Vous êtes sur la page 1sur 3

Engineering Change Request (ECR)

ECR #

3525

Product Name:

GasAlertMicro 5

Model #:

GasAlertMicro 5 Packing Kits

Initiated By:

Raymond Johnson

Description & Detailed Reason for Change:

Issue #

Date
:
Attachment links:

01

May 18, 2005

Assy1 Assy2 Ind1 PL1

Add M5-CDT (118407) to all BOM of all GasAlertMicro 5 packing kits.


The CD contains:
GasAlertMicro 5 Interactive Flash Training
GasAlertMicro 5 Quick Reference Guide (118770)
GasAlertMicro 5 Quick Reference Card (117359)
Along with other Marketing Materials (PDFs of Datasheet, Sample Ads, Spec Sheet, Etc).
The CD should be added to packing kits as soon as the CD is available.
ASSEMBLIES AND PARTS AFFECTED (OPTIONAL)
Assembly
Part
Part Number Change
Description
Reference
from
qty.
to

Assembly
Part Number
118407

GASALERTMICRO 5 INTERACTIVE TRAINING


CD-ROM

Type of Change:
Parts list
Electrical component
Literature/manual
Other:

Assembly procedure
Mechanical component
Plastic/metal parts

Packaging
Circuit board
Software/firmware

Urgency of Implementation:
Low

High

Requested Implementation:
Begin immediately
New Work Orders
Existing Work Orders

Rework of existing WIP


Rework of FG Inventory
Field upgrade/retrofit

OR
Production phase-in

As soon as the CD is available.


Page 1 of 3

QF-EN-010
Date Issued: 11 NOV 99
Revision: 08
Last Revised: 11 Jul 03

qty

Engineering Change Request (ECR)


Conditions:

upon depletion of
start date:

Comments:

Approvals Required:
CSA
Australia
Other:

UL
South Africa

Cenelec
None

Page 2 of 3
QF-EN-010
Date Issued: 11 NOV 99
Revision: 08
Last Revised: 11 Jul 03

Engineering Change Request (ECR)


Approvals & Comments:
Name:

Thom Crawford

Impact:
Date:

Manager, Product Compliance, Certification and Conformity

Approved
Name:

Comments:

Kevin Meyers

Date:

Vice President of Operations

Approved
Name:

Approved

Date:

Comments:
Date:

Engineering

Approved

Comments:
Date:

Production Line Supervisor

Reviewed

Comments: .

Kevin Trac

Reviewed

Date:
Comments:

Mike Kushliak

Date:

Name:

Comments:

Diane Lassila

Date:

Name:

Comments:

Darren Nippers

Date:

Name:

Comments:

Kevin Stockwell

Date:

Name:

Comments:

Eric Tsang

Date:

Name:

Comments:

Richard Cote

Date:

Name:

Comments:

Lee Morris

Date:

Name:

Comments:

Shane McEwen

Date:

Est. Cost/Time

(dd/mm/yy)

Comments:

Janet Hu

Date:

Technical Communicator

Reviewed

Est. Cost/Time

(dd/mm/yy)

Product Manager (Portables)

Reviewed

Est. Cost/Time

(dd/mm/yy)

Product Manager (Fixed, Standalone, IAQ)

Reviewed

Est. Cost/Time

(dd/mm/yy)

Inside Sales Manager

Reviewed

Est. Cost/Time

(dd/mm/yy)

Production Engineering Manager

Reviewed

Est. Cost/Time

(dd/mm/yy)

Certification Manager, BWE

Reviewed

Est. Cost/Time

(dd/mm/yy)

Quality Assurance Manager

Reviewed

Est. Cost/Time

(dd/mm/yy)

Marketing

Reviewed

Est. Cost/Time

(dd/mm/yy)

Production Manager

Reviewed

Est. Cost/Time

(dd/mm/yy)

Document Data Control (DDC) Coordinator

Name:

Est. Cost/Time

(dd/mm/yy)

Name:

Name:

Est. Cost/Time

(dd/mm/yy)

Name:

Name:

Est. Cost/Time

(dd/mm/yy)

Comments:

Shane Curley
Materials Manager
(dd/mm/yy)

Est. Cost/Time

(dd/mm/yy)

Est. Cost/Time

(dd/mm/yy)

Comments:

Page 3 of 3
QF-EN-010
Date Issued: 11 NOV 99
Revision: 08
Last Revised: 11 Jul 03

Vous aimerez peut-être aussi