Vous êtes sur la page 1sur 283

Traffic Impact Study

Montrose and Clarendon


Mixed Use Development
Chicago, Illinois

Prepared By

January 14, 2016

Contents
Executive Summary ........................................................................................................................ 1
Introduction ..................................................................................................................................... 3
Existing Conditions......................................................................................................................... 7
Site Location ............................................................................................................................... 7
Existing Street System Characteristics ....................................................................................... 7
Alternative Modes of Transportation ........................................................................................ 10
Existing Traffic Volumes .......................................................................................................... 14
Traffic Characteristics of the Proposed Development .................................................................. 17
Site Location and Existing Uses ............................................................................................... 17
Proposed Development Plan ..................................................................................................... 17
Parking ...................................................................................................................................... 17
Site Access ................................................................................................................................ 18
Residential Drop-Off/Pick-Up Activity .................................................................................... 18
Pedestrian Access...................................................................................................................... 19
Truck Loading ........................................................................................................................... 19
Directional Distribution ............................................................................................................ 19
Figure 7 ..................................................................................................................................... 20
Development Traffic Generation .............................................................................................. 21
Projected Traffic Conditions ......................................................................................................... 24
Planned Developments.............................................................................................................. 24
Other Area Growth ................................................................................................................... 26
Traffic Analysis and Recommendations ....................................................................................... 28
Discussion and Recommendations ........................................................................................... 31
Transportation Sustainability Recommendations ..................................................................... 34
Conclusion .................................................................................................................................... 35

Appendix

Montrose and Clarendon


Chicago, Illinois

List of Figures and Tables


Figures
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Site Location ...................................................................................................................... 4


Aerial View of Site Area..................................................................................................... 5
Existing Street Characteristics ............................................................................................ 8
Public Transportation Available ....................................................................................... 11
Existing Traffic Volumes .................................................................................................. 15
Existing Pedestrian and Bicycle Traffic Volumes .......................................................... 16
Estimated Directional Distribution ................................................................................... 20
Estimated Development-Generated Traffic ...................................................................... 23
Background Traffic ........................................................................................................... 25
Total Projected Traffic Volumes ...................................................................................... 27

Tables
1.
2.
3.

Projected Site-Generated Traffic Volumes ................................................................... 2221


Capacity Analyses Results - Existing Traffic Volumes .................................................... 29
Capactiy Analyses Results Projected Traffic Volumes ................................................. 30

Montrose and Clarendon


Chicago, Illinois

ii

I.
Executive Summary
This report summarizes the results of a traffic impact study conducted by Kenig, Lindgren,
OHara, Aboona, Inc. (KLOA, Inc.) for the mixed-use planned development to be located near
the intersection of Montrose Avenue and Clarendon Avenue in Chicago, Illinois. The objectives
of the traffic study are as follows.

Determine the existing vehicular, pedestrian, bicycle, and public transportation conditions in
the study area to establish a base condition.

Assess the impact that the proposed expansion will have on transportation conditions in the
area.

Determine any street, access, bicycle, and pedestrian modification and/or improvements that
will be necessary to effectively accommodate and mitigate future conditions.

Vehicle, pedestrian, and bicycle counts were conducted during a weekday morning and evening and
Saturday midday peak periods in order to determine the general peak hour of commuter activity
during these time periods. A total of 11 intersections were analyzed as part of this study.
Accessibility to and from the area is enhanced by various alternative modes of transportation. The
Chicago Transit Authority (CTA) rapid transit Purple and Red lines are provided within a half-mile
of the site and multiple CTA bus routes have stops within the study area. In addition, pedestrian
facilities including sidewalks, crosswalks, and pedestrian countdown timers at signalized
intersection are generally provided in the area. A barrier-protected bike lane is provided on both
sides of the street on North Broadway north of Montrose Avenue and shared bike lanes, or
Sharrows, are provided on Clarendon Avenue and Wilson Avenue. Mode-sharing facilities,
including Divvy bike stations and car-sharing vehicles, are also located within the area.
The development is divided in three sub-areas. Sub-Area A, located in the northwest corner of
the intersection of Montrose Avenue and Clarendon, will provide approximately 381 apartments
and 31,371 square feet of grocery retail space. Sub-Area B, located on Clarendon Avenue
between Sunnyside Avenue and Agatite Avenue, will provide approximately 250 apartments.
Sub-Area C will be located in the northeast corner of the intersection of Montrose Avenue and
Clarendon Avenue and provide approximately 6,000 square feet of retail.
Parking will be provided within parking garages at Sub-Areas A and B and an 11-space parking
lot will be provided at Sub-Area C for a total of 449 spaces. Access to Sub-Area A and Sub-Area
Cs parking will be provided via Clarendon Avenue while parking to Sub-Area B will be
provided on Agatite Avenue and the existing North-South Alley west of Sub-Area B. Residential
loading will also be provided on Agatite Avenue.

Montrose and Clarendon


Chicago, Illinois

With the addition of site-generated traffic as well as background growth, the following
improvements/modifications are recommended.

Provide left-turn lanes approximately 100 feet long for the Montrose Avenue approaches
at the intersection of Montrose Avenue and Clarendon Avenue. This will result in the
removal of approximately 18 spaces.

Modify the traffic signal at the intersection of Montrose Avenue and Clarendon Avenue
to provide protected lagging left-turn phases for all approaches.

At the intersection of Montrose Avenue and Marine Drive/Lake Shore Drive On-Ramp,
additional green time should be provided to Montrose Avenue approaches.

A right-turn lane should be provided on Montrose Avenue at its intersection with Marine
Drive/Lake Shore Drive On-Ramp, which will result in the loss of seven parking spaces.
Also, the westbound left-turn lane should be extended.

Sunnyside Avenue and Agitate Avenue should be converted to allow two-way between
Clarendon Avenue and the north-south alley. Approximately 16 total parking spaces will
be removed.

The signal timings for the intersection of Clarendon Avenue and Buena Avenue should
be modified to meet current CDOT standards.

High-visibility crosswalks must be installed at the following intersections.


o
o
o
o
o

Montrose Avenue and Hazel Street (North Approach)


Sheridan Road and Wilson Avenue
Clarendon Avenue and Buena Avenue (West Approach)
Clarendon Avenue and Sunnyside Avenue
Clarendon Avenue and Agatite Avenue

Montrose and Clarendon


Chicago, Illinois

1.
Introduction
This report summarizes the results of a traffic impact study conducted by Kenig, Lindgren,
OHara, Aboona, Inc. (KLOA, Inc.) for the Montrose and Clarendon mixed-use development to
be located in Chicago, Illinois. This planned development includes three sub-areas located on
Clarendon Avenue near its intersection with Montrose Avenue. The site is currently includes two
vacant buildings connected by a pedestrian bridge and an unused parking lot.
As proposed, Sub-Area A, located in the northwest corner of the intersection of Montrose
Avenue and Clarendon Avenue, will provide approximately 381 apartments and 31,371 square
feet of grocery retail space. Sub-Area B, located on Clarendon Avenue between Sunnyside
Avenue and Agatite Avenue, will provide approximately 250 apartments. Sub-Area C will be
located in the northeast corner of the intersection of Montrose Avenue and Clarendon Avenue
and provide approximately 6,000 square feet of retail.
Parking will be provided within parking garages in Sub-Areas A and B and an 11-space parking
lot will be provided in Sub-Area C for a total of 449 spaces. Access to Sub-Area A and Sub-Area
C will be provided via Clarendon Avenue while access to Sub-Area B will be provided via
Agatite Avenue, Sunnyside Avenue, and the existing North-South Alley west of Sub-Area B.
Residential loading will also be provided on Agatite Avenue for both Sub-Area A and B.
Figure 1 shows the location of the site in relation to the area street system. Figure 2 shows
an aerial view of the study area.
The purpose of this study is as follows.

Determine the existing vehicular, pedestrian, bicycle, and public transportation conditions in
the study area to establish a base condition.

Assess the impact that the proposed development will have on transportation conditions in
the area.

Determine any street, access, bicycle, and pedestrian modification and/or improvements that
will be necessary to effectively accommodate and mitigate future conditions.

Montrose and Clarendon


Chicago, Illinois

SITE
Site Location

Montrose and Clarendon


Chicago, Illinois

Figure 1

Aerial View of Site Location

Montrose and Clarendon


Chicago, Illinois

Figure 2

The sections of this report present the following.

Existing street conditions including vehicle, pedestrian, and bicycle volumes for the
weekday morning and weekday evening peak hours.

A detailed description of the proposed development.

Vehicle trip generation and directional distribution for the proposed development.

Background growth in traffic for future conditions, which includes planned developments
and an ambient growth factor applied to the existing peak hour traffic volumes within the
traffic study area.

Intersection capacity analyses for existing and future projected conditions for the
weekday morning, weekday evening, and Saturday midday peak hours.

Recommendations with respect to vehicular site access, the surrounding street network,
and pedestrian and bicycle features for the future condition.

Montrose and Clarendon


Chicago, Illinois

2.
Existing Conditions
Existing street and traffic conditions within the study area were documented based on field visits
and traffic counts. The following provides a summary of the physical characteristics of the
streets including geometry and traffic control, alternative modes of transportation available in the
area, and the peak hour vehicle, pedestrian, and bicycle flows along area streets.
Site Location
The site is located in the Uptown neighborhood of Chicago, which offers a mixture of residential
and commercial uses. Land uses in the area include Clarendon Park, Clarendon Park Community
Center, Montrose Beach and Harbor to the east and the Weiss Memorial Hospital to the
northeast.
Existing Street System Characteristics
The characteristics of the existing streets within the study area are illustrated in Figure 3 and
described below. All streets are under the jurisdiction of the Chicago Department of
Transportation (CDOT).
Montrose Avenue is an east-west collector street generally providing one lane in each direction.
Within the vicinity of the site, Montrose Avenue has signalized intersections with North
Broadway, Sheridan Road, Hazel Street, Clarendon Avenue, and Marine Drive/Lake Shore Drive
On-Ramp. At its signalized intersection with North Broadway and Sheridan Road, which are
located approximately 100 feet apart, Montrose Avenue provides eastbound exclusive left-turn
lanes. A westbound left-turn lane is provided at Sheridan Road but left-turn movements are
prohibited at North Broadway. Montrose Avenue has a posted photo-enforced park speed limit of
30 mph, generally allows unrestricted parking along the site frontage, and has an Annual
Average Daily Traffic (AADT) volume of 13,500 vehicles according to the Illinois Department
of Transportation (2014).
Clarendon Avenue is a north-south collector street generally providing one lane in each direction.
Within the study area, Clarendon Avenue is under stop sign control at its intersections with
Wilson Avenue, Montrose Avenue, and Buena Avenue and provides stop sign control at its
intersections with Agatite Avenue and Sunnydale Avenue. Unrestricted parking is generally
provided and shared bike lanes, or sharrows, are provided on both sides of Clarendon Avenue.
Montrose Avenue has an AADT of 3,500 vehicles (IDOT, 2014).

Montrose and Clarendon


Chicago, Illinois

AVEN UE

(7A-7P)

CLAREN DO N

RO AD

ON RED

SHERI
DAN

NO TURN

NB, SB APPROACH

NOT TO SCALE

WILSON AVE

HAZEL ST

VE
D RI
SH O RE
LAKE

P
SUNNYSIDE AVE

ONE-WAY

1)
(U S 4

SI
TE

N E DR
M ARI

P
ONE-WAY

AGATITE AVE

P
OA
BR

NO TURN
ON RED

DW

NB, SB, EB

8A-9P
M-SAT

P
15 MIN

ST

15 MIN

AY

9A-12A

M-SAT

15 MIN
7A-9P

M-SAT

30

30

P
P

MONTROSE
AVE

P
P

NO TRUCKS

LEGEND

5 TONS

P
P

- TRAVEL LANE

SCHOOL
DAYS
8A-4P

- TRAFFIC SIGNAL

- STOP SIGN
- ON-STREET PARKING

- NO PARKING

- PAYBOX

- LOADING AREA

- STANDING AREA

XX

20

BUENA AVE

SCHOOL

SCHOOL

20

- SPEED LIMIT
- BIKE LANE
- BUS STOP
- BUS STOP WITH SHELTER
- SHARROW
- BRICK PAVED CROSSWALK
- CROSSWALK
- CONTINENTAL CROSSWALK

SCHOOL

20

- SCHOOL SPEED LIMIT SIGN

PROJECT:

Montrose and Clarendon


Mixed-Use Development
Chicago, Illinois

TITLE:

EXISTING STREET CHARACTERISTICS

Job No: 15-253

Figure: 3

Wilson Avenue is an east-west collector street generally providing one lane in each direction.
Wilson has signalized intersections with Clarendon Avenue and Sheridan Road and right turns
on red are restricted at Sheridan Road from 7:00 A.M. to 7:00 P.M. for the northbound and
southbound approaches. Pay box parking and shared bike lanes, or sharrows, are provided
along the north and south sides of the street. Wilson Avenue has an AADT of 8,700 vehicles
(IDOT, 2014).
North Broadway is generally a north-south arterial street providing a single lane in each
direction. At its intersection with Montrose Avenue, North Broadway provides northbound and
southbound exclusive left-turn lanes. At its intersection with Sheridan Road, North Broadway
provides exclusive through and right-turn lanes for southbound traffic (southbound left-turn is
prohibited). North Broadway has buffer-protected bike lanes and pay box parking to the north of
Montrose Avenue and has unrestricted parking to the south. It has a posted photo-enforced park
speed limit of 30 mph and an ADT of 8,650 vehicles.
Sheridan Road is a north-south street generally providing one lane in each direction. At its
intersection with North Broadway, Sheridan Road provides exclusive left-turn lanes for both the
northbound and southbound directions. Sheridan Road generally provides parking on both sides
of the street, has a posted photo-enforced park speed limit of 30 mph, and has an ADT of 4,300
vehicles.
Marine Drive is a north-south street providing one lane in each direction. Access from Lake
Shore Drive is located approximately 200 feet north of Montrose Avenue and access to Lake
Shore Drive is provided via the southeast leg of its signalized intersection with Montrose
Avenue. At this intersection, right turns on red are restricted for the northbound, southbound, and
eastbound approaches.
Hazel Street is a north-south street generally providing a single lane in each direction between
Wilson Avenue and Buena Avenue. Hazel Street has a signalized intersection with Montrose
Avenue and an all-way stop control intersection with Junior Terrace. Hazel Street generally
provides unrestricted parking on both sides of the street.
Agatite Avenue and Sunnyside Avenue are a one-way couplet with Agatite Avenue providing
eastbound travel and Sunnyside Avenue providing westbound travel. Both streets are under stop
sign control at their intersections with Clarendon Avenue and unrestricted parking is provided on
both sides of each street.

Montrose and Clarendon


Chicago, Illinois

Alternative Modes of Transportation


Accessibility to and from the Uptown neighborhood is enhanced by the alternative modes of
transportation serving the area as described below.
Public Transportation. The public transportation provided within the Uptown area is illustrated
in Figure 4. The area is served by the CTA rapid transit Purple and Red lines at the Wilson
Station less than a half-mile northwest of the site. The following describes the L System lines
that have stops near the site.

The CTA Purple Line operates between Linden Avenue (in Wilmette) and Howard Street
(in Chicago) via Evanston. Additionally, the Purple Express Line, which serves the stop
at Chicago Avenue, runs during weekday rush-periods between the Howard Station and
the downtown Loop.

The CTA Red Line operates all times, every day between Howard Street located on the
Citys northern border to the 95th/Dan Ryan station located along the Dan Ryan
Expressway at 95th Street.

In addition, the area is also served by multiple bus routes, described below.

Route 36 (Broadway) generally operates along State Street, North Broadway, and Clark
Street from Loyola University to Congress Parkway. Notable stops include the Lincoln
Park Zoo, the Chicago History Museum, and the Main Post Office. Service is provided
seven days a week, including holidays.

Route 78 (Montrose) operates along Montrose Avenue from Harlem Avenue to just
before Lake Shore Drive. Summer service includes an additional stop at Montrose Beach.
Notable stops include Truman College, the Montrose Blue Line Station, Wright College,
and Chicago Read Hospital. Service is provided seven days a week, including holidays.

Route 81 (Lawrence) generally operates along Lawrence Avenue from Milwaukee


Avenue to Marine Drive. It provides service at all times seven days a week with notable
stops at Blue, Brown, and Red Line stations and at the Ravenswood Metra Station.

Route 135 (Clarendon/LaSalle Express) generally provides service along LaSalle Street
and Clarendon Avenue from the Weiss Memorial Hospital to Jackson Boulevard. No
stops are provided between its stops at the intersections of Columbus Drive with Wacker
Drive and Belmont Avenue with Lake Shore Drive. Service is only provided on the
weekdays, with southbound service only provided in the morning (approximately 5:45
A.M. to 10:00 A.M.) and only northbound service provided in the evening
(approximately 3:00 P.M. to 7:40 P.M.).

Montrose and Clarendon


Chicago, Illinois

10

SITE

Public Transportation Available

Montrose and Clarendon


Chicago, Illinois

Figure 4

11

Route 136 (Sheridan/LaSalle Express) generally provides service along LaSalle Street
and Sheridan Road from Devon Avenue to Jackson Boulevard. No stops are provided
between its stops at the intersections of Columbus Drive with Wacker Drive and Marine
Drive with Bittersweet Place. Service is only provided on the weekdays, with southbound
service only provided in the morning (approximately 5:45 A.M. to 9:50 A.M.) and only
northbound service provided in the evening (approximately 3:35 P.M. to 7:30 P.M.).

Route 146 (Inner Drive/Michigan Express) generally runs between Berwyn Avenue and
the Museum Campus along Lake Shore Drive, Michigan Avenue, and State Street. No
stops are provided between the intersections of Michigan Avenue with Delaware Place
and Lake Shore Drive with Belmont Avenue. Service is provided on the weekdays from
approximately 6:00 A.M. to 11:30 P.M. Earlier weekend service starting at 5:15 A.M. is
also provided.

Route 148 (Clarendon/Michicagn Express) provides north-south service from Foster


Avenue to Harrison Street primarily along Michicagn Avenue, Lake Shore Drive,
Clarendon Avenue, and Marine Drive. Service is provided from approximately 6:00 A.M.
to 11:00 P.M.

Route 151 (Sheridan) generally operates in a north-south orientation providing service to


Loyola University, Howard Terminal (Red-Purple-Yellow lines), the Sheridan Red Line
Station, Lincoln Park Zoo, Millennium Park, and Union Station. Service is provided
seven days a week, including holidays.

Non-Motorized Transportation Systems. Sidewalks are provided on all streets within the study
area. Pedestrian countdown timers are provided at all signalized intersections except Clarendon
Avenue and Buena Avenue, which cannot be installed since the signal is operated by a
mechanical controller. Crosswalks are provided as follows.

Continental Crosswalks
o Montrose Avenue and North Broadway (East, West, and South Approaches)
o Montrose Avenue and Sheridan Road
o North Broadway and Sheridan Road
o Montrose Avenue and Hazel Street (East, West, and South Approaches)
o Montrose Avenue and Marine Street/Lake Shore Drive On-Ramp (East, West and
North Approach)
o Clarendon Avenue and Wilson Avenue
o Clarendon Avenue and Buena Avenue (East, North, and South Approaches)
Brick Paver Crosswalk
o Montrose Avenue and North Broadway (North Approach)
Standard Crosswalk
o Montrose Avenue and Hazel Street (North Approach)
o Sheridan Road and Wilson Avenue Clarendon Avenue and Buena Avenue (West
Approach)
o Clarendon Avenue and Sunnyside Avenue
o Clarendon Avenue and Agatite Avenue
Montrose and Clarendon
Chicago, Illinois
12

Bicycle-specific infrastructure is located on North Broadway north of Montrose Avenue, where


barrier-protected bike lanes are provided on both sides of the street. Other streets in the area,
including Clarendon Avenue and Wilson Avenue, provide marked shared lanes (Sharrows)
linked to other bike routes. In addition, the Lakefront Trail is located less than one-half mile east
of the site and a pedestrian tunnel is provided under Lake Shore Drive opposite Buena Avenue.
Mode-Sharing Transportation Availability. Divvy Bike Sharing stations are located at multiple
locations within walking distance of the site. The nearest station is located in the southeast corner
of the intersection of Clarendon Avenue and Junior Terrace, which currently provides a total of
15 bike docks. Other stations are located near the intersections of North Broadway and Wilson
Avenue, Montrose Avenue and Sheridan Road, and Clarendon Avenue and Lakeside Avenue.
Car-sharing facilities are also available at multiple locations within walking distance of the site,
including multiple vehicles at the intersection of Clarendon Avenue and Junior Terrace. In
addition, vehicles are provided near Clarendon Park Community Center parking lot and the
intersections of Sheridan Road and North Broadway and Wilson Avenue and Hazel Street.

Montrose and Clarendon


Chicago, Illinois

13

Existing Traffic Volumes


In order to determine current vehicle, pedestrian, and bicycle conditions within the study area,
KLOA, Inc. utilized peak period traffic, pedestrian, and bicycle counts for the following
intersections.

Montrose Avenue and North Broadway


Montrose Avenue and Sheridan Road
Montrose Avenue and Hazel Street
Montrose Avenue and Clarendon Avenue
Montrose Avenue and Marine Drive/Lake Shore Drive On-Ramp
Sheridan Road and North Broadway
Sheridan Road and Wilson Avenue
Clarendon Avenue and Wilson Avenue
Clarendon Avenue and Buena Avenue
Clarendon Avenue and Sunnyside Avenue
Clarendon Avenue and Agatite Avenue

The counts were conducted on Tuesday, October 27, 2015 during the morning (7:00 A.M. to
9:00 A.M.), and the evening (4:00 P.M. to 6:00 P.M.) peak periods and on Saturday, October 24,
2015 the midday peak period (12:00 P.M. to 2:00 P.M.). In addition, previous counts conducted
during the same time periods on Thursday, July 9, 2015 and Saturday, July 11, 2015 were
utilized for the intersections of Montrose Avenue, Sheridan Avenue, and North Broadway and at
Montrose Avenue and Hazel Street. Furthermore, the counts were compared with previous count
data conducted in June 2009 (from June 16 to June 27) and adjustments were made to reflect
seasonal variations.
Due to the size of the study area, peak hours for the area varied. In order to provide a
conservative (worst-case) analysis, the peak hour volumes for the July counts were utilized as
well as those volumes from the October counts. The results of the traffic counts most recently
conducted showed that the weekday morning peak hour of traffic for the study area generally
occurs between 8:00 A.M. and 9:00 A.M., the weekday evening peak hour generally occurs
between 5:00 P.M. and 6:00 P.M., and the Saturday midday peak hour generally occurs from
12:15 P.M. to 1:15 P.M. Peak hours for the July counts were 7:45 A.M. and 8:45 A.M. for the
weekday morning, 4:15 P.M. and 5:15 P.M. for the weekday evening, and 1:00 P.M. to 2:00
P.M. for the Saturday midday peak hour. Figure 5 illustrates the existing peak hour vehicle
traffic volumes. Figure 6 illustrates the existing peak hour pedestrian and bicycle volumes,
showing the direction of travel.

Montrose and Clarendon


Chicago, Illinois

14

CLAREN DO N

AVEN UE

210 (324) [294]

36 (
29)[50]

91(
44)[37]

200 (
47)[80]

1
01(
67)[62]

SHERI
DAN

RO AD

40 (
45)[54]

356 (
203)[231
]

51 (81) [42]

N
NOT TO SCALE

43 (28) [21]
256 (367) [283]
170 (21) [35]

68 (27) [22]

WILSON AVE
60 (115) [86]

58 (34) [43]

290 (280) [322]

238 (311) [339]


21(
24)[29]

89 (
76)[60]

38 (
39)[27]

91 (30) [30]

HAZEL ST

43 (
50)[37]

1
52 (
21
0)[1
51
]

31(
25)[22]

43 (46) [29]

1)
(U S 4

N E DR
M ARI

1
20 (
1
27)[82]

378 (
99)[1
28]

27 (
51
)[1
4]

VE
D RI
SH O RE
LAKE

78 (
27)[23]

378 (
99)[1
24]

SUNNYSIDE AVE

43 (69) [60]

AGATITE AVE

376 (431) [352]

1 (0) [0]

5 (14) [5]

DW
280 (
67)[71
]

389 (519) [387]

80 (
27 )[42]

6 (18) [22]

43 (
26)[35]

6 (
3)[2]

382 (458) [369]

1
9 (
1
2)[1
8]

1
5 (
21
)[22]

32 (
53)[54]

37 (
42)[43]

37

1
33 (
1
32)[1
21
]

]
91
ST
)[
]
97
(
AY
24
[3
49
]
5)
54
25
(
)[
59
(

6
24

18 (28) [25]

9]
0)[
1
9 (
36]
8)[
6 (
1
]
[98
79)
(
]
37
1
[50
65)
(
65

1
42 (
1
64)[93]

OA
BR

25 (21) [22]

26 (37) [11]
337 (524) [343]
35 (25) [29]

9 (28) [25]

11 (23) [43]

3]
[
]
0)
1
301
5(
1
5)[
4
(8
6
28
20]
[
33) 1
02]
41( 2)[
5
(
46

MONTROSE AVE
62 (78) [83]
509 (361) [421]

48 (
29)[31
]

80 (52) [46]

21(
1
0)[1
6]

29 (
50)[27]

29 (
35)[32]

13 (38) [11]

46 (
42)[36]

5 (7) [3]

BUENA AVE
22 (6) [6]
35 (
36)[35]

1
38 (
1
58)[1
08]

28 (16) [16]

33 (
1
7)[1
6]

87 (34) [22]

]
83
]
)[ 280
77
[
(
3)
49 (
30
]
35
1
[6
3 (
1
1
)[1
4]
7)
(
8
80 (
56)[40]

64 (
83)[71
]

(00) - PM PEAK HOUR

34 (
6)[9]

6 (
1
3)[5]

65 (
81
)[78]

79 (
74)[88]
]
1
)[
0 (
1
)[2]
1
(
0
0]
29
)[
1
7]
1
1
23
(
)[
2
85
(
23
71

00 - AM PEAK HOUR

485 (274) [329]

6 (3) [10]

LEGEND

258 (
88)[1
1
0]

28 (46) [47]

90 (
91
)[57]

72 (43) [55]

531 (461) [468]


0 (1) [4]

40 (
36)[39]

25 (24) [38]

20 (
1
8)[22]

8 (13) [9]
53 (81) [131]

6 (
4)[6]

26 (36) [18]
490 (366) [442]
1
8 (
1
0)[1
6]

]
]
47
[7
[2
0)
8)
1( (
26
9]
[9
45
1
9)
1
1
(
53

41(
24)[41
]

88 (
1
09)[82]

0 (
1
)[0]

57 (61) [83]

14 (28) [34]
561 (427) [486]

[00] - SATURDAY MIDDAY PEAK HOUR


PROJECT:

Montrose and Clarendon


Mixed-Use Development
Chicago, Illinois

TITLE:

EXISTING TRAFFIC VOLUMES

Job No: 15-253

Figure: 5

15

AVEN UE

CLAREN DO N

2 (
2)[2]

SHERI
DAN

1
0 (
5)[1
0]

RO AD

N
NOT TO SCALE

135 (120) [78]

4 (2) [2]

52 (
44)[24]

WILSON AVE

5 (3) [2]

83 (
73)[46]

1
31(
1
42)[1
39]

35 (
73)[71
]

5 (4) [12]

52 (49) [27]

3]
[
3)
(

21 (41) [47]

94 (159) [156]

2 (
6)[4]

HAZEL ST

0 (
7)[5]

5 (
3)[3]

VE
D RI
SH O RE
LAKE

18 (10) [12]

20 (39) [16]

1)
(U S 4

2 (
1
)[3]

1(
9)[5]

N E DR
M ARI

1 (0) [0]

1
1
0 (
40)[37]

SUNNYSIDE AVE

3 (2) [2]

2 (1) [2]

OA
BR

1
1
1(
26)[26]

AGATITE AVE

27 (7) [8]

AY
52 (74) [97]

]
1
[
3)
(

]
)[6
1
(

6 (0) [6]

5 (4) [8]

3 (8) [5]

MONTROSE
AVE

44 (
27)[9]

1
20 (
45)[31
]

6 (14) [30]

0)[0]
1(

3 (
4)[6]

2 (
4)[2]

4]
1
)[
29
(

3]
0)[
0 (

48 (47) [58]

59 (115) [164]

]
44
1
)[
05
1
(

49]
[
33)
(
26

81 (60) [35]
95 (
33)[29]

40 (
56)[56]

1
9 (
39)[54]

29 (
65)[76]

70 (
1
84)[1
80]

15 (26) [34]

0]
0)[
1(

4]
[1
9)
1
(

48

4 (
1
)[3]

4 (
2)[4]

ST

52

]
41
1
[
8)
1
1
(

3 (
4)[6]

DW
16 (30) [30]

8 (11) [26]

8 (
7)[4]

6 (
1
0)[1
0]
8 (
1
0)[1
0]

AVE

11 (18) [6]

37

49 (126) [165]

9 (
1
2)[1
0]

65 (
1
62)[1
63]

4 (
40)[37]

16 (29) [29]

4 (7) [0]

BUENA

51 (56) [46]

]
21
[
5)
1
(

81 (137) [155]

21 (79) [102]

62 (
66)[62]

6 (0) [2]

12 (37) [29]

57 (
43)[31
]

8]
[2
4)
1
(

5
1

41 (32) [40]

1(
7)[7]

]
89
)[
63
(

8
]
29
)[
30
(

4 (
2)[1
]

LEGEND

00 - AM PEAK HOUR
(00) - PM PEAK HOUR
[00] - SATURDAY MIDDAY PEAK HOUR
00 (00)

00 (00)
PROJECT:

Montrose and Clarendon


Mixed-Use Development
Chicago, Illinois

- PEDESTRIAN VOLUME
- BICYCLE VOLUME

TITLE:

EXISTING PEDESTRIAN AND BICYCLE TRAFFIC VOLUMES

Job No: 15-253

Figure: 6

16

3.
Traffic Characteristics of the Proposed Development
The following provides a description of the proposed development with respect to the
surrounding area and how traffic will be able to access the site by way of the existing street
system. To evaluate the impact the proposed development will have on the area street system,
it is necessary to quantify the number of vehicle trips that will be generated during the peak
hours and to determine the directional distribution from where these vehicle trips will approach
and depart the site.
Site Location and Existing Uses
The site is part of a planned development along Clarendon Avenue which is divided in three subareas, which are described as follows.

Sub-Area A (4400 4424 North Clarendon Avenue) is bound by Montrose Avenue to the
south, Clarendon Avenue to the east, Agatite Avenue to the north, and the north-south
alley nearly opposite Dayton Street to the west. This parcel currently contains a vacant
five-story building.

Sub-Area B (4432 4458 North Clarendon Avenue) is bounded by Clarendon Avenue to


the east, Sunnyside Avenue to the north, Agatite Avenue to the south, and a north-south
alley to the west. Currently, this parcel is an unused parking lot.

Sub-Area C (4401 4415 North Clarendon Avenue) occupies the northeast corner of the
intersection of Montrose Avenue and Clarendon Avenue. Currently, this parcel is
occupied by a six-story vacant building.

Proposed Development Plan


As proposed, this PD will provide a total of 631 apartments and 37,371 square feet of
retail/grocery divided between the three sub-areas. Sub-Area A will provide approximately 381
apartments and 31,371 square feet of grocery retail space. Sub-Area B is to be approximately
250 apartments and Sub-Area C will provide approximately 6,000 square feet of retail.
Parking
Parking will be provided within all three Sub-Areas within the PD. Sub-Area A will provide a
total of 278 spaces within the three-floor parking garage at the base of the building. These spaces
will be for use by the retail space (98 spaces) and by residents of the building (180 spaces). SubArea B will provide a total of 160 residential parking spaces, also within the first three floors of
the building. Sub-Area C will provide a surface parking lot with approximately 11 spaces.

Montrose and Clarendon


Chicago, Illinois

17

Site Access
In order to improve access to and from Sub-Areas A and B, the one-way restrictions on
Sunnyside Avenue and Agatite Avenue are proposed to be removed between Clarendon Avenue
and the north-south alley. This will allow vehicles to enter and exit the development via
Sunnyside Avenue and Agatite Avenue. Both streets will provide one lane in each direction with
outbound movements under stop sign control. Clarendon Avenue at its intersection with
Sunnyside Avenue will continue to be under stop sign control, therefore remaining an all-way
stop control intersection. Access to the sub-areas within the development will be described
below.
Sub-Area A

Access to Sub-Area A will be provided on Clarendon Avenue approximately 150 feet north of
Montrose Avenue. This access drive will provide the only access to the parking garage and
residential loading for this sub-area. It will provide one inbound lane and one outbound lane with
outbound movements under stop sign control. Residential drop-off/pick-up will be provided
within a Porte-Cochere on the south side of Agatite Avenue. The proposed conversion of Agatite
Avenue to two-way traffic between Clarendon Avenue and the alley will improve access to this
sub-area.
Sub-Area B

Access to Sub-Area B will be provided along the north-south alley between Sunnyside Avenue
and Agatite Avenue, which will provide the only access to the parking garage. This access drive
will provide one inbound and one outbound lane with outbound movements under stop sign
control. As with Sub-Area A, a residential drop-off/pick-up within a Porte-Cochere will be
provided along Agatite Avenue. Traffic to and from this sub-area will benefit from the proposed
two-way nature of Sunnyside Avenue and Agatite Avenue. The proposed conversion of Agatite
Avenue and Sunnyside Avenue to two-way traffic between Clarendon Avenue and the alley will
improve access to this sub-area.
Sub-Area C

Access to the retail surface parking lot will be located on the east side of Clarendon Avenue
opposite the proposed garage access for Sub-Area A (approximately 150 feet north of the
intersection of Montrose Avenue and Clarendon Avenue).This access drive will provide one
inbound lane and one outbound lane with outbound movements under stop sign control.
Residential Drop-Off/Pick-Up Activity
As previously mentioned, Porte-Cocheres will be provided for the residents within Sub-Area A
and Sub-Area B. These areas will be located opposite each other on Agatite Avenue
approximately 100 feet west of Clarendon Avenue. Each Porte-Cochere will provide one
inbound lane and one outbound lane with outbound movements under stop sign control. Dropoff/pick-up traffic will benefit from the two-way access on Agatite Avenue.
Montrose and Clarendon
Chicago, Illinois

18

Pedestrian Access
Residential pedestrian access for Sub-Areas A and B is to be provided within the Porte-Cochere
of each building. Access to the retail space for Sub-Area A is to be located at the southeast
corner of the building. Retail access for pedestrians to Sub-Area C is to be determined.
Truck Loading
Truck loading for Sub-Area A is to be provided on Clarendon Avenue just south of the garage
access drive and on site within the parking garage. The loading dock off Clarendon Avenue will
be able to accommodate a single 55-foot truck, which will need to back in off Clarendon
Avenue. All truck loading for this dock will be limited during off-peak hours, specifically before
6:00 A.M. or after 9:00 P.M. Further, a loading dock for a 30-foot truck will be provided in the
southwest corner of the garage. The truck will access the dock via the Sub-Area A access drive
and complete all maneuvers internally. A residential loading zone will also be provided within
the garage, capable of accommodating two vehicles.
Sub-Area B will provide a single loading dock off the public alley just south of the parking
garage access. It will be able to accommodate a 30-foot truck which will need to back in.
Loading for Sub-Area C will be provided on the east side of the parking lot, where a single
loading space will be provided for a 30-foot truck. Truck-turning diagrams are provided in the
Appendix for Sub-Area A and B.
Directional Distribution
The directions of approach and departure of the future development-generated traffic were
estimated based on existing travel patterns. The estimates incorporate traffic counts as well as the
expected routes due to turning restrictions, one-way restrictions in the area, and access to the
development. Figure 7 illustrates the directional distribution of traffic.

Montrose and Clarendon


Chicago, Illinois

19

AVEN UE

CLAREN DO N

RO AD

SHERI
DAN

N
5%
1

NOT TO SCALE

WILSON AVE

10%
HAZEL ST

1)
(U S 4

N E DR
M ARI

SI
TE

VE
D RI
SH O RE
LAKE

SUNNYSIDE AVE

AGATITE AVE

OA
BR
AY

SI
TE

DW
ST

0%
1

ACCESS

SITE

MONTROSE AVE

20%
5%

30%

1
0%
BUENA AVE

LEGEND

00% - PERCENT DISTRIBUTION

PROJECT:

Montrose and Clarendon


Mixed-Use Development
Chicago, Illinois

TITLE:

ESTIMATED DIRECTIONAL DISTRIBUTION

Job No: 15-253

Figure: 7

20

Development Traffic Generation


The number of new peak hour vehicle trips estimated to be generated by the proposed development
was based on trip generation rates contained in Trip Generation Manual, 9th Edition, published by
the Institute of Transportation Engineers (ITE). The traffic projected to be generated by the
residential units is generally based on suburban locations where the primary mode of transportation
is the automobile. Therefore, given the urban location of the development, it is expected that
many development-generated trips will be made by modes of transportation other than the
automobile, including public transportation, bicycling, and walking. A review of the U.S. Census
data in the Uptown neighborhood shows that only between 30 and 45 percent of residents in the
area drive a car to work. As a result, the estimated number of generated trips was reduced by 60
percent to account for the residents that will use means of transportation other than the automobile
to commute to work. The reduction for the grocery and retail traffic was assumed to be reduced by
40 percent to account for residents within the PD or surrounding area that may patronize the
establishments without the use of a vehicle.
Table 1 summarizes the total trips anticipated with the development during the weekday
morning and evening peak hours and Saturday midday periods.
The estimated weekday morning and evening and Saturday midday peak hour traffic volumes
that will be generated by the proposed development were assigned to the street system in
accordance with the previously described directional distribution, as illustrated in Figure 8.

