WATERSUPPLY
5.1
PURPOSEANDSCOPE
5.1.1
The purpose of this chapter of the Code is to provide minimum standards for the design, installation and
maintenanceofwatersupplyanddistributionsystemwithinabuildinganditspremises.
5.1.2
The regulations of this chapter also provide guidelines for waterrequirements for different classes of buildings
accordingtotheiroccupancyclassification.
5.1.3
The provisions stated herein do not cover the requirements of water supply for industrial plants and process,
municipaluses,viz.streetwashing,streethydrant,etc.
5.2
TERMINOLOGY
ThissectionprovidesanalphabeticallistofthetermsusedinandapplicabletothischapteroftheCode.Incaseof
anyconflictorcontradictionbetweenadefinitiongiveninthissectionandthatinPart1,themeaningprovidedin
thissectionshallgovernforinterpretationoftheprovisionsofthischapter.
Accessible:Whenappliedtoafixture,applianceorequipmentshallmeanhavingaccessthereto,butwhichmay
require the removal of an access panel or similar obstruction; "readily accessible" shall mean direct access
withoutthenecessityofremovinganypanel,doororsimilarobstruction.
Airgap:Theunobstructedverticaldistancethroughthefreeatmospherebetweenthelowestopeningfromany
pipeorfaucetsupplyingwatertotank,plumbingfixtureorotherdeviceandthefloodlevelrimofthereceptacle.
AvailableHead:Theheadofwateravailableatthepointofconsiderationduetomains'pressureorstoragetank
oranyothersourceofpressure.
BackSiphonage:Theflowingbackofused,contaminated,orpollutedwaterfromaplumbingfixtureorvesselinto
awatersupplypipeduetoareducedpressureinsuchapipe(seeBackflow).
Backflow:Theflowofwaterorotherliquids,mixturesorsubstancesintothedistributionpipesofapotablewater
supplyfromanysourceotherthanitsintendedsource.
BackflowConnectionorcondition:Anyarrangementwherebybackflowcanoccur.
BackflowPreventer:Adeviceormeanstopreventbackflow.
BallCock:Awatersupplyvalve,openedorclosedbymeansofafloatorsimilardevice,usedtosupplywatertoa
tankforminganapprovedairgaporvacuumbreakerandactingasanantisiphondevice.AlsoknownasFLOAT
OPERATEDVALVE.
Bedpan Washer and Sterilizer: A fixture designed to wash bedpans and to flush the contents into the sanitary
drainage system and located adjacent to a water closet or clinical sink. Such fixtures can also be provided for
disinfectingutensilsbyscaldingwithsteamorhotwater.
BRANCH:Anypartofthepipingsystemotherthanariserormain.
BRANCHCONNECTOR:AconnectorbetweenwatermainandbranchpipesbyT,Y,TY,doubleY,andVbranches
accordingtotheirrespectiveshapes.
Building Supply: The water supply pipe carrying potable water from the water meter or other source of water
supplytoabuildingorotherpointofuseordistributiononthelot.
Part8
BuildingServices
8207
Part8
BuildingServices
Contamination:Ageneraltermmeaningtheintroductionintothepotablewatersupplyofchemicals,wastesor
sewagewhichwillrenderthewaterunfitforitsintendedpurpose.
Critical LEVEL: The level at which the vacuum breaker may be submerged before backflow occurs. When the
criticallevelisnotindicatedonthevacuumbreaker,thebottomofthedeviceshallbeconsideredasthecritical
level.
CrossConnection:Anyphysicalconnectionorarrangementbetweentwootherwiseseparatepipingsystems,one
ofwhichcontainspotablewaterandtheothereitherwaterofunknownorquestionablesafetyorsteam,gas,or
chemical whereby there may be a flow from one system to the other, the direction of flow depending on the
pressuredifferentialbetweenthetwosystems(SeeBackflow).
CYLINDER: A cylindrical closed vessel capable of containingwaterunder pressure greater than the atmospheric
pressure.
DevelopedLENGTH:Lengthofapipealongthecenterlineofthepipeandfittings
DistributionPIPE:Anypipeconveyingwaterfromastoragetank/cisternorfromahotwaterapparatussupplied
fromafeedcisternunderpressurefromthatcistern.
Effective OPENING: The minimum crosssectional area at the point of water supply discharge measured or
expressed in terms of (1) diameter of a circle, (2) if the opening is not circular, the diameter of a circle of
equivalentcrosssectionalarea.(Thisisalsoapplicabletoairgap.)
FAUCET:Avalveendofawaterpipebymeansofwhichwatercanbedrawnfromorheldwithinthepipe.
FeedCISTERN:Astoragetank/cisternusedforsupplyingcoldwatertoahotwaterapparatus.
FITTING:Anythingfittedorfixedinconnectionwiththesupply,measurement,control,distribution,utilizationor
disposalofwater."Waterfitting"includespipes(otherthanmains),taps,cocks,valves,ferrules,meters,cisterns,
baths,waterclosets,soilpansandothersimilarapparatususedinconnectionwiththesupplyanduseofwater.
FIXTURE:SeePlumbingFixture.
FixtureBRANCH:Awatersupplypipebetweenthefixturesupplypipeandthewaterdistributionpipe.
FixtureSUPPLY:Awatersupplypipeconnectingthefixturewiththefixturebranch.
FixtureUnit:Aquantityintermsofwhichtheloadproducingeffectsontheplumbingsystemofdifferentkindsof
plumbingfixturesareexpressedonsomearbitrarychosenscale.
FloatOperatedVALVE:SeeBallCock.
FloodLevelRIM:Thetopedgeofareceptaclefromwhichwateroverflows.
FlushTANK:Atanklocatedabovewaterclosets,urinalsorsimilarfixturesforthepurposeofflushingtheusable
portionofthefixture.AlsoknownasFLUSHINGCISTERNandFLUSHOMETERTANK.
FLUSHVALVE:SeeFlushometerValve.
FlushingCISTERN:SeeFlushTank.
FlushometerTANK:SeeFlushTank.
FlushometerVALVE:Adevicelocatedatthebottomofthetank,andwhichdischargesapredeterminedquantity
ofwatertofixturesforflushingpurposesandisclosedbydirectwaterpressureorothermechanicalmeans.Also
knownasFLUSHVALVE.
Full FACILITIES: The modern plumbing facilities allowed to the occupants of modern dwellings or, of VIP hotels
andaccommodations.
ULLOPENVALVE:Ashutoffvalvethatinthefullpositionhasastraightthroughflowpassagewaywithadiameter
notlessthanonenominalpipesizesmallerthannominalpipesizeoftheconnectingpipe.
GEYSER:Anapparatusforheatingwaterwithsupplycontrolontheinletsideanddeliveringitfromanoutlet.
GRADE:Theslopeorfallofalineofpipewithreferencetoahorizontalplane.
HANGERS:SeeSupports.
HorizontalPIPE:Anypipeorfittingwhichisinstalledinahorizontalpositionorwhichmakesananglelessthan45
degreeswiththehorizontal.
HotWaterTANK:Avesselforstoringhotwaterunderpressuregreaterthantheatmosphericpressure.
IndividualWaterSUPPLY:Asupplyotherthananapprovedpublicwatersupplywhichservesoneormorefamilies.
LAGGING:Thematerialusedforthermaloracousticinsulation.
8208
Vol.3
WaterSupply
Chapter5
LiquidWASTE:Thedischargefromanyfixture,applianceorappurtenanceinconnectionwithaplumbingsystem
whichdoesnotreceivefecalmatter.
MAIN:Theprincipalarteryofthesystem,towhichbranchesmaybeconnected,forthepurposeofwatersupply
fromasupplytoindividualconsumers.AlsoknownasWATERMAIN.
MechanicalJoint:Aconnectionbetweenpipes,fittingsorpipesandfittingswhichisneitherscrewed,caulked,
threaded,soldered,solventcemented,brazednorwelded.
OFFSET:Acombinationofapprovedbendsinalineofpipingusedtoconnecttwopipeswhoseaxesareparallel
butnotinline.
PLUMBING: The business, trade or work having to do with the installation, removal, alteration or repair of
plumbinganddrainagesystemsorpartthereof.
Plumbing APPLIANCES:Theplumbingfixtures whoseoperation or control canbedependent upon oneor more
energizedcomponents,suchasmotors,controls,heatingelements,orpressureortemperaturesensingelements.
Plumbing APPURTENANCE: A manufactured device or prefabricated assembly of component parts, which is an
adjunct to the basic piping system and plumbing fixtures, performing some useful function in the operation,
maintenance,servicing,economyorsafetyoftheplumbingsystem.
Plumbing FIXTURE: A receptacle or device which is either permanently or temporarily connected to the water
distributionsystemofthepremises,anddemandsasupplyofwatertherefrom,ordischargesusedwater,waste
materialsorsewageeitherdirectlyorindirectlytothedrainagesystemofthepremises,orrequiresbothawater
supplyconnectionandadischargetothedrainagesystemofthepremises.AlsoknownasFIXTURE.
Plumbing System : A system of potable water supply and distribution pipes, plumbing fixtures and traps, soil
wasteandventpipes,andsanitaryandstormsewersandbuildingdrainsincludingtheirrespectiveconnections,
devicesandaappurtenanceswithinabuildingorpremises.
PotableWATER:Waterfreefromimpuritieswhichmaycausediseasesorharmfulphysiologicaleffectsandwater
whichissatisfactoryfordrinking,culinaryanddomesticpurposes.
Private/PrivateUSE:Plumbingfixturesintendedfortheuseofafamilyinresidences,orfortherestricteduseof
anindividualincommercialestablishments.
Quick closing VALVE: A valve or faucet that closes automatically when released manually or controlled by
mechanicalmeansforfastactionclosing.
Receptor:Anapprovedplumbingfixtureordeviceofsuchmaterial,shapeandcapacityastoadequatelyreceive
thedischargefromindirectwastepipes,soconstructedandlocatedastobereadilycleaned.
ResidualHEAD:Theheadavailableatanyparticularpointinthedistributionsystem.
RestrictedFACILITIES:Theminimumplumbingfacilitiesacceptablefortheoccupantsoflowincomegroup.
RIM:Anunobstructedopenedgeofafixture.
RISER: A water supply pipe which extends vertically one full storey or more to convey water to branches or
fixtures.
ROUGHINGIN: The installation of all parts of the plumbing system which can be completed prior to the
installationoffixtures.Thisincludeswatersupply,drainage,ventpipingandnecessarysupports.
ServicePIPE:Thepipethatrunsbetweenthedistributionmaininthestreetandtheriserincaseofamultistoried
buildingorthewatermeterinthecaseofanindividualhouseandissubjecttowaterpressurefromsuchmain.
SlipJOINT:Anadjustabletubingconnection,consistingofacompressionnut,africtionring,andacompression
washer,designedtofitathreadedadapterfitting,orastandardtaperpipethread.
Soldered JOINT: A joint obtained by the joining of metal parts with metallic mixtures of alloys which melt at a
temperaturebelow427oCandabove149oC.
StopVALVE:Anydevice(includingastopcockorstoptap)otherthanadrawofftap,forstoppingatwilltheflow
ofwaterinapipe.
