAD OF TRANSPORT AND AIRPORTS


SECTION:
Antonis Lemesianos

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

1 ACC (Nicosia)
2 APPs (Larnaca, Paphos)
2 TWRs (Larnaca, Paphos)

- DCAC Cyprus owns and operates 2 airports

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

55

Gate-to-gate total costs (M)

55

Gate-to-gate ATM/CNS provision costs (M)

38

Gate-to-gate total ATM/CNS assets(M)

29

Gate-to-gate ANS total capex (M)


ATCOs in OPS

84

Gate-to-gate total staff


Total IFR flight-hours controlled by ANSP ('000)

127

En-route sectors
Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

174 000 km

195

IFR airport movements controlled by ANSP ('000)

Size
Size of controlled airspace:

62
4
444

153

DFS, Germany
Deutsche Flugsicherung GmbH
www.dfs.de

Institutional arrangements and links (2014)


Federal Ministry of
Transport, Building and
Urban Development
(M of TBU)
Federal Supervisory
Authority for Air
Navigation Services
!NSA

Status (2014)
- Limited liability company as of 1993, governed by Private
Company Law
- 100% State-owned
- Integrated civil/military ANSP

Joint Ministerial
Steering Group

Federal Ministry
of Defence
(M of D)

National Supervisory Authority (NSA):


Federal Supervisory Authority for Air Navigation Services

Body responsible for:


Safety Regulation
Federal Supervisory Authority for Air Navigation Services
(NSA)

Airspace Regulation
Federal Supervisory Authority for Air Navigation Services
(NSA)

DFS

Economic Regulation
Federal Supervisory Authority for Air Navigation Services
(NSA)

Corporate governance structure (2014)

DFS (2014)

SHAREHOLDER Meeting with M of TBU


Supervisory Board (12 Members)
Chairman + 11 Members
Chairman is recommended by the Government,
elected by the Supervisory Board.
Members represent: 1 (Chairman) from M of TBU,
1 M of TBU, 2 M of D, 1 M of F, 1 KFW *, 6 staff reps.
Chairman has a double voting right.
EXECUTIVE BOARD (3 members)
CEO + 2 members
Executive Board is appointed by the Supervisory Board.

CHAIRMAN OF THE SUPERVISORY BOARD:


Sts. Michael Odenwald

CHAIRMAN OF THE EXECUTIVE BOARD:


Prof. Klaus-Dieter Scheurle

* KFW = KFW -Bankengruppe

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

- DFS controls both upper and lower airspace, except GAT for
the upper airspace in North-Western Gerrmany
- Other ANS
- Consulting, training, engineering & maintenance services

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

1 039

Gate-to-gate total costs (M)

1 056

Gate-to-gate ATM/CNS provision costs (M)

1 055

Gate-to-gate total ATM/CNS assets(M)


Gate-to-gate ANS total capex (M)

Gate-to-gate total staff

5 618

Total IFR flight-hours controlled by ANSP ('000)

1 379

IFR airport movements controlled by ANSP ('000)

2 001

ACE 2012 Benchmarking Report

388 000 km

95
1 717

Minutes of ATFM delays ('000)

Size
Size of controlled airspace:

656

ATCOs in OPS

En-route sectors

1 UAC (Karlsruhe)
1 ACC/UAC/APP (Mnchen)
2 ACCs/APPs (Bremen, Langen)
1 ACC (co-located with Maastricht UAC) for OAT in upper
airspace in North-Western Germany
16 TWRs (Berlin Tempelhof closed in Nov.08)

117
2 207

154

DHMI, Turkey
General Directorate of State Airports Authority
www.dhmi.gov.tr

Institutional arrangements and links (2014)

Status (2014)
- Autonomous State body
- 100% State-owned

Ministry of Transport,
Maritime Affairs and
Communication
(M of TMAC)

Ministry of Defence
(M of D)

National Supervisory Authority (NSA):


Not applicable since Turkey is not bound by SES Regulations

Body responsible for:


Safety Regulation
Directorate General of Civil Aviation

Airspace Regulation
General Directorate of DHMI
DHMI

Directorate
General of
Civil Aviation

ANS
Division

Airports
Division

Civil Military
Co-ordination
Group

Economic Regulation
General Directorate of DHMI

Corporate governance structure (2014)


SUPERVISORY BOARD (6 members)
Chairman + 5 members
3 members represent DHMI,
2 represent the M of TMAC,
1 represents the Turkish Treasury.
The Chairman is the CEO.

Prime
Ministry
Senior
Audit
Board

DHMI (2014)

CHAIRMAN OF THE SUPERVISORY BOARD:


Mr. Orhan Birdal

DIRECTOR GENERAL (CEO):

EXECUTIVE BOARD
Director General (CEO) + 3 Deputy Director
Generals and affiliated units.
CEO is appointed by the M of TMAC.

Mr. Orhan Birdal

DIRECTOR ANS DIVISION:


Mr. Mustafa Kili

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

- DHMI is responsible for the administration of 47 State


Airports. ATS services are provided by DHMI in 52 Airports

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

398

Gate-to-gate total costs (M)

395

Gate-to-gate ATM/CNS provision costs (M)

352

Gate-to-gate total ATM/CNS assets(M)

631

Gate-to-gate ANS total capex (M)


ATCOs in OPS
Gate-to-gate total staff

977

IFR airport movements controlled by ANSP ('000)

960

ACE 2012 Benchmarking Report

982 000 km

5 407
948

Minutes of ATFM delays ('000)

Size
Size of controlled airspace:

51

Total IFR flight-hours controlled by ANSP ('000)

En-route sectors

2 ACCs (Ankara, Istanbul)


31 APPs
40 TWRs
2 FICs/RCCs
45 AIS/ARO
43 SAR sub-center units

22
634

155

DSNA, France
Directorate of Air Navigation Services
www.aviation-civile.gouv.fr

Institutional arrangements and links (2014)


Ministry
of Defence
(M of D)

Ministry in charge of Transport


(M of T)

Air Forces

General Directorate for Civil Aviation


(DGAC)

Military Air
Navigation
Directorate

Status (2014)
- DSNA is a division of DGAC
- 100% State-owned

National Supervisory Authority (NSA):

Directorate
for
Airspace

Air
Transport
Directorate
(DTA)

Air Navigation
Services
Directorate
(DSNA)

Civil Aviation
Safety
Directorate
(DSAC)
!NSA

Directorate for Civil Aviation Safety (DSAC)

Body responsible for:


Safety Regulation
Air Transport Directorate (DTA)

Airspace Regulation
Air Transport Directorate (DTA)
Direction de la circulation arienne militaire (DIRCAM)

Economic Regulation
Air Transport Directorate (DTA)
Operation Department (DO)
ACCs, APPs & TWRs, AIS

Technical Department
Operational Systems, R&D

Corporate governance structure (2014)

DSNA (2014)

Minister in charge of Transport


Director General for Civil Aviation

DIRECTOR OF DSNA:

EXECUTIVE BOARD (DSNA)


Director of DSNA
Deputy Director for Finance
Deputy Director for Planning & Strategy
Deputy Director for Human Resources
Director of Operation Department (DO)
Director of Technical Department (DTI)

M. Georges

DIRECTOR OF OPERATION DEPARTEMENT (DO):


M. Bruneau

DIRECTOR OF TECHNICAL DEPARTEMENT (DTI):


P. Planchon

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

- Delegation of airspace to Skyguide and Jersey

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

1 433

Gate-to-gate total costs (M)

1 435

Gate-to-gate ATM/CNS provision costs (M)

1 165

Gate-to-gate total ATM/CNS assets(M)

754

Gate-to-gate ANS total capex (M)

146

ATCOs in OPS

2 766

Gate-to-gate total staff

7 926

Total IFR flight-hours controlled by ANSP ('000)

2 117

IFR airport movements controlled by ANSP ('000)

1 922

En-route sectors
Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

5 ACCs
12 APPs/TWRs (i.e. Paris Orly, Paris CDG, Marseille, Lyon,
Nice, Bordeaux, Toulouse, Clermont Ferrand, Montpellier,
Strasbourg, Ble-Mulhouse, Nantes)
69 TWRs

Size
Size of controlled airspace:

1 010 000 km

100
2 055

156

EANS, Estonia
Estonian Air Navigation Services
www.eans.ee

Institutional arrangements and links (2014)

Status (2014)
- Joint-stock company as of 1998
- 100% State-owned

Government

National Supervisory Authority (NSA):


Ministry of Economic
Affairs and
Communications

Civil Aviation Administration

Ministry of
Finance

Body responsible for:


Safety Regulation
Government of the Republic of Estonia
Safety Supervision is done by the Civil Aviation Administration
(CAA)

Civil
Aviation
Administration
!NSA

Airspace Regulation
Government of the Republic of Estonia

Economic Regulation
Government of the Republic of Estonia
(Ministry of Economic Affairs and Communications & Ministry
of Finance)

EANS

Corporate governance structure (2014)

EANS (2014)

SUPERVISORY BOARD (6 members)


Chairman + 5 members
Members: 3 appointed by M of EC of which 1 is elected
Chairman by the members of the Supervisory Board;
3 appointed by M of F.

