DETAILED SHEET OF ESTIMATE OF PROPOSED CONSTRUCTION OF

COMMERCIAL BUILDING ON PLOT NOKHANDWA ROAD, INDORE


DISTRICT-INDORE, (M.P.)
B/TO :- AKVN INDORE
FOR :Nine Squares Architects Pvt. Ltd., LG 24-25,BCM Heights,
Bombay Hospital Link Road, Indore
MAIN COMMERCIAL BUILDING
S.No. Particular of Item.
1
1.1

No.

Length

Width

Depth

Unit

1.0
1.0

48.00
24.00

27.00
6.00

---------------

M2

1.0
1.0

48.00
24.00

27.00
6.00

---------------

M2

PLOT CLEANING AND LEVELLING WORK:


2.2 : Clearing jungle including uprooting of rank
vegetation, grass, brush wood, trees and saplings of
girth upto 30 cm measured at a height of 1 m above
ground level and removal of rubbish upto a distance of
50 m outside the periphery of the area cleared.

1.1.1 Main building: In ordinary soil.


1.1.2 Road area: In ordinary soil.
2.3 : Clearing grass and removal of the rubbish upto a
distance of 50 m outside the periphery of the area
cleared.
1.2.1 Main building: In ordinary soil.

M2

1.2

1.2.2 Road area: In ordinary soil.


2

EXCAVATION WORK:

M2

Quantity

1152.00
144.00

1152.00
144.00

2.6 : Earth work in excavation by mechanical means


(Hydraulic excavator )/ manual means over areas
(exceeding 30cm in depth. 1.5m in width as well as 10
sqm on plan) including dressing of sides and ramming of
bottom disposal of excavated earth, lead upto 50m and
lift upto 1.5m, disposed earth to be levelled and neatly
dressed. (No extra lift is payable if work is done by
mechanical means)

2.1 A. In Black Cotton Soil.


2.1.1 a. Footings: Main Building .
F-1
F-2
F-3
F-4
F-5
F-6
F-7
F-8
F-9
F-10
F-11
F-12
F-13
F-14
F-15
F-16
F-17
F-18
F-19
F-20
F-21
F-22

6.0

7.70

7.70

3.00

1.0
1.0
3.0
12.0
2.0

7.10
6.60
6.30
5.90
5.20

7.10
6.60
6.30
5.90
5.20

3.00
3.00
3.00
3.00
3.00

4.0
1.0
12.0
2.0
1.0

4.80
4.40
3.30
3.90
8.00

4.80
4.40
3.30
3.90
14.40

3.00
3.00
3.00
3.00
3.00

1.0
1.0
1.0
14.0
1.0

7.60
13.20
8.90
2.40
1.90

25.60
13.60
13.00
2.40
2.60

3.00
3.00
3.00
3.00
3.00

1.0
1.0
1.0
1.0
1.0

2.10
7.20
7.40
8.10
3.60

2.10
11.73
11.73
23.60
4.60

3.00
3.00
3.00
3.00
3.00

2.0

1.80

1.80

3.00

6.0
1.0
1.0
3.0
12.0

7.70
7.10
6.60
6.30
2.60

7.70
7.10
6.60
6.30
3.40

1.50
1.50
1.50
1.50
1.50

2.0
4.0
1.0
12.0
2.0

5.20
4.80
4.40
3.30
3.90

5.20
4.80
4.40
3.30
3.90

1.50
1.50
1.50
1.50
1.50

1.0
1.0
1.0
1.0
14.0

8.00
7.60
13.20
8.90
2.40

14.40
25.60
13.60
13.00
2.40

1.50
1.50
1.50
1.50
1.50

1.0

1.90

2.60

1.50

Total
2.2 B. In selected Soil.
2.2.1 a. Footings: Main Building .
F-1
F-2
F-3
F-4
F-5
F-6
F-7
F-8
F-9
F-10
F-11
F-12
F-13
F-14
F-15
F-16

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

1067.22
151.23
130.68
357.21
1253.16
162.24
276.48
58.08
392.04
91.26
345.60
583.68
538.56
347.10
241.92
14.82
13.23
253.37
260.41
573.48
49.68
19.44
7180.88
7180.88

533.61
75.62
65.34
178.61
159.12
81.12
138.24
29.04
196.02
45.63
172.80
291.84
269.28
173.55
120.96
7.41

F-17
F-18
F-19
F-20
F-21
F-22

1.0
1.0
1.0

2.10
7.20
7.40

2.10
11.73
11.73

1.50
1.50
1.50

1.0
1.0
2.0

8.10
3.60
1.80

23.60
4.60
1.80

1.50
1.50
1.50

3.1

2.20 : Open timbering in trenches including strutting and


shoring complete (measurements to be taken of the face
area timbered):
2.20.1 : Depth not exceeding 1.5 m.
a. Footings: Main Building .
F-1
F-2
F-3
F-4
F-5
F-6
F-7
F-8
F-9
F-10
F-11
F-12
F-13
F-14
F-15
F-16
F-17
F-18
F-19
F-20
F-21
F-22

3.2

M3
M3
M3
M3
M3
M3
M3

Total
TOTAL EXCAVATION MAIN BUILDING
3

M3
M3

6.0
1.0

15.40
14.20

15.40
14.20

1.50
1.50

1.0
3.0
12.0
2.0
4.0

13.20
12.60
11.80
10.40
9.60

13.20
12.60
11.80
10.40
9.60

1.50
1.50
1.50
1.50
1.50

1.0
12.0
2.0
1.0
1.0

8.80
6.60
7.80
16.00
15.20

8.80
6.60
7.80
28.80
51.20

1.50
1.50
1.50
1.50
1.50

1.0
1.0
14.0
1.0
1.0

26.40
17.80
4.80
3.80
4.20

27.20
26.00
4.80
5.20
4.20

1.50
1.50
1.50
1.50
1.50

1.0
1.0
1.0
1.0
2.0

14.40
14.80
16.20
7.20
3.60

23.46
23.46
47.20
9.20
3.60

1.50
1.50
1.50
1.50
1.50

6.0
1.0
1.0

15.40
14.20
13.20

15.40
14.20
13.20

1.50
1.50
1.50

3.0
12.0
2.0
4.0
1.0

12.60
11.80
10.40
9.60
8.80

12.60
11.80
10.40
9.60
8.80

1.50
1.50
1.50
1.50
1.50

12.0
2.0
1.0
1.0

6.60
7.80
16.00
15.20

6.60
7.80
28.80
51.20

1.50
1.50
1.50
1.50

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

2.20.2 : Depth exceeding 1.5 m but not exceeding 3 m.


a. Footings: Main Building .
F-1
F-2
F-3
F-4
F-5
F-6
F-7
F-8
F-9
F-10
F-11
F-12

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

6.62
126.68
130.20
286.74
24.84
9.72
3122.98
3122.98
10303.87

277.20
42.60
39.60
113.40
424.80
62.40
115.20
26.40
237.60
46.80
67.20
99.60
80.40
65.70
201.60
13.50
12.60
56.79
57.39
95.10
24.60
21.60
2182.08

277.20
42.60
39.60
113.40
424.80
62.40
115.20
26.40
237.60
46.80
67.20
99.60

F-13
F-14
F-15
F-16
F-17
F-18
F-19
F-20
F-21
F-22

3.3

F-4
F-5
F-6
F-7
F-8
F-9
F-10
F-11
F-12
F-13
F-14
F-15
F-16
F-17
F-18
F-19
F-20
F-21
F-22

26.40
17.80
4.80

27.20
26.00
4.80

1.50
1.50
1.50

1.0
1.0
1.0
1.0
1.0

3.80
4.20
14.40
14.80
16.20

5.20
4.20
23.46
23.46
47.20

1.50
1.50
1.50
1.50
1.50

1.0
2.0

7.20
3.60

9.20
3.60

1.50
1.50

6.0
1.0
1.0
3.0

15.40
14.20
13.20
12.60

15.40
14.20
13.20
12.60

1.50
1.50
1.50
1.50

12.0
2.0
4.0
1.0
12.0

11.80
10.40
9.60
8.80
6.60

11.80
10.40
9.60
8.80
6.60

1.50
1.50
1.50
1.50
1.50

2.0
1.0
1.0
1.0
1.0

7.80
16.00
15.20
26.40
17.80

7.80
28.80
51.20
27.20
26.00

1.50
1.50
1.50
1.50
1.50

14.0
1.0
1.0
1.0
1.0

4.80
3.80
4.20
14.40
14.80

4.80
5.20
4.20
23.46
23.46

1.50
1.50
1.50
1.50
1.50

1.0
1.0
2.0

16.20
7.20
3.60

47.20
9.20
3.60

1.50
1.50
1.50

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

2.20.3 : Depth exceeding 3 m but not exceeding 4.5 m.


a. Footings: Main Building .
F-1
F-2
F-3

1.0
1.0
14.0

2.26 : Extra for every additional lift of 1.5 m or part


thereof in excavation. (No extra lift is payable if work is
done by mechanical means)
2.26.1 : All kinds of soil.
2.26.1.1 : Depth exceeding 1.5 m but not exceeding 3 m.
2.26.1.2 : Depth exceeding 3 m but not exceeding 4.5 m.

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

M3
M3

2.25 : Filling available excavated earth (excluding hard


rock/Ordinary rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20cm in depth,
consolidating each deposited layer by ramming
A. FILLING UPTO F.G.L.
Total excavation as per Item No 2

M3

Deduction of P.C.C.

M3

Deduction of R.C.C. Footings

M3

80.40
65.70
201.60
13.50
12.60
56.79
57.39
95.10
24.60
21.60
2182.08

277.20
42.60
39.60
113.40
424.80
62.40
115.20
26.40
237.60
46.80
67.20
99.60
80.40
65.70
201.60
13.50
12.60
56.79
57.39
95.10
24.60
21.60
2182.08

3219.96
3219.96

10303.87
-550.31
-2671.22

Deduction of R.C.C. Columns


NET FILLING UPTO F.G.L.
B. FILLING UPTO P.L.
PF-1
PF-2
PF-3
PF-4
PF-5
PF-6
Deduction

M3
M3
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

41.00
5.25
10.50
14.40
9.13
2.56
14.00
1.20

52.00
19.15
3.66
28.00
24.00
4.50
3.40
3.33

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

1.0
1.0

41.00
5.25

52.00
19.15

0.20
0.20

M3

1.0
1.0
1.0
1.0
1.0

10.50
14.40
9.13
2.56
14.00

3.66
28.00
24.00
4.50
3.40

0.20
0.20
0.20
0.20
0.20

1.0

1.20

3.33

0.20

1.0
1.0
1.0

41.00
5.25
10.50

52.00
19.15
3.66

0.30
0.30
0.30

1.0
1.0
1.0
1.0
1.0

14.40
9.13
2.56
14.00
1.20

28.00
24.00
4.50
3.40
3.33

0.30
0.30
0.30
0.30
0.30

NET FILLING UPTO P.L.


TOTAL MURRUM FILLING:
EXTRA MURRUM REQUIRED FOR FILLING
6

2.27 : Supplying and filling in plinth with crusher stone


dust / coarse sand under floors including, watering,
ramming consolidating in layers not exceeding 20cm in
depth and dressing complete
PF-1
PF-2
PF-3
PF-4
PF-5
PF-6
Deduction

M3
M3
M3

2.28 : Supplying and filling in plinth with hard


muram/hard copra under floors including watering
ramming cosolidating in layers not exceeding 20cm in
depth and dressing complete.
PF-1
PF-2
PF-3
PF-4
PF-5
PF-6
Deduction

M3
M3
M3
M3
M3

2.32 : Preconstruction antitermite treatment to the


building under construction by providing
Stage 1: Treating the bottom and the sides (upto 30cm
hight of the excavated trench @ 5 litter per sqm of the
surface area.
Stage 2: After masonry/RCC work, the backfill in the
immdiate contact with the foundation structure treatment
@ 7.5 litter per sqm. of the vertical surface of the
substructure for each side.

M3
M3
M3
M3
M3
M3
M3
M3
M3

#REF!
#REF!
852.80
40.22
15.37
161.28
87.60
4.61
-19.04
-1.60
1141.24
855.93
#REF!

426.40
20.11
7.69
80.64
43.80
2.30
-9.52
-0.80
570.62

639.60
30.16
11.53
120.96
65.70
3.46
-14.28
-1.20
855.93

Stage 3: surface treatment by spreading emulsion over


the plinth area before laying the base concrete under
floors @ 5.0 litres/Sqm.
Stage 4: Pumping the emulsion in plinth masonry on
filling side at floor junction @ 7.5 litres/Sqm.
Stage 5: Pumping the emulsion from outer side of the
plinth below ground alround the masonry @ 5.0
litres/Sqm as per I.S. 8944 Emulsion. (1Chlorpyrifos: 19
water) with five years service guarantee (Measurements
to be taken for plinth area)
Note Treatment should start when foundation
trenches and pits are ready to take bed concrete or
leveling course in foundations. Laying of bed
concrete should start when the chemical emulsion
has been absorbed by the soil and the surface is
reasonably dry. Treatment should not be carried out
when it is raining or when soil is wet with rain or
subsoil water. This also applies to filled up soil
within the plinth area before laying the subgrade for
flooring.
9

M2

P.C.C. WORK: In foundation and up to Stilt Parking


Floor Level.
4.1 : Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering - All work up to plinth level :
4.1.1.4 : Nominal Mix -1 Cement : 3 sand : 6 graded
stone aggregate (M 10)
P.C.C. Work grade M-10
a. Footings: Main Building .
F-1

6.0

7.30

7.30

0.10

M3

F-2

1.0

6.70

6.70

0.10

M3

F-3

1.0

6.20

6.20

0.10

M3

F-4

3.0

5.90

5.90

0.10

M3

F-5

12.0

5.50

5.50

0.10

M3

F-6

2.0

4.80

4.80

0.10

M3

F-7

4.0

4.40

4.40

0.10

M3

F-8

1.0

4.00

4.00

0.10

M3

F-9

12.0

2.90

2.90

0.10

M3

F-10

2.0

3.50

3.50

0.10

M3

F-11

1.0

7.60

14.00

0.10

M3

F-12

1.0

7.20

25.20

0.10

M3

F-13

1.0

12.80

13.20

0.10

M3

F-14

1.0

8.50

12.60

0.10

M3

F-15

14.0

2.00

2.00

0.10

M3

F-16

1.0

1.50

2.20

0.10

M3

F-17

1.0

1.70

1.70

0.10

M3

F-18

1.0

6.80

11.33

0.10

M3

F-19

1.0

7.00

11.33

0.10

M3

F-20

1.0

7.70

23.20

0.10

M3

F-21

1.0

3.20

4.20

0.10

M3

F-22

2.0

1.40

1.40

0.10

M3

31.97
4.49
3.84
10.44
36.30
4.61
7.74
1.60
10.09
2.45
10.64
18.14
16.90
10.71
5.60
0.33
0.29
7.70
7.93
17.86
1.34
0.39

M3
b. P.C.C. below Stilt Slab, M-15.
PS-1

1.0

41.60

52.60

0.10

M3

PS-2

1.0

5.55

19.75

0.10

M3

PS-3

1.0

11.10

4.26

0.10

M3

PS-4

1.0

15.00

28.60

0.10

M3

PS-5

1.0
1.0

9.43
2.86

24.60
5.10

0.10
0.10

M3
M3

1.0

14.30

4.00

0.10

M3

1.0

1.50

3.93

0.10

M3

PS-6
Deduction

M3
c. P.C.C. below Stilt level Beam bottom, M-15.
Beams in -X- direction
SB-1

43.0

7.40

0.40

0.10

M3

1.0

8.03

0.40

0.10

M3

1.0

7.85

0.40

0.10

M3

1.0

4.87

0.40

0.10

M3

2.0

6.07

0.40

0.10

M3

2.0

6.20

0.40

0.10

M3

1.0

5.50

0.40

0.10

M3

SB-3

1.0

6.20

0.40

0.10

M3

SB-4

4.0

5.59

0.40

0.10

M3

1.0

4.90

0.40

0.10

M3

1.0

5.81

0.40

0.10

M3

1.0

3.10

0.40

0.10

M3

3.0

4.49

0.40

0.10

M3

1.0

4.65

0.40

0.10

M3

1.0

3.82

0.40

0.10

M3

2.0

3.10

0.40

0.10

M3

1.0

4.24

0.40

0.10

M3

3.0

4.21

0.40

0.10

M3

1.0

3.80

0.40

0.10

M3

1.0

3.93

0.40

0.10

M3

1.0

3.37

0.40

0.10

M3

1.0

2.76

0.40

0.10

M3

1.0

2.80

0.40

0.10

M3

2.0

2.89

0.40

0.10

M3

SB-10

3.0

0.90

0.40

0.10

M3

SB-12

3.0

0.58

0.40

0.10

M3

2.0

1.50

0.40

0.10

M3

1.0

3.93

0.40

0.10

M3

1.0

3.83

0.40

0.10

M3

1.0

10.20

0.50

0.10

M3

10.0

7.25

0.40

0.10

M3

SB-6

SB-7

SB-8
SB-9

SB-15
Beams in -Y- direction
SB-1

211.39

218.82
10.96
4.73
42.90
23.19
1.46
-5.72
-0.59
295.74

12.73
0.32
0.31
0.19
0.49
0.50
0.22
0.25
0.89
0.20
0.23
0.12
0.54
0.19
0.15
0.25
0.17
0.51
0.15
0.16
0.13
0.11
0.11
0.23
0.11
0.07
0.12
0.16
0.15
0.51
2.90

12.0

7.15

0.40

0.10

M3

15.0

7.30

0.40

0.10

M3

1.0

7.40

0.40

0.10

M3

SB-2

1.0

7.30

0.50

0.10

M3

SB-5

5.0

4.80

0.40

0.10

M3

4.0

4.90

0.40

0.10

M3

1.0

6.07

0.40

0.10

M3

1.0

4.50

0.40

0.10

M3

3.0

4.10

0.40

0.10

M3

1.0

3.96

0.40

0.10

M3

2.0

3.14

0.40

0.10

M3

2.0

4.10

0.40

0.10

M3

5.0

3.40

0.40

0.10

M3

1.0

2.56

0.40

0.10

M3

1.0

5.05

0.40

0.10

M3

1.0

3.30

0.40

0.10

M3

1.0

2.80

0.40

0.10

M3

1.0

3.14

0.40

0.10

M3

3.0

2.20

0.40

0.10

M3

2.0

2.80

0.40

0.10

M3

5.0

2.60

0.40

0.10

M3

1.0

3.14

0.40

0.10

M3

2.0

2.10

0.40

0.10

M3

1.0

0.75

0.40

0.10

M3

1.0

1.42

0.40

0.10

M3

2.0

2.80

0.30

0.10

M3

1.0

1.64

0.30

0.10

M3

1.0

9.18

0.40

0.10

M3

1.0

8.83

0.40

0.10

M3

5.0

7.57

0.40

0.10

M3

1.0

3.70

0.40

0.10

M3

4.0

4.50

0.40

0.10

M3

1.0

5.00

0.40

0.10

M3

1.0

3.07

0.40

0.10

M3

1.0

2.58

0.40

0.10

M3

SB-7

1.0

4.52

0.40

0.10

M3

SB-9

1.0

3.00

0.40

0.10

M3

SB-13

1.0

5.13

0.50

0.10

M3

SB-14

1.0

4.90

0.50

0.10

M3

1.0

6.42

0.50

0.10

M3

1.0

4.30

0.50

0.10

M3

1.0

6.24

0.50

0.10

M3

SB-6

SB-7

SB-8

SB-9

SB-10
SB-11
Beams in -inclined- direction
SB-1

SB-6

M3
TOTAL P.C.C.

M3

3.43
4.38
0.30
0.37
0.96
0.78
0.24
0.18
0.49
0.16
0.25
0.33
0.68
0.10
0.20
0.13
0.11
0.13
0.26
0.22
0.52
0.13
0.17
0.03
0.06
0.17
0.05
0.37
0.35
1.51
0.15
0.72
0.20
0.12
0.10
0.18
0.12
0.26
0.25
0.32
0.22
0.31
43.18
550.31

10

R.C.C. WORK- M:30 UPTO STILT PARKING FLOOR


LEVEL (PLINTH LEVEL): + 0.15MT
5.31 : Providing and laying in position ready mixed M-25
grade concrete for reinforced cement concrete work,
using cement content as per approved design mix and
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all leads,
having continuous agitated mixer, manufactured as per
mix design of specified grade for reinforced cement
concrete work, including pumping of R.M.C. from transit
mixer to site of laying, excluding the cost of centering,
shuttering, finishing and reinforcement, including cost of
admixtures in recommended proportions as per IS :
9103 to accelerate / retard setting of concrete, improve
workability without impairing strength and durability as
per direction of the Engineer - in - charge.
5.31.1 : All works upto plinth level.
5.28 : Extra for providing richer mixes at all floor levels.
Note : If Excess/ less cement over the specified cement
content used is payable/ recoverable separately)
5.28.1 : Providing M-30 grade concrete instead of M-25
grade BMC/RMC.
Note : Cement content considered in M-30 is @ 340
kg/cum)
STILT PARKING FLOOR SLABS
a. Plinth Slab
PS-1
PS-2
PS-3
PS-4
PS-5
PS-6
Deduction

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

41.60
5.85
11.10
15.00
9.73
3.16
14.60
1.80
3.00

52.60
19.75
4.26
28.60
24.60
5.10
4.00
3.93
2.40

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

a. Footings Main building


F-1
F-2
F-3
F-4
F-5
F-6
F-7
F-8
F-9
F-10
F-11
F-12
F-13
F-14
F-15
F-16
F-17
F-18
F-19

6.0
1.0
1.0
3.0
12.0
2.0
4.0
1.0
12.0
2.0
1.0
1.0
1.0
1.0
14.0
1.0
1.0
1.0
1.0

7.10
6.50
6.00
5.70
5.30
4.60
4.20
3.80
2.70
3.30
7.40
7.00
12.60
8.30
1.80
1.30
1.50
6.60
6.80

7.10
6.50
6.00
5.70
5.30
4.60
4.20
3.80
2.70
3.30
13.80
25.00
13.00
12.40
1.80
2.00
1.50
11.13
11.13

1.65
1.50
1.40
1.35
1.25
1.10
1.00
0.95
0.60
0.75
1.50
1.50
1.50
1.50
0.60
0.60
0.50
1.40
1.40

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

218.82
11.55
4.73
42.90
23.92
1.61
-5.84
-0.71
-0.72
296.27

499.06
63.38
50.40
131.58
421.35
46.55
70.56
13.72
52.49
16.34
153.18
262.50
245.70
154.38
27.22
1.56
1.13
102.84
105.96

1.0
1.0
2.0

7.50
3.00
1.20

23.00
4.00
1.20

1.40
0.70
0.50

M3
M3
M3
M3

12.0

0.60

0.90

2.75

M3

9.0

0.60

0.60

2.90

M3

C-3

3.0

0.60

0.60

3.00

M3

C-4

10.0

0.30

0.70

3.05

M3

C-5

9.0

0.60

0.80

3.15

M3

C-6

3.0

0.60

0.60

3.30

M3

C-7

5.0

0.60

0.60

3.40

M3

C-8

2.0

0.60

0.60

3.45

M3

C-9

2.0

0.30

1.40

3.80

M3

C-10

5.0

0.30

3.40

3.65

M3

C-11

4.0
16.0
4.0
6.0
2.0

0.30
0.60
0.60
0.40
0.30

1.20
0.60
0.60
0.70
0.30

2.90
2.90
2.90
2.90
3.80

M3
M3
M3
M3
M3

F-20
F-21
F-22

b. Columns upto Stilt level beam bottom level


C-1
C-2

C-12
C-13
C-14
C-15

M3
c. Stilt parking floor Level beams
Beams in -X- direction
SB-1

SB-3
SB-4

SB-6

SB-7

SB-8
SB-9
SB-10
SB-12

43.0
1.0
1.0
1.0
2.0
2.0
1.0
1.0
4.0
1.0
1.0
1.0
3.0
1.0
1.0
2.0

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

7.40
8.03
7.85
4.87
6.07
6.20
5.50
6.20
5.59
4.90
5.81
3.10
4.49
4.65
3.82
3.10

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

1.0

0.30

0.50

4.24

M3

3.0

0.30

0.50

4.21

M3

1.0

0.30

0.50

3.80

M3

1.0

0.30

0.50

3.93

M3

1.0
1.0

0.30
0.30

0.50
0.50

3.37
2.76

M3

1.0

0.30

0.50

2.80

M3

2.0

0.30

0.50

2.89

M3

3.0
3.0

0.30
0.30

0.50
0.50

0.90
0.58

M3
M3

M3

241.50
8.40
1.44
2671.22

17.82
9.40
3.24
6.41
13.61
3.56
6.12
2.48
3.19
18.62
4.18
16.70
4.18
4.87
0.68
115.06

47.73
1.20
1.18
0.73
1.82
1.86
0.83
0.93
3.35
0.74
0.87
0.47
2.02
0.70
0.57
0.93
0.64
1.89
0.57
0.59
0.51
0.41
0.42
0.87
0.41
0.26

2.0
1.0

0.30
0.30

0.50
0.50

1.50
3.93

M3
M3

1.0

0.30

0.50

3.83

M3

1.0

0.40

0.50

10.20

M3

10.0

0.30

0.50

7.25

M3

12.0

0.30

0.50

7.15

M3

15.0

0.30

0.50

7.30

M3

1.0

0.30

0.50

7.40

M3

SB-2

1.0

0.40

0.50

7.30

M3

SB-5

5.0

0.30

0.50

4.80

M3

4.0

0.30

0.50

4.90

M3

1.0

0.30

0.50

6.07

M3

1.0

0.30

0.50

4.50

M3

3.0

0.30

0.50

4.10

M3

1.0

0.30

0.50

3.96

M3

2.0

0.30

0.50

3.14

M3

2.0

0.30

0.50

4.10

M3

5.0

0.30

0.50

3.40

M3

1.0

0.30

0.50

2.56

M3

1.0

0.30

0.50

5.05

M3

1.0

0.30

0.50

3.30

M3

1.0

0.30

0.50

2.80

M3

1.0

0.30

0.50

3.14

M3

3.0

0.30

0.50

2.20

M3

2.0

0.30

0.50

2.80

M3

5.0

0.30

0.50

2.60

M3

1.0

0.30

0.50

3.14

M3

2.0

0.30

0.50

2.10

M3

1.0

0.30

0.50

0.75

M3

1.0

0.30

0.50

1.42

M3

2.0

0.20

0.50

2.80

M3

1.0

0.20

0.50

1.64

M3

1.0

0.30

0.50

9.18

M3

1.0

0.30

0.50

8.83

M3

5.0

0.30

0.50

7.57

M3

1.0

0.30

0.50

3.70

M3

4.0

0.30

0.50

4.50

M3

1.0

0.30

0.50

5.00

M3

1.0

0.30

0.50

3.07

M3

1.0

0.30

0.50

2.58

M3

1.0

0.30

0.50

4.52

M3

SB-15
Beams in -Y- direction
SB-1

SB-6

SB-7

SB-8

SB-9

SB-10
SB-11

Beams in -inclined- direction


SB-1

SB-6

SB-7

0.45
0.59
0.57
2.04
10.88
12.87
16.43
1.11
1.46
3.60
2.94
0.91
0.68
1.85
0.59
0.94
1.23
2.55
0.38
0.76
0.50
0.42
0.47
0.99
0.84
1.95
0.47
0.63
0.11
0.21
0.56
0.16

1.38
1.32
5.68
0.56
2.70
0.75
0.46
0.39
0.68

SB-9

1.0

0.30

0.50

3.00

SB-13
SB-14

1.0
1.0

0.40
0.40

0.50
0.50

5.13
4.90

M3
M3
M3

1.0

0.40

0.50

6.42

M3

1.0

0.40

0.50

4.30

M3

1.0

0.40

0.50

6.24

M3
M3

d. Columns above Plinth beam and upto Stilt Floor


level= +0.15MT.
C-1

12.0

0.60

0.90

0.30

M3

C-2

9.0

0.60

0.60

0.30

M3

C-3

3.0
10.0

0.60
0.30

0.60
0.70

0.30
0.30

M3
M3

9.0
3.0
5.0
2.0

0.60
0.60
0.60
0.60

0.80
0.60
0.60
0.60

0.30
0.30
0.30
0.30

M3
M3
M3
M3

2.0

0.30

1.40

0.30

M3

5.0
4.0

0.30
0.30

3.40
1.20

0.30
0.30

M3
M3

16.0
4.0
6.0
2.0

0.60
0.60
0.40
0.30

0.60
0.60
0.70
0.30

0.30
0.30
0.30
0.30

M3
M3
M3
M3
M3

C-4
C-5
C-6
C-7
C-8
C-9
C-10
C-11
C-12
C-13
C-14
C-15

TOTAL R.C.C. WORK UP TO STILT PARKING FLOOR


LEVEL : + 0.15
11

M3

SHUTTERING AND SCAFOLDING WORK:


UPTO STILT PARKING FLOOR LEVEL (PLINTH
LEVEL) = +0.15MT.
5.9 : Centering and shuttering including strutting,
propping etc. and removal of form for :
5.9.1 : Foundations, footings, bases of columns, etc. for
concrete up to plinth level.