Storage Cistern : A container, other than a flashing cistern, having a free water surface under atmospheric
pressureandusedforstorageofwater,andisconnectedtothewatermainortubewellbymeansofsupplypipe.
AlsoknownasSTORAGETANK.
STORAGETANK:SeeSTORAGECISTERN.
Supports: Hangers and anchors or devices for supporting and securing pipe, fixture and equipment to walls,
ceilings,floorsorotherstructuralmembers.AlsoknownasHANGERS.
BangladeshNationalBuildingCode2011
8209
Part8
BuildingServices
TemperedWater:Thewaterrangingintemperaturefrom29oCupto43oC.
VacuumBreaker:Atypeofbackflowpreventerinstalledonopeningssubjecttonormalatmosphericpressure.
Vertical Pipe: Any pipe which is installed in a vertical position or which makes an angle of not more than 45
degreeswiththevertical.
WARMINGPIPE:Anoverflowpipesofixedthatitsoutletwhetherinsideoroutsideabuilding,isinaconspicuous
positionwherethedischargeofanywatertherefromcanbereadilyseen.
Washout Valve: A device located at the bottom of the tank for the purpose of draining a tank for cleaning,
maintenance,etc.
Water conditioning or Treating Device: A device which conditions or treats a water supply so as to change its
chemicalcontentorremovesuspendedsolidsbyfiltration.
WaterHammerArrester:Adeviceusedtoabsorbthepressuresurge(waterhammer)whichoccurswhenwater
flowissuddenlystoppedinawatersupplysystem.
WaterHeater:Anyheatingdevicethatheatspotablewaterandsuppliesittothepotablehotwaterdistribution
system.
Water Line:A linemarked insideacisterntoindicate the highest water levelatwhichthe ballvalveshould be
adjustedtoshutoff.
WATERMAIN:SeeMAIN.
WaterOutlet:Adischargeopeningthroughwhichwaterissuppliedtoafixture,intotheatmosphere(exceptinto
an open tank which is part of the water supply system), to a boiler or heating system, or to any devices or
equipmentrequiringwatertooperatebutwhicharenotpartoftheplumbingsystem.
Water Supply System : A system consisting of building supply pipe, water distributing pipes, and necessary
connecting pipes, fittings, control valves, and all appurtenances carrying or supplying potable water in or
adjacenttothebuildingorpremises.
WeldedJointsorSeam:Anyjointorseamobtainedbythejoiningofmetalpartsintheplasticmoltenstate.
5.3
PERMITFORWATERCONNECTION
5.3.1 RequirementofPermit
Nowatersupplysystemshallbeinstalledinanewbuildinguntilapermitforsuchworkhasbeenissuedbythe
Authority.Theadditionoralterationoftheexistingwatersupplyfacilitiesinabuildingshallalsorequireapermit
fortheirinstallation.
5.3.1.1
ApplicationforPermit(ObtainingPublicSupplyConnection)
Applicationforapermitforwatersupplysystemshallbemadeinwritingbythelicensedplumberandtheowner
or his appointed person(s) or agent on a prescribed form (Appendix 8.5.A). The application shall accompany
buildingdrawingsshowingthewatersupplysystemwiththefollowingdetails:
(a)Siteplansshowingthelocationofwatermain.
(b)Typicalfloorplan(s)andelevationsofthebuildingwiththepositionofdifferentplumbingfixtures
andpiping.
(c)Materials,sizesandgradients(ifany)oftheproposedinterconnectingpipingsystem.
(d)Pipes(ifany)conveyingnonpotablewater(forflushingwaterclosetsandurinals)shallbemarkedby
distinctive(durable)yellowcolor.
(e)Designcalculationsofwaterrequirement,indicatingconsiderationsofpercapitawaterrequirement
andpopulation.
8210
Vol.3
WaterSupply
5.3.1.2
Chapter5
ApplicationofPermitforBulkWaterSupply
In the case of large housing colonies or where new services are so situated that it will be necessary for the
Authoritytolaynewmainsorextendanexistingmain,fullinformationabouttheproposedhousingschemeshall
be furnished to the Authority; information shall also be given regarding their phased requirements of water
supply with full justification. Such information shall include site plans, showing the layout of roads, footpaths,
buildingandboundariesandindicatingthereonthefinishedlineandleveloftheroadsorfootpathsandwater
supplylinesandappurtenances.
5.3.1.3
ApplicationforIndividual(PermissionforDTWInstallation)WaterSupply
For private water supply facility in addition to public water main connection through installing own deep tube
well,permissionmustbesoughtsubmittingapplicationtowatersupplyAuthorityinaprescribedform.Necessity
forsuchconnectionindicatingtotalwaterrequirementshouldbementioned.
5.3.2
JustificationofRequirement
Thedesigncalculationsforwatersupplysystemofhighriseandpublicbuildingsshallbesubmittedalongwiththe
drawingsmentionedinSection5.3.1above.
PermitsandApprovals
5.3.3
TheBuildingOfficialshallexamineorcausetobeexaminedtheapplicationforapermitandamendmentsthereto
within45daysfromthedayofreceiptofsuchapplication.Iftheapplicationdoesnotconformtotheprovisionsof
this Code, it shall be rejected in writing, stating the reasons therefore. If the proposed work satisfies the
provisionsofthisCode(Section5.3.2and5.3.3),theAuthorityshallissueanontransferablepermit.
CompletionCertificate
5.3.4
Oncompletionoftheplumbingworkforthewatersupplysystem,thelicensedplumbershallgiveacompletion
certificate in the prescribed form (Appendix 8.5.B) to the Authority for getting the water connection from the
mains.
LICENSING/REGISTRATIONOFPLUMBERS
5.4
5.4.1
LicenseRequirement
Plumbing work shall be executed only by a licensed plumber under the control of the Authority and shall be
responsibletocarryoutalllawfuldirectionsgivenbytheAuthority.Noindividual,partnership,corporationorfirm
shallengageinthebusinessofinstallation,repairoralterationofwatersupplysystemwithoutobtainingalicense
fromtheAuthority.
ExaminationandCertificationofPlumber
5.4.2
TheAuthorityshallestablishaplumbersselectionandexaminationboard.Theboardwilldetermine:
a) Therequirementsofobtaininglicense,i.e.,
(i)
minimumacademicqualification
(ii)
minimumpracticalvocationalandothertraining
(iii)
minimumyearsofexperience
(iv)
totalvolumeofworksdoneand
b) Finally,establishstandardsandproceduresforexaminationoftheapplicantsforlicense.
TheAuthoritywillissuelicensetosuchapplicantswhomeetthequalificationsthereofandsuccessfullypassthe
examinationconductedbytheboard.
BangladeshNationalBuildingCode2011
8211
Part8
BuildingServices
AnnulmentofLicense
5.4.3
The license of a plumber may be annulled by the Authority, if it is proved that a plumbing work has been
completed and certified by the licensed plumber violating the provisions of this Code and deliberately setting
asidetheapprovalsgiveninthepermitorwithoutreceivingthepermitfromtheAuthority.
5.5
WATERSUPPLYREQUIREMENTS
5.5.1
General
5.5.1.1
Buildingsequippedwithplumbingfixturesandusedforhumanoccupancyorhabitationshallbe
providedwiththesupplyofcoldpotablewaterintheamountsspecifiedinSection5.5.2to5.5.4and
atthepressuresspecifiedinSection5.10.4.2and5.10.4.3.Onlypotablewatershallbeaccessibleto
theplumbingfixturessupplyingwaterfordrinking,bathing,culinaryuseandfortheprocessingof
food.
5.5.1.2
Nonpotablewatermaybeusedforflushingwaterclosetsandurinalsprovidedsuchwatershallnotbe
accessiblefordrinkingorsuchotherpurposes.
WaterRequirementforDomesticUse
5.5.2
Water requirement for domestic purposes should be classified according to the socioeconomic status, type of
habitants,populationoftheareaandpublicfacilitiespresent.
Socioeconomicgroups:
(a) HighIncomegroupmonthlyIncome>1lactaka
(b) MiddleIncomegroupmonthlyIncome>30,0001lac
(c) lowincomegroupmonthlyIncome<20,000taka
TypeofHabitants/Population
(a) CityCorporationareas,bigcitiesPopulation>0.5million
(b) Smalldistricttowns,UpazilasandUrbangrowthcenterspopulation>0.1million
(c) Villageareaspopulation<0.05million
Water requirements for daily domestic use of a building shall be assessed on the basis of the one or a
combinationofthefollowingtwomethods:
(a) Number of occupants according to their occupancy classification and their water requirements as
specifiedinTable8.5.1(a).toTable8.5.1(d)
(b) PeakdemandormaximumprobableflowspecifiedinSectionP3andP4intheAppendix8.5.C.
Table8.5.1(a):WaterConsumptionforDomesticPurposes(Cities/BigDistrictTowns)[InResidentialBuildings]
8212
Cat
Socioeconomicgroup,TypeofBuilding&OtherFacilities
WaterConsumption
BigCities/CityCorporationArea/BigDistrictTowns
FullFacility
RestrictedFacility
(Population>0.5million)
(lpcd)
(lpcd)
Highincomegroup:
a1
SingleFamilyDwellingwithGarden&Carwashing
260
200
a2
BigMultiFamilyApartment/Flat(>2500sft)
200
150
Middleincomegroup:
b1
Officer'sQrt./Colony&moderateApartment(<2000sft)
180
135
b2
Smallbuilding/StaffQrt.&smallApartment(<1500sft)
120
Lowincomegroup:
Vol.3
WaterSupply
Chapter5
c1
JuniorstaffQrt./flat(<1000sft)&temporaryshade
80
c2
Standpostconnectioninthefringearea
65
c3
Commonyard(standpost)connectioninthefringearea
50
c4
Slumdwellerscollectionfromroadsidepublicstandpost
40
Table8.5.1(b):WaterRequirementforDomesticPurposes(DistrictTowns/Upazilas/UrbangrowthCentres)
[InResidentialBuildings]
Cat
Socioeconomicgroup,TypeofBuilding&OtherFacilities
WaterConsumption
Middleincomegroup:
a1
SingleFamilyDwellingwithGarden
150
a2
Officer'sQrt./Colony&moderateApartment(<2000sft)
135
a3
Smallbuilding/StaffQrt.&smallApartment(<1500sft)
120
Lowincomegroup:
b1
JuniorstaffQrt./flat(<1000sft)&temporaryshade
80
b2
PrivateStandpostconnectioninthefringearea
65
b3
Commonyard(standpost)connectioninthefringearea
50
b4
Slumdwellerscollectionfromroadsidepublicstandpost
40
RestrictedFacility
(lpcd)
Table8.5.1(c):WaterRequirementforDomesticPurposes(VillageAreasandSmallCommunities)[InResidentialBuildings]
Cat
Socioeconomicgroup,TypeofBuilding&OtherFacilities
VillageAreas/SmallCommunityfromhandtubewell,
dugwells,ponds&rivers(Nonpipedwatersupplysystem)
WaterConsumption
FullFacility
RestrictedFacility
(lpcd)
(lpcd)
a1
PrivateSource(OwnTubewell/dugwell&pond)
5060
a2
PublicSources(PublicTW/Dugwell/othersources)
4050
5.5.3
WaterRequirementforFireFighting
5.5.3.1
The Authority shall make provision to meet the water supply requirements for fire fighting in the
city/area,dependingonthepopulationdensityandtypesofoccupancy.