CHAIRMAN OF THE SUPERVISORY BOARD:


Andres Uusma

MANAGEMENT BOARD (2 members)


CEO + 1 member
CEO appointed by the Supervisory Board

CHAIRMAN OF THE MANAGEMENT BOARD & CEO:


Tanel Rautits

Operational ATS units:

Scope of services
GAT
OAT
-

Upper Airspace
Lower Airspace

Oceanic ANS
MET

1 ACC (Tallinn)
2 APPs/TWRs (Tallinn, Tartu)

Tech. serv. (NAV/COMM/SUR), Aeronautical info serv.


Consultancy services
Control Tallinn Aerodrome
Estonia is not member of EUROCONTROL
Estonia belongs to IFPS zone

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

18

Gate-to-gate total costs (M)

14

Gate-to-gate ATM/CNS provision costs (M)

14

Gate-to-gate total ATM/CNS assets(M)

18

Gate-to-gate ANS total capex (M)


ATCOs in OPS
Gate-to-gate total staff

46
156
66

IFR airport movements controlled by ANSP ('000)

47

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

77 102 km

Total IFR flight-hours controlled by ANSP ('000)

En-route sectors

Size
Size of controlled airspace:

3
20

157

ENAV, Italy
Company for Air Navigation Services
www.enav.it

Institutional arrangements and links (2014)

Status (2014)
- Joint-Stock Company
- 100% State-owned by Ministry of Economy and Finance

Government

National Supervisory Authority (NSA):


National
Agency
for Flight
Safety
(ANSV)

Ministry of
Infrastructure
and Transport
(Dept. Civil
Aviation)

Italian Civil
Aviation Authority
(ENAC)
!NSA

Italian Civil Aviation Authority (ENAC)

Ministry of
Economy and
Finance

Ministry of
Defence

Body responsible for:


Safety Regulation
Italian Civil Aviation Authority (ENAC) and Ministry of
Infrastructure and Transport (M of IT)

Italian
Air Force

Company for Air


Navigation
Services
(ENAV S.p.A.)

Airspace Regulation
Italian Civil Aviation Authority (ENAC)

Economic Regulation
Operational
Co-ordination
Committee
(CCO)

Ministry of Infrastructure and Transport and ENAC review


annually ANS charges in co-operation with Ministry of
Economy and Finance and Ministry of Defence

Corporate governance structure (2014)

CHIEF EXECUTIVE OFFICER


The CEO has been appointed by the
Ministry of Economy and Finance in consultation with
the Ministry of Infrastructure and Transport.
Reciprocal obligations between the Ministry of
Infrastructure and Transport and ENAV are regulated
through programme contract and service contract.

Upper Airspace
Lower Airspace

Oceanic ANS
MET

- Aeronautical Information service


- Training and licensing of ATCOs
- R&D consultancy services
- Aerodrome weather services, ATM and CNS
- Flight inspection

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

774

Gate-to-gate total costs (M)

719

Gate-to-gate ATM/CNS provision costs (M)

638

Gate-to-gate total ATM/CNS assets(M)


Gate-to-gate ANS total capex (M)

Gate-to-gate total staff

2 967

Total IFR flight-hours controlled by ANSP ('000)

1 028

IFR airport movements controlled by ANSP ('000)

1 106

ACE 2012 Benchmarking Report

DIRECTOR GENERAL:
Massimo Bellizzi

4 ACCs (Milan, Padua, Rome, Brindisi)


18 APPs co-located within TWR units + 1 APP stand-alone + 4
APPs co-located within ACC units
28 TWRs (including 16 low traffic airports which are not
included in ACE data analysis)
11 AFISs (low traffic airports not included in ACE data analysis)

Size
Size of controlled airspace:

733 000 km

112
1 439

Minutes of ATFM delays ('000)

Massimo Garbini

1 008

ATCOs in OPS

En-route sectors

CHIEF EXECUTIVE OFFICER (CEO):

Operational ATS units:

Scope of services
GAT
OAT

ENAV (2014)

61
104

158

Finavia, Finland
Finavia
www.finavia.fi

Institutional arrangements and links (2014)

Status (2014)
- Public Limited Company
- Integrated civil/military ANSP
- 100% State-owned

COUNCIL of STATE
(Government)
Chaired by the Prime Minister

National Supervisory Authority (NSA):


Finnish Transport Safety Agency

Ministry of Transport and


Communication (M of TC)

Body responsible for:


Safety Regulation
Finnish Transport Safety Agency

Finnish
Transport
Safety Agency
!NSA

Finavia
Business
areas

Group
Services

HR, Group Legal,


Communications,
Internal Audit

Marketing

Airspace Regulation
Finnish Transport Safety Agency

Economic Regulation
Finnish Transport Safety Agency

Helsinki
Airport

Passenger
Services

Airport
Network

Air
Navigation
Services

Corporate governance structure (2014)

Finavia (2014)

The BOARD (7 members)


Chairman + 6 members (1 member represents staff)
All members are appointed
by the General Meeting of Shareholders.
Chief Executive Officer of Finavia is not a member of the Board.

CHAIRMAN OF THE FINAVIA BOARD:


Soili Suonoja

PRESIDENT AND CEO:


Kari Savolainen
President and CEO

VICE PRESIDENT - AIR NAVIGATION SERVICES:


Raine Luojus

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

- Finavia owns and operates 25 airports


- Delegation of ATS in certain areas to LFV and Avinor
- 195 ATCOs in OPS reported below do not include those
providing services to military OAT flights

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

58

Gate-to-gate total costs (M)

70

Gate-to-gate ATM/CNS provision costs (M)

63

Gate-to-gate total ATM/CNS assets(M)

46

Gate-to-gate ANS total capex (M)

192

Gate-to-gate total staff

429

Total IFR flight-hours controlled by ANSP ('000)

115

IFR airport movements controlled by ANSP ('000)

248

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

Size
Size of controlled airspace:

411 000 km

ATCOs in OPS

En-route sectors

1 ACC (Tampere)
5 APPs/TWRs (Helsinki, Jyvskyl, Kuopio, TamperePirkkala, Rovaniemi)
3 Mil-APPs/TWRs (Halli, Kauhava, Utti)
10 TWRs
1 General Aviation Airport (Malmi)
6 AFISs (Enonteki, Kittil, Kajaani, Savonlinna, Kuusamo,
Varkaus)

5
46

159

HCAA, Greece
Hellenic Civil Aviation Authority
www.hcaa.gr

Institutional arrangements and links (2014)


Ministry of
Defence
(MOD)

Status (2014)
- State body
- 100% State-owned

Ministry of Infrastructure,
Transport & Networks

National Supervisory Authority (NSA):


Hellenic Air Navigation Supervisory Authority (HANSA)

Hellenic
National
Meteorological
Service
(HNMS)

Hellenic Air
Navigation
Supervisory
Authority
(HANSA)

Hellenic Civil Aviation


Authority (HCAA)
General
Directorate
ANS Provider

Administrative
Support
General
Directorate

Air
Transport
General
Directorate

Body responsible for:


Safety Regulation
Hellenic Civil Aviation Authority

Airspace Regulation
Air Navigation Airspace Committee

ANS
Regulatory
Division

Air Navigation
Airspace Committee
(Reps from HCAA,
HAF and
General Staff)

Security
Division

Civil Aviation
Training
Centre

Environmental
Protection

Economic Regulation
Ministry of Infrastructure, Transport & Networks and HCAA for
charges
Ministry of Finance for HCAA Budget

Corporate governance structure (2014)

HCAA (2014)
GOVERNOR:

Minister of Infrastructure, Transport & Networks

D. Koukis

DEPUTY GOVERNORS:

HCAA Governor and


two HCAA Deputy Governors
appointed by the Minister

G. Nanidis
V. Alevras

DIRECTOR GENERAL OF AIR NAVIGATION:

Three Directors General, one of which is


responsible for central and regional HCAA/ANS units

G. Kontogiannis

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

177

Gate-to-gate total costs (M)

174

Gate-to-gate ATM/CNS provision costs (M)

154

Gate-to-gate total ATM/CNS assets(M)

130

Gate-to-gate ANS total capex (M)


ATCOs in OPS
Gate-to-gate total staff

480

IFR airport movements controlled by ANSP ('000)

149

ACE 2012 Benchmarking Report

537 000 km

1 786
461

Minutes of ATFM delays ('000)

Size
Size of controlled airspace:

Total IFR flight-hours controlled by ANSP ('000)

En-route sectors

1 ACC
16 APPs
18 TWRs
15 AFISs

12
206

160

HungaroControl, Hungary
Hungarian Air Navigation Services
www.hungarocontrol.hu

Institutional arrangements and links (2014)


National
Airspace
Coordination
Committee
(NACC)

Ministry of
National
Development

Ministry of Defence
(MoD)

Status (2014)
- HungaroControl was set up on January 1st 2002
- Registered as Private Limited Company as of 22 November
2006
- Operates as a Private Limited Company as of 1st January
2007
- 100% State-owned

National Supervisory Authority (NSA):


Aviation Authority
National Transport
Authority

Body responsible for:


Safety Regulation

HungaroControl
Pte. Ltd. Co.