11.1 P.C.C. WORK: In foundation and up to Stilt Parking


Floor Level.
a. Footings: Main Building .
F-1
F-2
F-3
F-4
F-5
F-6
F-7
F-8
F-9

6.0

29.20

0.10

1.0
1.0
3.0
12.0
2.0

26.80
24.80
23.60
22.00
19.20

0.10
0.10
0.10
0.10
0.10

4.0
1.0
12.0

17.60
16.00
11.60

0.10
0.10
0.10

M2
M2
M2
M2
M2
M2
M2
M2
M2

0.45
1.03
0.98
1.28
0.86
1.25
162.38

1.94
0.97
0.32
0.63
1.30
0.32
0.54
0.22
0.25
1.53
0.43
1.73
0.43
0.50
0.05
11.18

3256.10

17.52
2.68
2.48
7.08
26.40
3.84
7.04
1.60
13.92

F-10
F-11
F-12
F-13
F-14
F-15
F-16
F-17
F-18
F-19
F-20
F-21
F-22

11.1.1 c. P.C.C. below Stilt level Beam bottom, M-15.


Beams in -X- direction
SB-1

SB-3
SB-4

SB-6

SB-7

SB-8
SB-9
SB-10
SB-12

SB-15
Beams in -Y- direction
SB-1

2.0
1.0
1.0

14.00
43.20
64.80

0.10
0.10
0.10

1.0
1.0
14.0
1.0
1.0

52.00
42.20
8.00
7.40
6.80

0.10
0.10
0.10
0.10
0.10

1.0
1.0
1.0
1.0
2.0

36.26
36.66
61.80
14.80
5.60

0.10
0.10
0.10
0.10
0.10

86.0
2.0
2.0
2.0
4.0

7.40
8.03
7.85
4.87
6.07

0.10
0.10
0.10
0.10
0.10

4.0
2.0
2.0
8.0
2.0

6.20
5.50
6.20
5.59
4.90

0.10
0.10
0.10
0.10
0.10

2.0
2.0
6.0
2.0
2.0

5.81
3.10
4.49
4.65
3.82

0.10
0.10
0.10
0.10
0.10

4.0
2.0
6.0
2.0
2.0

3.10
4.24
4.21
3.80
3.93

0.10
0.10
0.10
0.10
0.10

2.0
2.0
2.0
4.0
6.0

3.37
2.76
2.80
2.89
0.90

0.10
0.10
0.10
0.10
0.10

6.0
4.0
2.0
2.0
2.0

0.58
1.50
3.93
3.83
10.20

0.10
0.10
0.10
0.10
0.10

0.0
20.0
24.0
30.0

0.00
7.25
7.15
7.30

0.00
0.10
0.10
0.10

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

2.80
4.32
6.48
5.20
4.22
11.20
0.74
0.68
3.63
3.67
6.18
1.48
1.12
134.27

63.64
1.61
1.57
0.97
2.43
2.48
1.10
1.24
4.47
0.98
1.16
0.62
2.69
0.93
0.76
1.24
0.85
2.53
0.76
0.79
0.67
0.55
0.56
1.16
0.54
0.35
0.60
0.79
0.77
2.04
0.00
14.50
17.16
21.90

SB-2
SB-5
SB-6

SB-7

SB-8

SB-9

SB-10
SB-11
Beams in -inclined- direction
SB-1

SB-6

SB-7
SB-9
SB-13
SB-14

M2
M2

2.0
2.0
10.0

7.40
7.30
4.80

0.10
0.10
0.10

8.0
2.0
2.0
6.0
2.0

4.90
6.07
4.50
4.10
3.96

0.10
0.10
0.10
0.10
0.10

4.0
4.0
10.0
2.0
2.0

3.14
4.10
3.40
2.56
5.05

0.10
0.10
0.10
0.10
0.10

2.0
2.0
2.0
6.0
4.0

3.30
2.80
3.14
2.20
2.80

0.10
0.10
0.10
0.10
0.10

10.0
2.0
4.0
2.0
2.0

2.60
3.14
2.10
0.75
1.42

0.10
0.10
0.10
0.10
0.10

4.0
2.0
0.0
2.0
2.0

2.80
1.64
0.00
9.18
8.83

0.10
0.10
0.00
0.10
0.10

10.0
2.0
8.0
2.0
2.0

7.57
3.70
4.50
5.00
3.07

0.10
0.10
0.10
0.10
0.10

2.0
2.0
2.0
2.0
2.0

2.58
4.52
3.00
5.13
4.90

0.10
0.10
0.10
0.10
0.10

2.0
2.0
2.0

6.42
4.30
6.24

0.10
0.10
0.10

M2
M2
M2
M2
M2

1.0
1.0
1.0
1.0

188.40
51.20
30.72
87.20

0.10
0.10
0.10
0.10

M2
M2
M2
M2

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

11.2 R.C.C. WORK- M:30 UPTO STILT PARKING FLOOR


LEVEL (PLINTH LEVEL): + 0.15MT
5.28 : Extra for providing richer mixes at all floor levels.
a. Plinth Slab
PS-1
PS-2
PS-3
PS-4

1.48
1.46
4.80
3.92
1.21
0.90
2.46
0.79
1.26
1.64
3.40
0.51
1.01
0.66
0.56
0.63
1.32
1.12
2.60
0.63
0.84
0.15
0.28
1.12
0.33
0.00
1.84
1.77
7.57
0.74
3.60
1.00
0.61
0.52
0.90
0.60
1.03
0.98
1.28
0.86
1.25
214.03

18.84
5.12
3.07
8.72

PS-5
PS-6

1.0
1.0
1.0

68.65
16.52
37.20

0.10
0.10
0.10

1.0
1.0

11.46
10.80

0.10
0.10

6.0
1.0
1.0
3.0
12.0

28.40
26.00
24.00
22.80
21.20

1.65
1.50
1.40
1.35
1.25

2.0
4.0
1.0
12.0
2.0

18.40
16.80
15.20
10.80
13.20

1.10
1.00
0.95
0.60
0.75

1.0
1.0
1.0
1.0
14.0

42.40
64.00
51.20
41.40
7.20

1.50
1.50
1.50
1.50
0.60

1.0
1.0
1.0
1.0
1.0

6.60
6.00
35.46
35.86
61.00

0.60
0.50
1.40
1.40
1.40

C-1
C-2

12.0
9.0

C-3
C-4
C-5
C-6
C-7

3.0
10.0
9.0
3.0
5.0

3.00
2.40
2.40

2.75
2.90
3.00

C-8
C-9
C-10
C-11
C-12

2.0
2.0
5.0
4.0
16.0

2.00
2.80
2.40
2.40
2.40

3.05
3.15
3.30
3.40
3.45

C-13

4.0

3.40
7.40
3.00
2.40
2.40

3.80
3.65
2.90
2.90
2.90

M2
M2
M2
M2
M2
M2

11.3 5.28 : Extra for providing richer mixes at all floor


levels.
5.9.21 : Lintels, beams, columns, girders,
bressumers and cantilevers with water proof ply
12mm thick (item to be executed with prior
permission of S.E. in case of B & R works and from
Additional Project Director in case of PIU works)
a. Footings Main building
F-1
F-2
F-3
F-4
F-5
F-6
F-7
F-8
F-9
F-10
F-11
F-12
F-13
F-14
F-15
F-16
F-17
F-18
F-19
F-20

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

b. Columns upto Stilt level beam bottom level


M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

6.87
1.65
3.72
1.15
1.08
50.22

281.16
39.00
33.60
92.34
318.00
40.48
67.20
14.44
77.76
19.80
63.60
96.00
76.80
62.10
60.48
3.96
3.00
49.64
50.20
85.40
1534.97

99.00
62.64
21.60
61.00
79.38
23.76
40.80
16.56
25.84
135.05
34.80
111.36
27.84
739.63

c. Stilt parking floor Level beams


Beams in -X- direction
SB-1

86.0
2.0
2.0
2.0

7.40
8.03
7.85
4.87

0.50
0.50
0.50
0.50

4.0
4.0
2.0
2.0
8.0

6.07
6.20
5.50
6.20
5.59

0.50
0.50
0.50
0.50
0.50

2.0
2.0
2.0
6.0
2.0

4.90
5.81
3.10
4.49
4.65

0.50
0.50
0.50
0.50
0.50

2.0
4.0
2.0
6.0
2.0

3.82
3.10
4.24
4.21
3.80

0.50
0.50
0.50
0.50
0.50

2.0
2.0
2.0
2.0
4.0

3.93
3.37
2.76
2.80
2.89

0.50
0.50
0.50
0.50
0.50

6.0
6.0
4.0
2.0
2.0

0.90
0.58
1.50
3.93
3.83

0.50
0.50
0.50
0.50
0.50

SB-15

2.0

10.20

0.50

Beams in -Y- direction


SB-1

20.0

7.25

0.50

24.0
30.0
2.0
2.0
10.0

7.15
7.30
7.40
7.30
4.80

0.50
0.50
0.50
0.50
0.50

8.0
2.0
2.0
6.0
2.0

4.90
6.07
4.50
4.10
3.96

0.50
0.50
0.50
0.50
0.50

4.0
4.0
10.0
2.0
2.0

3.14
4.10
3.40
2.56
5.05

0.50
0.50
0.50
0.50
0.50

2.0

3.30

0.50

SB-3
SB-4

SB-7

SB-8
SB-9
SB-10
SB-12

SB-2
SB-5
SB-6

SB-7

SB-8

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

318.20
8.03
7.85
4.87
12.14
12.40
5.50
6.20
22.36
4.90
5.81
3.10
13.47
4.65
3.82
6.20
4.24
12.63
3.80
3.93
3.37
2.76
2.80
5.78
2.70
1.74
3.00
3.93
3.83
10.20

72.50
85.80
109.50
7.40
7.30
24.00
19.60
6.07
4.50
12.30
3.96
6.28
8.20
17.00
2.56
5.05
3.30

M2
M2

SB-9

2.0
2.0
6.0

2.80
3.14
2.20

0.50
0.50
0.50

SB-10

4.0
10.0
2.0
4.0
2.0

2.80
2.60
3.14
2.10
0.75

0.50
0.50
0.50
0.50
0.50

2.0
4.0
2.0

1.42
2.80
1.64

0.50
0.50
0.50

2.0
2.0
10.0
2.0

9.18
8.83
7.57
3.70

0.50
0.50
0.50
0.50

8.0
2.0
2.0
2.0
2.0

4.50
5.00
3.07
2.58
4.52

0.50
0.50
0.50
0.50
0.50

2.0
2.0
2.0
2.0
2.0

3.00
5.13
4.90
6.42
4.30

0.50
0.50
0.50
0.50
0.50

2.0

6.24

0.50

M2
M2
M2

C-1
C-2
C-3
C-4
C-5

12.0
9.0
3.0
10.0
9.0

3
2.4
2.4
2
2.8

0.30
0.30
0.30
0.30
0.30

M2
M2
M2
M2
M2

C-6
C-7
C-8
C-9
C-10

3.0
5.0
2.0
2.0
5.0

2.4
2.4
2.4
3.4
7.4

0.30
0.30
0.30
0.30
0.30

M2
M2
M2
M2
M2

C-11
C-12
C-13
C-14
C-15

4.0
16.0
4.0
6.0
2.0

3
2.4
2.4
2.2
1.2

0.30
0.30
0.30
0.30
0.30

M2
M2
M2
M2
M2

SB-11

Beams in -inclined- direction


SB-1

SB-6

SB-7
SB-9
SB-13
SB-14

M2
M2
M2
M2
M2
M2
M2
M2
M2

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

d. Columns above Plinth beam and upto Stilt Floor


level= +0.15MT.

M2
5.9.1 : Foundations, footings, bases of columns, etc.
for concrete up to plinth level.

M2

2.80
3.14
6.60
5.60
13.00
3.14
4.20
0.75
1.42
5.60
1.64

9.18
8.83
37.85
3.70
18.00
5.00
3.07
2.58
4.52
3.00
5.13
4.90
6.42
4.30
6.24
1043.15

10.80
6.48
2.16
6.00
7.56
2.16
3.60
1.44
2.04
11.10
3.60
11.52
2.88
3.96
0.72
76.02
398.52

5.9.21 : Lintels, beams, columns, girders,


bressumers and cantilevers with water proof ply
12mm thick (item to be executed with prior
permission of S.E. in case of B & R works and from
Additional Project Director in case of PIU works)
12

M2

D.P.C. WORK:
Providing and laying Damp proof Course 50mm thick
with concrete designation M-15 with 20mm nominal size
graded stone aggregates (crushed) mechanically mixed.
1.0

13

234.12

0.30

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.90
0.60
0.60
0.70
0.80
0.60
0.60
0.60
1.40
3.40
1.20
0.60
0.60
0.70

M2

R.C.C. M: 30, WORK IN SUPER STRUCTURE: ABOVE


STILT PARKING FLOOR LEVE = -+0.15 MT. AND UP
TO TERRACE LEVEL = + 38.25 MT.
5.31 : Providing and laying in position ready mixed M-25
grade concrete for reinforced cement concrete work,
using cement content as per approved design mix and
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all leads,
having continuous agitated mixer, manufactured as per
mix design of specified grade for reinforced cement
concrete work, including pumping of R.M.C. from transit
mixer to site of laying, excluding the cost of centering,
shuttering, finishing and reinforcement, including cost of
admixtures in recommended proportions as per IS :
9103 to accelerate / retard setting of concrete, improve
workability without impairing strength and durability as
per direction of the Engineer - in - charge.
5.31.2 : All works above plinth level and upto floor V
level.
5.28 : Extra for providing richer mixes at all floor levels.
Note : If Excess/ less cement over the specified cement
content used is payable/ recoverable separately)
5.28.1 : Providing M-30 grade concrete instead of M-25
grade BMC/RMC.
Note : Cement content considered in M-30 is @ 340
kg/cum)
A. STILT PARKING FLOOR:
a. Columns above Stilt Parking Floor level = +0.15MT.
and upto Podium floor level = + 3.25 MT. Level
12.0
C-1
9.0
C-2
3.0
C-3
10.0
C-4
9.0
C-5
3.0
C-6
5.0
C-7
2.0
C-8
2.0
C-9
5.0
C-10
4.0
C-11
16.0
C-12
4.0
C-13
6.0
C-14

2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

b. Windows seal Projection


Windows, W-1
W-2
W-3

21.0
1.0
2.0

2.00
3.20
2.30

0.60
0.60
0.60

0.10
0.10
0.10

M3
M3
M3

3716.26

70.24

8.10
4.05
1.35
5.25
5.40
1.35
2.25
0.90
2.10
12.75
3.60
7.20
1.80
3.15
54.30
2.52
0.19
0.28

3.0

1.00

0.60

0.10

M3
M3

c. Lintel
GFL-1
GFL-2
GFL-3
GFL-4

21.0
1.0
2.0
3.0

2.40
3.60
2.70
1.40

0.20
0.20
0.20
0.20

0.10
0.10
0.10
0.10

M3
M3
M3
M3
M3

d. Wheather shed
Windows, W-1
W-2
W-3
Vantilators, V-1

21.0
1.0
2.0
3.0

2.40
3.60
2.70
1.40

0.60
0.60
0.60
0.60

0.10
0.10
0.10
0.10

M3
M3
M3
M3
M3

1.0
1.0
1.0
1.0
1.0
1.0
3.0
1.0
2.0
33.0
1.0
1.0
1.0
30.0
1.0
2.0
1.0
1.0
1.0
2.0
1.0
1.0
1.0
3.0
3.0
3.0
1.0
3.0
2.0
1.0
1.0
1.0
1.0
3.0
1.0

7.40
6.20
8.26
7.64
3.93
4.87
5.59
4.21
4.49
7.40
3.83
3.37
9.69
7.40
5.50
4.21
4.90
5.81
5.59
6.70
6.20
4.49
2.15
7.30
7.67
0.90
3.93
3.10
1.50
1.27
4.25
2.89
3.10
0.90
6.20

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.20
0.20
0.20

0.55
0.55
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.90

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

7.0
1.0
12.0
9.0
4.0
2.0
1.0
1.0
1.0
2.0
4.0
1.0
1.0

7.25
7.40
7.15
7.30
7.30
4.90
3.14
4.10
4.10
7.30
3.40
1.64
2.56

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.40
0.40
0.40

0.55
0.55
0.55
0.55
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

Vantilators, V-1

e. Stilt floor roof Slab Beams


Beams in - X - Direction
SRB-1
SRB-2

SRB-3

SRB-4
SRB-5

SRB-6
SRB-7
SRB-8
Beams in - Y - Direction
SRB-1

SRB-2

SRB-3
SRB-4

0.18
3.17
1.01
0.07
0.11
0.08
1.27
3.02
0.22
0.32
0.25
3.82

1.63
1.36
1.49
1.38
0.71
0.88
3.02
0.76
1.62
43.96
0.69
0.61
1.31
29.97
0.74
1.14
0.66
0.78
0.75
1.81
0.84
0.61
0.29
2.96
3.11
0.49
0.71
1.26
0.41
0.17
0.57
0.39
0.28
0.24
1.12
11.17
1.63
18.88
14.45
5.26
1.76
0.57
0.74
0.55
1.97
2.45
0.30
0.46

SRB-5

SRB-6
SRB-7
SRB-12
Beams in - Inclined - Direction
SRB-2
SRB-3
SRB-5

Ramp Beam-B-1

Ramp Beam-B-2

f. Stilt Floor roof Slab


SFRS-1

1.0
1.0
1.0
3.0
3.0
2.0
2.0
5.0
2.0
2.0
1.0
2.0

1.75
4.50
3.30
2.20
3.14
4.10
2.80
2.45
2.10
2.80
0.90
7.25

0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20
0.20
0.40

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
1.73

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

1.0
2.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
2.0
1.0
4.0
5.0
1.0
1.0
3.0
1.0
4.0
1.0
1.0
1.0
1.0
4.0
1.0

8.83
9.18
7.57
3.00
5.00
3.08
2.65
4.60
2.15
7.30
7.25
7.40
4.50
9.88
8.03
7.70
7.57
1.00
6.06
2.70
4.10
5.45
4.20
2.60

0.40
0.40
0.30
0.30
0.30
0.30
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.25
0.25

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

2.0
23.0
1.0
6.0
8.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
2.0
2.0
5.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

8.30
8.00
8.30
8.00
8.00
4.90
3.40
3.40
4.95
7.60
4.95
4.55
4.95
8.00
8.00
8.00
4.15
2.68
4.00
6.00
4.00
6.00
7.75

4.00
4.00
5.25
3.90
4.10
4.95
3.70
2.80
8.00
4.70
7.70
8.00
2.96
4.10
5.20
4.30
1.90
8.00
6.00
4.55
6.50
3.75
5.10

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

0.32
0.61
0.45
0.89
1.27
1.11
0.76
1.65
0.38
0.50
0.08
10.01
1.59
3.30
2.04
0.41
0.68
0.42
0.48
0.76
0.35
2.41
1.20
4.88
3.71
1.63
1.32
3.81
1.25
0.66
1.00
0.45
0.68
0.90
1.26
0.20
222.24

9.96
110.40
6.54
28.08
39.36
3.64
1.89
1.43
5.94
5.36
5.72
5.46
2.20
9.84
12.48
25.80
1.18
3.21
3.60
4.10
3.90
3.38
5.93

SFRS-2
SFRS-3
Ramp
Outer Ramp
Ramp-1
Inner Ramp
Ramp-2

g. Stilt Floor Stair Case


Stair case -1
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -2
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -3
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
h. Ramp
Sloping Slab
Outer Ramp
Ramp-1

1.0
1.0
1.0
1.0
1.0
1.0
1.0
2.0
1.0
1.0
1.0
1.0
1.0

5.10
3.51
4.70
8.00
3.90
7.75
3.20
8.00
8.30
4.80
3.13
3.13
7.55

3.10
8.00
7.45
8.00
8.00
6.80
3.20
3.20
3.20
8.10
2.20
6.05
7.70

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.25

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

1.0
1.0

9.10
27.15

5.30
4.80

0.175
0.175

M3
M3

1.0
1.0

32.10
4.60

4.80
3.00

0.175
0.175

M3
M3
M3

9.0
1.0
1.0

0.02
0.34
2.10

1.50
13.50
3.30

9.0
1.0
1.0

0.02
0.34
2.10

1.50
13.50
3.30

9.0
1.0
1.0

0.02
0.34
1.90

1.50
13.50
2.80

9.0
1.0
1.0

0.02
0.34
1.90

1.50
13.50
2.80

9.0
1.0
1.0

0.02
0.34
2.10

1.50
13.50
3.30

9.0
1.0
1.0

0.02
0.34
2.10

1.50
13.50
3.30

0.15
0.15

M3
M3
M3
M3

1.0
1.0

9.51
27.07

4.50
4.50

0.175
0.175

M3
M3

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

2.37
4.21
5.25
9.60
4.68
7.91
1.54
7.68
3.98
5.83
1.03
2.84
14.53

8.44
22.81
26.96
2.42
431.46

0.32
0.68
1.04
0.32
0.68
1.04

0.32
0.68
0.80
0.32
0.68
0.80

0.32
0.68
1.04
0.32
0.68
1.04
11.76

7.49
21.31

Inner Ramp
Ramp-2

Sloping Beams
Ramp Beam-B-1

Ramp Beam-B-2

1.0
1.0

27.20
8.54

4.50
4.50

0.175
0.175

M3
M3
M3

5.0
1.0
1.0
1.0
1.0
4.0

7.57
4.20
3.00
3.10
2.28
4.50

0.30
0.30
0.30
0.30
0.30
0.30

0.53
0.53
0.53
0.53
0.53
0.23

M3
M3
M3
M3
M3
M3
M3

TOTAL R.C.C. WORK UP TO STILT PARKING FLOOR


ROOF LEVEL : +3.25 MT.

M3

B. PODIUM FLOOR :
a. Columns above Podium Floor level = +3.25MT. and
upto First floor level = + 8.25 MT. Level
12.0
9.0
3.0
10.0
9.0
3.0
5.0
2.0
2.0
5.0
4.0
16.0
4.0
6.0

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.90
0.60
0.60
0.70
0.80
0.60
0.60
0.60
1.40
3.40
1.20
0.60
0.60
0.70

4.25
4.25
4.25
4.25
4.25
4.25
4.25
4.25
4.25
4.25
4.25
4.25
4.25
4.25

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

b. Windows seal
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.00
3.20
2.30
1.00

0.60
0.60
0.60
0.60

0.10
0.10
0.10
0.10

M3
M3
M3
M3
M3

c. Lintel
FFL-1
FFL-2
FFL-3
FFL-4

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.20
0.20
0.20
0.20

0.10
0.10
0.10
0.10

M3
M3
M3
M3
M3

d. Wheather shed
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.60
0.60
0.60
0.60

0.10
0.10
0.10
0.10

M3
M3
M3
M3
M3

1.0
1.0
1.0

7.40
6.20
8.26

0.40
0.40
0.40

0.55
0.55
0.45

M3
M3
M3

C-1
C-2
C-3
C-4
C-5
C-6
C-7
C-8
C-9
C-10
C-11
C-12
C-13
C-14

e. Podium floor roof Slab Beams


Beams in - X - Direction
PRB-1
PRB-2

21.42
6.73
56.94

5.96
0.66
0.47
0.49
0.36
1.22
9.16
1416.13

13.77
6.89
2.30
8.93
9.18
2.30
3.83
1.53
3.57
21.68
6.12
12.24
3.06
5.36
100.73
0.60
0.19
0.00
0.18
0.97
0.24
0.07
0.00
0.08
0.40
0.72
0.22
0.00
0.25
1.19

1.63
1.36
1.49

PRB-3

PRB-4
PRB-5

PRB-6
PRB-7
PRB-8
PRB-9
PRB-15
Beams in - Y - Direction
PRB-1

PRB-2

PRB-3
PRB-4

PRB-5

1.0
1.0
1.0
3.0
1.0
1.0
2.0
37.0
1.0
1.0
1.0
31.0
1.0
2.0
2.0
1.0
1.0
2.0
2.0
1.0
3.0
1.0
3.0
2.0
1.0
1.0
1.0
3.0
1.0
1.0
2.0
1.0

7.64
3.93
4.87
5.59
6.08
4.21
4.49
7.40
3.83
3.37
7.20
7.40
5.50
4.21
4.90
5.81
5.59
6.70
6.20
4.49
0.90
3.93
3.10
1.50
1.27
4.25
3.10
0.90
7.25
7.40
7.30
10.07

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.40
0.40
0.30
0.30
0.30
0.30
0.20
0.20
0.40
0.40
0.40
0.40

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.95
0.50
0.50
0.35

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

12.0
9.0
12.0
9.0
2.0
2.0
1.0
1.0
2.0
1.0
4.0
1.0
1.0
1.0
1.0
1.0
3.0
3.0
2.0
2.0

7.25
7.40
7.15
7.30
7.30
4.90
3.14
4.10
7.30
4.10
3.40
1.64
2.56
1.75
4.50
3.30
2.20
3.14
4.10
2.80

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.40
0.40
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

1.38
0.71
0.88
3.02
1.09
0.76
1.62
49.28
0.69
0.61
0.97
30.97
0.74
1.14
1.32
0.78
0.75
1.81
1.67
0.61
0.49
0.71
1.26
0.41
0.17
0.57
0.28
0.24
2.76
1.48
2.92
1.41
15.66
11.99
15.44
11.83
2.63
1.76
0.57
0.74
1.97
0.55
2.45
0.30
0.46
0.32
0.61
0.45
0.89
1.27
1.11
0.76

PRB-6
PRB-7
Beams in - Inclined - Direction
PRB-2
PRB-3
PRB-5

PRB-9
PRB-10

f. Podium Floor roof Slab


FFRS-1

FFRS-2

2.0
2.0
1.0

2.10
2.80
0.90

0.20
0.20
0.20

0.45
0.45
0.45

M3
M3
M3

1.0
2.0
5.0
1.0
1.0
1.0
1.0
3.0
1.0
1.0
1.0
1.0
1.0

8.83
9.18
7.57
3.00
5.00
3.08
2.65
4.20
5.13
4.09
6.43
4.30
6.24

0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.40
0.30
0.30
0.30
0.30

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.50
0.35
0.35
0.35
0.35

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

2.0
18.0
1.0
6.0
8.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
2.0
1.0
1.0
2.0
2.0
4.0
2.0
1.0
1.0
4.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
10.0
1.0
1.0

8.30
8.00
8.30
8.00
8.00
4.90
3.40
3.40
4.95
7.60
4.80
4.95
7.55
4.53
4.95
8.00
8.00
8.00
6.80
4.15
2.68
8.00
7.53
28.25
4.00
6.00
4.00
6.00
3.80
7.75
5.10
8.30
8.30
8.30
3.58
3.51
4.70
8.00
8.00
3.13
3.90

4.00
4.00
5.25
3.90
4.10
4.95
3.70
2.80
8.00
4.70
4.55
7.70
3.85
8.00
2.96
4.10
5.20
4.30
3.85
1.90
8.00
4.30
4.30
4.95
6.00
4.55
6.50
3.75
3.55
5.10
3.10
5.20
4.00
4.30
8.30
8.00
7.45
8.00
4.00
8.00
8.00

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

0.38
0.50
0.08
1.59
3.30
5.11
0.41
0.68
0.42
0.36
1.70
1.03
0.43
0.68
0.45
0.66
207.46

9.96
86.40
6.54
28.08
39.36
3.64
1.89
1.43
5.94
5.36
3.28
5.72
8.72
5.44
2.20
9.84
12.48
20.64
7.85
1.18
3.21
20.64
4.85
20.98
3.60
4.10
3.90
3.38
2.02
5.93
2.37
6.47
4.98
5.35
4.45
4.21
5.25
9.60
48.00
3.76
4.68

M3
g. Podium Floor Stair Case -First stage
Stair case -1
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -2
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -3
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing

9.0
1.0
1.0

0.02
0.34
2.10

1.50
13.50
3.30

9.0
1.0
1.0

0.02
0.34
2.10

1.50
13.50
3.30

9.0
1.0
1.0

0.02
0.34
1.90

1.50
13.50
2.80

9.0
1.0
1.0

0.02
0.34
1.90

1.50
13.50
2.80

9.0
1.0
1.0

0.02
0.34
2.10

1.50
13.50
3.30

9.0
1.0
1.0

0.02
0.34
2.10

1.50
13.50
3.30

8.0
1.0
1.0

0.02
0.34
2.10

1.50
12.00
3.30

8.0
1.0
1.0

0.02
0.34
2.10

1.50
12.00
3.30

8.0
1.0
1.0

0.02
0.34
1.90

8.0
1.0
1.0

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3
M3

g. Podium Floor Stair Case -Second stage


Stair case -1
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -2
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -3
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
TOTAL R.C.C. WORK UP TO PODIUM FLOOR ROOF
LEVEL : +8.25 MT.