5.5.3.2
Provision shall be made by the owner of the building for water supply requirements for firefighting
purposeswithinthebuilding,dependingupontheheightandoccupancyofthebuilding,inconformity
withtherequirementslaiddowninPart4FireProtection.
5.5.3.3
Therequirementsregardingwatersupplyinstoragetanks,capacityoffirepumps,arrangementsofwet
risercumdowncomer and wet riser installations for buildings above 15 m in height, depending upon
theoccupancyuse,shallbeinaccordancewithSection4.2ofPart4.
5.5.4
5.5.4.1
WaterRequirementforSpecialEquipment
Watersupplyinmanybuildingsisalsorequiredformanyotherapplicationsotherthandomesticuse,
whichmustbeidentifiedintheinitialstagesofplanningsoastoprovidetherequisitewaterquantity,
storagecapacityandpressureasrequiredforeachapplication.
BangladeshNationalBuildingCode2011
8213
Part8
BuildingServices
5.5.4.2
Insuchinstancesinformationaboutthewateruseandthequalityrequiredmaybeobtainedfromthe
users.Sometypicalusesotherthandomesticuseandfirefightingpurposesareairconditioningandair
washing, swimming pools and water bodies and gardening. The water requirement for special
equipmentlikeairconditioningorsuchothersshallbebasedonthespecificationofthemanufacturer.
Table8.5.1(d):DomesticWaterRequirementsforVariousothersOccupanciesandFacilityGroups
Classof
ForFulla
ForRestricted
Occupancy
OccupancyGroups
Facilities
Facilities
(lpcd)
(lpcd)
OccupancyA:
A1:Mess,Hostels,orBoardingHouse
135
70
Residential
A2:MinimumStandardHousing
70
A3:HotelsorLodgingHouse(Perbed)
300
135
A4:Hotel(upto4Star)
180
A5:Hotels(upto5Star)
320
A6:GardeningandSprinkling
A7:CarWashing
OccupancyB:
B1:EducationalFacilities
70
45
Educational
B2:PreschoolFacilities
50
35
OccupancyC:
C1:InstitutionforChildren'sCare
180
100
Institutional
C2:CustodianInstitutionforCapable
180
100
C3:CustodianInstitutionforIncapable
120
70
C4:PenalandMentalInstitution
120
70
OccupancyD:
D1:NormalMedicalFacilities/SmallHospitals
340
225
HealthCare
D2:BigHospitals(Over100beds)
450
250
D3:EmergencyMedicalFacilities
300
135
D4:Nurses&MedicalQuarters
250
135
Table8.5.1(d)Cont.:DomesticWaterRequirementsforVariousothersOccupanciesandFacilityGroups
OccupancyGroups
ForFulla
Facilities
(lpcd)
ForRestricted
Facilities
(lpcd)
OccupancyE:
E1:LargeAssemblywithFixedSeats(perseat)
90
45
Assembly
E2:SmallAssemblywithFixedSeats(perseat)
90
45
E3:LargeAssemblywithoutFixedSeatsb
E4:SmallAssemblywithoutFixedSeats
E5:SportsFacilities
OccupancyF:
F1:Offices
45
30
Businessand
F2:SmallShopsandMarkets
45
30
Mercantile
F3:LargeShopsandMarkets
45
30
Classof
Occupancy
8214
F4:GarageandPetrolStations
70
45
F5:EssentialServices
70
45
F6:Restaurant
70
50
OccupancyG:
G1:LowHazardIndustries
40
25
Industrial
G2:ModerateHazardsIndustries
40
25
Vol.3
WaterSupply
Chapter5
OccupancyH:
H1:LowFireRiskStorage
10
Storage
H2:ModerateFireRiskStorage
10
OccupancyJ:
J1:ExplosiveHazardBuilding
Hazardous
J2:ChemicalHazardBuilding
OccupancyKc
K1:PrivateGarage&SpecialStructure
Miscellaneous
K2:Fences,TanksandTowers
aForfullfacilityinoccupancyclassificationsA,B,CandD,thewaterrequirementvalueincludes25%hotwater.
bInthecaseofmosques,thewaterrequirementsgivenaboveshallbeadequateforablutionandotherusesof
onedevoteeperprayer.TheappropriateLPCDvaluemaybecalculatedonthisbasis.
cWaterrequirementforoccupancyKisshownasaprovisionforunknownvisitorsonly.
5.6
ESTIMATIONOFDEMANDLOAD
5.6.1
Estimatesoftotalwatersupplyrequirementsforbuildingsshallbebasedontheestimationoftotalpresentand
predictedfuturepopulationandpercapitawaterrequirementasmentionedinsection5.5.
5.6.2
Inmakingassessmentofwatersupplyrequirementsoflargecomplexes,thefutureoccupantloadshallbekeptin
view.Usemaybemadeofthefollowingmethodsforestimatingfuturerequirements
(a) demographicmethodofpopulationprojection,
(b) arithmeticprogressionmethod,
(c) geometricalprogressionmethod,
(d) methodofvaryingincrementorincrementalincrease,
(e) logisticmethod,
(f) graphicalprojectionmethod,and
(g) graphicalcomparisonmethod.
5.6.3
Forresidentialbuildings,therequirementsofwatershallbebasedontheactualnumberofoccupants;wherethis
information is not available, the number of occupants for each residential unit may be based on a family size
around 5 (five). For assessing the population in other occupants, reference may be made to Part 4 Fire
Protection.
5.6.4
Toestimateofficebuildingoccupancy,allow7.49.3sqm(80100sqft)offloorspaceperperson,dependingon
thetypeofofficebuilding,exclusiveofelevatorandstairspace,corridors,orserviceareas.
5.6.5
Todeterminethepresentandfuturewaterrequirement:
(a) Classify the total population based on the basis socioeconomic status (Higher/middle/lower income
group&slumdwellers)
(b) Determinepercapitawaterrequirementfordifferentcategories(types)ofpeople fordifferenttypeof
domestic,recreational,andcommercialuses.
(c) Multiplythepopulationwithpercapitawaterconsumptiontodeterminethepresentandfuturewater
requirement.
BangladeshNationalBuildingCode2011
8215
Part8
BuildingServices
5.7
WATERSOURCESANDQUALITY
5.7.1
SourcesofWater
Theoriginofallsourcesofwaterisrainfall,Watercanbecollectedasitfallsasrainbeforeitreachestheground;
or as surface water when it flows over the ground or is pooled in lakes or ponds; or as ground water when it
percolates into the ground and flows or collects as ground water; or from the sea into which it finally flows.
Surfacewatersarephysicallyandmicrobiallycontaminatedandcannotbeusedwithouttreatment,ontheother
handgroundwatersourcesarechemicallycontaminatedandtreatmentmaybenecessaryinmanycases.
5.7.2
QualityofWater
ThequalityofwatertobeusedfordrinkingshallbemaintainedusingWHOWaterSafetyPlan(WSP)andatleast
complywiththeBangladeshStandard(ECR,1997)andWHOGuidelineValues(2004)aspresentedinTable5.Q1
ofAppendix8.5.D.Forpurposesotherthandrinking,waterifsuppliedseparately,shallbeabsolutelysafefrom
bacteriological contamination so as to ensure that there is no danger to the health of the users due to such
contaminants.
5.7.3
WasteWaterReclamation
Treatedsewageorotherwastewaterofthecommunitymaybeutilizedfornondomesticpurposessuchaswater
for cooling, flushing, lawns, parks, fire fighting and for certain industrial purposes after giving the necessary
treatmenttosuitthenatureoftheuse.Thissupplysystemshallbeallowedinresidencesonlyifproperprovision
ismadetoavoidanycrossconnectionofthistreatedwastewaterwithdomesticwatersupplysystem.
Wheneverabuildingisusedafterlongintervals,thewaterqualityofthestoredwatermustbecheckedsoasto
ensurethatthewaterissafeforuseasperwaterqualityrequirementsspecifiedinthisCode.
5.8
WATERSUPPLYSYSTEM
Eachfloororunitwithinthewatersupplysystemshallbeprovidedwithacontrolvalveinadditiontothemain
controlvalveattheentranceofthesystem.Oneofthefollowingpublicwatersupplysystemsshallbeadoptedfor
distributingwatertotheplumbingfixtureswithinthebuilding[Figures8.5.C.2(a),2(b)&2(c)ofAppendix8.5.C]
5.8.1
DirectConnectiontoWaterMain
For continuous water supply system with sufficient pressure to feed all plumbing fixtures during peak demand
period,thedirectconnectionofwaterdistributionsystemtothewatermainsmaybeadopted.However,direct
pumpingfromthepublicwatermainshouldstrictlybeprohibited.
5.8.2
SystemIncorporatingBalancingRoofTank
Forcontinuouswatersupplysystemwithinadequatepressureonlyduringpeakdemandhourorforintermittent
water supply with sufficient pressure to feed balancing tank, a balancing roof tank shall be required to feed
plumbing fixtures within the building. The connection to the balancing roof tank from the water main or from
groundtankorfromindividualwatersourcesshallbethroughanonreturnvalve.
5.8.3
SystemIncorporatingGroundTank
Forwatersupplysystemwithinadequatepressuretofeedplumbingfixturesorbalancingrooftank,thebuilding
premises shall have a ground (or underground) tank to store water. The water from the ground tank shall be
boosteduptotherooftanktofeedplumbingfixtures.Theconnectionofwatermaintothegroundtankshallbe
throughaballvalvesystem.Installationofboosterpumpdirectlyintothewatermainshallnotbeallowed.Since,
this system cannot ensure protection against possible contamination (particularly during flood), disinfection
systemshouldbeincorporated.
5.8.4
IndividualWaterSupply
In the absence of a public water supply system, or In case of need of additional supply of water, the building
premisesshallhaveindividualwatersupplyasspecifiedinSection5.23.1.Thewaterfromthesources(DTW)shall
beboosteduptotheroofstoragetanktofeedplumbingfixtures.Thesystemshallbeprotectedasspecifiedin
Section5.13.3to5.23.7.
8216
Vol.3
WaterSupply
5.9
STORAGEOFWATER
5.9.1
CapacityofStorageTank
5.9.1.1
Chapter5
Thetypeandcapacityofastoragetankshallbedeterminedconsideringthefollowingfactors:
(a) Therateandregularityofsupply;
(b) Thefrequencyofreplenishmentofthestoragetankduring24hours;
(c) Buildingoccupancyclassification;
(d) Hoursofsupplyofwateratsufficientlyhighpressuretofilluptheroofstoragetankinabsenceofaground
(orunderground)storagetank;
(e) Theamountofwaterrequiredforfirefightingandmethodoffirefightingsystem(Section4.2,Part4)
(f) Theamountofwaterrequiredbyspecialequipment(Section5.5.4).
5.9.1.2
Thesizeandvolumeofastoragetankshallbecalculatedconsideringthefollowingfactors:
a) Theamountofstoragetobeprovidedisafunctionofcapacityofthedistributionnetwork,thelocationofthe
servicestorage,andtheusetowhichitistobeput.
b) Tocomputetherequiredequalizingoroperatingstorage,amassdiagramorhydrographindicatingthehourly
rateofconsumptionisrequired.