Ministry of National Development

Airspace Regulation

Aviation
Authority
! NSA

Govt., Ministry of National Development

Economic Regulation
Govt., Ministry of National Development

Corporate governance structure (2014)

HungaroControl (2014)

SHAREHOLDER
The Minister responsible for transport exercises the rights
of the shareholder on behalf of the State

CHIEF EXECUTIVE OFFICER


The CEO is appointed by the Minister
responsible for transport

CHIEF EXECUTIVE OFFICER (CEO):


Kornl Szepessy

SUPERVISORY BOARD
President + 5 members
The President and all members are appointed
by the Minister responsible for transport
2 members are representatives of the employees

CHAIRMAN OF THE SUPERVISORY BOARD:


Zoltn Schvb

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

- Entry Point Central Ltd. (49% HungaroControl owned


company) provides training activities, e.g. initial ATM training
courses, development training (OJTI, Assessor) courses,
English language courses.
- HungaroControl provides ATM unit training.

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

111

Gate-to-gate total costs (M)

102

Gate-to-gate ATM/CNS provision costs (M)

91

Gate-to-gate total ATM/CNS assets(M)

74

Gate-to-gate ANS total capex (M)

21

ATCOs in OPS

166

Gate-to-gate total staff

710

Total IFR flight-hours controlled by ANSP ('000)

185

IFR airport movements controlled by ANSP ('000)

Size
Size of controlled airspace:

93 000 km

88

En-route sectors

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

1 ACC (Budapest)
1 APP (Budapest)
1 TWR (Budapest)
2 AFISs (Srmellk/Balaton, Debrecen)

161

IAA, Ireland
Irish Aviation Authority
www.iaa.ie

Institutional arrangements and links (2014)


Department of
Transport, Tourism
and Sport

Department
of Defence

Department of
Public Expenditure
and Reform

Status (2014)
- Commercial company as of 1994 governed by Companies
Acts, 1963 to 2009
- 100% State-owned (Department of Public Expenditure and
Reform) - IAA receives no funding or loans from the exchequer

National Supervisory Authority (NSA):


Safety Regulation Division
Standing Civil
Military ANS
Committee

Body responsible for:


Safety Regulation
IAA Safety Regulation Division

Airspace Regulation
Irish Aviation Authority
Safety
Regulation
Division
!NSA

Operational
Division

Commission for
Aviation Regulation

Technical
Division

IAA Safety Regulation Division

Economic Regulation
NSA responsible for Economic Regulation in the context of enroute charges
Commission for Aviation Regulation (established under the
Aviation Regulation Act in 2001)
The Act requires the Commission to make a determination
specifying the maximum levels of terminal navigation charges

Corporate governance structure (2014)

IAA (2014)
CHAIRMAN OF THE BOARD OF AUTHORITY:
Anne Nolan

BOARD OF THE AUTHORITY (9 members)


Chairman + CEO + 7 members

CHIEF EXECUTIVE OFFICER:


Eamonn Brennan

DIRECTOR OF OPERATIONS DIVISION:


EXECUTIVE BOARD (Senior Management Board)
(8 members)
CEO + 7 senior executives

Peter Kearney

DIRECTOR OF TECHNICAL DIVISION:


Philip Hughes

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

136

Gate-to-gate total costs (M)

133

Gate-to-gate ATM/CNS provision costs (M)

113

Gate-to-gate total ATM/CNS assets(M)


Gate-to-gate ANS total capex (M)

Gate-to-gate total staff

481

Total IFR flight-hours controlled by ANSP ('000)

264

IFR airport movements controlled by ANSP ('000)

207

ACE 2012 Benchmarking Report

457 000 km

6
204

Minutes of ATFM delays ('000)

Size
Size of controlled airspace:

89

ATCOs in OPS

En-route sectors

2 ACCs (Dublin, Shannon)


3 APPs (Dublin, Shannon, Cork)
3 TWRs (Dublin, Shannon, Cork)

11
8

162

LFV, Sweden
LFV, Swedish Air Navigation Services
www.lfv.se

Institutional arrangements and links (2014)

Status (2014)
- Public Enterprise
- 100% State-owned

Parliament

National Supervisory Authority (NSA):


Swedish Transport Agency
Ministry of Enterprise,
Energy and Communications
(M of EEC)

Ministry
of Defence

Body responsible for:


Safety Regulation
Swedish Transport Agency

Swedish
Transport
Agency
!NSA

Airspace Regulation
Swedish Transport Agency

Economic Regulation
Swedish Transport Agency

LFV

Swedish
Armed
Forces

Production Production
Terminal
En-route

Products
Business LFV holding
&
Support (Subsidiaries)
Services

Swedavia

Corporate governance structure (2014)


BOARD OF DIRECTORS (9 members)
Chairman + DG + 7 members
7 members are appointed by the Government
(Chairman + DG + 5 members);
2 members are appointed by Trade Unions.

CHAIRMAN OF THE BOARD OF DIRECTORS:


Jan Olson

DIRECTOR GENERAL:

EXECUTIVE BOARD (9 members)


DG + 8 members
DG is appointed by the Government

Olle Sundin

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

261

Gate-to-gate total costs (M)

254

Gate-to-gate ATM/CNS provision costs (M)

245

Gate-to-gate total ATM/CNS assets(M)

159

Gate-to-gate ANS total capex (M)


ATCOs in OPS
Gate-to-gate total staff

2 ACCs (Stockholm and Malm)


26 APPs (2 APPs combined with ACCs + 24 APPs combined
with TWRs)
31 TWRs (one of these only first half of 2012)
2 AFISs

Size
Size of controlled airspace:

626 000 km

10
509
1 063

Total IFR flight-hours controlled by ANSP ('000)

418

IFR airport movements controlled by ANSP ('000)

509

En-route sectors

22

Minutes of ATFM delays ('000)

77

ACE 2012 Benchmarking Report

LFV (2014)

163

LGS, Latvia
SJSC Latvijas Gaisa Satiksme
www.lgs.lv

Institutional arrangements and links (2014)

Status (2014)
- Joint-stock company since 1997
- 100% State-owned (Ministry of Transport)

Ministry of Transport
of the Republic of Latvia
(M of T)
! NSA

National Supervisory Authority (NSA):


- MoT (for policy and economic issues)
- Civil Aviation Agency (for safety, operational
aspects, certification and licensing issues)

Air Transport
Department

Body responsible for:


Safety Regulation
Civil Aviation Agency

Airspace Regulation
Civil Aviation Agency
Civil Aviation
Agency
! NSA

LGS

Economic Regulation

Airports

Air Transport Department and Cabinet of Ministers


(Government)

Corporate governance structure (2014)

LGS (2014)

SHAREHOLDER'S REPRESENTATIVE:

SHAREHOLDER Meeting (M of T).

Dzineta Innusa (Ministry of Transport, Deputy State Secretary


for Legal and Administrative Affairs)

MANAGEMENT BOARD (5 members)


Chairman of the Board + 4 members
All appointed by the shareholder (M of T).

CHAIRMAN OF THE BOARD:


Davids Taurins

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

- ATC services delegated to Latvia by Lithuania over a part of


the Baltic Sea

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

25

Gate-to-gate total costs (M)

26

Gate-to-gate ATM/CNS provision costs (M)

22

Gate-to-gate total ATM/CNS assets(M)

21

Gate-to-gate ANS total capex (M)


ATCOs in OPS
Gate-to-gate total staff

*FIC for western part of Riga FIR

Size
Size of controlled airspace:

95 300 km

4
81
362

Total IFR flight-hours controlled by ANSP ('000)

73

IFR airport movements controlled by ANSP ('000)

68

En-route sectors

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

1 ACC (Riga)
2 APPs (Riga, Liepaja)
2 TWRs (Riga, Liepaja)
1 AFIS/FIC* (Liepaja)

164

LPS, Slovak Republic


Letov Prevdzkov Sluby Slovenskej Republiky
www.lps.sk

Institutional arrangements and links (2014)


Ministry of Transport,
Construction and
Regional Development
(MoT)
!NSA
Directorate General
of Civil Aviation
and Water Transport

Status (2014)
- State-owned enterprise as of January 2000
- 100% State-owned

National Supervisory Authority (NSA):


Transport Authority

Inter-Ministerial
Commission
DefenceTransports

Ministry of
Defence
(M of D)

Body responsible for:


Safety Regulation
Ministry of Transport, Construction and Regional Development

Division
of Civil Aviation

Airspace Regulation
Ministry of Transport, Construction and Regional Development

Economic Regulation
Transport
Authority
!NSA

Airports

Air Traffic Services


of the Slovak
Republic (LPS SR)

Ministry of Transport, Construction and Regional Development


and other State bodies

Corporate governance structure (2014)

LPS (2014)

SUPERVISORY BOARD (9 members)


Chairman + 8 members
Members represent: 5 MoT,
3 staff reps., 1 trade union association rep.