Montrose and Clarendon


Chicago, Illinois

21

Table 1
PROJECTED SITE-GENERATED TRAFFIC VOLUMES
Weekday Morning
Weekday Evening
Peak Hour
Peak Hour
Use/Size (ITE Land-Use
In Out Total
In
Out Total
Code)

Saturday Midday Peak


Hour
In
Out
Total

Sub-Area A
Apartments1 381 units
(LUC 220)

38

152

190

148

79

227

88

87

175

Less 60% Reduction2 -23

-91

-114

-89

-47

-136

-53

-52

-105

Apartment Trip Total

15

61

76

59

32

91

35

35

70

66

41

107

168

162

330

238

228

466

Less 40% Reduction2 -27

-16

-43

-67

-65

-132

-95

-91

-186

Grocery2 37,371 s.f.


(LUC 850)

Grocery Trip Total

39

25

64

101

97

198

143

137

280

SUB-AREA A TOTAL

54

86

140

160

129

289

178

172

350

25

101

126

101

54

155

61

61

122

Less 60% Reduction2 -15

-61

-76

-61

-32

-93

-30

-31

-61

10

40

50

40

22

62

31

30

61

15

20

35

12

12

24

Less 40% Reduction2

-1

-1

-6

-8

-14

-5

-5

-10

SUB-AREA C TOTAL

12

21

14

TOTAL PD TRIPS

65

127

192

209

163

372

216

209

425

Sub-Area B
Apartments1 250 units
(LUC 220)

SUB-AREA B TOTAL
Sub-Area C
Retail2 6,000 s.f.
(LUC 826)

1 Trip generation was reduced by 60 percent to account for alternative modes of transportation available.
2 Trip generation reduced by 40 percent to account for residents within the PD or surrounding area that will patronize
these establishments without the use of a vehicle.

Montrose and Clarendon


Chicago, Illinois

22

CLAREN DO N

AVEN UE

RO AD

SHERI
DAN

N
NOT TO SCALE
10 (32) [33]

13 (16) [21]

WILSON AVE
6 (21) [22]

6 (21) [22]

1
9 (
24)[26]

1
3 (
1
6)[21
]

HAZEL ST

22 (
35)[39]

1
3 (
43)[47]

SI
TE

1
0 (
5)[8]
30 (
1
6)[23]

1)
(U S 4

N E DR
M ARI

10 (5) [8]

VE
D RI
SH O RE
LAKE

1
3 (
43)[47]

3 (
1
0)[8]

3 (10) [8]

SUNNYSIDE AVE

8 (30) [23]

AGATITE AVE

30 (16) [23]

AY

]
22
)[
21
(

1
3 (
1
6)[21
]

44 (
56)[73]

ST
38 (48) [62]
6 (8) [11]

ACCESS

38 (
50)[63]

SI
TE

DW

25 (32) [41]

22 (
35)[39]

8 (
30)[23]

OA
BR
13 (16) [21]

SITE

63]
[
63)
21(

21 (63) [63]

44 (56) [73]

MONTROSE AVE
23 (73) [76]

13 (42) [43]

38 (50) [63]

23 (73) [76]
6 (
21
)[22]

4 (
1
0)[1
1
]

19 (63) [65]

1
3 (
1
6)[21
]

BUENA AVE

0 (
3)[2]

1
3 (
40)[45]

30 (
1
6)[23]

6 (
21
)[22]

3 (
3)[5]

3 (
5)[6]

0 (3) [2]
1 (9) [5]

22 (32) [37]

(00) - PM PEAK HOUR


Insert A

[00] - SATURDAY MIDDAY PEAK HOUR


PROJECT:

Montrose and Clarendon


Mixed-Use Development
Chicago, Illinois

1(
7)[5]

00 - AM PEAK HOUR

8 (
30)[23]

64 (97) [129]

41(
1
20)[1
33]

3 (
5)[6]

]
[5
5)
1(

LEGEND

ACCESS

TITLE:

ESTIMATED SITE-GENERATED TRAFFIC VOLUMES

Job No: 15-253

Figure: 8

23

4.
Projected Traffic Conditions
The total projected traffic volumes include the existing traffic volumes, the traffic estimated to
be generated by the proposed subject development, and the traffic estimated to be generated by
planned developments in the nearby area.
Planned Developments
To account for growth in the area, the study also reviewed proposed and/or planned
developments near the study area in order to determine the traffic increase within the study area
in the future. Vehicle trips for the following projects were estimated and added to the street
network to represent future conditions, as shown in Figure 9.

3817 3845 North Broadway is to be located on the east side of North Broadway south
of Sheridan Road. It will contain 125 apartments located above approximately 12,000
square feet of office space and 17,400 square feet of ground floor retail. Access to the
below-grade parking garage containing 129 parking spaces will be provided from Grace
Street via the public alley and a proposed right-in/right-out access drive.

975 West Wilson Avenue is to be located at the southeast corner of the intersection of
Wilson Avenue and Sheridan Road. This mixed-use development will include a 137 units
and ground floor retail. Access to the 52-space parking garage will be provided on both
Sheridan Road and Wilson Avenue.

1050 West Wilson Avenue is to be located at the northwest corner of the intersection of
Wilson Avenue and Kenmore Avenue. This mixed-use development will provide a
seven-story, 102-unit development with ground floor retail and 21 parking spaces. Access
to the parking garage will be provided on Kenmore Avenue.

Wilson/Broadway Residential is to be located on the northeast corner of the intersection


of North Broadway and Wilson Avenue and will replace an existing 58,500 square foot
building. It is proposed to contain approximately 295 apartment units, 17,000 square feet
of ground floor retail and 148 on-site parking spaces with access provided off Winthrop
Avenue.

Pensacola Place has proposed an expansion of their existing Planned Development


generally bound by North Broadway, Sheridan Road, Montrose Avenue, and Hazel
Street. The expansion will add 160 apartments and townhomes and remove
approximately 21,000 square feet of commercial space for a total of 424 residential units.

Montrose and Clarendon


Chicago, Illinois

24

1(
2)[2]

1(
8)[6]

CLAREN DO N

AVEN UE

SHERI
DAN

RO AD

N
NOT TO SCALE

7 (14) [11]

5 (19) [13]

WILSON AVE
19 (11) [13]

13 (10) [10]
3 (5) [5]

1(
2)[2]

HAZEL ST

8 (
4)[5]

6 (
4)[4]

VE
D RI
SH O RE
LAKE

1(
2)[2]

SUNNYSIDE AVE

1(
2)[2]

1)
(U S 4

N E DR
M ARI

1(
2)[2]

SI
TE

AGATITE AVE

1(
2)[2]

OA
BR

4 (2) [3]

DW
AY

SI
TE

6 (4) [4]

ACCESS

ST
3 (1) [1]

2]
4)[
1(

1 (7) [4]

1 (7) [4]

10 (6) [7]

2]
3)[
0 (

1(
2)[2]

0 (
2)[2]

4 (
2)[3]

]
[2
4)
]
1(
[8
8)
(
]
[3
3)
(

SITE

MONTROSE AVE
4 (19) [11]

1 (5) [3]

3 (2) [2]

6 (4) [4]

3 (2) [2]
1(
2)[2]

6 (
4)[4]

1
3 (
7)[8]

2 (
6)[3]

1(
2)[1
]

]
1
)[
1
1(

]
[1
2)
1(

2 (
1
)[1
]

1 (7) [4]

2 (11) [6]

1(
2)[2]

]
[2
4)
]
1(
[5
8)
(
3

3 (
6)[4]

BUENA AVE

1(
2)[2]

LEGEND

00 - AM PEAK HOUR
(00) - PM PEAK HOUR
[00] - SATURDAY MIDDAY PEAK HOUR
PROJECT:

Montrose and Clarendon


Mixed-Use Development
Chicago, Illinois

TITLE:

TOTAL BACKGROUND TRAFFIC VOLUMES

Job No: 15-253

Figure: 9

25

Other Area Growth


To account for any additional increase in traffic from unknown developments outside of the
study area, an ambient growth factor of 0.5 percent per year was also applied to the study area
over a six year period to represent Year 2021 conditions. The existing traffic volumes were
therefore increased by 3.0 percent and combined with the traffic from other developments in the
area and the peak hour traffic volumes generated by the site to determine the total projected
traffic volumes, shown in Figure 10. Furthermore, in order to account for the increase in
population in the study area, all bicycle and pedestrian volumes were increased by 10 percent at
all intersections.

Montrose and Clarendon


Chicago, Illinois

26

CLAREN DO N

AVEN UE

236 (364) [304]

37 (
30)[52]

94 (
45)[38]

207 (
50)[84]

SHERI
DAN

1
04 (
69)[52]

RO AD

41(
46)[38]

368 (
21
7)[84]

53 (83) [22]

N
NOT TO SCALE

44 (29) [22]
269 (397) [304]
185 (54) [69]

70 (28) [69]

WILSON AVE
62 (118) [89]

60 (35) [14]

318 (319) [364]

264 (331) [362]


41(
49)[56]

93 (
80)[64]

52 (
56)[49]

100 (52) [53]

SUNNYSIDE AVE

0 (0) [0]
1
47 (
1
67)[1
21
]

8 (
30)[23]

1
70 (
206)[1
30]

AGATITE AVE

61 (89) [81]
418 (480) [402]

5 (14) [5]
56 (38) [46]

ACCESS

17 (32) [44]

1
20 (
78)[1
06]

445 (591) [472]

303 (
87)[96]

6 (19) [23]

9]
0)[
1
9 (
37]
8)[
6 (
1
]
01
)[1
81
41(
1
]
[54
70)
(
67

88 (
83)[1
09]

SI
TE

20 (
1
2)[1
9]

441 (526) [439]

6 (
3)[2]

22 (30) [48]

1
5 (
1
2)[23]

33 (
57)[58]

38 (
43)[44]

1
41(
1
38)[1
28]

8]
1
1
ST
)[
]
25
1
(
AY
42
3
57 71
)[
]
DW
59
2
(
OA
)[
2
64
BR
26 3 (
4

28 (
53)[1
4]

0 (
0)[0]

403 (
1
47)[1
78]

SI
TE

1)
(U S 4

N E DR
M ARI

10 (5) [8]

VE
D RI
SH O RE
LAKE

83 (
38)[32]

403 (
1
47)[1
78]

HAZEL ST

44 (
52)[38]

1
65 (
220 [1
61
]

38 (
30)[27]

47 (52) [35]

SITE
48 (101) [74]

3]
[
]
0)
1
375
5(
)[
1
6
5 7 ]
(
7
21
31
[
34)
(
05]
1
42
[
)
4
5
(
47

348 (547) [357]


36 (26) [30]

10 (36) [30]

MONTROSE AVE

49 (
30)[32]

541 (334) [404]


82 (54) [47]

BUENA AVE

22 (
1
0)[1
6]

70 (
86)[85]

23 (6) [6]

0 (3) [2]
1 (9) [5]

ACCESS
22 (32) [37]

Insert A

1(
7)[5]

Montrose and Clarendon


Mixed-Use Development
Chicago, Illinois

3 (
1
1
)[1
4]

PROJECT:

88 (
67)[49]

[00] - SATURDAY MIDDAY PEAK HOUR

66 (
85)[73]

(00) - PM PEAK HOUR

1
56 (
201
)[1
1
4]

LEGEND

41(
1
20)[1
33]

64 (97) [129]

00 - AM PEAK HOUR

0 (
3)[2]

1
3 (
40)[45]

]
92
]
)[ 291
88
[
(
2)
52
32
(
]
40
1
[6
7)
(
8

446 (
1
42)[1
77]

36 (
37)[36]

29 (16) [16]

1
49 (
1
86)[1
35]

90 (35) [23]

34 (
1
8)[1
6]

88 (
85)[91
]
]
06
[3
]
6)
21
1
24
)[
(
88
8
(
24
73

6 (3) [10]

30 (
52)[28]

13 (39) [11]

30 (
36)[33]

5 (7) [3]

47 (
43)[37]

0 (1) [4]

35 (
6)[9]

6 (
1
3)[5]

29 (47) [48]
568 (497) [553]

1
00 (
1
1
7)[83]

74 (44) [57]

280 (
1
09)[1
36]

]
]
55
[7
[2
0)
7)
]
1(
27
(
02
1
)[
50
1
23
1
(
55

41(
37)[40]

30 (44) [50]

27 (
23)[27]

59 (63) [85]

6 (
4)[6]

8 (13) [9]
58 (85) [137]

32 (
1
7)[24]

50 (110) [95]
511 (381) [459]

48 (
41
)[56]

14 (29) [35]
601 (513) [577]

92 (
1
1
4)[85]

65 (85) [38]
539 (413) [480]

TITLE:

TOTAL PROJECTED TRAFFIC VOLUMES

Job No: 15-253

Figure: 10

27

5.
Traffic Analysis and Recommendations
Traffic analyses were performed to determine the operation of the existing street system, evaluate
the impact of the proposed development, and determine the ability of the existing street system to
accommodate projected traffic demands. Analyses were performed for the weekday morning and
evening peak hours and Saturday midday peak hour for all intersections within the study area for
both the existing traffic volumes and projected traffic volumes upon the development of the site.
The traffic analyses were performed using the methodologies outlined in the Transportation
Research Boards Highway Capacity Manual (HCM), 2010 and modeled/analyzed using
Synchro 8.0 software. The analyses for the traffic signal-controlled intersections were
accomplished using existing cycle lengths and phasings obtained from CDOT to determine the
average overall vehicle delay, volume-to-capacity ratios and levels of service. For stop signcontrolled intersections, the methodology analyzes each approach separately by considering the
traffic volumes and lane characteristics for all approaches.
The ability of an intersection to accommodate traffic flow is expressed in terms of level of
service, which is assigned a letter from A to F based on the average control delay experienced by
vehicles passing through the intersection. The Highway Capacity Manual definitions for levels
of service and the corresponding control delay for signalized intersections and unsignalized
intersections are included in the Appendix of this report.
A summary of the traffic analyses results for the existing traffic volumes are presented in
Table 2. Analyses results for the projected traffic volumes are presented in Table 3. A
discussion of the intersections and recommendations follows.

Montrose and Clarendon


Chicago, Illinois

28

Table 2
CAPACITY ANALYSIS RESULTS EXISTING TRAFFIC VOLUMES
Weekday
Weekday
Morning
Evening
Peak Hour
Peak Hour
Intersection
LOS Delay
LOS
Delay

Saturday
Midday
Peak Hour
LOS Delay

Montrose Avenue/North Broadway1

21.6

17.9

20.0

Montrose Avenue/Sheridan Road1

12.0

16.6

12.7

North Broadway/Sheridan Road1

20.1

26.2

27.1

Montrose Avenue/Hazel Street1

7.8

8.3

11.4

Montrose Avenue/Clarendon
Avenue1

20.8

12.2

11.2

Montrose Avenue/Marine Drive/Lake


Shore Drive On-Ramp1

37.1

29.4

26.9

Wilson Avenue/Sheridan Road1

16.0

16.0

15.2

Clarendon Avenue/Wilson Avenue1

23.0

12.1

11.5

Clarendon Avenue/Buena Avenue1

9.7

8.5

7.4

Clarendon Avenue/Sunnyside
Avenue2

13.6

8.3

7.9

Clarendon Avenue/Agitate Avenue2

13.6

10.0

9.7

LOS = Level of Service


Delay is measured in seconds.
1 - Signalized Intersection
2 - Unsignalized Intersection

Montrose and Clarendon


Chicago, Illinois

29

Table 3
CAPACITY ANALYSIS RESULTS PROJECTED TRAFFIC VOLUMES
Weekday
Weekday
Morning
Evening
Peak Hour
Peak Hour
Intersection
LOS Delay
LOS
Delay

Saturday
Midday
Peak Hour
LOS Delay

Montrose Avenue/North Broadway1

22.1

18.7

20.8

Montrose Avenue/Sheridan Road1

12.6

15.9

13.9

North Broadway/Sheridan Road1

20.8

28.6

28.8

Montrose Avenue/Hazel Street1

8.8

9.5

13.2

Without Improvements

34.0

14.9

13.4

With Improvements

43.2

21.5

20.5

Without Improvements

44.2

33.8

29.4

With Improvements

36.2

32.3

28.6

Wilson Avenue/Sheridan Road1

16.6

17.0

15.3

Clarendon Avenue/Wilson Avenue1

30.2

14.4

12.6

Clarendon Avenue/Buena Avenue1

10.6

9.3

8.2

Clarendon Avenue/Sunnyside
Avenue2

12.2

8.9

8.6

Clarendon Avenue/Agitate Avenue2

14.9

10.7

10.3

Eastbound Approach

14.4

12.3

12.8

Westbound Approach

19.5

16.9

17.1

Montrose Avenue/Clarendon
Avenue1

Montrose Avenue/Marine Drive/Lake


Shore Drive On-Ramp1

Clarendon Avenue/Proposed Access


Drives2

LOS = Level of Service


Delay is measured in seconds.
1 - Signalized Intersection
2 - Unsignalized Intersection

Montrose and Clarendon


Chicago, Illinois

30

Discussion and Recommendations


The following summarizes how the intersections within the study area currently operate and are
projected to operate assuming the total projected traffic volumes. It will also identify any street
and traffic control improvements and/or modifications necessary to accommodate the projected
traffic volumes. A figure illustrating the proposed striping modifications and on-street parking
changes is provided in the Appendix.
Montrose Avenue, North Broadway, and Sheridan Road Intersections

The results of the capacity analyses show that the triangle of the three signalized intersections
created by Montrose Avenue, North Broadway, and Sheridan Road all operate at Levels of
Service (LOS) C or better during the morning, evening, and Saturday midday peak hours.
Observations during the peak hours show that queuing can occur for eastbound and westbound
through traffic but it typically clears within one cycle. Minor movements, especially the
westbound left-turn from Montrose Avenue to Sheridan Road, can also result in queues that
occasionally do not clear the intersection within a single cycle.
Under the projected conditions, the intersections will generally continue to operate at acceptable
levels of service. There will be minimal increases in delay but queuing for most movements will
continue to occur. This triangle of intersections has been optimized by CDOT and under
projected conditions does not immediately require any improvements/modifications. However,
the westbound left-turn lane at the intersection of Montrose Avenue and Sheridan Road should
be monitored to determine if a left-turn phase is required in the future. Under projected
conditions, a protected phase is not warranted based on CDOTs Suggested Planning Guidelines
for Separate Left-Turn Phases, but may be required in order to allow the left-turn movements to
clear thus minimizing any back-up of queued vehicles onto the westbound through lane.
Montrose Avenue and Hazel Street

The results of the capacity analyses show that the existing intersection operates at LOS A or B
during the morning, evening, and Saturday peak hours. While back-ups can occur for eastbound
and westbound traffic, these queues were observed to clear during each cycle. Further, the minor
approach queues regularly cleared the intersection during the north/south phase.
Under projected conditions, the results of the capacity analyses show that this intersection will
continue to operate at similar levels of service with minimal increase in delay. Observations of
the simulation show that minimal queuing for the northbound and southbound approaches.

Montrose and Clarendon


Chicago, Illinois

31

Montrose Avenue and Clarendon Avenue

The results of the capacity analyses show that this intersection currently operates at LOS C or
better during the weekday morning and evening and Saturday Midday peak hours. Under
existing conditions, traffic on Montrose Avenue experiences additional delay primarily due to
downstream queuing.
Under projected conditions, Montrose Avenue experiences an increase in southbound queuing
and delay, resulting in a LOS E during the morning peak hour. In order to minimize delay for
left-turning movements on Montrose Avenue, exclusive left-turn lanes and protected left-turn
phases should be provided. These lanes should be approximately 100 feet long for both
approaches. The addition of turn lanes on these approaches will result in the removal of
approximately 18 on-street parking spaces along Montrose Avenue.
Montrose Avenue and Marine Drive/Lake Shore Drive Southbound On-Ramp

The results of the capacity analyses show that this intersection currently operates at LOS C or D
during the weekday morning and evening and Saturday midday peak hours. This intersection has
a split-phase operation due to the orientation of the southbound on-ramp to Lake Shore Drive
and Marine Drives south approach. Observations show that some additional delay can occur due
to queuing for the Lake Shore Drive On-Ramp.
Under projected conditions, delays and queuing will continue, primarily due to the increase in
eastbound and westbound traffic at the intersection. In order to mitigate these delays, additional
green time should be reassigned from Marine Drive and given to eastbound and westbound
traffic to improve overall progression on Montrose Avenue. In addition, the storage for the
existing westbound left-turn lane can be extended, helping to separate westbound through traffic
from westbound to southbound left-turn movements. Because of the high volume of eastbound to
southbound right-turn movements accessing the Lake Shore Drive On-Ramp, consideration
should be given to providing an eastbound right-turn lane on Montrose Avenue by restricting onstreet parking a minimum of 150 feet from the intersection, which will result in the loss of
approximately seven on-street parking spaces.
Wilson Avenue with Sheridan Road and Clarendon Avenue

The results of the capacity analyses show that all intersections currently operate and are
projected to operate at acceptable levels of service. No improvements/modifications are
necessary at these intersections at this time as the increases in delay and queuing for all
movements will be minimal.

Montrose and Clarendon


Chicago, Illinois

32

Clarendon Avenue with Buena Avenue

The results of the capacity analysis show that this intersection currently operates and is projected
to operate at acceptable levels of service. However, the existing signal timings do not meet
current CDOT standards, specifically the provision of all-red clearance time. These
modifications will not significantly impact the operation of the signal.
Clarendon Avenue and Sunnyside Avenue

The results of the capacity analyses show that the all-way stop control intersection currently
operates at acceptable levels of service. Under projected conditions, Sunnyside Avenue will
become a two-way street from Clarendon Avenue to the existing north-south alley. Therefore,
Sunnyside Avenue will provide one eastbound lane and one westbound lane under stop sign
control (resulting in three-way all-way stop control). The intersection will continue to operate at
acceptable levels of service with the two-way conversion and projected site traffic. Due to the
width of the street, on-street parking will need to be removed from Sunnyside Avenue on both
sides of the street between Clarendon Avenue and the public alley to accommodate the two-way
traffic, thereby resulting in the removal of approximately nine on-street parking spaces.
Clarendon Avenue and Agitate Avenue

The results of the capacity analyses show that this intersection currently operates at LOS A and
B during the weekday morning and evening and Saturday midday peak hours. As with Sunnyside
Avenue, Agitate Avenue will become a two-way street from Clarendon Avenue to the existing
north-south alley. Therefore, it will provide one westbound lane and one eastbound lane under
stop sign control. The Clarendon Avenue approaches will remain uncontrolled.
On-street parking will need to be removed from both sides of Agatite Avenue between
Clarendon Avenue and the public alley to accommodate the Porte-Cochere access drives.
Additional spaces on the north side of the street will need to be removed to accommodate twoway traffic, thereby resulting in the total removal of approximately seven on-street parking
spaces. CDOTs Typical Contra-Flow to Alley design guidelines should be followed when
designing Agatite Avenue to allow two-way traffic operations between the public alley and
Clarendon Avenue.

Montrose and Clarendon


Chicago, Illinois

33

Clarendon Avenue and Proposed Access Drives and Loading Dock

As proposed, access to Sub-Area A and Sub-Area C will be located opposite each other. Both
access drives will provide one inbound lane and one outbound lane with outbound movements
under stop sign control. Under projected conditions, both approaches will operate at acceptable
levels of service. Due to the turning radius of a 55-foot truck at the loading dock, parking will
need to be removed on the east side of Clarendon Avenue between the access drives and
Montrose Avenue, which will result in the removal of approximately five unregulated spaces.
The removal of these spaces will also benefit through traffic on Clarendon Avenue by providing
a by-pass lane to allow northbound through traffic to go around any queued left-turning vehicles
into Sub-Area A.
Transportation Sustainability Recommendations
The following summarizes suggested measures to be implemented by the development and
recommendations to further minimize the impact of the development, foster alternative modes of
transportation other than the automobile, and to enhance pedestrian/bicycle safety.

Consideration should be given to providing bike storage for residents. In addition, bike
racks should be provided near the retail and grocery entrances.

Consideration should be given to providing multiple car-sharing vehicles within the


proposed parking garages.

The following crosswalks should be replaced with high-visibility, continental crosswalks.


o
o
o
o
o

Montrose Avenue and Hazel Street (North Approach)


Sheridan Road and Wilson Avenue
Clarendon Avenue and Buena Avenue (West Approach)
Clarendon Avenue and Sunnyside Avenue
Clarendon Avenue and Agatite Avenue

Montrose and Clarendon


Chicago, Illinois

34

6.
Conclusion
This report summarizes the methodologies, results, and findings of a traffic impact study
conducted by Kenig, Lindgren, OHara, Aboona, Inc. (KLOA, Inc.) to assess the impact of the
proposed development of the mixed-use planned development to be located near the intersection
of Montrose Avenue and Clarendon Avenue in Chicago, Illinois. As proposed, the development
will provide a total of 631 apartments and 37,371 square feet of retail/grocery within three subareas. Based on the preceding analyses and recommendations, the following conclusions have
been made:

The volume of traffic to be generated by the development will be reduced given its
location in an urban area and this proximity to alternative modes of transportation.

The existing street system can sufficiently accommodate the traffic to be generated by the
proposed development as well as the addition of background growth given the following
improvements.
o Provide protected left-turn phases for the Montrose Avenue approaches at the
intersection of Montrose Avenue and Clarendon Avenue.
o At the intersection of Montrose Avenue and Clarendon Avenue, provide left-turn
lanes at all approaches approximately 100 feet each. This will result in the
removal of approximately 18 spaces.
o At the intersection of Montrose Avenue and Marine Drive/Lake Shore Drive OnRamp, additional green time should be provided to Montrose Avenue.
o A right-turn lane should be provided on Montrose Avenue at its intersection with
Marine Drive/Lake Shore Drive On-Ramp, resulting in the removal of seven
parking spaces. Also, the westbound left-turn lane should be extended.
o Sunnyside Avenue and Agitate Avenue should be converted to allow two-way
between Clarendon Avenue and the north-south alley, which will result in the loss
of approximately 16 parking spaces.

The proposed access system will adequately accommodate the proposed increase in
traffic. The access drives for Sub-Area A and C will be located opposite each other and
will both provide one inbound lane and one outbound lane with outbound movements
under stop sign control.

Montrose and Clarendon


Chicago, Illinois

35

The signal timings for the intersection of Clarendon Avenue and Buena Avenue should
be modified to meet current CDOT standards.

High-visibility crosswalks must be installed at the following intersections.


o
o
o
o
o

Montrose Avenue and Hazel Street (North Approach)


Sheridan Road and Wilson Avenue
Clarendon Avenue and Buena Avenue (West Approach)
Clarendon Avenue and Sunnyside Avenue
Clarendon Avenue and Agatite Avenue

Montrose and Clarendon


Chicago, Illinois

36

Appendix
Traffic Counts
AutoTurn Diagrams
Demographic Data
Level of Service Table
Capacity Analyses Reports
95th Percentile Queue Tables
Proposed Striping/On-Street Parking Modifications

Montrose and Clarendon


Chicago, Illinois

A-1

Traffic Counts

Montrose and Clarendon


Chicago, Illinois

A-2

Kenig Lindgren O'Hara Aboona, Inc.


9575 W. Higgins Rd., Suite 400

Count Name: North Broadway/Montrose


Site Code:
Start Date: 07/09/2015
Page No: 1

Rosemont, Illinois, United States 60018


(847)518-9990

Turning Movement Data


Start Time

Montrose Avenue

Montrose Avenue

North Broadway

Eastbound

Westbound

Northbound

North Broadway
Southbound

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

Int. Total

7:00 AM

7:15 AM

7:30 AM

7:45 AM

Hourly Total

8:00 AM

12

126

11

18

149

77

11

88

15

40

12

55

11

45

13

61

353

8:15 AM

17

129

10

22

157

61

11

72

15

40

11

56

13

60

12

17

85

370

8:30 AM

18

115

22

15

155

69

12

82

10

48

13

58

10

63

12

82

377

8:45 AM

16

130

22

23

168

79

12

91

20

41

12

61

10

54

14

70

390

Hourly Total

63

500

65

78

629

286

46

25

333

60

169

48

230

44

222

32

56

298

1490

*** BREAK ***

4:00 PM

22

110

12

29

144

125

23

23

148

27

64

25

91

21

52

14

27

87

470

4:15 PM

20

120

19

42

159

100

17

26

117

22

63

25

85

25

55

10

28

90

451

4:30 PM

22

102

12

43

136

82

23

15

105

25

70

24

95

30

87

14

40

131

467

4:45 PM

17

108

17

39

142

117

13

11

130

40

82

23

122

16

68

19

25

103

497

Hourly Total

81

440

60

153

581

424

76

75

500

114

279

97

393

92

262

57

120

411

1885

5:00 PM

21

110

15

60

146

113

19

13

132

33

81

33

114

30

73

16

25

119

511

5:15 PM

15

87

16

43

118

104

13

21

117

23

64

33

89

22

70

14

37

106

430

5:30 PM

12

101

21

37

134

110

19

17

129

16

69

16

86

16

83

12

33

111

460

5:45 PM

17

114

17

44

148

106

17

25

123

26

70

37

97

25

68

11

51

104

472

Hourly Total

65

412

69

184

546

433

68

76

501

98

284

119

386

93

294

53

146

440

1873

*** BREAK ***

12:00 PM

17

107

22

42

146

89

21

17

110

29

71

42

100

31

88

17

33

136

492

12:15 PM

17

128

16

58

161

102

19

27

121

18

81

46

100

25

72

27

43

124

506

12:30 PM

16

132

13

48

161

109

20

30

129

31

55

29

87

24

76

22

32

122

499

12:45 PM

18

114

16

57

148

104

18

16

122

25

59

36

84

14

73

22

25

109

463

Hourly Total

68

481

67

205

616

404

78

90

482

103

266

153

371

94

309

88

133

491

1960

1:00 PM

21

119

16

51

156

89

17

25

106

25

70

56

95

26

86

15

38

127

484

1:15 PM

27

138

19

49

184

90

12

10

102

29

68

28

102

18

88

16

38

122

510

1:30 PM

23

134

21

42

178

118

19

18

137

25

62

33

88

22

78

14

27

114

517

1:45 PM

13

132

29

38

174

113

13

23

126

22

59

27

82

25

85

38

119

501

Hourly Total

84

523

85

180

692

410

61

76

471

101

259

144

367

91

337

54

141

482

2012

Grand Total

361

2356

346

800

3064

1957

329

342

2287

476

1257

14

561

1747

414

1424

284

596

2122

9220

Approach %

0.0

11.8

76.9

11.3

0.0

0.0

85.6

14.4

0.0

27.2

72.0

0.8

0.0

19.5

67.1

13.4

Total %

0.0

3.9

25.6

3.8

33.2

0.0

0.0

21.2

3.6

24.8

0.0

5.2

13.6

0.2

18.9

0.0

4.5

15.4

3.1

23.0

Lights

352

2204

323

2880

1850

289

2140

457

1100

14

1571

403

1280

278

1961

8552

% Lights

100.0

97.5

93.5

93.4

94.0

100.0

94.5

87.8

93.6

96.0

87.5

100.0

89.9

97.3

89.9

97.9

92.4

92.8

Buses

12

25

37

29

30

34

35

% Buses

0.0

0.3

0.3

0.3

0.3

0.0

0.6

7.6

1.6

0.2

2.3

0.0

1.7

0.0

2.4

0.4

1.6

110
1.2

Single-Unit Trucks

10

10

23

12

17

30

38

25

30

108

% Single-Unit
Trucks

0.0

0.8

0.4

2.9

0.8

0.0

0.6

1.5

0.7

1.7

2.4

0.0

2.2

0.7

1.8

0.7

1.4

1.2

Articulated Trucks

15

% Articulated
Trucks

0.0

0.3

0.2

0.6

0.2

0.0

0.1

0.0

0.0

0.0

0.4

0.0

0.3

0.0

0.1

0.4

0.1

0.2

Bicycles on Road

132

10

146

82

10

92

10

93

103

84

94

435

% Bicycles on
Road

0.0

1.1

5.6

2.9

4.8

0.0

4.2

3.0

4.0

2.1

7.4

0.0

5.9

1.9

5.9

0.7

4.4

4.7

Pedestrians

800

342

561

596

% Pedestrians

100.0

100.0

100.0

100.0

Kenig Lindgren O'Hara Aboona, Inc.


9575 W. Higgins Rd., Suite 400

Count Name: Montrose/Sheridan


Site Code:
Start Date: 07/09/2015
Page No: 1

Rosemont, Illinois, United States 60018


(847)518-9990

Turning Movement Data


Start Time

Montrose Avenue

Montrose Avenue

Sheridan Road

Eastbound

Westbound

Northbound

Sheridan Road
Southbound

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

Int. Total

7:00 AM

86

95

53

18

64

14

13

39

15

58

231

7:15 AM

101

108

48

20

57

19

13

24

11

20

22

37

226

7:30 AM

116

124

61

70

25

15

29

37

15

51

274

7:45 AM

149

154

77

15

88

15

10

18

25

35

18

49

316

Hourly Total

29

452

481

14

239

26

57

279

67

25

54

92

37

131

27

70

195

1047

8:00 AM

11

134

145

80

19

87

31

12

38

31

21

47

317

8:15 AM

130

136

63

21

68

23

10

12

33

39

10

28

54

291

8:30 AM

132

140

72

10

79

20

14

34

13

34

13

14

60

313

8:45 AM

16

124

140

81

21

91

31

18

36

27

21

40

307

Hourly Total

41

520

561

12

296

17

71

325

105

36

49

141

32

131

38

84

201

1228

*** BREAK ***

4:00 PM

11

113

125

129

31

144

26

11

32

37

42

14

33

64

370

4:15 PM

127

137

108

34

121

36

24

41

12

32

10

33

54

353

4:30 PM

13

130

12

143

99

40

116

31

41

40

15

28

10

35

53

352

4:45 PM

12

105

14

117

121

13

39

140

23

23

30

13

42

10

33

65

352

Hourly Total

45

475

41

522

25

457

39

144

521

116

32

120

148

48

144

44

134

236

1427

5:00 PM

15

125

140

114

49

120

25

38

29

14

39

12

36

65

354

5:15 PM

113

119

106

37

113

28

33

34

10

37

10

38

57

323

5:30 PM

105

16

112

115

12

44

132

23

19

32

14

39

13

45

66

342

5:45 PM

10

119

11

131

113

10

35

127

31

37

39

36

10

45

55

352

Hourly Total

38

462

38

502

15

448

29

165

492

107

26

127

134

47

151

45

164

243

1371

*** BREAK ***

12:00 PM

14

113

15

128

94

16

57

115

18

14

40

32

12

35

101

56

331

12:15 PM

138

148

100

15

35

122

31

12

57

43

12

30

16

51

58

371

12:30 PM

15

129

145

118

10

27

134

21

12

36

33

10

34

12

25

56

368

12:45 PM

134

13

142

10

107

31

125

24

18

33

42

33

14

31

55

364

Hourly Total

45

514

43

563

28

419

49

150

496

94

56

166

150

42

132

51

208

225

1434

1:00 PM

10

128

11

139

99

36

113

21

11

53

32

19

34

39

62

346

1:15 PM

16

137

18

154

13

90

37

110

23

12

45

35

14

33

39

56

355

1:30 PM

153

160

12

120

45

135

24

12

35

36

36

14

33

59

390

1:45 PM

16

138

155

10

112

45

131

15

32

21

14

26

11

44

51

358

Hourly Total

48

556

37

608

43

421

25

163

489

83

41

165

124

56

129

43

155

228

1449

Grand Total

246

2979

12

173

3237

137

2280

185

750

2602

572

216

681

789

262

818

248

815

1328

7956

Approach %

0.0

7.6

92.0

0.4

0.0

5.3

87.6

7.1

0.0

0.1

72.5

27.4

0.0

19.7

61.6

18.7

Total %

0.0

3.1

37.4

0.2

40.7

0.0

1.7

28.7

2.3

32.7

0.0

0.0

7.2

2.7

9.9

0.0

3.3

10.3

3.1

16.7

Lights

233

2800

12

3045

128

2146

173

2447

492

209

702

255

719

232

1206

7400

% Lights

94.7

94.0

100.0

94.1

93.4

94.1

93.5

94.0

100.0

86.0

96.8

89.0

97.3

87.9

93.5

90.8

93.0

Buses

12

13

47

50

28

29

40

43

135

% Buses

0.4

0.4

0.0

0.4

1.5

2.1

0.5

1.9

0.0

4.9

0.5

3.7

0.0

4.9

1.2

3.2

1.7

Single-Unit Trucks

19

23

14

19

20

24

17

28

94

% Single-Unit
Trucks

1.6

0.6

0.0

0.7

2.9

0.6

0.5

0.7

0.0

3.5

1.9

3.0

1.5

2.1

2.8

2.1

1.2

Articulated Trucks

11

% Articulated
Trucks

0.0

0.1

0.0

0.1

0.7

0.0

0.0

0.0

0.0

0.2

0.9

0.4

0.0

0.2

0.4

0.2

0.1

Bicycles on Road

144

152

73

10

85

31

31

40

48

316

% Bicycles on
Road

3.3

4.8

0.0

4.7

1.5

3.2

5.4

3.3

0.0

5.4

0.0

3.9

1.1

4.9

2.0

3.6

4.0

Pedestrians

173

750

681

815

% Pedestrians

100.0

100.0

100.0

100.0

Kenig Lindgren O'Hara Aboona, Inc.