Theproceduretobeusedindeterminingtheneededstoragevolumefollows:
a) Obtainahydrographofhourlydemandsforthemaximumday,throughastudyofavailablerecords.
b) Tabulatethehourlydemanddataforthemaximumdayanddrawacumulativedemandcurve,
c) The required operating storage is found by comparing (maximum deviation) the cumulative demand
curve(SShapedCurve)withcumulativepumpingcurve(Straightline)plottedonit..
c) Therequiredcapacityofatankvarieswiththecapacityandrunningtimeofthehouseorfillpumps,however,
followingproceduremaybefollowedtodeterminethecapacityofstoragetanksandpump:
a) Capacity of Roof Tank = x Total daily demand of water (m3) + 1 hr. reserve (m3) for firefighting
requirement(fortallbuilding).Therefore,twotimesfillingofrooftankwillmeetthedailyrequirement.
b) CapacityofDeliveryPump=Peakhourlydemandofwater,lph.Therefore,dailypumpingperiodwould
bearound78hours(23hoursinthemorning+3hoursintheafternoon+2hoursintheevening).
c) Capacity of Under Ground Reservoir = 1 x Total daily demand of water (m3) + 1 hr. reserve (m3) for
firefighting(fortallbuilding).Foremergencyrequirement23daysdailydemandofwaterissometimes
stored.
5.9.2
ConstructionofStorageTank
5.9.2.1
General
Storagetankshallbeeasilyaccessibleforinspectionandcleaning.Thetankshallbeprovidedwithadequatesize
ofvalveddrainsatitslowestpointinaccordancewithTable8.5.2.Thewatersupplyinletintothestoragetank
shallbeatanelevationthatisrequiredforanairgapinanopentankwithoverflow(Section5.18.6)or100mm
BangladeshNationalBuildingCode2011
8217
Part8
BuildingServices
abovetheoverflowwhicheverisgreater.Thediameterofoverflowpipeshallnotbelessthanthesizeshownin
Table8.5.3forthespecificdischargeintostoragetank.Thestoragetankshallbeequippedwithwatertightand
verminandrodentproofcover.Thetankshallbeprovidedwithreturnbendventpipewithanopenareanotless
thanhalftheareaoftheriser(upfeedordownfeed).Allopenings(overflowpipeandventpipe)shallbeprovided
with corrosion resistant screens against the entrance of insects and vermin. There must be at least two
compartments/unitsforalternativecleaning.
Table8.5.2:SizesofStorageTankDrainagePipes
TankCapacity(V)
inLitres( )
DiameterofDrainage Pipe
(mm)
V2800
25
2800<V5500
38
5500<V11000
50
11000<V19000
63
19000<V28000
75
28000<V
100
Table8.5.3:SizesofOverflowPipesforStorageTank
MaximumDischarge(Q)of
WaterSupplyPipeintoStorageTank(l/min)
DiameterofOverflowPipe
(mm)
Q190
50
190<Q570
63
570<Q760
75
760<Q1500
100
1500<Q2650
125
2650<Q3800
150
3800<Q
200
5.9.2.2
RoofStorageTank
Theroofstoragetankshallbeconstructedwithprestressedorreinforcedconcreteorferrocementorgalvanized
steel or of the material that will resist any action by the plain or chlorinated water. The tank shall be made of
watertightwithouttheuseofputty.Tanksmadeofnongalvanizedmetalsheetsshallbecoatedinternallywitha
nontoxicmaterialwhichdoesnotimpartatasteorodor.Themetalstoragetankshallbecoatedexternallywitha
goodqualityanticorrosiveweatherresistantpaint.Theoutletofstoragetanktothedistributionsystemshallbeat
least50mmabovethetankbottom.
Toprovidesufficientpressure,thebottomofthetankmustbeelevatedsufficientlyabovethehighestfloorwater
fixtures.
Ventpipeshouldbeprovidetoavoidanyairlockandshouldbeplacedwherethehorizontalbranchpipesconnect
theverticaldownfeedpipes(notadjacenttostoragetankandatinterconnectionplacebetweenstoragetank
anddistributionpipes).
5.9.2.3
GroundorUndergroundStorageTank
The ground or underground storage tank shall be constructed of either prestressed or reinforced concrete or
ferrocement.Thetankshallbeabsolutelywaterproofandhaveawatertightcastironmanholecoversuitablefor
inspection.Theinsideandoutsideofthetankmaybecoatedwithnontoxicandwaterproofmaterials.Theground
tank shall be placed at a location so as to avoid contamination by flood water or any other sources. Each
compartment/units should be divided in two chambers with provision of sump for longer contact time with
chlorineandeasycleaning
8218
Vol.3
WaterSupply
5.10
DESIGNOFDISTRIBUTIONSYSTEM
5.10.1
RateofFlowofWater
Chapter5
Oneoftheimportantitemsthatneedstobedeterminedbeforethesizesofpipesandfittingsforanypartofthe
waterpipingsystemmaybedecidedupon,istherateofflowintheservicepipewhich,inturndependsuponthe
numberofhoursforwhichthesupplyisavailableatsufficientlyhighpressure.Ifthenumberofhoursforwhich
thesupplyisavailableisless,therewillbelargenumberoffittingsinusesimultaneouslyandtherateofflowwill
becorrespondinglylarge.
Thedatarequiredfordeterminingthesizeofthecommunicationandservicepipesare:
a) themaximumrateofdischargerequiredatpeakdemandperiod(Peakhourlydemandofwater)
Total
XPeakFactor(usually2.2)
b) thelengthofthepipe;and
c)
theheadlossbyfrictioninpipes,fittingsandmeters.Forheadlosscalculationinpipingsystem
i)
DeterminethetotallengthofpipeandcalculatetheequivalentPipeLength(HeadLossfrombend,gatevalves,reducer
etc.)fromTables8.5.C2(a),C2(b)andC(c)ofAppendix8.5.C.
ii)
Assumetheprobablemaximumvelocityofflow(v)ortentativediameterofpipes(d),
consideringmaximumpermissibleheadlossof1.51.6m/100m
For13mmand50mmdiameterpipe:0.300.60m/sec
For75mmand100mmdiameterpipe:0.750.90m/sec
For150mmand200mmdiameterpipe:1.151.30m/sec
iii) Determinationoftotalheadloss(hf)fromHazenWilliam'sNomograph(Figure8.5.C.4ofAppendix8.5.C)orfrictionloss
4 fLv2
formula,hf= 2 gd where,f=frictionlossfactor,L=lengthofpipe,v=velocityofflowandd=diameterofpipe.
5.10.2 DischargeComputation
5.10.2.1
BasedonFixtureUnitsThedesignoftheconsumerspipesorthesupplypipetothefixturesisbasedon:
a) thenumberandkindoffixturesinstalled;
b) thefixtureunitflowrate;and
c) theprobablesimultaneoususeofthesefixtures.
Theratesatwhichwaterisdesirablydrawnintodifferenttypesoffixturesareknown.Theseratesbecomewhole
numbersofsmallsizewhentheyareexpressedinfixtureunit.Thefixtureunitsfordifferentsanitaryappliancesor
groupsofappliancesaregiveninthefollowingTable8.5.4
Table8.5.4:FixtureUnitfordifferentTypesofFixtureswithInletPipeDiameter
SlNo.
TypeofFixture
FixtureUnit(FU)
MinimumSizeof
AsLoadFactor
FixtureBranch,mm
AblutionTap
15
Bathtubsupplywithspout
15
ShowerStallDomestic
15
BangladeshNationalBuildingCode2011
8219
Part8
BuildingServices
SlNo.
5.10.2.2
TypeofFixture
FixtureUnit(FU)
AsLoadFactor
MinimumSizeof
FixtureBranch,mm
ShowerinGroupperhead
15
WashBasin(DomesticUse)
15
WashBasin(PublicUse)
15
WashBasin(Surgical)
15
KitchenSink(DomesticUse)
15/20
WashingMachine
15/20
10
DrinkingFountain
0.5
15
ProbableSimultaneousDemand(HunterCurve)
Thepossibilitythatallwatersupplytapsinanysystemindomesticandcommercialusewilldrawwateratthe
same time are extremely remote. Designing the water mains for the gross flow will result in bigger and
uneconomicalpipemainsandisnotnecessary.AprobabilitystudymadebyHuntersuggeststherelationshipas
showninFigure8.5.C.1ofAppendix8.5.C,andmayalsobecalculatedfromTable8.5.5.
5.10.3
PipeSizeComputation
Commerciallyavailablestandardsizesofpipesareonlytobeusedagainstthesizesarrivedatbyactualdesign.
Therefore, several empirical formulae are used, even though they give less accurate results. The Hazen and
Williamsformulaandthechartsbasedonthesamemaybeusedwithoutanyriskofinaccuracyinviewofthefact
that the pipes normally to be used for water supply are of smaller sizes. Nomogram of Hazen and Williams
equationhasbeenprovidedinFigure8.5.C.4ofAppendix8.5.C.
5.10.4
GeneralFeaturesofDistributionSystemDesign
5.10.4.1
The water supply system shall be designed to supply minimum but requisite quantity of water to all fixtures,
devicesandappurtenancesineverysectionofthebuildingwithadequatepressure.Thedesignrequirementsofa
watersupplysystemarepresentedinTable8.5.6.
5.10.4.2
For a down feed water distribution system (roof tank supply), static pressure due to gravity increases with
increasing floor height (4.32 psi or 0.3 Bar per floor of 10 ft. height at non flow condition). Therefore, water
distributionpipeinabuildingshallbemaintainedatapressuresothatnoneoftheirfittingsshallaresubjecttoa
waterheadgreaterthan35m(approximately50psi).
Table8.5.5:ProbableSimultaneousDemand
No.of
SystemwithFlushTanks
SystemwithFlushValves
FixtureUnits
Demand(BasedonFixtureUnits)
Demand(AfterHunter)
FlowinLitre
UnitRateof
FlowinLitre
FIow )
perMinute
FIow1)
perMinute
(1)
(2)
(3)
(4)
(5)
20
2.0
56.6
4.7
133.1
40
3.3
93.4
6.3
178.4
60
4.3
121.8
7.4
209.5
80
5.1
144.4
8.3
235.0
100
5.7
161.4
9.1
257.7
120
6.4
181.2
9.8
277.5
140
7.1
201.0
10.4
294.5
160
7.6
215.2
11.0
311.5
180
8.2
232.2
11.6
328.5
UnitRateof
1
8220
Vol.3
WaterSupply
Chapter5
200
8.6
243.5
12.3
348.3
220
9.2
260.5
12.7
359.6
240
9.6
271.8
13.1
370.9
300
11.4
322.8
14.7
416.2
400
14.0
396.4
17.0
481.4
500
16.7
472.9
19.0
538.0
600
19.4
549.3
21.1
597.5
700
21.4
606.0
23.0
651.3
800
24.1
682.4
24.5
693.7
900
26.1
739.0
26.1
739.0
1000
28.1
795.7
Unitrateofflow=Effectivefixtureunits.