CHAIRPERSON OF THE SUPERVISORY BOARD:


Martin atlo

DIRECTOR GENERAL (CEO):

EXECUTIVE BOARD (10 members)


CEO + 9 members
The CEO is appointed by the MoT.

Miroslav Barto

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

With effect from 10 February 2014, the OAT unit was shifted
from LPS to the supervision of Ministry of Defence.

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

63

Gate-to-gate total costs (M)

62

Gate-to-gate ATM/CNS provision costs (M)

56

Gate-to-gate total ATM/CNS assets(M)

63

Gate-to-gate ANS total capex (M)

35

ATCOs in OPS
Gate-to-gate total staff

Size
Size of controlled airspace:

48 700 km

94
469

Total IFR flight-hours controlled by ANSP ('000)

84

IFR airport movements controlled by ANSP ('000)

29

En-route sectors

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

1 ACC (Bratislava)
2 APPs (Bratislava, Kosice)
5 TWRs (Bratislava, Kosice, Piestany, Poprad and Zilina)
1 Central ATS Reporting Office (Bratislava)

165

LVNL, Netherlands
Luchtverkeersleiding Nederland
www.lvnl.nl

Institutional arrangements and links (2014)

Status (2014)
- Corporate Entity as of 1993 (by Air Traffic Law)
- 100% State-owned

Ministry of Infrastructure and the Environment (MIE)

National Supervisory Authority (NSA):


Directorate - General
for Mobility and Transport
(DGB)

The Human Environment and


Transport Inspectorate
(ILenT)
!NSA

The Human Environment and Transport Inspectorate (ILenT)

Body responsible for:


Safety Regulation
Directorate-General for Mobility and Transport (DGB)

Airspace Regulation
Directorate-General for Mobility and Transport (DGB)

Economic Regulation
Directorate-General for Mobility and Transport (DGB)
LVNL

Corporate governance structure (2014)

LVNL (2014)

SUPERVISORY DIRECTORS BOARD (6 members)


Chairman + 5 members + 1 observer
Members comprise representatives from: Ministry of Defence,
and members nominated by Dutch scheduled airlines (KLM),
Dutch charter airlines (Transavia) and Dutch airports
(Amsterdam Schiphol)

EXECUTIVE BOARD (2 members)


Chairman + 1 member
Executive Board of LVNL is appointed by the MIE,
on the recommendation of the Supervisory Board.

Upper Airspace
Lower Airspace

Dr.ir. P. Riemens (CEO)

Operational ATS units:


Oceanic ANS
MET

- Controls lower airspace up to FL 245

Gate-to-gate total revenues (M)

233

Gate-to-gate total costs (M)

215

Gate-to-gate ATM/CNS provision costs (M)

163

Gate-to-gate total ATM/CNS assets(M)

104

Gate-to-gate ANS total capex (M)

198

Gate-to-gate total staff

885

Total IFR flight-hours controlled by ANSP ('000)

150

IFR airport movements controlled by ANSP ('000)

483

ACE 2012 Benchmarking Report

Size
Size of controlled airspace:

52 200 km

17

ATCOs in OPS

Minutes of ATFM delays ('000)

1 ACC (Amsterdam)
3 APPs (Schiphol, Eelde, Beek)
4 TWRs (Schiphol, Rotterdam, Eelde, Beek)
- New Millingen ACC (Military ACC) is not included in ACE
data analysis
- Rotterdam APP has been located in Schiphol since 2002

Key financial and operational figures (ACE 2012)

En-route sectors

G.J.N.H. Cerfontaine

CHAIRMAN OF THE EXECUTIVE BOARD (CEO):

Scope of services
GAT
OAT

CHAIRMAN OF THE SUPERVISORY BOARD:

5
399

166

MATS, Malta
Malta Air Traffic Services Limited
www.maltats.com

Institutional arrangements and links (2014)

Ministry for Tourism


(MT)

Status (2014)
- Malta Air Traffic Services Ltd (Reg. no. C27965) is a fully
Government owned company. MATS has been operating as
the sole ANSP for Malta since the 1st January 2002

Ministry for Transport


and Infrastructure
(MTI)

National Supervisory Authority (NSA):


Civil Aviation Directorate Malta (CADM)

Civil Aviation
Directorate
! NSA

Body responsible for:


Safety Regulation
Civil Aviation Directorate

Airspace Regulation
Civil Aviation Directorate

Malta Air Traffic Services Ltd


(MATS)

Economic Regulation
Civil Aviation Directorate

Corporate governance structure (2014)

MATS (2014)

BOARD of DIRECTORS (5 members)


Chairman + 4 Directors
Members are appointed by the Government,
representing the MT.

CHAIRMAN OF BOARD OF DIRECTORS:


Maj. Vanni Ganado

CEO:
Brig. Carmel Vassallo

The Board of Directors appoints the CEO.

HEAD OF ATS DIVISION:


Robert Sant

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

1 ACC/APP (Malta)
1 TWR/APP (Luqa)

- MATS controls portions of airspace delegated


to Malta ACC by Rome ACC

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

19

Gate-to-gate total costs (M)

15

Gate-to-gate ATM/CNS provision costs (M)

14

Gate-to-gate total ATM/CNS assets(M)

Gate-to-gate ANS total capex (M)

ATCOs in OPS
Gate-to-gate total staff

231 000 km

48
145

Total IFR flight-hours controlled by ANSP ('000)

61

IFR airport movements controlled by ANSP ('000)

33

En-route sectors

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

Size
Size of controlled airspace:

167

M-NAV, Former Yugoslav Republic of Macedonia


Air Navigation Services
www.mnavigation.mk

Institutional arrangements and links (2014)

Status (2014)
- Joint-stock company
- 100% State-owned

Government

National Supervisory Authority (NSA):


Ministry of
Defence

Ministry of Transport

Civil Aviation Agency (CAA)

Body responsible for:


Safety Regulation
Safety Dept. of Civil Aviation Agency

Public
Enterprise
for Airport
Services

Civil Aviation Agency (CAA)


! NSA

Air Force
and Defence

Airspace Regulation
Civil-military Aviation Committee

Economic Regulation
Government, Civil Aviation Agency
M-NAV

Corporate governance structure (2014)

M-NAV (2014)
CHAIRMAN OF THE SUPERVISORY BOARD:

SUPERVISORY BOARD
(3 members appointed by the Government)

Ilir Mehmedi

DIRECTOR GENERAL OF CAA:


Dejan Mojsoski

MANAGEMENT BOARD
(3 executive directors appointed by the Government)

DIRECTOR OF ANS DEPARTEMENT:


Nikolet Tagarinski

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

10

Gate-to-gate total costs (M)

10

Gate-to-gate ATM/CNS provision costs (M)

Gate-to-gate total ATM/CNS assets(M)

Gate-to-gate ANS total capex (M)

ATCOs in OPS
Gate-to-gate total staff

Size
Size of controlled airspace:

24 700 km

61
273

Total IFR flight-hours controlled by ANSP ('000)

18

IFR airport movements controlled by ANSP ('000)

11

En-route sectors

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

1 ACC (Skopje)
2 APPs (Skopje and Ohrid)
2 TWRs (Skopje and Ohrid)
1 AFIS (Skopje)

168

MoldATSA, Moldova
Moldavian Air Traffic Services Authority
www.moldatsa.md

Institutional arrangements and links (2014)


Government

Ministry of
Economy

Status (2014)
- State enterprise since 1994 (by Government Regulation Nr.3
from 12.01.1994)
- 100% State-owned

National Supervisory Authority (NSA):

Ministry of Transport
and Road
Infrastructure

Ministry of
Defence

Civil Aviation Administration (CAA)

Body responsible for:


Safety Regulation
Ministry of Transport and Road Infrastructure

Civil Aviation
Administration
(CAA)
! NSA

Airspace Regulation
Ministry of Transport and Road Infrastructure

Economic Regulation
Ministry of Transport and Road Infrastructure

Airport
Operator

Aircraft
Operator

MoldATSA

Corporate governance structure (2014)

MoldATSA (2014)

SUPERVISORY BOARD (7 members)


Chairman + 6 members
All members are appointed by the Ministry of Transport and
Road Infrastructure
Members represent Ministry of Transport and Road
Infrastructure (2), MoldATSA management (1),
Ministry of Finance (2),
Ministry of Economy (2)