9575 W. Higgins Rd., Suite 400

Count Name: North Broadway/Sheridan


Site Code:
Start Date: 07/09/2015
Page No: 1

Rosemont, Illinois, United States 60018


(847)518-9990

Turning Movement Data


Start Time

North Broadway

North Broadway

Sheridan Road

Eastbound

Westbound

Northbound

Sheridan Road
Southbound

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

Int. Total

7:00 AM

32

39

12

10

23

16

23

17

40

118

7:15 AM

50

10

61

39

50

13

13

29

14

12

26

166

7:30 AM

52

17

70

39

48

13

19

37

20

18

38

193

7:45 AM

76

20

96

30

11

11

42

15

18

10

33

14

27

41

212

Hourly Total

210

54

266

120

39

23

163

48

58

21

115

71

74

145

689

8:00 AM

45

17

62

36

46

14

30

44

15

14

29

181

8:15 AM

60

13

73

39

16

57

20

16

38

20

22

42

210

8:30 AM

65

22

87

42

13

15

59

15

19

35

17

21

38

219

8:45 AM

48

25

73

38

16

11

55

24

20

46

22

30

204

Hourly Total

218

77

295

155

54

37

217

73

85

20

163

60

79

139

814

*** BREAK ***

4:00 PM

69

12

81

63

14

12

77

19

15

15

35

19

29

10

49

242

4:15 PM

50

21

71

64

23

15

89

17

14

18

34

20

21

15

41

235

4:30 PM

70

24

94

80

25

16

105

14

12

20

29

15

18

33

261

4:45 PM

58

25

83

85

15

19

101

29

14

19

46

26

24

51

281

Hourly Total

247

82

13

329

292

77

62

372

79

55

10

72

144

80

92

38

174

1019

5:00 PM

64

18

83

93

20

13

117

25

16

22

43

24

17

41

284

5:15 PM

73

17

90

73

13

12

86

17

14

10

36

14

21

13

35

247

5:30 PM

79

25

104

61

18

68

17

23

20

45

22

24

11

46

263

5:45 PM

68

18

88

69

17

18

88

20

20

22

45

16

22

10

38

259

Hourly Total

284

78

22

365

296

57

61

359

79

73

17

74

169

76

84

43

160

1053

*** BREAK ***

12:00 PM

74

43

117

78

16

20

94

17

21

28

11

23

35

274

12:15 PM

70

22

93

89

26

20

116

21

16

24

39

15

22

17

38

286

12:30 PM

59

27

86

67

17

85

15

21

16

41

12

27

17

39

251

12:45 PM

60

26

86

69

23

92

13

21

34

35

19

24

12

43

256

Hourly Total

263

118

24

382

303

82

57

387

66

64

13

95

143

57

96

55

155

1067

1:00 PM

69

35

13

105

64

23

15

90

24

16

36

18

21

11

39

270

1:15 PM

79

35

114

97

21

16

120

16

15

28

39

21

28

51

324

1:30 PM

69

35

105

73

31

29

105

15

13

34

30

24

29

53

293

1:45 PM

87

26

113

62

17

29

80

19

10

24

31

15

23

38

262

Hourly Total

304

131

21

437

296

92

89

395

74

47

15

102

136

78

101

29

181

1149

Grand Total

1526

540

85

2074

30

1462

401

329

1893

419

382

69

384

870

422

526

181

954

5791

Approach %

0.2

0.2

73.6

26.0

0.0

1.6

77.2

21.2

0.0

48.2

43.9

7.9

0.0

44.2

55.1

0.6

Total %

0.1

0.1

26.4

9.3

35.8

0.0

0.5

25.2

6.9

32.7

0.0

7.2

6.6

1.2

15.0

0.0

7.3

9.1

0.1

16.5

Lights

1361

483

1852

29

1300

365

1694

383

324

61

768

395

452

853

5167

% Lights

100.0

100.0

89.2

89.4

89.3

96.7

88.9

91.0

89.5

91.4

84.8

88.4

88.3

93.6

85.9

100.0

89.4

89.2

Buses

39

41

37

41

24

28

38

39

% Buses

0.0

0.0

2.6

0.4

2.0

0.0

2.5

1.0

2.2

0.7

6.3

1.4

3.2

0.2

7.2

0.0

4.1

149
2.6

Single-Unit Trucks

31

15

46

30

39

16

10

27

10

12

22

134

% Single-Unit
Trucks

0.0

0.0

2.0

2.8

2.2

0.0

2.1

2.2

2.1

3.8

2.6

1.4

3.1

2.4

2.3

0.0

2.3

2.3

Articulated Trucks

18

% Articulated
Trucks

0.0

0.0

0.1

0.4

0.2

0.0

0.2

1.0

0.4

0.5

0.5

2.9

0.7

0.2

0.0

0.0

0.1

0.3

Bicycles on Road

93

38

131

92

19

112

15

22

41

15

24

39

323

% Bicycles on
Road

0.0

0.0

6.1

7.0

6.3

3.3

6.3

4.7

5.9

3.6

5.8

5.8

4.7

3.6

4.6

0.0

4.1

5.6

Pedestrians

85

329

384

181

% Pedestrians

100.0

100.0

100.0

100.0

Kenig Lindgren O'Hara Aboona, Inc.


9575 W. Higgins Rd., Suite 400

Count Name: Montrose/Hazel


Site Code:
Start Date: 07/09/2015
Page No: 1

Rosemont, Illinois, United States 60018


(847)518-9990

Turning Movement Data


Start Time

Montrose Avenue

Montrose Avenue

Hazel Street

Eastbound

Westbound

Northbound

Hazel Street
Southbound

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

Int. Total

7:00 AM

100

108

56

62

17

11

10

183

7:15 AM

110

118

49

51

12

189

7:30 AM

128

133

62

67

12

15

220

7:45 AM

159

169

75

78

23

10

12

262

Hourly Total

11

497

20

14

528

10

242

20

258

17

12

56

33

12

18

47

35

854

8:00 AM

137

146

79

82

12

15

16

259

8:15 AM

127

139

65

69

14

13

23

230

8:30 AM

152

161

76

16

81

10

14

264

8:45 AM

121

130

88

93

14

16

15

247

Hourly Total

14

537

25

19

576

308

36

325

17

21

50

45

21

10

23

56

54

1000

*** BREAK ***

4:00 PM

109

16

124

135

22

146

37

27

283

4:15 PM

132

145

124

12

132

29

12

19

295

4:30 PM

131

142

114

24

121

35

13

10

283

4:45 PM

109

13

127

10

141

159

26

25

296

Hourly Total

26

481

31

45

538

24

514

20

67

558

13

14

127

33

14

11

81

28

1157

5:00 PM

10

126

10

141

10

123

11

137

25

20

295

5:15 PM

110

126

108

17

118

20

10

14

13

267

5:30 PM

111

15

133

133

16

135

32

15

12

288

5:45 PM

114

17

128

125

16

133

33

12

28

11

284

Hourly Total

31

461

36

41

528

20

489

14

60

523

12

19

110

39

10

25

77

44

1134

*** BREAK ***

12:00 PM

140

14

152

112

63

120

48

87

13

294

12:15 PM

145

13

157

114

37

122

49

28

12

297

12:30 PM

146

12

159

123

16

129

30

10

29

12

310

12:45 PM

10

140

12

156

121

11

23

135

36

34

16

314

Hourly Total

27

571

26

51

624

13

470

23

139

506

11

16

163

32

18

29

178

53

1215

1:00 PM

138

11

147

113

127

41

12

11

291

1:15 PM

155

12

11

172

112

17

123

36

13

27

10

318

1:30 PM

12

151

11

19

174

132

17

147

36

13

10

34

15

349

1:45 PM

12

135

12

13

159

130

17

137

51

14

24

10

320

Hourly Total

35

579

38

54

652

25

487

22

56

534

16

22

164

46

18

22

97

46

1278

Grand Total

144

3126

176

224

3446

100

2510

94

378

2704

86

38

104

670

228

93

39

128

536

260

6638

Approach %

0.0

4.2

90.7

5.1

0.0

3.7

92.8

3.5

0.0

37.7

16.7

45.6

0.0

35.8

15.0

49.2

Total %

0.0

2.2

47.1

2.7

51.9

0.0

1.5

37.8

1.4

40.7

0.0

1.3

0.6

1.6

3.4

0.0

1.4

0.6

1.9

3.9

Lights

139

2954

163

3256

98

2344

94

2536

83

27

102

212

87

30

120

237

6241

% Lights

96.5

94.5

92.6

94.5

98.0

93.4

100.0

93.8

96.5

71.1

98.1

93.0

93.5

76.9

93.8

91.2

94.0

Buses

10

11

45

45

57

% Buses

0.0

0.3

0.6

0.3

0.0

1.8

0.0

1.7

0.0

0.0

0.0

0.0

0.0

2.6

0.0

0.4

0.9

Single-Unit Trucks

16

19

16

17

39

% Single-Unit
Trucks

0.7

0.5

1.1

0.6

1.0

0.6

0.0

0.6

0.0

0.0

0.0

0.0

1.1

0.0

1.6

1.2

0.6

Articulated Trucks

% Articulated
Trucks

0.0

0.1

0.0

0.1

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Bicycles on Road

144

10

158

105

106

11

16

19

299

% Bicycles on
Road

2.8

4.6

5.7

4.6

1.0

4.2

0.0

3.9

3.5

28.9

1.9

7.0

5.4

20.5

4.7

7.3

4.5

Pedestrians

224

378

670

536

% Pedestrians

100.0

100.0

100.0

100.0

Kenig Lindgren O'Hara Aboona, Inc.


9575 W. Higgins Rd., Suite 400

Count Name: Clarendon and Montrose


Site Code:
Start Date: 10/24/2015
Page No: 1

Rosemont, Illinois, United States 60018


(847)518-9990

Turning Movement Data


Start Time

Montrose

Montrose

Clarendon

Clarendon

Eastbound

Westbound

Northbound

Southbound

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

11

110

72

82

12

13

126

86

98

19

112

12

129

80

88

12

128

20

152

84

10

95

19

446

52

31

517

26

322

15

23

363

1:00 PM

98

14

116

98

12

1:15 PM

116

133

89

13

1:30 PM

115

125

91

1:45 PM

118

131

80

Hourly Total

21

447

37

26

505

28

358

U-Turn

Left

Thru

Right

12:00 PM

12:15 PM

94

112

12:30 PM

12:45 PM

Hourly Total

Peds

App.
Total

U-Turn

Peds

App.
Total

Int. Total

26

15

36

16

234

10

44

15

11

12

304

21

12

49

15

304

18

14

34

35

61

311

41

76

26

34

143

1153

107

12

100

29

12

24

276

27

15

12

28

101

288

10

35

16

89

277

16

28

10

25

11

40

397

273

32

53

119

23

40

30

35

93

1114

Left

Thru

Right

10

14

27

38

16

12

30

34

46

130

12

19

13

11

12

12

11

39

48

*** BREAK ***

7:00 AM

134

14

154

55

14

62

10

15

17

12

42

10

32

16

46

304

7:15 AM

147

33

12

187

79

15

90

14

25

13

14

52

58

12

16

76

405

7:30 AM

136

15

156

12

63

11

81

26

32

20

78

12

70

10

88

403

7:45 AM

11

131

10

10

152

53

11

60

11

33

16

60

11

60

12

13

83

355

Hourly Total

29

548

72

40

649

28

250

15

51

293

61

105

66

41

232

39

220

34

55

293

1467

8:00 AM

129

16

13

151

80

82

11

20

11

42

12

68

11

88

363

8:15 AM

114

23

17

143

12

95

21

116

13

13

32

18

83

16

22

117

408

8:30 AM

131

17

35

150

12

68

65

85

11

23

19

43

31

63

27

103

381

8:45 AM

12

121

16

30

149

11

97

10

25

118

12

36

16

15

64

19

70

10

21

99

430

Hourly Total

26

495

72

95

593

35

340

26

120

401

40

92

49

49

181

80

284

43

81

407

1582

*** BREAK ***

4:00 PM

94

107

113

14

122

16

25

10

10

52

11

14

24

31

312

4:15 PM

15

117

136

100

109

27

13

47

14

23

315

4:30 PM

10

103

119

58

64

12

11

12

29

14

11

28

240

4:45 PM

99

10

113

84

93

19

10

35

15

17

31

272

Hourly Total

37

413

25

28

475

23

355

10

26

388

38

83

41

37

163

31

51

31

66

113

1139

5:00 PM

98

14

119

141

154

23

10

31

17

12

29

333

5:15 PM

98

111

138

150

17

17

10

16

44

20

31

336

5:30 PM

12

87

13

112

124

11

23

144

10

24

42

18

14

32

39

337

5:45 PM

12

84

11

107

129

12

11

146

31

13

43

12

22

318

Hourly Total

38

367

44

33

449

25

532

37

45

594

36

95

29

47

160

27

67

27

60

121

1324

Grand Total

170

2716

302

253

3188

165

2157

114

305

2436

249

484

251

273

985

241

738

191

331

1170

7779

Approach %

0.0

5.3

85.2

9.5

0.0

6.8

88.5

4.7

0.1

25.3

49.1

25.5

0.0

20.6

63.1

16.3

Total %

0.0

2.2

34.9

3.9

41.0

0.0

2.1

27.7

1.5

31.3

0.0

3.2

6.2

3.2

12.7

0.0

3.1

9.5

2.5

15.0

Lights

159

2671

290

3120

165

2087

109

2361

236

433

242

912

238

672

183

1093

7486

% Lights

93.5

98.3

96.0

97.9

100.0

96.8

95.6

96.9

100.0

94.8

89.5

96.4

92.6

98.8

91.1

95.8

93.4

96.2

Buses

15

33

36

15

20

40

44

115

% Buses

2.9

0.2

1.3

0.5

0.0

1.5

2.6

1.5

0.0

1.2

3.1

0.8

2.0

0.8

5.4

1.0

3.8

1.5

Single-Unit Trucks

14

11

11

11

11

47

% Single-Unit
Trucks

2.4

0.3

0.7

0.4

0.0

0.5

0.0

0.5

0.0

1.2

1.4

0.4

1.1

0.0

1.2

1.0

0.9

0.6

Articulated Trucks

10

15

32

% Articulated
Trucks

0.0

0.3

0.0

0.2

0.0

0.2

0.9

0.2

0.0

0.4

2.1

1.6

1.5

0.0

0.1

1.6

0.3

0.4

Bicycles on Road

24

32

21

22

19

27

16

18

99

% Bicycles on
Road

1.2

0.9

2.0

1.0

0.0

1.0

0.9

0.9

0.0

2.4

3.9

0.8

2.7

0.4

2.2

0.5

1.5

1.3

Pedestrians

253

305

273

331

% Pedestrians

100.0

100.0

100.0

100.0

StudyName MontroseLSDOnRampMarineDrive
StartDate Saturday,October24,201512:00PM
EndDate Tuesday,October27,20156:00PM
SiteCode

ReportSummary
TimePeriod

Class.

HL

BL

Southbound
BL
BR
R

HL

Northeastbound
BL
BR
R

Total

Peak1
SpecifiedPeriod
8:00AM9:00AM
OneHourPeak
8:00AM9:00AM

Lights

52

Eastbound
BR
HR
484

78

617

385

117

92

284

501

90

15

125

56

205

36

637

45

25

29

21

120

295

1443

0%

38%

88%

100%

96%

97%

96%

0%

100%

99%

99%

53%

98%

93%

0%

100%

94%

91%

86%

90%

68%

0%

0%

0%

0%

0%

0%

100%

0%

98%

83%

100%

100%

95%

95%

96%

Northwestbound
BL
BR
HR

Buses

12

15

14

0%

13%

0%

0%

1%

0%

1%

0%

0%

1%

0%

0%

0%

0%

0%

0%

0%

9%

5%

7%

9%

0%

0%

0%

0%

0%

0%

0%

0%

2%

13%

0%

0%

4%

4%

2%

ngleUnitTruc

14

25

0%

25%

2%

0%

1%

1%

1%

0%

0%

0%

0%

33%

1%

1%

0%

0%

0%

0%

6%

2%

13%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

1%

ticulatedTruc

Crosswalk
edestria Total
W

44

44

100%

26

0%

26

100%

SE

0%

25%

0%

0%

0%

0%

1%

0%

0%

0%

0%

13%

0%

0%

0%

0%

6%

0%

3%

1%

8%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

icyclesonRoa

11

0%

0%

10%

0%

1%

1%

1%

0%

0%

0%

1%

0%

0%

6%

0%

0%

0%

1%

0%

0%

2%

0%

0%

0%

0%

0%

0%

0%

0%

0%

3%

0%

0%

1%

1%

1%

0%

Total
PHF

0
0

8
0.67

59
0.78

485
0.97

81
0.63

633
0.94

399
0.85

0
0

117
0.84

93
0.68

288
0.94

15
0.54

513
0.96

97
0.78

0
0

9
0.75

16
0.57

138
0.75

65
0.6

228
0.76

53
0.88

0
0

0
0

0
0

0
0

0
0

0
0

46
0.68

30
0.68

29
0.81

21
0.66

126
0.85

312
0.7

1500
0.92

70

70

42%

27%

34%

6%

15%

4%

8%

21%

27

27

Approach%

Peak2
SpecifiedPeriod
5:00PM6:00PM
OneHourPeak
5:00PM6:00PM

Westbound
T
R

Lights

0
0

639
0.93

0%

43%

13

81

271

50

415

584

52

33

484

10

579

126

10

74

58

150

61

341

42

38

35

10

126

158

1270

0%

100%

100%

99%

96%

99%

98%

0%

100%

100%

99%

100%

99%

100%

0%

100%

100%

94%

89%

93%

84%

0%

0%

0%

0%

0%

0%

99%

100%

100%

76%

100%

100%

91%

96%

97%

Buses

11

11

11

24

0%

0%

0%

0%

4%

1%

1%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

5%

8%

6%

15%

0%

0%

0%

0%

0%

0%

0%

0%

0%

22%

0%

0%

8%

4%

2%

ngleUnitTruc

0%

0%

0%

1%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

1%

2%

1%

1%

0%

0%

0%

0%

0%

0%

1%

0%

0%

2%

0%

0%

1%

1%

0%

ticulatedTruc

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

2%

1%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100%

100%

23

23

100%

SE

0%

icyclesonRoa

0%

0%

0%

0%

0%

0%

1%

0%

0%

0%

1%

0%

1%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

Total
PHF

0
0

13
0.81

81
0.92

274
0.86

52
0.87

420
0.9

595
0.92

0
0

52
0.72

33
0.82

488
0.94

10
0.5

583
0.93

126
0.88

0
0

10
0.62

8
0.4

79
0.9

65
0.9

162
0.88

73
0.73

0
0

0
0

0
0

0
0

0
0

0
0

344
0.87

1
0.25

42
0.7

50
0.74

35
0.73

10
0.83

138
0.82

165
0.9

1303
0.93

51

32%

46%

45%

10%

12%

6%

0%

26%

11%

13%

Approach%

0%

SW

SW

0
51

StudyName MontroseLSDOnRampMarineDrive
StartDate Saturday,October24,201512:00PM
EndDate Tuesday,October27,20156:00PM
SiteCode

ReportSummary
TimePeriod

Class.

HL

BL

BL

Northwestbound
BL
BR
HR

HL

Northeastbound
BL
BR
R

Total

Peak1
SpecifiedPeriod
12:15PM1:15PM
OneHourPeak
12:15PM1:15PM

Lights

131

Eastbound
BR
HR
328

46

514

381

101

20

Westbound
T
R
300

424

171

36

Southbound
BR
R
89

45

179

34

481

36

22

31

16

105

155

1222

0%

100%

96%

100%

100%

99%

98%

0%

99%

100%

99%

100%

99%

96%

0%

100%

100%

91%

90%

93%

87%

0%

0%

0%

0%

0%

0%

100%

0%

100%

81%

97%

100%

95%

95%

98%

Buses

12

18

0%

0%

0%

0%

0%

0%

2%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

7%

10%

6%

10%

0%

0%

0%

0%

0%

0%

0%

0%

0%

15%

0%

0%

4%

4%

1%

ngleUnitTruc

0%

0%

0%

0%

0%

0%

0%

0%

1%

0%

0%

0%

0%

1%

0%

0%

0%

2%

0%

1%

3%

0%

0%

0%

0%

0%

0%

0%

0%

0%

4%

3%

0%

2%

1%

0%

Crosswalk
edestria Total
W

100%

49

49

100%

rticulatedTruc

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

icyclesonRoa

0%

0%

4%

0%

0%

1%

0%

0%

0%

0%

0%

0%

0%

3%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

1%

0%

Total
PHF

0
0

9
0.45

137
0.88

329
0.9

46
0.77

521
0.92

388
0.85

0
0

102
0.88

20
0.56

302
0.8

3
0.75

427
0.89

178
0.91

0
0

9
0.56

36
0.53

98
0.72

50
0.66

193
0.82

39
0.89

0
0

0
0

0
0

0
0

0
0

0
0

483
0.86

0
0

36
0.75

27
0.84

32
0.8

16
0.67

111
0.82

164
0.8

1252
0.94

67

42%

31%

34%

14%

15%

3%

0%

39%

9%

13%

Approach%

100%

SE

100%

SW

0
67

Kenig Lindgren O'Hara Aboona, Inc.


9575 W. Higgins Rd., Suite 400

Count Name: Sheridan and Wilson


Site Code:
Start Date: 10/24/2015
Page No: 1

Rosemont, Illinois, United States 60018


(847)518-9990

Turning Movement Data


Start Time

Wilson

Wilson

Sheridan

Sheridan

Eastbound

Westbound

Northbound

Southbound

App.
Total

U-Turn

Left

Thru

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

Int. Total

15

92

16

115

39

64

39

10

35

54

10

38

13

16

61

271

28

101

32

11

46

48

18

51

15

16

84

18

121

348

14

32

84

36

10

43

55

13

67

10

20

90

66

21

99

350

64

10

28

84

36

27

49

13

62

19

22

94

88

310

29

70

326

22

268

43

127

333

25

143

38

151

206

54

218

57

74

329

1295

22

84

30

88

15

79

51

90

51

10

40

63

18

61

10

20

89

356

61

44

77

13

35

10

26

58

12

47

16

13

75

1:30 PM

22

87

343

122

66

12

39

80

40

11

30

58

12

37

14

21

63

1:45 PM

26

323

19

106

69

13

48

87

28

44

45

19

46

12

13

77

Hourly Total

100

315

78

475

18

275

41

182

334

31

154

39

140

224

61

191

52

67

304

1337

U-Turn

Left

Thru

Right

Peds

Right

Peds

12:00 PM

23

61

12:15 PM

20

88

53

85

11

12:30 PM

20

95

66

12:45 PM

25

10

Hourly Total

427

1:00 PM
1:15 PM

16

114

18

133

13

25

66

14

325

50

*** BREAK ***

7:00 AM

113

13

123

42

21

23

67

23

10

23

37

22

49

79

306

7:15 AM

15

120

12

139

13

61

18

15

92

46

13

32

68

24

60

13

97

396

7:30 AM

10

82

11

101

17

69

19

18

105

36

17

48

20

85

10

19

115

369

7:45 AM

12

80

10

13

102

17

86

22

19

125

49

20

62

24

84

20

10

128

417

Hourly Total

44

395

26

49

465

51

258

80

75

389

25

154

36

92

215

90

278

51

45

419

1488

8:00 AM

21

104

132

18

48

25

74

38

12

24

56

26

86

35

119

381

8:15 AM

13

89

111

13

47

19

50

79

36

13

21

54

22

92

42

123

367

8:30 AM

10

55

11

12

76

21

57

10

37

88

38

21

47

22

118

11

35

151

362

8:45 AM

16

47

16

79

16

63

14

19

93

18

40

11

28

69

31

68

15

23

114

355

Hourly Total

60

295

43

35

398

68

215

51

131

334

31

152

43

94

226

101

364

42

135

507

1465

*** BREAK ***

4:00 PM

19

74

10

19

103

14

69

16

43

99

54

33

62

23

51

15

27

89

353

4:15 PM

18

57

34

81

10

77

18

55

105

10

49

10

61

69

13

42

18

61

316

4:30 PM

20

64

19

15

103

46

51

55

60

45

75

15

49

11

19

75

308

4:45 PM

30

70

14

107

58

10

41

73

45

34

60

17

53

11

23

81

321

Hourly Total

87

265

42

82

394

30

250

52

190

332

27

208

31

173

266

68

195

43

87

306

1298

5:00 PM

24

84

12

15

120

68

26

22

101

47

48

61

25

59

18

21

102

384

5:15 PM

22

73

11

16

106

11

100

16

48

127

57

16

41

80

13

45

26

67

380

5:30 PM

42

68

16

28

126

70

18

41

90

54

10

33

67

14

59

35

82

365

5:45 PM

27

57

14

93

88

22

31

117

59

17

37

84

15

45

38

69

363

Hourly Total

115

282

48

73

445

27

326

82

142

435

25

217

50

159

292

67

208

45

120

320

1492

Grand Total

494

1872

238

387

2604

216

1592

349

847

2157

164

1028

237

809

1429

441

1454

290

528

2185

8375

Approach %

0.0

19.0

71.9

9.1

0.0

10.0

73.8

16.2

0.0

11.5

71.9

16.6

0.0

20.2

66.5

13.3

Total %

0.0

5.9

22.4

2.8

31.1

0.0

2.6

19.0

4.2

25.8

0.0

2.0

12.3

2.8

17.1

0.0

5.3

17.4

3.5

26.1

Lights

449

1798

229

2476

200

1552

335

2087

160

948

229

1337

430

1348

273

2051

7951

% Lights

90.9

96.0

96.2

95.1

92.6

97.5

96.0

96.8

97.6

92.2

96.6

93.6

97.5

92.7

94.1

93.9

94.9

Buses

33

26

60

12

25

27

29

33

43

% Buses

6.7

1.4

0.4

2.3

3.7

0.8

1.4

1.2

0.6

2.6

0.4

2.0

1.1

2.3

1.7

2.0

157
1.9

Single-Unit Trucks

20

34

15

20

28

35

50

127

% Single-Unit
Trucks

1.6

1.1

2.5

1.3

1.9

0.5

0.9

0.7

1.2

1.9

2.5

2.0

1.4

2.4

3.1

2.3

1.5

Articulated Trucks

10

18

19

40

% Articulated
Trucks

0.6

0.1

0.0

0.2

1.9

0.3

0.6

0.5

0.6

1.8

0.0

1.3

0.0

0.5

0.0

0.3

0.5

Bicycles on Road

27

30

16

20

15

16

31

34

100

% Bicycles on
Road

0.2

1.4

0.8

1.2

0.0

1.0

1.1

0.9

0.0

1.5

0.4

1.1

0.0

2.1

1.0

1.6

1.2

Pedestrians

387

847

809

528

% Pedestrians

100.0

100.0

100.0

100.0

Kenig Lindgren O'Hara Aboona, Inc.


9575 W. Higgins Rd., Suite 400

Count Name: Wilson and Clarendon


Site Code:
Start Date: 10/24/2015
Page No: 1

Rosemont, Illinois, United States 60018


(847)518-9990

Turning Movement Data


Start Time

Wilson

Wilson

Clarendon

Clarendon

Eastbound

Westbound

Northbound

Southbound

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

Int. Total

14

84

110

55

61

10

76

90

19

11

10

36

16

11

12

33

214

12

18

37

36

10

52

10

11

115

71

289

83

19

17

30

24

26

58

77

11

86

12

68

10

286

90

12

24

10

10

28

32

333

30

43

395

35

270

228

19

22

324

27

68

32

40

127

44

88

39

26

171

1017

16

12

80

17

103

92

20

109

69

79

13

10

17

29

13

13

31

242

71

81

11

12

30

15

18

29

1:30 PM

11

91

10

110

249

61

67

12

14

12

32

12

12

23

1:45 PM

70

84

232

69

82

15

10

21

13

13

33

Hourly Total

47

333

26

51

220

406

18

270

21

19

309

24

52

36

45

112

33

42

41

49

116

*** BREAK ***

943

7:00 AM

10

121

14

22

145

13

51

10

74

11

15

10

32

15

27

278

7:15 AM

10

7:30 AM

133

17

18

160

15

63

10

88

11

20

36

11

33

47

331

83

16

106

20

83

110

21

16

40

39

10

57

7:45 AM

313

73

11

85

24

108

17

149

11

20

10

41

11

37

13

61

Hourly Total

336

34

410

52

60

496

72

305

44

15

421

54

71

24

18

149

38

124

30

21

192

1258

8:00 AM

16

82

20

11

118

63

50

122

19

31

49

12

10

67

338

8:15 AM

13

77

18

31

108

38

81

16

10

135

10

20

34

42

21

12

72

349

8:30 AM

17

31

29

26

78

26

40

17

75

24

10

33

60

26

17

93

279

8:45 AM

11

48

24

15

83

43

91

18

143

17

28

52

14

51

32

13

97

375

Hourly Total

57

238

91

83

387

170

262

43

52

475

38

91

21

21

150

36

202

91

52

329

1341

U-Turn

Left

Thru

Right

Peds

12:00 PM

72

12:15 PM

92

12:30 PM

13

92

12:45 PM

Hourly Total

1:00 PM
1:15 PM

*** BREAK ***

4:00 PM

12

71

18

90

10

64

12

10

86

17

24

49

16

18

33

258

4:15 PM

64

10

19

81

77

12

96

17

16

13

13

46

17

10

34

257

4:30 PM

71

11

21

91

35

48

15

27

13

16

11

10

40

206

4:45 PM

65

17

78

62

79

15

27

12

14

11

37

221

Hourly Total

35

271

34

75

340

31

238

40

30

309

44

70

35

26

149

58

48

38

45

144

942

5:00 PM

105

21

120

81

92

12

22

10

37

15

13

19

35

284

5:15 PM

13

83

12

23

108

102

10

116

16

33

11

12

18

41

298

5:30 PM

58

14

70

97

22

105

22

16

34

14

10

27

236

5:45 PM

10

66

15

79

90

106

22

10

10

41

12

19

245

Hourly Total

35

312

30

73

377

21

370

28

44

419

39

82

24

44

145

30

48

44

49

122

1063

Grand Total

240

1897

263

385

2401

347

1715

195

182

2257

226

434

172

194

832

239

552

283

242

1074

6564

Approach %

0.0

10.0

79.0

11.0

0.0

15.4

76.0

8.6

0.0

27.2

52.2

20.7

0.0

22.3

51.4

26.4

Total %

0.0

3.7

28.9

4.0

36.6

0.0

5.3

26.1

3.0

34.4

0.0

3.4

6.6

2.6

12.7

0.0

3.6

8.4

4.3

16.4

Lights

229

1840

256

2326

325

1677

189

2191

209

396

156

761

231

495

270

996

6274

% Lights

100.0

95.4

97.0

97.3

96.9

93.7

97.8

96.9

97.1

92.5

91.2

90.7

91.5

96.7

89.7

95.4

92.7

95.6

Buses

37

41

14

24

12

11

32

34

39

136

% Buses

0.0

0.4

2.0

1.1

1.7

4.0

0.5

0.5

1.1

5.3

2.5

5.2

3.8

0.4

6.2

1.4

3.6

2.1

Single-Unit Trucks

18

12

11

18

59

% Single-Unit
Trucks

0.0

3.8

0.3

1.5

0.7

0.6

0.5

1.0

0.5

0.4

1.6

1.7

1.3

0.4

1.6

2.8

1.7

0.9

Articulated Trucks

13

17

% Articulated
Trucks

0.0

0.0

0.0

0.0

0.0

0.9

0.5

0.5

0.6

0.0

0.0

0.6

0.1

0.8

0.2

0.0

0.3

0.3

Bicycles on Road

15

16

12

17

20

27

13

18

78

% Bicycles on
Road

0.0

0.4

0.8

0.0

0.7

0.9

0.7

1.0

0.8

1.8

4.6

1.7

3.2

1.7

2.4

0.4

1.7

1.2

Pedestrians

385

182

194

242

% Pedestrians

100.0

100.0

100.0

100.0

Kenig Lindgren O'Hara Aboona, Inc.


9575 W. Higgins Rd., Suite 400

Count Name: Buena and Clarendon


Site Code:
Start Date: 10/24/2015
Page No: 1

Rosemont, Illinois, United States 60018


(847)518-9990

Turning Movement Data


Start Time

Buena

Buena

Clarendon

Clarendon

Eastbound

Westbound

Northbound

Southbound

App.
Total

U-Turn

Left

Thru

Right

15

12

18

20

33

43

12

1:30 PM

1:45 PM

Hourly Total

10

20

23

U-Turn

Left

12:00 PM

12:15 PM

12:30 PM

Peds

App.
Total

U-Turn

Left

Thru

Right

25

18

32

17

19

15

60

25

11

13

13

18

12

13

11

16

12

38

53

16

18

49

Thru

Right

Peds

10

12:45 PM

Hourly Total

1:00 PM
1:15 PM

Peds

App.
Total

U-Turn

Left

Thru

Right

Peds

App.
Total

Int. Total

34

24

14

29

80

10

42

34

37

99

29

11

13

46

27

12

31

95

27

11

44

31

12

35

92

18

113

35

38

166

11

116

47

132

366

27

16

37

21

25

81

24

32

14

43

25

28

108

33

13

45

11

11

13

73

31

15

13

51

20

10

24

98

41

23

123

30

56

176

77

36

90

360

*** BREAK ***

7:00 AM

17

12

16

33

43

23

11

71

40

46

157

7:15 AM

27

40

10

64

17

11

87

11

64

12

82

216

7:30 AM

17

13

26

13

16

10

82

25

16

117

74

12

92

251

7:45 AM

17

10

14

28

47

19

72

54

62

170

Hourly Total

11

78

38

52

127

10

24

40

38

27

236

84

45

347

29

232

21

42

282

794

8:00 AM

20

15

32

11

10

35

12

50

70

78

166

8:15 AM

33

13

38

12

10

30

10

48

12

71

14

84

177

8:30 AM

22

14

33

23

11

48

10

13

69

59

71

181

8:45 AM

10

18

12

15

40

16

31

13

16

48

65

13

73

168

Hourly Total

22

93

28

57

143

16

62

28

35

144

36

51

215

34

265

41

306

692

*** BREAK ***

4:00 PM

14

16

12

46

12

14

66

24

26

110

4:15 PM

11

17

11

32

48

19

22

92

4:30 PM

18

11

18

13

29

21

24

76

4:45 PM

14

11

37

12

50

21

24

97

Hourly Total

25

19

25

49

26

55

37

26

133

34

48

193

85

11

20

96

375

5:00 PM

11

13

38

15

53

22

12

28

101

5:15 PM

13

12

13

13

43

11

57

26

28

111

5:30 PM

16

17

15

22

19

52

16

65

27

33

134

5:45 PM

12

15

11

18

14

35

17

48

20

25

102

Hourly Total

34

16

43

56

44

66

55

18

168

37

56

223

95

13

32

114

448

Grand Total

59

268

144

248

471

50

143

31

332

224

147

917

256

294

1320

84

870

66

218

1020

3035

Approach %

0.0

12.5

56.9

30.6

0.0

22.3

63.8

13.8

0.0

11.1

69.5

19.4

0.0

8.2

85.3

6.5

Total %

0.0

1.9

8.8

4.7

15.5

0.0

1.6

4.7

1.0

7.4

0.0

4.8

30.2

8.4

43.5

0.0

2.8

28.7

2.2

33.6

Lights

53

254

131

438

46

127

31

204

135

829

247

1211

83

781

63

927

2780

% Lights

89.8

94.8

91.0

93.0

92.0

88.8

100.0

91.1

91.8

90.4

96.5

91.7

98.8

89.8

95.5

90.9

91.6

Buses

24

24

44

44

72

% Buses

3.4

0.0

0.7

0.6

0.0

0.7

0.0

0.4

0.0

2.6

0.0

1.8

0.0

5.1

0.0

4.3

2.4

Single-Unit Trucks

16

24

39

% Single-Unit
Trucks

3.4

0.7

0.7

1.1

0.0

0.7

0.0

0.4

2.0

1.7

2.0

1.8

1.2

0.9

0.0

0.9

1.3

Articulated Trucks

% Articulated
Trucks

0.0

0.0

0.7

0.2

0.0

0.0

0.0

0.0

0.7

0.1

0.0

0.2

0.0

0.5

0.0

0.4

0.2

Bicycles on Road

12

10

24

14

18

47

59

33

36

137

% Bicycles on
Road

3.4

4.5

6.9

5.1

8.0

9.8

0.0

8.0

5.4

5.1

1.6

4.5

0.0

3.8

4.5

3.5

4.5

Pedestrians

248

332

294

218

% Pedestrians

100.0

100.0

100.0

100.0

Kenig Lindgren O'Hara Aboona, Inc.