5.10.4.3
795.7
28.1
ThedistributionsystemshallbemaintainedatapressurenotlessthanthosespecifiedinTable8.5.6duringpeak
demandperiod.
5.10.4.4
TheminimumsizeofsupplypipefordifferentfixturesshallbeinaccordancewithTable8.5.6.Thefixturesupply
shallnotterminatemorethan0.76m(2.5ft)fromthepointofconnectiontothefixture.Areducedsizeflexible
waterconnectionpipeshallbeused.
5.10.4.5
Thewaterflowvelocityinthedistributionsystemshallbecontrolledtominimizethepossibilityofwaterhammer.
5.10.4.6
Thedesignofwaterdistributionsystemshallconformtoapprovedengineeringpractices.Analternativeguideto
thedesignofabuildingwaterdistributionsystemisalsopresentedinAppendix8.5.C.
Note: Thesizingofwaterdistributionpipingwithinthebuildingmaybemadeeitherbyconsideringthevelocity
of flow or by velocity of flow and pressure loss as governing parameters. The first method have limited
applicationforoneortwostoreybuildingsprovidedtheminimumavailablepressureissufficienttooperatethe
highest ormost remote fixtures duringpeakdemand period. The secondmethod provides betterestimate of
pipesizesforawaterdistributionsystem.
5.10.5
DesignofWaterDistributionPump
Thecapacityofawaterdeliverypumpcanbecalculatedfromtheestimatedmaximumrateofflow(Q)ofwaterin
gpm,andtotalhead(H=hs+hd+hf+hv)ofsupplyofwaterinftandusingthefollowingformula:
BreakHorsePower,BHP= H x Q xEfficiencyofpumpin%.
3960
Statichead,hsisthetotalsuctionliftofwater(sumofverticaldistancebetweentheundergroundreservoirand
pumplevelanddeliveryhead,hdistheverticaldistancebetweenthepumplevelandrooftankstoragepoint.
Frictional head loss, hf can be determined for whole length (vertical and horizontal) of pipe flow using the
proceduresdescribedinsection5.10.1(c).
v2
Velocityhead,hv= 2 g where,v=velocityofflowofwateratthedischargepointintherooftank.
BangladeshNationalBuildingCode2011
8221
Part8
BuildingServices
5.11
WATERDISTRIBUTIONINTALLBUILDINGS
5.11.1
DistributionMethods
In tall buildings some of the fixtures at the lower level may be subject to excessive pressure. The sanitary
appliancesandfittingsintallbuildingsshallnotbesubjecttoapressureofgreaterthan350kPa.Thisshallbe
achievedbyoneoracombinationofthefollowingtwomethods:
a)ZoningFloorsbyIntermediateTank:Highrisebuildingsshallbezonedbyprovidingintermed4atetankson
differentfloors,eachfeedingazonerangingfrom56storeyssothattheplumbingfixturesarenotsubjectedto
excessive pressure.Distribution in each zone shallbethroughindependent downtakepipes from intermediate
tanksasshowninFigures8.5.C.3(a),8.5.C.3(b),8.5.C.3(c)and8.5.C.3(d)ofAppendix8.5.C.Thefloorsonwhich
anintermediatetanksarelocatedshallbefedfromthestoryaboveit.
i) SystemIncorporatingIntermediateTanksSuppliedbyStorageTankWaterrequiredforthebuilding
shall be pumped from the underground tank to the storage tank. The intermediate tanks shall be fed
fromthestoragetankthroughaseparatedowntakepipe.
ii) System Incorporating Intermediate Tanks Supplied by Independent Pumps Alternatively the
intermediatetanksmaybesuppliedfromtheundergroundtankthroughindependentpumps
Table8.5.6:WaterSupplySystemDesignRequirements
Fixture
SupplyControl
Bathroomgroup
Flushtank
55
Bathroomgroup
Flushometervalve
55
Bathtub
Faucet
13
55
15.1
Clotheswasher
13
55
Combinationfixture
Faucet
13
55
Dishwashingmachine
13
55
10.4
Drinkingfountain
Faucet
13
55
2.8
Kitchensink
Faucet
13
55
9.5
Laundrytray
Faucet
13
55
15.1
Washbasin
Faucet
19
55
Pedestalurinal
Flushtank
13
55
56.8
Pedestalurinal
Flushometervalve
19
100
56.8
Restaurantsink
Faucet
19
55
Servicesink
Faucet
13
55
11.4
Showerhead
Mixingvalve
13
55
11.4
Watercloset
Flushtank
19
55
11.4
Watercloset
Flushometertank
19
55
6.1
Watercloset
Flushometervalve
25
100
132
13
19
25
55
55
100
Forfixturenotlistedherebutmaximum
supplysizerequirement
Note:1psi=6.895kPa(1kPa=0.145psi),1gallon=3.785liter
b) SystemIncorporatingPressureReducingValves:Theexcessivepressuressufferedbydifferentfixturesshall
beminimizedbypressurereductionvalves.
c) HydroPneumatic System: This system may be adopted where the source is independent of public water
supplysystem.Inthissystemthesupplyshallbethroughapneumaticpressurevesselfittedwithaccessories
like nonreturn and pressure relief valves. The pump and compressor shall be automatically controlled
throughanelectriccontrolpaneltoprovideairandwaterasandwhenneeded.
8222
Vol.3
WaterSupply
5.11.2
Chapter5
RecirculationofWasteWater
Recirculationofcoolingwaterand/orwastewaterfromwashbasintothecisternofwaterclosetsandurinalsin
the lower floor may be provisioned only through a separate tank. No connection between the potable water
supplylineandtherecirculatedwastewaterlineshallbeallowedwithorwithoutanynonreflexornonreturn
valves.
5.12
HOTWATERSUPPLYINSTALLATION
5.12.1
HotWaterRequirements
For a residential building, hot water may be supplied to all plumbing fixtures and equipment used for bathing,
washing,cleansing,laundryandculinarypurposes.Foranonresidentialbuilding,hotwatermaybesuppliedfor
bathingandwashingpurposes.WaterrequirementforhotwatersupplyshallbeinaccordancewithSection5.5.
5.12.2
StorageTemperature
Thedesignofhotwatersupplysystemmaybebaseduponthefollowingtemperaturerequirement:
Scalding
68oC
Hotbath
41oC
Warmbath
37oC
Tepidbath
30oC
Sink
5.12.3
60oC
StorageCapacity
Thecapacityofhotwatervesselshallbebasedonthemaximumshorttimedemandofthepremises.
5.12.4
HotWaterHeater
Thehotwaterheatershallconformtothefollowingstandards:BS758,BS779,BS843,BS855,BS1250,BS2883
andthosespecifiedinPart5ofthisCode.
5.12.5
ColdWaterSupplyConnectiontoWaterHeaters
Theconnectionofcoldwatersupplypipingintowaterheatershallbemadenearitsbottom.Theminimumsizeof
coldwatersupplypipingshallbebasedontheprobablehotwaterdemandofdifferentfixturesbutnotlessthan
25mm.Thesupplypipeshalldelivercoldwaterintohotwatercylinderasfollows:
a) The water heater (electric or gas) of less than 15 liters storage capacity may be directly connected to the
watermainthroughanonreturnvalve.
b) Thestorageheaterof20to70literscapacitymaybeconnecteddirectlytothewatermainthroughanon
return valve and with an additional device that will prevent the siphonage of hot water back to the water
main.
c) Theenclosedwaterheaterwithstoragecapacitygreaterthan70litersshallbefedfromthestoragetank.This
waterheatershallnotbeconnecteddirectlytothewatermain.
d) Thewatersupplyconnectiontoanopenvesseltypewaterheatermaybemadewithanairgapofatleast15
mmabovethetopedgeofthewaterheater.Ballvalveconnectionshallnotbeusedtocontroltheflowof
waterintothiswaterheater.
5.12.6
HotWaterDistributionPiping
Theconnectionofhotwaterdistribution pipetothehotwatercylindershallbeatthetopofthecylinder.The
installationofpipingshallbesuchastoavoidairlock.Incaseofhotwaterhorizontalpipingthegradientshallnot
belessthan1in250.
BangladeshNationalBuildingCode2011
8223
Part8
BuildingServices
5.12.6.1
TheprocedureforsizingmaybethesameasthatforcoldwaterdistributionsysteminSec5.10butinnocase
shallthesizebelessthanthatspecifiedinTable8.5.7.
Table8.5.7:MinimumPipeSizeforHotWaterPiping
DifferentPipes
MinimumDiameter(mm)
Thesizeofmaindistributingpipethatsupplieshotwatertothefixtures 25
inthesamestoreyofthehotwatercylinder
Thesizeofmaindistributingpipethatsupplieshotwatertothefixtures 19
notinthesamestoreyofhotwatercylinder
5.12.6.2
Branchpipesupplyinghotwatertothebathtuborshower
19
Branchpipesupplyinghotwatertothesink
19
Branchpipesupplyinghotwatertothewashbasin
19
The design consideration of hot water piping shall be such that hot water will appear quickly at the outlet of
differentfixtures.Toimprovethesituation,asecondarycirculationsystemwithflowandreturnpipefromandto
thehotwatercylinder(Fig8.5.1)maybeadopted.Thelengthofhotwaterdistributionpipemeasuredalongthe
pipefromthetopofdrawofftaptothehotwatercylinderorthesecondarycirculationpipeshallnotexceedthe
lengthprescribedinTable8.5.8.Thedrawofftapshallnotbeconnectedtotheprimaryfloworreturnpipe.
Table8.5.8:MaximumPermissibleLengthofHotWaterDrawOffPipe
5.12.7
LargestInternalDiameter(D)ofPipe
LengthofPipe(m)
D<19mm
12
20mm<D<25mm
7.5
25mm<D
VentPipe
Thepressuretypehotwaterheatershallbeprovidedwithaventpipeofnotlessthan19mmdiameter.Thevent
pipeshallriseverticallyabovethewaterlineofcoldwatertankbyatleast150mmplus1mmforevery30mm
heightofwaterlineabovethebottomofthewaterheater.
Theventpipeshallbeconnectedtothetopofthehotwatercylinder.Theventpipemaybeusedtosupplyhot
watertothepointinbetweenthecoldwatertankandthehotwatercylinder.Theventpipeshallnotbeprovided
withanyvalveorcheckvalves.
Theterminationofventpipeshallbesuchasnottocauseanyaccidentaldischargetohurtorscaldanypasserby
orpersoninthevicinity.
5.12.8
CapacityofColdWaterStorageTank
Thestoragecapacityofcoldwatercisternshallbeatleastequaltothesizeofhotwaterstoragecylinderifthe
coldwatercisternsupplieswateronlytothehotwaterheatercylinder.Thiscapacityshallbeatleasttwicethe
capacityofhotwaterheatercylinderifthecoldwaterstoragetankalsosupplieswatertothecoldwaterdrawoff
taps.