CHAIRMAN OF THE SUPERVISORY BOARD:


Vladimir Cebotari

DIRECTOR GENERAL (CEO):


Petru Erhan

Management Board:
Director General MoldATSA

HEAD OF ATM DIVISION:


Sergei Fedoseev

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

11

Gate-to-gate total costs (M)

11

Gate-to-gate ATM/CNS provision costs (M)

Gate-to-gate total ATM/CNS assets(M)

Gate-to-gate ANS total capex (M)

ATCOs in OPS
Gate-to-gate total staff

Size
Size of controlled airspace:

33 900 km

57
322

Total IFR flight-hours controlled by ANSP ('000)

16

IFR airport movements controlled by ANSP ('000)

16

En-route sectors

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

1 ACC (Chisinau)
1 APP (Chisinau)
4 TWRs (Chisinau, Balti, Cahul, Marculesti)

169

MUAC, Maastricht
Maastricht Upper Area Control Centre
EUROCONTROL

www.eurocontrol.int

Institutional arrangements and links (2014)


Four States
National
Supervisory
Committee
!NSA

Permanent
Commission of
EUROCONTROL

(including
representatives
of the 4 States
NSAs)

EUROCONTROL
Agency

Status (2014)
- EUROCONTROL: International Organisation established
under the EUROCONTROL Convention of 13.12.1960 and
amended on 12.2.1981. At the request of the Benelux States
and Germany, MUAC is operated as a EUROCONTROL
Agencys Service according to the Maastricht Agreements of
25.11.1986

EUROCONTROL
Committee of
Management (CoM)

National Supervisory Authority (NSA):


Four States' National Supervisory Committee

Body responsible for:


Safety Regulation

Maastricht Upper
Area Control Centre
(MUAC)

Maastricht Co-ordination
Group (MCG)
Senior officials from
Belgium, The Netherlands,
Luxembourg and Germany.

Maastricht Agreements Art. 1.2: each of the 4 States retains


its competence and obligations in respect of regulations

Airspace Regulation
The MCG determines a common position for the 4 States in
all matters relating to the operation of ATS by MUAC
concerning, inter alia, airspace organisation and sectorisation

Economic Regulation
Financial arrangements for the exploitation of MUAC are
adopted by the Committee of Management. EUROCONTROL
DG seeks approval of the budget, which contains a special
budgetary Annex for MUAC, with the Permanent Commission

Corporate governance structure (2014)

MUAC (2014)

Permanent Commission
of EUROCONTROL

DIRECTOR GENERAL OF EUROCONTROL:

Director General of
EUROCONTROL

CoM

Director of MUAC

MCG

Frank Brenner

DIRECTOR OF MUAC:
Jac Jansen

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

1 ACC (Maastricht)

- Controls GAT in the upper airspace (>FL245) above Benelux


and North-Western Germany
- A German ATC unit responsible for handling OAT above
North-Western Germany and managed by the DFS is colocated at MUAC

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)
Gate-to-gate total costs (M)

141

Gate-to-gate ATM/CNS provision costs (M)

141

Gate-to-gate total ATM/CNS assets(M)


Gate-to-gate ANS total capex (M)

9
247

Gate-to-gate total staff

646

IFR airport movements controlled by ANSP ('000)

560
n/appl

En-route sectors

20

Minutes of ATFM delays ('000)

59

ACE 2012 Benchmarking Report

260 000 km

69

ATCOs in OPS

Total IFR flight-hours controlled by ANSP ('000)

Size
Size of controlled airspace:

170

NATA Albania, Albania


National Air Traffic Agency
http://www.albcontrol.com.al/

Institutional arrangements and links (2014)

Status (2014)
- Since May 1999 NATA, now ALBCONTROL, is a joint-stock
company
- 100% State owned

Ministry of Transport
and Infrastructure
(MT&I)

National Supervisory Authority (NSA):

Ministry of Economic
Development, Trade
and Entrepreneurship
(MEDTE)

Civil Aviation Agency (CAA)

Body responsible for:


Safety Regulation
MT&I and Civil Aviation Agency (CAA)

Civil Aviation Agency


(CAA)
! NSA

Airspace Regulation

ALBCONTROL
Air Navigation
Services of Albania

MT&I and Civil Aviation Agency (CAA)

Economic Regulation
Ministry of Economic Development, Trade and
Entrepreneurship (MEDTE)

Corporate governance structure (2014)

NATA Albania (2014)

SUPERVISORY BOARD (6 members)


Chairman + 5 members

CHAIRMAN OF SUPERVISORY BOARD:

All 6 members are nominated by the MEDTE.


2 members are proposed by the MEDTE, 2 members by the
MT&I and 2 members by the Ministry of Finance.

Genci Gjonaj

DIRECTOR GENERAL (CEO) OF ALBCONTROL:

MANAGEMENT BOARD (6 members)


Director General + 5 Head of Divisions

Belinda Balluku

HEAD OF THE ATS DEPARTMENT:

Director General is appointed by MEDTE


through the Supervisory Board of ALBCONTROL

Sokol Rui

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

21

Gate-to-gate total costs (M)

23

Gate-to-gate ATM/CNS provision costs (M)

21

Gate-to-gate total ATM/CNS assets(M)

42

Gate-to-gate ANS total capex (M)


ATCOs in OPS
Gate-to-gate total staff

56

IFR airport movements controlled by ANSP ('000)

21

ACE 2012 Benchmarking Report

36 000 km

309
41

Minutes of ATFM delays ('000)

Size
Size of controlled airspace:

Total IFR flight-hours controlled by ANSP ('000)

En-route sectors

1 ACC (Tirana)
1 APP (Tirana)
1 TWR (Tirana)
1 AFIS (Tirana)

4
12

171

NATS, United Kingdom


NATS Ltd
www.nats.co.uk

Institutional arrangements and links (2014)


Ministry of
Defence
(MoD)

Department
for Transport
(DfT)

Contract
for provision
of services

Private Owners
The
LHR
UK NATS
Airline
Airports
Employees
Group
Limited

UK CAA
!NSA

SRG
DAP
RPG

NATS Holdings Ltd

Status (2014)
- Public Private Partnership as of 2001
- 49% State-owned (Govt retains a Golden Share)
- 51% private-owned (42% by the Airline Group, 4% by LHR
Airports Limited and 5% by UK NATS employees)
- The Airline Group comprises 7 airlines: BA, Virgin Atlantic,
Lufthansa, EasyJet, Thomas Cook, Thomson Airways and
Monarch Airlines

National Supervisory Authority (NSA):


UK CAA

NATS Ltd

Body responsible for:


Safety Regulation
UK CAA, Safety Regulation Group (SRG)

NATS (En Route) Plc (NERL)


Regulated subsidiary for
En-route and Oceanic ANS

NATS (Services)
Limited (NSL)
Airport ANS
+ New Business

Airspace Regulation
UK CAA, Directorate of Airspace Policy (DAP)

Economic Regulation
UK CAA, Regulatory Policy Group (RPG) which sets charges
through a formula linked to the Retail Price Index (RPI) where
"RPI minus X" targets for En-route and Oceanic
Charges are usually set for 5 years at a time (although CP3
was set at 4 years to align with RP1)

Corporate governance structure (2014)


NATS BOARD OF DIRECTORS
(14 members)
Chairman + 13 members. Chairman is appointed
by the shareholders. Out of the 13 members,
10 are Non Executive Directors (6 appointed by the
Airline Group + 3 Partnership Directors appointed
by the Government + 1 appointed by LHR Airports Limited).
3 are Executive Directors - Chief Executive,
Finance Director, and Managing Director Operations.

NATS (2014)
CHAIRMAN OF THE NATS BOARD:
John Devaney

CEO of NATS:
Richard Deakin

MANAGING DIRECTOR, NATS SERVICES


NATS Executive

Senior Leadership Team, Operations

Paul Reid
Catherine Mason (from 1 April 2014)

Senior Leadership Team, Services

MANAGING DIRECTOR, NATS OPERATIONS


Martin Rolfe

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

939

Gate-to-gate total costs (M)

770

Gate-to-gate ATM/CNS provision costs (M)

760

Gate-to-gate total ATM/CNS assets(M)

957

Gate-to-gate ANS total capex (M)

137

ATCOs in OPS

1 423

Gate-to-gate total staff

4 426

Total IFR flight-hours controlled by ANSP ('000)

1 292

IFR airport movements controlled by ANSP ('000)

1 731

En-route sectors
Minutes of ATFM delays ('000)

1 OAC (Shanwick)
3 ACCs (London AC, London TC, Prestwick)
16 APPs
16 TWRs (including Gibraltar TWR)
2 AFISs

Size
Size of controlled airspace:

3 002 000 km

73
984
Continental: 882 000 km - Oceanic: 2 120 000 km

ACE 2012 Benchmarking Report

172

NAV Portugal, Portugal


Navegao Area de Portugal - NAV Portugal, E.P.E.
www.nav.pt

Institutional arrangements and links (2014)


Ministry of Finance
(M of F)

Ministry of Economy
& Employment
(MEE)

Status (2014)
- Public Entity Corporation as of December 1998
- 100% State-owned

National Supervisory Authority (NSA):


National Institute for Civil Aviation (INAC)

Body responsible for:


Safety Regulation

Aircraft Accident
Prevention and
Investigation
(GPIAA)

Secretary
of State

National Institute of Civil Aviation (INAC)

Airspace Regulation
INAC+FA (Portuguese Air Force) + NAV Portugal in close
permanent co-ordination

Economic Regulation
National Institute for
Civil Aviation (INAC)
!NSA

Airports of
Portugal
(ANA SA)

Air Navigation of Portugal

National Institute of Civil Aviation (INAC)

NAV Portugal E.P.E.