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

1.50
12.00
2.80

0.15
0.15

M3
M3
M3

0.02
0.34
1.90

1.50
12.00
2.80

0.15
0.15

M3
M3
M3

8.0
1.0
1.0

0.02
0.34
2.10

1.50
12.00
3.30

0.15
0.15

M3
M3
M3

8.0
1.0
1.0

0.02
0.34
2.10

1.50
12.00
3.30

0.15
0.15

M3
M3
M3
M3
M3

437.66

0.32
0.68
1.04
0.32
0.68
1.04
0.32
0.68
0.80
0.32
0.68
0.80
0.32
0.68
1.04
0.32
0.68
1.04
11.76

0.28
0.61
1.04
0.28
0.61
1.04
0.28
0.61
0.80
0.28
0.61
0.80
0.28
0.61
1.04
0.28
0.61
1.04
11.09
771.25

C. FIRST FLOOR :
a. Columns above First Floor level = +8.25MT. and
upto Second floor level = + 12.00 MT. Level
12.0
9.0
3.0
9.0
2.0
5.0
1.0
2.0
5.0
4.0
2.0

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.90
0.60
0.60
0.80
0.60
0.60
0.60
1.40
3.40
1.20
0.60

3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

b. Windows seal
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.00
3.20
2.30
1.00

0.60
0.60
0.60
0.60

4.25
4.25
4.25
4.25

M3
M3
M3
M3
M3

c. Lintel
FFL-1
FFL-2
FFL-3
FFL-4

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.20
0.20
0.20
0.20

4.25
4.25
4.25
4.25

M3
M3
M3
M3
M3

d. Wheather shed
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.60
0.60
0.60
0.60

0.10
0.10
0.10
0.10

M3
M3
M3
M3
M3

1.0
1.0
1.0
30.0
1.0
1.0
21.0
1.0
1.0
2.0
1.0
1.0
1.0
3.0
2.0
1.0
1.0
1.0
1.0
2.0
1.0
1.0

7.40
6.20
3.39
7.40
4.49
4.58
7.40
4.90
4.21
6.70
4.49
4.58
3.93
3.10
1.50
2.76
4.24
2.80
0.90
2.40
5.50
6.20

0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.40
0.30
0.30
0.30
0.30
0.20
0.20
0.30
0.30
0.30

0.55
0.55
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.55
0.55
0.55

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

4.0
11.0

7.40
7.25

0.40
0.40

0.55
0.55

M3
M3

C-1
C-2
C-3
C-5
C-6
C-7
C-8
C-9
C-10
C-11
C-12

e. First floor roof Slab Beams


Beams in - X - Direction
FRB-1
FRB-2

FRB-3

FRB-4
FRB-5

FRB-6
FRB-7
FRB-8
Beams in - Y - Direction
FRB-1

10.21
5.10
1.70
6.80
1.13
2.84
0.57
2.65
16.07
4.54
1.13
52.73
25.50
8.16
0.00
7.65
41.31
10.20
3.06
0.00
3.57
16.83
0.72
0.22
0.00
0.25
1.19

1.63
1.36
0.61
39.96
0.81
0.82
20.98
0.66
0.57
1.81
0.61
0.62
0.71
1.26
0.41
0.37
0.57
0.25
0.08
0.79
0.91
1.02
6.51
17.55

FRB-2
FRB-3
FRB-4
FRB-5

FRB-6
FRB-7
Beams in - Inclined - Direction
FRB-3

10.0
3.0
2.0
1.0
1.0
3.0
1.0
1.0
1.0
1.0
2.0
3.0
1.0
3.0
2.0
1.0
2.0
1.0

7.15
7.30
4.90
4.21
7.30
7.30
4.10
5.50
4.50
3.30
2.50
3.14
2.20
4.10
2.80
2.10
2.80
0.90

0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20
0.20

0.55
0.55
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

2.0

8.37

0.30

0.45

M3
M3

f. First Floor roof Slab


FFRS-1

FFRS-2

FFRS-3
g. First Floor Stair Case
Stair case -1
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -2

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

4.0
7.0
4.0
4.0
9.0
1.0
4.0
1.0
1.0
1.0
1.0
3.0
1.0
1.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

8.30
8.00
8.00
8.30
8.00
8.30
8.00
8.00
4.90
3.40
8.30
8.00
8.30
3.40
2.85
7.60
4.11
8.40
4.53
8.00
8.30
4.95
8.30
8.30
3.90
3.13
8.67

4.00
4.00
3.15
4.30
4.30
5.25
5.05
3.90
4.95
3.70
3.90
4.10
4.10
2.80
8.00
4.70
4.85
2.20
8.30
5.20
5.20
2.96
4.75
3.75
8.30
8.30
8.00

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.25

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

15.73
4.82
1.76
0.76
1.31
2.96
0.55
0.99
0.61
0.45
0.68
1.27
0.30
1.66
0.76
0.19
0.50
0.08
2.26
136.15

19.92
33.60
15.12
21.41
46.44
6.54
24.24
4.68
3.64
1.89
4.86
14.76
5.10
1.43
6.84
5.36
2.99
2.77
5.64
6.24
6.47
2.20
5.91
4.67
4.86
3.90
17.34
278.81

0.42
0.91
0.74
0.42
0.91
0.74

First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -3
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing

12.0
1.0
1.0

0.02
0.34
1.30

1.50
18.00
2.80

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.30

1.50
18.00
2.80

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

TOTAL R.C.C. WORK UP TO FIRST FLOOR ROOF


LEVEL : +12.00 MT.

M3
M3
M3
M3
M3

D. SECOND FLOOR :
a. Columns above Second Floor level = +12.00MT.
and upto Third floor level = + 15.75 MT. Level
12.0
9.0
3.0
9.0
2.0
5.0
1.0
2.0
5.0
4.0
2.0

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.90
0.60
0.60
0.80
0.60
0.60
0.60
1.40
3.40
1.20
0.60

3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

b. Windows seal
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.00
3.20
2.30
1.00

0.60
0.60
0.60
0.60

0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3

c. Lintel
FFL-1
FFL-2
FFL-3
FFL-4

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.20
0.20
0.20
0.20

0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3

d. Wheather shed
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

M3
M3
M3
M3
M3

1.0
1.0
1.0

7.40
6.20
3.39

0.40
0.40
0.40

0.55
0.55
0.45

M3
M3
M3

C-1
C-2
C-3
C-5
C-6
C-7
C-8
C-9
C-10
C-11
C-12

e. Second floor roof Slab Beams


Beams in - X - Direction
SRB-1
SRB-2

0.42
0.91
0.55
0.42
0.91
0.55
0.42
0.91
0.74
0.42
0.91
0.74
12.07
539.09

10.21
5.10
1.70
6.80
1.13
2.84
0.57
2.65
16.07
4.54
1.13
52.73
0.90
0.29
0.00
0.27
1.46
0.36
0.11
0.00
0.13
0.59
0.00
0.00
0.00
0.00
0.00

1.63
1.36
0.61

SRB-3

SRB-4
SRB-5

SRB-6
SRB-7
SRB-8
Beams in - Y - Direction
SRB-1

SRB-2
SRB-3
SRB-4
SRB-5

SRB-6
SRB-7
Beams in - Inclined - Direction
SRB-3
Extra Beam in - Y - direction
SRB-9

30.0
1.0
1.0
21.0
1.0
1.0
2.0
1.0
1.0
1.0
3.0
2.0
1.0
1.0
1.0
1.0
2.0
1.0
1.0

7.40
4.49
4.58
7.40
4.90
4.21
6.70
4.49
4.58
3.93
3.10
1.50
2.76
4.24
2.80
0.90
2.40
5.50
6.20

0.40
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.40
0.30
0.30
0.30
0.30
0.20
0.20
0.30
0.30
0.30

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.55
0.55
0.55

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

4.0
11.0
10.0
3.0
2.0
1.0
1.0
3.0
1.0
1.0
1.0
1.0
2.0
3.0
1.0
3.0
2.0
1.0
2.0
1.0

7.40
7.25
7.15
7.30
4.90
4.21
7.30
7.30
4.10
5.50
4.50
3.30
2.50
3.14
2.20
4.10
2.80
2.10
2.80
0.90

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20
0.20

0.55
0.55
0.55
0.55
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

2.0

8.37

0.30

0.45

M3

1.0

7.30

0.00

0.45

M3
M3

4.0
5.0
6.0
2.0
4.0
7.0
1.0
4.0
1.0
1.0
1.0
1.0
3.0
1.0
1.0
2.0
1.0

8.30
8.00
8.00
8.00
8.30
8.00
8.30
8.00
8.00
4.90
3.40
8.30
8.00
8.30
3.40
2.85
7.60

4.00
4.00
3.15
5.15
4.30
4.30
5.25
5.05
3.90
4.95
3.70
3.90
4.10
4.10
2.80
8.00
4.70

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

f. Second Floor roof Slab


SFRS-1

39.96
0.81
0.82
20.98
0.66
0.57
1.81
0.61
0.62
0.71
1.26
0.41
0.37
0.57
0.25
0.08
0.79
0.91
1.02
6.51
17.55
15.73
4.82
1.76
0.76
1.31
2.96
0.55
0.99
0.61
0.45
0.68
1.27
0.30
1.66
0.76
0.19
0.50
0.08
2.26
0.00
138.49

19.92
24.00
22.68
12.36
21.41
36.12
6.54
24.24
4.68
3.64
1.89
4.86
14.76
5.10
1.43
6.84
5.36

SFRS-2

SFRS-3
g. Second Floor Stair Case
Stair case -1
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -2
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -3
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.25

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

4.11
8.40
4.53
4.95
8.00
8.30
3.13
8.30
8.30
3.90
7.55

4.85
2.20
8.30
2.96
5.20
5.20
8.30
4.75
3.75
8.30
7.70

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.30

1.50
18.00
2.80

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.30

1.50
18.00
2.80

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

TOTAL R.C.C. WORK UP TO SECOND FLOOR ROOF


LEVEL : +15.75 MT.

M3
M3
M3
M3
M3

E. THIRD FLOOR :
a. Columns above Third Floor level = +15.75MT. and
upto Fourth floor level = + 19.50 MT. Level
C-1
C-2
C-3
C-5
C-6
C-7
C-8
C-9
C-10
C-11
C-12
b. Windows seal
Windows, W-1
W-2

12.0
9.0
3.0
9.0
2.0
5.0
1.0
2.0
5.0
4.0
2.0

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.90
0.60
0.60
0.80
0.60
0.60
0.60
1.40
3.40
1.20
0.60

3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

5.0
1.0

2.00
3.20

0.60
0.60

0.15
0.15

M3
M3

2.99
2.77
5.64
2.20
6.24
6.47
3.90
5.91
4.67
4.86
14.53
276.00

0.42
0.91
0.74
0.42
0.91
0.74
0.42
0.91
0.55
0.42
0.91
0.55
0.42
0.91
0.74
0.42
0.91
0.74
12.07
481.35

10.21
5.10
1.70
6.80
1.13
2.84
0.57
2.65
16.07
4.54
1.13
52.73
0.90
0.29

0.0
3.0

2.30
1.00

0.60
0.60

0.15
0.15

M3
M3
M3

c. Lintel
FFL-1
FFL-2
FFL-3
FFL-4

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.20
0.20
0.20
0.20

#REF!
#REF!
#REF!
#REF!

M3
M3
M3
M3
M3

d. Wheather shed
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

M3
M3
M3
M3
M3

1.0
1.0
1.0
30.0
1.0
1.0
21.0
1.0
1.0
2.0
1.0
1.0
1.0
3.0
2.0
1.0
1.0
1.0
1.0
2.0
1.0
1.0

7.40
6.20
3.39
7.40
4.49
4.58
7.40
4.90
4.21
6.70
4.49
4.58
3.93
3.10
1.50
2.76
4.24
2.80
0.90
2.40
5.50
6.20

0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.40
0.30
0.30
0.30
0.30
0.20
0.20
0.30
0.30
0.30

0.55
0.55
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.55
0.55
0.55

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

4.0
11.0
10.0
3.0
2.0
1.0
1.0
3.0
1.0
1.0
1.0
1.0
2.0
3.0
1.0
3.0
2.0
1.0
2.0
1.0

7.40
7.25
7.15
7.30
4.90
4.21
7.30
7.30
4.10
5.50
4.50
3.30
2.50
3.14
2.20
4.10
2.80
2.10
2.80
0.90

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20
0.20

0.55
0.55
0.55
0.55
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

W-3
Vantilators, V-1

e. Third floor roof Slab Beams


Beams in - X - Direction
3RB-1
3RB-2

3RB-3

3RB-4
3RB-5

3RB-6
3RB-7
3RB-8
Beams in - Y - Direction
3RB-1

3RB-2
3RB-3
3RB-4
3RB-5

3RB-6
3RB-7
Beams in - Inclined - Direction

0.00
0.27
1.46
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00

1.63
1.36
0.61
39.96
0.81
0.82
20.98
0.66
0.57
1.81
0.61
0.62
0.71
1.26
0.41
0.37
0.57
0.25
0.08
0.79
0.91
1.02
6.51
17.55
15.73
4.82
1.76
0.76
1.31
2.96
0.55
0.99
0.61
0.45
0.68
1.27
0.30
1.66
0.76
0.19
0.50
0.08

SRB-3
Extra Beam in - Y - direction
SRB-9
f. Third Floor roof Slab
3RS-1

3RS-2

3RS-3
g. Third Floor Stair Case
Stair case -1
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -2
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -3
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing

2.0

8.37

0.30

0.45

M3

1.0

7.30

0.00

0.45

M3
M3

4.0
7.0
4.0
4.0
9.0
1.0
4.0
1.0
1.0
1.0
1.0
3.0
1.0
1.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

8.30
8.00
8.00
8.30
8.00
8.30
8.00
8.00
4.90
3.40
8.30
8.00
8.30
3.40
2.85
7.60
4.11
8.40
4.53
4.95
8.00
8.30
3.13
8.30
8.30
3.90
7.55

4.00
4.00
3.15
4.30
4.30
5.25
5.05
3.90
4.95
3.70
3.90
4.10
4.10
2.80
8.00
4.70
4.85
2.20
8.30
2.96
5.20
5.20
8.30
4.75
3.75
8.30
7.70

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.25

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.30

1.50
18.00
2.80

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.30

1.50
18.00
2.80

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3
M3

2.26
0.00
138.49

19.92
33.60
15.12
21.41
46.44
6.54
24.24
4.68
3.64
1.89
4.86
14.76
5.10
1.43
6.84
5.36
2.99
2.77
5.64
2.20
6.24
6.47
3.90
5.91
4.67
4.86
14.53
276.00

0.42
0.91
0.74
0.42
0.91
0.74
0.42
0.91
0.55
0.42
0.91
0.55
0.42
0.91
0.74
0.42
0.91
0.74
12.07

TOTAL R.C.C. WORK UP TO THIRD FLOOR ROOF


LEVEL : +19.50 MT.

M3

F. FOURTH FLOOR :
a. Columns above Fourth Floor level = +19.50MT. and
upto Third floor level = + 23.25 MT. Level
12.0
9.0
3.0
9.0
2.0
5.0
1.0
2.0
5.0
4.0
2.0

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.90
0.60
0.60
0.80
0.60
0.60
0.60
1.40
3.40
1.20
0.60

3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

b. Windows seal
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.00
3.20
2.30
1.00

0.60
0.60
0.60
0.60

#REF!
#REF!
#REF!
#REF!

M3
M3
M3
M3
M3

c. Lintel
FFL-1
FFL-2
FFL-3
FFL-4

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.20
0.20
0.20
0.20

#REF!
#REF!
#REF!
#REF!

M3
M3
M3
M3
M3

d. Wheather shed
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

M3
M3
M3
M3
M3

1.0
1.0
1.0
30.0
1.0
1.0
21.0
1.0
1.0
2.0
1.0
1.0
2.0
1.0
3.0
2.0
1.0
1.0
1.0
1.0
2.0
1.0

7.40
6.20
3.39
7.40
4.49
4.58
7.40
4.90
4.21
6.70
4.49
4.58
7.20
3.93
3.10
1.50
2.76
4.24
2.80
0.90
2.40
5.50

0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.40
0.40
0.30
0.30
0.30
0.30
0.20
0.20
0.30
0.30

0.55
0.55
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.55
0.55

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

C-1
C-2
C-3
C-5
C-6
C-7
C-8
C-9
C-10
C-11
C-12

e. Fourth floor roof Slab Beams


Beams in - X - Direction
4RB-1
4RB-2

4RB-3

4RB-4
4RB-5

4RB-6
4RB-7
4RB-8

#REF!

10.21
5.10
1.70
6.80
1.13
2.84
0.57
2.65
16.07
4.54
1.13
52.73
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00

1.63
1.36
0.61
39.96
0.81
0.82
20.98
0.66
0.57
1.81
0.61
0.62
2.59
0.71
1.26
0.41
0.37
0.57
0.25
0.08
0.79
0.91

Beams in - Y - Direction
4RB-1

4RB-2
4RB-3
4RB-4
4RB-5

4RB-6
4RB-7
Beams in - Inclined - Direction
4RB-3
Extra Beam in - Y - direction
4RB-9
f. Fourth Floor roof Slab
4RS-1

4RS-2

1.0

6.20

0.30

0.55

M3

4.0
11.0
10.0
3.0
2.0
1.0
1.0
3.0
1.0
2.0
1.0
1.0
1.0
2.0
3.0
1.0
3.0
2.0
1.0
2.0
1.0

7.40
7.25
7.15
7.30
4.90
4.21
7.30
7.30
4.10
7.30
5.50
4.50
3.30
2.50
3.14
2.20
4.10
2.80
2.10
2.80
0.90

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20
0.20

0.55
0.55
0.55
0.55
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

2.0

8.37

0.30

0.45

M3

1.0

7.30

0.00

0.00

M3
M3

4.0
7.0
4.0
4.0
9.0
1.0
4.0
1.0
1.0
1.0
1.0
3.0
1.0
1.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

8.30
8.00
8.00
8.30
8.00
8.30
8.00
8.00
4.90
3.40
8.30
8.00
8.30
3.40
2.85
7.60
4.11
8.40
4.53
8.00
8.30
4.95
7.55
8.30
8.30
3.90
3.13

4.00
4.00
3.15
4.30
4.30
5.25
5.05
3.90
4.95
3.70
3.90
4.10
4.10
2.80
8.00
4.70
4.85
2.20
8.30
5.20
5.20
2.96
7.70
4.75
3.75
8.30
8.30

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

12.0
1.0

0.02
0.34

1.50
18.00

g. Fourth Floor Stair Case


Stair case -1
First flight
Tread and Riser
Vast slab

0.15

M3
M3

1.02
6.51
17.55
15.73
4.82
1.76
0.76
1.31
2.96
0.55
2.63
0.99
0.61
0.45
0.68
1.27
0.30
1.66
0.76
0.19
0.50
0.08
2.26
0.00
143.71

19.92
33.60
15.12
21.41
46.44
6.54
24.24
4.68
3.64
1.89
4.86
14.76
5.10
1.43
6.84
5.36
2.99
2.77
5.64
6.24
6.47
2.20
8.72
5.91
4.67
4.86
3.90
227.22

0.42
0.91

Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -2
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -3
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing

0.15

M3

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

1.50
18.00
2.80

0.15
0.15

M3
M3
M3

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

1.0

1.50

3.30

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

12.0
1.0
1.0

0.02
0.34
1.30

1.50
18.00
2.80

12.0
1.0
1.0

0.02
0.34
1.30

12.0
1.0
1.0
12.0
1.0
1.0

TOTAL R.C.C. WORK UP TO FOURTH FLOOR ROOF


LEVEL : +23.25 MT.

M3
M3
M3
M3
M3

G. FIFTH FLOOR :
a. Columns above Fifth Floor level = +23.25MT. and
upto Sixth floor level = + 27.00 MT. Level
11.0
9.0
3.0
9.0
1.0
4.0
1.0
2.0
5.0
4.0
2.0

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.30
0.30
0.30
0.60

0.90
0.60
0.60
0.80
0.60
0.60
0.60
1.40
3.40
1.20
0.60

3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

b. Windows seal
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.00
3.20
2.30
1.00

0.60
0.60
0.60
0.60

0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3

c. Lintel
FFL-1
FFL-2
FFL-3
FFL-4

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.20
0.20
0.20
0.20

0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3

d. Wheather shed
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

M3
M3
M3
M3
M3

C-1
C-2
C-3
C-5
C-6
C-7
C-8
C-9
C-10
C-11
C-12

0.74
0.42
0.91
0.74
0.42
0.91
0.55
0.42
0.91
0.55
0.42
0.91
0.74
0.42
0.91
0.74
12.07
#REF!

18.71
10.21
3.40
13.61
1.13
4.54
1.13
2.65
16.07
4.54
2.27
78.25
0.90
0.29
0.00
0.27
1.46
0.36
0.11
0.00
0.13
0.59
0.00
0.00
0.00
0.00
0.00

e. Fifth floor roof Slab Beams


Beams in - X - Direction
5RB-1
5RB-2

5RB-3

5RB-4
5RB-5

5RB-6
5RB-7
5RB-8
Beams in - Y - Direction
5RB-1

5RB-2
5RB-3
5RB-4
5RB-5

5RB-6
5RB-7
5RB-9
Beams in - Inclined - Direction
5RB-3
f. Fifth Floor roof Slab
5RS-1

1.0
1.0
1.0
30.0
1.0
1.0
21.0
1.0
1.0
2.0
1.0
1.0
2.0
1.0
3.0
2.0
1.0
1.0
1.0
1.0
2.0
1.0
1.0

7.40
6.20
3.39
7.40
4.49
4.58
7.40
4.90
4.21
6.70
4.49
4.58
7.20
3.93
3.10
1.50
2.76
4.24
2.80
0.90
2.40
5.50
6.20

0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.40
0.40
0.30
0.30
0.30
0.30
0.20
0.20
0.30
0.30
0.30

0.55
0.55
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.55
0.55
0.55

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

4.0
11.0
10.0
3.0
2.0
1.0
1.0
3.0
1.0
2.0
1.0
1.0
1.0
2.0
3.0
1.0
3.0
2.0
1.0
2.0
1.0
1.0

7.40
7.25
7.15
7.30
4.90
4.21
7.30
7.30
4.10
7.30
5.50
4.50
3.30
2.50
3.14
2.20
4.10
2.80
2.10
2.80
0.90
7.30

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20
0.20
0.00

0.55
0.55
0.55
0.55
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.55

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

2.0

8.37

0.30

0.45

M3
M3

4.0
7.0
4.0
4.0
9.0
1.0
4.0
1.0
1.0
1.0
1.0
3.0

8.30
8.00
8.00
8.30
8.00
8.30
8.00
8.00
4.90
3.40
8.30
8.00

4.00
4.00
3.15
4.30
4.30
5.25
5.05
3.90
4.95
3.70
3.90
4.10

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

1.63
1.36
0.61
39.96
0.81
0.82
20.98
0.66
0.57
1.81
0.61
0.62
2.59
0.71
1.26
0.41
0.37
0.57
0.25
0.08
0.79
0.91
1.02
6.51
17.55
15.73
4.82
1.76
0.76
1.31
2.96
0.55
2.63
0.99
0.61
0.45
0.68
1.27
0.30
1.66
0.76
0.19
0.50
0.08
0.00
2.26
138.26
19.92
33.60
15.12
21.41
46.44
6.54
24.24
4.68
3.64
1.89
4.86
14.76

5RS-2

g. Fifth Floor Stair Case


Stair case -1
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -2
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -3
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

1.0
1.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

8.30
3.40
2.85
7.60
4.11
8.40
4.53
8.00
8.30
4.95
7.55
8.30
8.30
3.90
3.13

4.10
2.80
8.00
4.70
4.85
2.20
8.30
5.20
5.20
2.96
7.70
4.75
3.75
8.30
8.30

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.30

1.50
18.00
2.80

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.30

1.50
18.00
2.80

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

TOTAL R.C.C. WORK UP TO FIFTH FLOOR ROOF


LEVEL : +27.00 MT.

M3
M3
M3
M3
M3

H. SIXTH FLOOR :
a. Columns above Sixthth Floor level = +27.00MT.
and upto Seventh floor level = + 30.75 MT. Level
C-1
C-2
C-3
C-5
C-6
C-7
C-9
C-10
C-11
C-12

11.0
9.0
3.0
9.0
1.0
4.0
2.0
5.0
4.0
2.0

0.60
0.60
0.60
0.60
0.60
0.60
0.30
0.30
0.30
0.60

0.90
0.60
0.60
0.80
0.60
0.60
1.40
3.40
1.20
0.60

3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

5.10
1.43
6.84
5.36
2.99
2.77
5.64
6.24
6.47
2.20
8.72
5.91
4.67
4.86
3.90
270.19

0.42
0.91
0.74
0.42
0.91
0.74
0.42
0.91
0.55
0.42
0.91
0.55
0.42
0.91
0.74
0.42
0.91
0.74
12.07
500.82

18.71
10.21
3.40
13.61
1.13
4.54
2.65
16.07
4.54
2.27
77.11

b. Windows seal
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.00
3.20
2.30
1.00

0.60
0.60
0.60
0.60

0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3

c. Lintel
FFL-1
FFL-2
FFL-3
FFL-4

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.20
0.20
0.20
0.20

0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3

d. Wheather shed
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

M3
M3
M3
M3
M3

1.0
1.0
1.0
27.0
2.0
1.0
20.0
2.0
1.0
1.0
2.0
3.0
1.0
1.0
1.0
2.0
3.0
1.0
1.0
1.0
1.0
2.0

7.40
6.20
3.37
7.40
4.49
4.21
7.40
4.21
5.59
5.81
6.20
6.70
4.49
5.50
3.93
1.50
3.10
2.76
4.24
2.89
3.10
0.90

0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.40
0.30
0.30
0.30
0.30
0.30
0.20
0.20

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

12.0
12.0
7.0
2.0
3.0
1.0

7.25
7.15
7.30
7.30
7.30
4.10

0.40
0.40
0.40
0.40
0.30
0.30

0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3

1.0
3.0
3.0
2.0
2.0
1.0
2.0
2.0

3.30
2.20
3.14
4.10
2.80
4.50
2.10
2.80

0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3
M3
M3
M3

1.0

41.60

52.60

0.15

M3

e. Sixth floor roof Slab Beams


Beams in - X - Direction
SRB-1
SRB-2

SRB-3

SRB-4
SRB-5

SRB-6
SRB7
Beams in - Y - Direction
SRB-1
SRB-2
SRB-3
SRB-4
SRB-5

SRB-6

f. Sixth Floor roof Slab


SFRS-1

0.90
0.29
0.00
0.27
1.46
0.36
0.11
0.00
0.13
0.59
0.00
0.00
0.00
0.00
0.00

1.33
1.12
0.61
35.96
1.62
0.76
19.98
1.14
0.75
0.78
1.67
2.71
0.61
0.74
0.71
0.41
1.26
0.37
0.57
0.39
0.28
0.16
15.66
15.44
9.20
2.63
2.96
0.55
0.45
0.89
1.27
1.11
0.76
0.61
0.38
0.50
126.33
328.22

SFRS-2
SFRS-3
SFRS-4
SFRS-5
SFRS-6
Deduction
SFRS-7
SFRS-8
Main Lift cut slab : SFRS-9
Service Lift cut Slab : SFRS-10
Press Shaft : SFRS-11
SFRS-12
SFRS-13
Seen below : SFRS-14
Stair case-1 : SFRS-15
Stair case-2 : SFRS-16
Stair case-3 : SFRS-17
Open Court : SFRB-18
Terrace : SFRB-19
g. Sixth Floor Stair Case
Stair case -1
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -2
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -3
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing

1.0
1.0
1.0
1.0
1.0

5.55
11.10
15.00
9.43
2.86

19.75
4.26
28.60
24.60
5.10

0.15
0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3

1.0
1.0
3.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

14.30
1.50
2.10
2.80
1.00
1.10
1.30
5.50
6.60
5.90
6.60
18.20
15.80

4.00
3.93
2.80
2.20
1.60
2.15
3.30
7.60
3.30
2.80
3.30
15.80
13.30

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

12.0
1.0
1.0

0.02
0.34
1.30

12.0
1.0
1.0

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

1.50
18.00
2.80

0.15
0.15

M3
M3
M3

0.02
0.34
1.30

1.50
18.00
2.80

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

TOTAL R.C.C. WORK UP TO SIXTH FLOOR ROOF


LEVEL : +30.75 MT.

