MANCOM REPORT
DATE: October 21, 2015
PROJECT
ITEMS
CURRENT STATUS
ON -GOING WORKS
IN-CHARGE
CURRENT TARGET
B. HOUSING COMPONENTS
Paolo
Revised as of 9/18/15
as per MBF comments
MJ
MJ
1. DASMARIAS
Duplex
Revised as of 9/18/15
as per MBF comments
MJ
MJ
Mariz
Options for with/without elevator plan.
(Flexible Plan)
C. AMENITIES
Clubhouse
Gate and Guardhouse
Commercial Center
D. ROAD SECTIONS
E. SCALE MODEL
For schematic
Hold
Scheme as of 9/18/15
For design parameters verification
Scheme as of 9/18/15
Scheme as of 9/18/15
For design parameters verification
Scheme as of 9/18/15
MJ
DONE
Mariz
DONE
MJ
DONE
Paolo
DONE
Paolo
PROJECT
ITEMS
A. MIRABELLE
CURRENT STATUS
On-going
ON -GOING WORKS
On-going
IN-CHARGE
Mariz
Mariz
DONE
Submitted October 09,2015
Mariz
DONE
Submitted October 09,2015
Landscaping
Mariz
DONE
Submitted October 09,2015
Paolo
DONE (Oct 8)
Print two schemes (Blue and Peach)
Mariz
2. AUREVILLE
C. MODEL 66 SQ M
DONE
Landscaping Update
Compilation of Engineering
Drawings as per Ar. Dupher's
update
Studies c/o BRB
DONE
MJ
aa. PHOEBE
bb. TIARA
D. SIGNAGE PYLON
F. COMMERCIAL CENTER
Submitted Oct. 6
C. LINEAR PARK
E. SHOPHOUSE
CURRENT TARGET
DONE
Submitted October 09,2015
Landscaping
B. CRISTELLE
Working drawings
For schematic layout
DONE
For scheduling
For presentation
4. PACIFIC GRAND
TOWNHOMES
For scheduling
Paolo
For scheduling
Paolo
B. AMENITY AREA
Interior Design
Mariz
A. PLANTING STRIP
B. RFO UNITS
5. COSTA SMERALDA
C. FOR BUILDING PERMIT APPLICATION
DONE
Mariz
Paolo
Paolo
PROJECT
ITEMS
CURRENT STATUS
ON -GOING WORKS
OLIVIA-Blk 14 Lot 17
(Vincent/Emilyn Gocotano)
OLIVIA-Blk 13 Lot 17
(Ylette/Benjie Rocha)
For scheduling
Paolo
OLIVIA-Blk 1 Lot 10
Julie Ann Agbang
OLIVIA-Blk 1 Lot 12
Michael Delima
For scheduling
Paolo
6. PGV PHASE 1 to 4
IN-CHARGE
CURRENT TARGET
A. MRB CONDOMINIUM
Submitted Oct. 6
MJ
DONE
Schematic Study
Mariz
DONE
Paolo
DONE
Mariz
A. MARILAO TOWNSHIP
B. MRB CONDOMINIUM
Mariz
MJ
Research
B. PHILGBC
Mariz
Acquired Application/Membership Forms
DPD ID: Complete
Mariz
PROJECT
A. Site
Developme
nt Plan
REMARKS
CURRENT
IN-CHARGE
& ISSUES
TARGET
Transfer
Dwgs to
CAD file
(Site Devt.
Updated Drawin
Plan, Topo
Maps) as
per MBF
comments
Paolo
Land Data
Computati Updated Comput Paolo
ons
Waiting for
comments
/
B. HOUSING corrections
as per
concerning
dept.
Single
Revised as
Detached of 9/14/15)
MJ
Routing of
drawings
for
comments
(9/15/15)
MJ
Revised as
of 9/14/15)
MJ
Routing of
drawings
for
comments
(9/15/15)
MJ
Scheme as
of 9/11/15
MJ
DONE
Gate and
Scheme as
Guardhous
of 9/14/15
e
Mariz
DONE
Commercia Scheme as
l Center of 9/14/15
MJ
DONE
For
Scheme as
schematic of 9/14/15
Paolo
DONE
Duplex
1. DASMA
C. AMENITIE
D. ROAD SE
Clubhouse
E. SCALE
Submitted
to Ms Linda
Preliminary
G. comments
Drawings
On-going
on Sept.