9575 W. Higgins Rd., Suite 400

Count Name: Sunnyside and Clarendon


Site Code:
Start Date: 10/24/2015
Page No: 1

Rosemont, Illinois, United States 60018


(847)518-9990

Turning Movement Data


Start Time

Sunnyside

Clarendon

Clarendon

Eastbound

Northbound

Southbound

U-Turn

Left

Right

Peds

App. Total

U-Turn

Left

Thru

Peds

App. Total

U-Turn

Thru

Right

Peds

App. Total

Int. Total

12:00 PM

20

21

17

26

47

12:15 PM

10

24

29

45

51

80

12:30 PM

23

26

37

43

69

12:45 PM

22

23

26

32

55

Hourly Total

34

89

20

99

125

26

14

152

251

1:00 PM

11

18

23

19

24

47

1:15 PM

10

18

21

20

23

44

1:30 PM

13

24

27

13

15

42

1:45 PM

13

20

23

19

20

44

Hourly Total

47

14

80

19

94

71

11

11

82

177

*** BREAK ***

7:00 AM

21

26

32

11

43

69

7:15 AM

32

41

69

76

117

7:30 AM

10

35

45

77

85

130

7:45 AM

45

49

69

73

122

Hourly Total

30

28

133

161

247

30

277

438

8:00 AM

10

26

29

100

13

113

142

8:15 AM

15

24

32

105

16

123

155

8:30 AM

64

28

12

35

102

19

121

157

8:45 AM

21

43

52

93

27

121

173

Hourly Total

110

27

121

20

148

400

75

18

478

627

*** BREAK ***

4:00 PM

12

33

40

24

32

75

4:15 PM

10

37

44

18

26

70

4:30 PM

10

22

27

24

12

37

64

4:45 PM

25

31

23

12

36

67

Hourly Total

37

22

117

13

142

89

38

10

131

276

5:00 PM

32

39

21

26

65

5:15 PM

28

37

23

32

69

5:30 PM

13

17

33

17

52

32

40

92

5:45 PM

12

16

37

53

18

23

76

Hourly Total

40

49

130

39

181

94

24

10

121

302

Grand Total

298

149

670

118

825

11

1026

204

72

1241

2071

Approach %

0.0

40.0

60.0

0.7

18.1

81.2

0.9

82.7

16.4

Total %

0.0

0.1

0.1

0.2

0.3

7.2

32.4

39.8

0.5

49.5

9.9

59.9

Lights

145

597

748

11

949

190

1150

1901

% Lights

0.0

100.0

60.0

100.0

97.3

89.1

90.7

100.0

92.5

93.1

92.7

91.8

Buses

31

32

45

51

83

% Buses

0.0

0.0

0.0

0.0

0.7

4.6

3.9

0.0

4.4

2.9

4.1

Single-Unit Trucks

11

12

12

4.0
24

% Single-Unit Trucks

0.0

0.0

0.0

0.0

0.7

1.6

1.5

0.0

0.7

2.5

1.0

1.2

Articulated Trucks

10

% Articulated Trucks

0.0

0.0

0.0

0.0

0.7

0.4

0.5

0.0

0.4

1.0

0.5

0.5

Bicycles on Road

28

29

21

22

53

% Bicycles on Road

100.0

0.0

40.0

0.0

0.7

4.2

3.5

0.0

2.0

0.5

1.8

2.6

Pedestrians

298

118

72

% Pedestrians

100.0

100.0

100.0

Kenig Lindgren O'Hara Aboona, Inc.


9575 W. Higgins Rd., Suite 400

Count Name: Clarendon and Agatite


Site Code:
Start Date: 10/24/2015
Page No: 1

Rosemont, Illinois, United States 60018


(847)518-9990

Turning Movement Data


Start Time

Agatite

Clarendon

Clarendon

Eastbound

Northbound

Southbound

U-Turn

Left

Right

Peds

App. Total

U-Turn

Left

Thru

Peds

App. Total

U-Turn

Thru

Right

Peds

App. Total

Int. Total

12:00 PM

20

20

15

15

38

12:15 PM

30

30

43

43

78

12:30 PM

23

23

42

42

73

12:45 PM

25

25

28

28

62

Hourly Total

21

25

25

98

98

128

128

251

1:00 PM

20

21

18

19

47

1:15 PM

11

10

19

19

19

19

48

1:30 PM

11

22

22

12

12

41

1:45 PM

11

11

21

21

16

16

48

Hourly Total

11

24

41

35

82

83

65

66

184

*** BREAK ***

7:00 AM

13

14

21

21

34

35

70

7:15 AM

11

16

38

38

62

62

116

7:30 AM

11

12

41

41

81

81

134

7:45 AM

10

12

51

51

69

69

132

Hourly Total

45

19

54

151

151

246

247

452

8:00 AM

24

24

89

89

120

8:15 AM

12

16

14

29

29

110

110

153

8:30 AM

62

33

15

33

93

93

134

8:45 AM

25

48

48

93

93

144

Hourly Total

27

111

32

134

27

134

385

385

551

*** BREAK ***

4:00 PM

12

32

32

21

23

67

4:15 PM

44

44

20

20

72

4:30 PM

30

30

21

21

55

4:45 PM

27

28

23

23

60

Hourly Total

11

22

33

33

133

134

85

87

254

5:00 PM

41

41

24

24

72

5:15 PM

32

32

26

26

67

5:30 PM

13

45

46

30

31

90

5:45 PM

12

47

49

19

19

75

Hourly Total

15

21

26

36

165

168

99

100

304

Grand Total

55

160

255

215

763

67

768

1008

12

1013

1996

Approach %

0.0

25.6

74.4

0.3

0.4

99.3

0.3

99.5

0.2

Total %

0.0

2.8

8.0

10.8

0.1

0.2

38.2

38.5

0.2

50.5

0.1

50.8

Lights

51

155

206

690

692

947

952

1850

% Lights

92.7

96.9

95.8

100.0

0.0

90.4

90.1

100.0

93.9

100.0

94.0

92.7

Buses

33

33

34

34

67

% Buses

0.0

0.0

0.0

0.0

0.0

4.3

4.3

0.0

3.4

0.0

3.4

Single-Unit Trucks

12

12

10

10

3.4
24

% Single-Unit Trucks

3.6

0.0

0.9

0.0

0.0

1.6

1.6

0.0

1.0

0.0

1.0

1.2

Articulated Trucks

% Articulated Trucks

0.0

0.0

0.0

0.0

0.0

0.1

0.1

0.0

0.2

0.0

0.2

0.2

Bicycles on Road

27

30

15

15

52

% Bicycles on Road

3.6

3.1

3.3

0.0

100.0

3.5

3.9

0.0

1.5

0.0

1.5

2.6

Pedestrians

255

67

12

% Pedestrians

100.0

100.0

100.0

AutoTurn Diagrams

Montrose and Clarendon


Chicago, Illinois

A-3

2,200 SF TOTAL

2,200 SF TOTAL

2,200 SF TOTAL

2,200 SF TOTAL

TW OW AY TRA

N.CLAREND

TW OW AY TRA

N.CLAREND
UNIT 04
UNIT 05
UNIT 06
UNIT 07
UNIT 08
TOWNHOUSETOWNHOUSETOWNHOUSETOWNHOUSE TOWNHOUSE

UNIT 04
UNIT 05
UNIT 06
UNIT 07
UNIT 08
TOWNHOUSETOWNHOUSETOWNHOUSETOWNHOUSE TOWNHOUSE

2,200 SF TOTAL

2,200 SF TOTAL

2,200 SF TOTAL

2,200 SF TOTAL

2,200 SF TOTAL

2,200 SF TOTAL

SCALE: 1" = 50'

24'
- 0"

24'
- 0"

(c) 2015 Transoft Sol


uti
ons, I
nc. Al
l ri
ghts reserved.

DESIGN VEHICLE
(c) 2015 Transoft Solutions, Inc. All rights reserved.

(c) 2015 Transoft Solutions, Inc. All rights reserved.

7.50

42.50

3.00

35.50

0.00

3.00

12.50

WB-50

feet

Tractor Width

: 8.00

Lock to Lock Time

:6.0

Trailer Width

: 8.50

Steering Angle

: 17.7

Tractor Track

: 8.00

Articulating Angle

: 70.0

Trailer Track

: 8.50

(c) 2015 Transoft Solutions, Inc. All rights reserved.

W. MONTROSE AVE.

W. MONTROSE AVE.

TWO-WAY TRAFFIC

TWO-WAY TRAFFIC

EXISTING

EXISTING

EXISTING

FOUR STORY

EXISTING

FOUR STORY

FOUR STORY

BUILDING

FOUR STORY

BUILDING

BUILDING

N.I.C.

BUILDING

N.I.C.

N.I.C.

EXISTING

TWENTY-SEVEN

STORY BUILDING

STORY BUILDING

N.I.C.

N.I.C.

OUTBOUND

$DATE$

$DATE$

LRA

01-14-16

9575 West Higgins Road, Suite 400


Rosemont, Illinois 60018
P: (847) 518-9990 F: (847) 518-9987
Kenig,Lindgren,O'Hara,Aboona,Inc.

DATE

DATE MODIFIED -

$DATE$

MD

CHECKED

EXISTING

TWENTY-SEVEN

INBOUND

DRAWN

N.I.C.

PROJECT # 15-253

SCALE:

1" = 50'

DRAWN

MD

CHECKED

LRA

DATE

01-14-2016

11x17

MONTROSE AND CLARENDON


MIXED-USE DEVELOPMENT
CHICAGO, ILLINOIS

EXHIBIT NO.

WB-50 TRUCK INBOUND / OUTBOUND FROM LOADING ZONE


A

INBOUND

(c) 2015 Transoft Sol


uti
ons, I
nc. Al
l ri
ghts reserved.

N
SCALE: 1" = 50'

T
r
ans
of
t Sol
ut
i
ons
,I
nc
.Al
lr
i
ght
s

r
e
s
e
r
v
e
d.

(c) 2015 Transoft Sol


uti
ons, I
nc. Al
l ri
ghts reserved.

ghts reserved.
l ri
nc. Al
ons, I
uti
(c) 2015 Transoft Sol

ALLEY

(
c
) 201
5

EXISTING SIX

DESIGN VEHICLE

EXISTING SIX

STORY

STORY

BUILDING

BUILDING

N.I.C.

N.I.C.

30.00

4.00

20.00

SU-30

feet

Width

: 8.00

Track

: 8.00

Lock to Lock Time

: 6.0

Steering Angle

: 31.8

(c) 2015 Transof


t Sol
uti
ons, I
nc. A l
l ri
ghts reserved.

OUTBOUND

N.I.C.

N.I.C.

$DATE$

BUILDING

01-14-16

$DATE$

STORY

BUILDING

9575 West Higgins Road, Suite 400


Rosemont, Illinois 60018
P: (847) 518-9990 F: (847) 518-9987
Kenig,Lindgren,O'Hara,Aboona,Inc.

DATE

DATE MODIFIED -

$DATE$
LRA

CHECKED

DRAWN

EXISTING SIX

STORY

uti
ons, I
nc. Al
l ri
ghts reserved.
(c) 2015 Transoft Sol

MD

EXISTING SIX

(c) 2015 Transoft Sol


uti
ons, I
nc. Al
l ri
ghts reserved.

ALLEY

(c) 2015 Transoft Solutions, Inc. All rights reserved.

PROJECT # 15-253

SCALE:

1" = 50'

DRAWN

MD

CHECKED

LRA

DATE

01-14-2016

11x17

MONTROSE AND CLARENDON


MIXED-USE DEVELOPMENT
CHICAGO, ILLINOIS

EXHIBIT NO.

SINGLE UNIT TRUCK INBOUND / OUTBOUND FROM LOADING ZONE


B

2,200 SF TOTAL

2,200 SF TOTAL

2,200 SF TOTAL

2,200 SF TOTAL

TW OW AY TRA

N.CLAREND

TW OW AY TRA

N.CLAREND
UNIT 04
UNIT 05
UNIT 06
UNIT 07
UNIT 08
TOWNHOUSETOWNHOUSETOWNHOUSETOWNHOUSE TOWNHOUSE

UNIT 04
UNIT 05
UNIT 06
UNIT 07
UNIT 08
TOWNHOUSETOWNHOUSETOWNHOUSETOWNHOUSE TOWNHOUSE

2,200 SF TOTAL

2,200 SF TOTAL

2,200 SF TOTAL

2,200 SF TOTAL

2,200 SF TOTAL

2,200 SF TOTAL

SCALE: 1" = 50'

(c) 2015 Transoft Sol


uti
ons, I
nc. A l
l ri
ghts reserved.

(c) 2015 Transoft Sol


uti
ons, I
nc. Al
l ri
ghts reserved.

24'
- 0"

24'
- 0"

(c) 2015 Transoft Sol


uti
ons, I
nc. Al
l ri
ghts reserved.

(c) 2015 Transoft Sol


uti
ons, I
nc. Al
l ri
ghts reserved.

(c) 2015 Transoft Sol


uti
ons, I
nc. Al
l ri
ghts reserved.

ghts reserved.
l ri
nc. Al
ons, I
uti
(c) 2015 Transoft Sol

DESIGN VEHICLE
23.66

ghts reserved.
l ri
nc. A l
ons, I
uti
(c) 2015 Transoft Sol

3.39

13.33

Freightliner 14ft
Freight Van
Width

: 8.00

Track

: 7.79

Lock to Lock Time

: 6.0

Steering Angle

: 45.9

W. MONTROSE AVE.

W. MONTROSE AVE.

TWO-WAY TRAFFIC

TWO-WAY TRAFFIC

EXISTING

EXISTING

EXISTING

FOUR STORY

EXISTING

FOUR STORY

FOUR STORY

BUILDING

FOUR STORY

BUILDING

BUILDING

N.I.C.

BUILDING

N.I.C.

N.I.C.

EXISTING

TWENTY-SEVEN

STORY BUILDING

STORY BUILDING

N.I.C.

N.I.C.

OUTBOUND

$DATE$

$DATE$

LRA

01-14-16

9575 West Higgins Road, Suite 400


Rosemont, Illinois 60018
P: (847) 518-9990 F: (847) 518-9987
Kenig,Lindgren,O'Hara,Aboona,Inc.

DATE

DATE MODIFIED -

$DATE$

MD

CHECKED

EXISTING

TWENTY-SEVEN

INBOUND

DRAWN

N.I.C.

PROJECT # 15-253

SCALE:

1" = 50'

DRAWN

MD

CHECKED

LRA

DATE

01-14-2016

11x17

MONTROSE AND CLARENDON


MIXED-USE DEVELOPMENT
CHICAGO, ILLINOIS

EXHIBIT NO.

FREIGHT VAN INBOUND / OUTBOUND FROM LOADING ZONE


C

Demographic Data

Montrose and Clarendon


Chicago, Illinois

A-4

Legend:
Boundaries
State
'14 County
'14 Census Tract

Features
Major Road
Street
Stream/Waterbody

Your Selections
Your Selections

Items in grey text are not visible at this zoom level

1 of 1

11/12/2015

DP03

SELECTED ECONOMIC CHARACTERISTICS


2009-2013 American Community Survey 5-Year Estimates

Note: This is a modified view of the original table.


Supporting documentation on code lists, subject definitions, data accuracy, and statistical testing can be found on the American Community Survey
website in the Data and Documentation section.
Sample size and data quality measures (including coverage rates, allocation rates, and response rates) can be found on the American Community
Survey website in the Methodology section.

Although the American Community Survey (ACS) produces population, demographic and housing unit estimates, it is the Census Bureau's Population
Estimates Program that produces and disseminates the official estimates of the population for the nation, states, counties, cities and towns and
estimates of housing units for states and counties.

Subject

EMPLOYMENT STATUS
Population 16 years and over
In labor force
Civilian labor force
Employed
Unemployed
Armed Forces
Not in labor force

Census Tract
315.01, Cook
County, Illinois
Percent

Census Tract
315.02, Cook
County, Illinois
Percent

Census Tract
321, Cook
County, Illinois
Percent

Census Tract
8307, Cook
County, Illinois
Percent

3,063
56.6%
56.6%
54.1%
2.5%
0.0%
43.4%

3,777
67.8%
67.8%
60.6%
7.2%
0.0%
32.2%

6,267
79.8%
79.8%
70.7%
9.1%
0.0%
20.2%

3,172
75.7%
75.7%
63.1%
12.6%
0.0%
24.3%

1,733
4.4%

2,561
10.7%

5,004
11.4%

2,400
16.6%

Females 16 years and over


In labor force
Civilian labor force
Employed

1,413
54.8%
54.8%
52.4%

1,873
64.6%
64.6%
59.2%

3,042
76.4%
76.4%
68.0%

1,429
68.5%
68.5%
57.0%

Own children under 6 years


All parents in family in labor force

227
67.4%

349
47.6%

396
81.6%

126
77.0%

Own children 6 to 17 years


All parents in family in labor force

79
82.3%

496
90.3%

305
95.7%

265
81.5%

1,657
28.8%
5.7%
42.5%
8.4%
2.2%
12.3%

2,244
27.5%
2.0%
52.2%
4.5%
8.7%
5.1%

4,348
31.4%
4.2%
47.0%
2.3%
7.3%
7.9%

1,968
28.8%
6.1%
54.5%
3.3%
4.0%
3.4%

(X)

(X)

(X)

(X)

Civilian labor force


Percent Unemployed

COMMUTING TO WORK
Workers 16 years and over
Car, truck, or van -- drove alone
Car, truck, or van -- carpooled
Public transportation (excluding taxicab)
Walked
Other means
Worked at home
Mean travel time to work (minutes)

1 of 5

11/12/2015

Subject

OCCUPATION
Civilian employed population 16 years and over
Management, business, science, and arts
occupations
Service occupations
Sales and office occupations
Natural resources, construction, and maintenance
occupations
Production, transportation, and material moving
occupations
INDUSTRY
Civilian employed population 16 years and over
Agriculture, forestry, fishing and hunting, and mining
Construction
Manufacturing
Wholesale trade
Retail trade
Transportation and warehousing, and utilities
Information
Finance and insurance, and real estate and rental
and leasing
Professional, scientific, and management, and
administrative and waste management services
Educational services, and health care and social
assistance
Arts, entertainment, and recreation, and
accommodation and food services
Other services, except public administration
Public administration
CLASS OF WORKER
Civilian employed population 16 years and over
Private wage and salary workers
Government workers
Self-employed in own not incorporated business
workers
Unpaid family workers
INCOME AND BENEFITS (IN 2013 INFLATIONADJUSTED DOLLARS)
Total households
Less than $10,000
$10,000 to $14,999
$15,000 to $24,999
$25,000 to $34,999
$35,000 to $49,999
$50,000 to $74,999
$75,000 to $99,999
$100,000 to $149,999
$150,000 to $199,999
$200,000 or more
Median household income (dollars)
Mean household income (dollars)
With earnings
Mean earnings (dollars)
With Social Security
Mean Social Security income (dollars)
With retirement income
Mean retirement income (dollars)

2 of 5

Census Tract
315.01, Cook
County, Illinois
Percent

Census Tract
315.02, Cook
County, Illinois
Percent

Census Tract
321, Cook
County, Illinois
Percent

Census Tract
8307, Cook
County, Illinois
Percent

1,657
41.3%

2,288
28.4%

4,433
57.8%

2,001
49.2%

22.6%
22.8%
8.0%

30.0%
27.7%
0.0%

15.6%
18.1%
0.5%

21.8%
18.6%
2.9%

5.4%

13.9%

8.0%

7.4%

1,657
0.4%

2,288
0.0%

4,433
0.0%

2,001
0.4%

7.1%
4.6%
3.9%
12.1%
2.6%
1.0%
6.9%

0.8%
6.7%
0.0%
9.8%
12.0%
3.8%
10.2%

0.6%
7.5%
2.9%
4.2%
5.7%
1.2%
14.0%

2.4%
7.5%
1.0%
5.3%
6.7%
5.3%
8.2%

10.4%

5.6%

24.9%

25.3%

25.0%

15.2%

20.8%

20.1%

13.6%

23.5%

9.1%

13.6%

9.2%
3.3%

6.5%
5.9%

6.3%
2.9%

2.8%
1.0%

1,657
91.6%
6.7%
1.8%

2,288
85.1%
9.7%
5.2%

4,433
87.3%
6.2%
6.5%

2,001
92.3%
5.2%
2.4%

0.0%

0.0%

0.0%

0.0%

1,535

2,267

4,224

1,783

21.8%
11.4%
15.2%
9.8%
6.7%
5.8%
13.1%
11.9%
2.7%
1.6%
(X)
(X)

25.8%
7.0%
18.7%
8.5%
10.0%
14.1%
7.5%
6.1%
2.3%
0.0%
(X)
(X)

14.1%
11.2%
10.0%
4.2%
9.4%
17.7%
9.8%
13.6%
4.9%
5.1%
(X)
(X)

22.3%
7.0%
5.4%
10.8%
13.0%
12.2%
10.8%
7.3%
7.9%
3.2%
(X)
(X)

68.1%
(X)
14.7%
(X)
2.2%
(X)

67.4%
(X)
12.7%
(X)
3.2%
(X)

79.5%
(X)
14.7%
(X)
2.6%
(X)

79.3%
(X)
9.3%
(X)
3.3%
(X)

11/12/2015

Subject

With Supplemental Security Income


Mean Supplemental Security Income (dollars)
With cash public assistance income
Mean cash public assistance income (dollars)
With Food Stamp/SNAP benefits in the past 12
months
Families
Less than $10,000
$10,000 to $14,999
$15,000 to $24,999
$25,000 to $34,999
$35,000 to $49,999
$50,000 to $74,999
$75,000 to $99,999
$100,000 to $149,999
$150,000 to $199,999
$200,000 or more
Median family income (dollars)
Mean family income (dollars)
Per capita income (dollars)
Nonfamily households
Median nonfamily income (dollars)
Mean nonfamily income (dollars)
Median earnings for workers (dollars)
Median earnings for male full-time, year-round workers
(dollars)
Median earnings for female full-time, year-round
workers (dollars)
HEALTH INSURANCE COVERAGE
Civilian noninstitutionalized population
With health insurance coverage
With private health insurance
With public coverage
No health insurance coverage
Civilian noninstitutionalized population under 18
years
No health insurance coverage
Civilian noninstitutionalized population 18 to 64 years
In labor force:
Employed:
With health insurance coverage
With private health insurance
With public coverage
No health insurance coverage
Unemployed:
With health insurance coverage
With private health insurance
With public coverage
No health insurance coverage
Not in labor force:
With health insurance coverage
With private health insurance
With public coverage
3 of 5

Census Tract
315.01, Cook
County, Illinois
Percent
11.9%
(X)
10.5%
(X)
25.9%

Census Tract
315.02, Cook
County, Illinois
Percent
12.4%
(X)
10.6%
(X)
28.9%

Census Tract
321, Cook
County, Illinois
Percent
4.2%
(X)
3.3%
(X)
13.8%

Census Tract
8307, Cook
County, Illinois
Percent
12.1%
(X)
4.8%
(X)
28.5%

544
22.4%
11.2%
13.8%
2.9%
1.8%
7.4%
6.8%
28.1%
5.5%
0.0%
(X)
(X)

780
10.6%
4.1%
21.5%
14.1%
7.1%
16.0%
12.8%
10.0%
3.7%
0.0%
(X)
(X)

888
3.0%
6.4%
0.0%
9.6%
10.0%
9.0%
5.2%
24.7%
17.7%
14.4%
(X)
(X)

545
11.2%
3.1%
8.6%
17.8%
14.3%
9.2%
9.9%
9.4%
16.5%
0.0%
(X)
(X)

(X)

(X)

(X)

(X)

991
(X)
(X)

1,487
(X)
(X)

3,336
(X)
(X)

1,238
(X)
(X)

(X)
(X)

(X)
(X)

(X)
(X)

(X)
(X)

(X)

(X)

(X)

(X)

3,240
81.7%
45.9%
41.5%
18.3%

4,493
67.7%
34.7%
33.5%
32.3%

6,890
85.1%
70.3%
16.6%
14.9%

3,491
74.5%
48.6%
26.7%
25.5%

306

884

701

435

0.0%

7.7%

0.0%

11.0%

2,408

3,241

5,549

2,880

1,670
1,594
78.5%
62.2%
17.9%
21.5%
76
85.5%
51.3%
52.6%
14.5%
738
67.6%
17.8%
51.5%

2,494
2,221
62.7%
55.8%
7.4%
37.3%
273
16.1%
0.0%
16.1%
83.9%
747
64.5%
8.7%
55.8%

4,949
4,393
86.2%
84.5%
2.4%
13.8%
556
57.9%
48.7%
9.2%
42.1%
600
75.3%
32.7%
42.7%

2,364
1,981
75.6%
72.4%
3.7%
24.4%
383
35.0%
10.4%
24.5%
65.0%
516
80.0%
14.1%
65.9%
11/12/2015

Subject

No health insurance coverage


PERCENTAGE OF FAMILIES AND PEOPLE WHOSE
INCOME IN THE PAST 12 MONTHS IS BELOW THE
POVERTY LEVEL
All families
With related children under 18 years
With related children under 5 years only
Married couple families
With related children under 18 years
With related children under 5 years only
Families with female householder, no husband present
With related children under 18 years
With related children under 5 years only
All people
Under 18 years
Related children under 18 years
Related children under 5 years
Related children 5 to 17 years
18 years and over
18 to 64 years
65 years and over
People in families
Unrelated individuals 15 years and over

Census Tract
315.01, Cook
County, Illinois
Percent
32.4%

Census Tract
315.02, Cook
County, Illinois
Percent
35.5%

Census Tract
321, Cook
County, Illinois
Percent
24.7%

Census Tract
8307, Cook
County, Illinois
Percent
20.0%

38.1%
39.6%
31.8%
26.5%
20.2%
21.7%
51.4%

26.7%
35.7%
0.0%
22.4%
36.2%
0.0%
47.6%

9.5%
14.2%
9.9%
9.5%
15.8%
0.0%
10.6%

21.3%
24.2%
8.0%
16.4%
16.9%
0.0%
32.9%

88.2%
100.0%

45.7%
0.0%

10.6%
100.0%

40.7%
100.0%

46.6%
50.3%
50.3%
51.4%
47.7%
46.2%
42.4%
63.9%
42.9%
49.7%

35.4%
42.2%
42.2%
57.0%
35.0%
33.8%
29.6%
70.9%
32.0%
39.6%

20.8%
15.8%
15.8%
17.2%
14.2%
21.3%
17.9%
50.5%
10.5%
26.7%

33.3%
43.2%
43.2%
16.3%
51.6%
31.9%
30.5%
55.7%
24.3%
40.5%

Data are based on a sample and are subject to sampling variability. The degree of uncertainty for an estimate arising from sampling variability is
represented through the use of a margin of error. The value shown here is the 90 percent margin of error. The margin of error can be interpreted
roughly as providing a 90 percent probability that the interval defined by the estimate minus the margin of error and the estimate plus the margin of
error (the lower and upper confidence bounds) contains the true value. In addition to sampling variability, the ACS estimates are subject to
nonsampling error (for a discussion of nonsampling variability, see Accuracy of the Data). The effect of nonsampling error is not represented in these
tables.

There were changes in the edit between 2009 and 2010 regarding Supplemental Security Income (SSI) and Social Security. The changes in the edit
loosened restrictions on disability requirements for receipt of SSI resulting in an increase in the total number of SSI recipients in the American
Community Survey. The changes also loosened restrictions on possible reported monthly amounts in Social Security income resulting in higher Social
Security aggregate amounts. These results more closely match administrative counts compiled by the Social Security Administration.

Workers include members of the Armed Forces and civilians who were at work last week.
Census occupation codes are 4-digit codes and are based on the Standard Occupational Classification (SOC). The Census occupation codes for
2010 and later years are based on the 2010 revision of the SOC. To allow for the creation of 2009-2013 tables, occupation data in the multiyear files
(2009-2013) were recoded to 2013 Census occupation codes. We recommend using caution when comparing data coded using 2013 Census
occupation codes with data coded using Census occupation codes prior to 2010. For more information on the Census occupation code changes,
please visit our website at http://www.census.gov/people/io/methodology/.

Industry codes are 4-digit codes and are based on the North American Industry Classification System (NAICS). The Census industry codes for 2013
and later years are based on the 2012 revision of the NAICS. To allow for the creation of 2009-2013 and 2011-2013 tables, industry data in the
multiyear files (2009-2013 and 2011-2013) were recoded to 2013 Census industry codes. We recommend using caution when comparing data coded
using 2013 Census industry codes with data coded using Census industry codes prior to 2013. For more information on the Census industry code
changes, please visit our website at http://www.census.gov/people/io/methodology/.

While the 2009-2013 American Community Survey (ACS) data generally reflect the February 2013 Office of Management and Budget (OMB)
definitions of metropolitan and micropolitan statistical areas; in certain instances the names, codes, and boundaries of the principal cities shown in
ACS tables may differ from the OMB definitions due to differences in the effective dates of the geographic entities.

Estimates of urban and rural population, housing units, and characteristics reflect boundaries of urban areas defined based on Census 2010 data. As
a result, data for urban and rural areas from the ACS do not necessarily reflect the results of ongoing urbanization.
4 of 5

11/12/2015

Source: U.S. Census Bureau, 2009-2013 5-Year American Community Survey


Explanation of Symbols:
1. An '**' entry in the margin of error column indicates that either no sample observations or too few sample observations were available to
compute a standard error and thus the margin of error. A statistical test is not appropriate.
2. An '-' entry in the estimate column indicates that either no sample observations or too few sample observations were available to compute an
estimate, or a ratio of medians cannot be calculated because one or both of the median estimates falls in the lowest interval or upper interval of an
open-ended distribution.
3. An '-' following a median estimate means the median falls in the lowest interval of an open-ended distribution.
4. An '+' following a median estimate means the median falls in the upper interval of an open-ended distribution.
5. An '***' entry in the margin of error column indicates that the median falls in the lowest interval or upper interval of an open-ended distribution. A
statistical test is not appropriate.
6. An '*****' entry in the margin of error column indicates that the estimate is controlled. A statistical test for sampling variability is not appropriate.
7. An 'N' entry in the estimate and margin of error columns indicates that data for this geographic area cannot be displayed because the number of
sample cases is too small.
8. An '(X)' means that the estimate is not applicable or not available.

Level of Service Table

Montrose and Clarendon


Chicago, Illinois

A-5

LEVEL OF SERVICE CRITERIA


Signalized Intersections
Level of
Service
A

Average Control
Delay
Interpretation
(seconds per vehicle)
Favorable progression. Most vehicles arrive during the
10
green indication and travel through the intersection
without stopping.

Good progression, with more vehicles stopping than for


Level of Service A.

>10 - 20

Individual cycle failures (i.e., one or more queued


vehicles are not able to depart as a result of insufficient
capacity during the cycle) may begin to appear.
Number of vehicles stopping is significant, although many
vehicles still pass through the intersection without
stopping.

>20 - 35

The volume-to-capacity ratio is high and either


progression is ineffective or the cycle length is too long.
Many vehicles stop and individual cycle failures are
noticeable.

>35 - 55

Progression is unfavorable. The volume-to-capacity ratio


is high and the cycle length is long. Individual cycle
failures are frequent.

>55 - 80

>80.0
The volume-to-capacity ratio is very high, progression is
very poor and the cycle length is long. Most cycles fail to
clear the queue.
Unsignalized Intersections
Level of Service
Average Total Delay (SEC/VEH)
F

0 - 10

> 10 - 15

> 15 - 25

> 25 - 35

> 35 - 50

> 50

Source: Highway Capacity Manual, 2010.