M3
M3
M3
M3
M3

I. SEVENTH FLOOR :
a. Columns above Seventh Floor level = +30.75MT.
and upto Third floor level = + 34.50 MT. Level
C-1
C-2
C-3
C-5
C-6
C-7
C-9
C-10

9.0
9.0
3.0
4.0
1.0
1.0
2.0
5.0

0.60
0.60
0.60
0.60
0.60
0.60
0.30
0.30

0.90
0.60
0.60
0.80
0.60
0.60
1.40
3.40

3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15

M3
M3
M3
M3
M3
M3
M3
M3

16.44
7.09
64.35
34.78
2.19
-8.58
-0.88
-2.65
-0.92
-0.24
-0.35
-0.64
-6.27
-3.27
-2.48
-3.27
-43.13
-31.52
348.87

0.42
0.91
0.74
0.42
0.91
0.74
0.42
0.91
0.55
0.42
0.91
0.55
0.42
0.91
0.74
0.42
0.91
0.74
12.07
566.43

15.31
10.21
3.40
6.05
1.13
1.13
2.65
16.07

4.0
2.0

0.30
0.60

1.20
0.60

3.15
3.15

M3
M3
M3

b. Windows seal
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.00
3.20
2.30
1.00

0.60
0.60
0.60
0.60

0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3

c. Lintel
FFL-1
FFL-2
FFL-3
FFL-4

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.20
0.20
0.20
0.20

0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3

d. Wheather shed
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

M3
M3
M3
M3
M3

1.0
1.0
1.0
21.0
2.0
1.0
16.0
2.0
1.0
1.0
2.0
3.0
1.0
1.0
2.0
3.0
1.0
1.0
1.0
1.0
2.0

7.40
6.20
3.37
7.40
4.49
4.21
7.40
4.21
5.59
5.81
6.20
6.70
4.49
5.50
1.50
3.10
2.76
4.24
2.89
3.10
0.90

0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

12.0
5.0
7.0
2.0
3.0
1.0

7.25
7.15
7.30
7.30
7.30
4.10

0.40
0.40
0.40
0.40
0.30
0.30

0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3

1.0
3.0
3.0
2.0
2.0
1.0
2.0
2.0

3.30
2.20
3.14
4.10
2.80
4.50
2.10
2.80

0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3
M3
M3

C-11
C-12

e. Seventh floor roof Slab Beam


Beams in - X - Direction
SRB-1
SRB-2

SRB-3

SRB-5

SRB-6
SRB7
Beams in - Y - Direction
SRB-1
SRB-2
SRB-3
SRB-4
SRB-5

SRB-6

4.54
2.27
62.75
0.90
0.29
0.00
0.27
1.46
0.36
0.11
0.00
0.13
0.59
0.00
0.00
0.00
0.00
0.00

1.33
1.12
0.61
27.97
1.62
0.76
15.98
1.14
0.75
0.78
1.67
2.71
0.61
0.74
0.41
1.26
0.37
0.57
0.39
0.28
0.16
15.66
6.44
9.20
2.63
2.96
0.55
0.45
0.89
1.27
1.11
0.76
0.61
0.38
0.50

M3
f. Seventh Floor roof Slab
SFRS-1
SFRS-2
SFRS-3
SFRS-4
SFRS-5
SFRS-6
Deduction
SFRS-7
SFRS-8
Main Lift cut slab : SFRS-9
Service Lift cut Slab : SFRS-10
Press Shaft : SFRS-11
SFRS-12
SFRS-13
Seen below : SFRS-14
Stair case-1 : SFRS-15
Stair case-2 : SFRS-16
Stair case-3 : SFRS-17
Open Court : SFRB-18
Terrace : SFRB-19
Terrace : SFRB-20
Terrace : SFRB-21
g. Seventh Floor Stair Case
Stair case -1
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -2
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -3
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing

1.0
1.0
1.0
1.0
1.0
1.0

41.60
5.55
11.10
15.00
9.43
2.86

52.60
19.75
4.26
28.60
24.60
5.10

0.15
0.15
0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3
M3

1.0
1.0
3.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

14.30
1.50
2.10
2.80
1.00
1.10
1.30
5.50
6.60
5.90
6.60
18.20
15.80
16.50
4.53

4.00
3.93
2.80
2.20
1.60
2.15
3.30
7.60
3.30
2.80
3.30
15.80
13.30
16.60
8.00

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

12.0
1.0
1.0

0.02
0.34
1.30

1.50
18.00
2.80

12.0
1.0
1.0

0.02
0.34
1.30

1.50
18.00
2.80

12.0
1.0
1.0

0.02
0.34
1.50

12.0
1.0
1.0

0.02
0.34
1.50

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

0.15
0.15

M3
M3
M3

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

1.50
18.00
3.30

0.15
0.15

TOTAL R.C.C. WORK UP TO SEVENTH FLOOR ROOF


LEVEL : +34.50 MT.

M3
M3
M3
M3
M3

J. EIGHTH FLOOR :
a. Columns above Eighth Floor level = +34.50MT. and
upto Terrace level = + 38.25 MT. Level
C-1

9.0

0.60

0.90

3.15

M3

104.63
328.22
16.44
7.09
64.35
34.78
2.19
-8.58
-0.88
-2.65
-0.92
-0.24
-0.35
-0.64
-6.27
-3.27
-2.48
-3.27
-43.13
-31.52
-41.09
-5.44
302.34

0.42
0.91
0.74
0.42
0.91
0.74
0.42
0.91
0.55
0.42
0.91
0.55
0.42
0.91
0.74
0.42
0.91
0.74
12.07
483.84

15.31

9.0
3.0
4.0
1.0
1.0
2.0
5.0
4.0
2.0

0.60
0.60
0.60
0.60
0.60
0.30
0.30
0.30
0.60

0.60
0.60
0.80
0.60
0.60
1.40
3.40
1.20
0.60

3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

b. Windows seal
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.00
3.20
2.30
1.00

0.60
0.60
0.60
0.60

0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3

c. Lintel
FFL-1
FFL-2
FFL-3
FFL-4

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.20
0.20
0.20
0.20

0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3

d. Wheather shed
Windows, W-1
W-2
W-3
Vantilators, V-1

5.0
1.0
0.0
3.0

2.40
3.60
2.70
1.40

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

M3
M3
M3
M3
M3

1.0
1.0
1.0
21.0
2.0
1.0
16.0
2.0
1.0
1.0
2.0
3.0
1.0
1.0
2.0
3.0
1.0
1.0
1.0
1.0
2.0

7.40
6.20
3.37
7.40
4.49
4.21
7.40
4.21
5.59
5.81
6.20
6.70
4.49
5.50
1.50
3.10
2.76
4.24
2.89
3.10
0.90

0.40
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.20

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

12.0
5.0
7.0
2.0
3.0
1.0

7.25
7.15
7.30
7.30
7.30
4.10

0.40
0.40
0.40
0.40
0.30
0.30

0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3

1.0

3.30

0.30

0.45

M3

C-2
C-3
C-5
C-6
C-7
C-9
C-10
C-11
C-12

e. Eighth floor roof Slab Beam


Beams in - X - Direction
SRB-1
SRB-2

SRB-3

SRB-5

SRB-6
SRB7
Beams in - Y - Direction
SRB-1
SRB-2
SRB-3
SRB-4
SRB-5

10.21
3.40
6.05
1.13
1.13
2.65
16.07
4.54
2.27
62.75
0.90
0.29
0.00
0.27
1.46
0.36
0.11
0.00
0.13
0.59
0.00
0.00
0.00
0.00
0.00

1.33
1.12
0.61
27.97
1.62
0.76
15.98
1.14
0.75
0.78
1.67
2.71
0.61
0.74
0.41
1.26
0.37
0.57
0.39
0.28
0.16
15.66
6.44
9.20
2.63
2.96
0.55
0.45

SRB-6

3.0
3.0
2.0
2.0
1.0
2.0
2.0

2.20
3.14
4.10
2.80
4.50
2.10
2.80

0.30
0.30
0.30
0.30
0.30
0.20
0.20

0.45
0.45
0.45
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3
M3
M3
M3

1.0
1.0
1.0
1.0
1.0
1.0

41.60
5.55
11.10
15.00
9.43
2.86

52.60
19.75
4.26
28.60
24.60
5.10

0.15
0.15
0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3
M3

1.0
1.0
3.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

14.30
1.50
2.10
2.80
1.00
1.10
1.30
5.50
6.60
5.90
6.60
18.20
15.80
16.50
4.53

4.00
3.93
2.80
2.20
1.60
2.15
3.30
7.60
3.30
2.80
3.30
15.80
13.30
16.60
8.00

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.30

1.50
18.00
2.80

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.30

1.50
18.00
2.80

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

M3
M3
M3

12.0
1.0
1.0

0.02
0.34
1.50

1.50
18.00
3.30

0.15
0.15

f. Eighth Floor roof Slab


SFRS-1
SFRS-2
SFRS-3
SFRS-4
SFRS-5
SFRS-6
Deduction
SFRS-7
SFRS-8
Main Lift cut slab : SFRS-9
Service Lift cut Slab : SFRS-10
Press Shaft : SFRS-11
SFRS-12
SFRS-13
Seen below : SFRS-14
Stair case-1 : SFRS-15
Stair case-2 : SFRS-16
Stair case-3 : SFRS-17
Open Court : SFRB-18
Terrace : SFRB-19
Terrace : SFRB-20
Terrace : SFRB-21
g. Eighth Floor Stair Case
Stair case -1
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -2
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -3
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing

M3
M3
M3
M3

0.89
1.27
1.11
0.76
0.61
0.38
0.50
104.63

328.22
16.44
7.09
64.35
34.78
2.19
-8.58
-0.88
-2.65
-0.92
-0.24
-0.35
-0.64
-6.27
-3.27
-2.48
-3.27
-43.13
-31.52
-41.09
-5.44
302.34

0.42
0.91
0.74
0.42
0.91
0.74
0.42
0.91
0.55
0.42
0.91
0.55
0.42
0.91
0.74
0.42
0.91
0.74
12.07

TOTAL R.C.C. WORK UP TO EIGHT FLOOR ROOF


LEVEL : +38.25 MT.

M3
M3
M3

TOTAL R.C.C. M:30


EXTRA FOR R.C.C.
K. STAIR CASE TOWER & LIFT MACHINE ROOM AT
TERRACE LEVEL:
a. Columns above Terrace Floor and upto Parapet
wall, 1.2 MT ht.
At sixth floor level
C-6
C-7
C-8
At seventh floor level
C-1
C-5
C-7
At Eighth floor roof level (Terrace Level)
C-1
C-2
C-3
C-5
C-6
C-12
Stair case & Lift room columns
C-5
C-7
C-9
C-10
C-11
Stair case & Lift room Beams
Beams in X- Direction
TB-3

TB-5
TB-8
Beams in Y- Direction
TB-1
TB-5

TB-6
Stair case & Lift room Slab
S-1

b. Windows seal, Stair case Tower


W-3
W-4
W-5

1.0
1.0
1.0

0.60
0.60
0.60

0.60
0.60
0.60

1.20
1.20
1.20

M3
M3
M3

1.0
5.0
3.0

0.60
0.60
0.60

0.90
0.80
0.60

1.20
1.20
1.20

M3
M3
M3

1.0
8.0
3.0
3.0
1.0
2.0

0.60
0.60
0.60
0.60
0.60
0.60

0.90
0.60
0.60
0.80
0.60
0.60

1.20
1.20
1.20
1.20
1.20
1.20

M3
M3
M3
M3
M3
M3

1.0
1.0
2.0
5.0
4.0

0.60
0.60
0.30
0.30
0.30

0.80
0.60
1.40
3.40
1.20

3.00
3.00
3.00
3.00
3.00

M3
M3
M3
M3
M3

2.0
1.0
1.0
2.0
1.0
1.0

6.70
6.20
4.90
3.20
5.50
6.20

0.30
0.30
0.30
0.30
0.30
0.30

0.45
0.45
0.45
0.45
0.55
0.55

M3
M3
M3
M3
M3
M3

1.0
3.0
2.0
1.0
2.0

7.30
3.30
2.20
2.80
0.30

0.40
0.30
0.30
0.30
0.20

0.55
0.45
0.45
0.45
0.45

M3
M3
M3
M3
M3

1.0
1.0
1.0

7.00
6.80
6.40

3.90
3.90
3.40

0.15
0.15
0.15

M3
M3
M3

2.0
2.0
2.0

1.80
1.60
1.60

0.20
0.20
0.20

0.10
0.10
0.10

M3
M3
M3
M3

483.84
#REF!
#REF!

0.43
0.43
0.43
0.65
2.88
1.30
0.65
3.46
1.30
1.73
0.43
0.86

1.44
1.08
2.52
15.30
4.32

1.81
0.84
0.66
0.86
0.91
1.02
1.61
1.34
0.59
0.38
0.05

4.10
3.98
3.26
0.07
0.06
0.06
60.81

TOTAL TERRACE LEVEL R.C.C. M:30

M3

EXTRA FOR TERRACE LEVEL R.C.C.

M3

12

SHUTTERING AND SCAFOLDING WORK:


ABOVE PLINTH LEVEL
Centering and Shuttering i/c Shutering, propping etc. &
removal of formwork for:
A. STILT PARKING FLOOR:
A12.1 5.9.6 : Columns, Pillars, Piers, Abutments, Posts and
Struts.
a. Columns above Stilt Parking Floor level = +0.15MT.
and upto Podium floor level = + 3.25 MT. Level
C-1
C-2
C-3

12.0
9.0
3.0
10.0

2.40
1.80
1.80
2.00

2.50
2.50
2.50
2.50

9.0
3.0
5.0
2.0
2.0

2.20
1.80
1.80
1.80
3.40

2.50
2.50
2.50
2.50
2.50

5.0
4.0
16.0
4.0
6.0

7.40
3.00
1.80
1.80
2.00

2.50
2.50
2.50
2.50
2.50

A12.2 5.9.5 : Lintels, beams, girders, bressumers and


cantilevers.
b. Windows seal Projection
Windows, W-1
42.0
W-2
2.0
W-3
4.0
Vantilators, V-1
6.0

2.00

0.10

3.20
2.30
1.00

0.10
0.10
0.10

42.0
2.0
4.0

2.40
3.60
2.70

0.10
0.10
0.10

6.0

1.40

0.10

21.0
21.0
1.0
1.0
2.0

2.40
1.20
3.60
1.20
2.70

0.60
0.10
0.60
0.10
0.60

2.0

1.20

0.10

C-4
C-5
C-6
C-7
C-8
C-9
C-10
C-11
C-12
C-13
C-14
Total

c. Lintel
GFL-1
GFL-2
GFL-3
GFL-4

d. Wheather shed
Windows, W-1
Sides
W-2
Sides
W-3
Sides

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

M2
M2
M2
M2
M2

M2
M2
M2
M2
M2

M2
M2
M2
M2
M2
M2

60.81
60.81

72.00
40.50
13.50
50.00
49.50
13.50
22.50
9.00
17.00
92.50
30.00
72.00
18.00
30.00
530.00
530.00

8.40
0.64
0.92
0.60
10.56

10.08
0.72
1.08
0.84
12.72

30.24
2.52
2.16
0.12
3.24
0.24

Vantilators, V-1
Sides

3.0
3.0

1.40
1.20

0.60
0.10

M2
M2
M2

e. Stilt floor roof Slab Beams


Beams in - X - Direction
SRB-1
0
SRB-2
0
0
0
0
0
0
0
0
0
SRB-3
0
0
0
0
0
0
0
0
0
0
SRB-4
0
SRB-5
0
0
0
0
SRB-6
SRB-7
SRB-8
Beams in - Y - Direction
SRB-1
0
0
0
SRB-2
0
0
0
SRB-3
0
SRB-4
0

2.0

7.40

0.55

2.0
2.0
2.0
2.0
2.0

6.20
8.26
7.64
3.93
4.87

0.55
0.45
0.45
0.45
0.45

6.0
2.0
4.0
66.0
2.0

5.59
4.21
4.49
7.40
3.83

0.45
0.45
0.45
0.45
0.45

2.0
2.0
60.0
2.0
4.0

3.37
9.69
7.40
5.50
4.21

0.45
0.45
0.45
0.45
0.45

2.0
2.0
2.0
4.0
2.0

4.90
5.81
5.59
6.70
6.20

0.45
0.45
0.45
0.45
0.45

2.0
2.0
6.0
2.0
6.0

4.49
2.15
0.90
3.93
3.10

0.45
0.45
0.45
0.45
0.45

4.0
2.0
2.0
2.0
2.0

1.50
1.27
4.25
2.89
3.10

0.45
0.45
0.45
0.45
0.45

6.0
2.0

0.90
6.20

0.45
0.90

14.0

7.25

0.55

2.0
24.0
18.0
8.0
4.0

7.40
7.15
7.30
7.30
4.90

0.55
0.55
0.55
0.45
0.45

2.0
2.0
2.0
4.0
8.0

3.14
4.10
4.10
7.30
3.40

0.45
0.45
0.45
0.45
0.45

2.0

1.64

0.45

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

2.52
0.36
41.40

8.14
6.82
7.43
6.88
3.54
4.38
15.09
3.79
8.08
219.78
3.45
3.03
8.72
199.80
4.95
7.58
4.41
5.23
5.03
12.06
5.58
4.04
1.94
2.43
3.54
8.37
2.70
1.14
3.83
2.60
2.79
2.43
11.16
55.83
8.14
94.38
72.27
26.28
8.82
2.83
3.69
3.69
13.14
12.24
1.48

0
0
SRB-5
0
0
0
0
0
0
SRB-6
0
SRB-7
SRB-12
Beams in - Inclined - Direction
SRB-2
0
SRB-3
SRB-5
0
0
0
Ramp Beam-B-1
0
0
0
0
Ramp Beam-B-2

2.0
2.0
2.0

2.56
1.75
4.50

0.45
0.45
0.45

2.0
6.0
6.0
4.0
4.0

3.30
2.20
3.14
4.10
2.80

0.45
0.45
0.45
0.45
0.45

10.0
4.0
4.0
2.0
4.0

2.45
2.10
2.80
0.90
7.25

0.45
0.45
0.45
0.45
1.73

2.0
4.0
4.0
2.0

8.83
9.18
7.57
3.00

0.45
0.45
0.45
0.45

2.0
2.0
2.0
2.0
2.0

5.00
3.08
2.65
4.60
2.15

0.45
0.45
0.45
0.55
0.55

4.0
2.0
8.0
8.0

7.30
7.25
7.40
4.20

0.55
0.55
0.55
0.25

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

Total
A12.3 5.9.3 : Suspended floors, roofs, landings, balconies
and access platform.
f. Stilt Floor roof Slab
SFRS-1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
SFRS-2
SFRS-3
Ramp

2.0
23.0
1.0

8.30
8.00
8.30

4.00
4.00
5.25

6.0
8.0
1.0

8.00
8.00
4.90

3.90
4.10
4.95

1.0

3.40

2.80

1.0
1.0
1.0
1.0
1.0

4.95
7.60
4.95
4.55
4.95

8.00
4.70
7.70
8.00
2.96

2.0
2.0
5.0
1.0
1.0

8.00
8.00
8.00
3.13
7.55

4.10
5.20
4.30
6.05
7.70

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

2.30
1.58
4.05
2.97
5.94
8.48
7.38
5.04
11.03
3.78
5.04
0.81
50.03
7.95
16.52
13.63
2.70
4.50
2.77
2.39
5.06
2.37
16.06
7.98
32.56
8.40
1124.80
1189.48

66.40
736.00
43.58
187.20
262.40
24.26
-9.52
-39.60
-35.72
-38.12
-36.40
-14.65
-65.60
-83.20
-172.00
-18.94
-58.14

Outer Ramp
Ramp-1
0
Inner Ramp
Ramp-2
0
0
f-1. Ground Floor roof Slab side
SFRS-1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
SFRS-2
SFRS-3
Ramp
Outer Ramp
Ramp-1
0
Inner Ramp
Ramp-2
0
0

1.0
1.0

9.10
27.15

5.30
4.80

0.0
1.0
1.0

0.00
32.10
4.60

0.00
4.80
3.00

2.0
23.0
1.0

24.60
24.00
27.10

0.15
0.15
0.15

6.0
8.0
1.0

23.80
24.20
19.70

0.15
0.15
0.15

1.0
1.0
1.0
1.0
1.0

12.40
25.90
24.60
25.30
25.10

0.15
0.15
0.15
0.15
0.15

1.0
2.0
2.0
5.0
1.0

15.82
24.20
26.40
24.60
18.36

0.15
0.15
0.15
0.15
0.15

1.0

30.50

0.25

1.0
1.0

28.80
63.90

0.18
0.18

0.0
1.0
1.0

0.00
73.80
15.20

0.00
0.18
0.18

9.0
1.0

0.02
0.34

1.50
13.50

Landing

2.0
1.0

0.34
2.10

3.20
3.30

Second flight
Tread and Riser
Vast slab

9.0
1.0

0.02
0.34

1.50
13.50

2.0
1.0

0.34
2.10

3.20
3.30

Landing
Stair case -2
First flight

M2
M2
M2
M2
M2

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

M2
M2
M2
M2
M2
M2
M2

Total
A12.4 5.9.7 : Stairs, (excluding landings) except spiralstaircases.
g. Stilt Floor Stair Case
Stair case -1
First flight
Tread and Riser
Vast slab

M2

M2
M2
M2
M2
M2
M2
M2
M2

-48.23
-130.32
0.00
-154.08
-13.80
401.52

7.38
82.80
4.07
21.42
29.04
2.96
-1.86
-3.89
-3.69
-3.80
-3.77
-2.37
-7.26
-7.92
-18.45
-2.75
-7.63

-5.04
-11.18
0.00
-12.92
-2.66
52.49
454.01

0.32
4.56
2.16
6.93
0.32
4.56
2.16
6.93

Tread and Riser


Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing
Stair case -3
First flight
Tread and Riser
Vast slab
Landing
Second flight
Tread and Riser
Vast slab
Landing

9.0
1.0

0.02
0.34

1.50
13.50

M2
M2

2.0
1.0

0.34
1.90

3.20
2.80

M2
M2

9.0
1.0

0.02
0.34

1.50
13.50

M2
M2

2.0
1.0

0.34
1.90

3.20
2.80

M2
M2

9.0
1.0

0.02
0.34

1.50
13.50

2.0
1.0

0.34
2.10

3.20
3.30

M2
M2
M2
M2

9.0
1.0

0.02
0.34

1.50
13.50

2.0
1.0

0.34
2.10

3.20
3.30

M2
M2
M2
M2
M2

h. Ramp
Sloping Slab
Outer Ramp
Ramp-1
0
Inner Ramp
Ramp-2
0
0
0
Sloping Beams
Ramp Beam-B-1
0
0
0
0
Ramp Beam-B-2
Total
5.9.6 : Columns, Pillars, Piers, Abutments, Posts and
Struts.
5.9.5 : Lintels, beams, girders, bressumers and
cantilevers.
5.9.3 : Suspended floors, roofs, landings, balconies
and access platform.
5.9.7 : Stairs, (excluding landings) except spiralstaircases.
B. PODIUM FLOOR :
B12.5 5.9.6 : Columns, Pillars, Piers, Abutments, Posts and
Struts.

1.0
1.0

9.51
27.07

4.50
4.50

M2
M2

1.0

27.20

4.50

1.0

8.54

4.50

M2
M2
M2

10.0
2.0
2.0
2.0
2.0

7.57
4.20
3.00
3.10
2.28

0.53
0.53
0.53
0.53
0.53

8.0

4.50

0.23

M2
M2
M2
M2
M2
M2
M2
M2

M2
M2
M2
M2

0.32
4.56
2.16
5.32
0.32
4.56
2.16
5.32

0.32
4.56
2.16
6.93
0.32
4.56
2.16
6.93
80.63

42.77
121.79
122.40
38.43
325.40

39.74
4.41
3.15
3.26
2.39
8.10
61.05
467.08

530.00
1189.48
454.01
428.72

a. Columns above Podium Floor level = +3.25MT. and


upto First floor level = + 8.25 MT. Level
C-1
12.0
C-2
9.0
C-3
3.0
C-4
10.0
C-5
9.0
C-6
3.0
C-8
2.0
C-9
C-10
C-11
C-12
C-13
C-14

b. Windows seal
Windows, W-1
W-2
W-3
Vantilators, V-1

c. Lintel
FFL-1
FFL-2
FFL-3
FFL-4
d. Wheather shed
Windows, W-1
Sides
W-2
Sides
W-3
Sides
Vantilators, V-1
Sides

e. Podium floor roof Slab Beams


Beams in - X - Direction
PRB-1
0
PRB-2
0
0
0
0
0
0
0

M2
M2

2.40
1.80
1.80

4.25
4.25
4.25

2.0

2.00
2.20
1.80
1.80
3.40

4.25
4.25
4.25
4.25
4.25

5.0
4.0
16.0
4.0
6.0

7.40
3.00
1.80
1.80
2.00

4.25
4.25
4.25
4.25
4.25

10.0
2.0

2.00
3.20

0.10
0.10

0.0
6.0

2.30
1.00

0.10
0.10

10.0
2.0
0.0
6.0

2.40
3.60
2.70
1.40

0.10
0.10
0.10
0.10

M2
M2
M2
M2
M2

5.0

2.40

0.60

5.0
1.0
1.0
0.0
0.0

1.20
3.60
1.20
2.70
1.20

0.10
0.60
0.10
0.60
0.10

M2
M2
M2
M2
M2

3.0
3.0

1.40
1.20

0.60
0.10

2.0
2.0
2.0

7.40
6.20
8.26

0.55
0.55
0.45

2.0
2.0
2.0
6.0
2.0

7.64
3.93
4.87
5.59
6.08

0.45
0.45
0.45
0.45
0.45

2.0
4.0

4.21
4.49

0.45
0.45

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

M2
M2
M2
M2
M2

M2
M2
M2
M2

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

122.40
68.85
22.95
85.00
84.15
22.95
15.30
28.90
157.25
51.00
122.40
30.60
51.00
607.75

2.00
0.64
0.00
0.60
3.24

2.40
0.72
0.00
0.84
3.96
7.20
0.60
2.16
0.12
0.00
0.00
2.52
0.36
12.96

8.14
6.82
7.43
6.88
3.54
4.38
15.09
5.47
3.79
8.08

0
0
PRB-3
0
0
0
0
0
0
0
PRB-4
0
PRB-5
0
0
0
#REF!
PRB-6
PRB-7
Beams in - Y - Direction
PRB-1
0
0
0
PRB-2
0
PRB-3
0
PRB-4
0
0
0
PRB-5
0
0
0
0
0
PRB-6
0
PRB-7
Beams in - Inclined - Direction
PRB-2
PRB-3
PRB-5
PRB-9
PRB-10
0
0
0

74.0
2.0
2.0

7.40
3.83
7.20

0.45
0.45
0.45

62.0
2.0
4.0
4.0
2.0

7.40
5.50
4.21
4.90
5.81

0.45
0.45
0.45
0.45
0.45

2.0
4.0
6.0
2.0
6.0

5.59
6.70
0.90
3.93
3.10

0.45
0.45
0.45
0.45
0.45

4.0
2.0
2.0
#REF!
2.0

1.50
1.27
4.25
#REF!
3.10

0.45
0.45
0.45
#REF!
0.45

6.0

0.90

0.45

24.0
18.0
24.0

7.25
7.40
7.15

0.45
0.45
0.45

18.0
4.0
4.0
4.0
2.0

7.30
7.30
4.90
7.30
4.10

0.45
0.45
0.45
0.45
0.45

8.0
2.0
2.0
2.0
2.0

3.40
1.64
2.56
1.75
4.50

0.45
0.45
0.45
0.45
0.45

2.0
6.0
6.0
4.0
4.0

3.30
2.20
3.14
4.10
2.80

0.45
0.45
0.45
0.45
0.45

4.0
4.0
2.0

2.10
2.80
0.90

0.45
0.45
0.45

2.0
10.0
2.0
2.0
2.0

8.83
7.57
3.00
5.13
4.09

0.45
0.45
0.45
0.50
0.35

2.0
0.0
0.0

6.43
0.00
0.00

0.35
0.00
0.00

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

246.42
3.45
6.48
206.46
4.95
7.58
8.82
5.23
5.03
12.06
2.43
3.54
8.37
2.70
1.14
3.83
#REF!
2.79
2.43
78.30
59.94
77.22
59.13
13.14
8.82
13.14
3.69
12.24
1.48
2.30
1.58
4.05
2.97
5.94
8.48
7.38
5.04
3.78
5.04
0.81
7.95
34.07
2.70
5.13
2.86
4.50
0.00
0.00
316.05

f. Podium Floor roof Slab


FFRS-1
FFRS-2
f-1. First Floor roof Slab side
FFRS-1
FFRS-2

2.0
1.0

8.30
4.15

4.00
1.90

2.0
1.0

24.60
12.10

0.15
0.15

M2
M2
M2
M2
M2

TOTAL F.F. R.C.C. M:30, GENERAL SHUTTERING

M2

TOTAL F.F. R.C.C.


SHUTTERING

M2

M:30,

WHEATHER

SHED

K. STAIR CASE TOWER & LIFT MACHINE ROOM AT


TERRACE LEVEL:
a. Columns above Terrace Floor and upto Parapet
wall, 1.2 MT ht.
C-6
1.0
C-7
1.0
b. Windows seal, Stair case Tower
W-3
4.0
W-4
4.0
#REF!
#REF!
#REF!
d. Tower roof Slab side
#REF!
TOTAL S.F.
13

M2

2.40
2.40

1.20
1.20

M2
M2

1.80

0.10

1.60

0.10

M2
M2

#REF!

#REF!

M2

#REF!

#REF!

