Vous êtes sur la page 1sur 9

DESIGN & PLANNING DEPARTMENT

MANCOM REPORT
DATE: October 21, 2015
PROJECT

ITEMS

CURRENT STATUS

ON -GOING WORKS

REMARKS & ISSUES

IN-CHARGE

CURRENT TARGET

(Walnut Creek Residences)


Horizontal Development Proposal:
Updated Drawings (as of 9/18/15)
as per MBF comments
Vertical Dev't. Proposal:
Initial design concept submitted
10/6/15

A. SITE DEVELOPMENT PLAN

Land Data Computations


Single Detached

B. HOUSING COMPONENTS

Waiting for comments / corrections as per


concerning dept.

Vertical Development Proposal:


-Study scheme for condominium
development
-Verify zoning and density compliance
-Follow up Rc. Dupher re: computation
-7-10 storeys suggestion to EAT
Updated Computations
(as of 9/18/15) as per MBF comments

Paolo

Revised as of 9/18/15
as per MBF comments

MJ

Routed drawings for comments (9/15/15)

MJ

Furnish template of design memo

1. DASMARIAS
Duplex

Revised as of 9/18/15
as per MBF comments

MJ

Routed drawings for comments (9/15/15)

MJ

schematic study for typical floor level


layout
Condominium Plan Study

Mariz
Options for with/without elevator plan.
(Flexible Plan)

C. AMENITIES

Clubhouse
Gate and Guardhouse
Commercial Center

D. ROAD SECTIONS
E. SCALE MODEL

For schematic
Hold

Submitted to Ms Linda G. Drawings (Walnut Creek


Residences) 9/15/15

Scheme as of 9/18/15
For design parameters verification
Scheme as of 9/18/15
Scheme as of 9/18/15
For design parameters verification
Scheme as of 9/18/15

Hold (September 24, 2015)

MJ

DONE

Mariz

DONE

MJ

DONE

Paolo

DONE

Paolo

Ist week of Oct.

PROJECT

ITEMS
A. MIRABELLE

CURRENT STATUS
On-going

ON -GOING WORKS

On-going

IN-CHARGE
Mariz

For inventory and update w/ Romar

Mariz

DONE
Submitted October 09,2015

For liquidation and finalization of


inventory c/o Mariz

Mariz

DONE
Submitted October 09,2015

Landscaping

For inventory and update w/ Romar

Mariz

DONE
Submitted October 09,2015

For schematic floor plan,


Perspective

Reviewed by BRB as of Sept. 23, '15

Paolo

DONE (Oct 8)
Print two schemes (Blue and Peach)

Start on October 19,2015

Mariz

On site meeting BRB


October 28-29 2015

Interior Decoration- Final

Interior Decoration- Final

2. AUREVILLE

C. MODEL 66 SQ M

DONE

D. Entrance Statement and Signage

Landscaping Update
Compilation of Engineering
Drawings as per Ar. Dupher's
update
Studies c/o BRB

A.1. SITE DEVELOPMENT PLAN

A.2. CONDOMINIUM SITE DEV'T. PLAN

B. HOUSE MODEL UNITS


3. PACIFIC GRAND VILLAS 5

DONE

MJ

Update Ar. Dupher of MRB Scheme 2

aa. PHOEBE

For updating of plans comments For scheduling

Mariz & Paolo

Print engineering drawings c/o Pao

bb. TIARA

For updating of plans comments For scheduling

Mariz & Paolo

Print engineering drawings c/o Pao

For architectural working


drawings

D. SIGNAGE PYLON

For finalization of working


drawings

F. COMMERCIAL CENTER

Coordination with Ar. Dupher

Submitted Oct. 6

C. LINEAR PARK

E. SHOPHOUSE

CURRENT TARGET
DONE
Submitted October 09,2015

Landscaping
B. CRISTELLE

REMARKS & ISSUES


For liquidation and finalization of
inventory c/o Mariz

Working drawings
For schematic layout

DONE
For scheduling

For presentation

4. PACIFIC GRAND
TOWNHOMES

A. FOR BUILDING PERMIT APPLICATION (OLD


VICTORIA)

aa. Block 2 Cluster- 5 units

For scheduling

Paolo

bb. Block 5 Cluster- 2 units

For scheduling

Paolo

B. AMENITY AREA

For design concept

Budget RFA letter to KTG and EAT

C. MODEL UNIT VICTORIA

Interior Design

Completion of Unit as per


operations Nov 18

For updating of construction

Mariz

OB & Research Mandaue Foam's


website for furnitures
Tentative dates of interior decorating
Nov 30- Dec 5 or Dec 7-12

