Status of National Highway Projects (EPC) in SPS Nellore District as on 11

Sanctioned cost

Sl.
No.

NH No.

PWD
Div.

Name of Work

Date of
Sanction

Job No.
Length (in km)

565

Kadapa

Rehabilitation and
augmentation from km.425/400
565 AP
to 509/400 of existing NH-565
NHDPIV
of Penchalakona to Yerpedu
2013 - 015
section in Andhra Pradesh
Dt.06.01.20
under NHDP Phase IV on
14
EPC contract basis

Expenditur

Original

83.58

Awarded cost
Appointed date

2014-15
Date of
Completion

Revised

361.30

Agt.Date

361.30

Exp during
2014-15 up to
3/15

10

11

12

06.01.201
4

200.69

19.5.14
31.7.14

30.07.16

44.09

file:///var/www/apps/conversion/tmp/scratch_2/300169339.xlsx

Sanctioned cost

Sl.
No.

NH No.

PWD
Div.

Name of Work

Date of
Sanction

Job No.
Length (in km)

565

Kadapa

Rehabilitation and upgradation


565 AP
of NH-565 from km.294/0 to
NHDPIV
361/327 (Vaggampalle to
2014 - 026
Dornala
T-junction Sec) in
Dt.04.02.20
Andhra Pradesh under NHDP
14
Phase IV on EPC

Expenditur

Original

67.30

Awarded cost
Appointed date

2014-15
Date of
Completion

Revised

258.99

Agt.Date

258.99

Exp during
2014-15 up to
3/15

10

11

12

04.02.201
4

160.20

04.6.14
02.7.14

01.7.16

16.5376

file:///var/www/apps/conversion/tmp/scratch_2/300169339.xlsx

Sanctioned cost

Sl.
No.

NH No.

PWD
Div.

Name of Work

Date of
Sanction

Job No.
Length (in km)

67

Kadapa

Rehabilitation and upgradation


67 AP
from km.641/0 to 695/0 of NHNHDPIV
67
(Dornala T Junction to
2014 - 03
Atmakur) of NH 67 in Andhra
Dt.15.07.20
Pradesh under NHDP Phase
14
IV on EPC

Expenditur

Original

53.00

Awarded cost
Appointed date

2014-15
Date of
Completion

Revised

251.55

Agt.Date

251.55

Exp during
2014-15 up to
3/15

10

11

12

15.07.201
4

154.80

23.2.15
26.2.15

25.2.17

7.7401

file:///var/www/apps/conversion/tmp/scratch_2/300169339.xlsx

Sanctioned cost

Sl.
No.

NH No.

PWD
Div.

Name of Work

Date of
Sanction

Job No.

67

365&5
65

Kadapa

Rehabilitation and upgradation


of NH 67 from Km 695/0 to
741/950 (Atmakur to Nellore
section) in the State of A.P. to
two lane with paved shoulders
under NHDP IV on EPC Basis
(Kadapa)

067 AP
NHDP IV
2014-15
-013 dt 1410-2014

44.50

Kadapa

Length (in km)

Expenditur

Estimate for Consultancy


services for preparation of
feasibility study report for
development of NHs in the
State of A.P under NHDP IV
(EPC Mode) (Vijayawada)

365&565A.P.-NHDP
IV -2013-14
-25
dt
14-02-2014

Original

Agt.Date
Awarded cost
Appointed date

2014-15
Date of
Completion

Revised

Exp during
2014-15 up to
3/15

10

11

12

24.02.17

12.5755

297.78

329.57

14-102014

251.51

10.12.14
25.2.15

2.97

2.97

14-022014

0.4675

10-10-14
17.10.14

file:///var/www/apps/conversion/tmp/scratch_2/300169339.xlsx

16.10.15

0.071

Sanctioned cost

Sl.
No.

NH No.

PWD
Div.