M2
M2

REINFORCEMENT:
Cold twisted steel and hot rolled deformed steel
reinforcement for RCC work i/c cutting, bending, binding
& placing in position complete i/c cost of binding wires.
REINFORCEMENT UPTO PLINTH LEVEL:
(i). REINFORCEMENT AS PER;
R.C.C. WORK- M:30 UPTO STILT PARKING FLOOR
LEVEL
(PLINTH
+ 0.15MT
5.28 : Extra
forLEVEL):
providing
richer mixes at all floor
levels.
a. Plinth Slab
8MM Dia bars @ 200MM C/C Both ways
PS-1
Parallel to Short span

1.0

44.36

264.00

0.39

Kg

Parallel to Long span

1.0

53.92

190.59

0.39

Kg

PS-2
Parallel to Short span

1.0

7.17

99.75

0.39

Kg

Parallel to Long span

1.0

20.71

27.86

0.39

Kg

Parallel to Short span

2.0

12.06

22.30

0.39

Kg

Parallel to Long span

2.0

5.22

51.81

0.39

Kg

Parallel to Short span

2.0

15.40

144.50

0.39

Kg

Parallel to Long span

2.0

29.56

76.00

0.39

Kg

PS-3

PS-4

66.40
7.89
74.29
7.38
1.82
9.20
1011.24

20.16

2.88
2.88
0.72
0.64
#REF!
#REF!
#REF!

4567.31
4007.90
278.93
225.03
209.77
210.97
1735.73
1752.32

PS-5
Parallel to Short span

1.0

10.69

141.43

0.39

Kg

Parallel to Long span

1.0

25.20

45.38

0.39

Kg

Parallel to Short span

1.0

4.12

29.85

0.39

Kg

Parallel to Long span

1.0

5.70

15.68

0.39

Kg

Parallel to Short span

1.0

15.00

20.50

0.39

Kg

Parallel to Long span

1.0

4.60

74.00

0.39

Kg

Parallel to Short span

1.0

2.76

23.46

0.39

Kg

Parallel to Long span

1.0

4.53

9.00

0.39

Kg

Parallel to Short span

#REF!

#REF!

#REF!

0.39

Kg

Parallel to Long span

#REF!

#REF!

#REF!

0.39

Kg

Parallel to Short span

#REF!

#REF!

#REF!

0.39

Kg

Parallel to Long span

#REF!

#REF!

#REF!

0.62

Kg

Parallel to Short span

1.0

2.80

13.00

0.39

Kg

Parallel to Long span

1.0

3.40

11.10

0.39

Kg

PS-6

#REF!

0
8MM Dia bars @ 200MM C/C Both ways

Total

Kg

#REF!

Kg

(ii). REINFORCEMENT AS PER;


#REF!
a. Footings Main building
#REF!
F-1

F-2

F-3

F-4

F-5

F-6

6.0
6.0
6.0
6.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
3.0
3.0
3.0
3.0
12.0
12.0
12.0
12.0
2.0
2.0
2.0

7.60
7.60
7.60
7.60
7.00
7.00
7.00
7.00
6.50
6.50
6.50
6.50
6.20
6.20
6.20
6.20
5.80
5.80
5.80
5.80
5.10
5.10
0.80

47.66
48.00
47.66
48.00
44.00
44.00
44.00
44.00
49.20
48.80
49.20
48.80
36.88
36.63
29.50
36.00
34.38
34.38
27.50
27.50
31.34
31.34
5.34

0.89
0.89
0.62
0.62
0.89
0.89
0.62
0.62
0.89
0.89
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

589.37
446.04
47.97
34.86
119.93
132.76
25.25
15.90
#REF!
#REF!
#REF!
#REF!

14.20
14.72
#REF!
3937.71

1934.37
1948.17
1347.54
1357.15
274.14
274.14
190.97
190.97
284.62
282.31
198.28
196.66
425.24
422.36
340.19
415.15
1483.35
1483.35
1186.68
1186.68
198.17
198.17
5.29

F-7

F-8

F-9

F-10

F-11

F-12

F-13

#REF!
#REF!

#REF!

#REF!

#REF!

b. Columns upto Stilt level beam bottom level


#REF!
C-1
Stirrups
C-2
Stirrups
C-3
Stirrups
C-4
Stirrups
C-5

2.0
4.0
4.0
4.0
4.0
1.0
1.0
1.0
1.0
12.0
12.0
12.0
12.0
2.0
2.0
2.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

1.20
4.70
4.70
1.10
1.10
4.30
4.30
1.10
1.10
3.20
3.20
0.50
0.50
3.80
3.80
0.80
1.00
7.90
14.30
#REF!
#REF!
7.50
25.50
0.80
1.00
13.10
13.50
0.80
1.00

2.67
28.67
28.67
4.67
4.67
26.33
26.33
4.67
4.67
18.67
18.67
0.67
0.67
23.33
23.33
4.00
2.67
93.00
50.66
#REF!
#REF!
167.67
48.00
4.00
2.67
87.67
85.33
4.00
2.67

0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.89
0.89
0.62
0.62
0.89
0.89
0.62
0.62
0.89
0.89
0.62
0.62
0.89
0.89
0.62
0.62
0.89
0.89
0.62
0.62

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.89
0.89
0.62
0.62

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

12.0
12.0
9.0
9.0
3.0
3.0
3.0
10.0
10.0
9.0
9.0

3.87
2.90
4.20
2.30
4.30
4.12
2.30
3.99
1.90
4.27
4.45

10.00
15.25
10.00
16.00
6.00
8.00
15.50
8.00
16.25
8.00
4.00

1.58
0.39
2.46
0.39
2.46
1.58
0.39
0.89
0.39
1.58
2.46

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

3.97
334.18
334.18
12.74
12.74
70.20
70.20
3.18
3.18
638.07
638.07
2.49
2.49
157.80
157.80
3.97
3.31
653.88
644.79
#REF!
#REF!
1119.18
1089.28
1.99
1.66
1022.11
1025.24
1.99
1.66
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

733.75
206.97
929.88
129.17
190.40
156.23
41.71
284.09
120.41
485.76
394.09

Stirrups
C-6
Stirrups
C-7
Stirrups
C-8
Stirrups
C-9
Stirrups
C-10
Stirrups
C-11
Stirrups
C-12
Stirrups
C-13
Stirrups
#REF!
Stirrups
#REF!
Stirrups
0
#REF!
Stirrups
#REF!
Stirrups
#REF!
Stirrups
#REF!
Stirrups

c. Stilt parking floor Level beams


#REF!
SB-1
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top

Extra Bottom

9.0
3.0
3.0
5.0
5.0
2.0
2.0
2.0
2.0
2.0
5.0
5.0
5.0
4.0
4.0
4.0
16.0
16.0
16.0
4.0
4.0
4.0
#REF!
#REF!
#REF!
#REF!

2.70
4.42
2.30
4.52
2.30
4.39
2.30
4.92
4.74
3.30
4.95
4.77
7.30
4.20
4.02
2.90
4.20
4.02
2.30
4.20
4.02
2.30
2.44
#REF!
1.54
#REF!

16.25
6.00
18.00
6.00
18.75
4.00
18.75
12.00
4.00
20.25
8.00
6.00
19.00
4.00
8.00
15.50
6.00
8.00
15.50
4.00
6.00
15.25
5.00
#REF!
6.00
#REF!

0.39
1.58
0.39
1.58
0.39
0.89
0.39
1.58
0.89
0.39
2.46
1.58
0.39
2.46
1.58
0.39
2.46
1.58
0.39
2.46
1.58
0.39
0.89
0.39
0.89
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

8.00
4.00
#REF!
6.00
#REF!
6.00
#REF!
8.00
6.00
#REF!

1.58
2.46
0.39
1.58
0.39
1.58
0.39
2.46
1.58
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

43.0
1.0
1.0
1.0
1.0
1.0
43.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

9.82
1.70
2.70
1.90
2.60
0.20
50.66
13.69
2.00
3.00
3.00
3.50
3.50
2.15
2.70
2.75
2.60
2.75
2.25

5.00
3.00
2.00
3.00
3.00
12.00
1.50
6.00
3.00
8.00
6.00
4.00
6.00
4.00
2.00
4.00
4.00
3.00
3.00

0.89
0.89
1.58
0.89
1.58
2.46
0.39
0.89
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

154.00
125.70
48.44
214.25
84.09
31.26
33.64
186.57
33.75
52.12
487.08
226.10
270.47
165.31
203.25
70.12
991.87
813.00
222.46
165.31
152.44
54.72
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

1879.06
4.54
8.53
5.07
12.32
5.90
1274.44
73.10
9.48
37.92
28.44
22.12
33.18
13.59
8.53
17.38
16.43
13.04
10.67

Separation Bars, 20MM dia.


Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top

Extra Bottom

Separation Bars, 20MM dia.


Stirrups
0
Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
#REF!
Extra Top

Extra Bottom

Separation Bars, 20MM dia.


Stirrups
SB-3

1.0
1.0
1.0
1.0
1.0
3.0
1.0
1.0
3.0
3.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
2.0
2.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
#REF!
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
#REF!
#REF!
1.0
1.0

3.50
2.15
3.00
0.20
54.53
9.19
2.15
3.00
0.25
53.33
6.21
2.05
3.10
2.20
2.15
2.90
0.20
33.47
9.57
1.90
3.00
2.85
3.15
1.90
2.75
2.60
2.25
3.50
0.20
41.47
7.54
1.45
2.00
2.20
1.60
1.95
0.20
42.33
6.84
1.45
2.00
2.20
1.60
1.95
0.20
37.67
#REF!
1.90
3.00
3.00
2.85
3.15
2.00
2.75
2.60
2.75
2.25
3.50
0.20
#REF!
7.54

3.00
3.00
3.00
57.00
1.50
6.00
8.00
3.00
7.00
1.50
6.00
3.00
3.00
4.00
3.00
3.00
14.00
1.50
5.00
2.00
15.00
2.00
2.00
3.00
12.00
6.00
2.00
2.00
31.00
2.70
4.00
2.00
2.00
2.00
3.00
6.00
12.00
1.50
4.00
2.00
2.00
2.00
3.00
6.00
12.00
1.50
6.00
3.00
8.00
3.00
3.00
3.00
4.00
6.00
4.00
3.00
2.00
3.00
31.00
#REF!
4.00

1.58
0.89
1.58
2.46
0.39
0.89
1.58
1.58
2.46
0.39
0.89
1.58
1.58
1.58
0.89
1.58
2.46
0.39
0.89
1.58
0.89
0.89
1.58
1.58
0.89
0.89
0.89
1.58
2.46
0.39
0.89
0.89
0.89
0.89
0.89
0.89
2.46
0.39
0.89
0.89
0.89
0.89
0.89
0.89
2.46
0.39
0.89
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
2.46
0.39
0.89

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

16.59
5.74
14.22
28.04
31.90
147.22
27.18
14.22
12.92
93.60
33.16
9.72
14.69
13.90
5.74
13.75
6.89
19.58
85.17
6.00
40.05
5.07
9.95
9.01
29.37
13.88
4.01
11.06
30.50
87.33
53.68
2.58
3.56
3.92
4.27
10.41
5.90
24.77
24.35
2.58
3.56
3.92
4.27
10.41
5.90
22.04
#REF!
9.01
37.92
14.22
13.51
14.93
12.64
26.07
16.43
13.04
7.11
#REF!
#REF!
#REF!
26.84

Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
SB-4
Stirrups
0
Stirrups
0
Extra Top
Separation Bars, 20MM dia.
Stirrups
#REF!
Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Separation Bars, 20MM dia.
Stirrups
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
SB-7
Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.

1.0
1.0
1.0
1.0
1.0
1.0
1.0
4.0
4.0
1.0
1.0
1.0
1.0
1.0
1.0
#REF!
1.0
1.0
1.0
1.0
1.0
1.0
3.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
3.0

1.45
2.00
2.20
1.60
1.95
0.20
42.33
6.39
38.27
5.70
33.00
7.15
1.60
0.20
39.06
#REF!
1.55
4.35
2.10
4.53
0.20
#REF!
5.29
1.45
0.20
30.60
5.45
1.55
2.20
1.95
0.20
31.33

2.00
2.00
2.00
3.00
6.00
12.00
1.50
5.00
1.50
6.00
1.50
5.00
4.00
4.00
1.50
4.00
2.00
3.00
3.00
2.00
9.00
#REF!
5.00
4.00
4.00
1.50
4.00
4.00
2.00
6.00
4.00
1.50

0.89
0.89
0.89
0.89
0.89
2.46
0.39
0.89
0.39
0.89
0.39
0.89
0.89
2.46
0.39
0.89
0.89
0.89
1.58
1.58
2.46
0.39
0.89
0.89
2.46
0.39
0.89
1.58
1.58
0.89
2.46
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
2.0
1.0
1.0
1.0
1.0
2.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
3.0
1.0
1.0
1.0
1.0
3.0

5.70
1.55
2.40
2.50
2.00
2.35
0.20
26.14
4.98
1.50
2.50
2.35
2.35
0.30
21.34
5.58
1.50
2.50
2.35
2.35
0.30
28.94
5.55
1.50
2.50
2.35
2.35
0.30

5.00
4.00
6.00
3.00
6.00
4.00
22.00
1.50
5.00
6.00
6.00
6.00
2.00
14.00
1.50
5.00
6.00
6.00
6.00
2.00
14.00
1.50
6.00
6.00
6.00
6.00
2.00
14.00

0.89
1.58
0.89
0.89
0.89
1.58
0.39
0.39
0.89
0.89
0.89
0.89
1.58
2.46
0.39
0.89
0.89
0.89
0.89
1.58
2.46
0.39
0.89
0.89
0.89
0.89
1.58
2.46

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

2.58
3.56
3.92
4.27
10.41
5.90
24.77
113.74
89.54
30.44
19.30
31.82
5.70
1.97
22.85
#REF!
2.76
11.61
9.95
14.31
4.43
#REF!
70.62
5.16
1.97
17.90
19.40
9.80
6.95
10.41
1.97
54.98
25.37
9.80
12.82
6.68
10.68
14.85
1.72
15.29
44.32
8.01
13.35
12.55
7.43
20.66
24.96
24.83
8.01
13.35
12.55
7.43
10.33
16.93
88.91
8.01
13.35
12.55
7.43
31.00

Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top

Extra Bottom

Separation Bars, 20MM dia.


Stirrups
SB-8
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
SB-9
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
SB-10
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
#REF!
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Top

3.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
2.0
1.0
1.0
1.0
2.0
3.0
1.0
1.0
1.0
3.0
#REF!
1.0
1.0
1.0
1.0
#REF!
#REF!
3.0
1.0
1.0
1.0
1.0
#REF!
2.0
1.0
1.0

26.20
5.14
1.50
2.50
2.35
2.35
0.30
26.00
6.35
1.50
2.50
2.85
1.90
2.35
2.89
0.30
26.87
4.71
2.10
1.60
1.86
0.20
22.80
3.56
1.60
1.90
0.20
19.40
4.68
1.70
2.50
2.20
2.35
0.30
19.34
3.69
1.60
1.90
0.20
20.27
1.70
1.60
1.90
0.20
7.00
#REF!
1.50
2.50
2.35
2.35
0.30
0.67
1.92
1.55
2.40
1.60
0.20
#REF!
2.30
1.45
1.60

1.50
5.00
6.00
6.00
6.00
2.00
14.00
1.50
5.00
3.00
6.00
2.00
3.00
8.00
2.00
30.00
1.50
5.00
2.00
3.00
2.00
7.00
1.50
4.00
6.00
2.00
7.00
1.50
5.00
6.00
6.00
2.00
6.00
22.00
1.50
4.00
6.00
2.00
7.00
1.50
4.00
6.00
2.00
7.00
1.50
5.00
6.00
6.00
6.00
2.00
14.00
44.10
5.00
2.00
3.00
6.00
9.00
#REF!
4.00
4.00
6.00

0.39
0.89
0.89
0.89
0.89
1.58
2.46
0.39
0.89
0.89
0.89
1.58
1.58
0.89
1.58
2.46
0.39
0.89
0.89
0.89
0.89
2.46
0.39
0.89
0.89
0.89
2.46
0.39
0.89
0.89
0.89
0.89
0.89
2.46
0.39
0.89
0.89
0.89
2.46
0.39
0.89
0.89
0.89
2.46
0.39
0.89
0.89
0.89
0.89
0.89
2.46
0.39
0.89
0.89
0.89
0.89
2.46
0.39
0.89
0.89
0.89

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

45.99
22.87
8.01
13.35
12.55
7.43
10.33
15.21
28.26
4.01
13.35
9.01
9.01
16.73
9.13
22.14
15.72
20.96
3.74
4.27
3.31
3.44
13.34
12.67
8.54
3.38
3.44
11.35
20.83
9.08
13.35
3.92
12.55
16.24
11.31
26.27
8.54
3.38
3.44
23.71
18.16
8.54
3.38
3.44
12.29
#REF!
8.01
13.35
12.55
4.18
#REF!
#REF!
25.63
2.76
6.41
8.54
4.43
#REF!
16.38
5.16
8.54

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top

Extra Bottom

Separation Bars, 20MM dia.


Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
Beams in -Y- direction
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
SB-1
Extra Top

Extra Bottom

Separation Bars, 20MM dia.


Stirrups

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
0.0
1.0
1.0
1.0
1.0
1.0
10.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
10.0
1.0

1.90
0.20
11.00
6.89
1.90
2.65
2.50
2.50
2.25
2.20
2.35
0.20
26.87
5.17
1.80
2.25
2.40
0.20
25.86
1.34
1.60
2.10
1.90
0.20
1.00
10.75
1.60
2.10
2.20
2.55
2.80
2.25
1.90
2.52
2.40
0.20
48.66

2.00
7.00
1.50
5.00
3.00
3.00
2.00
6.00
2.00
2.00
6.00
22.00
1.50
5.00
2.00
3.00
2.00
7.00
1.50
5.00
3.00
2.00
2.00
7.00
-0.10
5.00
3.00
2.00
2.00
2.00
2.00
2.00
4.00
2.00
2.00
24.00
1.50

0.89
2.46
0.39
0.89
1.58
0.89
0.89
1.58
1.58
0.89
1.58
2.46
0.39
0.89
1.58
0.89
1.58
2.46
0.39
0.89
0.89
0.89
0.89
2.46
0.39
0.89
0.89
0.89
0.89
1.58
1.58
1.58
0.89
1.58
1.58
2.46
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

d. Columns above Plinth beam and upto Stilt Floor


level= +0.15MT.
#REF!
C-1
Stirrups
C-2
Stirrups
C-3
Stirrups
C-4
Stirrups
C-5
Stirrups
C-6
Stirrups
C-7
Stirrups

12.0
12.0
9.0
9.0
3.0
3.0
3.0
10.0
10.0
9.0
9.0
9.0
3.0
3.0
5.0
5.0

1.74
2.90
1.38
2.30
2.10
1.74
2.30
1.38
1.90
1.74
2.10
2.70
1.74
2.30
1.74
2.30

10.00
3.33
10.00
3.33
6.00
8.00
3.33
8.00
3.33
8.00
4.00
3.33
6.00
3.33
4.00
3.33

1.58
0.39
2.46
0.39
2.46
1.58
0.39
0.89
0.39
1.58
2.46
0.39
1.58
0.39
0.89
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

3.38
3.44
6.44
30.66
9.01
7.08
4.45
23.70
7.11
3.92
22.28
10.82
31.44
23.01
5.69
6.01
7.58
3.44
15.13
0.00
4.27
3.74
3.38
3.44
-0.04
478.38
4.27
3.74
3.92
8.06
8.85
7.11
6.76
7.96
7.58
118.08
28.47
#REF!
2351.62

329.90
45.19
305.53
26.88
92.99
65.98
8.96
98.26
24.68
197.94
185.98
31.56
49.49
8.96
30.97
14.94

C-8
Stirrups
C-9
Stirrups
C-10
Stirrups
C-11
Stirrups
C-12
Stirrups
C-13
Stirrups
#REF!
Stirrups
#REF!
Stirrups
0
#REF!
Stirrups
#REF!
Stirrups
#REF!
Stirrups
#REF!
Stirrups

2.0
2.0
2.0
2.0
2.0
5.0
5.0
5.0
4.0
4.0
4.0
16.0
16.0
16.0
4.0
4.0
4.0
#REF!
#REF!
#REF!
#REF!

1.38
2.30
1.74
1.38
3.30
1.38
1.38
7.30
2.10
1.74
2.90
2.10
1.74
2.30
2.10
1.74
2.30
#REF!
#REF!
#REF!
#REF!

4.00
3.33
12.00
4.00
3.33
8.00
6.00
3.33
4.00
8.00
3.33
6.00
8.00
3.33
4.00
6.00
3.33
5.00
#REF!
6.00
#REF!

0.89
0.39
1.58
0.89
0.39
2.46
1.58
0.39
2.46
1.58
0.39
2.46
1.58
0.39
2.46
1.58
0.39
0.89
0.39
0.89
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

8.00
4.00
#REF!
6.00
#REF!
8.00
#REF!
8.00
6.00
#REF!

1.58
2.46
0.39
1.58
0.39
1.58
0.39
2.46
1.58
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

#REF!

Kg

Kg

TOTAL STEEL UPTO PLINTH LEVEL

Kg

(iii). REINFORCEMENT AS PER;


A. STILT PARKING FLOOR:
a. Columns above Stilt Parking Floor level = +0.15MT.
and
upto Podium floor level = + 3.25 MT. Level
#REF!
12.0
C-1
12.0
Stirrups
9.0
C-2
9.0
Stirrups
3.0
C-3
3.0
3.0
Stirrups
3.0
C-4
10.0
Stirrups
10.0
C-5
9.0
9.0
Stirrups
3.0
C-6
3.0
Stirrups
5.0
C-7

3.94
2.90
3.94
2.30
3.94
3.94
2.30
3.94
1.90
3.94
3.94
2.70
3.94
2.30
3.94

10.00
17.67
10.00
17.67
6.00
8.00
17.67
8.00
17.67
8.00
4.00
17.67
6.00
#REF!
4.00

1.58
0.39
2.46
0.39
2.46
1.58
0.39
0.89
0.39
1.58
2.46
0.39
1.58
0.39
0.89

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

9.83
5.97
65.98
9.83
8.57
135.79
65.41
47.40
82.66
87.97
15.06
495.94
351.90
47.79
82.66
65.98
11.95
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

747.02
239.77
872.32
142.62
174.46
149.40
47.54
84.16
130.91
498.02
348.93
167.43
112.05
#REF!
70.13

5.0
2.0
2.0
2.0
2.0
2.0
2.0
5.0
5.0
4.0
4.0
4.0
4.0
16.0
16.0
4.0
4.0
4.0

2.30
3.94
2.30
3.94
3.94
3.30
3.94
3.94
7.30
3.94
3.94
2.90
3.94
1.54
2.30
#REF!
#REF!
2.30

1.67
4.00
1.67
12.00
4.00
#REF!
8.00
6.00
1.67
4.00
8.00
1.00
6.00
8.00
1.67
4.00
6.00
1.67

0.39
0.89
0.39
1.58
0.89
0.39
2.46
1.58
0.39
2.46
1.58
0.39
2.46
1.58
0.39
2.46
1.58
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
2.70
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

8.00
4.00
#REF!
6.00
#REF!
8.00
#REF!
8.00
6.00
#REF!

1.58
2.46
0.39
1.58
0.39
1.58
0.39
2.46
1.58
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

b. Windows seal Projection


Windows, W-1
Stirrups
W-2
Stirrups
W-3
Stirrups
Vantilators, V-1
Stirrups

21.0
21.0
1.0
1.0
2.0
2.0
3.0
3.0

1.90
0.65
3.10
0.65
2.20
0.65
0.90
0.65

2.00
11.00
2.00
17.00
2.00
12.50
2.00
6.00

0.62
0.39
0.62
0.39
0.62
0.39
0.62
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

c. Lintel
GFL-1
Stirrups
GFL-2
Stirrups
GFL-3
Stirrups
GFL-4
Stirrups

21.0
21.0
1.0
1.0
2.0
2.0
3.0
3.0

5.30
0.25
4.50
0.25
3.60
0.25
2.30
0.25

4.00
13.50
4.00
19.50
4.00
14.50
4.00
8.00

0.62
0.39
0.62
0.39
0.62
0.39
0.62
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

d. Wheather shed
Windows, W-1
Main bars
W-2
Main bars
W-3

21.0
21.0
1.0
1.0
2.0

2.30
0.77
3.50
0.77
2.60

5.33
21.00
5.33
31.00
5.00

0.39
0.62
0.39
0.62
0.39

Kg
Kg
Kg
Kg
Kg

Stirrups
C-8
Stirrups
C-9
Stirrups
C-10
Stirrups
C-11
Stirrups
C-12
Stirrups
C-13
Stirrups
#REF!
#REF!
Stirrups
#REF!
Stirrups
#REF!
Stirrups
#REF!
Stirrups

7.48
28.05
2.99
149.40
28.05
#REF!
155.08
186.76
23.73
155.08
199.21
4.52
232.62
311.45
23.92
#REF!
#REF!
5.98
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

49.48
58.56
3.84
4.31
5.46
6.34
3.35
4.56
135.89
276.02
27.64
11.16
1.90
17.86
2.83
17.11
2.34
356.86
100.40
210.53
7.28
14.80
10.14

Main bars
Vantilators, V-1
Main bars
e. Stilt floor roof Slab Beams
#REF!
SRB-1
Bottom Straight Bars
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top

Extra Bottom

Separation Bars, 20MM dia.


Stirrups
SRB-2
Extra Top
Separation Bars, 20MM dia.
Stirrups
0
Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Bottom Straight Bars
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Bottom Straight Bars
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Bottom Straight Bars
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top

2.0
3.0
3.0

0.77
1.30
0.77

23.83
5.00
13.00

0.62
0.39
0.62

Kg
Kg
Kg
Kg

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
3.0
1.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
3.0
1.0
2.0
33.0
1.0
1.0
1.0
3.0
1.0
2.0
33.0
1.0
1.0
1.0
3.0
1.0
2.0
33.0
1.0
3.0
30.0
1.0
2.0
1.0
3.0
1.0
2.0

10.48
10.84
1.80
2.70
1.90
2.60
0.20
2.04
7.64
2.00
3.05
2.35
2.75
2.25
3.05
0.20
2.04
9.70
2.15
3.00
0.25
1.84
9.08
2.05
3.05
2.55
2.15
3.00
0.25
1.84
5.37
5.73
3.80
6.00
4.85
2.25
0.30
1.84
6.31
6.67
3.80
5.00
0.25
1.84
7.03
7.39
3.80
5.00
0.25
1.84
5.65
2.00

7.00
2.00
4.00
5.00
4.00
8.00
21.00
62.84
5.00
4.00
24.00
6.00
13.00
6.00
6.00
40.00
52.67
5.00
8.00
3.00
7.00
69.83
5.00
3.00
3.00
6.00
3.00
4.00
11.00
51.93
3.00
3.00
12.00
12.00
12.00
6.00
6.00
33.75
3.00
3.00
12.00
4.00
7.00
41.58
3.00
3.00
12.00
4.00
7.00
56.90
5.00
3.00

0.89
1.58
0.89
1.58
1.58
1.58
2.46
0.39
1.58
1.58
1.58
1.58
1.58
1.58
1.58
2.46
0.39
1.58
1.58
1.58
2.46
0.39
1.58
1.58
1.58
1.58
0.89
1.58
2.46
0.39
1.58
2.46
2.46
2.46
2.46
1.58
2.46
0.39
1.58
2.46
2.46
2.46
2.46
0.39
1.58
2.46
2.46
2.46
2.46
0.39
1.58
1.58

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

22.75
7.61
18.61
392.12

65.29
34.25
6.41
21.33
12.01
32.86
10.33
49.99
60.36
12.64
115.66
22.28
56.49
63.99
28.91
39.36
41.90
76.63
27.18
14.22
4.31
50.11
71.73
9.72
14.46
72.52
5.74
37.92
223.25
37.27
25.45
42.29
336.53
177.12
286.34
703.89
4.43
24.22
29.91
147.67
112.18
98.40
142.07
29.84
99.97
1636.15
112.18
98.40
4.31
122.49
44.64
18.96

Extra Bottom

Separation Bars, 20MM dia.


Stirrups
0
Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Separation Bars, 20MM dia.
Stirrups
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0

Extra Top

Extra Bottom

Separation Bars, 20MM dia.