Corporate governance structure (2014)

NAV Portugal (2014)

BOARD OF ADMINISTRATION (3 members)


Chairman + 2 members

CHAIRMAN OF THE BOARD OF ADMINISTRATION:


Luis Ottolini Coimbra

All members are appointed by the MEE for a 3 year term.


Each member has executive functions within NAV Portugal.
Each member is responsible to supervise one or several NAV
Portugal Directorates and Advisory Bodies to the Board.
There are 7 Directorates and 3 Advisory Bodies.
NAV Portugal has also a Board of Auditors composed of 3
members who are appointed by MEE for a 3 year term.

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

117

Gate-to-gate total costs (M)

145

Gate-to-gate ATM/CNS provision costs (M)

127

Gate-to-gate total ATM/CNS assets(M)


Gate-to-gate ANS total capex (M)

Size
Size of controlled airspace:

5 845 000 km

6
214

Gate-to-gate total staff

721

Total IFR flight-hours controlled by ANSP ('000)

285

IFR airport movements controlled by ANSP ('000)

269

Minutes of ATFM delays ('000)

2 ACCs (Lisboa, Santa Maria)


8 APPs (Lisboa, Porto, Faro, Madeira, Santa Maria, Ponta
Delgada, Horta, Flores)
10 TWRs (Lisboa, Cascais, Porto, Faro, Funchal, Porto Santo,
Ponta Delgada, Santa Maria, Horta, Flores)

38

ATCOs in OPS

En-route sectors

Luis Ottolini Coimbra

Operational ATS units:

Scope of services
GAT
OAT

CEO:

7
390
Continental: 665 000 km - Oceanic: 5 180 000 km

ACE 2012 Benchmarking Report

173

NAVIAIR, Denmark
Air Navigation Services
www.naviair.dk

Institutional arrangements and links (2014)

Status (2014)
- Company owned by the state
- 100% State-owned

Ministry of Transport
(MoT)

National Supervisory Authority (NSA):


Danish Transport Authority (Trafikstyrelsen)

Body responsible for:


Safety Regulation
Accident
Investigation Board
(AIB)

Danish CAA
(Trafikstyrelsen)
!NSA

Danish Transport Authority (Trafikstyrelsen)


Air Navigation
Service (NAVIAIR)

Airspace Regulation
Danish Transport Authority (Trafikstyrelsen)

Economic Regulation
Danish Transport Authority (Trafikstyrelsen)
Bornholm
Airport

Corporate governance structure (2014)

NAVIAIR (2014)

BOARD OF DIRECTORS
1 Chairman + 7 Members
(three members elected by the employees)

CHAIRMAN OF BOARD OF DIRECTORS


Anne Birgitte Lundholt

EXECUTIVE BOARD (2 members)


CEO + CFO
The CEO and CFO are appointed by the Board of Directors.

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Note: ANS Greenland upper airspace is delegated to Isavia


and NAV Canada

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

120

Gate-to-gate total costs (M)

114

Gate-to-gate ATM/CNS provision costs (M)

113

Gate-to-gate total ATM/CNS assets(M)

156

Gate-to-gate ANS total capex (M)

195

Gate-to-gate total staff

673

Total IFR flight-hours controlled by ANSP ('000)

201

IFR airport movements controlled by ANSP ('000)

326

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

(Excluding Greenland)
1 ACC (Copenhagen)
6 APPs/TWRs ( Kastrup, Roskilde, Rnne, Billund, Aarhus,
Aalborg)
1 AFIS (Vagar)

Size
Size of controlled airspace:

158 000 km

14

ATCOs in OPS

En-route sectors

Morten Dambk

Operational ATS units:

Scope of services
GAT
OAT

CHIEF EXECUTIVE OFFICER (CEO):

7
10

174

Oro Navigacija, Lithuania


State Enterprise Oro Navigacija
www.ans.lt

Institutional arrangements and links (2014)

Status (2014)
- Since July 2001
- 100% State-owned Enterprise (SOE)

Ministry of Transport
and Communications
(M of TC)

National Supervisory Authority (NSA):


Civil Aviation Administration

Body responsible for:


Safety Regulation
Lithuania CAA

Civil Aviation
Administration
! NSA

Airspace Regulation
Oro Navigacija in coordination with CAA and M of TC

Economic Regulation
Oro Navigacija in coordination with CAA and M of TC
Oro Navigacija

Airlines

Airports

Corporate governance structure (2014)

Oro Navigacija (2014)

SUPERVISORY BOARD (5 members)


Chairman + 4 members
represent M of TC

CHAIRMAN OF THE SUPERVISORY BOARD:


Arijandas liupas

DIRECTOR GENERAL (CEO):


MANAGEMENT BOARD
Duties taken up by Director General
DG is appointed by the Minister.

Algimantas Raius

DIRECTOR ATM:
Sergej Smirnov

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

1 ACC (Vilnius)
3 APPs
4 TWRs

- Air Navigation Services are delegated to LGS


(Latvia) above some part of the Baltic sea

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

25

Gate-to-gate total costs (M)

25

Gate-to-gate ATM/CNS provision costs (M)

23

Gate-to-gate total ATM/CNS assets(M)

34

Gate-to-gate ANS total capex (M)


ATCOs in OPS
Gate-to-gate total staff

74 700 km

4
85
296

Total IFR flight-hours controlled by ANSP ('000)

52

IFR airport movements controlled by ANSP ('000)

42

En-route sectors

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

Size
Size of controlled airspace:

175

PANSA, Poland
Polish Air Navigation Services Agency (PANSA)
www.pansa.pl

Institutional arrangements and links (2014)

Status (2014)
- PANSA has been operating as an independent entity as from
1st April 2007, separated from the Polish Airports State
Enterprise (PPL)
- State body (acting as a legal entity with an autonomous
budget)
- 100% State owned

Ministry of Infrastructure
and Development
(MID)

National Supervisory Authority (NSA):

Civil Aviation
Office (CAO)
! NSA

Civil Aviation Office (CAO)

Polish Air
Navigation
Services Agency
(PANSA)

Body responsible for:


Safety Regulation
Polish Airports
State Enterprise
(PPL)

Civil Aviation Office (CAO)

Airspace Regulation
Civil Aviation Office (CAO)

Economic Regulation
Civil Aviation Office (CAO)

Corporate governance structure (2014)

PANSA (2014)

NO SUPERVISORY BOARD

ADMINISTRATION
According to the Act establishing PANSA, the Agency is
managed by the President and his two Vice-Presidents.
The President is nominated by the Prime Minister.
The two Vice-Presidents are nominated by the MID

Upper Airspace
Lower Airspace

Oceanic ANS
MET

- APP Krakw is providing ATC services for Krakw and


Katowice
- Katowice TWR is providing only aerodrome control when APP
Krakw is providing radar services for Katowice

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

172

Gate-to-gate total costs (M)

167

Gate-to-gate ATM/CNS provision costs (M)

147

Gate-to-gate total ATM/CNS assets(M)

149

Gate-to-gate ANS total capex (M)


ATCOs in OPS
Gate-to-gate total staff

1 ACC with 8 sectors


4 APPs (Warszawa, Gdask, Krakw, Pozna) providing radar
control
5 TWRs (Warszawa, Gdask, Krakw, Pozna, Katowice)
providing aeodrome control
6 TWRs (Wrocaw, Szczecin, Rzeszw, d, Zielona Gra,
Bydgoszcz) providing aeodrome control and non-radar
approach control
4 FIS units (Warszawa, Krakw, Gdask, Pozna)

Size
Size of controlled airspace:

334 000 km

442

IFR airport movements controlled by ANSP ('000)

324

ACE 2012 Benchmarking Report

Maciej Rodak

1 712
402

Minutes of ATFM delays ('000)

VICE PRESIDENT- AIR NAVIGATION DEPARTMENT:

19

Total IFR flight-hours controlled by ANSP ('000)

En-route sectors

Krzysztof Kapis

Operational ATS units:

Scope of services
GAT
OAT

PRESIDENT OF PANSA:

8
355

176

ROMATSA, Romania
Romanian Air Traffic Services Administration
www.romatsa.ro

Institutional arrangements and links (2014)


Ministry of Transport
(MoT)
Airspace
Management
Council

Directorate of
Civil Aviation
!NSA

Ministry of
Defence
(MoD)

Status (2014)
- Autonomous and self-financing organisation as of 1991
(Government Resolution GR74/1991 ammended by
GR731/1992, GR75/2005, GR1090/2006, GR1251/2007,
GR741/2008)
- 100% State-owned

National Supervisory Authority (NSA):


- Directorate of Civil Aviation
- Romanian Civil Aeronautical Authority (RCAA)

Body responsible for:


Safety Regulation

Romanian Civil
Aeronautical Authority
(RCAA)
!NSA

ROMATSA

Airports Operator (4 major


airports under responsibility
of the MoT + 12
airports under local authorities)

Ministry of Transport (MoT)


Enforcement and safety oversight is delegated and
discharged through the RCAA

Airspace Regulation
Both Ministry of Transport (MoT) and Ministry of Defence
(MoD), and discharged through the RCAA and Air Force Staff

Economic Regulation
Ministry of Transport (MoT)

Corporate governance structure (2014)

ROMATSA (2014)

ADMINISTRATION BOARD (7 voting members)


Chairman + 6 members
Members represent: MoT, M of Public Finance,
ROMATSA, RCAA and other entity + additional
non voting participants representing staff.

CHAIRMAN OF THE ADMINISTRATION BOARD:


Cristian Ghibu

STEERING COMMITTEE
Duties taken up by DG.
DG is appointed by the MoT.
DG + other directors.

DIRECTOR GENERAL (CEO):


Valentin Cimpuieru

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

181

Gate-to-gate total costs (M)

185

Gate-to-gate ATM/CNS provision costs (M)

165

Gate-to-gate total ATM/CNS assets(M)

134

Gate-to-gate ANS total capex (M)


ATCOs in OPS
Gate-to-gate total staff

441

IFR airport movements controlled by ANSP ('000)

148

ACE 2012 Benchmarking Report

254 000 km

1 519
289

Minutes of ATFM delays ('000)

Size
Size of controlled airspace:

Total IFR flight-hours controlled by ANSP ('000)

En-route sectors

1 ACC (Bucharest)
3 APPs
16 TWRs

11
1

177

Skyguide, Switzerland
Skyguide
www.skyguide.ch

Institutional arrangements and links (2014)


Ministry of
Defence
(M of D)

Status (2014)
- Joint-stock company as of 1996. Currently 14 shareholders;
99,91% is held by the Swiss Confederation which by law must
hold at least 51%
- Integrated civil/military as of 2001

Ministry of Environment,
Transport, Energy and
Communications (M of ETEC)

National Supervisory Authority (NSA):


Federal Office for Civil Aviation (FOCA)

Body responsible for:


Safety Regulation

Federal Office for Civil


Aviation (FOCA)
! NSA

Swiss Air Force


(Swiss AF)

Federal Office for Civil Aviation

Airspace Regulation
Federal Office for Civil Aviation

Economic Regulation

Skyguide

The Ministry of the Environment, Transport, Energy and


Communications

Corporate governance structure (2014)

Skyguide (2014)

GENERAL ASSEMBLY of the Shareholders

SUPERVISORY BOARD (7 members)


Chairman + 6 members
All members are appointed by the General Assembly for
their expertise.

Daniel Weder

Operational ATS units:

Scope of services
Upper Airspace
Lower Airspace

Oceanic ANS
MET

- ATC services delegated to Geneva ACC by France

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

329

Gate-to-gate total costs (M)

317

Gate-to-gate ATM/CNS provision costs (M)

293

Gate-to-gate total ATM/CNS assets(M)

293

Gate-to-gate ANS total capex (M)


ATCOs in OPS
Gate-to-gate total staff

69 700 km

362

IFR airport movements controlled by ANSP ('000)

491

ACE 2012 Benchmarking Report

Size
Size of controlled airspace:

1 378
327

Minutes of ATFM delays ('000)

2 ACCs (Geneva, Zurich)


4 APPs (Geneva, Zurich, Lugano, Bern)
7 TWRs (Geneva, Zurich, Lugano, Bern, Buochs, Altenrhein,
Grenchen)

41

Total IFR flight-hours controlled by ANSP ('000)

En-route sectors

Guy Emmenegger

DIRECTOR GENERAL (CEO):

EXECUTIVE BOARD (6 members)


CEO + 5 members
The CEO is appointed by the Supervisory Board.

GAT
OAT

CHAIRMAN OF THE SUPERVISORY BOARD:

19
620

178

Slovenia Control, Slovenia


Slovenia Control Ltd
www.sloveniacontrol.si

Institutional arrangements and links (2014)


Slovenska
odkodninska
druba, d.d.
(exercising the
Corporate Governance
of State Capital
Investments Act)

Ministry of
Infrastructure
and Spatial
Planning

Aircraft Accident
and Incident
Investigation
Board

Civil Aviation
Authority

Status (2014)
- Since 2004 the Slovenia Control, Slovenian Air Navigation
Services Ltd, as a 100% state-owned enterprise is
independent of national supervisory authorities.

National Supervisory Authority (NSA):


Civil Aviation Authority

Body responsible for:


Safety Regulation

NSA

Ministry of Infrastructure and Spatial Planning

Airspace Regulation

Slovenia Control Ltd

Ministry of Infrastructure and Spatial Planning

Economic Regulation
Slovenska odkodninska druba, d.d. (exercising the
Corporate Governance of State Capital Investments Act)

Corporate governance structure (2014)

Slovenia Control (2014)

Supervisory Board
Chairman (elected) + 3 members appointed by the
Slovenska odkodninska druba, d.d. + 2 staff reps.
appointed by employees board

CHAIRMAN OF THE SUPERVISORY BOARD:


Duan Hoevar

DIRECTOR GENERAL (CEO):

Director General (CEO) of Slovenia Control

Franc eljko upani, Ph.D.

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

35

Gate-to-gate total costs (M)

32

Gate-to-gate ATM/CNS provision costs (M)

28

Gate-to-gate total ATM/CNS assets(M)

35

Gate-to-gate ANS total capex (M)

11

ATCOs in OPS
Gate-to-gate total staff

Size
Size of controlled airspace:

20 400 km

89
215

Total IFR flight-hours controlled by ANSP ('000)

48

IFR airport movements controlled by ANSP ('000)

32

En-route sectors

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

1 ACC (Ljubljana)
3 APPs (Ljubljana, Maribor, Portoro)
3 TWRs (Ljubljana, Maribor, Portoro)

179

SMATSA, Serbia and Montenegro


Serbia and Montenegro Air Traffic Services SMATSA llc
http://www.smatsa.rs

Institutional arrangements and links (2014)


Government of
Montenegro

Government of the
Republic of Serbia

Status (2014)
- Limited liability company founded in 2003
- 92% owned by Serbia and 8% owned by Montenegro
- Integrated civil/military ANSP

National Supervisory Authority (NSA):


Civil Aviation Directorate of the Republic of Serbia
Civil Aviation Agency of Montenegro
Civil Aviation
Directorate of the
Republic of Serbia

Civil Aviation
Agency of Montenegro

Body responsible for:


Safety Regulation
- Civil Aviation Directorate of the Republic of Serbia
- Civil Aviation Agency of Montenegro

Airspace Regulation
- Civil Aviation Directorate of the Republic of Serbia
- Civil Aviation Agency of Montenegro
SMATSA

Economic Regulation
Ministry of Finance of the Republic of Serbia

Corporate governance structure (2014)

SMATSA (2014)

ASSEMBLY

PRESIDENT OF THE ASSEMBLY:

6 members representing founders


(Government of the Republic of Serbia
and Government of Montenegro)
selected from the Ministries in charge of transport,
finance, and defence)

Mirel Radi Ljubisavljevi

SUPERVISORY BOARD

PRESIDENT OF THE SUPERVISORY BOARD:

5 members appointed by the Assembly for a period of 4


years, upon proposals of the Government of the Republic
of Serbia (4) and Government of Montenegro (1)
CEO is appointed by the Supervisory Board.