(Walnut
28-29;
Creek
follow-up
Residences
) 9/15/15
Interior For
A. MIRABELL On-going Decoration inventory
- Final
encoding
For
Landscapin inventory
g
and update
w/ Romar
Interior For
B. CRISTELL On-going Decoration inventory
- Final
encoding
2.
AUREVIL
LE
Paolo
Ist week of
Oct.
Mariz
Week 38
(Sept 1418)
Mariz
Mariz
Week 38
(Sept 1418)
For
Landscapin inventory
g
and update
w/ Romar
Mariz
For
For
schematic
comments
floor plan,
c/o BRB
Perspective
Paolo
9/17/2015
D. Entrance Statement
Ff up
Landscapin
Engineerin
g Update
g
Mariz
Week 38
(Sept 1418)
A. Planting
Strip
For
schematic For
site
landscape
developme quotation
nt layout
Mariz
Week 38
(Sept 1418)
Verify sales
Ff up Ms.
and docs
Al (Sales
departmen
Doc)
t
Paolo
Janella- Blk
Pouched to
15 Lot 18;
Iloilo
Natalia- Blk
(9/17/15)
15 Lot 24
Paolo
C. MODEL 6
DONE
3. COSTA B. RFO
SMERAL Units
DA
C. FOR
BUILDING
PERMIT
APPLICATIO
N
DONE
4. PGV
PHASE 1
to 4
aa. Phase
A. FOR BUIL
4A (2
units)
OLIVIA-Blk
14 Lot 17 For
OLIVIA-Blk scheduling
13 Lot 18
Paolo
Next Week
aa. Phase
4B (2
units)
OLIVIA-Blk
1 Lot 10 For
OLIVIA-Blk scheduling
1 Lot 13
Paolo
Next Week
For
scheduling
Paolo
For
scheduling
Paolo
A. FOR
BUILDING
aa. Block 2
5.
PERMIT
Cluster- 5
PACIFIC APPLICATIO
units
N (OLD
GRAND
TOWNHO VICTORIA)
MES
bb. Block 5
Cluster- 2
units
Compilatio
n of
Engineerin
6.
g Drawings
Coordinatio
PACIFIC
as per Ar.
A. Site Development Pla
n with Ar.
Dupher's
GRAND
Dupher
update
VILLAS 5
Studies c/o
BRB
aa.
B. House Mo
PHOEBE
MJ
For
updating of For
Mariz & Paolo
plans
scheduling
comments
For
updating of For
bb. TIARA
Mariz & Paolo
plans
scheduling
comments
C. Linear Park
For
architectur
al working
drawings
D. Signage Pylon
For
finalization
of working
drawings
E. Shophouse
F. Commercial Center
Working
drawings
For
For
schematic
scheduling
layout
DONE
Proposal's
Comparativ
e Analysis
A. Marilao Township
7.
SCHEMA
TIC SITE
Proposal's
RESEARC
B. Jaro Grand Estates, S Comparativ
H
e Analysis
For Site
Scheme
Furnish
A. Updating of Floor Pla copy to
Logistics
Mariz
8-Sep
Mariz
8-Sep
8-Sep
Review of
supplier /
B. Costing study of carp
contractors
quotation
8. MAIN
OFFICE
INTERIO
R
RENOVAT C. Interior
ION
layout
For
study of
schematic
Finance
study
Departmen
t
Paolo
DONE
Logistics
DONE
Already got
a copy of
organizatio
nal
Paolo
structure of
Finance
Departmen
t
registered
9.
Sept
CPE/Trai
a. Green Co 24,2015;
ning and
Expos
SMX, MOA
Complex,
registered
Oct
b. PHILCON
8-11,
2015;
10:00am6:00pm
SMX, MOA
Complex,
Copy of
preregistration
Mariz
confirmatio
n code on
file
Copy of
preregistration
Mariz
confirmatio
n code on
file
Approved
by AAH
registered
Oct
8-11,
2015;
10:00am6:00pm
SMX, MOA
Complex,
d. Real Esta Research
c. Manila F
For
inquiries:
Application
e. PHILGBC
/
Membershi
p forms
Copy of
preregistration
Mariz
confirmatio
n code on
file
Mariz
MMY/MJM
ID ff up
HRD
Mariz