Stirrups

33.0
1.0
1.0
30.0
1.0
2.0
1.0
2.0
33.0
1.0
1.0
30.0
1.0
2.0
2.0
33.0
1.0
1.0
30.0
33.0
1.0
1.0
30.0
1.0
2.0
1.0
1.0
1.0
1.0
1.0
2.0
2.0
2.0
2.0
2.0
2.0
30.0
1.0
2.0
1.0
1.0
30.0
1.0
1.0
1.0
1.0
1.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0

2.00
3.00
2.75
2.25
3.05
0.20
1.84
5.57
5.57
1.40
2.20
1.90
1.95
0.20
1.84
8.48
2.25
3.00
0.20
1.84
5.27
5.15
2.60
3.70
0.20
1.84
4.45
1.40
0.20
1.84
11.13
4.35
2.30
2.85
0.20
1.64
8.48
1.70
2.20
1.95
0.20
1.64
6.58
2.40
3.60
0.20
1.64
5.29
5.65
0.80
1.55
2.40
2.50
2.00
2.35
2.00
0.20
1.64

3.00
17.00
13.00
2.00
3.00
48.00
43.10
3.00
2.00
3.00
4.00
4.00
4.00
10.00
45.90
5.00
9.00
4.00
7.00
75.00
5.00
3.00
4.00
3.00
9.00
39.30
7.00
4.00
4.00
34.70
5.00
4.00
6.00
4.00
7.00
97.90
6.00
8.00
3.00
4.00
10.00
75.00
6.00
12.00
4.00
6.00
56.00
3.00
3.00
3.00
8.00
6.00
3.00
2.00
4.00
3.00
22.00
43.10

2.46
1.58
1.58
1.58
1.58
2.46
0.39
0.89
1.58
0.89
1.58
0.89
1.58
2.46
0.39
0.89
1.58
1.58
2.46
0.39
1.58
1.58
1.58
1.58
2.46
0.39
0.89
0.89
2.46
0.39
1.58
1.58
1.58
1.58
2.46
0.39
0.89
0.89
0.89
1.58
2.46
0.39
1.58
1.58
1.58
2.46
0.39
0.89
1.58
1.58
1.58
1.58
1.58
1.58
1.58
0.89
2.46
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

487.08
80.58
56.49
213.30
14.46
47.23
30.93
29.74
580.84
3.74
13.90
202.92
12.32
9.84
65.88
1245.29
32.00
18.96
103.32
1776.06
41.63
24.41
492.96
17.54
8.86
28.20
27.72
4.98
1.97
24.90
175.85
54.98
43.61
36.02
6.89
125.23
1358.50
12.10
11.75
12.32
4.92
1439.10
62.38
45.50
22.75
2.95
35.82
28.25
53.56
7.58
39.18
45.50
23.70
12.64
29.70
10.68
21.65
55.13

0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
SRB-4
Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
SRB-5
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
2.0
2.0
2.0
2.0
2.0
2.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
3.0
3.0
3.0
3.0
3.0
2.0
2.0
2.0
2.0
2.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

6.34
3.00
5.10
4.40
0.30
1.64
7.25
3.00
5.10
4.40
0.30
1.64
7.03
3.00
5.10
4.40
0.30
1.64
8.14
3.00
5.10
4.40
0.30
1.64
2.34
3.00
5.10
2.10
4.40
2.90
0.30
1.84
5.37
2.10
2.75
1.45
2.90
1.86
0.20
1.84
4.18
1.45
1.90
0.20
1.64
2.94
3.00
5.10
4.40
0.30
1.64
2.35
1.45
1.90
0.20
1.64
5.69
3.00

6.00
8.00
4.00
8.00
14.00
50.00
6.00
8.00
4.00
8.00
14.00
59.10
6.00
8.00
4.00
8.00
14.00
56.90
6.00
8.00
4.00
8.00
14.00
68.00
6.00
4.00
8.00
3.00
8.00
3.00
21.00
10.00
6.00
4.00
3.00
2.00
4.00
4.00
10.00
40.30
5.00
4.00
2.00
6.00
32.00
6.00
8.00
4.00
8.00
14.00
16.00
5.00
4.00
2.00
6.00
13.70
6.00
8.00

1.58
2.46
1.58
1.58
2.46
0.39
1.58
2.46
1.58
1.58
2.46
0.39
1.58
2.46
1.58
1.58
2.46
0.39
1.58
2.46
1.58
1.58
2.46
0.39
1.58
2.46
1.58
1.58
1.58
1.58
2.46
0.39
1.58
1.58
1.58
1.58
1.58
0.89
2.46
0.39
0.89
1.58
1.58
2.46
0.39
1.58
2.46
1.58
1.58
2.46
0.39
0.89
1.58
1.58
2.46
0.39
1.58
2.46

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

60.10
59.04
32.23
55.62
10.33
31.98
68.73
59.04
32.23
55.62
10.33
37.80
66.64
59.04
32.23
55.62
10.33
36.39
154.33
118.08
64.46
111.23
20.66
86.99
66.55
88.56
193.39
29.86
166.85
41.24
46.49
21.53
50.91
13.27
13.04
4.58
18.33
6.62
4.92
28.92
55.80
27.49
18.01
8.86
61.40
55.74
118.08
64.46
111.23
20.66
20.47
10.46
9.16
6.00
2.95
8.76
53.94
59.04

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
Extra Top
Separation Bars, 20MM dia.
Stirrups
SRB-6
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
SRB-7
Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
SRB-1
Bottom Straight Bars
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Bottom Straight Bars
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
1.0
1.0
1.0
1.0
1.0
1.0
12.0
12.0
12.0
12.0
12.0
12.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0

5.10
4.40
0.30
1.64
3.97
1.25
0.20
1.64
4.18
1.45
1.90
0.20
1.44
2.34
1.80
2.65
2.50
2.35
2.35
0.30
1.44
8.33
8.69
1.85
2.25
2.40
0.20
2.04
8.48
1.55
2.10
1.90
0.20
2.04
8.23
8.59
1.65
2.50
0.20
2.04
8.38
1.55
2.20
2.80
1.90
2.52
0.20
2.04

4.00
8.00
14.00
50.50
5.00
4.00
4.00
29.90
5.00
4.00
2.00
6.00
32.00
5.00
4.00
3.00
22.00
8.00
8.00
22.00
10.00
3.00
3.00
4.00
3.00
3.00
9.00
73.50
5.00
2.00
2.00
2.00
5.00
75.00
3.00
3.00
8.00
3.00
8.00
72.50
5.00
3.00
4.00
4.00
4.00
6.00
19.00
74.00

1.58
1.58
2.46
0.39
0.89
1.58
2.46
0.39
0.89
1.58
1.58
2.46
0.39
0.89
0.89
0.89
0.89
0.89
2.46
2.46
0.39
0.89
1.58
1.58
1.58
1.58
2.46
0.39
0.89
0.89
0.89
0.89
2.46
0.39
0.89
1.58
1.58
1.58
2.46
0.39
0.89
0.89
0.89
0.89
0.89
0.89
2.46
0.39

Kg

0
f. Stilt Floor roof Slab
SFRS-1
Parallel to Short span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

2.0
4.0
6.0
8.0

11.45
1.60
2.50
11.45

23.33
12.67
12.67
2.20

0.62
0.89
0.62
0.62

Kg
Kg
Kg
Kg

32.23
55.62
10.33
32.30
17.67
7.90
1.97
19.12
18.60
9.16
6.00
2.95
17.97
31.24
19.22
21.23
146.85
50.20
138.74
48.71
16.85
155.69
288.33
81.84
74.66
79.63
31.00
409.34
37.74
2.76
3.74
3.38
2.46
59.67
263.69
488.60
250.27
142.20
47.23
692.17
335.62
37.25
70.49
89.71
60.88
121.11
84.13
529.87
20825.62
2252.20

331.24
72.14
117.78
124.94

Parallel to Long span


Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom

2.0
4.0
1.0
14.0

6.44
1.60
2.50
6.44

36.70
20.35
20.35
1.72

0.39
0.62
0.39
0.39

Kg
Kg
Kg
Kg

Parallel to Short span


Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom

23.0
46.0
0.0
92.0
23.0
46.0
1.0
2.0

8.90
1.60
2.50
8.90
6.44
1.60
2.50
6.44

27.40
14.20
14.20
2.20
48.38
24.69
24.69
8.10

0.62
0.89
0.62
0.62
0.39
0.62
0.39
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

Parallel to Short span


Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom

1.0
2.0
0.0
2.0
1.0
2.0
0.0
2.0

6.33
1.60
2.50
6.33
9.38
1.60
2.50
9.38

64.60
32.80
32.80
7.92
40.20
20.60
20.60
6.15

0.89
0.89
0.62
0.62
0.89
0.89
0.62
0.89

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

Parallel to Short span


Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom

6.0
12.0
0.0
12.0
6.0
12.0
0.0
2.0

4.80
1.30
2.50
4.80
8.72
1.30
2.50
8.72

53.33
27.67
27.67
7.32
22.35
11.68
11.68
5.10

0.62
0.89
0.89
0.62
0.39
0.62
0.62
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

Parallel to Short span


Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom

8.0
16.0
0.0
16.0
8.0
16.0
0.0
2.0

5.00
1.30
2.50
5.00
8.72
1.30
2.50
8.72

53.33
27.67
27.67
7.32
23.17
12.09
12.09
5.05

0.62
0.89
0.89
0.62
0.39
0.62
0.62
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

Parallel to Short span


Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom

1.0
2.0
0.0
2.0
1.0
2.0
0.0
2.0

5.85
1.30
2.50
5.85
5.62
1.30
2.50
5.62

31.33
16.67
16.67
5.20
27.52
14.26
14.26
5.79

0.62
0.89
0.89
0.62
0.39
0.62
0.62
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

Parallel to Short span


Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span

1.0
2.0
0.0
2.0
1.0

4.15
1.40
2.50
4.15
4.12

21.00
11.00
11.00
3.80
15.59

0.62
0.89
0.89
0.62
0.39

Kg
Kg
Kg
Kg
Kg

184.37
80.76
19.84
60.33
3477.44
930.16
0.00
1116.84
2794.47
1126.54
24.07
40.69
363.94
93.41
0.00
62.17
335.60
58.67
0.00
102.68
952.26
384.10
0.00
261.41
456.14
112.94
0.00
34.69
1322.58
512.13
0.00
363.07
630.50
155.88
0.00
34.35
113.63
38.56
0.00
37.72
60.33
22.99
0.00
25.38
54.03
27.41
0.00
19.55
25.05

Alternate extra at top over discontinious edge


Alternate extra at top over continious edge
Alternate extra at bottom

2.0
0.0
2.0

1.40
2.50
4.12

8.29
8.29
3.70

0.62
0.62
0.39

Kg
Kg
Kg

Parallel to Short span


Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom

1.0
2.0
0.0
2.0
1.0
2.0
0.0
2.0

9.35
1.40
2.50
9.35
5.67
1.40
2.50
5.67

31.00
16.50
16.50
4.64
46.00
23.50
23.50
8.70

0.62
0.89
0.89
0.62
0.39
0.62
0.62
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

Parallel to Short span

1.0

5.60

43.35

0.62

Kg

Alternate extra at top over discontinious edge

2.0

1.30

22.18

0.89

Kg

Alternate extra at top over continious edge

0.0

2.50

22.18

0.89

Kg

Alternate extra at bottom

2.0

5.60

8.40

0.62

Kg

Parallel to Long span

1.0

8.32

25.00

0.39

Kg

Alternate extra at top over discontinious edge

2.0

1.30

13.00

0.62

Kg

Alternate extra at top over continious edge

0.0

2.50

13.00

0.62

Kg

Alternate extra at bottom

2.0

8.32

5.34

0.39

Kg

Parallel to Short span


Alternate extra at top over discontinious edge
Alternate extra at top over continious edge

1.0
2.0
0.0
2.0

8.60
1.60
2.50
8.60

37.00
19.00
19.00
5.20

0.62
0.89
0.89
0.62

Kg
Kg
Kg
Kg

1.0
2.0
0.0
2.0

5.67
1.60
2.50
5.67

46.25
23.62
23.62
8.40

0.39
0.62
0.62
0.39

Kg
Kg
Kg
Kg

#REF!
#REF!
0.0
#REF!
#REF!

#REF!
1.30
2.50
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

0.62
0.89
0.89
0.62
0.39

Kg
Kg
Kg
Kg
Kg

#REF!
0.0
2.0

1.30
2.50
#REF!

#REF!
#REF!
#REF!

0.62
0.62
0.39

Kg
Kg
Kg

#REF!

#REF!

#REF!

0.62

Kg

#REF!
0.0
#REF!
#REF!
#REF!

1.40
2.50
#REF!
#REF!
1.40

#REF!
#REF!
#REF!
#REF!
#REF!

0.89
0.89
0.62
0.39
0.62

Kg
Kg
Kg
Kg
Kg

0.0
2.0

2.50
#REF!

#REF!
#REF!

0.62
0.39

Kg
Kg

#REF!
#REF!

#REF!
1.40

#REF!
#REF!

0.62
0.89

Kg
Kg

Alternate extra at bottom


Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
#REF!
Parallel to Short span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
#REF!
Parallel to Short span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
#REF!
Parallel to Short span
Alternate extra at top over discontinious edge

14.40
0.00
11.89
179.73
41.12
0.00
53.80
101.71
40.79
0.00
38.48
150.52
51.32
0.00
58.33
81.12
20.96
0.00
34.65
197.28
54.11
0.00
55.45
102.26
46.87
0.00
37.15
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Alternate extra at top over continious edge


Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
#REF!
Parallel to Short span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
#REF!
Parallel to Short span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
#REF!
Parallel to Short span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
#REF!
Parallel to Short span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom

0.0
#REF!
#REF!

2.50
#REF!
#REF!

#REF!
#REF!
#REF!

0.89
0.62
0.39

Kg
Kg
Kg

#REF!
0.0
2.0

1.40
2.50
#REF!

#REF!
#REF!
#REF!

0.62
0.62
0.39

Kg
Kg
Kg

#REF!

#REF!

#REF!

0.62

Kg

#REF!
0.0
#REF!
#REF!
#REF!

1.40
2.50
#REF!
#REF!
1.40

#REF!
#REF!
#REF!
#REF!
#REF!

0.89
0.89
0.62
0.39
0.62

Kg
Kg
Kg
Kg
Kg

0.0
2.0

2.50
#REF!

#REF!
#REF!

0.62
0.39

Kg
Kg

#REF!
#REF!

#REF!
1.40

#REF!
#REF!

0.62
0.89

Kg
Kg

0.0
#REF!
#REF!
#REF!
0.0

2.50
#REF!
#REF!
1.40
2.50

#REF!
#REF!
#REF!
#REF!
#REF!

0.89
0.62
0.62
0.89
0.89

Kg
Kg
Kg
Kg
Kg

2.0

#REF!

#REF!

0.62

Kg

#REF!
#REF!
0.0

#REF!
1.40
2.50

#REF!
#REF!
#REF!

0.89
0.89
0.89

Kg
Kg
Kg

#REF!
#REF!
#REF!
0.0
2.0

#REF!
#REF!
1.40
2.50
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

0.62
0.62
0.89
0.89
0.62

Kg
Kg
Kg
Kg
Kg

#REF!
#REF!
0.0
#REF!

#REF!
1.40
2.50
#REF!

#REF!
#REF!
#REF!
#REF!

0.89
0.89
0.89
0.62

Kg
Kg
Kg
Kg

#REF!
#REF!
0.0
2.0

#REF!
1.40
2.50
#REF!

#REF!
#REF!
#REF!
#REF!

0.39
0.89
0.89
0.62

Kg
Kg
Kg
Kg
Kg

Kg

g. Stilt Floor Stair Case


First flight
Vast slab
Landing

1.0
1.0
1.0
1.0

2.10
3.76
2.70
4.02

21.46
8.50
23.00
11.50

1.58
1.58
1.58
1.58

Kg
Kg
Kg
Kg

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1647.25

71.20
50.54
98.12
73.04

Second flight
Vast slab
Landing

1.0
1.0
1.0
1.0

2.10
3.76
2.70
4.02

21.69
8.50
23.00
11.50

1.58
1.58
1.58
1.58

Kg
Kg
Kg
Kg
Kg

#REF!

Kg

Kg

TOTAL G.F. REINFORCEMENT

Kg

B. PODIUM FLOOR :
a. Columns above Podium Floor level = +3.25MT. and
upto First floor level = + 8.25 MT. Level
C-1
Stirrups
C-2
Stirrups
C-3
Stirrups
C-4
Stirrups
C-5
Stirrups
C-6
Stirrups
C-8
Stirrups
C-9
Stirrups
C-10
Stirrups
Staff Rooms

12.0
12.0
9.0
9.0
3.0
3.0
10.0
10.0
9.0
9.0
3.0
3.0
2.0
2.0
2.0
2.0
5.0
5.0

5.33
2.30
5.33
1.70
5.33
1.70
5.33
1.90
5.33
2.10
5.33
1.10
5.33
1.70
5.33
3.30
5.33
7.30

10.00
29.66
10.00
29.66
6.00
29.66
17.67
29.66
17.67
29.66
4.00
29.66
4.00
29.66
4.00
29.66
12.00
29.66

1.58
0.39
2.46
0.39
2.46
1.58
0.39
0.89
0.39
1.58
2.46
0.39
1.58
0.39
0.89
0.39
0.89
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

#REF!

Kg

Kg

b. Windows seal
Windows, W-1
Stirrups
W-2
Stirrups
W-3
Stirrups
Vantilators, V-1
Stirrups

5.0
5.0
1.0
1.0
0.0
0.0
3.0
3.0

1.90
0.65
3.10
0.65
2.20
0.65
1.05
0.65

2.00
11.00
2.00
17.00
2.00
12.50
2.00
6.00

0.62
0.39
0.62
0.39
0.62
0.39
0.62
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

c. Lintel
FFL-1
Stirrups
FFL-2
Stirrups
FFL-3
Stirrups
FFL-4

5.0
5.0
1.0
1.0
0.0
0.0
3.0

3.30
0.25
4.50
0.25
3.60
0.25
2.30

4.00
13.50
4.00
19.50
4.00
14.50
4.00

0.62
0.39
0.62
0.39
0.62
0.39
0.62

Kg
Kg
Kg
Kg
Kg
Kg
Kg

71.96
50.54
98.12
73.04
586.56
#REF!
#REF!
#REF!

1010.57
319.30
1180.06
177.00
236.01
239.03
367.24
501.61
330.51
885.81
157.34
38.18
67.37
39.33
37.95
76.35
284.62
422.26
5726.55
532.76
111.23

11.78
13.94
3.84
4.31
0.00
0.00
3.91
4.56

40.92
6.58
11.16
1.90
0.00
0.00
17.11

Stirrups
d. Wheather shed
Windows, W-1
Main bars
W-2
Main bars
W-3
Main bars
Vantilators, V-1
Main bars
e. Podium floor roof Slab Beams
PRB-1
Extra Top

Extra Bottom

Separation Bars, 20MM dia.


Stirrups
0
Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
PRB-2
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Separation Bars, 20MM dia.
Stirrups
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0

3.0

0.25

8.00

0.39

Kg

5.0
5.0
1.0
1.0
0.0
0.0
3.0
3.0

2.30
0.77
3.50
0.77
2.60
0.77
1.30
0.77

5.33
21.00
5.33
31.00
5.00
23.83
5.00
13.00

0.39
0.60
0.39
0.60
0.39
0.60
0.39
0.60

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

1.0
2.0
33.0
1.0
1.0
30.0
1.0
2.0
1.0
1.0
33.0
1.0
1.0
30.0
1.0
2.0
2.0
1.0
1.0
1.0
30.0
33.0
1.0
1.0
1.0
1.0
1.0
2.0
2.0
2.0
2.0
2.0
1.0
1.0
2.0
1.0
1.0
30.0
3.0
1.0
1.0
1.0
1.0
1.0
1.0

10.48
2.00
2.00
3.00
2.75
2.25
3.05
0.20
1.84
9.28
5.57
1.40
2.20
1.90
1.95
0.20
1.84
11.34
2.25
3.00
0.20
1.84
10.72
1.40
0.20
1.84
7.01
4.35
2.30
2.85
0.20
1.64
7.95
1.70
2.20
1.95
0.20
1.64
9.03
3.00
5.10
4.40
0.30
1.64
9.16

5.00
3.00
3.00
17.00
13.00
2.00
3.00
48.00
75.00
3.00
2.00
3.00
4.00
4.00
4.00
10.00
63.00
5.00
9.00
4.00
7.00
83.60
7.00
4.00
4.00
77.40
5.00
4.00
6.00
4.00
7.00
40.30
6.00
8.00
3.00
4.00
10.00
49.70
6.00
8.00
4.00
8.00
14.00
56.90
5.00

1.58
1.58
2.46
1.58
1.58
1.58
1.58
2.46
0.39
0.89
1.58
0.89
1.58
0.89
1.58
2.46
0.39
0.89
1.58
1.58
2.46
0.39
0.89
0.89
2.46
0.39
1.58
1.58
1.58
1.58
2.46
0.39
0.89
0.89
0.89
1.58
2.46
0.39
1.58
2.46
1.58
1.58
2.46
0.39
0.89

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

2.34

23.91
48.51
7.28
14.32
0.00
0.00
7.61
18.01

82.79
18.96
487.08
80.58
56.49
213.30
14.46
47.23
53.82
24.78
580.84
3.74
13.90
202.92
12.32
9.84
90.42
50.46
32.00
18.96
103.32
1979.71
66.79
4.98
1.97
55.54
55.38
54.98
43.61
36.02
6.89
51.55
42.45
12.10
11.75
12.32
4.92
953.64
256.81
59.04
32.23
55.62
10.33
36.39
40.76

Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Bottom Straight Bars
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Bottom Straight Bars
Extra Top
Extra Bottom
Separation Bars, 20MM dia.
Stirrups
0
Extra Top

Extra Bottom
Separation Bars, 20MM dia.
Stirrups
f. Podium Floor roof Slab
FFRS-1
Parallel to Short span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
FFRS-2
Parallel to Short span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom
Parallel to Long span
Alternate extra at top over discontinious edge
Alternate extra at top over continious edge
Alternate extra at bottom

3.0
3.0
3.0
3.0
3.0
3.0
3.0
1.0
7.0
7.0
7.0
7.0
7.0
7.0
2.0
12.0
12.0
12.0
12.0
12.0
37.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0

1.80
2.65
2.50
2.35
2.35
0.30
1.44
7.29
7.65
1.85
2.25
2.40
0.20
2.04
7.57
8.59
1.65
2.50
0.20
2.04
11.46
4.63
5.28
5.88
4.98
5.60
3.28
5.12

4.00
3.00
22.00
8.00
8.00
22.00
61.80
3.00
3.00
4.00
3.00
3.00
9.00
28.40
3.00
3.00
8.00
3.00
8.00
30.93
5.00
3.00
4.00
4.00
4.00
6.00
19.00
62.17

0.89
0.89
0.89
0.89
2.46
2.46
0.39
0.89
1.58
1.58
1.58
1.58
2.46
0.39
0.89
1.58
1.58
1.58
2.46
0.39
0.89
0.89
0.89
0.89
0.89
0.89
2.46
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

2.0
2.0
0.0
2.0
1.0
2.0
0.0
2.0

11.20
1.40
2.50
4.15
6.72
1.40
2.50
4.12

21.0
11.0
11.0
3.8
15.6
8.3
8.3
3.7

0.62
0.89
0.89
0.62
0.39
0.62
0.62
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

1.0
2.0
0.0
2.0
1.0
2.0
0.0
2.0

7.05
1.60
2.50
8.60
4.62
1.60
2.50
5.67

37.0
19.0
19.0
5.2
46.2
23.6
23.6
8.4

0.62
0.89
0.89
0.62
0.39
0.62
0.62
0.39

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

TOTAL STAFF ROOMS, F.F. REINFORCEMENT WORK


Kg
EXTRA FOR F.F. WORK

K. STAIR CASE TOWER & LIFT MACHINE ROOM AT


TERRACE LEVEL:

Kg

19.22
21.23
146.85
50.20
138.74
48.71
104.12
19.46
253.83
81.84
74.66
79.63
31.00
158.15
40.42
488.60
250.27
142.20
47.23
295.33
1886.89
111.26
169.17
188.40
159.56
269.14
1379.76
1117.21

291.65
27.41
0.00
19.55
40.85
14.40
0.00
11.89
161.73
54.11
0.00
55.45
83.32
46.87
0.00
37.15
14943.47

20670.01
20670.01

a. Columns above Terrace Floor and upto Parapet


wall, 1.2 MT ht.
C-6
Stirrups
C-7
Stirrups
b. Windows seal, Stair case Tower
W-3
Stirrups
W-4
Stirrups
TOTAL REINFORCEMENT WORK AT TERRACE
LEVEL

1.0
1.0
1.0
1.0

1.65
2.30
1.65
2.30

4.00
7.00
4.00
7.00

0.60
0.39
0.60
0.39

Kg
Kg
Kg
Kg

2.0
2.0
2.0
2.0

1.70
0.25
1.50
0.25

2.00
10.00
2.00
9.00

0.60
0.39
0.60
0.39

Kg
Kg
Kg
Kg
Kg
Kg

EXTRA FOR TERRACE LEVEL WORK


14

BRICK WORK 200 MM THICK:


BRICK WORK UPTO PLINTH LEVEL:
Brickwork with well burnt chimney bricks in bulls patent
trench kiln manufactured by ghol process, crushing
strength not less than 25 kg/Sq.cm. & Water absorption
not more than 15% in foundation and plinth,20cm thk.
a. CM 1:8, Laying for beam bottom
SB-1
0
0
0
0
0
0
#REF!
SB-3
SB-4
0
0
#REF!
0
SB-7
0
0
0
0
0
SB-8
0
SB-9
0
SB-10
#REF!
0
0
0
Beams in -Y- direction
SB-1

43.0
1.0
1.0
1.0
2.0
2.0
1.0
#REF!
1.0
4.0
1.0
1.0
#REF!
3.0
1.0
1.0
2.0
1.0
3.0
1.0
1.0
1.0
1.0
1.0
2.0
3.0
#REF!
3.0
2.0
1.0
1.0
0.0

7.40
8.03
7.85
4.87
6.07
6.20
5.50
#REF!
6.20
5.59
4.90
5.81
#REF!
4.49
4.65
3.82
3.10
4.24
4.21
3.80
3.93
3.37
2.76
2.80
2.89
0.90
#REF!
0.58
1.50
3.93
3.83
0.00

0.40
0.40
0.40
0.40
0.40
0.40
0.40
#REF!
0.40
0.40
0.40
0.40
#REF!
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
#REF!
0.40
0.40
0.40
0.40
0.10

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

10.0

7.25

0.40

0.10

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

3.96
6.28
3.96
6.28
4.08
1.95
3.60
1.76
31.86
31.86

12.73
0.32
0.31
0.19
0.49
0.50
0.22
#REF!
0.25
0.89
0.20
0.23
#REF!
0.54
0.19
0.15
0.25
0.17
0.51
0.15
0.16
0.13
0.11
0.11
0.23
0.11
#REF!
0.07
0.12
0.16
0.15
0.00
2.90
#REF!

#REF!

M3

M3

b. CM 1:6, Above Plinth beam and upto Plinth Level


SB-1
0
0
0
0
0
0
#REF!
SB-3
SB-4
0
0
#REF!
0
SB-7
0
0
0
0
0
SB-8
0
SB-9
0
SB-10
#REF!
0
0
0
Beams in -Y- direction
SB-1

15

43.0
1.0

7.40
8.03

0.20
0.20

0.25
0.25

1.0
1.0
2.0
2.0
1.0

7.85
4.87
6.07
6.20
5.50

0.20
0.20
0.20
0.20
0.20

0.25
0.25
0.25
0.25
0.25

#REF!
1.0
4.0
1.0
1.0

#REF!
6.20
5.59
4.90
5.81

0.20
0.20
0.20
0.20
0.20

#REF!
0.25
0.25
0.25
0.25

#REF!
3.0
1.0
1.0
2.0

#REF!
4.49
4.65
3.82
3.10

0.20
0.20
0.20
0.20
0.20

#REF!
0.25
0.25
0.25
0.25

1.0
3.0
1.0
1.0
1.0

4.24
4.21
3.80
3.93
3.37

0.20
0.20
0.20
0.20
0.20

0.25
0.25
0.25
0.25
0.25

1.0
1.0
2.0
3.0
#REF!

2.76
2.80
2.89
0.90
#REF!

0.20
0.20
0.20
0.20
0.20

0.25
0.25
0.25
0.25
#REF!

3.0
2.0
1.0
1.0
0.0

0.58
1.50
3.93
3.83
0.00

0.20
0.20
0.20
0.20
0.20

0.25
0.25
0.25
0.25
0.75

10.0

7.25

0.20

0.25

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

#REF!

M3

M3

BRICK WORK ABOVE PLINTH LEVEL:


200 MM THICK BRICK WORK
Brickwork with well burnt chimney bricks in bulls patent
trench kiln manufactured by ghol process, crushing
strength not less than 25 kg/Sq.cm. & Water absorption
not more than 15% in Ground Floor and First Floor main
front and back walls,20cm thk.
a. CM 1:6
Ground Floor

#REF!
14.32

15.91
0.40
0.39
0.24
0.61
0.62
0.28
#REF!
0.31
1.12
0.25
0.29
#REF!
0.67
0.23
0.19
0.31
0.21
0.63
0.19
0.20
0.17
0.14
0.14
0.29
0.14
#REF!
0.09
0.15
0.20
0.19
0.00
3.63
#REF!
#REF!
18.09

2.0
2.0
1.0

38.30
50.30
4.00

0.20
0.20
0.20

2.50
2.50
2.50

4.0
1.0
1.0
2.0
1.0

8.40
7.20
5.00
2.75
10.05

0.20
0.20
0.20
0.20
0.20

2.50
2.50
2.50
2.50
2.50

1.0
1.0
1.0
1.0
1.0

3.90
4.50
4.90
4.30
6.70

0.20
0.20
0.20
0.20
0.20

2.50
2.50
2.50
2.50
2.50

1.0
1.0
1.0
1.0
1.0

3.20
2.25
4.50
1.50
2.80

0.20
0.20
0.20
0.20
0.20

2.50
2.50
2.50
2.50
2.50

Wash area

1.0

3.00

0.20

2.50

Projection of Windows & Vantilators for Elevation


Coener Windows

2.0

4.25

0.20

2.50

2.0
6.0
30.0
30.0
21.0

2.80
0.30
0.20
0.20
1.80

0.20
0.40
0.40
0.10
0.30

2.50
3.45
3.45
3.45
3.45

21.0
1.0
2.0

1.80
3.00
2.10

1.20
1.20
0.60

0.30
0.20
0.20

3.0
4.0
4.0
1.0
1.0

0.80
3.00
1.80
1.20
2.40

0.60
3.00
2.10
2.10
2.50

0.20
0.20
0.20
0.20
0.20

4.0

1.20

3.70

0.20

Water Cooler

Window Projections

Deduction for opening in G.F.


