Vous êtes sur la page 1sur 10

Lift Well Pressurization

Width
Door Size
Total No. of Doors
Leakage from
Dooor at each mid landing
Door at terrace level
Door at Ground Level
1

Basement
Height
0.9
19

to
2.4 m

Closed Door Leakage calculation-:

Perimeter -:
6.6 m
Gap-:
5 mm
Total no. of leakage doors-:
Total Leakage area-:
0.594 Sqm
Pressure Diff-:
50 Pa
Air Leakage-:
0.827xLeakage AreaxP.D.
3 CMS
7356 CFM
2
Open Door Leakage Calculation-:

18

Door Area-:
2.16 Sqm
Assuming No. of Doors open
1
Air Leakage-:
Door AreaxNo. open Of doorsxVelocity
1.620 CMS
3431 CFM
Total Area Quantity-:
10786 CFM
Add 5% Duct leakage

11326 CFM

Seventeenth

Lift Well Pressurization


Width
Door Size
Total No. of Doors
Leakage from
Dooor at each mid landing
Door at terrace level
Door at Ground Level
1

Basement
Height
0.9
15

to
2.4 m

Closed Door Leakage calculation-:

Perimeter -:
6.6 m
Gap-:
5 mm
Total no. of leakage doors-:
Total Leakage area-:
0.462 Sqm
Pressure Diff-:
50 Pa
Air Leakage-:
0.827xLeakage AreaxP.D.
3 CMS
5721 CFM
2
Open Door Leakage Calculation-:

14

Door Area-:
2.16 Sqm
Assuming No. of Doors open
1
Air Leakage-:
Door AreaxNo. open Of doorsxVelocity
1.620 CMS
3431 CFM
Total Area Quantity-:
9152 CFM
Add 5% Duct leakage

9609 CFM

Thirteenth

Thirteenth

Lift Well Pressurization


Width
Door Size
Total No. of Doors
Leakage from
Dooor at each mid landing
Door at terrace level
Door at Ground Level
1

Basement
Height
0.9
16

to
2.4 m

Closed Door Leakage calculation-:

Perimeter -:
6.6 m
Gap-:
5 mm
Total no. of leakage doors-:
Total Leakage area-:
0.495 Sqm
Pressure Diff-:
50 Pa
Air Leakage-:
0.827xLeakage AreaxP.D.
3 CMS
6130 CFM
2
Open Door Leakage Calculation-:

15

Door Area-:
2.16 Sqm
Assuming No. of Doors open
1
Air Leakage-:
Door AreaxNo. open Of doorsxVelocity
1.620 CMS
3431 CFM
Total Area Quantity-:
9560 CFM
Add 5% Duct leakage

10038 CFM

Fourteenth

Fourteenth

Lift Well Pressurization


Width
Door Size
Total No. of Doors
Leakage from
Dooor at each mid landing
Door at terrace level
Door at Ground Level
1

Basement
Height
0.9
14

to
2.4 m

Closed Door Leakage calculation-:

Perimeter -:
6.6 m
Gap-:
5 mm
Total no. of leakage doors-:
Total Leakage area-:
0.429 Sqm
Pressure Diff-:
50 Pa
Air Leakage-:
0.827xLeakage AreaxP.D.
3 CMS
5313 CFM
2
Open Door Leakage Calculation-:

13

Door Area-:
2.16 Sqm
Assuming No. of Doors open
1
Air Leakage-:
Door AreaxNo. open Of doorsxVelocity
1.620 CMS
3431 CFM
Total Area Quantity-:
8743 CFM
Add 5% Duct leakage

9180 CFM

Twelth

Twelth

Baesement staircase pressurization calculation All Towers


Staircase Pressurization
Width
Door Size
Total No. of Doors
Leakage from
Dooor at each mid landing
Door at terrace level
Door at Ground Level

Basement
Height
1.2
2

to
2.4 m

Closed Door Leakage calculation-:


Perimeter -:
7.2 m
Gap-:
5 mm
Total no. of leakage doors-:
Total Leakage area-:
0 Sqm
Pressure Diff-:
50 Pa
Air Leakage-:
0.827xLeakage AreaxP.D.
0 CMS
0 CFM
Open Door Leakage Calculation-:

Door Area-:
2.88 Sqm
Assuming No. of Doors open
2
Air Leakage-:
Door AreaxNo. open Of doorsxVelocity
4.320 CMS
9148.235294118 CFM
Total Area Quantity-:
9148.235294118 CFM
Add 5% Duct leakage

9605.647058824 CFM

Ground

Vous aimerez peut-être aussi