Capacity Analyses Reports

Montrose and Clarendon


Chicago, Illinois

A-6

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

62
1900
10
45
1
60
1.00
0.89

509
1900
12

57
1900
12
75
1

376
1900
12

43
1900
12
0
0

1
1900
10
0
0

37
1900
10
25
1

0.95
0.98
0.985

0.95

0.95
1.00
0.999

0.95

49
1900
9
165
1
85
1.00
0.97

246
1900
10

1.00
0.94
0.850

53
1900
9
0
1
25
1.00
0.94

145
1900
10

1.00

0
1900
12
0
0
25
1.00

0.95
0.99
0.980

0.95

1660

1509

3368

2928

2902

1660

1417
Yes
109

3368

0
Yes

2928

0
Yes

2902

0
Yes

48
16
0.98
7%

48

0.950
1620
0.503
765

16
30
112
2.5

30
205
4.7
52
0.98
4%

0.98
3%
0

63
pm+pt
5
2
5.0
9.0
9.0%
3.0
1.0
0.0
4.0
Lag
Yes
43.0
0.43
0.17
19.5
0.0
19.5
B

519
NA
2

23
49

39.0
47.0
47.0%
3.0
2.0
0.0
5.0
42.0
0.42
0.74
32.4
0.0
32.4
C
28.3
C
273
406

0.950
1624
0.531
855

0.98
0%

0.98
2%

428
NA
6 26

58
Perm
2
39.0
47.0
47.0%
3.0
2.0
0.0
5.0
42.0
0.42
0.09
0.7
0.0
0.7
A
0
4

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

46.0
0.46
0.27
1.9
0.5
2.4
A
2.4
A
10
15

0.950
1577
0.658
1059

1
30
276
6.3
52
8
0.98
15%
0

70
0.98
0%

0.98
15%

54
pm+pt
3
8 24
7.0
11.0
11.0%
3.0
1.0
0.0
4.0
Lead
Yes
31.0
0.31
0.17
19.7
0.0
19.7
B

149
NA
8 24

13
27

23.0
0.23
0.22
26.5
0.0
26.5
C
24.7
C
30
46

16
30
330
7.5
29
9
0.98
0%
0

29
0.98
3%

0.98
7%
0

50
pm+pt
3
4 24
7.0
11.0
11.0%
3.0
1.0
0.0
4.0
Lead
Yes
31.0
0.31
0.14
20.7
0.0
20.7
C

289
NA
4 24

20
44

70
5
0.98
4%
0

23.0
0.23
0.43
33.3
0.0
33.3
C
31.4
C
78
118
Synchro 8 Report
Page 1

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

10

12

13

14

16

20

24

26

32

10

12

13

14

16

20

24

26

32

28.0
28.0
28%
3.0
2.0

10.0
10.0
10%
2.0
0.0

28.0
28.0
28%
3.0
2.0

38.0
47.0
47%
2.0
0.0

28.0
28.0
28%
2.0
0.0

8.0
9.0
9%
3.5
0.5

38.0
38.0
38%
3.0
1.0

28.0
28.0
28%
2.0
0.0

5.0
15.0
15%
3.0
1.0

4.0
4.0
4%
2.0
0.0

38.0
38.0
38%
3.0
1.0

10.0
10.0
10%
3.0
1.0

Lag
Yes

Lead
Yes

Lag
Yes

Lead
Yes

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
45
371
0
0
0
0.17

EBT
125
697
0
0
0
0.74

EBR

11/30/2015

WBL

75
658
0
0
0
0.09

WBT
32

WBR

1557
699
0
0
0.50

NBL

NBT
196

318
0
0
0
0.17

674
0
0
0
0.22

NBR

SBL
165
364
0
0
0
0.14

SBT
250

SBR

679
0
0
0
0.43

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 4:SBTL and 8:NBTL, Start of Green
Natural Cycle: 95
Control Type: Pretimed
Maximum v/c Ratio: 0.74
Intersection Signal Delay: 21.6
Intersection LOS: C
Intersection Capacity Utilization 62.5%
ICU Level of Service B
Analysis Period (min) 15
Splits and Phases:

1: North Broadway & Montrose Avenue

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 3

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

11/30/2015

10

12

13

14

16

20

24

26

32

Intersection Summary

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 4

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

28
1900
12
0
1
25
1.00
0.94

531
1900
12

0
1900
12
0
0

382
1900
10

18
1900
10
50
1

41
1900
10
0
1

37
1900
12
0
0

0.95
0.99
0.993

0.95

1.00

1.00
0.86
0.850

32
1900
12
0
0
25
1.00

133
1900
12

1.00

0
1900
10
0
0
25
1.00

88
2000
10

1.00

11
1900
10
50
1
100
1.00
0.98

1.00

1863

3012

1609

1478

1863

0
Yes

3012

0
Yes

1609

1266
Yes
109

1.00
0.98
0.975
0.992
1531
0.953
1446

65
1
0.98
2%

65
0.98
3%

0.98
10%
0

42
Perm

0
Perm

207
NA
12 32

16 32

12 32

0.950
1752
0.446
771

0.950
1428
0.243
360

5
30
672
15.3

30
112
2.5
81
0.98
3%

0.98
2%

29
custom
13 20
10

542
NA
10 20

58.0
0.58
0.05
0.8
3.8
4.6
A
1
m1

60.0
0.60
0.49
1.9
1.8
3.6
A
3.7
A
11
14

49
16
0.98
0%
0

49
0.98
18%

0.98
5%
0

11
Perm

408
NA
14

14
38.0
38.0
38.0%
3.0
1.0
0.0
4.0
Lead
Yes
34.0
0.34
0.09
19.3
0.0
19.3
B

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

3
m9

38.0
38.0
38.0%
3.0
1.0
0.0
4.0
Lead
Yes
34.0
0.34
0.40
18.6
0.0
18.6
B
18.6
B
59
91

4
0.98
0%

0.98
16%

90
NA
16 32

36.0
0.36
0.16
9.0
0.0
9.0
A
6.3
A
13
25

36.0
0.36
0.08
0.5
0.0
0.5
A
0
1

0
Yes

13
30
277
6.3

30
252
5.7
81
11
0.98
1%

4
8
0.98
3%
0

36.0
0.36
0.39
25.0
0.0
25.0
C
25.0
C
91
154
Synchro 8 Report
Page 5

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

10

12

13

16

20

24

10

12

13

16

20

24

39.0
47.0
47%
3.0
2.0

7.0
11.0
11%
3.0
1.0

28.0
28.0
28%
3.0
2.0

5.0
9.0
9%
3.0
1.0

10.0
10.0
10%
2.0
0.0

28.0
28.0
28%
3.0
2.0

38.0
47.0
47%
2.0
0.0

28.0
28.0
28%
2.0
0.0

8.0
9.0
9%
3.5
0.5

28.0
28.0
28%
2.0
0.0

5.0
15.0
15%
3.0
1.0

4.0
4.0
4%
2.0
0.0

Lead
Yes

Lag
Yes

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Lag
Yes

Lag
Yes

Synchro 8 Report
Page 6

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

26

32

26

32

38.0
38.0
38%
3.0
1.0

10.0
10.0
10%
3.0
1.0

11/30/2015

Lead
Yes

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 7

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
32

643
563
0
0
0.36

1117
395
0
0
0.75

EBR

11/30/2015

WBL
50
122
0
0
0
0.09

WBT
592

WBR

1027
0
0
0
0.40

NBL

NBT
172

NBR

579
0
0
0
0.16

525
0
0
0
0.08

SBL

SBT
197

SBR

528
0
0
0
0.39

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 4:SBTL and 8:NBTL, Start of Green
Natural Cycle: 95
Control Type: Pretimed
Maximum v/c Ratio: 0.74
Intersection Signal Delay: 12.0
Intersection LOS: B
Intersection Capacity Utilization 81.7%
ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

2: Sheridan Road & Montrose Avenue

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 8

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

11/30/2015

10

12

13

16

20

24

Intersection Summary

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 9

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

26

11/30/2015

32

Intersection Summary

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 10

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

NBL

NBT

NBR

SBL

SBT

SBR

SEL

SET

SER

NWL

NWT

NWR

64
1900
9
0
1
35
1.00
0.99

80
1900
10

3
1900
10
75
1

79
1900
10

0
1900
10
0
0

71
1900
10
0
1

49
1900
12
0
0

1.00

1.00

1.00

1.00
0.89
0.850

8
1900
12
0
0
25
1.00

135
1900
12

1.00

0
1900
10
0
0
25
1.00

232
1900
10

1.00
1.00
0.995

65
1900
9
0
1
25
1.00
0.90

1.00

1494

1556

1673

1463

1494

0
Yes

1556

0
Yes

1673

1306
Yes
98

1.00
0.99
0.966
0.998
1605
0.986
1582

21
15
0.94
3%

21

0.950
1464
0.702
1076

0.950
1562
0.700
1033

2
30
492
11.2
3
0.94
11%

0.94
6%
0

68
pm+pt
5
2
8.0
9.0
9.0%
3.5
0.5
0.0
4.0
Lag
Yes
31.0
0.31
0.19
24.5
0.0
24.5
C

88
NA
2

29
60

20.0
30.0
30.0%
3.5
0.5
0.0
4.0
Lead
Yes
26.0
0.26
0.23
30.3
0.0
30.3
C
27.8
C
43
85

30
252
5.7
37
4
0.94
0%
0

37
0.94
4%

0.94
14%

69
pm+pt
1
6
8.0
9.0
9.0%
3.5
0.5
0.0
4.0
Lag
Yes
31.0
0.31
0.20
14.2
0.0
14.2
B

84
NA
6

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

36
73

20.0
30.0
30.0%
3.5
0.5
0.0
4.0
Lead
Yes
26.0
0.26
0.21
14.4
0.0
14.4
B
14.3
B
45
88

12
0.94
0%

0.94
6%

247
76
NA custom
4 14
4
20.0
26.0
26.0%
3.5
0.5
0.0
4.0
57.0
0.57
0.26
9.8
1.0
10.8
B
14.3
B
33
89

22.0
0.22
0.21
25.5
0.0
25.5
C
12
65

0
Yes

18
30
494
11.2

30
276
6.3
3
6
0.94
0%

0.94
0%

0.94
12%

0
Perm

205
NA
8

8
20.0
35.0
35.0%
3.5
0.5

12
8
0.94
18%
0

20.0
35.0
35.0%
3.5
0.5
0.0
4.0
31.0
0.31
0.41
27.7
0.0
27.7
C
27.7
C
93
159
Synchro 8 Report
Page 11

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

14

14
20.0
35.0
35%
3.5
0.5

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 12

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

NBL

NBT
412

352
0
0
0
0.19

389
0
0
0
0.23

NBR

11/30/2015

SBL

SBT
172

346
0
0
0
0.20

404
0
0
0
0.21

SBR

SEL

SET
196

SER

953
478
0
0
0.52

363
0
0
0
0.21

NWL

NWT
414

NWR

502
0
0
0
0.41

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 22 (22%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 70
Control Type: Pretimed
Maximum v/c Ratio: 0.41
Intersection Signal Delay: 20.1
Intersection LOS: C
Intersection Capacity Utilization 50.0%
ICU Level of Service A
Analysis Period (min) 15
Splits and Phases:

3: Sheridan Road & North Broadway

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 13

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

11/30/2015

14

Intersection Summary

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 14

Lanes, Volumes, Timings


4: Hazel Street & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

14
1900
10
25
1
25
1.00
0.98

561
1900
12

25
1900
12
0
0

389
1900
12

6
1900
12
0
0

20
1900
9
0
0

15
1900
9
0
0

1.00
1.00
0.998

1.00

1.00

1625

1663

0
Yes

1625

0
Yes

0
Yes

1.00
0.94
0.949
0.977
1338
0.894
1181

1.00

1663

1.00
0.94
0.938
0.980
1349
0.908
1232

19
1900
9
0
0
25
1.00

6
1900
9

1.00

18
1900
9
0
0
25
1.00

6
1900
9

1.00
1.00
0.994

9
1900
10
25
1
25
1.00
0.98

0.950
1685
0.476
826

0.950
1685
0.350
610

5
30
672
15.3
52
0.96
0%

0.96
2%
0

15
Perm

610
NA
2

2
71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.03
2.8
0.0
2.8
A
1
m3

71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.55
4.5
0.0
4.5
A
4.4
A
51
65

2
30
665
15.1
59
15
0.96
0%
0

59
0.96
0%

0.96
5%
0

9
Perm

411
NA
6

6
71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.02
8.3
0.0
8.3
A

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

2
m5

71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.38
10.2
0.0
10.2
B
10.2
B
117
m142

21
30
408
9.3
52
6
0.96
0%
0

19
0.96
0%

0.96
0%
0

0
Perm

46
NA
8

8
29.0
29.0
29.0%
3.0
1.0

29.0
29.0
29.0%
3.0
1.0
0.0
4.0
25.0
0.25
0.14
19.9
0.0
19.9
B
19.9
B
12
42

0
0
Yes

16
30
329
7.5
40
2
0.96
0%
0

40
0.96
5%

0.96
12%
0

0
Perm

42
NA
4

4
29.0
29.0
29.0%
3.0
1.0

19
4
0.96
0%
0

29.0
29.0
29.0%
3.0
1.0
0.0
4.0
25.0
0.25
0.14
21.8
0.0
21.8
C
21.8
C
13
41
Synchro 8 Report
Page 15

Lanes, Volumes, Timings


4: Hazel Street & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
553
0
0
0
0.03

EBT
592

EBR

1115
0
0
0
0.55

11/30/2015

WBL
25
408
0
0
0
0.02

WBT
585

WBR

1089
0
0
0
0.38

NBL

NBT
328
323
0
0
0
0.14

NBR

SBL

SBT
249

SBR

307
0
0
0
0.14

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 35 (35%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.55
Intersection Signal Delay: 7.8
Intersection LOS: A
Intersection Capacity Utilization 83.3%
ICU Level of Service E
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

4: Hazel Street & Montrose Avenue

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 16

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

26
1900
10
25
1
25
1.00
0.96

490
1900
12

72
1900
12
0
0

337
1900
12

26
1900
12
0
0

48
1900
10
0
0

43
1900
9
0
0

1.00
0.99
0.989

1.00

1.00
0.92
0.948

1.00

80
1900
9
50
1
25
1.00
0.84

280
1900
9

1.00

40
1900
10
25
1
25
1.00
0.92

90
1900
10

1.00
0.99
0.981

35
1900
10
25
1
25
1.00
0.99

1.00
0.98
0.980

1.00

1650

1635

1310

1411

1650

0
Yes

1635

0
Yes

1310

0
Yes

1411

0
Yes

0.950
1465
0.473
703

0.950
1685
0.325
568

14
30
665
15.1
81
0.92
15%

0.92
1%
0

28
Perm

611
NA
4

4
66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.06
8.3
0.0
8.3
A
4
m13

66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.59
10.1
0.0
10.1
B
10.1
B
81
189

0.950
1604
0.313
488

7
30
844
19.2
48
5
0.92
0%
0

48
0.92
0%

0.92
3%
0

38
Perm

394
NA
8

8
66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.11
8.3
0.0
8.3
A
7
m20

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.39
8.6
0.0
8.6
A
8.6
A
70
143

0.950
1624
0.609
879

27
30
1232
28.0
81
3
0.92
0%
0

95
0.92
5%

0.92
5%
0

43
Perm

150
NA
2

2
34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.29
33.6
0.0
33.6
C
21
54

34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.36
25.4
0.0
25.4
C
27.2
C
60
117

8
30
332
7.5
120
3
0.92
10%
0

120
0.92
0%

0.92
5%
0

87
Perm

351
NA
6

6
34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.33
31.6
0.0
31.6
C
43
88

95
4
0.92
0%
0

34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.82
49.1
0.0
49.1
D
45.6
D
202
#355
Synchro 8 Report
Page 17

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
435
0
0
0
0.06

EBT
585
1028
13
0
0
0.60

EBR

WBL
25
352
0
0
0
0.11

11/30/2015

WBT
764

WBR

1016
0
0
0
0.39

NBL
25
146
0
0
0
0.29

NBT
1152
411
0
0
0
0.36

NBR

SBL
50
263
0
0
0
0.33

SBT
252

SBR

428
0
0
0
0.82

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.82
Intersection Signal Delay: 20.8
Intersection LOS: C
Intersection Capacity Utilization 91.1%
ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

5: Clarendon Avenue & Montrose Avenue

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 18

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

EBR2

WBL2

WBL

WBT

WBR

NBL

NBT

NBR

NBR2

8
1900
10
0
0
25
1.00

53
1900
12

485
1900
10
25
1

80
1900
10

46
1900
10

286
1900
10

15
1900
10
0
0

29
1900
10
0
0

21
1900
10

1.00
0.97
0.850

1.00

1.00

1.00
1.00
0.993

1.00

46
1900
10
0
0
25
1.00

29
1900
10

1.00
1.00

41
1900
10
0
1
25
1.00

1.00

1.00

1503

1698

1459

0
No

1698

0
Yes

1.00
0.96
0.946
0.982
1578
0.982
1529

0
No

1
0.92
0%

1
0.92
0%

0
0

0.993
1566
0.964
1516

0.950
1677
0.713
1258

3
30
379
8.6

30
844
19.2
26
0.92
50%

0.92
2%
0

0
pm+pt
7
4
8.0
9.0
9.0%
3.0
0.0

67
NA
4
43.0
52.0
52.0%
3.0
2.0
0.0
5.0

6
0.92
0%

6
0.92
2%

614
Perm

0.92
0%

0.92
1%

0.92
1%

0
Perm

95
Perm

327
NA
8

8
43.0
43.0
43.0%
3.0
2.0

47.0
0.47
0.90
43.7
0.0
43.7
D

8
43.0
43.0
43.0%
3.0
2.0
0.0
5.0
Lag
Yes
38.0
0.38
0.20
22.2
0.0
22.2
C

337
#569

40
78

4
43.0
52.0
52.0%
3.0
2.0
0.0
5.0

Lead
Yes

Lag
Yes
47.0
0.47
0.09
18.2
0.0
18.2
B
41.2
D
24
m37

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

43.0
43.0
43.0%
3.0
2.0
0.0
5.0
Lag
Yes
38.0
0.38
0.51
26.9
0.0
26.9
C
25.9
C
156
240

30
720
16.4
26
2
0.92
50%
0

44
0.92
2%

0.92
13%

0
Split
2

137
NA
2

23.0
23.0
23.0%
3.0
2.0

23.0
23.0
23.0%
3.0
2.0
0.0
5.0
18.0
0.18
0.48
43.3
0.0
43.3
D
43.3
D
79
141
Synchro 8 Report
Page 19

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

SBL2

SBL

SBT

SBR

9
1900
10

137
1900
10

65
1900
10
25
1

1.00

16
1900
10
0
0
25
1.00

1.00

1.00
0.87
0.850

0.992
1626
0.992
1626

11/30/2015

1322
1151
No

30
377
8.6
0.92
0%

0.92
6%

0.92
9%

0
Split
6

0
Split
6

176
NA
6

25.0
25.0
25.0%
3.0
2.0

25.0
25.0
25.0%
3.0
2.0

25.0
25.0
25.0%
3.0
2.0
0.0
5.0
20.0
0.20
0.54
43.0
0.0
43.0
D
41.7
D
102
171

44
1
0.92
14%
71
Perm
6
25.0
25.0
25.0%
3.0
2.0
0.0
5.0
20.0
0.20
0.31
38.5
0.0
38.5
D

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

39
81
Synchro 8 Report
Page 20

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
764
714
0
0
0
0.09

EBR

EBR2

25
685
0
0
0
0.90

WBL2

WBL

WBT
299

478
0
0
0
0.20

647
0
0
0
0.51

11/30/2015

WBR

NBL

NBT
640

NBR

NBR2

284
0
0
0
0.48

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 3 (3%), Referenced to phase 2:NBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.90
Intersection Signal Delay: 37.1
Intersection LOS: D
Intersection Capacity Utilization 107.1%
ICU Level of Service G
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 21

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

SBL2

SBL

SBT
297
325
0
0
0
0.54

11/30/2015

SBR
25
230
0
0
0
0.31

Intersection Summary

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 22

Lanes, Volumes, Timings


7: Sheridan Road & Wilson Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

60
1900
10
25
1
25
1.00
0.89

290
1900
12

43
1900
12
0
0

210
1900
12

51
1900
12
0
0

43
1900
12
0
0

40
1900
12
0
0

1.00
0.96
0.971

1.00

1.00
0.96
0.967

1.00

101
1900
10
25
1
25
1.00
0.89

356
1900
12

1.00

31
1900
10
50
1
25
1.00
0.98

152
1900
12

1.00
0.98
0.981

68
1900
10
25
1
25
1.00
0.94

1.00
0.99
0.985

1.00

1610

1570

1435

1591

1610

0
No

1570

0
No

1435

0
No

1591

0
No

0.950
1428
0.553
742

0.950
1560
0.469
720

30
426
9.7
135
0.96
18%

0.96
2%
0

62
Perm

347
NA
4

4
32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.20
14.3
0.0
14.3
B
15
39

32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.52
17.6
0.0
17.6
B
17.1
B
98
170

0.950
1636
0.408
688

30
1312
29.8
94
5
0.96
5%
0

94
0.96
8%

0.96
2%
0

71
Perm

272
NA
8

8
32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.24
12.6
0.0
12.6
B
15
m19

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.42
13.6
0.0
13.6
B
13.4
B
66
m83

0.950
1636
0.630
960

30
380
8.6
135
5
0.96
2%
0

35

30
336
7.6
131

131

0.96
3%

0.96
12%
0

0.96
7%

0.96
3%

0.96
4%
0

32
Perm

203
NA
2

105
Perm

413
NA
6

2
33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.11
12.3
0.0
12.3
B
7
23

33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.33
14.2
0.0
14.2
B
13.9
B
51
96

6
33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.25
14.0
0.0
14.0
B
25
57

35
10
0.96
15%
0

33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.60
18.8
0.0
18.8
B
17.8
B
120
206
Synchro 8 Report
Page 23

Lanes, Volumes, Timings


7: Sheridan Road & Wilson Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
308
0
0
0
0.20

EBT
346

EBR

668
0
0
0
0.52

11/30/2015

WBL
25
299
0
0
0
0.24

WBT
1232

WBR

652
0
0
0
0.42

NBL
50
296
0
0
0
0.11

NBT
300
618
0
0
0
0.33

NBR

SBL
25
413
0
0
0
0.25

SBT
256

SBR

685
0
0
0
0.60

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 65
Control Type: Pretimed
Maximum v/c Ratio: 0.60
Intersection Signal Delay: 16.0
Intersection LOS: B
Intersection Capacity Utilization 71.9%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

7: Sheridan Road & Wilson Avenue

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 24

Lanes, Volumes, Timings


8: Clarendon Avenue & Wilson Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

58
1900
1.00

238
1900
1.00
0.99
0.968
0.993
1583
0.876
1392

91
1900
1.00

170
1900
1.00

43
1900
1.00

38
1900
1.00

36
1900
1.00

0
Yes

0
Yes

0
Yes

200
1900
1.00
0.95
0.962
0.995
1459
0.956
1394

91
1900
1.00

89
1900
1.00
0.97
0.981
0.987
1545
0.874
1348

21
1900
1.00

256
1900
1.00
0.99
0.988
0.982
1599
0.708
1149

0
0

36
30
1312
29.8
52
0.89
9%

0.89
2%
0

0
Perm

434
NA
4

4
38.0
38.0
58.5%
3.0
1.0

38.0
38.0
58.5%
3.0
1.0
0.0
4.0

12
30
628
14.3
21
4
0.89
1%
0

21
0.89
5%

0.89
2%
0

0
Perm

527
NA
8

8
38.0
38.0
58.5%
3.0
1.0

38.0
38.0
58.5%
3.0
1.0
0.0
4.0

14
30
680
15.5
52
6
0.89
2%
0

83
0.89
8%

0.89
6%
0

0
Perm

167
NA
2

2
27.0
27.0
41.5%
3.0
1.0

27.0
27.0
41.5%
3.0
1.0
0.0
4.0

0
Yes

33
30
320
7.3
52
2
0.89
0%
0

52
0.89
3%

0.89
8%
0

0
Perm

367
NA
6

6
27.0
27.0
41.5%
3.0
1.0

83
2
0.89
9%
0

27.0
27.0
41.5%
3.0
1.0
0.0
4.0

34.0
0.52
0.58
12.2
0.0
12.2
B
12.2
B
58
85
1232

34.0
0.52
0.87
31.7
0.0
31.7
C
31.7
C
164
#353
548

23.0
0.35
0.34
16.6
0.0
16.6
B
16.6
B
43
87
600

23.0
0.35
0.71
26.1
0.0
26.1
C
26.1
C
112
#227
240

745
0

606
0

486
0

514
0

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 25

Lanes, Volumes, Timings


8: Clarendon Avenue & Wilson Avenue

Lane Group
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
0
0
0.58

EBR

11/30/2015

WBL

WBT
0
0
0.87

WBR

NBL

NBT
0
0
0.34

NBR

SBL

SBT
0
0
0.71

SBR

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 32 (49%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 65
Control Type: Pretimed
Maximum v/c Ratio: 0.87
Intersection Signal Delay: 23.0
Intersection LOS: C
Intersection Capacity Utilization 80.3%
ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:

8: Clarendon Avenue & Wilson Avenue

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 26

Lanes, Volumes, Timings


9: Clarendon Avenue & Buena Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

22
1900
1.00

87
1900
1.00
0.97
0.973
0.992
1584
0.967
1530

28
1900
1.00

6
1900
1.00

5
1900
1.00

33
1900
1.00

34
1900
1.00

0
Yes

0
Yes

0
Yes

258
1900
1.00
0.99
0.997
0.994
1608
0.958
1543

6
1900
1.00

138
1900
1.00
0.98
0.977
0.992
1547
0.931
1445

35
1900
1.00

13
1900
1.00
0.97
0.973
0.988
1616
0.959
1548

0
0

21
30
501
11.4
41
0.96
9%

0.96
1%
0

0
Perm

143
NA
4

4
20.0
25.0
38.5%
3.0
0.0

20.0
25.0
38.5%
3.0
0.0
0.0
3.0

5
30
915
20.8
51
6
0.96
0%
0

51
0.96
0%

0.96
0%
0

0
Perm

25
NA
8

8
20.0
25.0
38.5%
3.0
0.0

20.0
25.0
38.5%
3.0
0.0
0.0
3.0

26
30
477
10.8
41
4
0.96
0%
0

57
0.96
0%

0.96
7%
0

0
Perm

214
NA
2

2
20.0
40.0
61.5%
3.0
0.0

20.0
40.0
61.5%
3.0
0.0
0.0
3.0

0
Yes

3
30
1232
28.0
62
9
0.96
6%
0

62
0.96
0%

0.96
6%
0

0
Perm

310
NA
6

6
20.0
40.0
61.5%
3.0
0.0

57
8
0.96
0%
0

20.0
40.0
61.5%
3.0
0.0
0.0
3.0

22.0
0.34
0.27
14.9
0.0
14.9
B
14.9
B
34
73
421

22.0
0.34
0.05
12.9
0.0
12.9
B
12.9
B
5
19
835

37.0
0.57
0.26
7.1
0.0
7.1
A
7.1
A
33
65
397

37.0
0.57
0.35
8.9
0.0
8.9
A
8.9
A
59
103
1152

531
0

527
0

833
0

879
0

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 27

Lanes, Volumes, Timings


9: Clarendon Avenue & Buena Avenue

Lane Group
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
0
0
0.27

EBR

11/30/2015

WBL

WBT
0
0
0.05

WBR

NBL

NBT
0
0
0.26

NBR

SBL

SBT
0
0
0.35

SBR

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 32 (49%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 40
Control Type: Pretimed
Maximum v/c Ratio: 0.35
Intersection Signal Delay: 9.7
Intersection LOS: A
Intersection Capacity Utilization 35.9%
ICU Level of Service A
Analysis Period (min) 15
Splits and Phases:

9: Clarendon Avenue & Buena Avenue

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

Synchro 8 Report
Page 28

HCM Unsignalized Intersection Capacity Analysis


10: Clarendon Avenue & Sunnyside Avenue

11/30/2015

Movement
Lane Configurations
Sign Control
Volume (vph)
Peak Hour Factor
Hourly flow rate (vph)

EBL

EBR

NBL

NBT

SBT

SBR

Stop
0
0.91
0

0
0.91
0

27
0.91
30

Stop
120
0.91
132

Stop
378
0.91
415

78
0.91
86

Direction, Lane #
Volume Total (vph)
Volume Left (vph)
Volume Right (vph)
Hadj (s)
Departure Headway (s)
Degree Utilization, x
Capacity (veh/h)
Control Delay (s)
Approach Delay (s)
Approach LOS

NB 1
162
30
0
0.13
4.5
0.20
780
8.6
8.6
A

SB 1
501
0
86
-0.01
4.1
0.56
873
12.2
12.2
B

Intersection Summary
Delay
Level of Service
Intersection Capacity Utilization
Analysis Period (min)

11.3
B
44.4%
15

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

ICU Level of Service

Synchro 8 Report
Page 1

HCM Unsignalized Intersection Capacity Analysis


11: Clarendon Avenue & Agatite Avenue

Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)

11/30/2015

EBL

EBR

NBL

NBT

SBT

SBR

5
Stop
0%
0.90
6
111
12.0
4.0
9

25

0
0.90
0

378
Free
0%
0.90
420
3
12.0
4.0
0

0.90
28

142
Free
0%
0.90
158
27
12.0
4.0
2
None

None

0.90
0

332
692

558

531

692
6.4

558
6.2

531
4.1

3.5
99
374

3.3
94
473

2.2
100
950

EB 1
33
6
28
453
0.07
6
13.6
B
13.6
B

NB 1
158
0
0
1700
0.09
0
0.0

SB 1
420
0
0
1700
0.25
0
0.0

0.0

0.0

0.7
36.1%
15

15-253 Montrose/Clarendon 8:00 am 11/10/2015 AM Existing


RAC

ICU Level of Service

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

78
1900
10
45
1
60
1.00
0.84

361
1900
12

61
1900
12
75
1

431
1900
12

69
1900
12
0
0

0
1900
10
0
0

59
1900
10
25
1

0.95
0.95
0.979

0.95

0.95

0.95

97
1900
9
165
1
85
1.00
0.95

255
1900
10

1.00
0.88
0.850

119
1900
9
0
1
25
1.00
0.86

268
1900
10

1.00

0
1900
12
0
0
25
1.00

0.95
0.95
0.972

0.95

1693

1583

3306

3240

2829

1693

1399
Yes
109

3306

0
Yes

3240

0
Yes

2829

0
Yes

0.950
1668
0.454
672

24
30
112
2.5

30
205
4.7
118
0.94
1%

0.94
1%
0

83
pm+pt
5
2
5.0
9.0
9.0%
3.0
1.0
0.0
4.0
Lag
Yes
43.0
0.43
0.25
21.3
0.0
21.3
C

384
NA
2

31
61

39.0
47.0
47.0%
3.0
2.0
0.0
5.0
42.0
0.42
0.54
25.3
0.0
25.3
C
21.7
C
180
271

105
30
0.94
2%

0.950
1608
0.482
701

105
0.94
0%

0.94
1%

532
NA
6 26

65
Perm
2
39.0
47.0
47.0%
3.0
2.0
0.0
5.0
42.0
0.42
0.10
1.2
0.0
1.2
A
0
8

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

46.0
0.46
0.35
2.1
0.4
2.5
A
2.5
A
14
19

0.950
1624
0.535
865

26
30
330
7.5

30
276
6.3
118
11
0.94
8%
0

184
0.94
1%

0.94
4%

127
pm+pt
3
8 24
7.0
11.0
11.0%
3.0
1.0
0.0
4.0
Lead
Yes
31.0
0.31
0.45
17.4
0.0
17.4
B

285
NA
8 24

20
m29

23.0
0.23
0.38
19.0
0.0
19.0
B
18.5
B
39
m55

65
29
0.94
0%
0

65
0.94
0%

0.94
5%
0

103
pm+pt
3
4 24
7.0
11.0
11.0%
3.0
1.0
0.0
4.0
Lead
Yes
31.0
0.31
0.32
23.4
0.1
23.5
C

334
NA
4 24

42
79

184
19
0.94
3%
0

23.0
0.23
0.50
33.7
0.0
33.7
C
31.3
C
90
134
Synchro 8 Report
Page 1

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

10

12

13

14

16

20

24

26

32

10

12

13

14

16

20

24

26

32

28.0
28.0
28%
3.0
2.0

10.0
10.0
10%
2.0
0.0

28.0
28.0
28%
3.0
2.0

38.0
47.0
47%
2.0
0.0

28.0
28.0
28%
2.0
0.0

8.0
9.0
9%
2.0
0.0

38.0
38.0
38%
3.0
1.0

28.0
28.0
28%
2.0
0.0

5.0
15.0
15%
3.0
1.0

4.0
4.0
4%
2.0
0.0

38.0
38.0
38%
3.0
1.0

10.0
10.0
10%
3.0
1.0

Lag
Yes

Lead
Yes

Lag
Yes

Lead
Yes

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
45
338
0
0
0
0.25

EBT
125
711
0
0
0
0.54

EBR

11/30/2015

WBL

75
650
0
0
0
0.10

WBT
32

WBR

1533
509
0
0
0.52

NBL

NBT
196

280
0
0
0
0.45

745
0
0
0
0.38

NBR

SBL
165
321
0
10
0
0.33

SBT
250

SBR

670
0
0
0
0.50

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 4:SBTL and 8:NBTL, Start of Green
Natural Cycle: 95
Control Type: Pretimed
Maximum v/c Ratio: 0.54
Intersection Signal Delay: 17.9
Intersection LOS: B
Intersection Capacity Utilization 65.8%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

1: North Broadway & Montrose Avenue

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 3

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

11/30/2015

10

12

13

14

16

20

24

26

32

Intersection Summary

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 4

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

46
1900
12
0
1
25
1.00
0.91

411
1900
12

1
1900
12
0
0

458
1900
10

28
1900
10
50
1

24
1900
10
0
1

42
1900
12
0
0

0.95
0.99
0.991

0.95

1.00

1.00
0.67
0.850

53
1900
12
0
0
25
1.00

132
1900
12

1.00

0
1900
10
0
0
25
1.00

109
2000
10

1.00
1.00

23
1900
10
50
1
100
1.00
0.95

1.00

1881

3072

1795

1507

1881

0
Yes

3072

0
Yes

1795

1009
Yes
109

1.00
0.93
0.975
0.988
1573
0.917
1372

162
7
0.99
0%

162
0.99
0%

0.99
6%
0

24
Perm

0
Perm

229
NA
12 32

16 32

12 32

0.950
1770
0.385
652

0.950
1685
0.357
600

7
30
672
15.3

30
112
2.5
137
0.99
2%

0.99
1%

46
custom
13 20
10

416
NA
10 20

60.0
0.60
0.07
2.1
2.9
5.0
A
2
m5

60.0
0.60
0.37
2.8
0.8
3.6
A
3.8
A
20
30

126
29
0.99
0%
0

126
0.99
0%

0.99
2%
0

23
Perm

491
NA
14

14
38.0
38.0
38.0%
3.0
1.0
0.0
4.0
Lead
Yes
34.0
0.34
0.11
21.4
0.0
21.4
C
8
m13

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

38.0
38.0
38.0%
3.0
1.0
0.0
4.0
Lead
Yes
34.0
0.34
0.47
26.4
0.0
26.4
C
26.2
C
136
145

40
0.99
0%

0.99
4%

110
NA
16 32

36.0
0.36
0.17
6.7
1.1
7.8
A
6.4
A
13
m16

36.0
0.36
0.06
0.2
0.0
0.2
A
0
m0

0
Yes

13
30
277
6.3

30
252
5.7
137
18
0.99
0%

40
10
0.99
0%
0

36.0
0.36
0.46
26.6
0.0
26.6
C
26.6
C
104
174
Synchro 8 Report
Page 5

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

10

12

13

16

20

24

10

12

13

16

20

24

39.0
47.0
47%
3.0
2.0

7.0
11.0
11%
3.0
1.0

28.0
28.0
28%
3.0
2.0

5.0
9.0
9%
3.0
1.0

10.0
10.0
10%
2.0
0.0

28.0
28.0
28%
3.0
2.0

38.0
47.0
47%
2.0
0.0

28.0
28.0
28%
2.0
0.0

8.0
9.0
9%
2.0
0.0

28.0
28.0
28%
2.0
0.0

5.0
15.0
15%
3.0
1.0

4.0
4.0
4%
2.0
0.0

Lead
Yes

Lag
Yes

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Lag
Yes

Lag
Yes

Synchro 8 Report
Page 6

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

26

32

26

32

38.0
38.0
38%
3.0
1.0

10.0
10.0
10%
3.0
1.0

11/30/2015

Lead
Yes

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 7

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
32

637
520
0
0
0.39

1128
429
0
0
0.60

EBR

11/30/2015

WBL
50
204
0
0
0
0.11

WBT
592

WBR

1049
0
0
0
0.47

NBL

NBT
172

NBR

646
367
0
0
0.39

433
0
0
0
0.06

SBL

SBT
197

SBR

502
0
0
0
0.46

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 4:SBTL and 8:NBTL, Start of Green
Natural Cycle: 95
Control Type: Pretimed
Maximum v/c Ratio: 0.54
Intersection Signal Delay: 16.6
Intersection LOS: B
Intersection Capacity Utilization 81.7%
ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

2: Sheridan Road & Montrose Avenue

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 8

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

11/30/2015

10

12

13

16

20

24

Intersection Summary

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 9

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

26

11/30/2015

32

Intersection Summary

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 10

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

NBL

NBT

NBR

SBL

SBT

SBR

SEL

SET

SER

NWL

NWT

NWR

83
1900
9
0
1
35
1.00
0.97

56
1900
10

11
1900
10
75
1

74
1900
10

1
1900
10
0
0

85
1900
10
0
1

77
1900
12
0
0

1.00
1.00
0.998

1.00

1.00

1.00
0.72
0.850

7
1900
12
0
0
25
1.00

303
1900
12

1.00

0
1900
10
0
0
25
1.00

231
1900
10

1.00
0.96
0.975

81
1900
9
0
1
25
1.00
0.82

1.00

1418

1624

1705

1436

1418

0
Yes

1624

0
Yes

1705

1034
Yes
98

1.00
0.98
0.973
0.999
1769
0.994
1754

79
14
0.93
5%

79

0.950
1608
0.704
1162

0.950
1608
0.710
988

10
30
492
11.2
15
0.93
1%

0.93
7%
0

89
pm+pt
5
2
8.0
9.0
9.0%
3.5
0.5
0.0
4.0
Lag
Yes
31.0
0.31
0.23
25.0
0.0
25.0
C

72
NA
2

39
75

20.0
30.0
30.0%
3.5
0.5
0.0
4.0
Lead
Yes
26.0
0.26
0.19
26.6
0.0
26.6
C
25.7
C
31
68

1
30
252
5.7
63
2
0.93
0%
0

63
0.93
1%

0.93
9%

87
pm+pt
1
6
8.0
9.0
9.0%
3.5
0.5
0.0
4.0
Lag
Yes
31.0
0.31
0.26
14.6
0.0
14.6
B

81
NA
6

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

41
71

20.0
30.0
30.0%
3.5
0.5
0.0
4.0
Lead
Yes
26.0
0.26
0.19
14.4
0.0
14.4
B
14.5
B
39
71

37
0.93
0%

0.93
4%

248
91
NA custom
4 14
4
20.0
26.0
26.0%
3.5
0.5
0.0
4.0
57.0
0.57
0.26
9.1
1.0
10.1
B
15.1
B
32
88

22.0
0.22
0.30
28.7
0.0
28.7
C
28
79

0
Yes

13
30
494
11.2

30
276
6.3
15
10
0.93
0%

0.93
0%

0.93
3%

0
Perm

417
NA
8

8
20.0
35.0
35.0%
3.5
0.5

37
30
0.93
0%
0

20.0
35.0
35.0%
3.5
0.5
0.0
4.0
31.0
0.31
0.76
40.2
0.0
40.2
D
40.2
D
231
#353
Synchro 8 Report
Page 11

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

14

14
20.0
35.0
35%
3.5
0.5

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 12

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

NBL

NBT
412

382
0
0
0
0.23

376
0
0
0
0.19

NBR

11/30/2015

SBL

SBT
172

337
0
0
0
0.26

422
0
0
0
0.19

SBR

SEL

SET
196

SER

971
493
0
0
0.52

303
0
0
0
0.30

NWL

NWT
414

NWR

552
0
0
0
0.76

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 22 (22%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 70
Control Type: Pretimed
Maximum v/c Ratio: 0.76
Intersection Signal Delay: 26.2
Intersection LOS: C
Intersection Capacity Utilization 58.3%
ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:

3: Sheridan Road & North Broadway

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 13

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

11/30/2015

14

Intersection Summary

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 14

Lanes, Volumes, Timings


4: Hazel Street & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

28
1900
10
25
1
25
1.00
0.98

427
1900
12

24
1900
12
0
0

519
1900
12

18
1900
12
0
0

18
1900
9
0
0

12
1900
9
0
0

1.00
1.00
0.995

1.00

1.00

1665

1670

0
Yes

1665

0
Yes

0
Yes

1.00
0.91
0.940
0.978
1306
0.919
1169

1.00

1670

1.00
0.90
0.924
0.985
1294
0.945
1213

12
1900
9
0
0
25
1.00

3
1900
9

1.00

10
1900
9
0
0
25
1.00

4
1900
9

1.00
0.99
0.992

28
1900
10
25
1
25
1.00
0.96

0.950
1685
0.391
677

0.950
1685
0.447
758

6
30
672
15.3
74
0.99
0%

0.99
1%
0

28
Perm

455
NA
2

2
71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.06
4.3
0.0
4.3
A
4
m10

71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.41
5.9
0.0
5.9
A
5.8
A
76
95