Windows, W-1
W-2
W-3
Vantilators, V-1
Doors, D-1
D-2
D-3
Opening
Fix window in service corridor

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

#REF!

M3

M3
First Floor
3.0

4.80

0.20

2.50

M3

2.0

5.10

0.20

2.50

M3

2.0

1.20

0.20

2.50

M3

2.0

2.25

0.20

2.50

M3

2.0

2.80

0.20

2.50

M3

3.0

3.90

0.20

2.50

M3

38.30
50.30
2.00
16.80
3.60
2.50
2.75
5.03
1.95
2.25
2.45
2.15
3.35
1.60
1.13
2.25
0.75
1.40
1.50

4.25
2.80
2.48
8.28
2.07
39.12
201.06
13.61
0.72
0.50
0.29
7.20
3.02
0.50
1.20
3.55
30.60
170.46
151.76
18.70

7.20
5.10
1.20
2.25
2.80
5.85

2.0

6.70

0.20

2.50

M3

1.0

1.50

0.20

2.50

M3

Parapet Wall

1.0

127.60

0.20

1.00

M3

Elevation projections

6.0

0.30

0.40

1.00

M3

10.0

0.20

0.40

0.80

M3

10.0

0.20

0.10

0.80

M3

30.0

7.20

0.30

0.80

M3
M3

Deduction for opening in F.F.


Windows, W-1

5.0

1.80

1.20

0.20

M3

W-2

1.0

3.00

1.20

0.20

M3

W-3

0.0

2.10

0.60

0.20

M3

Vantilators, V-1

3.0

0.80

0.60

0.20

M3

Doors, D-1

2.0

3.00

3.00

0.20

M3

D-2

2.0

3.00

2.10

0.20

M3

D-3

3.0

1.20

2.10

0.20

M3

#REF!

M3
M3
M3

M3
M3

Staff Rooms
Staff Rooms Parapet Wall, Second Floor
Parapet Wall

1.0
1.0

47.80
8.10

1.00
1.00

0.20
0.20

STAFF ROOMS, SECOND FLOOR NET BRICK WORK


16

17

M3
M3
M3
M3

EXTRA FOR BRICK WORK:


Extra for brickwork in super structure in First Floor roof
level ,20 cm thik.

M3

Extra for brickwork in super structure in Second Floor


roof level ,20 cm thik.

M3

DOORS, WINDOWS AND VANTILATORS:


TEAK WOOD DOORS : Providing and fixing of Second
quality teak wood frames and Shutters including making
in all respect
G. F. DOOR FRAMES:
Doors, D-1

4.0

9.00

0.13

0.05

M3

D-2

4.0

6.00

0.13

0.05

M3

D-3

1.0

5.40

0.13

0.05

M3

#REF!

M3

M3

STAFF ROOMS, F. F. DOOR FRAMES:


Doors, D-1

2.0

9.00

0.13

0.05

M3

6.70
0.75
25.52
0.72
0.64
0.16
51.84
110.73
2.16
0.72
0.00
0.29
3.60
2.52
1.51
10.80
99.93
21.27
4.25
74.41

9.56
1.62
11.18
11.18

74.41
11.18

0.23
0.15
0.03
0.32
0.09

0.11

D-2

2.0

7.20

0.13

0.05

M3

D-3

3.0

5.40

0.13

0.05

M3
M3

DOOR SHUTTERS:
Providing and fixing Water Proof flush door shutters
decorative type core of block board construction with
frame of Ist class hard wood & well matched teak ply
veneering with vertical grains or cross bands & face
veneer on both faces of the shutters, including M.S. butt
hinges & screws, also providing lipping with teak wood
battens 25mm depth on all edges of the shutters.

35mm thick shutters


G. F. DOOR SHUTTERS:
Doors, D-1

4.0

2.85

2.93

M2

D-2

4.0

1.65

2.03

M2

D-3

1.0

1.05

2.03

M2

#REF!

M2

M2

STAFF ROOMS, F. F. DOOR SHUTTERS:


Doors, D-1

2.0

2.85

2.93

M2

D-2

2.0

2.85

2.03

M2

D-3

3.0

1.05

2.03

M2
M2

ALLUMINIUM SECTION WINDOWS: Providing and


fixing of Alluminium Section Window frames of Three
track with powder coating and Glass panel of 5MM thick
including making in all respect
GROUND FLOOR
Windows, W-1
W-2

21.0

1.80

1.20

M2

1.0

3.00

1.20

M2

#REF!

M2

M2

STAFF ROOMS, FIRST FLOOR


Windows, W-1

5.0

1.80

1.20

M2

W-2

1.0

3.00

1.20

M2
M2

ALLUMINIUM SECTION VANTILATORS: Providing and


fixing of Alluminium Section Vantilators frames of Single
track with powder coating and Glass Louvers of 5MM
thick including making in all respect
G. F. VANTILATORS:

0.09
0.10
0.30

33.35
13.37
2.13
38.37
10.46

16.67
11.54
6.38
34.59

45.36
3.60
42.48
6.48

10.80
3.60
14.40

W-3

2.0

2.10

0.60

M2

Vantilators, V-1

3.0

0.80

0.60

M2
M2

#REF!
STAFF ROOMS, F. F. VANTILATORS:
W-3
Vantilators, V-1
STAFF ROOMS, FIRST FLOOR
18

M2
M2
M2

0.0
3.0

2.10
0.80

0.60
0.60

21.0

1.70

1.10

3.10

Kg

1.0

2.90

1.10

3.10

Kg

2.0
3.0

2.10
0.80

0.60
0.60

2.25
2.25

Kg
Kg
Kg

MS GRILLS AND RAILLING:


Providing and fixing M.S. grills of required pattern in
wooden frames windows, ventilators etc. with round
headed bolts and nuts by screw etc.
a. Plain grill for openings
GROUND FLOOR
Windows
Windows, W-1
W-2
Vantilators
W-3
Vantilators, V-1

#REF!

Kg

Kg
STAFF ROOMS, FIRST FLOOR
Windows
Windows, W-1
W-2
Vantilators
W-3
Vantilators, V-1
STAFF ROOMS, FIRST FLOOR

b. Plain raillings for stair case


Ground Floor
c.
Ornamental
windows(Corner)
First floor
Second floor
19

design

in

elevation

5.0
1.0

1.70
2.90

1.10
1.10

3.10
3.10

Kg
Kg

0.0
3.0

2.10
0.80

0.60
0.60

2.25
2.25

Kg
Kg
Kg

2.0

9.40

0.85

M2

1.0
1.0

6.80
6.80

0.90
0.90

M2

for

HARDWARE FITTINGS AND ACCESSORIES:


GROUND FLOOR
a. Providing 40X5 mm iron hold fasts 40cm. Long i/c.
fixing to frame with 10mm dia both nuts and wooden
plug and embedding in CC 30X10X15 cms (1:3:6)
22.0
Iron hold fast
5.0
b. Providing and fixing bright finished M.S. butt hinges
with
necessary screws
etc.type)
complete.
22.0
125X85X5.50mm
(Heavy

M2

6.00

Nos.

4.00

Nos.
Nos.

2.00

Nos.

2.52
1.44
3.96

0.00
1.44
1.44

121.74
9.89
5.67
3.24
140.54
104.10
36.44

28.99
9.89
0.00
3.24
42.11

15.98

6.12
6.12

132.00
20.00
152.00
44.00

5.0
100X50X5.50mm (Heavy type)
c. Providing and fixing bright finished M.S. tower bolts
(barrel type) with screws etc. complete.
22.0
100X10mm
5.0
75X8mm
d. Providing and fixing bright finished M.S. handles with
screws etc. complete.
8.0
125mm
100mm
1.0
e. Providing and fixing bright finished M.S. door Mortice
lock and latch including a pair of lever handles with
screws etc. complete.

3.00

Nos.

1.00
1.00

Nos.
Nos.

1.00

Nos.

1.00

Nos.

300X16X5mm

9.0

1.00

Nos.

9.0

1.00

Nos.

9.0

2.00

Nos.

7.0

6.00

Nos.

3.0

4.00

Nos.

f. Providing and fixing Rubber buffers with screws etc.


complete.
g. Providing and fixing Door stopper with screws etc.
complete.
STAFF ROOMS, FIRST FLOOR
a. Providing 40X5 mm iron hold fasts 40cm. Long i/c.
fixing to frame with 10mm dia both nuts and wooden
plug and embedding in CC 30X10X15 cms (1:3:6)
Iron hold fast

Nos.
b. Providing and fixing bright finished M.S. butt hinges
with necessary screws etc. complete.
125X85X5.50mm (Heavy type)

7.0

2.00

Nos.

100X50X5.50mm (Heavy type)

3.0

3.00

Nos.

100X10mm

7.0

1.00

Nos.

75X8mm

3.0

1.00

Nos.

125mm

4.0

1.00

Nos.

100mm

3.0

1.00

Nos.

7.0

1.00

Nos.

7.0

1.00

Nos.

7.0

2.00

Nos.

c. Providing and fixing bright finished M.S. tower bolts


(barrel type) with screws etc. complete.

d. Providing and fixing bright finished M.S. handles with


screws etc. complete.

e. Providing and fixing bright finished M.S. door Mortice


lock and latch including a pair of lever handles with
screws etc. complete.
300X16X5mm
f. Providing and fixing Rubber buffers with screws etc.
complete.
g. Providing and fixing Door stopper with screws etc.
complete.

20

MAIN GATE:

15.00

22.00
5.00

8.00
1.00

9.00

9.00
18.00

42.00
12.00
54.00

14.00
9.00

7.00
3.00

4.00
3.00

7.00

7.00

14.00

Providing and fixing MS Channel main gate having width


3.0M and 3.0 M height

21

3.0

2.10

2.45

M2

4.0

1.20

3.70

M2

GLASS WORK:
Providing and fixing of Alluminium Fix Window with 5MM
thick Branded glass in all respect.
GROUND FLOOR
#REF!
Fix window in service corridor

M2
0

22

1.0

1.20

3.70

M2

1.0
1.0

7.63
12.50

58.20
1.50

M2
M2

FLOORING WORK:
(i) Terrace finishing with Water Profing material:
25mm Cement concrete flooring 1:2:4 (1 Cement, 2
Sand, 4 Graded stone aggregates 12.5mm nominal
sizeand W.P.Compound as specified) finished with
floating coat of neat cement at terrace level with proper
slope..
F.F. Terrace
S.F. Terrace
#REF!

M2

M2
M2

staff rooms Terrace


(ii) VITRIFIED FLOORING:
12 mm thick Red ceramic rough tiles flooring over 30mm
(average) thick base of cement mortar 1:6 laid over and
jointed with grey cement slurry mixed with pigment to
match the shade of the slab i/c. rubbing and polishing
complete.
a. Ground Floor-1
Common Dining Hall
Skirting
#REF!
b. Ground Floor-2
VIP Dining Hall
Skirting
0

(iii) KOTA STONE FLOORING:


Kota stone slabs 20mm thick in Risers and Treadsof
steps, skirting dado in 12mm (average) thick cement
mortar 1:3 and jointed with grey cement slurry mixed
with pigment to match the shade of the slab i/c. rubbing
and polishing complete.

1.0
1.0

35.80
97.60

14.80
0.30

1.0
1.0

9.20
29.60

7.40
0.30

M2
M2
M2
M2
M2
M2

15.44

17.76
17.76
4.44

444.07
18.75
#REF!
#REF!
18.75

529.84
29.28
559.12
68.08
8.88
76.96

a. Ground Floor-1
Gas Cylinder Store
Skirting
Kitchen
Skirting
Store-1
Skirting
Store-2
Skirting
Store-3
Skirting
Service Corridore
Skirting
Dish Washing
Skirting
Foyer
Skirting
Hand Washing
Skirting
VIP Entry
Skirting
General Entry
Skirting
Service Stair Case area
Skirting
Service Stair Case
Treads
Risers
Landing
Skirting
Main Entrance
Treads
Risers

1.0
1.0

2.30
17.00

6.80
0.30

1.0
1.0
1.0
1.0
0.0

9.20
24.60
3.00
16.80
2.75

7.00
0.30
6.00
0.30
6.00

0.0
1.0
1.0
1.0
1.0

16.30
2.75
16.30
10.90
26.80

0.30
6.00
0.30
4.00
0.30

1.0
1.0
1.0
1.0
1.0

5.90
17.60
3.70
12.60
18.00

4.70
0.30
5.00
0.30
0.79

1.0
1.0
1.0
1.0
1.0

33.97
10.30
23.00
5.10
12.60

0.30
3.00
0.30
3.00
0.30

1.0
1.0

6.40
14.80

2.80
0.30

28.0

0.30

1.00

29.0
1.0
1.0

0.15
1.80
19.70

1.00
2.60
0.12

5.0

0.30

3.00

6.0

0.15

3.00

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

#REF!

M2
M2
M2
M2

M2

Extra for nosing in steps on treads of kota stone slab.


b. Staff Rooms, First Floor
Staff Room-1
Skirting

Staff Room-2
Skirting

KOTA SLONE MIRROR POLICE PLAT FORM:

R.M.

1.0

36.40

1.0
1.0

4.70
14.80

4.50
0.15

1.0
1.0
1.0
1.0
1.0

1.00
4.80
4.90
14.00
1.10

1.40
0.15
3.90
0.15
1.70

1.0

5.60

0.15

M2
M2
M2
M2
M2
M2
M2
M2
M2

15.64
5.10
64.40
7.38
18.00
5.04
0.00
0.00
16.50
4.89
43.60
8.04
27.73
5.28
18.50
3.78
14.14
10.19
30.90
6.90
15.30
3.78
17.92
4.44
8.40
4.35
4.68
2.36
4.50
2.70
374.45
336.65
37.80

36.40

21.15
2.22
1.40
0.72
19.11
2.10
1.87
0.84
49.41

Ground Floor
Kitchen

Store-1
Store
Store-3
Service Plat form
Gag Cylinder Room
#REF!
Staff Rooms, First Floor
Staff Room-1
Staff Room-2
Staff Rooms
(IV) GRANITE FLOORING:
Ground Floor
Kitchen/Pantry

Service Plat Form


Counter top Wash basin

#REF!
Extra for nosing in granite top platform slab.
(V) GLAZED TILES FLOORING:
Ground Floor
Above Kitchen Plat-Form

Dish Washing Area


Hand Washing Area

M2

1.0
2.0

4.80
3.90

1.20
1.20

1.0
2.0
2.0
1.0
2.0

5.00
5.00
5.00
4.60
12.00

0.60
0.60
0.60
0.60
1.80

1.0

2.60

0.80

1.0
1.0

2.60
3.95

0.60
0.60

M2
M2
M2

1.0
1.0
1.0

3.40
2.60
2.20

1.20
0.30
0.40

M2

2.0
1.0
1.0
1.0
1.0

1.20
1.40
3.40
2.85
0.60

1.40
4.80
0.60
0.60
1.20

1.0
1.0
5.0
1.0

0.10
0.10
0.40
2.20

2.85
3.40
1.50
2.80

1.0

28.85

1.0
1.0
1.0
2.0

4.60
10.40
4.60
4.70

1.30
2.10
2.10
2.10

2.0
1.0
1.0

2.90
5.20
9.43

2.10
2.10
2.10

4.0
1.0
2.0

4.80
12.80
3.40

2.10
1.20
2.10

M2
M2
M2
M2

1.0
1.0
2.0
1.0

12.40
12.70
5.75
9.80

2.10
2.10
2.10
2.10

M2
M2
M2

M2
M2
M2
M2
M2
M2
M2
M2

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
R.M.

M2
M2
M2
M2
M2
M2
M2

Common wash area

#REF!
Staff Rooms, F. Floor
Powder Room

M2

5.76
9.36
3.00
6.00
6.00
2.76
43.20
2.08
78.16

1.56
2.37
3.93

4.08
0.78
0.88
3.36
6.72
2.04
1.71
0.72
0.29
0.34
3.00
6.16
30.08
28.85

5.98
21.84
9.66
19.74
12.18
10.92
19.80
40.32
15.36
14.28
170.08

26.04
26.67
24.15
20.58

M2

Staff Toilets
(VI) CERAMIC TILES FLOORING:
Ground Floor
Common wash area
4.0

1.20

1.20

1.0
1.0
1.0
1.0

1.20
1.20
1.80
2.50

5.40
1.20
1.50
5.40

M2

#REF!
Staff Rooms, F. Floor
Powder Room
Hand Wash
Staff Toilets

M2
M2
M2
M2
M2

1.0
1.0

7.45
2.10

4.70
3.40

M2
M2
M2

97.44

5.76
6.48
1.44
2.70
13.50
29.88

35.02
7.14
42.16

23

PLASTER WORK:
a. 20MM thick cement plaster to uneven surface:
In 1:6 CM
Ground Floor
Common Dining Hall

Store-1
Store
Store-3
Kitchen
Gas Cylinder Store

Dish Washing
Foyer
Hand Washing

VIP Dining Hall


VIP Entry

2.0
2.0

35.80
14.80

3.95
3.95

1.0
1.0
2.0
2.0
2.0

3.20
0.80
6.00
3.00
2.75

3.95
3.95
3.95
3.95
3.95

1.0
2.0
2.0
1.0
2.0

6.00
2.75
6.00
9.20
7.00

3.95
3.95
3.95
3.95
3.95

1.0
1.0
1.0
1.0
1.0

2.00
6.00
3.00
4.60
5.90

3.95
3.95
3.95
3.95
3.95

1.0
1.0
1.0
1.0
1.0

4.70
3.70
5.00
9.43
7.40

3.95
3.95
3.95
3.95
3.95

1.0
2.0
2.0
2.0
1.0

6.90
5.80
9.40
3.40
9.20

3.95
3.95
3.95
3.95
3.95

1.0
1.0
1.0

7.40
10.30
3.00

3.95
3.95
3.95

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

#REF!

M2

M2
Staff Rooms, First Floor
Staff Room-1
Staff Room-2
Parapet Wall

Staff Rooms
Staff Rooms, Second Floor

2.0
2.0
2.0

4.60
4.50
5.15

3.30
3.30
3.30

2.0
1.0
1.0
1.0
1.0

4.70
21.90
25.60
4.00
9.43

3.30
1.00
1.00
1.00
1.00

M2
M2
M2
M2
M2
M2
M2
M2
M2

282.82
116.92
12.64
3.16
47.40
23.70
21.73
23.70
21.73
47.40
36.34
55.30
7.90
23.70
11.85
18.17
23.31
18.57
14.62
19.75
37.24
29.23
27.26
45.82
74.26
26.86
36.34
29.23
40.69
11.85
1189.46
1071.35
118.11

30.36
29.70
33.99
31.02
21.90
25.60
4.00
9.43
186.00

Parapet Wall

1.0
1.0
1.0

27.00
4.70
7.70

1.00
1.00
1.00

1.0

53.60

1.00

2.0
2.0
1.0
1.0

35.80
14.80
3.20
0.80

3.30
3.30
3.30
3.30

2.0
2.0
2.0
1.0
2.0

6.00
3.00
2.75
6.00
2.75

3.30
3.30
3.30
3.30
3.30

2.0
1.0
2.0
1.0
1.0

6.00
9.20
7.00
2.00
6.00

3.30
3.30
3.30
3.30
3.30

1.0
1.0
1.0
1.0
1.0

3.00
4.60
5.90
4.70
3.70

3.30
3.30
3.30
3.30
3.30

1.0
1.0
1.0
1.0
4.0

5.00
9.43
7.40
6.90
5.40

3.30
3.30
3.30
3.30
3.30

2.0
2.0
12.0
1.0
1.0

9.00
4.20
1.20
3.40
9.20

3.30
3.30
3.30
3.30
3.30

1.0
1.0
1.0

7.40
10.30
3.00

3.30
3.30
3.30

Staff Rooms

M2
M2
M2
M2
M2

b. 12MM thick cement plaster to even surface:


In 1:5 CM
Ground Floor
Common Dining Hall

Store-1
Store
Store-3
Kitchen
Gas Cylinder Store

Dish Washing
Foyer
Hand Washing

VIP Dining Hall


VIP Entry

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

#REF!

M2

M2
Staff Rooms, First Floor
Staff Room-1
Staff Room-2

2.0
2.0
2.0

4.60
4.50
5.15

3.35
3.35
3.35

2.0

4.70

3.35

M2
M2
M2
M2

27.00
4.70
7.70
53.60
93.00

236.28
97.68
10.56
2.64
39.60
19.80
18.15
19.80
18.15
39.60
30.36
46.20
6.60
19.80
9.90
15.18
19.47
15.51
12.21
16.50
31.11
24.42
22.77
71.28
59.40
27.72
47.52
11.22
30.36
24.42
33.99
9.90
1088.10
989.43
98.67

30.82
30.15
34.51
31.49

Parapet Wall

21.90
25.60
4.00

1.00
1.00
1.00

1.0

9.43

1.00

M2
M2
M2

1.0
1.0
1.0
1.0

27.00
4.70
7.70
53.60

1.00
1.00
1.00
1.00

M2
M2
M2
M2

Staff Rooms
Staff Rooms, Second Floor
Parapet Wall

M2
M2

1.0
1.0
1.0

M2

Staff Rooms
c. 8MM thick cement plaster to ceiling:
In 1:3 CM
Ground Floor
Common Dining Hall

Roof beams
VIP Dining Hall
VIP Entry

1.0
1.0
1.0

41.20
5.45
10.70

52.20
19.35
3.86

1.0
1.0
1.0
0.0
1.0

14.60
9.33
2.76
14.20
1.40

28.20
24.20
4.70
4.00
3.53

1.0
1.0
1.0
7.0
1.0

5.40
2.50
1.50
1.50
1.50

4.30
5.40
1.80
52.20
41.20

1.0
1.0

9.20
10.30

7.40
3.00

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

#REF!

M2

M2
M2

Staff Room-1
Staff Room-2
Powder Room
Hand Wash

1.0
1.0

4.60
5.15

4.50
4.70

1.0
1.0

7.45
2.10

4.70
3.40

M2
M2
M2
M2

1.0

#REF!

12.45

M2

12.0
12.0

1.80
1.30

Staff Rooms, First Floor


Extra for plastering done on mouldings cornices or
architraves including neat finish to line and level.
a. In two coat

24

PAINTING WORK:
GROUND FLOOR

R.M.
R.M.
R.M.

21.90
25.60
4.00
9.43
187.89

27.00
4.70
7.70
53.60
93.00

2150.64
105.46
41.30
411.72
225.67
12.97
0.00
4.94
23.22
13.50
2.70
548.10
61.80
68.08
30.90
3701.00
3602.02
98.98
20.70
24.21
35.02
7.14
87.06

#REF!

21.60
15.60
37.20

a. White washing on new work (three or more coats) to


give an even shade with white Cement.
#REF!
0

M2
M2

b. Acrylic Emlusion paint (two or more coats) with oil


bound washable of required shade on new work over
over and i/c. a priming coat with cement primer to give
an even shade including three coat of Putty with rubbing
and touching etc. complete in all respect.
M2
M2

#REF!
0
c. Distempering (two or more coats) with oil bound
washable distemper of required shade on new work over
over and i/c. a priming coat with cement primer to give
an even shade.

M2
M2

#REF!
0
d. Painting (two or more coats) with synthetic enamel
paint on Windows and Vantilators grill, Main gate, Stair
case railling and Balcony railling etc. work over and i/c.
an under coat of suitable shade with priming coat to give
an even shade.
#REF!
0

M2
M2

3602.02
98.98

989.43
98.67

1071.35
118.11

104.90
19.08

STAFF ROOMS, FIRST FLOOR


a. White washing on new work (three or more coats) to
give an even shade with white Cement.

M2

b. Acrylic Emlusion paint (two or more coats) with oil


bound washable of required shade on new work over
over and i/c. a priming coat with cement primer to give
an even shade including three coat of Putty with rubbing
and touching etc. complete in all respect.

M2

c. Distempering (two or more coats) with oil bound


washable distemper of required shade on new work over
over and i/c. a priming coat with cement primer to give
an even shade.

M2

d. Painting (two or more coats) with synthetic enamel


paint on Windows and Vantilators grill, Main gate, Stair
case railling and Balcony railling etc. work over and i/c.
an under coat of suitable shade with priming coat to give
an even shade.

M2

STAFF ROOMS, SECOND FLOOR


a. Distempering (two or more coats) with oil bound
washable distemper of required shade on new work over
over and i/c. a priming coat with cement primer to give
an even shade.

M2

#REF!

187.89

279.00

28.08

186.00

ABSTRACT SHEET OF ESTIMATE OF PROPOSED CONSTRUCTION OF


COMMERCIAL BUILDING ON PLOT NOKHANDWA ROAD, INDORE
DISTRICT-INDORE, (M.P.)

B/TO :- AKVN INDORE

FOR :Nine Squares Architects Pvt. Ltd., LG 24-25,BCM Heights,


Bombay Hospital Link Road, Indore
MAIN COMMERCIAL BUILDING

BOQ OF MAIN BUILDING


WORK UP TO PLINTH LEVEL

S.No. Particular of Item.


1
1.1

Rate

Amount

1152.00
144.00

M2
M2

Rs.4.14
Rs.4.14

Rs.4,769.28
Rs.596.16

1152.00
144.00

M2
M2

Rs.2.13
Rs.2.13

Rs.2,453.76
Rs.306.72

2.3 : Clearing grass and removal of the rubbish upto a


distance of 50 m outside the periphery of the area cleared.
Main building: In ordinary soil.
Road area: In ordinary soil.

Unit

PLOT CLEANING AND LEVELLING WORK:


2.2 : Clearing jungle including uprooting of rank vegetation,
grass, brush wood, trees and saplings of girth upto 30 cm
measured at a height of 1 m above ground level and
removal of rubbish upto a distance of 50 m outside the
periphery of the area cleared.
Main building: In ordinary soil.
Road area: In ordinary soil.

1.2

Quantity

EXCAVATION WORK:

2.6 : Earth work in excavation by mechanical means


(Hydraulic excavator )/ manual means over areas
(exceeding 30cm in depth. 1.5m in width as well as 10
sqm on plan) including dressing of sides and ramming of
bottom disposal of excavated earth, lead upto 50m and lift
upto 1.5m, disposed earth to be levelled and neatly
dressed. (No extra lift is payable if work is done by
mechanical means)
A. In Black Cotton Soil.
B. In selected Soil.
3

3.1
3.2
3.3
4

7180.88

M3

Rs.129.00

Rs.926,334.04

3122.98

M3

Rs.129.00

Rs.402,864.68

2182.08
2182.08

M2
M2

Rs.59.00
Rs.62.00

Rs.128,742.72
Rs.135,288.96

2182.08

M2

Rs.66.00

Rs.144,017.28

2.26 : Extra for every additional lift of 1.5 m or part thereof


in excavation. (No extra lift is payable if work is done by
mechanical means)
2.26.1 : All kinds of soil.
2.26.1.1 : Depth exceeding 1.5 m but not exceeding 3 m.

3219.96

M3

Rs.30.00

Rs.96,598.74

2.26.1.2 : Depth exceeding 3 m but not exceeding 4.5 m.

3219.96

M3

Rs.60.00

Rs.193,197.49

2.20 : Open timbering in trenches including strutting and


shoring complete (measurements to be taken of the face
area timbered):
2.20.1 : Depth not exceeding 1.5 m.
2.20.2 : Depth exceeding 1.5 m but not exceeding 3 m.
2.20.3 : Depth exceeding 3 m but not exceeding 4.5 m.

2.25 : Filling available excavated earth (excluding hard


rock/Ordinary rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20cm in
depth, consolidating each deposited layer by ramming

#REF!

#REF!
#REF!

#REF!
#REF!

M3
M3

Rs.60.00
Rs.50.00

#REF!
#REF!

#REF!

M3

Rs.325.00

#REF!

#REF!

#REF!

#REF!

Rs.500.00

#REF!

#REF!

#REF!

No.

Rs.450.00

#REF!

#REF! #REF!
#REF!

#REF! #REF!
#REF!

P.C.C. WORK: In foundation and up to Stilt Parking


Floor Level.

4.1 : Providing and laying in position cement concrete of


specified grade excluding the cost of centering and
shuttering - All work up to plinth level :

P.C.C. Work grade M-10


R.C.C. WORK- M:30 UPTO STILT PARKING FLOOR
LEVEL
(PLINTH and
LEVEL):
0.15MT
5.31 : Providing
laying+ in
position ready mixed M-25
grade concrete for reinforced cement concrete work, using
cement content as per approved design mix and
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all leads,
having continuous agitated mixer, manufactured as per
mix design of specified grade for reinforced cement
concrete work, including pumping of R.M.C. from transit
mixer to site of laying, excluding the cost of centering,
shuttering, finishing and reinforcement, including cost of
admixtures in recommended proportions as per IS : 9103
to accelerate / retard setting of concrete, improve
#REF! workability
#REF!
without impairing strength and durability as per
direction of the Engineer - in - charge.