Upper Airspace
Lower Airspace

Oceanic ANS
MET

- ANS Services (ATM, CNS, MET, AIS)


- SMATSA provides Air Traffic Services in the 55% of the
upper airspace of Bosnia and Herzegovina
- ANS personnel and pilot training, Flight Inspection Services,
PANS-OPS and cartography

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

82

Gate-to-gate total costs (M)

84

Gate-to-gate ATM/CNS provision costs (M)

75

Gate-to-gate total ATM/CNS assets(M)


Gate-to-gate ANS total capex (M)

Radojica Rovanin

Size
Size of controlled airspace:

145 566 km

8
246

Gate-to-gate total staff

855

Total IFR flight-hours controlled by ANSP ('000)

209

IFR airport movements controlled by ANSP ('000)

1 ACC (Belgrade)
1 APP collocated with ACC Belgrade
6 APPs/TWRs (Batajnica, Kraljevo, Nis, Vrsac, Podgorica,
Tivat)
1 TWR

100

ATCOs in OPS

69

En-route sectors

Minutes of ATFM delays ('000)

ACE 2012 Benchmarking Report

CEO:

Operational ATS units:

Scope of services
GAT
OAT

Bratislav Grubai

180

UkSATSE, Ukraine
Ukrainian State Air Traffic Service Enterprise
www.uksatse.ua

Institutional arrangements and links (2014)

Status (2014)
- Self-financing enterprise
- 100% State-owned

Ministry of Infrastructure of Ukraine


(State Aviation Administration)

National Supervisory Authority (NSA):


State Aviation Administration (SAAU) acts as NSA

Ukrainian State Air Traffic Service Enterprise (UkSATSE)

Body responsible for:


Safety Regulation
State Aviation Administration

Regional branches
AIS
Ukraerocenter (Ukrainian Airspace
Management and Planning Center)
Training & Certification Center of UkSATSE
UkSATSE Flight Calibration Service
Medical Certification Center

Airspace Regulation
State Aviation Administration

Economic Regulation
Ministry of Infrastructure of Ukraine

Corporate governance structure (2014)

UkSATSE (2014)

No Supervisory Board

DIRECTOR GENERAL OF UkSATSE:

MANAGEMENT BOARD

Yuriy Cherednichenko

DIRECTOR GENERAL

Operational ATS units:

Scope of services
GAT
OAT

Upper Airspace
Lower Airspace

Oceanic ANS
MET

Key financial and operational figures (ACE 2012)


Gate-to-gate total revenues (M)

246

Gate-to-gate total costs (M)

262

Gate-to-gate ATM/CNS provision costs (M)

249

Gate-to-gate total ATM/CNS assets(M)

256

Gate-to-gate ANS total capex (M)


ATCOs in OPS
Gate-to-gate total staff

Size
Size of controlled airspace:

776 442 km

73
994
6 131

Total IFR flight-hours controlled by ANSP ('000)

384

IFR airport movements controlled by ANSP ('000)

214

En-route sectors

34

Minutes of ATFM delays ('000)

10

ACE 2012 Benchmarking Report

5 ACCs/APPs (Dnipropetrovs'k, Kyiv, L'viv, Odesa,


Simferopol')
6 APPs (Donetsk, Ivano-Frankivs'k, Kharkiv, Luhansk,
Uzghorod, Zaporizhzhia)
22 TWRs
9 AFISs

181

Annex9ANSPsfactsheets
ACE2012BenchmarkingReportwith20132017outlook

GLOSSARY
ACC

AreaControlCentre

ACE

AirTrafficManagementCostEffectiveness

ADSB

AutomaticDependentSurveillanceBroadcast

Aena

AeropuertosEspaolesyNavegacinArea,Spain

AFIS

Airport/AerodromeFlightInformationService

AIS

AeronauticalInformationServices

ANS

AirNavigationServices

ANSCR

AirNavigationServicesoftheCzechRepublic

ANSP

AirNavigationServiceProvider

APP

ApproachControlUnit

ARMATS

ArmenianAirTrafficServices

ATC

AirTrafficControl

ATCO

AirTrafficControlOfficer

ATFM

AirTrafficFlowManagement

ATM

AirTrafficManagement

BULATSA

AirTrafficServicesAuthority,Bulgaria

AustroControl

AustroControlsterreichischeGesellschaftfrZivilluftfahrtmbH,Austria

Avinor

Avinor,Norway

Billion

Belgocontrol

Belgocontrol,Belgium

CAPEX

CapitalExpenditure

CNS

Communications,NavigationandSurveillance

CRCO

CentralRouteChargesOffice

CroatiaControl

Hrvatskakontrolazraneplovidbed.o.o.,CroatianAirNavigationServices

DCACCyprus

DepartmentofCivilAviationofCyprus

DFS

DeutscheFlugsicherungGmbH,Germany

DHM

DevletHavaMeydanlarsletmesi,Turkey

DME

DistanceMeasuringEquipment

DSNA

Directiondesservicesdelanavigationarienne,France

EANS

EstonianAirNavigationServices

EC

EuropeanCommission

ECAC

EuropeanCivilAviationConference

ENAV

EnteNazionalediAssistenzaalVoloS.p.A.,Italy

ERC

EUROCONTROLResearchCentre

ETS

EarlyTerminationofService

EU

EuropeanUnion

FAB

FunctionalAirspaceBlock

FDP

FlightDataProcessingsystem

Finavia

Finavia,Finland

FIS

FlightInformationService

FL

FlightLevel

FTE

FullTimeEquivalent

GDP

GrossDomesticProduct

HCAA

HellenicCivilAviationAuthority,Greece

HMI

HumanMachineInterface

Glossary
ACE2012BenchmarkingReportwith20132017outlook

HQ

Headquarters

HungaroControl

HungaroControl,Hungary

IAA

IrishAviationAuthority,Ireland

IFR

InstrumentFlightRules

IFRS

InternationalFinancialReportingStandards

ILS

InstrumentLandingSystem

LFV

Luftfartsverket,Sweden

LGS

LatvijasGaisaSatiksme,Latvia

LPS

LetovPrevdzkovSlubySlovenskejRepubliky,SttnyPodnik,SlovakRepublik

LVNL

LuchtverkeersleidingNederland,Netherlands

Million

MATS

MaltaAirTrafficServicesLtd

MET

AeronauticalMeteorology

MNAV

AirNavigationServicesProvideroftheformerYugoslavRepublicofMacedonia

MoldATSA

MoldavianAirTrafficServicesAuthority

MSSR

MonopulseSecondarySurveillanceRadar

MUAC

MaastrichtUpperAirCentre

NSA

NationalSupervisoryAuthority

NATAAlbania

NationalAirTrafficAgency,Albania

NATS

NationalAirTrafficServices,UK

NAVPortugal

NavegaoAreadePortugalNAVPortugal,EPE

NAVIAIR

AirNavigationServicesFlyvesikringstjenesten,Denmark

NBV

NetBookValue

NDB

NonDirectionalBeacon

NM

EUROCONTROLNetworkManager

OAT

Operationalairtraffic

OPS

Operations

OroNavigacija

StateEnterpriseOroNavigacija,Lithuania

PANSA

PolishAirNavigationServicesAgency

PPPs

Purchasingpowerparities

PRB

PerformanceReviewBody

PRC

PerformanceReviewCommission

PRR

PerformanceReviewReport

PRU

PerformanceReviewUnit

RDP

RadarDataProcessingsystem

RP1

ReferencePeriod1

RPI

RetailPriceIndex

ROMATSA

RomanianAirTrafficServicesAdministration

SAR

SearchandRescue

SES

SingleEuropeanSky

SESARIP1

SingleEuropeanSkyATMResearchImplementationPackage1

SEID

SpecificationforEconomicInformationDisclosure

Skyguide

Skyguide,Switzerland

SloveniaControl

SloveniaControl,Slovenia

SMATSA

SerbiaandMontenegroAirTrafficServicesAgency

TC

TerminalControl

TWR

TrafficControlledTower

UKCAA

UnitedKingdomCivilAviationAuthority

UkSATSE

UkrainianStateAirTrafficServiceEnterprise

Glossary
ACE2012BenchmarkingReportwith20132017outlook

VFR
VOR

VisualFlightRules
VeryhighfrequencyOmnidirectionalRange

Glossary
ACE2012BenchmarkingReportwith20132017outlook

ATM Cost-Eectiveness (ACE) 2012 Benchmarking Report with 2013-2017 outlook

EUROCONTROL

REPORT COMMISSIONED BY THE PERFORMANCE REVIEW COMMISSION

ATM Cost-Eectiveness (ACE)


2012 Benchmarking Report
with 2013-2017 outlook

Prepared by the Performance Review Unit (PRU)


with the ACE Working Group

COPYRIGHT NOTICE AND DISCLAIMER


European Organisation for the Safety of Air Navigation (EUROCONTROL)
This document is published by the Performance Review Commission in the interest of the exchange of information.
It may be copied in whole or in part providing that the copyright notice and disclaimer are included. The information contained in this document may not be modified
without prior written permission from the Performance Review Commission.
The view expressed herein do not necessarily reflect the ocial views or policy of EUROCONTROL which makes no warranty, either implied or express, for the information
contained in this document, neither does it assume any legal liability or responsibility for the accuracy completeness or usufulness of this information.
Printed by EUROCONTROL 96, rue de la Fuse, B-1130 Brussels, Belgium. Tel: +32 2 729 3956. Fax: +32 2 729 9108.

Cover ACE Layout A3 2012.indd 1

May 2014

23/05/14 11:21

Vous aimerez peut-être aussi