Name of Work

Date of
Sanction

Job No.
Length (in km)

Expenditur

Total

248.38

Original

Awarded cost
Appointed date

2014-15
Date of
Completion

Revised

1172.59

Agt.Date

Exp during
2014-15 up to
3/15

1204.38

767.67

file:///var/www/apps/conversion/tmp/scratch_2/300169339.xlsx

10

11

12

81.0142

PS Nellore District as on 11.12.2015


Amount Rs. in Crore
Length completed in Km.

current month Total


in Rs. Crores
in Rs. Crores

0.000

110.04

current month

Total

17

upto previous
month

16

18

19

20

DBM=0.00

65.9487

15

DBM=48.81

Up to 2014-15

Up to previous
month 11/2015

14

2015-16

DBM=13.25

2015-16

62.060

Expenditure Details

Overall
phy. Prog.
(%)

Agency

Remarks ( in KMs)

21

22

23

74

Clear & Grub = 73.681


Embankment = 73.681
Sub-Grade= 73.681
GSB= 70.428
WMM1st = 70.628
WMM-2nd
= 70.628
DBM = 62.060
BC=30.405
Box & Slab
Culverts
= 27 Nos
Completed,
H.P. Culverts =
78 Nos. Completed.
M/s KNR
MNB
(New)
Constructi
01
No.
Completed
ons Ltd.
MNB (Re-Construction)
02 Nos. Completed

Utility Ducts =
6 No. Completed.
Further work is under progress

file:///var/www/apps/conversion/tmp/scratch_2/300169339.xlsx

Length completed in Km.

current month Total


in Rs. Crores
in Rs. Crores

0.000

64.65

current month

Total

17

upto previous
month

16

18

19

20

DBM=0.00

48.11

15

DBM=47.97

Up to 2014-15

Up to previous
month 11/2015

14

2015-16

DBM=NIL

2015-16

47.970

Expenditure Details

Overall
phy. Prog.
(%)

Agency

Remarks ( in KMs)

21

22

23

71

Clear & Grub = 54.695


Embankment = 53.695
Sub-Grade = 52.845
GSB =
50.985
WMM 1st =
48.835
WMM 2nd =
48.170
DBM = 47.97 Kms
BC= 38.300 Kms
HP Culverts =
M/S Dilip
31 Nos. Completed
buildcon
Limited,B
Box Culverts =
hopal
34 Nos. Completed,

MNB(New)
7 No. Completed.
MNB (Widening)
2
Nos. Completed
MNB
(Re-Construction)
5
No.s Completed.
Further work is under progress

file:///var/www/apps/conversion/tmp/scratch_2/300169339.xlsx

Expenditure Details

Length completed in Km.

current month Total


in Rs. Crores
in Rs. Crores

0.0000

15.48

current month

Total

17

upto previous
month

16

18

19

20

DBM=0.0

7.7401

15

DBM=0.0

Up to 2014-15

Up to previous
month 11/2015

14

2015-16

DBM=0.0

2015-16

Overall
phy. Prog.
(%)

Agency

Remarks ( in KMs)

21

22

23

M/s SRK
Clear & Grub = 13.50
Constructi
Sub-Grade = 3.675
ons &
GSB = 3.56
Projects
WMM-1st = 0.88
pvt.
Further work is in progress
Ltd.Hyd

file:///var/www/apps/conversion/tmp/scratch_2/300169339.xlsx

Length completed in Km.

current month Total


in Rs. Crores
in Rs. Crores

current month

Total

17

18

19

20

17.16

0.0000

29.74

PQC=0.0

16

PQC=0.0

15

upto previous
month

Up to previous
month 11/2015

14

2015-16
Up to 2014-15

2015-16

0.224

0.000

0.295

Overall
phy. Prog.
(%)

Agency

Remarks ( in KMs)

21

22

23

PQC=0.0

Expenditure Details

Clear & Grub = 22.75 Embankment


M/S
= 18.50
Sub Grade = 8.250
BSCPL
Box Culverts =
Infrastruct
12 Nos Completed.
ure Ltd
Further work is in progress

M/s K&J
Projects
Pvt., Ltd

Land plan schedules for 3(A)


submitted to MORT&H New Delhi

file:///var/www/apps/conversion/tmp/scratch_2/300169339.xlsx

Expenditure Details

Length completed in Km.

current month Total


in Rs. Crores
in Rs. Crores

15

16

139.1828

0.00

220.197

17

Total

14

current month

Up to previous
month 11/2015

upto previous
month

2015-16
Up to 2014-15

2015-16

18

19

20

Overall
phy. Prog.
(%)

Agency

Remarks ( in KMs)

21

22

23

Executive Engineer (R&B)


NH Division, Kadapa.