A. PLANTING STRIP
B. RFO UNITS
5. COSTA SMERALDA
C. FOR BUILDING PERMIT APPLICATION

DONE

For schematic site development


For landscape quotation
layout

Mariz

Verify sales and docs department Ff up Ms. Al (Sales Doc)

Paolo

Janella- Blk 15 Lot 18;


(Ramon/Angelie Talaron)
Natalia- Blk 15 Lot 24
(Reynold/Flordenita Sazon)

Pouched to Iloilo (9/17/15)

Paolo

Follow up Romar c/o Mariz

Verification of drawing completeness

PROJECT

ITEMS

A. FOR BUILDING PERMIT APPLICATION

CURRENT STATUS

ON -GOING WORKS

aa. Phase 4A (2 units)

OLIVIA-Blk 14 Lot 17
(Vincent/Emilyn Gocotano)
OLIVIA-Blk 13 Lot 17
(Ylette/Benjie Rocha)

For scheduling

Paolo

On going c/o Pao

aa. Phase 4B (2 units)

OLIVIA-Blk 1 Lot 10
Julie Ann Agbang
OLIVIA-Blk 1 Lot 12
Michael Delima

For scheduling

Paolo

Received complete as per Jomar's


email October 13 2015

6. PGV PHASE 1 to 4

REMARKS & ISSUES

IN-CHARGE

CURRENT TARGET

A. MRB CONDOMINIUM

Submitted Oct. 6

MJ

DONE

B. SOUTH HALF COMMERCIAL DEV'T.

Schematic Study

Mariz

DONE

Paolo

DONE

Mariz

Waiting for shortlisted consultants

7. JARO SOUTH HALF DEV'T.


C. GOOGLE MAP COMPILATION

Jaro Grand Estates Development

D. PGV PHASE 4C-4D

Total number of lots/inventory

A. MARILAO TOWNSHIP

Proposal's Comparative Analysis Submitted (Sept. 16, '15)

B. MRB CONDOMINIUM

For Site Scheme

Mariz

C.JARO GRAND ESTATES, NORTH HALF

For Site Scheme

MJ

8. SCHEMATIC SITE RESEARCH

D. JARO GRAND ESTATES, SOUTH HALF


A. REAL ESTATES ORGANIZATION

Research

B. PHILGBC

For inquiries: Application / Membership


forms

Arch. /EnP. Brando R. Bulosan


Design and Planning Department - HEAD

Mariz
Acquired Application/Membership Forms
DPD ID: Complete

Mariz

Furnish copies of the lot plan and


clubhouse for BRB

DESIGN & PLANNING DEPARTMENT


MANCOM REPORT
DATE: SEPTEMBER 17, 2015
ON
ITEMS
CURRENT STATUS
-GOING
WORKS

PROJECT

A. Site
Developme
nt Plan

REMARKS
CURRENT
IN-CHARGE
& ISSUES
TARGET

Transfer
Dwgs to
CAD file
(Site Devt.
Updated Drawin
Plan, Topo
Maps) as
per MBF
comments

Paolo

Land Data
Computati Updated Comput Paolo
ons

Waiting for
comments
/
B. HOUSING corrections
as per
concerning
dept.

Single
Revised as
Detached of 9/14/15)

MJ

Routing of
drawings
for
comments
(9/15/15)

MJ

Revised as
of 9/14/15)

MJ

Routing of
drawings
for
comments
(9/15/15)

MJ

Scheme as
of 9/11/15

MJ

DONE

Gate and
Scheme as
Guardhous
of 9/14/15
e

Mariz

DONE

Commercia Scheme as
l Center of 9/14/15

MJ

DONE

For
Scheme as
schematic of 9/14/15

Paolo

DONE

Duplex

1. DASMA

C. AMENITIE

D. ROAD SE

Clubhouse

E. SCALE

Submitted
to Ms Linda
Preliminary
G. comments
Drawings
On-going
on Sept.
(Walnut
28-29;
Creek
follow-up
Residences
) 9/15/15

Interior For
A. MIRABELL On-going Decoration inventory
- Final
encoding
For
Landscapin inventory
g
and update
w/ Romar
Interior For
B. CRISTELL On-going Decoration inventory
- Final
encoding

2.
AUREVIL
LE

Paolo

Ist week of
Oct.

