Académique Documents
Professionnel Documents
Culture Documents
To ensure continued good performance of our operations and cementing wells to increase
the quality of operations, cementing Service Company must provide equipment, personnel
and materials as requested in accordance with our technical task from tender.
Technical task from tender included estimation of necessary equipment, personnel, cement
and cement additive, along with a support package like
-Design cementing operations
-Analysis complete the necessary laboratory
-Post job analyze
- Engineering technical support
The cementing package are sized for 3 drilling and 1-2 WO rigs activity .For overlap
operations ,we must have option for on call equipment (pump unit and BMX) and personal if
is required.
These charges for one package are inclusive of all cementation and pressure testing
operations like:
Casing cementing,
Cementing plugs and remedial operations
BOP & all related surface well control equipment, Wellhead,
Completion packer set,
FIT, LOT
Normal package are include:
Materials
Chemicals
Following chemicals will also be stocked and supplied by the contractor, as required per job:
Laboratory tests facility available to run a standard test as per API RP 10 B and additional;
Cemstress analyze
SGSA test (gel strength analyze)
Compatibility tests,
Gas migration risk test