5.12.9
SafetyDevices
Thetemperaturereliefvalveorpressurereliefvalveoracombinationoftemperatureandpressurereliefvalves
shallbeinstalledfortheequipmentforheatingorstorageofhotwater.Thetemperaturereliefvalveshallbeset
atamaximumtemperatureof99oC.Themaximumpressureratingofwaterheatershallnotbemorethan1000
kPa.Thetemperaturereliefvalveshallbeplaceddirectlyabovethecylinderitservesbutinnocasemorethan75
mmawayfromthecylinder.Thelocationofpressurereliefvalveshallbeclosetotheequipmentitserves.There
shallbenovalveconnectioninbetweenareliefvalveandthehotwatercylinderitserves.
8224
Vol.3
WaterSupply
5.12.10
Chapter5
WastesfromReliefValve
Theoutletofpressure,temperatureorsuchothervalveshallnotbedirectlyconnectedtothedrainagesystem.
5.12.11
DrainCock
Adequatesizeofdraincockshallbeprovidedwithallstoragetanksfortheirpropercleaning.
5.13
MATERIALS,FITTINGS&APPLIANCES
a) Thematerialsandfittingsforwatersupplyanddistributionpipeandforstoragetankshallcomplywiththe
standardslistedinPart5'BuildingMaterials'andshallbeinaccordancewithSection2.15andthosespecified
inthissection.
b) The materials chosen shall be resistant to corrosion, both inside and outside or shall be suitably protected
againstcorrosionandfreefromalltoxicandharmfulsubstances.PolyethyleneandunplasticizedPVCpipes
shallnotbeinstallednearhotwaterpipesornearanyotherheatsource..
c) Alljointingofpipesandfittingsshallbedoneinaccordancewithacceptablestandardpractices.
5.13.1
WaterSupplyServiceandDistributionPipes
WatersupplyserviceanddistributionpipesshallconformtothestandardslistedinTables8.5.9and8.5.10.The
watersupplypipesandtubingusedoutsidethebuildingorundergroundshallhaveaminimumworkingpressure
of1.1MPaat23oC.Incaseofwatersupplyexceeding1.1MPapressure,thepipingmaterialshallhaveatleasta
rated working pressure equal to the highest available pressure. The hot water distribution piping shall have a
minimumpressureof550kPaat80oC.Differenttypes/classesofuPVC(UnplasticizedPVCpipes)areusedbothfor
serviceandinternaldistributionpipesasdescribedinTable8.5.11.However,Polyvinylchloride(PVC)plasticpipesshall
notbeusedexposedandunprotectedasriserorwaterdistributionpipe.PolytheneorunplasticizedPVCpipes
shallnotbeinstalledneartheheatersorhotwaterpiping.Leadpipesmaybeusedonlyforflushingandoverflow
purposesinawatersupplysystem.
5.13.2
PipeFittings
ThepipefittingsshallbeinaccordancewiththestandardslistedinTable8.5.12andthosespecifiedinPart5.
5.13.3
Concrete,PrestressedorFerrocementStructures
The properties of the materials used for storage tank or such other structures shall conform to the material
standardsspecifiedinPart5oftheCode.
Table8.5.9:WaterSupplyServicePipe
Materials
Standards
Acrylonitrilebutadienestyrene(ABS)plasticpipe
ASTMD1527,ASTMD2282
Brasspipe
ASTMB43
Castironwaterpipe
ASTMD377
CopperorCopperalloypipe
ASTMB42,ASTMB302
CopperorCopperalloytubing
ASTMB75,ASTMB88,ASTMB251,ASTMB447
Chlorinatedpolyvinylchloride(CPVC)pipe
ASTMD2846,ASTMF441,ASTMF442
Galvanizedsteelpipe
ASTMA53
Polybutyline(PB)plasticpipeandtubing
ASTMD2662,ASTMD2666,ASTMD3309
Polyethyline(PE)plasticpipeandtubing
ASTMD2239,ASTMD2737
PVCplasticpipe
ASTMD1785,ASTMD2241,ASTMD2672
BangladeshNationalBuildingCode2011
8225
Part8
BuildingServices
Table8.5.10:WaterDistributionPipe
Material
Standard
Brasspipe
ASTMB43
CopperorCopperalloypipe
ASTMB42,ASTMB302
CopperorCopperalloytubing
ASTMB75,ASTMB88,ASTMB251,ASTMB477
CPVCplasticpipeandtubing
ASTMD2846,ASTMF441,ASTMF442
Galvanizedsteelpipe
ASTMA53
PVCplasticpipe
ASTMD1785,ASTMD2241,ASTMD2672
5.14
GENERALREQUIREMENTFORPIPEWORK
5.14.1
PublicWaterMains
Thefollowingprinciplesshallapplyforthemains:
a) Servicemainsshallbeofadequatesizetogivetherequiredrateofflow.
Table8.5.11(a):WorkingPressureRangeofDifferentTypesofuPVC(UnplasticizedPVC)Pipes
Type/Class(Bar)(kg/cm2)
Material
uPVCPipe
ClassB6.06.12
uPVCPipe
ClassC9.09.19
uPVCPipe
ClassD12.012.25
uPVCPipe
ClassE15.015.30
Table8.5.11(b):AverageWallThicknessClassEuPVC(UnplasticizedPVC)Pipes
AverageWallThicknessofClassETypeuPVCPipe
3/8inch(9.5mm)
inch(13mm)
inch(19mm)
1.0inch(25mm)
1.9mm
2.1mm
2.5mm
2.7mm
Table8.5.12:PipeFittings
Material
Standard
Asbestoscement
ISO160,ISO881,ISO392
Castiron
ASMEB164,ASMEB16.12
Copperorcopperalloy
ASMEB16.15,ASMEB16.18,ASMEB1622
ASMEB16.23,ASMEB16.26,ASMEB16.29
ASMEB16.32
Greyironandductileiron
AWWAC110,ISO2531
Malleableiron
ASMEB16.3
Plastic,uPVC
ASTMD2464,ASTMD2466,ASTMD2467
ASTMD2609,ASTMF409,ASTMF437,
ASTMF438,ASTMF439
Steel
8226
ASMEB16.9,ASMEB16.11,ASMEB16.28
Vol.3
WaterSupply
Chapter5
b) Themainsshallbedividedintosectionsbymakingloopsystemandwiththeprovisionsofsluicevalvesand
othervalvessothatanypartofwatermainmaybeshutoffforrepairswithoutaffectingmajorpartofpipe
network
c) Toavoiddeadends,themainsshallbearrangedinagridformationorinanetwork.
d) Wheredeadendsareunavoidable,ahydrantshallbeprovidedtoactasawashout
e) Thewashoutvalveshallnotdischargedirectlyintoadrainorsewer,orintoamanholeorchamberdirectly
connectedtoit;aneffectivelytrappedchambershallbeinterposed,intowhichthewashoutshalldischarge.
f)
Airvalvesshallbeprovidedatallsummits,andwashoutatlowpointsbetweensummits.
g) Mainsneednotbelaidatunvaryinggradients,butmayfollowthegeneralcontouroftheground.Theyshall,
however,fallcontinuouslytowardsthewashoutandrisetowardstheairvalves.Thegradientshallbesuch
thatthereshallalwaysbeapositivepressureateverypointunderworkingconditions.
h) Thecoverforthemainsshallbeatleast900mmunderroadwaysand750mminthecaseoffootpaths.This
covershallbemeasuredfromthetopofthepipetothesurfaceoftheground.
i)
The mains shall be located sufficiently away from other service lines like electric and telegraph cables to
ensure safety and where the mains cannot be located away from such lines, suitable protective measures
shallbeaccordedtothemains.
5.14.2
InterconnectionPipesfromWaterMain
a) EverypremisesthatissuppliedwithwaterbytheAuthorityshallhaveitsownseparatecommunicationpipe.
Inthecaseofagrouporblockofpremisesbelongingtothesameownerthesamecommunicationpipemay
supplywatertomorethanonepremiseswiththepriorpermissionoftheAuthority.
b) Thecommunicationpipebetweenthewatermainandthestopcockattheboundaryofthepremisesshallbe
laidbytheAuthority.
c) Connectionsupto50mmdiametermaybemadeonthewatermainbymeansofscrewedferrules,provided
the size of the connections does not exceed onethird the size of the water main. In all other cases, the
connectionshallbemadebyaTbranchoffthewatermain.
d) Asfaraspracticable,thecommunicationpipeandtheundergroundservicepipeshallbelaidatrightanglesto
themainandinapproximatelystraightlinestofacilitatelocationforrepairs.Itisalsorecommendedthatthe
communicationpipebelaidinapipeinpipesleeveoflargerdia.Madeofnoncorrosivematerialtoprotect
thecommunicationpipe.
e) Everycommunicationpipeshallhaveastopcockandmeterinsertedinit.Thewaterwayofeachsuchfitting
shallnotbelessthantheinternalsectionalareaofthecommunicationpipeandthefittingsshallbelocated
withinthepremisesataconspicuousplaceaccessibletotheAuthoritywhichshallhaveexclusivecontrolover
it.
5.14.3
User/ConsumerPipes
a) Noconsumerpipeshallbelaidinthepremisestoconnectthecommunicationpipewithouttheapprovalof
theAuthority.
b) Theconsumerpipewithinthepremisesshallbelaidundergroundwithasuitablecovertosafeguardagainst
damagefromtrafficandextremesofweather.
c) Tocontrolthebranchpipetoeachseparatelyoccupiedpartofabuildingsuppliedbyacommonservicepipe,
astoptapshallbefixedtominimizetheinterruptionofthesupplyduringrepairs.Allsuchstopvalvesshallbe
BangladeshNationalBuildingCode2011
8227
Part8
BuildingServices
fixed in accessible positions and properly protected. To supply water for drinking or for culinary purposes,
direct taps shall be provided on the branch pipes connected directly to the consumer pipe. In the case of
multistoriedbuildings,downtaketapsshallbesuppliedfromoverheadtanks.
d) Pumpsshallnotbeallowedontheservicepipe,astheycauseadropinpressureonthesuctionside,thereby
affecting the supply to the adjoining properties. In cases where pumping is required, a properly protected
storagetankofadequatecapacityshallbeprovidedtofeedthepump.
e) Nodirectboosting(byboosterpumps)shallbeallowedfromtheservicepipes(communicationandconsumer
pipes).
f)
Consumerpipesshallbesodesignedandconstructedastoavoidairlocks.Drainingtapsshallbeprovidedat
thelowestpointsfromwhichthepipingshallrisecontinuouslytodrawofftaps.
g) Consumer pipes shall be so designed as to reduce the production and transmission of noise as much as
possible.
h) Consumerpipesinroofspacesandunventilatedairspacesunderfloorsorinbasementsshallbeprotected
againstcorrosion.
i)
Consumerpipesshallbesolocatedthattheyarenotundulyexposedtoaccidentaldamageandshallbefixed
insuchpositionsastofacilitatecleaningandavoidaccumulationsofdirt.
j)
Allconsumerpipesshallbesolaidastopermitexpansionandcontractionorothermovements.