Mariz

Week 38
(Sept 1418)

Mariz

Mariz

Week 38
(Sept 1418)

For
Landscapin inventory
g
and update
w/ Romar

Mariz

For
For
schematic
comments
floor plan,
c/o BRB
Perspective

Paolo

9/17/2015

D. Entrance Statement

Ff up
Landscapin
Engineerin
g Update
g

Mariz

Week 38
(Sept 1418)

A. Planting
Strip

For
schematic For
site
landscape
developme quotation
nt layout

Mariz

Week 38
(Sept 1418)

Verify sales
Ff up Ms.
and docs
Al (Sales
departmen
Doc)
t

Paolo

Janella- Blk
Pouched to
15 Lot 18;
Iloilo
Natalia- Blk
(9/17/15)
15 Lot 24

Paolo

C. MODEL 6

DONE

3. COSTA B. RFO
SMERAL Units
DA
C. FOR
BUILDING
PERMIT
APPLICATIO
N

DONE

4. PGV
PHASE 1
to 4

aa. Phase
A. FOR BUIL
4A (2
units)

OLIVIA-Blk
14 Lot 17 For
OLIVIA-Blk scheduling
13 Lot 18

Paolo

Next Week

aa. Phase
4B (2
units)

OLIVIA-Blk
1 Lot 10 For
OLIVIA-Blk scheduling
1 Lot 13

Paolo

Next Week

For
scheduling

Paolo

For
scheduling

Paolo

A. FOR
BUILDING
aa. Block 2
5.
PERMIT
Cluster- 5
PACIFIC APPLICATIO
units
N (OLD
GRAND
TOWNHO VICTORIA)
MES
bb. Block 5
Cluster- 2
units

Compilatio
n of
Engineerin
6.
g Drawings
Coordinatio
PACIFIC
as per Ar.
A. Site Development Pla
n with Ar.
Dupher's
GRAND
Dupher
update
VILLAS 5
Studies c/o
BRB

aa.
B. House Mo
PHOEBE

MJ

For
updating of For
Mariz & Paolo
plans
scheduling
comments

For
updating of For
bb. TIARA
Mariz & Paolo
plans
scheduling
comments

C. Linear Park

For
architectur
al working
drawings

D. Signage Pylon

For
finalization
of working
drawings

E. Shophouse
F. Commercial Center

Working
drawings
For
For
schematic
scheduling
layout

DONE

Proposal's
Comparativ
e Analysis

A. Marilao Township

7.
SCHEMA
TIC SITE
Proposal's
RESEARC
B. Jaro Grand Estates, S Comparativ
H
e Analysis
For Site
Scheme
Furnish
A. Updating of Floor Pla copy to
Logistics

Mariz

8-Sep

Mariz

8-Sep

8-Sep

C. Jaro Grand Estates, N

Review of
supplier /
B. Costing study of carp
contractors
quotation

8. MAIN
OFFICE
INTERIO
R
RENOVAT C. Interior
ION
layout

For
study of
schematic
Finance
study
Departmen
t

Paolo

DONE

Logistics

DONE

Already got
a copy of
organizatio
nal
Paolo
structure of
Finance
Departmen
t

registered

9.
Sept
CPE/Trai
a. Green Co 24,2015;
ning and
Expos
SMX, MOA
Complex,
registered
Oct
b. PHILCON

8-11,
2015;
10:00am6:00pm
SMX, MOA
Complex,

Copy of
preregistration
Mariz
confirmatio
n code on
file

Copy of
preregistration
Mariz
confirmatio
n code on
file

Approved
by AAH

registered
Oct
8-11,
2015;
10:00am6:00pm
SMX, MOA
Complex,
d. Real Esta Research
c. Manila F

For
inquiries:
Application
e. PHILGBC
/
Membershi
p forms

Copy of
preregistration
Mariz
confirmatio
n code on
file
Mariz
MMY/MJM
ID ff up
HRD

Mariz

Vous aimerez peut-être aussi