4
30
665
15.1
115
26
0.99
0%
0

115
0.99
0%

0.99
2%
0

28
Perm

542
NA
6

6
71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.06
7.9
0.0
7.9
A
6
m11

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.49
9.4
0.0
9.4
A
9.3
A
116
155

18
30
408
9.3
74
14
0.99
0%
0

39
0.99
0%

0.99
0%
0

0
Perm

32
NA
8

8
29.0
29.0
29.0%
3.0
1.0

29.0
29.0
29.0%
3.0
1.0
0.0
4.0
25.0
0.25
0.10
18.3
0.0
18.3
B
18.3
B
7
31

0
0
Yes

12
30
329
7.5
56
4
0.99
0%
0

56
0.99
0%

0.99
0%
0

0
Perm

27
NA
4

4
29.0
29.0
29.0%
3.0
1.0

39
2
0.99
8%
0

29.0
29.0
29.0%
3.0
1.0
0.0
4.0
25.0
0.25
0.09
20.5
0.0
20.5
C
20.5
C
7
29
Synchro 8 Report
Page 15

Lanes, Volumes, Timings


4: Hazel Street & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
453
0
0
0
0.06

EBT
592

EBR

1120
0
0
0
0.41

11/30/2015

WBL
25
507
0
0
0
0.06

WBT
585

WBR

1116
0
0
0
0.49

NBL

NBT
328
316
0
0
0
0.10

NBR

SBL

SBT
249

SBR

301
0
0
0
0.09

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 18 (18%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.49
Intersection Signal Delay: 8.3
Intersection LOS: A
Intersection Capacity Utilization 83.3%
ICU Level of Service E
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

4: Hazel Street & Montrose Avenue

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 16

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

36
1900
10
25
1
25
1.00
0.98

366
1900
12

43
1900
12
0
0

524
1900
12

37
1900
12
0
0

29
1900
10
0
0

26
1900
9
0
0

1.00
1.00
0.990

1.00

1.00
0.98
0.963

1.00

27
1900
9
50
1
25
1.00
0.94

67
1900
9

1.00

36
1900
10
25
1
25
1.00
0.95

91
1900
10

1.00
0.99
0.984

25
1900
10
25
1
25
1.00
0.98

1.00
0.98
0.957

1.00

1654

1651

1366

1405

1654

0
Yes

1651

0
Yes

1366

0
Yes

1405

0
Yes

0.950
1604
0.349
578

0.950
1685
0.456
792

11
30
665
15.1
60
0.98
5%

0.98
1%
0

37
Perm

417
NA
4

4
66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.10
10.7
0.0
10.7
B
7
23

66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.41
10.5
0.0
10.5
B
10.5
B
78
146

0.950
1685
0.695
1173

7
30
844
19.2
47
4
0.98
2%
0

47
0.98
0%

0.98
2%
0

26
Perm

573
NA
8

8
66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.05
6.0
0.0
6.0
A

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

3
m7

66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.56
7.7
0.0
7.7
A
7.6
A
57
131

0.950
1624
0.652
1046

17
30
1232
28.0
60
8
0.98
3%
0

33
0.98
0%

0.98
13%
0

37
Perm

123
NA
2

2
34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.11
26.4
0.0
26.4
C
17
42

34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.29
25.3
0.0
25.3
C
25.6
C
51
100

20
30
332
7.5
45
4
0.98
0%
0

45
0.98
0%

0.98
2%
0

28
Perm

95
NA
6

6
34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.09
26.3
0.0
26.3
C
13
34

33
1
0.98
4%
0

34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.22
22.2
0.0
22.2
C
23.1
C
35
76
Synchro 8 Report
Page 17

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
358
0
0
0
0.10

EBT
585
1029
0
0
0
0.41

EBR

WBL
25
491
0
0
0
0.05

11/30/2015

WBT
764

WBR

1026
0
0
0
0.56

NBL
25
351
0
0
0
0.11

NBT
1152
421
0
0
0
0.29

NBR

SBL
50
313
0
0
0
0.09

SBT
252

SBR

435
0
0
0
0.22

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 86 (86%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.56
Intersection Signal Delay: 12.2
Intersection LOS: B
Intersection Capacity Utilization 83.3%
ICU Level of Service E
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

5: Clarendon Avenue & Montrose Avenue

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 18

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

EBR2

WBL2

WBL

WBT

WBR

NBL

NBT

NBR

NBR2

13
1900
10
0
0
25
1.00

81
1900
12

274
1900
10
25
1

52
1900
10

52
1900
10

485
1900
10

10
1900
10
0
0

35
1900
10
0
0

10
1900
10

1.00

1.00

1.00

1.00
1.00
0.997

1.00

42
1900
10
0
0
25
1.00

50
1900
10

1.00
1.00

33
1900
10
0
1
25
1.00

1.00

1.00

1485

1749

1485

0
No

1749

0
Yes

1.00
0.98
0.955
0.985
1534
0.985
1504

0
No

0.850
0
0

0.993
1698
0.935
1597

0.950
1685
0.692
1227

1
30
379
8.6

30
844
19.2
23
0.93
0%

0.93
0%
0

0.93
1%

0.93
4%

0.93
0%

0.93
0%

0.93
1%

0
pm+pt
7
4
8.0
9.0
9.0%
3.0
0.0

101
NA
4

351
Perm

0
Perm

91
Perm

533
NA
8

8
45.0
45.0
45.0%
3.0
2.0

49.0
0.49
0.48
17.0
0.0
17.0
B

8
45.0
45.0
45.0%
3.0
2.0
0.0
5.0
Lag
Yes
40.0
0.40
0.19
20.8
0.0
20.8
C

118
138

37
73

46.0
54.0
54.0%
3.0
2.0
0.0
5.0

4
46.0
54.0
54.0%
3.0
2.0
0.0
5.0

Lead
Yes

Lag
Yes
49.0
0.49
0.13
12.7
0.0
12.7
B
16.0
B
33
49

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

45.0
45.0
45.0%
3.0
2.0
0.0
5.0
Lag
Yes
40.0
0.40
0.76
34.4
0.0
34.4
C
32.4
C
287
422

30
720
16.4
23
3
0.93
0%
0

27
0.93
0%

0.93
24%

0.93
0%

0.93
0%

0
Split
2

148
NA
2

23.0
23.0
23.0%
3.0
2.0

23.0
23.0
23.0%
3.0
2.0
0.0
5.0
18.0
0.18
0.54
45.3
0.0
45.3
D
45.3
D
87
151
Synchro 8 Report
Page 19

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

SBL2

SBL

SBT

SBR

10
1900
10

79
1900
10

65
1900
10
25
1

1.00

8
1900
10
0
0
25
1.00

1.00

1.00
0.91
0.850

0.991
1676
0.991
1676

11/30/2015

1346
1220
No

30
377
8.6
27
0.93
0%

0.93
0%

0.93
6%

0.93
12%

0
Split
6

0
Split
6

105
NA
6

70
Perm

23.0
23.0
23.0%
3.0
2.0

23.0
23.0
23.0%
3.0
2.0

23.0
23.0
23.0%
3.0
2.0
0.0
5.0
18.0
0.18
0.35
39.7
0.0
39.7
D
40.0
D
59
110

6
23.0
23.0
23.0%
3.0
2.0
0.0
5.0
18.0
0.18
0.32
40.4
0.0
40.4
D

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

39
82
Synchro 8 Report
Page 20

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
764
786
0
0
0
0.13

EBR

EBR2

25
727
0
0
0
0.48

WBL2

WBL

WBT
299

490
0
0
0
0.19

700
0
0
0
0.76

11/30/2015

WBR

NBL

NBT
640

NBR

NBR2

276
0
0
0
0.54

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 77 (77%), Referenced to phase 2:NBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.76
Intersection Signal Delay: 29.4
Intersection LOS: C
Intersection Capacity Utilization 81.0%
ICU Level of Service D
Analysis Period (min) 15
Splits and Phases:

6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 21

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

SBL2

SBL

SBT
297
301
0
0
0
0.35

11/30/2015

SBR
25
219
0
0
0
0.32

Intersection Summary

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 22

Lanes, Volumes, Timings


7: Sheridan Road & Wilson Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

115
1900
10
25
1
25
1.00
0.93

280
1900
12

46
1900
12
0
0

324
1900
12

81
1900
12
0
0

50
1900
12
0
0

45
1900
12
0
0

1.00
0.97
0.970

1.00

1.00
0.96
0.971

1.00

67
1900
10
25
1
25
1.00
0.89

203
1900
12

1.00

25
1900
10
50
1
25
1.00
0.94

210
1900
12

1.00
0.97
0.979

27
1900
10
25
1
25
1.00
0.89

1.00
0.98
0.973

1.00

1571

1579

1569

1543

1571

0
No

1579

0
No

1569

0
No

1543

0
No

0.950
1620
0.393
622

0.950
1560
0.481
702

30
426
9.7
120
0.97
4%

0.97
3%
0

119
Perm

336
NA
4

4
32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.46
21.0
0.0
21.0
C
33
80

32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.52
17.6
0.0
17.6
B
18.5
B
95
165

0.950
1685
0.577
964

30
1312
29.8
159
4
0.97
6%
0

159
0.97
8%

0.97
2%
0

28
Perm

418
NA
8

8
32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.10
8.0
0.0
8.0
A

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

4
m8

32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.64
16.0
0.0
16.0
B
15.5
B
144
240

0.950
1636
0.563
862

30
380
8.6
120
3
0.97
0%
0

73
0.97
0%

0.97
2%
0

26
Perm

268
NA
2

2
33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.06
11.4
0.0
11.4
B
6
19

33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.40
14.9
0.0
14.9
B
14.6
B
70
124

30
336
7.6
142
7
0.97
2%
0

142
0.97
3%

0.97
7%
0

69
Perm

255
NA
6

6
33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.19
13.1
0.0
13.1
B
16
40

73
5
0.97
0%
0

33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.38
14.8
0.0
14.8
B
14.4
B
66
118
Synchro 8 Report
Page 23

Lanes, Volumes, Timings


7: Sheridan Road & Wilson Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
258
0
0
0
0.46

EBT
346

EBR

652
0
0
0
0.52

11/30/2015

WBL
25
291
0
0
0
0.10

WBT
1232

WBR

655
0
0
0
0.64

NBL
50
415
0
0
0
0.06

NBT
300
675
0
0
0
0.40

NBR

SBL
25
371
0
0
0
0.19

SBT
256

SBR

664
0
0
0
0.38

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 65
Control Type: Pretimed
Maximum v/c Ratio: 0.64
Intersection Signal Delay: 16.0
Intersection LOS: B
Intersection Capacity Utilization 73.4%
ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

7: Sheridan Road & Wilson Avenue

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 24

Lanes, Volumes, Timings


8: Clarendon Avenue & Wilson Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

34
1900
1.00

311
1900
1.00
0.99
0.989
0.996
1641
0.939
1544

30
1900
1.00

21
1900
1.00

28
1900
1.00

39
1900
1.00

29
1900
1.00

0
Yes

0
Yes

0
Yes

47
1900
1.00
0.94
0.951
0.988
1532
0.916
1404

44
1900
1.00

76
1900
1.00
0.96
0.977
0.986
1495
0.901
1334

24
1900
1.00

367
1900
1.00
0.99
0.991
0.997
1653
0.972
1610

0
0

10
30
1312
29.8
49
0.89
3%

0.89
2%
0

0
Perm

421
NA
4

4
38.0
38.0
58.5%
3.0
1.0

38.0
38.0
58.5%
3.0
1.0
0.0
4.0

8
30
628
14.3
41
2
0.89
3%
0

41
0.89
0%

0.89
2%
0

0
Perm

467
NA
8

8
38.0
38.0
58.5%
3.0
1.0

38.0
38.0
58.5%
3.0
1.0
0.0
4.0

18
30
680
15.5
49
3
0.89
0%
0

73
0.89
5%

0.89
5%
0

0
Perm

156
NA
2

2
27.0
27.0
41.5%
3.0
1.0

27.0
27.0
41.5%
3.0
1.0
0.0
4.0

0
Yes

49
30
320
7.3
44
6
0.89
25%
0

44
0.89
0%

0.89
0%
0

0
Perm

135
NA
6

6
27.0
27.0
41.5%
3.0
1.0

73
2
0.89
0%
0

27.0
27.0
41.5%
3.0
1.0
0.0
4.0

34.0
0.52
0.52
9.6
0.0
9.6
A
9.6
A
55
79
1232

34.0
0.52
0.55
13.3
0.0
13.3
B
13.3
B
112
187
548

23.0
0.35
0.32
15.8
0.0
15.8
B
15.8
B
39
80
600

23.0
0.35
0.26
11.4
0.0
11.4
B
11.4
B
23
58
240

812
0

845
0

483
0

528
0

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 25

Lanes, Volumes, Timings


8: Clarendon Avenue & Wilson Avenue

Lane Group
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
0
0
0.52

EBR

11/30/2015

WBL

WBT
0
0
0.55

WBR

NBL

NBT
0
0
0.32

NBR

SBL

SBT
0
0
0.26

SBR

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 32 (49%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 65
Control Type: Pretimed
Maximum v/c Ratio: 0.55
Intersection Signal Delay: 12.1
Intersection LOS: B
Intersection Capacity Utilization 55.5%
ICU Level of Service B
Analysis Period (min) 15
Splits and Phases:

8: Clarendon Avenue & Wilson Avenue

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 26

Lanes, Volumes, Timings


9: Clarendon Avenue & Buena Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

6
1900
1.00

34
1900
1.00
0.97
0.961
0.995
1559
0.984
1535

16
1900
1.00

3
1900
1.00

7
1900
1.00

17
1900
1.00

6
1900
1.00

0
Yes

0
Yes

0
Yes

88
1900
1.00
0.99
0.984
0.997
1638
0.988
1620

13
1900
1.00

158
1900
1.00
0.98
0.977
0.996
1536
0.981
1510

36
1900
1.00

38
1900
1.00
0.98
0.981
0.997
1655
0.991
1637

0
0

19
30
501
11.4
32

8
30
915
20.8
56

56

0.84
0%

0.84
3%
0

0.84
0%

0.84
0%

0.84
0%
0

0
Perm

66
NA
4

0
Perm

57
NA
8

4
20.0
25.0
38.5%
3.0
0.0

20.0
25.0
38.5%
3.0
0.0
0.0
3.0

8
20.0
25.0
38.5%
3.0
0.0

20.0
25.0
38.5%
3.0
0.0
0.0
3.0

27
30
477
10.8
32
7
0.84
0%
0

43
0.84
0%

0.84
9%
0

0
Perm

251
NA
2

2
20.0
40.0
61.5%
3.0
0.0

20.0
40.0
61.5%
3.0
0.0
0.0
3.0

0
Yes

15
30
1232
28.0
66
12
0.84
0%
0

66
0.84
0%

0.84
2%
0

0
Perm

127
NA
6

6
20.0
40.0
61.5%
3.0
0.0

43
7
0.84
0%
0

20.0
40.0
61.5%
3.0
0.0
0.0
3.0

22.0
0.34
0.12
12.2
0.0
12.2
B
12.2
B
12
33
421

22.0
0.34
0.10
13.8
0.0
13.8
B
13.8
B
13
32
835

37.0
0.57
0.29
7.4
0.0
7.4
A
7.4
A
40
69
397

37.0
0.57
0.14
6.2
0.0
6.2
A
6.2
A
18
37
1152

532
0

559
0

871
0

928
0

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 27

Lanes, Volumes, Timings


9: Clarendon Avenue & Buena Avenue

Lane Group
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
0
0
0.12

EBR

11/30/2015

WBL

WBT
0
0
0.10

WBR

NBL

NBT
0
0
0.29

NBR

SBL

SBT
0
0
0.14

SBR

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 32 (49%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 40
Control Type: Pretimed
Maximum v/c Ratio: 0.29
Intersection Signal Delay: 8.5
Intersection LOS: A
Intersection Capacity Utilization 29.6%
ICU Level of Service A
Analysis Period (min) 15
Splits and Phases:

9: Clarendon Avenue & Buena Avenue

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

Synchro 8 Report
Page 28

HCM Unsignalized Intersection Capacity Analysis


10: Clarendon Avenue & Sunnyside Avenue

11/30/2015

Movement
Lane Configurations
Sign Control
Volume (vph)
Peak Hour Factor
Hourly flow rate (vph)

EBL

EBR

NBL

NBT

SBT

SBR

Stop
0
0.82
0

0
0.82
0

51
0.82
62

Stop
127
0.82
155

Stop
99
0.82
121

27
0.82
33

Direction, Lane #
Volume Total (vph)
Volume Left (vph)
Volume Right (vph)
Hadj (s)
Departure Headway (s)
Degree Utilization, x
Capacity (veh/h)
Control Delay (s)
Approach Delay (s)
Approach LOS

NB 1
217
62
0
0.19
4.2
0.25
838
8.7
8.7
A

SB 1
154
0
33
-0.12
4.0
0.17
890
7.8
7.8
A

Intersection Summary
Delay
Level of Service
Intersection Capacity Utilization
Analysis Period (min)

8.3
A
41.9%
15

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

ICU Level of Service

Synchro 8 Report
Page 1

HCM Unsignalized Intersection Capacity Analysis


11: Clarendon Avenue & Agatite Avenue

Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)

11/30/2015

EBL

EBR

NBL

NBT

SBT

SBR

14
Stop
0%
0.84
17
26
12.0
4.0
2

21

0
0.84
0

99
Free
0%
0.84
118
2
12.0
4.0
0

0.84
25

164
Free
0%
0.84
195
7
12.0
4.0
1
None

None

0.84
0

332
341

151

144

341
6.4

151
6.2

144
4.1

3.5
97
644

3.3
97
876

2.2
100
1420

EB 1
42
17
25
766
0.05
4
10.0
A
10.0
A

NB 1
195
0
0
1700
0.11
0
0.0

SB 1
118
0
0
1700
0.07
0
0.0

0.0

0.0

1.2
22.0%
15

15-253 Montrose/Clarendon 5:00 am 11/10/2015 PM Existing


RAC

ICU Level of Service

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

83
1900
10
45
1
60
1.00
0.81

421
1900
12

83
1900
12
75
1

352
1900
12

60
1900
12
0
0

7
1900
10
0
0

54
1900
10
25
1

0.95
0.95
0.978

0.95

0.95
1.00
0.996

0.95

91
1900
9
165
1
85
1.00
0.93

324
1900
10

1.00
0.85
0.850

99
1900
9
0
1
25
1.00
0.88

247
1900
10

1.00

0
1900
12
0
0
25
1.00

0.95
0.96
0.978

0.95

1693

1568

3285

3190

2910

1693

1334
Yes
109

3285

0
Yes

3190

0
Yes

2910

0
Yes

144
30
0.97
3%

144

0.950
1668
0.504
715

26
30
112
2.5

30
205
4.7
141
0.97
1%

0.97
1%
0

86
pm+pt
5
2
5.0
9.0
9.0%
3.0
1.0
0.0
4.0
Lag
Yes
43.0
0.43
0.24
21.0
0.0
21.0
C

434
NA
2

32
63

39.0
47.0
47.0%
3.0
2.0
0.0
5.0
42.0
0.42
0.61
27.2
0.0
27.2
C
22.8
C
211
315

86
Perm

0.97
0%

0.97
1%

425
NA
6 26

2
39.0
47.0
47.0%
3.0
2.0
0.0
5.0
42.0
0.42
0.14
2.7
0.0
2.7
A
0
19

0.950
1577
0.424
617

46.0
0.46
0.28
1.8
0.5
2.3
A
2.3
A
11
15

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

0.950
1624
0.561
895

2
30
276
6.3
141
26
0.97
7%
0

180
0.97
3%

0.97
5%

102
pm+pt
3
8 24
7.0
11.0
11.0%
3.0
1.0
0.0
4.0
Lead
Yes
31.0
0.31
0.40
16.2
0.0
16.2
B

262
NA
8 24

16
m23

23.0
0.23
0.36
18.0
0.1
18.1
B
17.6
B
33
m47

18
30
330
7.5
76
14
0.97
0%
0

76
0.97
0%

0.97
4%
0

94
pm+pt
3
4 24
7.0
11.0
11.0%
3.0
1.0
0.0
4.0
Lead
Yes
31.0
0.31
0.29
22.7
0.1
22.8
C

390
NA
4 24

38
73

180
14
0.97
2%
0

23.0
0.23
0.57
36.3
0.0
36.3
D
33.7
C
111
161
Synchro 8 Report
Page 1

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

10

12

13

14

16

20

24

26

32

10

12

13

14

16

20

24

26

32

28.0
28.0
28%
3.0
2.0

10.0
10.0
10%
2.0
0.0

28.0
28.0
28%
3.0
2.0

38.0
47.0
47%
2.0
0.0

28.0
28.0
28%
2.0
0.0

8.0
9.0
9%
2.0
0.0

38.0
38.0
38%
3.0
1.0

28.0
28.0
28%
2.0
0.0

5.0
15.0
15%
3.0
1.0

4.0
4.0
4%
2.0
0.0

38.0
38.0
38%
3.0
1.0

10.0
10.0
10%
3.0
1.0

Lag
Yes

Lead
Yes

Lag
Yes

Lead
Yes

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
45
355
0
0
0
0.24

EBT
125
711
0
0
0
0.61

EBR

11/30/2015

WBL

75
623
0
0
0
0.14

WBT
32

WBR

1525
676
0
0
0.50

NBL

NBT
196

258
0
0
0
0.40

735
0
75
0
0.40

NBR

SBL
165
328
0
25
0
0.31

SBT
250

SBR

683
0
0
0
0.57

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 4:SBTL and 8:NBTL, Start of Green
Natural Cycle: 95
Control Type: Pretimed
Maximum v/c Ratio: 0.61
Intersection Signal Delay: 20.0
Intersection LOS: B
Intersection Capacity Utilization 64.7%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

1: North Broadway & Montrose Avenue

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 3

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

11/30/2015

10

12

13

14

16

20

24

26

32

Intersection Summary

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 4

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

47
1900
12
0
1
25
1.00
0.88

468
1900
12

4
1900
12
0
0

369
1900
10

25
1900
10
50
1

41
1900
10
0
1

43
1900
12
0
0

0.95
0.98
0.990

0.95

1.00

1.00
0.67
0.850

54
1900
12
0
0
25
1.00

121
1900
12

1.00

0
1900
10
0
0
25
1.00

82
2000
10

1.00
1.00
0.999

43
1900
10
50
1
100
1.00
0.94

1.00

1877

3061

1795

1478

1877

0
Yes

3061

0
Yes

1795

987
Yes
109

1.00
0.92
0.973
0.988
1550
0.916
1341

163
7
0.93
2%

163
0.93
2%

0.93
7%
0

44
Perm

0
Perm

234
NA
12 32

16 32

12 32

0.950
1770
0.434
714

0.950
1604
0.274
437

1
30
112
2.5
155
0.93
2%

0.93
1%

51
custom
13 20
10

507
NA
10 20

60.0
0.60
0.08
2.4
3.7
6.1
A
3
m5

60.0
0.60
0.45
3.3
1.1
4.5
A
4.6
A
29
38

8
30
672
15.3
165
29
0.93
0%
0

165
0.93
5%

0.93
2%
0

46
Perm

424
NA
14

14
38.0
38.0
38.0%
3.0
1.0
0.0
4.0
Lead
Yes
34.0
0.34
0.31
22.1
0.0
22.1
C
17
39

38.0
38.0
38.0%
3.0
1.0
0.0
4.0
Lead
Yes
34.0
0.34
0.41
17.0
0.0
17.0
B
17.5
B
80
111

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

37
0.93
0%

0.93
4%

88
NA
16 32

36.0
0.36
0.14
6.0
0.0
6.0
A
4.2
A
10
m12

36.0
0.36
0.10
0.6
0.0
0.6
A
0
m0

0
Yes

14
30
277
6.3

30
252
5.7
155
6
0.93
0%

37
10
0.93
2%
0

36.0
0.36
0.48
27.1
0.0
27.1
C
27.1
C
107
180
Synchro 8 Report
Page 5

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

10

12

13

16

20

24

10

12

13

16

20

24

39.0
47.0
47%
3.0
2.0

7.0
11.0
11%
3.0
1.0

28.0
28.0
28%
3.0
2.0

5.0
9.0
9%
3.0
1.0

10.0
10.0
10%
2.0
0.0

28.0
28.0
28%
3.0
2.0

38.0
47.0
47%
2.0
0.0

28.0
28.0
28%
2.0
0.0

8.0
9.0
9%
2.0
0.0

28.0
28.0
28%
2.0
0.0

5.0
15.0
15%
3.0
1.0

4.0
4.0
4%
2.0
0.0

Lead
Yes

Lag
Yes

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Lag
Yes

Lag
Yes

Synchro 8 Report
Page 6

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

26

32

26

32

38.0
38.0
38%
3.0
1.0

10.0
10.0
10%
3.0
1.0

11/30/2015

Lead
Yes

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 7

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
32

660
546
0
0
0.45

1126
381
0
0
0.68

EBR

11/30/2015

WBL
50
148
0
0
0
0.31

WBT
592

WBR

1046
0
0
0
0.41

NBL

NBT
172

NBR

646
0
0
0
0.14

425
0
0
0
0.10

SBL

SBT
197

SBR

491
0
0
0
0.48

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 4:SBTL and 8:NBTL, Start of Green
Natural Cycle: 95
Control Type: Pretimed
Maximum v/c Ratio: 0.61
Intersection Signal Delay: 12.7
Intersection LOS: B
Intersection Capacity Utilization 81.7%
ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

2: Sheridan Road & Montrose Avenue

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 8

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

11/30/2015

10

12

13

16

20

24

Intersection Summary

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 9

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

26

11/30/2015

32

Intersection Summary

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 10

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

NBL

NBT

NBR

SBL

SBT

SBR

SEL

SET

SER

NWL

NWT

NWR

71
1900
9
0
1
35
1.00
0.97

40
1900
10

14
1900
10
75
1

88
1900
10

2
1900
10
0
0

117
1900
10
0
1

83
1900
12
0
0

1.00
1.00
0.997

1.00

1.00

1.00
0.64
0.850

6
1900
12
0
0
25
1.00

280
1900
12

1.00

0
1900
10
0
0
25
1.00

290
1900
10

1.00
0.92
0.961

78
1900
9
0
1
25
1.00
0.74

1.00

1284

1638

1705

1436

1284

0
Yes

1638

0
Yes

1705

912
Yes
131

1.00
0.98
0.970
0.999
1749
0.994
1735

102
28
0.89
5%

102

0.950
1562
0.681
1082

0.950
1577
0.717
886

16
30
492
11.2
21
0.89
4%

0.89
11%
0

80
pm+pt
5
2
8.0
9.0
9.0%
3.5
0.5
0.0
4.0
Lag
Yes
31.0
0.31
0.22
25.0
0.0
25.0
C

61
NA
2

35
68

20.0
30.0
30.0%
3.5
0.5
0.0
4.0
Lead
Yes
26.0
0.26
0.18
24.0
0.0
24.0
C
24.6
C
22
55

1
30
252
5.7
89
11
0.89
7%
0

89
0.89
3%

0.89
8%

88
pm+pt
1
6
8.0
9.0
9.0%
3.5
0.5
0.0
4.0
Lag
Yes
31.0
0.31
0.28
17.3
0.0
17.3
B

101
NA
6

40
66

20.0
30.0
30.0%
3.5
0.5
0.0
4.0
Lead
Yes
26.0
0.26
0.24
21.8
0.0
21.8
C
19.7
B
52
91

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

29
0.89
0%

0.89
4%

326
131
NA custom
4 14
4
20.0
26.0
26.0%
3.5
0.5
0.0
4.0
57.0
0.57
0.34
12.7
1.8
14.5
B
18.9
B
56
141

22.0
0.22
0.43
29.2
0.6
29.8
C
49
98

0
Yes

15
30
494
11.2

30
276
6.3
21
10
0.89
0%

0.89
0%

0.89
4%

0
Perm

415
NA
8

8
20.0
35.0
35.0%
3.5
0.5

29
29
0.89
1%
0

20.0
35.0
35.0%
3.5
0.5
0.0
4.0
31.0
0.31
0.76
40.3
0.0
40.3
D
40.3
D
229
340
Synchro 8 Report
Page 11

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

14

14
20.0
35.0
35%
3.5
0.5

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 12

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

NBL

NBT
412

359
0
0
0
0.22

345
0
0
0
0.18

NBR

11/30/2015

SBL

SBT
172

309
0
0
0
0.28

426
0
0
0
0.24

SBR

SEL

SET
196

SER

971
478
0
0
0.66

302
35
0
0
0.49

NWL

NWT
414

NWR

548
0
0
0
0.76

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 22 (22%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 70
Control Type: Pretimed
Maximum v/c Ratio: 0.76
Intersection Signal Delay: 27.1
Intersection LOS: C
Intersection Capacity Utilization 57.4%
ICU Level of Service B
Analysis Period (min) 15
Splits and Phases:

3: Sheridan Road & North Broadway

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 13

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

11/30/2015

14

Intersection Summary

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 14

Lanes, Volumes, Timings


4: Hazel Street & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

34
1900
10
25
1
25
1.00
0.96

486
1900
12

38
1900
12
0
0

387
1900
12

22
1900
12
0
0

22
1900
9
0
0

22
1900
9
0
0

1.00
0.99
0.992

1.00

1.00

1654

1648

0
Yes

1654

0
Yes

0
Yes

1.00
0.89
0.930
0.979
1272
0.901
1118

1.00

1648

1.00
0.90
0.932
0.983
1317
0.922
1191

18
1900
9
0
0
25
1.00

2
1900
9

1.00

16
1900
9
0
0
25
1.00

6
1900
9

1.00
0.99
0.989

25
1900
10
25
1
25
1.00
0.94

0.950
1636
0.454
748

0.950
1620
0.375
602

8
30
672
15.3
97
0.92
3%

0.92
1%
0

37
Perm

569
NA
2

2
71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.07
10.1
0.0
10.1
B
9
m25

71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.51
13.7
0.0
13.7
B
13.5
B
190
295

6
30
665
15.1
164
34
0.92
5%
0

164
0.92
4%

0.92
2%
0

27
Perm

445
NA
6

6
71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.07
5.2
0.0
5.2
A
4
12

71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.40
7.3
0.0
7.3
A
7.2
A
110
146

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

24
30
408
9.3
97
30
0.92
0%
0

54
0.92
0%

0.92
0%
0

0
Perm

48
NA
8

8
29.0
29.0
29.0%
3.0
1.0

29.0
29.0
29.0%
3.0
1.0
0.0
4.0
25.0
0.25
0.15
19.0
0.0
19.0
B
19.0
B
12
41

0
0
Yes

24
30
329
7.5
56
2
0.92
0%
0

56
0.92
0%

0.92
0%
0

0
Perm

46
NA
4

4
29.0
29.0
29.0%
3.0
1.0

54
4
0.92
5%
0

29.0
29.0
29.0%
3.0
1.0
0.0
4.0
25.0
0.25
0.15
18.7
0.0
18.7
B
18.7
B
11
40
Synchro 8 Report
Page 15

Lanes, Volumes, Timings


4: Hazel Street & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
501
0
0
0
0.07

EBT
592

EBR

1106
0
0
0
0.51

11/30/2015

WBL
25
403
0
0
0
0.07

WBT
585

WBR

1110
0
0
0
0.40

NBL

NBT
328
315
0
0
0
0.15

NBR

SBL

SBT
249

SBR

297
0
0
0
0.15

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.51
Intersection Signal Delay: 11.4
Intersection LOS: B
Intersection Capacity Utilization 75.0%
ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

4: Hazel Street & Montrose Avenue

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 16

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

18
1900
10
25
1
25
1.00
0.98

442
1900
12

55
1900
12
0
0

343
1900
12

11
1900
12
0
0

31
1900
10
0
0

35
1900
9
0
0

1.00
1.00
0.996

1.00

1.00
0.97
0.947

1.00

42
1900
9
50
1
25
1.00
0.95

71
1900
9

1.00

39
1900
10
25
1
25
1.00
0.96

57
1900
10

1.00
0.99
0.983

29
1900
10
25
1
25
1.00
0.98

1.00
0.98
0.951

1.00

1652

1664

1449

1395

1652

0
Yes

1664

0
Yes

1449

0
Yes

1395

0
Yes

0.950
1685
0.498
867

0.950
1685
0.395
684

12
30
665
15.1
35
0.96
0%

0.96
1%
0

19
Perm

517
NA
4

4
66.0
68.0
68.0%
3.0
1.0
0.0
4.0
64.0
0.64
0.03
3.1
0.0
3.1
A
1
m3

66.0
68.0
68.0%
3.0
1.0
0.0
4.0
64.0
0.64
0.49
5.7
0.0
5.7
A
5.6
A
35
46

0.950
1604
0.669
1080

3
30
844
19.2
58
8
0.96
0%
0

58
0.96
0%

0.96
2%
0

30
Perm

368
NA
8

8
66.0
68.0
68.0%
3.0
1.0
0.0
4.0
64.0
0.64
0.07
7.3
0.0
7.3
A
7
18

66.0
68.0
68.0%
3.0
1.0
0.0
4.0
64.0
0.64
0.35
9.3
0.0
9.3
A
9.2
A
98
148

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

0.950
1624
0.698
1135

27
30
1232
28.0
35
5
0.96
9%
0

29
0.96
5%

0.96
2%
0

41
Perm

91
NA
2

2
32.0
32.0
32.0%
3.0
1.0
0.0
4.0
28.0
0.28
0.14
28.5
0.0
28.5
C
20
47

32.0
32.0
32.0%
3.0
1.0
0.0
4.0
28.0
0.28
0.21
21.3
0.0
21.3
C
23.5
C
31
71

24
30
332
7.5
31
6
0.96
0%
0

31
0.96
0%

0.96
2%
0

44
Perm

110
NA
6

6
32.0
32.0
32.0%
3.0
1.0
0.0
4.0
28.0
0.28
0.14
28.5
0.0
28.5
C
21
49

29
3
0.96
3%
0

32.0
32.0
32.0%
3.0
1.0
0.0
4.0
28.0
0.28
0.27
23.9
0.0
23.9
C
25.2
C
42
89
Synchro 8 Report
Page 17

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
554
0
0
0
0.03

EBT
585
1061
0
0
0
0.49

EBR

WBL
25
437
0
0
0
0.07

11/30/2015

WBT
764

WBR

1066
0
0
0
0.35

NBL
25
302
0
0
0
0.14

NBT
1152
425
0
0
0
0.21

NBR

SBL
50
317
0
0
0
0.14

SBT
252

SBR

407
0
0
0
0.27

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 84 (84%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.49
Intersection Signal Delay: 11.2
Intersection LOS: B
Intersection Capacity Utilization 75.0%
ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

5: Clarendon Avenue & Montrose Avenue

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 18

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

EBR2

WBL2

WBL

WBT

WBR

NBL

NBT

NBR

NBR2

9
1900
10
0
0
25
1.00

131
1900
12

329
1900
10
25
1

46
1900
10

102
1900
10

301
1900
10

3
1900
10
0
0

32
1900
10
0
0

16
1900
10

1.00
0.97
0.850

1.00

1.00

1.00
1.00
0.999

1.00

36
1900
10
0
0
25
1.00

27
1900
10

1.00
1.00

20
1900
10
0
1
25
1.00

1.00

1.00

1494

1753

1449

0
No

1753

0
Yes

1.00
0.99
0.942
0.984
1558
0.984
1548

0
No

0
0

0.997
1705
0.980
1672

0.950
1671
0.662
1164

1
30
379
8.6

30
844
19.2
49
0.94
0%

0.94
0%
0

0
pm+pt
7
4
8.0
8.0
8.9%
3.0
0.0

149
NA
4
43.0
45.0
50.0%
3.0
2.0
0.0
5.0

6
0.94
1%

6
0.94
0%

399
Perm

0.94
1%

0.94
0%

0.94
1%

0
Perm

130
Perm

323
NA
8

8
37.0
37.0
41.1%
3.0
2.0

40.0
0.44
0.62
24.4
0.0
24.4
C

8
37.0
37.0
41.1%
3.0
2.0
0.0
5.0
Lag
Yes
32.0
0.36
0.31
23.7
0.0
23.7
C

169
268

53
100

4
43.0
45.0
50.0%
3.0
2.0
0.0
5.0

Lead
Yes

Lag
Yes
40.0
0.44
0.20
16.2
0.0
16.2
B
22.1
C
50
89

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

37.0
37.0
41.1%
3.0
2.0
0.0
5.0
Lag
Yes
32.0
0.36
0.52
26.5
0.0
26.5
C
25.7
C
143
224