5.14.4
ProhibitedConnections
a) Aservicepipeshallnotbeconnectedintoanydistributionpipe;suchconnectionmaypermitthebackflowof
waterfromacisternintotheservicepipe,incertaincircumstances,withconsequentdangerofcontamination
and depletion of storage capacity. It might also result in pipes and fittings being subjected to a pressure
higherthanthatforwhichtheyaredesigned,andinfloodingfromoverflowingcisterns.
b) NopipeforconveyanceorinconnectionwithwatersuppliedbytheAuthorityshallcommunicatewithany
otherreceptacleusedorcapableofbeingusedforconveyanceotherthanwatersuppliedbytheAuthority.
c) Wherestoragetanksareprovided,nopersonshallconnectorbepermittedtoconnectanyservicepipewith
anydistributingpipe.
d) Noserviceorsupplypipeshallbeconnecteddirectlytoanywaterclosetoraurinal.Allsuchsuppliesshallbe
fromflushingcisternswhichshallbesuppliedfromstoragetank.
e) Noserviceorsupplypipeshallbeconnecteddirectlytoanyhotwatersystemortoanyotherapparatusused
forheatingotherthanthroughafeedcisternthereof.
5.15
5.15.1
SAFECONVEYANCEANDDISTRIBUTIONOFWATER&PREVENTIONOFBACKFLOW
BasicPrinciples
a) Wholesome water supply provided for drinking and culinary purposes shall not be liable to contamination
from any less satisfactory water. There shall, therefore, be no crossconnection whatsoever between the
distribution system for wholesome water and any pipe or fitting containing unwholesome water, or water
liable to contamination, or of uncertain quality, or water which has been used for any other purpose. The
provision of reflux or nonreturn valves or closed and sealed stop valves shall not be construed as a
permissiblesubstituteforcompleteabsenceofcrossconnection.
8228
Vol.3
WaterSupply
Chapter5
b) Thedesignofthepipeworkshallbesuchthatthereisnopossibilityofbackflowtowardsthesourceofsupply
from any cistern or appliance, whether by siphonage or otherwise. Reflux nonreturn valves shall not be
reliedupontopreventsuchbackflow.
c) Whereasupplyoflesssatisfactorywaterthanwholesomewaterbecomesinevitableasanalternativeoris
required to be mixed with the latter, it shall be delivered only into a cistern and by a pipe or fitting
dischargingintotheairgapataheightabovethetopedgeofthecisternequaltotwiceitsnominalboreand
in no case less than 150 mm.It is necessaryto maintaina definite airgap in allappliances or taps usedin
waterclosets.
d) Allpipeworkshallbesodesigned,laidorfixedandmaintainedastoremaincompletelywatertight,thereby
avoidingwastage,damagetopropertyandtheriskofcontamination.
e) Nowatersupplylineshallbelaidorfixedsoastopassintoorthroughanysewer,scouroutletordrainorany
manholeconnectedtherewithnorthroughanyashpitormanurepitoranymaterialofsuchnaturethatis
likelytocauseunduedeteriorationofthepipe,exceptwhereitisunavoidable.
f)
Wherethelayingofanypipethroughcorrosivesoilorpreviousmaterialisunavoidable,thepipingshallbe
properlyprotectedfromcontactwithsuchsoilormaterialbybeingcarriedthroughanexteriorcastirontube
or by some other suitable means as approved by the Authority. Any existing piping or fitting laid or fixed,
which does not comply with the above requirements, shall be removed immediately by the consumer and
relaidbyhiminconformitywiththeaboverequirementsandtothesatisfactionoftheAuthority.
g) Where lines have to be laid in close proximity to electric cables or in corrosive soils, adequate
precautions/protectionshouldbetakentoavoidcorrosion.
h) Undergroundpipingshallbelaidatsuchadepththatitisunlikelytobedamagedbyfrostortrafficloadsand
vibrations. It shall not be laid in ground liable to subsidence, but where such ground cannot be avoided,
specialprecautionsshallbetakentoavoiddamagetothepiping.Wherepipinghastobelaidacrossrecently
disturbed ground, the ground shall be thoroughly consolidated so as to provide a continuous and even
support.
i)
Undesigningandplanningthelayoutofthepipework,dueattentionshallbegiventothemaximumrateof
discharge required, economy in Iabour and materials, protection against damage and corrosion, water
hammer, protection from frost, if required, and to avoidance of airlocks, noise transmission and unsightly
arrangement.
j)
Toreducefrictionallosses,pipingshallbeassmoothaspossibleinside.Methodsofjointingshallbesuchasto
avoidinternalroughnessandprojectionatthejoints,whetherofthejointingmaterialsorotherwise.
k) Change in diameter and in direction shall preferably be gradual rather than abrupt to avoid undue loss of
head.Nobendorcurveinpipingshallbemadewhichislikelytomateriallydiminishoralterthecrosssection.
l)
Noboilerforgeneratingsteamorclosedboilersofanydescriptionoranymachineryshallbesupplieddirect
fromaserviceorsupplypipe.Everysuchboilerormachineryshallbesuppliedfromafeedcistern.
5.15.2
BackflowPrevention
a) The installation shall be such that water delivered is not liable to become contaminated or that
contaminationofthepublicwatersupplydoesnotoccur.
b) Thevarioustypesofpipingandmechanicaldevicesacceptableforbackflowprotectionare:
i)
Barometricloop,
ii) Airgap,
iii) Atmospherevacuumbreaker,
BangladeshNationalBuildingCode2011
8229
Part8
BuildingServices
iv) Pressurevacuumbreaker,
v) Doublecheckvalve,and
vi) Reducedpressurebackflowdevice.
c)
Theinstallationshallnotadverselyaffectdrinkingwater:
i)
bymaterialsincontactwiththewaterbeingunsuitableforthepurpose;
ii) asaresultofbackflowofwaterfromwaterfittings,orwaterusingappliancesintopipeworkconnected
tomainsortootherfittingsandappliances;
iii) by crossconnection between pipes conveying water supplied by the water undertaker with pipes
conveyingwaterfromsomeothersource;and
iv) bystagnation,particularlyathightemperatures.
d) No pump or similar apparatus, the purpose of which is to increase the pressure in or rate of flow from a
supplypipeoranyfittingorapplianceconnectedtoasupplypipe,shallbeconnectedunlessthepriorwritten
permissionofthewatersupplierhasbeenobtainedineachinstance.
Theuseofsuchapumporsimilarapparatusislikelytoleadtopressurereductionintheupstreampipework
which,ifsignificant,increasetheriskofbackflowfromotherfittings.
e) Thewatershallnotcomeincontactwithunsuitablematerialsofconstruction.
f)
Nopipeorfittingshallbelaidin,onorthroughlandfill,refuse,anashpit,sewer,drain,cesspoolorrefuse
chute,oranymanholeconnectedwiththem.
g) Nopipesusceptibletodeteriorationbycontactwithanysubstanceshallbelaidorinstalledinaplacewhere
suchdeteriorationislikelytooccur.Nopipethatispermeabletoanycontaminantshallbelaidorinstalledin
anypositionwherepermeationislikelytooccur.
h) Ifaliquid(otherthanwater)isusedinanytypeofheatingprimarycircuit,whichtransfersheattowaterfor
domesticuse,theliquidshallbenontoxicandnoncorrosive.
i)
A backflow prevention device shall be arranged or connected at or as near as practicable to each point of
deliveryanduseofwater.Applianceswithbuiltinbackflowpreventionshallbecapableofpassingthetest.
All backflow prevention devices shall be installed so that they are accessible for examination, repair or
replacement.SuchdevicesshallbecapableofbeingtestedperiodicallybytheAuthoritytoensurethatthe
deviceisfunctioningefficientlyandnobackflowisoccurringatanytime.
5.16
LAYINGOFPIPESONSITE
5.16.1
ExcavationofTrenchesandRefilling
a) Thebottomsofthetrenchexcavationsshallbesopreparedthatthebarrelsofthepipes,whenlaid,arewell
beddedfortheirwholelengthonafirmsurfaceandaretruetolineandgradient.
b) Intherefillingoftrenches,thepipesshallbesurroundedwithfineselectedmaterial,wellrammedsoasto
resistsubsequentmovementofthepipes.
c) Nostonesshallbeincontactwiththepipes;whenrestingonrock,thepipesshallbebeddedonfineselected
materialor(especiallywherethereisasteepgradient)onalayerofconcrete.
d) Thewidthofexcavationtrenchshallbeatleast0.4mmorethantheoutsidediameterofthepipe.
e) The depth of ground cover shall be at least 0.9 m under roadway or 0.75 m under garden from the top
surfaceofthepipetothegroundsurface.
8230
Vol.3
WaterSupply
f)
Chapter5
Thebottomofthetrenchshallbecarefullypreparedsothatthepipewillbebeddedwellforitsentirelength
onfirmsurface.
5.16.2
LayingofPipe
a) Thepipesshallbecarefullyclearedofallforeignmatterbeforebeinglaid.
b) Inslopingground,thepipelayingshallproceedinupwarddirection.Thepipeshallbeprovidedwithanchor
blockstowithstandhydraulicpressure.
5.16.3
LayingofPipeThroughDucts,Chases,NotchesorHoles
Provisionsforlayingpipesinductsorchaseshallbemadeduringthetimeofconstruction.Whenthesewillbecut
into existing walls, they shall be large enough with smooth finishing for fixing the pipe and to accommodate
thermalexpansion.Pipingsubjecttoexternalpressureshallnotbelaidinnotchesorholes.
5.16.4
LaggedPiping
Laggedpipingshallbeentirelycoveredwithwaterproofandfireinsulatingmaterialsbeforetheirattachmentto
the walls outside the building and shall be anchored with the wall keeping a gap in between the wall and the
piping.
5.16.5
JointingofPipes
Alljointsandconnectionsshallbegastightandwatertightforthepressurerequiredbythetestinaccordance
withSec5.22.2.Thejointsbetweendifferentpipingandfittingsforwatersupplyshallconformtothestandards
citedagainsttheminTable8.5.13.Therequirementsforthejointsnotspecifiedinthetableshallbesubjecttothe
approvaloftheAuthority.
Table8.5.13:JointsBetweenDifferentPipingandFittings
Material
Standard
ABSplasticpipeandfittings
Asbestos,cementpipeandfittings
ASTMD1869
Brasspipeandfittings
ASMEB1.20.1
Castironpipeandfittings
ASTMC564
Copperandcopperalloypipeandfittings
ASTMB32,ASMEB1.20.1
PVCplasticpipeandfittings
Galvanizedsteelpipeandfittings
ASMEB1.20.1
PBplasticpipe,tubingandfittings
PEplasticpipe,tubingandfittings
ASTMD2657
PVCplasticpipeandfittings
5.16.6
SpecialCareforRatProofing
The location and installation of water meter box shall be such as not to permit the entrance of rats into the
building.Theopeningsthroughwalls,floorsorceilingsfortheinstallationofpipingshallbeclosedbyusingproper
collarstopreventtheentranceofrats.
BangladeshNationalBuildingCode2011
8231
Part8
BuildingServices
5.17
HANGERSANDSUPPORT
Thepipingsystemshallbeinstalledwithproperhangersandsupporttominimizeunduestrainsandstresses.All
fixturesandfittingsshallbeprovidedwithhangersandsupporttosecurethemproperly.
5.17.1
Galvanicaction
Hangers,anchorsandstrappingmaterialsshallbestrongandductileandshallnotpromotegalvanicaction.
5.17.2
HangerSpacing
VerticalandhorizontalpipingshallbesupportedinaccordancewithTable8.5.14.