550.31

M3

Rs.3,300.00

Rs.1,816,012.94

#REF!

M3

Rs.5,300.00

#REF!

10

#REF!

11

3256.10

M3

Rs.6,085.00

Rs.19,813,398.01

3716.26

M2

Rs.290.00

Rs.1,077,716.27

65.01

M2

Rs.415.00

Rs.26,977.49

SHUTTERING AND SCAFOLDING WORK:


UPTO STILT PARKING FLOOR LEVEL (PLINTH LEVEL)
= +0.15MT.
5.9 : Centering and shuttering including strutting, propping
etc. and removal of form for :

12

11

D.P.C. WORK:
Providing and laying Damp proof Course 50mm thick with
concrete designation M-15 with 20mm nominal size
graded stone aggregates (crushed) mechanically mixed.

BRICK WORK UPTO PLINTH LEVEL:

Brickwork with well burnt chimney bricks in bulls patent


trench kiln manufactured by ghol process, crushing
strength not less than 25 kg/Sq.cm. & Water absorption
not more than 15% in foundation and plinth,20cm thk.

a. CM 1:8, Laying for beam bottom


b. CM 1:6, Above Plinth beam and upto Plinth Level

12

REINFORCEMENT UPTO PLINTH LEVEL:


(i). REINFORCEMENT AS PER;
R.C.C. WORK- M:30 UPTO STILT PARKING FLOOR
LEVEL
(PLINTH LEVEL):
0.15MT
(ii). REINFORCEMENT
AS+PER;
#REF!
TOTAL WORK UPTO PLINTH LEVEL:
WORK OF GROUND FLOOR

R.C.C. M: 30, WORK IN SUPER STRUCTURE: ABOVE


STILT PARKING FLOOR LEVE = -+0.15 MT. AND UP TO
TERRACE LEVEL = + 38.25 MT.

#REF!

M3

Rs.4,280.00

#REF!

#REF!

M3

Rs.4,855.00

#REF!

#REF!

Kg

Rs.57.00

#REF!

#REF!

Kg

Rs.57.00

#REF!
#REF!

5.31 : Providing and laying in position ready mixed M-25


grade concrete for reinforced cement concrete work, using
cement content as per approved design mix and
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all leads,
having continuous agitated mixer, manufactured as per
mix design of specified grade for reinforced cement
concrete work, including pumping of R.M.C. from transit
mixer to site of laying, excluding the cost of centering,
shuttering, finishing and reinforcement, including cost of
admixtures in recommended proportions as per IS : 9103
to accelerate / retard setting of concrete, improve
workability without impairing strength and durability as per
direction of the Engineer - in - charge.

TOTAL R.C.C. WORK UP TO STILT PARKING FLOOR


ROOF LEVEL : +3.25 MT.
2

1416.13

M3

Rs.6,085.00

Rs.8,617,166.46

5.9.6 : Columns, Pillars, Piers, Abutments, Posts and


Struts.

530.00

M2

Rs.310.00

Rs.164,300.00

5.9.5 : Lintels,
cantilevers.

1189.48

M2

Rs.375.00

Rs.446,056.13

SHUTTERING AND SCAFOLDING WORK:


ABOVE PLINTH LEVEL
Centering and Shuttering i/c Shutering, propping etc. &
removal of formwork for:
A. STILT PARKING FLOOR:

beams,

girders,

bressumers

and

5.9.3 : Suspended floors, roofs, landings, balconies and


access platform.
3

454.01

M2

Rs.375.00

Rs.170,252.63

#REF!

Kg

Rs.57.00

#REF!

173.02

M3

Rs.4,855.00

Rs.840,029.90

0.32
38.37

M3
M2

Rs.142,000.00
Rs.3,450.00

Rs.45,262.50
Rs.132,389.44

REINFORCEMENT:
Cold twisted steel and hot rolled deformed steel
reinforcement for RCC work i/c cutting, bending, binding &
placing in position complete i/c cost of binding wires.
A. STILT PARKING FLOOR:

BRICK WORK ABOVE PLINTH LEVEL:


200 MM THICK BRICK WORK
Brickwork with well burnt chimney bricks in bulls patent
trench kiln manufactured by ghol process, crushing
strength not less than 25 kg/Sq.cm. & Water absorption
not more than 15% in Ground Floor and First Floor main
front and back walls,20cm thk.

DOORS, WINDOWS AND VANTILATORS:


TEAK WOOD DOORS : Providing and fixing of Second
quality teak wood frames and Shutters including making in
all respect
G. F. DOOR FRAMES:
DOOR SHUTTERS:

ALLUMINIUM SECTION WINDOWS: Providing and fixing


of Alluminium Section Window frames of Three track with
powder coating and Glass panel of 5MM thick including
making in all respect
42.48

M2

Rs.3,135.00

Rs.133,174.80

3.96

M2

Rs.3,380.00

Rs.13,384.80

104.10
15.98

Kg
M2

Rs.95.00
Rs.3,510.00

Rs.9,889.57
Rs.56,089.80

6.12

M2

Rs.4,280.00

Rs.26,193.60

132.00

Nos

Rs.25.00

Rs.3,300.00

ALLUMINIUM SECTION VANTILATORS: Providing and


fixing of Alluminium Section Vantilators frames of Single
track with powder coating and Glass Louvers of 5MM thick
including making in all respect

MS GRILLS AND RAILLING:


Providing and fixing M.S. grills of required pattern in
wooden frames windows, ventilators etc. with round
headed bolts and nuts by screw etc.
a. Plain grill for openings
b. Plain raillings for stair case
c. Ornamental design in elevation for windows(Corner)

HARDWARE FITTINGS AND ACCESSORIES:


a. Providing 40X5 mm iron hold fasts 40cm. Long i/c. fixing
to frame with 10mm dia both nuts and wooden plug and
embedding in CC 30X10X15 cms (1:3:6)
Iron hold fast

b. Providing and fixing bright finished M.S. butt hinges with


necessary screws etc. complete.
125X85X5.50mm (Heavy type)
100X50X5.50mm (Heavy type)
c. Providing and fixing bright finished M.S. tower bolts
(barrel type) with screws etc. complete.

44.00
15.00

Nos
Nos

Rs.45.00
Rs.30.00

Rs.1,980.00
Rs.450.00

100X10mm
75X8mm
d. Providing and fixing bright finished M.S. handles with
screws etc. complete.

22.00
5.00

Nos
Nos

Rs.70.00
Rs.60.00

Rs.1,540.00
Rs.300.00

125mm
100mm

8.00

Nos

Rs.270.00

Rs.2,160.00

1.00

Nos

Rs.220.00

Rs.220.00

9.00

Nos

Rs.1,250.00

Rs.11,250.00

9.00

Nos

Rs.55.00

Rs.495.00

18.00

Nos

Rs.20.00

Rs.360.00

e. Providing and fixing bright finished M.S. door Mortice


lock and latch including a pair of lever handles with screws
etc. complete.
300X16X5mm
f. Providing and fixing Rubber buffers with screws etc.
complete.
g. Providing and fixing Door stopper with screws etc.
complete.

MAIN GATE:
Providing and fixing MS Channel main gate having width
3.0M and 3.0 M height

15.44

M2

Rs.2,480.00

Rs.38,278.80

17.76

M2

Rs.2,250.00

Rs.39,960.00

#REF!

M2

Rs.415.00

#REF!

(ii) VITRIFIED FLOORING:

559.12

M2

Rs.1,050.00

Rs.587,076.00

(iii) KOTA STONE FLOORING:

336.65

M2

Rs.810.00

Rs.272,685.11

36.40

R.M.

Rs.255.00

Rs.9,282.00

78.16

M2

Rs.1,155.00

Rs.90,274.80

(IV) GRANITE FLOORING:

30.08

M2

Rs.4,230.00

Rs.127,217.25

Extra for nosing in granite top platform slab.

28.85

R.Mt.

Rs.435.00

Rs.12,549.75

(V) GLAZED TILES FLOORING:

170.08

M2

Rs.855.00

Rs.145,418.40

GLASS WORK:
Providing and fixing of Alluminium Fix Window with 5MM
thick Branded glass in all respect.
Fix window in service corridor

10

FLOORING WORK:
(i) Terrace finishing with Water Profing material:

Extra for nosing in steps on treads of kota stone slab.


KOTA SLONE MIRROR POLICE PLAT FORM:

(VI) CERAMIC TILES FLOORING:


11

29.88

M2

Rs.765.00

Rs.22,858.20

1071.35

M2

Rs.295.00

Rs.316,049.09

989.43

M2

Rs.270.00

Rs.267,147.26

3602.02

M2

Rs.265.00

Rs.954,534.90

37.20

R.M.

Rs.280.00

Rs.10,416.00

3602.02

M2

Rs.55.00

Rs.198,111.02

PLASTER WORK:
a. 20MM thick cement plaster to uneven surface:
In 1:6 CM
Ground Floor
b. 12MM thick cement plaster to even surface:
In 1:5 CM
Ground Floor
c. 8MM thick cement plaster to ceiling:
In 1:3 CM
Ground Floor
Extra for plastering done on mouldings cornices or
architraves including neat finish to line and level.
a. In two coat

12

PAINTING WORK:
a. White washing on new work (three or more coats) to
give an even shade with white Cement.

b. Acrylic Emlusion paint (two or more coats) with oil bound


washable of required shade on new work over over and i/c.
a priming coat with cement primer to give an even shade
including three coat of Putty with rubbing and touching etc.
complete in all respect.

989.43

M2

Rs.110.00

Rs.108,837.77

1071.35

M2

Rs.85.00

Rs.91,064.99

104.90

M2

Rs.255.00

Rs.26,749.50
#REF!

c. Distempering (two or more coats) with oil bound


washable distemper of required shade on new work over
over and i/c. a priming coat with cement primer to give an
even shade.

d. Painting (two or more coats) with synthetic enamel paint


on Windows and Vantilators grill, Main gate, Stair case
railling and Balcony railling etc. work over and i/c. an
under coat of suitable shade with priming coat to give an
even shade.

TOTAL GROUND FLOOR :


GRAND TOTAL OF GENERAL CANTEEN WORK
B

BOQ OIF V.I.P. CANTEEN WORK


WORK UP TO PLINTH LEVEL

#REF!

Quantity

Unit

Rate

Amount

PLOT CLEANING AND LEVELLING WORK:


2.2 : Clearing jungle including uprooting of rank vegetation,
grass, brush wood, trees and saplings of girth upto 30 cm
measured at a height of 1 m above ground level and
removal of rubbish upto a distance of 50 m outside the
periphery of the area cleared.
Main building: In ordinary soil.

144.00

M2

Rs.140.00

Rs.20,160.00

EXCAVATION WORK:
2.6 : Earth work in excavation by mechanical means
(Hydraulic excavator )/ manual means over areas
(exceeding 30cm in depth. 1.5m in width as well as 10
sqm on plan) including dressing of sides and ramming of
bottom disposal of excavated earth, lead upto 50m and lift
upto 1.5m, disposed earth to be levelled and neatly
dressed. (No extra lift is payable if work is done by
mechanical means)
A. In Black Cotton Soil.
B. In selected Soil.

#REF!
#REF!

M2
M2

Rs.140.00
Rs.160.00

#REF!
#REF!

2.25 : Filling available excavated earth (excluding hard


rock/Ordinary rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20cm in
#REF!
depth, consolidating each deposited layer by ramming
#REF!
#REF!

#REF!
#REF!

M3
M3

Rs.60.00
Rs.50.00

#REF!
#REF!

S.No. Particular of Item.

#REF! #REF!
#REF!

#REF! #REF!
#REF!
#REF!
#REF!
9

#REF!

M3

Rs.325.00

#REF!

#REF!
#REF!

#REF!
No.

Rs.500.00
Rs.450.00

#REF!
#REF!

#REF!

M3

Rs.3,300.00

#REF!

#REF!

M3

Rs.5,300.00

#REF!

P.C.C. WORK: In foundation and up to Stilt Parking


Floor Level.
4.1 : Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering - All work up to plinth level :

P.C.C. Work grade M-10


10

R.C.C. WORK- M:30 UPTO STILT PARKING FLOOR


LEVEL (PLINTH LEVEL): + 0.15MT
5.31 : Providing and laying in position ready mixed M-25
grade concrete for reinforced cement concrete work, using
cement content as per approved design mix and
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all leads,
having continuous agitated mixer, manufactured as per
mix design of specified grade for reinforced cement
concrete work, including pumping of R.M.C. from transit
mixer to site of laying, excluding the cost of centering,
shuttering, finishing and reinforcement, including cost of
admixtures in recommended proportions as per IS : 9103
to accelerate / retard setting of concrete, improve
#REF! #REF!
workability without impairing strength and durability as per
direction of the Engineer - in - charge.

#REF!

11

#REF!

M3

Rs.6,085.00

#REF!

#REF!

M2

Rs.290.00

#REF!

5.23

M2

Rs.415.00

Rs.2,170.45

SHUTTERING AND SCAFOLDING WORK:


UPTO STILT PARKING FLOOR LEVEL (PLINTH LEVEL)
= +0.15MT.
5.9
: Centering and shuttering including strutting, propping
etc. and removal of form for :

12

11

D.P.C. WORK:
Providing and laying Damp proof Course 50mm thick with
concrete designation M-15 with 20mm nominal size
graded stone aggregates (crushed) mechanically mixed.

BRICK WORK UPTO PLINTH LEVEL:

Brickwork with well burnt chimney bricks in bulls patent


trench kiln manufactured by ghol process, crushing
strength not less than 25 kg/Sq.cm. & Water absorption
not more than 15% in foundation and plinth,20cm thk.

a. CM 1:8, Laying for beam bottom


b. CM 1:6, Above Plinth beam and upto Plinth Level

12

M3
M3

Rs.4,280.00
Rs.4,855.00

Rs.61,285.32
Rs.87,828.16

3937.71

Kg

Rs.57.00

Rs.224,449.19

#REF!

Kg

Rs.57.00

#REF!

REINFORCEMENT UPTO PLINTH LEVEL:


(i). REINFORCEMENT AS PER;
R.C.C. WORK- M:30 UPTO STILT PARKING FLOOR
LEVEL
(PLINTH LEVEL):
0.15MT
(ii). REINFORCEMENT
AS+PER;
#REF!
TOTAL WORK UPTO PLINTH LEVEL:
WORK OF GROUND FLOOR

14.32
18.09

R.C.C. M: 30, WORK IN SUPER STRUCTURE: ABOVE


STILT PARKING FLOOR LEVE = -+0.15 MT. AND UP TO
TERRACE LEVEL = + 38.25 MT.

#REF!

5.31 : Providing and laying in position ready mixed M-25


grade concrete for reinforced cement concrete work, using
cement content as per approved design mix and
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all leads,
having continuous agitated mixer, manufactured as per
mix design of specified grade for reinforced cement
concrete work, including pumping of R.M.C. from transit
mixer to site of laying, excluding the cost of centering,
shuttering, finishing and reinforcement, including cost of
admixtures in recommended proportions as per IS : 9103
to accelerate / retard setting of concrete, improve
workability without impairing strength and durability as per
direction of the Engineer - in - charge.

TOTAL R.C.C. WORK UP TO STILT PARKING FLOOR


ROOF LEVEL : +3.25 MT.
2

#REF!

M3

Rs.6,085.00

#REF!

#REF!

M2

Rs.310.00

#REF!

428.72

M2

Rs.375.00

Rs.160,768.25

SHUTTERING AND SCAFOLDING WORK:


ABOVE PLINTH LEVEL
Centering and Shuttering i/c Shutering, propping etc. &
removal of formwork for:
A. STILT PARKING FLOOR:
5.9.6 : Columns, Pillars, Piers, Abutments, Posts and
Struts.
5.9.3 : Suspended floors, roofs, landings, balconies and
access platform.

REINFORCEMENT:
Cold twisted steel and hot rolled deformed steel
reinforcement for RCC work i/c cutting, bending, binding &
placing in position complete i/c cost of binding wires.
A. STILT PARKING FLOOR:

#REF!

Kg

Rs.57.00

#REF!

22.95

M3

Rs.4,855.00

Rs.111,438.43

TEAK WOOD DOORS : Providing and fixing of Second


quality teak wood frames and Shutters including making in
all respect
G. F. DOOR FRAMES:

0.09

M3

Rs.142,000.00

Rs.12,780.00

DOOR SHUTTERS:

10.46

M2

Rs.3,450.00

Rs.36,095.63

6.48

M2

Rs.3,135.00

Rs.20,314.80

BRICK WORK ABOVE PLINTH LEVEL:


200 MM THICK BRICK WORK
Brickwork with well burnt chimney bricks in bulls patent
trench kiln manufactured by ghol process, crushing
strength not less than 25 kg/Sq.cm. & Water absorption
not more than 15% in Ground Floor and First Floor main
front and back walls,20cm thk.

DOORS, WINDOWS AND VANTILATORS:

ALLUMINIUM SECTION WINDOWS: Providing and fixing


of Alluminium Section Window frames of Three track with
powder coating and Glass panel of 5MM thick including
making in all respect

MS GRILLS AND RAILLING:


Providing and fixing M.S. grills of required pattern in
wooden frames windows, ventilators etc. with round
headed bolts and nuts by screw etc.
a. Plain grill for openings

36.44

Kg

Rs.95.00

Rs.3,461.35

0.00
0.00

M2
M2

Rs.3,510.00
Rs.4,280.00

Rs.0.00
Rs.0.00

2.00

Nos

Rs.25.00

Rs.50.00

4.00
2.00

Nos
Nos

Rs.45.00
Rs.30.00

Rs.180.00
Rs.60.00

6.00

Nos

Rs.70.00

Rs.420.00

75X8mm

3.00

Nos

Rs.60.00

Rs.180.00

d. Providing and fixing bright finished M.S. handles with


screws etc. complete.
Common wash area
100mm

1.00

Nos

Rs.270.00

Rs.270.00

1.00

Nos

Rs.220.00

Rs.220.00

b. Plain raillings for stair case


c. Ornamental design in elevation for windows(Corner)
7

HARDWARE FITTINGS AND ACCESSORIES:


a. Providing 40X5 mm iron hold fasts 40cm. Long i/c. fixing
to frame with 10mm dia both nuts and wooden plug and
embedding in CC 30X10X15 cms (1:3:6)
Iron hold fast
b. Providing and fixing bright finished M.S. butt hinges with
necessary screws etc. complete.
125X85X5.50mm (Heavy type)
100X50X5.50mm (Heavy type)
c. Providing and fixing bright finished M.S. tower bolts
(barrel type) with screws etc. complete.
100X10mm

e. Providing and fixing bright finished M.S. door Mortice


lock and latch including a pair of lever handles with screws
etc. complete.

300X16X5mm

2.00

Nos

Rs.1,250.00

Rs.2,500.00

1.00

Nos

Rs.55.00

Rs.55.00

1.00

Nos

Rs.20.00

Rs.20.00

0.00

M2

Rs.2,480.00

Rs.0.00

4.44

M2

Rs.2,250.00

Rs.9,990.00

(i) Terrace finishing with Water Profing material:

#REF!

M2

Rs.415.00

#REF!

(ii) VITRIFIED FLOORING:

76.96

M2

Rs.1,050.00

Rs.80,808.00

(iii) KOTA STONE FLOORING:

37.80

M2

Rs.810.00

Rs.30,618.00

f. Providing and fixing Rubber buffers with screws etc.


complete.
g. Providing and fixing Door stopper with screws etc.
complete.

MAIN GATE:
Providing and fixing MS Channel main gate having width
3.0M and 3.0 M height

10

11

GLASS WORK:
Providing and fixing of Alluminium Fix Window with 5MM
thick Branded glass in all respect.
Fix window in service corridor
FLOORING WORK:

PLASTER WORK:
a. 20MM thick cement plaster to uneven surface:
In 1:6 CM

Ground Floor

118.11

M2

Rs.295.00

Rs.34,840.98

98.67

M2

Rs.270.00

Rs.26,640.90

98.98

M2

Rs.265.00

Rs.26,229.70

98.98

M2

Rs.55.00

Rs.5,443.90

98.67

M2

Rs.110.00

Rs.10,853.70

b. 12MM thick cement plaster to even surface:


In 1:5 CM
Ground Floor
c. 8MM thick cement plaster to ceiling:
In 1:3 CM
Ground Floor
12

PAINTING WORK:
a. White washing on new work (three or more coats) to
give an even shade with white Cement.

b. Acrylic Emlusion paint (two or more coats) with oil bound


washable of required shade on new work over over and i/c.
a priming coat with cement primer to give an even shade
including three coat of Putty with rubbing and touching etc.
complete in all respect.

c. Distempering (two or more coats) with oil bound


washable distemper of required shade on new work over
over and i/c. a priming coat with cement primer to give an
even shade.
118.11

M2

Rs.85.00

Rs.10,038.93

19.08

M2

Rs.255.00

Rs.4,865.40
#REF!

d. Painting (two or more coats) with synthetic enamel paint


on Windows and Vantilators grill, Main gate, Stair case
railling and Balcony railling etc. work over and i/c. an
under coat of suitable shade with priming coat to give an
even shade.

TOTAL GROUND FLOOR :


GRAND TOTAL OF V.I.P. CANTEEN WORK
C

STAFF ROOMS WORK BOQ

R.C.C. M: 30, WORK IN SUPER STRUCTURE: ABOVE


STILT PARKING FLOOR LEVE = -+0.15 MT. AND UP TO
TERRACE LEVEL = + 38.25 MT.

#REF!

5.31 : Providing and laying in position ready mixed M-25


grade concrete for reinforced cement concrete work, using
cement content as per approved design mix and
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all leads,
having continuous agitated mixer, manufactured as per
mix design of specified grade for reinforced cement
concrete work, including pumping of R.M.C. from transit
mixer to site of laying, excluding the cost of centering,
shuttering, finishing and reinforcement, including cost of
admixtures in recommended proportions as per IS : 9103
to accelerate / retard setting of concrete, improve
workability without impairing strength and durability as per
direction of the Engineer - in - charge.

TOTAL R.C.C. M:30

#REF!

M3

Rs.6,085.00

#REF!

EXTRA FOR R.C.C.

#REF!

M3

5%

#REF!

#REF!

M2

Rs.310.00

#REF!

20.16

M2

Rs.375.00

Rs.7,560.00

SHUTTERING AND SCAFOLDING WORK:


Centering and Shuttering i/c Shutering, propping etc. &
removal of formwork for:
B. PODIUM FLOOR :
TOTAL F.F. R.C.C. M:30, GENERAL SHUTTERING
TOTAL F.F.
SHUTTERING

R.C.C.

M:30,

WHEATHER

SHED

REINFORCEMENT:
Cold twisted steel and hot rolled deformed steel
reinforcement for RCC work i/c cutting, bending, binding &
placing in position complete i/c cost of binding wires.
20670.01
20670.01

Kg
Kg

Rs.57.00
5%

Rs.1,178,190.68
Rs.58,909.53

85.59

M3

Rs.4,855.00

Rs.415,539.45

Extra for brickwork in super structure in First Floor roof


level ,20 cm thik.

74.41

M3

5%

Rs.20,776.97

Extra for brickwork in super structure in Second Floor roof


level ,20 cm thik.

11.18

M3

5%

Rs.1,038.85

0.30
34.59

M3
M2

Rs.142,000.00
Rs.3,450.00

Rs.43,132.50
Rs.119,348.44

B. PODIUM FLOOR :
EXTRA FOR F.F. WORK
4

200 MM THICK BRICK WORK


Brickwork with well burnt chimney bricks in bulls patent
trench kiln manufactured by ghol process, crushing
strength not less than 25 kg/Sq.cm. & Water absorption
not more than 15% in Ground Floor and First Floor main
front and back walls,20cm thk.

DOORS, WINDOWS AND VANTILATORS:


TEAK WOOD DOORS : Providing and fixing of Second
quality teak wood frames and Shutters including making in
all respect
STAFF ROOMS, F. F. DOOR FRAMES:
STAFF ROOMS, F. F. DOOR SHUTTERS:

ALLUMINIUM SECTION WINDOWS: Providing and fixing


of Alluminium Section Window frames of Three track with
powder coating and Glass panel of 5MM thick including
making in all respect
14.40

M2

Rs.3,135.00

Rs.45,144.00

1.44

M2

Rs.3,380.00

Rs.4,867.20

42.11
0.00
6.12

Kg
M2
M2

Rs.95.00
Rs.3,510.00
Rs.4,280.00

Rs.4,000.83
Rs.0.00
Rs.26,193.60

54.00

Nos

Rs.25.00

Rs.1,350.00

ALLUMINIUM SECTION VANTILATORS: Providing and


fixing of Alluminium Section Vantilators frames of Single
track with powder coating and Glass Louvers of 5MM thick
including making in all respect

MS GRILLS AND RAILLING:


Providing and fixing M.S. grills of required pattern in
wooden frames windows, ventilators etc. with round
headed bolts and nuts by screw etc.
a. Plain grill for openings
b. Plain raillings for stair case
c. Ornamental design in elevation for windows(Corner)

HARDWARE FITTINGS AND ACCESSORIES:


a. Providing 40X5 mm iron hold fasts 40cm. Long i/c. fixing
to frame with 10mm dia both nuts and wooden plug and
embedding in CC 30X10X15 cms (1:3:6)
Iron hold fast

b. Providing and fixing bright finished M.S. butt hinges with


necessary screws etc. complete.
125X85X5.50mm (Heavy type)
100X50X5.50mm (Heavy type)
c. Providing and fixing bright finished M.S. tower bolts
(barrel type) with screws etc. complete.

14.00
9.00

Nos
Nos

Rs.45.00
Rs.30.00

Rs.630.00
Rs.270.00

100X10mm
75X8mm
d. Providing and fixing bright finished M.S. handles with
screws etc. complete.

7.00
3.00

Nos
Nos

Rs.70.00
Rs.60.00

Rs.490.00
Rs.180.00

125mm
100mm
e. Providing and fixing bright finished M.S. door Mortice
lock and latch including a pair of lever handles with screws
etc. complete.

4.00
3.00

Nos
Nos

Rs.270.00
Rs.220.00

Rs.1,080.00
Rs.660.00

300X16X5mm
f. Providing and fixing Rubber buffers with screws etc.
complete.

7.00

Nos

Rs.1,250.00

Rs.8,750.00

7.00

Nos

Rs.55.00

Rs.385.00

14.00

Nos

Rs.20.00

Rs.280.00

M2

Rs.2,250.00

Rs.0.00

g. Providing and fixing Door stopper with screws etc.


complete.

GLASS WORK:
Providing and fixing of Alluminium Fix Window with 5MM
thick Branded glass in all respect.
Fix window in service corridor

FLOORING WORK:
(i) Terrace finishing with Water Profing material:
18.75

M2

Rs.2,250.00

Rs.42,187.50

KOTA SLONE MIRROR POLICE PLAT FORM:

49.41
3.93

M2
M2

Rs.810.00
Rs.1,155.00

Rs.40,022.10
Rs.4,539.15

(V) GLAZED TILES FLOORING:

97.44

M2

Rs.855.00

Rs.83,311.20

(VI) CERAMIC TILES FLOORING:

42.16

M2

Rs.765.00

Rs.32,248.58

PLASTER WORK:
a. 20MM thick cement plaster to uneven surface:
In 1:6 CM
Staff Rooms, First Floor

279.00

M2

Rs.295.00

Rs.82,304.58

b. 12MM thick cement plaster to even surface:


In 1:5 CM
Staff Rooms, First Floor

191.67

M2

Rs.270.00

Rs.51,750.90

87.06

M2

Rs.265.00

Rs.23,070.90

(iii) KOTA STONE FLOORING:

10

c. 8MM thick cement plaster to ceiling:


In 1:3 CM

11

PAINTING WORK:
a. White washing on new work (three or more coats) to
give an even shade with white Cement.

#REF!

M2

Rs.55.00

#REF!

187.89

M2

Rs.110.00

Rs.20,668.29

279.00

M2

Rs.85.00

Rs.23,714.88

28.08

M2

Rs.255.00

Rs.7,160.40
#REF!

b. Acrylic Emlusion paint (two or more coats) with oil bound


washable of required shade on new work over over and i/c.
a priming coat with cement primer to give an even shade
including three coat of Putty with rubbing and touching etc.
complete in all respect.

c. Distempering (two or more coats) with oil bound


washable distemper of required shade on new work over
over and i/c. a priming coat with cement primer to give an
even shade.
d. Painting (two or more coats) with synthetic enamel paint
on Windows and Vantilators grill, Main gate, Stair case
railling and Balcony railling etc. work over and i/c. an
under coat of suitable shade with priming coat to give an
even shade.
STAFF ROOMS WORK :
BOQ OF GENERAL CANTEEN

#REF!

BOQ OF V.I.P. CANTEEN

#REF!

STAFF ROOM

#REF!

TOTAL

#REF!

GENERAL ELECTRICAL WORK

4.5%

#REF!

WATER SUPPLY & SANITORY WORK


GRAND TOTAL

2.5%

#REF!
#REF!