Table8.5.14:HangerSpacing
PipingMaterial
Max.Horizontal
Max.Vertical
Spacing(m)
Spacing(m)
Galvanizedsteelpipe
3.5
4.5
Copperpipeorcopperalloytubing>38mmdiameter
3.5
3.0
Copperpipeorcopperalloytubing<38mmdiameter
2.0
3.0
PVCpipeandtubing
1.0
1.0
Aluminiumtubing
3.0
4.5
Brasspipe
3.0
3.0
5.18
PROTECTIONOFPOTABLEWATERSUPPLY
5.18.1
Crossconnection
Potable water supply system shall be protected against nonpotable water sources or wastes (solid, liquid or
gases). There shall be no crossconnection between potable water distribution system and nonpotable water
distributionorwastedisposalsystem.
5.18.2
Submergedoutlet
Frompotablewatersupplysystemshallbeavoided.Connectionofpotablewatertoboilerfeedwatersystem,or
heatingorcoolingsystemshallbemadethroughproperairgap.
5.18.3
Coolingwater
Waterusedforcoolingorforotherpurposesshallnotbereturnedtothepotablewatersupplysystem.
5.18.4
Backflow
Potable water supply system shall be protected against backflow either by air gap or by back flow preventor.
Reflexnonreturnvalveshallnotbeusedforthispurpose.Detailshavebeenexplainedinsection5.15.2.
5.18.5
BackflowProtections
The connection of potable water for health care plumbing fixtures shall be protected against backflow in
accordancewithTable8.5.15.
5.18.6
AirGap
The minimum air gaps for different water supply openings or outlet shall be at least 3 times the effective
opening when they will be placed close to a wall. The minimum air gaps shall be at least 2times the effective
openingwhentheywillbelocatedawayfromawall.
8232
Vol.3
WaterSupply
Chapter5
Table8.5.15:WaterSupplyProtectionforHospitalFixtures
5.18.7
Fixtures
ProtectionsRequired
Aspirators
Vacuumbreaker
Bedpanwasher
Vacuumbreaker
Boilingtypesterilizer
Airgap
Exhaustcondenser
Vacuumbreaker
Flushfloordrain
Vacuumbreaker
Houseconnection
Vacuumbreaker
Pressuresterilizer
Vacuumbreaker
Vacuumsystem
Airgaporvacuumbreaker
(cleaningandfluidsection)
Potablewatersupplyconnectiontoanycisternorapparatuscontainingchemical(s)shallbedoneonlywiththe
specialapprovalforsuchconnectionbytheAuthorityandshallbemarkedbyatag.
5.18.8
Allpipingandfittingshallbedesigned,installedandmaintainedastobeandtoremaincompletelyairtightand
therebyavoidingwasteofwater,damagetopropertyandtoavoidtheriskofcontamination.
5.18.9
Nonpotablewatersupplysystemshallhavetobepaintedandmarkedbyatag.
5.18.10
Flushingvalveoperatedwaterclosetswheninstalledinanybuildingshallbesuppliedthroughaseparatebranch
pipewithabackflowpreventeratthestartingpointwherethebranchpipeistakenofffromthesupplypipe.
5.19
HEALTHCAREWATERSUPPLY
5.19.1
GeneralRequirement
Allhospitalsshallhaveatleasttwoservicepipesfromtheindividualwatersupplysourceorfromthewatermain
forsupplyingwaterwithoutanyinterruption.Forroofstoragesystem,thehospitalshallhaveatleasttwostorage
tanks such that each of them is capable of serving the water distribution system in absence of the other. All
specialfixturesshallbeinstalledwithoutinterferencetothetransportationandtothesafetyofpatientandstaff.
5.19.2
HotWaterSupply
Allhospitalsshallbeequippedtosupplyhotwaterasrequiredbydifferentfixturesandequipment.
5.19.3
WaterSupplyProtection
The water supply connection to all special equipment or fixtures shall be protected against backflow, flooding,
foulingandcontaminationofwatersupplysysteminaccordancewithSection5.9.
5.20
CLEANINGANDDISINFECTINGTHESYSTEM
5.20.1
General
Thenewandrepairedpotablewatersupplysystemincludingstoragetankshallbedisinfectedbeforetheiruse.
The existing water supply system shall be cleaned and disinfected depending upon the quality of water. The
storagetankshallbecleanedanddisinfectedatleastonceayear.
BangladeshNationalBuildingCode2011
8233
Part8
BuildingServices
5.20.2
DisinfectionProcedure
Thefollowingproceduremaybeadoptedtodisinfecttheplumbingsystem:
a) Thewatersupplysystemorstoragetankshallbeflushedwithpotablewateruntilcleanwaterappearsatthe
outlets.
b) Thesystemorpartthereofwhichrequiresdisinfectionshallbefilledupwithchlorinatedwatercontaining50
mg/lofchlorinefor24hoursorfor3hourswithachlorinatedwaterofchlorineconcentrationof200mg/l.
c) After the period of disinfection, the system shall be flushed with potable water until the chlorine is
completelyremovedfromthewaterinthesystem.
d) The above procedureshall berepeateduntil thebacteriologicalexamination shows presence of no water
contaminationwithinthesystem.
5.21
INSPECTION,TESTINGANDCOMPLETIONCERTIFICATE
5.21.1
Inspection
Pipingandjointsshallnotbeenclosed,concealedorcovereduntiltheyhavebeeninspectedandapprovedbythe
Authority. All piping and fixtures shall be inspected for satisfactory supports and protection from damage and
corrosion.
5.21.2
Testing
After installation of the entire water supply system or part thereof, it shall be tested and approved by the
Authoritybeforeitsuse.
a) Testing of Water Mains : The section of the main to be tested shall be charged with water carefully by
providinga25mminletwithastopcocktoexpelallairfromthemain.Themainshallbeallowedtostandfull
ofwaterforafewdays.Afterthatthemainsshallbetestedtoapressureof500kPaordoublethemaximum
workingpressure,whicheverisgreaterforatleast5minutes.Thesystemshallbeabletomaintaintheabove
testpressure.
b) TestingofDistributionPipesandFixtures:Thedistributionsystemtobetestedshallbeslowlyandcarefully
chargedwithwatertoexpelallairfromthesystemandtoavoidallshocksandwaterhammer.Thepipingand
fittingsshallbeabsolutelywatertightwhenalldrawofftapsareclosed.Thesystemshallbeabletomaintain
thepressuresandflowrequiredunderworkingconditions.
c) Testing of Hot Water System : The entire hot water system shall be tested for the maximum rated
temperatureandpressureofhotwaterstoragesystem.Thesystemshallbeabletomaintaintherequired
testpressure.Allsafetydevicesshallbetestedfortheirproperoperation.
5.21.3
CompletionCertificate
Thelicensedplumbershallissuecompletioncertificateinaprescribedform(Appendix8.5.B)totheAuthorityon
completionofthewatersupplysystemorpartthereofforinspectionandtesting.Aftertesting,theAuthoritywill
allowthewaterconnectionfromthewatermain(ifany)andgivethefinalapproval(Appendix8.5.B)tousethe
system.
5.22
GUIDETOMAINTENANCE
Theownerorhis/herdesignatedagentshallmaintainthewatersupplysysteminasafeoperatingcondition as
specifiedbytheCode.
8234
Vol.3
WaterSupply
5.22.1
Chapter5
FrequencyofCleaning
The storage tank shall be inspected regularly and shall be cleaned and disinfected periodically. Metal tanks
showingthesignofcorrosionshallbecoatedasspecifiedinSection5.9.2.2.
5.22.2
OverflowPipe
Theoverflowpipesofstoragetankshallbeinspectedregularlytokeeptheflowfreefromobstruction.
5.22.3
WaterQuality
Aperiodicalexaminationofwaterqualitymaybemade.
5.23
INDIVIDUALWATERSUPPLYSYSTEM
5.23.1
General
Intheabsenceofapublicwatersupply,the individualpotablewatersourceshallbeusedtosupplywaterina
distributionsystem.Thefollowingwatersourcesmaybeusedforindividualwatersupplypurposes:drilledwell,
dugwell,drivenwell,spring,infiltrationgallery.
5.23.2
WaterRequirements
ThecapacityofsourceshallbesufficienttosupplywaterasspecifiedinSection5.5.
5.23.3
QualityofWater
Water from developed well or cistern shall meet the potable water quality standard requirements specified by
theDepartmentofEnvironment,Bangladesh.
5.23.4
Chlorination
Thewellorcisternshallbechlorinatedaftertheirconstructionorrepair.
5.23.5
LocationofWaterSource
Theminimumdistanceofwatersourceandpumpsuctionlinefrompotentialsourcesofcontaminationshallbein
accordancewithTable8.5.16.
Table8.5.16:DistancefromPotentialSourcesofContamination
PotentialSourceofContamination
Distance(m)
Pumpfloordrainofcastiron,drainingtogroundsurface
Sewer
Farmsilo
Septictank
Subsurfacepit/Seepagepit
15
Subsurfacedisposalfield
15
Barnyard
30
Pasture
30
5.23.6
WellConstruction
5.23.6.1
LocationofWaterTable
Theindividualwatersupplyshallnotbedevelopedfromawaterbearingstratumwithwatertableatadepthless
than3mbelowthegroundsurface.
BangladeshNationalBuildingCode2011
8235
Part8
BuildingServices
5.23.6.2
OutsideCasing
The outside watertight casing shall have to be installed for each well up to a depth of at least 3 m below the
groundsurfaceandshallprojectatleast150mmabovethegroundsurface.Thelowerendofthecasingshallbe
sealedinanimpermeablestratumorextendintothewaterbearingstratum.Thesizeofthecasingshallbelarge
enoughtopermittheinstallationofanindependentdroppipe.Thecasingmaybeofconcrete,tile,orgalvanized
or corrugated metal pipe. The annular space between the casing and the earth shall be filled with grout to a
minimumdepthof3m.Forfloodproneregions,topofthecasingorpipesleeveshallbeatleast300mmabove
thefloodlevel.
5.23.6.3
WellCover
Allpotablewellsshallbeequippedwithawatertightcoveroverlappingthetopofthecasingorpipesleeve.Fordugorboredwell,
theoverlapanddownwardextensionofthecovershallbeatleast50mmoutsidethewellcasingorwell.Theannularspacebetween
thecasingorpipesleeveandthedroppipeshallhaveawatertightsealing.
5.23.6.4
DrainagefromWellPlatformorPumpHouse
Theconstructionofwellplatformorpumphouseshallbesuchthatthiswilldrainawayfromthewellbygravity.
5.23.7
PumpingEquipment
Thedesign,installationandconstructionofpumpsshallbesuchthattheywillnotpermittheentranceofanycontaminatingmaterial
intothewellorwatersupplysystem.Thepumpshallbeaccessibleforinspection,maintenanceandrepair.
RelevantAppendices:
Appendix8.5.A ApplicationforPermittoConstructWaterSupplyandDistributionSystem
Appendix8.5.BCompletionCertificate(WaterSupplyWorks)
Appendix8.5.C SizingofColdWaterSupplyandDistributionPiping
Appendix8.5.D RecommendedWaterQualityforDomesticPurposes.
8236
Vol.3