30
720
16.4
49
1
0.94
0%
0

9
0.94
0%

0.94
19%

0.94
3%

0.94
0%

0
Split
2

118
NA
2

23.0
23.0
25.6%
3.0
2.0

23.0
23.0
25.6%
3.0
2.0
0.0
5.0
18.0
0.20
0.38
35.4
0.0
35.4
D
35.4
D
59
110
Synchro 8 Report
Page 19

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

SBL2

SBL

SBT

SBR

9
1900
10

98
1900
10

50
1900
10
25
1

1.00

36
1900
10
0
0
25
1.00

1.00

1.00
0.96
0.850

0.984
1644
0.984
1644

11/30/2015

1370
1311
No

30
377
8.6
9
0.94
0%

0.94
0%

0.94
9%

0.94
10%

0
Split
6

0
Split
6

152
NA
6

53
Perm

22.0
22.0
24.4%
3.0
2.0

22.0
22.0
24.4%
3.0
2.0

22.0
22.0
24.4%
3.0
2.0
0.0
5.0
17.0
0.19
0.49
38.8
0.0
38.8
D
37.4
D
78
139

6
22.0
22.0
24.4%
3.0
2.0
0.0
5.0
17.0
0.19
0.21
33.6
0.0
33.6
C
26
59

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 20

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
764
744
0
0
0
0.20

EBR

EBR2

WBL2

25
644
0
0
0
0.62

WBL

WBT
299

413
0
0
0
0.31

623
0
0
0
0.52

11/30/2015

WBR

NBL

NBT
640

NBR

NBR2

311
0
0
0
0.38

Intersection Summary
Area Type:
Other
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 81 (90%), Referenced to phase 2:NBTL, Start of Green
Natural Cycle: 90
Control Type: Pretimed
Maximum v/c Ratio: 0.62
Intersection Signal Delay: 26.9
Intersection LOS: C
Intersection Capacity Utilization 76.6%
ICU Level of Service D
Analysis Period (min) 15
Splits and Phases:

6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 21

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

SBL2

SBL

SBT
297
310
0
0
0
0.49

11/30/2015

SBR
25
247
0
0
0
0.21

Intersection Summary

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 22

Lanes, Volumes, Timings


7: Sheridan Road & Wilson Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

86
1900
10
25
1
25
1.00
0.95

322
1900
12

29
1900
12
0
0

294
1900
12

42
1900
12
0
0

37
1900
12
0
0

54
1900
12
0
0

1.00
0.99
0.981

1.00

1.00
0.96
0.971

1.00

62
1900
10
25
1
25
1.00
0.88

231
1900
12

1.00

22
1900
10
50
1
25
1.00
0.95

151
1900
12

1.00
0.98
0.988

22
1900
10
25
1
25
1.00
0.90

1.00
0.98
0.971

1.00

1626

1635

1528

1551

1626

0
No

1635

0
No

1528

0
No

1551

0
No

0.950
1604
0.470
751

0.950
1685
0.453
720

30
426
9.7
78
0.97
5%

0.97
2%
0

89
Perm

362
NA
4

4
32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.29
15.8
0.0
15.8
B
22
54

32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.54
17.9
0.0
17.9
B
17.5
B
104
178

0.950
1685
0.534
897

30
1312
29.8
156
12
0.97
3%
0

156
0.97
0%

0.97
1%
0

23
Perm

346
NA
8

8
32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.08
8.3
0.0
8.3
A
4
m9

32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.51
13.9
0.0
13.9
B
13.5
B
114
192

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

0.950
1652
0.636
969

30
380
8.6
78
2
0.97
2%
0

71
0.97
0%

0.97
6%
0

23
Perm

194
NA
2

2
33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.06
11.5
0.0
11.5
B
5
17

33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.29
13.6
0.0
13.6
B
13.4
B
48
90

30
336
7.6
139
5
0.97
0%
0

139
0.97
2%

0.97
5%
0

64
Perm

294
NA
6

6
33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.15
12.6
0.0
12.6
B
15
37

71
10
0.97
4%
0

33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.44
15.6
0.0
15.6
B
15.1
B
78
139
Synchro 8 Report
Page 23

Lanes, Volumes, Timings


7: Sheridan Road & Wilson Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
311
0
0
0
0.29

EBT
346

EBR

675
0
0
0
0.54

11/30/2015

WBL
25
299
0
0
0
0.08

WBT
1232

WBR

679
0
0
0
0.51

NBL
50
386
0
0
0
0.06

NBT
300
658
0
0
0
0.29

NBR

SBL
25
417
0
0
0
0.15

SBT
256

SBR

668
0
0
0
0.44

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 65
Control Type: Pretimed
Maximum v/c Ratio: 0.54
Intersection Signal Delay: 15.2
Intersection LOS: B
Intersection Capacity Utilization 70.7%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

7: Sheridan Road & Wilson Avenue

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 24

Lanes, Volumes, Timings


8: Clarendon Avenue & Wilson Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

43
1900
1.00

339
1900
1.00
0.99
0.990
0.995
1646
0.935
1544

30
1900
1.00

35
1900
1.00

21
1900
1.00

27
1900
1.00

50
1900
1.00

0
Yes

0
Yes

0
Yes

80
1900
1.00
0.97
0.970
0.985
1585
0.888
1417

37
1900
1.00

60
1900
1.00
0.97
0.967
0.989
1583
0.916
1450

29
1900
1.00

283
1900
1.00
0.99
0.992
0.995
1669
0.932
1560

0
0

9
30
1312
29.8
27
0.90
0%

0.90
2%
0

0
Perm

458
NA
4

4
38.0
38.0
58.5%
3.0
1.0

38.0
38.0
58.5%
3.0
1.0
0.0
4.0

8
30
628
14.3
47
2
0.90
3%
0

47
0.90
0%

0.90
1%
0

0
Perm

376
NA
8

8
38.0
38.0
58.5%
3.0
1.0

38.0
38.0
58.5%
3.0
1.0
0.0
4.0

28
30
680
15.5
27
3
0.90
0%
0

46
0.90
0%

0.90
2%
0

0
Perm

129
NA
2

2
27.0
27.0
41.5%
3.0
1.0

27.0
27.0
41.5%
3.0
1.0
0.0
4.0

0
Yes

24
30
320
7.3
24
4
0.90
3%
0

24
0.90
2%

0.90
1%
0

0
Perm

186
NA
6

6
27.0
27.0
41.5%
3.0
1.0

46
2
0.90
0%
0

27.0
27.0
41.5%
3.0
1.0
0.0
4.0

34.0
0.52
0.56
8.9
0.0
8.9
A
8.9
A
49
71
1232

34.0
0.52
0.46
11.8
0.0
11.8
B
11.8
B
84
146
548

23.0
0.35
0.24
13.2
0.0
13.2
B
13.2
B
27
62
600

23.0
0.35
0.36
15.9
0.0
15.9
B
15.9
B
46
94
240

811
0

819
0

531
0

516
0

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 25

Lanes, Volumes, Timings


8: Clarendon Avenue & Wilson Avenue

Lane Group
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
0
0
0.56

EBR

11/30/2015

WBL

WBT
0
0
0.46

WBR

NBL

NBT
0
0
0.24

NBR

SBL

SBT
0
0
0.36

SBR

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 32 (49%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 65
Control Type: Pretimed
Maximum v/c Ratio: 0.56
Intersection Signal Delay: 11.5
Intersection LOS: B
Intersection Capacity Utilization 54.5%
ICU Level of Service A
Analysis Period (min) 15
Splits and Phases:

8: Clarendon Avenue & Wilson Avenue

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 26

Lanes, Volumes, Timings


9: Clarendon Avenue & Buena Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn

11/30/2015

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

6
1900
1.00

22
1900
1.00
0.96
0.951
0.994
1501
0.984
1475

16
1900
1.00

10
1900
1.00

3
1900
1.00

16
1900
1.00

9
1900
1.00

0
Yes

0
Yes

0
Yes

110
1900
1.00
1.00
0.995
0.996
1662
0.984
1637

5
1900
1.00

108
1900
1.00
0.98
0.970
0.995
1593
0.977
1561

35
1900
1.00

11
1900
1.00
0.96
0.984
0.979
1567
0.936
1458

0
0

17
30
501
11.4
40
0.93
33%

0.93
0%
0

0
Perm

47
NA
4

4
20.0
25.0
38.5%
3.0
0.0

20.0
25.0
38.5%
3.0
0.0
0.0
3.0

3
30
915
20.8
46
2
0.93
0%
0

46

37
30
477
10.8
40

31

0.93
0%

0.93
9%
0

0.93
0%

0.93
11%

0.93
1%
0

0
Perm

26
NA
8

0
Perm

171
NA
2

8
20.0
25.0
38.5%
3.0
0.0

20.0
25.0
38.5%
3.0
0.0
0.0
3.0

2
20.0
40.0
61.5%
3.0
0.0

20.0
40.0
61.5%
3.0
0.0
0.0
3.0

0
Yes

5
30
1232
28.0
62
10
0.93
0%
0

62
0.93
0%

0.93
2%
0

0
Perm

133
NA
6

6
20.0
40.0
61.5%
3.0
0.0

31
4
0.93
0%
0

20.0
40.0
61.5%
3.0
0.0
0.0
3.0

22.0
0.34
0.09
11.3
0.0
11.3
B
11.3
B
8
28
421

22.0
0.34
0.05
13.8
0.0
13.8
B
13.8
B
6
21
835

37.0
0.57
0.19
5.9
0.0
5.9
A
5.9
A
22
48
397

37.0
0.57
0.14
6.8
0.0
6.8
A
6.8
A
21
43
1152

510
0

495
0

904
0

933
0

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 27

Lanes, Volumes, Timings


9: Clarendon Avenue & Buena Avenue

Lane Group
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
0
0
0.09

EBR

11/30/2015

WBL

WBT
0
0
0.05

WBR

NBL

NBT
0
0
0.19

NBR

SBL

SBT
0
0
0.14

SBR

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 32 (49%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 40
Control Type: Pretimed
Maximum v/c Ratio: 0.19
Intersection Signal Delay: 7.4
Intersection LOS: A
Intersection Capacity Utilization 24.1%
ICU Level of Service A
Analysis Period (min) 15
Splits and Phases:

9: Clarendon Avenue & Buena Avenue

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 28

HCM Unsignalized Intersection Capacity Analysis


10: Clarendon Avenue & Sunnyside Avenue

11/30/2015

Movement
Lane Configurations
Sign Control
Volume (vph)
Peak Hour Factor
Hourly flow rate (vph)

EBL

EBR

NBL

NBT

SBT

SBR

Stop
0
0.78
0

0
0.78
0

14
0.78
18

Stop
82
0.78
105

Stop
124
0.78
159

23
0.78
29

Direction, Lane #
Volume Total (vph)
Volume Left (vph)
Volume Right (vph)
Hadj (s)
Departure Headway (s)
Degree Utilization, x
Capacity (veh/h)
Control Delay (s)
Approach Delay (s)
Approach LOS

NB 1
123
18
0
0.06
4.1
0.14
855
7.8
7.8
A

SB 1
188
0
29
-0.07
4.0
0.21
903
8.0
8.0
A

Intersection Summary
Delay
Level of Service
Intersection Capacity Utilization
Analysis Period (min)

7.9
A
30.3%
15

ICU Level of Service

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 1

HCM Unsignalized Intersection Capacity Analysis


11: Clarendon Avenue & Agatite Avenue

Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)

11/30/2015

EBL

EBR

NBL

NBT

SBT

SBR

5
Stop
0%
0.83
6
26
12.0
4.0
2

22

0
0.83
0

128
Free
0%
0.83
154
2
12.0
4.0
0

0.83
27

93
Free
0%
0.83
112
8
12.0
4.0
1
None

None

0.83
0

332
294

188

180

294
6.4

188
6.2

180
4.1

3.5
99
685

3.3
97
835

2.2
100
1377

EB 1
33
6
27
802
0.04
3
9.7
A
9.7
A

NB 1
112
0
0
1700
0.07
0
0.0

SB 1
154
0
0
1700
0.09
0
0.0

0.0

0.0

1.1
22.9%
15

ICU Level of Service

15-253 Montrose/Clarendon 12:15 pm 11/10/2015 Saturday Midday Existing


RAC

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

65
1900
10
45
1
60
1.00
0.89

539
1900
12

59
1900
12
75
1

418
1900
12

61
1900
12
0
0

1
1900
10
0
0

43
1900
10
25
1

0.95
0.97
0.981

0.95

0.95
1.00
0.999

0.95

57
1900
9
165
1
85
1.00
0.97

262
1900
10

1.00
0.93
0.850

55
1900
9
0
1
25
1.00
0.94

150
1900
10

1.00

0
1900
12
0
0
25
1.00

0.95
0.98
0.979

0.95

1660

1509

3320

2928

2893

1660

1410
Yes
109

3320

0
Yes

2928

0
Yes

2893

0
Yes

53
17
0.98
7%

53

0.950
1620
0.474
721

21
30
112
2.5

30
205
4.7
57
0.98
4%

0.98
3%
0

66
pm+pt
5
2
5.0
9.0
9.0%
3.0
1.0
0.0
4.0
Lag
Yes
43.0
0.43
0.19
19.9
0.0
19.9
B

550
NA
2

24
51

39.0
47.0
47.0%
3.0
2.0
0.0
5.0
42.0
0.42
0.79
35.0
0.0
35.0
D
30.5
C
297
#447

0.950
1624
0.506
812

0.98
0%

0.98
2%

489
NA
6 26

60
Perm
2
39.0
47.0
47.0%
3.0
2.0
0.0
5.0
42.0
0.42
0.09
0.9
0.0
0.9
A
0
5

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

46.0
0.46
0.32
1.8
0.4
2.2
A
2.2
A
10
15

0.950
1577
0.654
1049

1
30
276
6.3
57
9
0.98
15%
0

77
0.98
0%

0.98
15%

56
pm+pt
3
8 24
7.0
11.0
11.0%
3.0
1.0
0.0
4.0
Lead
Yes
31.0
0.31
0.18
19.7
0.0
19.7
B

154
NA
8 24

14
28

23.0
0.23
0.23
26.0
0.0
26.0
C
24.4
C
30
47

17
30
330
7.5
32
10
0.98
0%
0

32
0.98
3%

0.98
7%
0

58
pm+pt
3
4 24
7.0
11.0
11.0%
3.0
1.0
0.0
4.0
Lead
Yes
31.0
0.31
0.16
20.9
0.0
20.9
C

311
NA
4 24

23
50

77
5
0.98
4%
0

23.0
0.23
0.46
33.8
0.0
33.8
C
31.8
C
85
127
Synchro 8 Report
Page 1

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

10

12

13

14

16

20

24

26

32

10

12

13

14

16

20

24

26

32

28.0
28.0
28%
3.0
2.0

10.0
10.0
10%
2.0
0.0

28.0
28.0
28%
3.0
2.0

38.0
47.0
47%
2.0
0.0

28.0
28.0
28%
2.0
0.0

8.0
9.0
9%
3.5
0.5

38.0
38.0
38%
3.0
1.0

28.0
28.0
28%
2.0
0.0

5.0
15.0
15%
3.0
1.0

4.0
4.0
4%
2.0
0.0

38.0
38.0
38%
3.0
1.0

10.0
10.0
10%
3.0
1.0

Lag
Yes

Lead
Yes

Lag
Yes

Lead
Yes

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
45
354
0
0
0
0.19

EBT
125
697
0
0
0
0.79

EBR

1/14/2016

WBL

75
655
0
0
0
0.09

WBT
32

WBR

1538
557
0
0
0.50

NBL

NBT
196

308
0
0
0
0.18

674
0
0
0
0.23

NBR

SBL
165
362
0
0
0
0.16

SBT
250

SBR

678
0
0
0
0.46

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 4:SBTL and 8:NBTL, Start of Green
Natural Cycle: 95
Control Type: Pretimed
Maximum v/c Ratio: 0.79
Intersection Signal Delay: 22.1
Intersection LOS: C
Intersection Capacity Utilization 62.5%
ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:

1: North Broadway & Montrose Avenue

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 3

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

1/14/2016

10

12

13

14

16

20

24

26

32

Intersection Summary

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 4

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

29
1900
12
0
1
25
1.00
0.94

568
1900
12

0
1900
12
0
0

441
1900
10

22
1900
10
50
1

48
1900
10
0
1

38
1900
12
0
0

0.95
0.99
0.993

0.95

1.00

1.00
0.85
0.850

33
1900
12
0
0
25
1.00

141
1900
12

1.00

0
1900
10
0
0
25
1.00

92
2000
10

1.00

17
1900
10
50
1
100
1.00
0.98

1.00

1863

3010

1609

1478

1863

0
Yes

3010

0
Yes

1609

1249
Yes
109

1.00
0.98
0.976
0.992
1532
0.953
1445

71
1
0.98
2%

71
0.98
3%

0.98
10%
0

49
Perm

0
Perm

217
NA
12 32

16 32

12 32

0.950
1752
0.398
689

0.950
1428
0.210
311

5
30
672
15.3

30
112
2.5
89
0.98
3%

0.98
2%

30
custom
13 20
10

580
NA
10 20

58.0
0.58
0.05
0.9
4.2
5.1
A
1
m1

60.0
0.60
0.52
2.0
2.3
4.3
A
4.4
A
13
m16

54
17
0.98
0%
0

54
0.98
18%

0.98
5%
0

17
Perm

472
NA
14

14
38.0
38.0
38.0%
3.0
1.0
0.0
4.0
Lead
Yes
34.0
0.34
0.16
21.8
0.0
21.8
C
4
m14

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

38.0
38.0
38.0%
3.0
1.0
0.0
4.0
Lead
Yes
34.0
0.34
0.46
18.7
0.0
18.7
B
18.8
B
61
109

4
0.98
0%

0.98
16%

94
NA
16 32

36.0
0.36
0.16
10.0
0.0
10.0
A
6.8
A
13
31

36.0
0.36
0.09
0.7
0.0
0.7
A
0
1

0
Yes

12
30
277
6.3

30
252
5.7
89
12
0.98
1%

4
9
0.98
3%
0

36.0
0.36
0.41
25.6
0.0
25.6
C
25.6
C
97
163
Synchro 8 Report
Page 5

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

10

12

13

16

20

24

10

12

13

16

20

24

39.0
47.0
47%
3.0
2.0

7.0
11.0
11%
3.0
1.0

28.0
28.0
28%
3.0
2.0

5.0
9.0
9%
3.0
1.0

10.0
10.0
10%
2.0
0.0

28.0
28.0
28%
3.0
2.0

38.0
47.0
47%
2.0
0.0

28.0
28.0
28%
2.0
0.0

8.0
9.0
9%
3.5
0.5

28.0
28.0
28%
2.0
0.0

5.0
15.0
15%
3.0
1.0

4.0
4.0
4%
2.0
0.0

Lead
Yes

Lag
Yes

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Lag
Yes

Lag
Yes

Synchro 8 Report
Page 6

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

26

32

26

32

38.0
38.0
38%
3.0
1.0

10.0
10.0
10%
3.0
1.0

1/14/2016

Lead
Yes

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 7

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
32

612
534
0
0
0.38

1117
390
0
0
0.80

EBR

1/14/2016

WBL
50
105
0
0
0
0.16

WBT
592

WBR

1026
0
0
0
0.46

NBL

NBT
172

NBR

579
0
0
0
0.16

519
0
0
0
0.09

SBL

SBT
197

SBR

527
0
0
0
0.41

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 4:SBTL and 8:NBTL, Start of Green
Natural Cycle: 95
Control Type: Pretimed
Maximum v/c Ratio: 0.79
Intersection Signal Delay: 12.6
Intersection LOS: B
Intersection Capacity Utilization 83.2%
ICU Level of Service E
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

2: Sheridan Road & Montrose Avenue

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 8

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

1/14/2016

10

12

13

16

20

24

Intersection Summary

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 9

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

26

1/14/2016

32

Intersection Summary

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 10

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

NBL

NBT

NBR

SBL

SBT

SBR

SEL

SET

SER

NWL

NWT

NWR

66
1900
9
0
1
35
1.00
1.00

88
1900
10

3
1900
10
75
1

88
1900
10

0
1900
10
0
0

73
1900
10
0
1

52
1900
12
0
0

1.00

1.00

1.00

1.00
0.88
0.850

8
1900
12
0
0
25
1.00

140
1900
12

1.00

0
1900
10
0
0
25
1.00

248
1900
10

1.00
1.00
0.995

70
1900
9
0
1
25
1.00
0.89

1.00

1494

1556

1673

1463

1494

0
Yes

1556

0
Yes

1673

1294
Yes
98

1.00
0.99
0.965
0.998
1601
0.986
1579

23
16
0.94
3%

23

0.950
1464
0.694
1064

0.950
1562
0.688
1005

2
30
492
11.2
3
0.94
11%

0.94
6%
0

70
pm+pt
5
2
8.0
9.0
9.0%
3.5
0.5
0.0
4.0
Lag
Yes
31.0
0.31
0.20
24.6
0.0
24.6
C

97
NA
2

30
62

20.0
30.0
30.0%
3.5
0.5
0.0
4.0
Lead
Yes
26.0
0.26
0.25
30.8
0.0
30.8
C
28.2
C
48
92

30
252
5.7
41
4
0.94
0%
0

41
0.94
4%

0.94
14%

74
pm+pt
1
6
8.0
9.0
9.0%
3.5
0.5
0.0
4.0
Lag
Yes
31.0
0.31
0.22
15.7
0.0
15.7
B

94
NA
6

39
72

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

20.0
30.0
30.0%
3.5
0.5
0.0
4.0
Lead
Yes
26.0
0.26
0.23
16.3
0.0
16.3
B
16.0
B
50
97

13
0.94
0%

0.94
6%

264
78
NA custom
4 14
4
20.0
26.0
26.0%
3.5
0.5
0.0
4.0
57.0
0.57
0.28
10.7
1.2
11.9
B
15.1
B
35
102

22.0
0.22
0.22
25.7
0.0
25.7
C
15
68

0
Yes

18
30
494
11.2

30
276
6.3
3
6
0.94
0%

0.94
0%

0.94
12%

0
Perm

213
NA
8

8
20.0
35.0
35.0%
3.5
0.5

13
8
0.94
18%
0

20.0
35.0
35.0%
3.5
0.5
0.0
4.0
31.0
0.31
0.43
28.1
0.0
28.1
C
28.1
C
98
166
Synchro 8 Report
Page 11

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

14

14
20.0
35.0
35%
3.5
0.5

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 12

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

NBL

NBT
412

349
0
0
0
0.20

389
0
0
0
0.25

NBR

1/14/2016

SBL

SBT
172

339
0
0
0
0.22

404
0
0
0
0.23

SBR

SEL

SET
196

SER

953
476
0
0
0.55

361
0
0
0
0.22

NWL

NWT
414

NWR

501
0
0
0
0.43

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 22 (22%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 70
Control Type: Pretimed
Maximum v/c Ratio: 0.43
Intersection Signal Delay: 20.8
Intersection LOS: C
Intersection Capacity Utilization 50.0%
ICU Level of Service A
Analysis Period (min) 15
Splits and Phases:

3: Sheridan Road & North Broadway

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 13

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

1/14/2016

14

Intersection Summary

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 14

Lanes, Volumes, Timings


4: Hazel Street & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

14
1900
10
25
1
25
1.00
0.98

601
1900
12

30
1900
12
0
0

445
1900
12

6
1900
12
0
0

27
1900
9
0
0

15
1900
9
0
0

1.00
1.00
0.998

1.00

1.00

1625

1660

0
Yes

1625

0
Yes

0
Yes

1.00
0.94
0.950
0.976
1336
0.883
1164

1.00

1660

1.00
0.94
0.944
0.976
1353
0.872
1186

20
1900
9
0
0
25
1.00

6
1900
9

1.00

32
1900
9
0
0
25
1.00

6
1900
9

1.00
1.00
0.993

10
1900
10
25
1
25
1.00
0.98

0.950
1685
0.437
759

0.950
1685
0.322
561

5
30
672
15.3
57
0.96
0%

0.96
2%
0

15
Perm

657
NA
2

2
71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.03
2.9
0.0
2.9
A
1
m2

71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.59
4.9
0.0
4.9
A
4.9
A
57
71

1
30
665
15.1
65
16
0.96
0%
0

65
0.96
0%

0.96
5%
0

10
Perm

470
NA
6

6
71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.03
7.9
0.0
7.9
A
3
m4

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.43
11.4
0.0
11.4
B
11.3
B
159
m178

28
30
408
9.3
57
6
0.96
0%
0

21
0.96
0%

0.96
0%
0

0
Perm

67
NA
8

8
29.0
29.0
29.0%
3.0
1.0

29.0
29.0
29.0%
3.0
1.0
0.0
4.0
25.0
0.25
0.21
21.2
0.0
21.2
C
21.2
C
19
55

0
0
Yes

16
30
329
7.5
44
2
0.96
0%
0

44
0.96
5%

0.96
12%
0

0
Perm

43
NA
4

4
29.0
29.0
29.0%
3.0
1.0

21
4
0.96
0%
0

29.0
29.0
29.0%
3.0
1.0
0.0
4.0
25.0
0.25
0.14
22.0
0.0
22.0
C
22.0
C
13
42
Synchro 8 Report
Page 15

Lanes, Volumes, Timings


4: Hazel Street & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
508
0
0
0
0.03

EBT
592

EBR

1113
0
0
0
0.59

1/14/2016

WBL
25
375
0
0
0
0.03

WBT
585

WBR

1089
0
0
0
0.43

NBL

NBT
328
317
0
0
0
0.21

NBR

SBL

SBT
249

SBR

303
0
0
0
0.14

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 35 (35%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.59
Intersection Signal Delay: 8.8
Intersection LOS: A
Intersection Capacity Utilization 83.3%
ICU Level of Service E
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

4: Hazel Street & Montrose Avenue

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 16

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

50
1900
10
25
1
25
1.00
0.96

511
1900
12

74
1900
12
0
0

348
1900
12

48
1900
12
0
0

49
1900
10
0
0

88
1900
9
0
0

1.00
0.99
0.982

1.00

1.00
0.92
0.951

1.00

120
1900
9
50
1
25
1.00
0.83

303
1900
9

1.00

41
1900
10
25
1
25
1.00
0.93

100
1900
10

1.00
0.99
0.981

36
1900
10
25
1
25
1.00
0.98

1.00
0.96
0.966

1.00

1649

1618

1312

1369

1649

0
Yes

1618

0
Yes

1312

0
Yes

1369

0
Yes

0.950
1465
0.447
664

0.950
1685
0.310
541

14
30
665
15.1
89
0.92
15%

0.92
1%
0

54
Perm

635
NA
4

4
66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.13
9.0
0.0
9.0
A
9
m23

66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.62
10.8
0.1
10.9
B
10.7
B
100
196

0.950
1604
0.212
334

13
30
844
19.2
53
5
0.92
0%
0

53
0.92
0%

0.92
3%
0

39
Perm

430
NA
8

8
66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.12
9.6
0.0
9.6
A
7
m21

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.43
9.7
0.0
9.7
A
9.7
A
74
166

0.950
1624
0.591
842

25
30
1232
28.0
89
3
0.92
0%
0

104
0.92
5%

0.92
5%
0

45
Perm

162
NA
2

2
34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.45
45.3
0.0
45.3
D
23
64

34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.39
26.7
0.0
26.7
C
30.8
C
68
128

15
30
190
4.3
132
3
0.92
10%
0

132
0.92
0%

0.92
5%
0

130
Perm

425
NA
6

6
34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.52
37.7
0.0
37.7
D
68
132

104
4
0.92
0%
0

34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
1.01
81.5
0.0
81.5
F
71.2
E
~267
#469
Synchro 8 Report
Page 17

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
411
0
0
0
0.13

EBT
585
1027
19
0
0
0.63

EBR

WBL
25
335
0
0
0
0.12

1/14/2016

WBT
764

WBR

1008
0
0
0
0.43

NBL
25
100
0
0
0
0.45

NBT
1152
411
0
0
0
0.39

NBR

SBL
50
252
0
0
0
0.52

SBT
110

SBR

421
0
0
0
1.01

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 1.01
Intersection Signal Delay: 30.1
Intersection LOS: C
Intersection Capacity Utilization 93.3%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

5: Clarendon Avenue & Montrose Avenue

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 18

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

EBR2

WBL2

WBL

WBT

WBR

NBL

NBT

NBR

NBR2

8
1900
10
0
0
25
1.00

58
1900
12

541
1900
10
25
1

82
1900
10

47
1900
10

317
1900
10

15
1900
10
0
0

30
1900
10
0
0

22
1900
10

1.00
0.97
0.850

1.00

1.00

1.00
1.00
0.993

1.00

47
1900
10
0
0
25
1.00

30
1900
10

1.00
1.00

42
1900
10
0
1
25
1.00

1.00

1.00

1503

1702

1459

0
No

1702

0
Yes

1.00
0.96
0.945
0.982
1577
0.982
1523

0
No

1
0.92
0%

1
0.92
0%

0
0

0.994
1574
0.964
1523

0.950
1677
0.710
1253

3
30
379
8.6

30
844
19.2
28
0.92
50%

0.92
2%
0

0
pm+pt
7
4
8.0
9.0
9.0%
3.0
0.0

72
NA
4
43.0
52.0
52.0%
3.0
2.0
0.0
5.0

6
0.92
0%

6
0.92
2%

677
Perm

0.92
0%

0.92
1%

0.92
1%

0
Perm

97
Perm

361
NA
8

8
43.0
43.0
43.0%
3.0
2.0

47.0
0.47
0.99
59.5
0.0
59.5
E

8
43.0
43.0
43.0%
3.0
2.0
0.0
5.0
Lag
Yes
38.0
0.38
0.20
22.3
0.0
22.3
C

393
#663

41
79

4
43.0
52.0
52.0%
3.0
2.0
0.0
5.0

Lead
Yes

Lag
Yes
47.0
0.47
0.10
17.8
0.0
17.8
B
55.5
E
26
m40

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

43.0
43.0
43.0%
3.0
2.0
0.0
5.0
Lag
Yes
38.0
0.38
0.56
28.2
0.0
28.2
C
27.0
C
177
269

30
720
16.4
28
2
0.92
50%
0

48
0.92
2%

0.92
13%

0
Split
2

141
NA
2

23.0
23.0
23.0%
3.0
2.0

23.0
23.0
23.0%
3.0
2.0
0.0
5.0
18.0
0.18
0.50
43.8
0.0
43.8
D
43.8
D
82
144
Synchro 8 Report
Page 19

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

SBL2

SBL

SBT

SBR

9
1900
10

141
1900
10

67
1900
10
25
1

1.00

16
1900
10
0
0
25
1.00

1.00

1.00
0.86
0.850

0.993
1627
0.993
1627

1/14/2016

1322
1138
No

30
377
8.6
0.92
0%

0.92
6%

0.92
9%

0
Split
6

0
Split
6

180
NA
6

25.0
25.0
25.0%
3.0
2.0

25.0
25.0
25.0%
3.0
2.0

25.0
25.0
25.0%
3.0
2.0
0.0
5.0
20.0
0.20
0.55
43.4
0.0
43.4
D
42.1
D
104
175

48
1
0.92
14%
73
Perm
6
25.0
25.0
25.0%
3.0
2.0
0.0
5.0
20.0
0.20
0.32
38.9
0.0
38.9
D
40
83

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 20

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
764
717
0
0
0
0.10

EBR

EBR2

25
685
0
0
0
0.99

WBL2

WBL

WBT
299

476
0
0
0
0.20

648
0
0
0
0.56

1/14/2016

WBR

NBL

NBT
640

NBR

NBR2

283
0
0
0
0.50

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 3 (3%), Referenced to phase 2:NBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.99
Intersection Signal Delay: 44.2
Intersection LOS: D
Intersection Capacity Utilization 110.9%
ICU Level of Service H
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 21

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

SBL2

SBL

SBT
297
325
0
0
0
0.55

1/14/2016

SBR
25
227
0
0
0
0.32

Intersection Summary

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 22

Lanes, Volumes, Timings


7: Sheridan Road & Wilson Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

62
1900
10
25
1
25
1.00
0.89

318
1900
12

47
1900
12
0
0

236
1900
12

53
1900
12
0
0

44
1900
12
0
0

41
1900
12
0
0

1.00
0.96
0.973

1.00

1.00
0.96
0.968

1.00

104
1900
10
25
1
25
1.00
0.88

368
1900
12

1.00

38
1900
10
50
1
25
1.00
0.98

165
1900
12

1.00
0.98
0.981

70
1900
10
25
1
25
1.00
0.93

1.00
0.99
0.985

1.00

1608

1572

1434

1591

1608

0
No

1572

0
No

1434

0
No

1591

0
No

0.950
1428
0.520
694

0.950
1560
0.434
665

30
426
9.7
148
0.96
18%

0.96
2%
0

65
Perm

380
NA
4

4
32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.23
14.9
0.0
14.9
B
16
42

32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.57
18.7
0.0
18.7
B
18.2
B
111
190

0.950
1636
0.395
665

30
1312
29.8
103
5
0.96
5%
0

103
0.96
8%

0.96
2%
0

73
Perm

301
NA
8

8
32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.26
13.2
0.0
13.2
B
15
m20

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.46
14.2
0.0
14.2
B
14.0
B
73
m89

0.950
1636
0.620
936

30
380
8.6
148
5
0.96
2%
0

38

30
336
7.6
144

144

0.96
3%

0.96
12%
0

0.96
7%

0.96
3%

0.96
4%
0

40
Perm

218
NA
2

108
Perm

426
NA
6

2
33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.14
12.9
0.0
12.9
B
9
27

33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.35
14.5
0.0
14.5
B
14.3
B
55
103

6
33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.27
14.2
0.0
14.2
B
26
59

38
11
0.96
15%
0

33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.62
19.3
0.0
19.3
B
18.3
B
125
214
Synchro 8 Report
Page 23

Lanes, Volumes, Timings


7: Sheridan Road & Wilson Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
288
0
0
0
0.23

EBT
346

EBR

667
0
0
0
0.57

1/14/2016

WBL
25
276
0
0
0
0.26

WBT
1232

WBR

652
0
0
0
0.46

NBL
50
286
0
0
0
0.14

NBT
300
617
0
0
0
0.35

NBR

SBL
25
403
0
0
0
0.27

SBT
256

SBR

685
0
0
0
0.62

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 65
Control Type: Pretimed
Maximum v/c Ratio: 0.62
Intersection Signal Delay: 16.6
Intersection LOS: B
Intersection Capacity Utilization 72.1%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

7: Sheridan Road & Wilson Avenue

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 24

Lanes, Volumes, Timings


8: Clarendon Avenue & Wilson Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

60
1900
1.00

264
1900
1.00
0.99
0.968
0.993
1583
0.878
1395

100
1900
1.00

185
1900
1.00

44
1900
1.00

52
1900
1.00

37
1900
1.00

0
Yes

0
Yes

0
Yes

207
1900
1.00
0.95
0.962
0.995
1454
0.950
1380

94
1900
1.00

93
1900
1.00
0.96
0.970
0.986
1518
0.833
1260

41
1900
1.00

269
1900
1.00
0.99
0.988
0.982
1598
0.670
1086

0
0

36
30
1312
29.8
57
0.89
9%

0.89
2%
0

0
Perm

476
NA
4

4
38.0
38.0
58.5%
3.0
1.0

38.0
38.0
58.5%
3.0
1.0
0.0
4.0

11
30
628
14.3
23
4
0.89
1%
0

23
0.89
5%

0.89
2%
0

0
Perm

559
NA
8

8
38.0
38.0
58.5%
3.0
1.0

38.0
38.0
58.5%
3.0
1.0
0.0
4.0

24
30
680
15.5
57
6
0.89
2%
0

91
0.89
8%

0.89
6%
0

0
Perm

208
NA
2

2
27.0
27.0
41.5%
3.0
1.0

27.0
27.0
41.5%
3.0
1.0
0.0
4.0

0
Yes

33
30
320
7.3
57
2
0.89
0%
0

57
0.89
3%

0.89
8%
0

0
Perm

381
NA
6

6
27.0
27.0
41.5%
3.0
1.0

91
2
0.89
9%
0

27.0
27.0
41.5%
3.0
1.0
0.0
4.0

34.0
0.52
0.64
12.8
0.0
12.8
B
12.8
B
61
88
1232

34.0
0.52
0.98
50.8
0.0
50.8
D
50.8
D
195
#400
548

23.0
0.35
0.45
18.0
0.0
18.0
B
18.0
B
54
108
600

23.0
0.35
0.75
28.2
0.0
28.2
C
28.2
C
118
#244
240

746
0

573
0

461
0

509
0

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 25

Lanes, Volumes, Timings


8: Clarendon Avenue & Wilson Avenue

Lane Group
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
0
0
0.64

EBR

1/14/2016

WBL

WBT
0
0
0.98

WBR

NBL

NBT
0
0
0.45

NBR

SBL

SBT
0
0
0.75

SBR

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 32 (49%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 70
Control Type: Pretimed
Maximum v/c Ratio: 0.98
Intersection Signal Delay: 30.2
Intersection LOS: C
Intersection Capacity Utilization 86.6%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:

8: Clarendon Avenue & Wilson Avenue

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 26

Lanes, Volumes, Timings


9: Clarendon Avenue & Buena Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

23
1900
1.00

90
1900
1.00
0.97
0.973
0.992
1580
0.963
1517

29
1900
1.00

6
1900
1.00

5
1900
1.00

34
1900
1.00

35
1900
1.00

0
Yes

0
Yes

0
Yes

280
1900
1.00
0.99
0.998
0.995
1611
0.956
1541

6
1900
1.00

149
1900
1.00
0.98
0.977
0.992
1545
0.926
1434

36
1900
1.00

13
1900
1.00
0.97
0.973
0.988
1613
0.951
1529

0
0

21
30
501
11.4
45
0.96
9%

0.96
1%
0

0
Perm

148
NA
4

4
20.0
25.0
38.5%
3.0
1.0

20.0
25.0
38.5%
3.0
1.0
0.0
4.0

5
30
915
20.8
56
6
0.96
0%
0

56
0.96
0%

0.96
0%
0

0
Perm

25
NA
8

8
20.0
25.0
38.5%
3.0
1.0

20.0
25.0
38.5%
3.0
1.0
0.0
4.0

25
30
477
10.8
45
4
0.96
0%
0

63
0.96
0%

0.96
7%
0

0
Perm

228
NA
2

2
20.0
40.0
61.5%
3.0
1.0

20.0
40.0
61.5%
3.0
1.0
0.0
4.0

0
Yes

2
30
1232
28.0
68
9
0.96
6%
0

68
0.96
0%

0.96
6%
0

0
Perm

334
NA
6

6
20.0
40.0
61.5%
3.0
1.0

63
8
0.96
0%
0

20.0
40.0
61.5%
3.0
1.0
0.0
4.0

21.0
0.32
0.29
16.0
0.0
16.0
B
16.0
B
37
78
421

21.0
0.32
0.05
13.5
0.0
13.5
B
13.5
B
5
20
835

36.0
0.55
0.28
7.9
0.0
7.9
A
7.9
A
38
73
397

36.0
0.55
0.39
9.9
0.0
9.9
A
9.9
A
68
119
1152

504
0

497
0

805
0

854
0

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 27

Lanes, Volumes, Timings


9: Clarendon Avenue & Buena Avenue

Lane Group
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
0
0
0.29

EBR

1/14/2016

WBL

WBT
0
0
0.05

WBR

NBL

NBT
0
0
0.28

NBR

SBL

SBT
0
0
0.39

SBR

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 32 (49%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 40
Control Type: Pretimed
Maximum v/c Ratio: 0.39
Intersection Signal Delay: 10.6
Intersection LOS: B
Intersection Capacity Utilization 37.7%
ICU Level of Service A
Analysis Period (min) 15
Splits and Phases:

9: Clarendon Avenue & Buena Avenue

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

Synchro 8 Report
Page 28

HCM Unsignalized Intersection Capacity Analysis


10: Clarendon Avenue & Sunnyside Avenue

1/14/2016

Movement
Lane Configurations
Sign Control
Volume (vph)
Peak Hour Factor
Hourly flow rate (vph)

EBL

EBR

NBL

NBT

SBT

SBR

Stop
10
0.91
11

0
0.91
0

28
0.91
31

Stop
147
0.91
162

Stop
403
0.91
443

83
0.91
91

Direction, Lane #
Volume Total (vph)
Volume Left (vph)
Volume Right (vph)
Hadj (s)
Departure Headway (s)
Degree Utilization, x
Capacity (veh/h)
Control Delay (s)
Approach Delay (s)
Approach LOS

EB 1
11
11
0
0.20
5.7
0.02
559
8.8
8.8
A

NB 1
192
31
0
0.13
4.6
0.24
766
9.0
9.0
A

SB 1
534
0
91
-0.01
4.1
0.61
859
13.4
13.4
B

Intersection Summary
Delay
Level of Service
Intersection Capacity Utilization
Analysis Period (min)

12.2
B
46.8%
15

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

ICU Level of Service

Synchro 8 Report
Page 1

HCM Unsignalized Intersection Capacity Analysis


11: Clarendon Avenue & Agatite Avenue

Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)

1/14/2016

EBL

EBR

NBL

NBT

SBT

SBR

5
Stop
0%
0.90
6
122
12.0
4.0
10

56

8
0.90
9

403
Free
0%
0.90
448
3
10.0
4.0
0

0.90
62

170
Free
0%
0.90
189
30
10.0
4.0
2
None

None

0.90
0

332
779

600

570

779
6.4

600
6.2

570
4.1

3.5
98
326

3.3
86
444

2.2
99
910

EB 1
68
6
62
431
0.16
14
14.9
B
14.9
B

NB 1
198
9
0
910
0.01
1
0.5
A
0.5

SB 1
448
0
0
1700
0.26
0
0.0
0.0

1.6
38.6%
15

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

ICU Level of Service

Synchro 8 Report
Page 2

HCM Unsignalized Intersection Capacity Analysis


12: Clarendon Avenue & Proposed Access

Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

22

0
Stop
0%
0.92
0

64

41

0.92
0

0.92
45

0.92
1

0.92
0

446
Free
0%
0.92
485

13

0.92
1

156
Free
0%
0.92
170

0.92
70

0
Stop
0%
0.92
0

0.92
24

None

0.92
14

None

190
751

752

492

821

758

170

499

171

751
7.1

752
6.5

492
6.2

821
7.1

758
6.5

170
6.2

499
4.1

171
4.1

3.5
92
317

4.0
100
325

3.3
88
577

3.5
100
250

4.0
100
322

3.3
100
874

2.2
96
1065

2.2
100
1407

EB 1
93
24
70
477
0.20
18
14.4
B
14.4
B

WB 1
1
1
0
250
0.00
0
19.5
C
19.5
C

NB 1
215
45
1
1065
0.04
3
2.1
A
2.1

SB 1
499
0
14
1407
0.00
0
0.0
0.0

2.2
49.5%
15

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected


RAC

ICU Level of Service

Synchro 8 Report
Page 3

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

85
1900
10
45
1
60
1.00
0.86

413
1900
12

63
1900
12
75
1

480
1900
12

89
1900
12
0
0

7
1900
10
0
0

64
1900
10
25
1

0.95
0.95
0.976

0.95

0.95
1.00
0.997

0.95

125
1900
9
165
1
85
1.00
0.94

271
1900
10

1.00
0.87
0.850

123
1900
9
0
1
25
1.00
0.85

277
1900
10

1.00

0
1900
12
0
0
25
1.00

0.95
0.95
0.971

0.95

1693

1583

3264

3223

2812

1693

1384
Yes
109

3264

0
Yes

3223

0
Yes

2812

0
Yes

115
33
0.94
2%

115

0.950
1668
0.422
634

28
30
112
2.5

30
205
4.7
130
0.94
1%

0.94
1%
0

90
pm+pt
5
2
5.0
9.0
9.0%
3.0
1.0
0.0
4.0
Lag
Yes
43.0
0.43
0.28
22.2
0.0
22.2
C

439
NA
2

34
65

39.0
47.0
47.0%
3.0
2.0
0.0
5.0
42.0
0.42
0.62
27.4
0.0
27.4
C
23.7
C
214
320

0.950
1608
0.459
662

0.94
0%

0.94
1%

606
NA
6 26

67
Perm
2
39.0
47.0
47.0%
3.0
2.0
0.0
5.0
42.0
0.42
0.10
1.4
0.0
1.4
A
0
9

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

46.0
0.46
0.40
2.1
0.4
2.5
A
2.5
A
14
21

0.950
1624
0.516
831

2
30
276
6.3
130
12
0.94
8%
0

202
0.94
1%

0.94
4%

131
pm+pt
3
8 24
7.0
11.0
11.0%
3.0
1.0
0.0
4.0
Lead
Yes
31.0
0.31
0.48
18.6
0.0
18.6
B

302
NA
8 24

21
m27

23.0
0.23
0.41
18.4
0.5
18.9
B
18.9
B
39
m53

27
30
330
7.5
71
32
0.94
0%
0

71
0.94
0%

0.94
5%
0

133
pm+pt
3
4 24
7.0
11.0
11.0%
3.0
1.0
0.0
4.0
Lead
Yes
31.0
0.31
0.42
26.0
0.6
26.6
C

356
NA
4 24

55
98

202
21
0.94
3%
0

23.0
0.23
0.53
34.5
0.0
34.5
C
32.4
C
97
144
Synchro 8 Report
Page 1

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

10

12

13

14

16

20

24

26

32

10

12

13

14

16

20

24

26

32

28.0
28.0
28%
3.0
2.0

10.0
10.0
10%
2.0
0.0

28.0
28.0
28%
3.0
2.0

38.0
47.0
47%
2.0
0.0

28.0
28.0
28%
2.0
0.0

8.0
9.0
9%
2.0
0.0

38.0
38.0
38%
3.0
1.0

28.0
28.0
28%
2.0
0.0

5.0
15.0
15%
3.0
1.0

4.0
4.0
4%
2.0
0.0

38.0
38.0
38%
3.0
1.0

10.0
10.0
10%
3.0
1.0

Lag
Yes

Lead
Yes

Lag
Yes

Lead
Yes

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
45
324
0
0
0
0.28

EBT
125
711
0
0
0
0.62

EBR

1/14/2016

WBL

75
644
0
0
0
0.10

WBT
32

WBR

1516
422
0
0
0.55

NBL

NBT
196

271
0
0
0
0.48

742
168
146
0
0.53

NBR

SBL
165
313
0
41
0
0.49

SBT
250

SBR

667
0
0
0
0.53

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 4:SBTL and 8:NBTL, Start of Green
Natural Cycle: 95
Control Type: Pretimed
Maximum v/c Ratio: 0.62
Intersection Signal Delay: 18.7
Intersection LOS: B
Intersection Capacity Utilization 66.1%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

1: North Broadway & Montrose Avenue

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 3

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

1/14/2016

10

12

13

14

16

20

24

26

32

Intersection Summary

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 4

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

47
1900
12
0
1
25
1.00
0.91

497
1900
12

1
1900
12
0
0

526
1900
10

30
1900
10
50
1

41
1900
10
0
1

43
1900
12
0
0

0.95
0.99
0.992

0.95

1.00

1.00
0.64
0.850

57
1900
12
0
0
25
1.00

138
1900
12

1.00

0
1900
10
0
0
25
1.00

114
2000
10

1.00
1.00

32
1900
10
50
1
100
1.00
0.95

1.00

1881

3074

1795

1507

1881

0
Yes

3074

0
Yes

1795

963
Yes
109

1.00
0.92
0.976
0.988
1574
0.912
1355

178
8
0.99
0%

178
0.99
0%

0.99
6%
0

41
Perm

0
Perm

240
NA
12 32

16 32

12 32

0.950
1770
0.338
574

0.950
1685
0.278
469

6
30
672
15.3

30
112
2.5
150
0.99
2%

0.99
1%

47
custom
13 20
10

503
NA
10 20

60.0
0.60
0.08
3.0
3.8
6.9
A
3
m7

60.0
0.60
0.45
3.9
1.3
5.1
A
5.3
A
30
56

138
32
0.99
0%
0

138
0.99
0%

0.99
2%
0

32
Perm

561
NA
14

14
38.0
38.0
38.0%
3.0
1.0
0.0
4.0
Lead
Yes
34.0
0.34
0.20
20.7
0.0
20.7
C
10
m16

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

38.0
38.0
38.0%
3.0
1.0
0.0
4.0
Lead
Yes
34.0
0.34
0.53
23.9
0.0
23.9
C
23.8
C
138
145

44
0.99
0%

0.99
4%

115
NA
16 32

36.0
0.36
0.18
6.7
1.2
7.8
A
5.9
A
13
m17

36.0
0.36
0.10
0.5
0.0
0.5
A
0
m0

0
Yes

12
30
277
6.3

30
252
5.7
150
20
0.99
0%

44
11
0.99
0%
0

36.0
0.36
0.48
27.5
0.0
27.5
C
27.5
C
111
186
Synchro 8 Report
Page 5

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

10

12

13

16

20

24

10

12

13

16

20

24

39.0
47.0
47%
3.0
2.0

7.0
11.0
11%
3.0
1.0

28.0
28.0
28%
3.0
2.0

5.0
9.0
9%
3.0
1.0

10.0
10.0
10%
2.0
0.0

28.0
28.0
28%
3.0
2.0

38.0
47.0
47%
2.0
0.0

28.0
28.0
28%
2.0
0.0

8.0
9.0
9%
2.0
0.0

28.0
28.0
28%
2.0
0.0

5.0
15.0
15%
3.0
1.0

4.0
4.0
4%
2.0
0.0

Lead
Yes

Lag
Yes

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Lag
Yes

Lag
Yes

Synchro 8 Report
Page 6

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

26

32

26

32

38.0
38.0
38%
3.0
1.0

10.0
10.0
10%
3.0
1.0

1/14/2016

Lead
Yes

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 7

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
32

607
500
0
0
0.44

1128
400
0
0
0.69

EBR

1/14/2016

WBL
50
159
0
0
0
0.20

WBT
592

WBR

1049
0
0
0
0.53

NBL

NBT
172

NBR

646
367
0
0
0.41

416
0
0
0
0.10

SBL

SBT
197

SBR

495
0
0
0
0.48

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 4:SBTL and 8:NBTL, Start of Green
Natural Cycle: 95
Control Type: Pretimed
Maximum v/c Ratio: 0.62
Intersection Signal Delay: 15.9
Intersection LOS: B
Intersection Capacity Utilization 81.7%
ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

2: Sheridan Road & Montrose Avenue

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 8

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

1/14/2016

10

12

13

16

20

24

Intersection Summary

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 9

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

26

1/14/2016

32

Intersection Summary

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 10

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

NBL

NBT

NBR

SBL

SBT

SBR

SEL

SET

SER

NWL

NWT

NWR

85
1900
9
0
1
35
1.00
0.97

67
1900
10

11
1900
10
75
1

85
1900
10

0
1900
10
0
0

88
1900
10
0
1

88
1900
12
0
0

1.00

1.00

1.00

1.00
0.70
0.850

7
1900
12
0
0
25
1.00

322
1900
12

1.00

0
1900
10
0
0
25
1.00

246
1900
10

1.00
0.97
0.979

86
1900
9
0
1
25
1.00
0.81

1.00

1425

1627

1705

1436

1425

0
Yes

1627

0
Yes

1705

1000
Yes
98

1.00
0.97
0.971
0.999
1760
0.994
1746

86
16
0.93
5%

86

0.950
1608
0.698
1151

0.950
1608
0.702
960

8
30
492
11.2
16
0.93
1%

0.93
7%
0

91
pm+pt
5
2
8.0
9.0
9.0%
3.5
0.5
0.0
4.0
Lag
Yes
31.0
0.31
0.24
25.2
0.0
25.2
C

84
NA
2

40
76

20.0
30.0
30.0%
3.5
0.5
0.0
4.0
Lead
Yes
26.0
0.26
0.22
28.2
0.0
28.2
C
26.6
C
38
79

30
252
5.7
69
2
0.93
0%
0

69
0.93
1%

0.93
9%

92
pm+pt
1
6
8.0
9.0
9.0%
3.5
0.5
0.0
4.0
Lag
Yes
31.0
0.31
0.28
14.9
0.0
14.9
B

91
NA
6

43
68

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

20.0
30.0
30.0%
3.5
0.5
0.0
4.0
Lead
Yes
26.0
0.26
0.22
17.1
0.0
17.1
B
16.0
B
44
81

41
0.93
0%

0.93
4%

265
95
NA custom
4 14
4
20.0
26.0
26.0%
3.5
0.5
0.0
4.0
57.0
0.57
0.27
10.0
1.2
11.1
B
16.0
B
35
101

22.0
0.22
0.32
29.4
0.0
29.4
C
33
82

0
Yes

14
30
494
11.2

30
276
6.3
16
11
0.93
0%

0.93
0%

0.93
3%

0
Perm

449
NA
8

8
20.0
35.0
35.0%
3.5
0.5

41
33
0.93
0%
0

20.0
35.0
35.0%
3.5
0.5
0.0
4.0
31.0
0.31
0.82
44.5
0.0
44.5
D
44.5
D
255
#417
Synchro 8 Report
Page 11

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

14

14
20.0
35.0
35%
3.5
0.5

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 12

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

NBL

NBT
412

379
0
0
0
0.24

376
0
0
0
0.22

NBR

1/14/2016

SBL

SBT
172

330
0
0
0
0.28

423
0
0
0
0.22

SBR

SEL

SET
196

SER

971
490
0
0
0.55

296
0
0
0
0.32

NWL

NWT
414

NWR

550
0
0
0
0.82

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 22 (22%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 70
Control Type: Pretimed
Maximum v/c Ratio: 0.82
Intersection Signal Delay: 28.6
Intersection LOS: C
Intersection Capacity Utilization 60.1%
ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:

3: Sheridan Road & North Broadway

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 13

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

1/14/2016

14

Intersection Summary

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 14

Lanes, Volumes, Timings


4: Hazel Street & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

29
1900
10
25
1
25
1.00
0.98

513
1900
12

44
1900
12
0
0

591
1900
12

19
1900
12
0
0

23
1900
9
0
0

12
1900
9
0
0

1.00
1.00
0.995

1.00

1.00

1665

1657

0
Yes

1665

0
Yes

0
Yes

1.00
0.90
0.940
0.978
1301
0.916
1157

1.00

1657

1.00
0.89
0.929
0.981
1296
0.920
1177

12
1900
9
0
0
25
1.00

3
1900
9

1.00

17
1900
9
0
0
25
1.00

4
1900
9

1.00
0.99
0.988

36
1900
10
25
1
25
1.00
0.96

0.950
1685
0.347
601

0.950
1685
0.379
645

9
30
672
15.3
81
0.99
0%

0.99
1%
0

29
Perm

562
NA
2

2
71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.07
4.7
0.0
4.7
A
4
m10

71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.50
6.9
0.0
6.9
A
6.7
A
101
126

3
30
665
15.1
127
28
0.99
0%
0

127
0.99
0%

0.99
2%
0

36
Perm

616
NA
6

6
71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.08
8.1
0.0
8.1
A
9
m14

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.55
10.9
0.1
11.0
B
10.9
B
168
191

23
30
408
9.3
81
15
0.99
0%
0

43
0.99
0%

0.99
0%
0

0
Perm

44
NA
8

8
29.0
29.0
29.0%
3.0
1.0

29.0
29.0
29.0%
3.0
1.0
0.0
4.0
25.0
0.25
0.14
18.5
0.0
18.5
B
18.5
B
10
38

0
0
Yes

12
30
329
7.5
61
4
0.99
0%
0

61
0.99
0%

0.99
0%
0

0
Perm

27
NA
4

4
29.0
29.0
29.0%
3.0
1.0

43
2
0.99
8%
0

29.0
29.0
29.0%
3.0
1.0
0.0
4.0
25.0
0.25
0.09
20.5
0.0
20.5
C
20.5
C
7
29
Synchro 8 Report
Page 15

Lanes, Volumes, Timings


4: Hazel Street & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
402
0
0
0
0.07

EBT
592

EBR

1113
0
0
0
0.50

1/14/2016

WBL
25
432
0
0
0
0.08

WBT
585

WBR

1116
71
0
0
0.59

NBL

NBT
328
311
0
0
0
0.14

NBR

SBL

SBT
249

SBR

298
0
0
0
0.09

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 18 (18%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.55
Intersection Signal Delay: 9.5
Intersection LOS: A
Intersection Capacity Utilization 83.3%
ICU Level of Service E
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

4: Hazel Street & Montrose Avenue

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 16

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

110
1900
10
25
1
25
1.00
0.98

381
1900
12

44
1900
12
0
0

547
1900
12

101
1900
12
0
0

30
1900
10
0
0

83
1900
9
0
0

1.00
0.99
0.977

1.00

1.00
0.98
0.969

1.00

78
1900
9
50
1
25
1.00
0.94

87
1900
9

1.00

37
1900
10
25
1
25
1.00
0.96

117
1900
10

1.00
0.99
0.984

26
1900
10
25
1
25
1.00
0.98

1.00
0.96
0.927

1.00

1653

1616

1372

1331

1653

0
Yes

1616

0
Yes

1372

0
Yes

1331

0
Yes

0.950
1604
0.293
486

0.950
1685
0.444
771

11
30
665
15.1
66
0.98
5%

0.98
1%
0

112
Perm

434
NA
4

4
66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.37
13.8
0.0
13.8
B
24
49

66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.42
10.8
0.0
10.8
B
11.4
B
90
142

0.950
1685
0.572
969

17
30
844
19.2
51
4
0.98
2%
0

51
0.98
0%

0.98
2%
0

27
Perm

661
NA
8

8
66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.06
7.1
0.0
7.1
A
3
m6

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

66.0
66.0
66.0%
3.0
1.0
0.0
4.0
62.0
0.62
0.66
10.4
0.0
10.4
B
10.3
B
75
m136

0.950
1624
0.609
975

13
30
1232
28.0
66
8
0.98
3%
0

36
0.98
0%

0.98
13%
0

38
Perm

150
NA
2

2
34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.13
27.1
0.0
27.1
C
18
44

34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.36
27.9
0.0
27.9
C
27.8
C
68
124

49
30
191
4.3
49
4
0.98
0%
0

49
0.98
0%

0.98
2%
0

80
Perm

174
NA
6

6
34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.27
29.9
0.0
29.9
C
39
79

36
1
0.98
4%
0

34.0
34.0
34.0%
3.0
1.0
0.0
4.0
30.0
0.30
0.40
23.0
0.0
23.0
C
25.2
C
62
124
Synchro 8 Report
Page 17

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
301
0
0
0
0.37

EBT
585
1029
0
0
0
0.42

EBR

WBL
25
478
0
0
0
0.06

1/14/2016

WBT
764

WBR

1008
0
0
0
0.66

NBL
25
290
0
0
0
0.13

NBT
1152
420
0
0
0
0.36

NBR

SBL
50
292
0
0
0
0.27

SBT
111

SBR

433
0
0
0
0.40

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 86 (86%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.66
Intersection Signal Delay: 14.9
Intersection LOS: B
Intersection Capacity Utilization 100.4%
ICU Level of Service G
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

5: Clarendon Avenue & Montrose Avenue

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 18

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

EBR2

WBL2

WBL

WBT

WBR

NBL

NBT

NBR

NBR2

13
1900
10
0
0
25
1.00

85
1900
12

334
1900
10
25
1

54
1900
10

54
1900
10

567
1900
10

10
1900
10
0
0

36
1900
10
0
0

10
1900
10

1.00

1.00

1.00

1.00
1.00
0.997

1.00

43
1900
10
0
0
25
1.00

52
1900
10

1.00
1.00

34
1900
10
0
1
25
1.00

1.00

1.00

1486

1749

1486

0
No

1749

0
Yes

1.00
0.98
0.956
0.985
1534
0.985
1502

0
No

0.850
0
0

0.993
1698
0.850
1452

0.950
1685
0.689
1222

1
30
379
8.6

30
844
19.2
25
0.93
0%

0.93
0%
0

0.93
1%

0.93
4%

0.93
0%

0.93
0%

0.93
1%

0
pm+pt
7
4
8.0
9.0
9.0%
3.0
0.0

105
NA
4

417
Perm

0
Perm

95
Perm

621
NA
8

8
45.0
45.0
45.0%
3.0
2.0

49.0
0.49
0.57
18.7
0.0
18.7
B

8
45.0
45.0
45.0%
3.0
2.0
0.0
5.0
Lag
Yes
40.0
0.40
0.19
20.9
0.0
20.9
C

150
189

39
75

46.0
54.0
54.0%
3.0
2.0
0.0
5.0

4
46.0
54.0
54.0%
3.0
2.0
0.0
5.0

Lead
Yes

Lag
Yes
49.0
0.49
0.15
12.6
0.0
12.6
B
17.5
B
35
59

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

45.0
45.0
45.0%
3.0
2.0
0.0
5.0
Lag
Yes
40.0
0.40
0.89
44.5
0.0
44.5
D
41.4
D
360
#575

30
720
16.4
25
3
0.93
0%
0

29
0.93
0%

0.93
24%

0.93
0%

0.93
0%

0
Split
2

152
NA
2

23.0
23.0
23.0%
3.0
2.0

23.0
23.0
23.0%
3.0
2.0
0.0
5.0
18.0
0.18
0.55
45.8
0.0
45.8
D
45.8
D
89
155
Synchro 8 Report
Page 19

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

SBL2

SBL

SBT

SBR

10
1900
10

81
1900
10

70
1900
10
25
1

1.00

8
1900
10
0
0
25
1.00

1.00

1.00
0.90
0.850

0.991
1676
0.991
1676

1/14/2016

1346
1213
No

30
377
8.6
29
0.93
0%

0.93
0%

0.93
6%

0.93
12%

0
Split
6

0
Split
6

107
NA
6

75
Perm

23.0
23.0
23.0%
3.0
2.0

23.0
23.0
23.0%
3.0
2.0

23.0
23.0
23.0%
3.0
2.0
0.0
5.0
18.0
0.18
0.36
39.8
0.0
39.8
D
40.3
D
60
112

6
23.0
23.0
23.0%
3.0
2.0
0.0
5.0
18.0
0.18
0.34
41.0
0.0
41.0
D
42
86

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 20

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
764
721
0
0
0
0.15

EBR

EBR2

25
728
0
0
0
0.57

WBL2

WBL

WBT
299

488
0
0
0
0.19

700
0
0
0
0.89

1/14/2016

WBR

NBL

NBT
640

NBR

NBR2

276
0
0
0
0.55

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 77 (77%), Referenced to phase 2:NBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.89
Intersection Signal Delay: 33.8
Intersection LOS: C
Intersection Capacity Utilization 84.9%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:

6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 21

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

SBL2

SBL

SBT
297
301
0
0
0
0.36

1/14/2016

SBR
25
218
0
0
0
0.34

Intersection Summary

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 22

Lanes, Volumes, Timings


7: Sheridan Road & Wilson Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

118
1900
10
25
1
25
1.00
0.93

319
1900
12

52
1900
12
0
0

364
1900
12

83
1900
12
0
0

52
1900
12
0
0

46
1900
12
0
0

1.00
0.97
0.972

1.00

1.00
0.96
0.971

1.00

69
1900
10
25
1
25
1.00
0.88

217
1900
12

1.00

30
1900
10
50
1
25
1.00
0.94

220
1900
12

1.00
0.97
0.979

28
1900
10
25
1
25
1.00
0.89

1.00
0.98
0.974

1.00

1566

1581

1564

1543

1566

0
No

1581

0
No

1564

0
No

1543

0
No

0.950
1620
0.349
553

0.950
1560
0.430
627

30
426
9.7
132
0.97
4%

0.97
3%
0

122
Perm

383
NA
4

4
32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.53
24.7
0.0
24.7
C
35
#89

32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.59
19.3
0.0
19.3
B
20.6
C
113
195

0.950
1685
0.560
932

30
1312
29.8
175
4
0.97
6%
0

175
0.97
8%

0.97
2%
0

29
Perm

461
NA
8

8
32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.11
8.0
0.0
8.0
A
4
m6

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.70
16.6
0.0
16.6
B
16.1
B
165
220

0.950
1636
0.548
830

30
380
8.6
132
3
0.97
0%
0

80
0.97
0%

0.97
2%
0

31
Perm

281
NA
2

2
33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.08
11.6
0.0
11.6
B
7
21

33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.42
15.3
0.0
15.3
B
14.9
B
74
131

30
336
7.6
158
7
0.97
2%
0

158
0.97
3%

0.97
7%
0

71
Perm

271
NA
6

6
33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.20
13.4
0.0
13.4
B
17
42

80
5
0.97
0%
0

33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.41
15.1
0.0
15.1
B
14.8
B
71
127
Synchro 8 Report
Page 23

Lanes, Volumes, Timings


7: Sheridan Road & Wilson Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
229
0
0
0
0.53

EBT
346

EBR

650
0
0
0
0.59

1/14/2016

WBL
25
260
0
0
0
0.11

WBT
1232

WBR

656
0
0
0
0.70

NBL
50
401
0
0
0
0.08

NBT
300
673
0
0
0
0.42

NBR

SBL
25
357
0
0
0
0.20

SBT
256

SBR

664
0
0
0
0.41

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 65
Control Type: Pretimed
Maximum v/c Ratio: 0.70
Intersection Signal Delay: 17.0
Intersection LOS: B
Intersection Capacity Utilization 75.8%
ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

7: Sheridan Road & Wilson Avenue

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 24

Lanes, Volumes, Timings


8: Clarendon Avenue & Wilson Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

35
1900
1.00

331
1900
1.00
0.99
0.983
0.996
1625
0.935
1523

52
1900
1.00

64
1900
1.00

29
1900
1.00

56
1900
1.00

30
1900
1.00

0
Yes

0
Yes

0
Yes

50
1900
1.00
0.94
0.951
0.988
1527
0.906
1384

45
1900
1.00

80
1900
1.00
0.95
0.964
0.985
1435
0.880
1246

49
1900
1.00

397
1900
1.00
0.99
0.992
0.994
1652
0.895
1484

0
0

16
30
1312
29.8
54
0.89
3%

0.89
2%
0

0
Perm

469
NA
4

4
38.0
38.0
58.5%
3.0
1.0

38.0
38.0
58.5%
3.0
1.0
0.0
4.0

7
30
628
14.3
45
2
0.89
3%
0

45
0.89
0%

0.89
2%
0

0
Perm

551
NA
8

8
38.0
38.0
58.5%
3.0
1.0

38.0
38.0
58.5%
3.0
1.0
0.0
4.0

31
30
680
15.5
54
3
0.89
0%
0

80
0.89
5%

0.89
5%
0

0
Perm

208
NA
2

2
27.0
27.0
41.5%
3.0
1.0

27.0
27.0
41.5%
3.0
1.0
0.0
4.0

0
Yes

49
30
320
7.3
48
6
0.89
25%
0

48
0.89
0%

0.89
0%
0

0
Perm

141
NA
6

6
27.0
27.0
41.5%
3.0
1.0

80
2
0.89
0%
0

27.0
27.0
41.5%
3.0
1.0
0.0
4.0

34.0
0.52
0.58
9.8
0.0
9.8
A
9.8
A
56
80
1232

34.0
0.52
0.71
17.8
0.0
17.8
B
17.8
B
150
258
548

23.0
0.35
0.45
17.5
0.0
17.5
B
17.5
B
52
106
600

23.0
0.35
0.27
11.7
0.0
11.7
B
11.7
B
25
61
240

804
0

779
0

460
0

521
0

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 25

Lanes, Volumes, Timings


8: Clarendon Avenue & Wilson Avenue

Lane Group
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
0
0
0.58

EBR

1/14/2016

WBL

WBT
0
0
0.71

WBR

NBL

NBT
0
0
0.45

NBR

SBL

SBT
0
0
0.27

SBR

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 32 (49%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 65
Control Type: Pretimed
Maximum v/c Ratio: 0.71
Intersection Signal Delay: 14.4
Intersection LOS: B
Intersection Capacity Utilization 64.9%
ICU Level of Service C
Analysis Period (min) 15
Splits and Phases:

8: Clarendon Avenue & Wilson Avenue

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 26

Lanes, Volumes, Timings


9: Clarendon Avenue & Buena Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

6
1900
1.00

35
1900
1.00
0.96
0.962
0.995
1556
0.982
1528

16
1900
1.00

3
1900
1.00

7
1900
1.00

18
1900
1.00

6
1900
1.00

0
Yes

0
Yes

0
Yes

109
1900
1.00
0.99
0.987
0.998
1645
0.988
1626

13
1900
1.00

186
1900
1.00
0.98
0.979
0.996
1537
0.979
1507

37
1900
1.00

39
1900
1.00
0.98
0.981
0.997
1654
0.989
1631

0
0

19
30
501
11.4
35

8
30
915
20.8
61

61

0.84
0%

0.84
3%
0

0.84
0%

0.84
0%

0.84
0%
0

0
Perm

68
NA
4

0
Perm

58
NA
8

4
20.0
25.0
38.5%
3.0
1.0

20.0
25.0
38.5%
3.0
1.0
0.0
4.0

8
20.0
25.0
38.5%
3.0
1.0

20.0
25.0
38.5%
3.0
1.0
0.0
4.0

23
30
477
10.8
35
7
0.84
0%
0

47
0.84
0%

0.84
9%
0

0
Perm

286
NA
2

2
20.0
40.0
61.5%
3.0
1.0

20.0
40.0
61.5%
3.0
1.0
0.0
4.0

0
Yes

14
30
1232
28.0
72
13
0.84
0%
0

72
0.84
0%

0.84
2%
0

0
Perm

152
NA
6

6
20.0
40.0
61.5%
3.0
1.0

47
7
0.84
0%
0

20.0
40.0
61.5%
3.0
1.0
0.0
4.0

21.0
0.32
0.13
13.0
0.0
13.0
B
13.0
B
13
35
421

21.0
0.32
0.11
14.5
0.0
14.5
B
14.5
B
14
34
835

36.0
0.55
0.34
8.7
0.0
8.7
A
8.7
A
51
85
397

36.0
0.55
0.17
7.0
0.0
7.0
A
7.0
A
24
45
1152

506
0

532
0

844
0

906
0

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 27

Lanes, Volumes, Timings


9: Clarendon Avenue & Buena Avenue

Lane Group
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
0
0
0.13

EBR

1/14/2016

WBL

WBT
0
0
0.11

WBR

NBL

NBT
0
0
0.34

NBR

SBL

SBT
0
0
0.17

SBR

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 32 (49%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 40
Control Type: Pretimed
Maximum v/c Ratio: 0.34
Intersection Signal Delay: 9.3
Intersection LOS: A
Intersection Capacity Utilization 32.1%
ICU Level of Service A
Analysis Period (min) 15
Splits and Phases:

9: Clarendon Avenue & Buena Avenue

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

Synchro 8 Report
Page 28

HCM Unsignalized Intersection Capacity Analysis


10: Clarendon Avenue & Sunnyside Avenue

1/14/2016

Movement
Lane Configurations
Sign Control
Volume (vph)
Peak Hour Factor
Hourly flow rate (vph)

EBL

EBR

NBL

NBT

SBT

SBR

Stop
5
0.82
6

0
0.82
0

53
0.82
65

Stop
167
0.82
204

Stop
147
0.82
179

38
0.82
46

Direction, Lane #
Volume Total (vph)
Volume Left (vph)
Volume Right (vph)
Hadj (s)
Departure Headway (s)
Degree Utilization, x
Capacity (veh/h)
Control Delay (s)
Approach Delay (s)
Approach LOS

EB 1
6
6
0
0.20
5.2
0.01
629
8.2
8.2
A

NB 1
268
65
0
0.18
4.3
0.32
821
9.3
9.3
A

SB 1
226
0
46
-0.11
4.1
0.26
872
8.5
8.5
A

Intersection Summary
Delay
Level of Service
Intersection Capacity Utilization
Analysis Period (min)

8.9
A
45.4%
15

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

ICU Level of Service

Synchro 8 Report
Page 1

HCM Unsignalized Intersection Capacity Analysis


11: Clarendon Avenue & Agatite Avenue

Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)

1/14/2016

EBL

EBR

NBL

NBT

SBT

SBR

14
Stop
0%
0.84
17
28
12.0
4.0
2

38

30
0.84
36

147
Free
0%
0.84
175
2
10.0
4.0
0

0.84
45

206
Free
0%
0.84
245
7
10.0
4.0
0
None

None

0.84
0

332
522

210

203

522
6.4

210
6.2

203
4.1

3.5
97
493

3.3
94
812

2.2
97
1349

EB 1
62
17
45
691
0.09
7
10.7
B
10.7
B

NB 1
281
36
0
1349
0.03
2
1.2
A
1.2

SB 1
175
0
0
1700
0.10
0
0.0
0.0

1.9
39.3%
15

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

ICU Level of Service

Synchro 8 Report
Page 2

HCM Unsignalized Intersection Capacity Analysis


12: Clarendon Avenue & Proposed Access

Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

32

0
Stop
0%
0.92
0

97

120

0.92
3

0.92
130

0.92
8

0.92
3

142
Free
0%
0.92
154

40

0.92
10

201
Free
0%
0.92
218

0.92
105

0
Stop
0%
0.92
0

0.92
35

None

0.92
43

None

191
0.94
669

0.94
670

176

0.94
771

0.94
688

0.94
222

198

0.94
226

614
7.1

614
6.5

176
6.2

723
7.1

633
6.5

137
6.2

198
4.1

141
4.1

3.5
90
349

4.0
100
345

3.3
88
867

3.5
96
261

4.0
100
336

3.3
100
854

2.2
91
1375

2.2
100
1352

EB 1
140
35
105
634
0.22
21
12.3
B
12.3
B

WB 1
13
10
3
315
0.04
3
16.9
C
16.9
C

NB 1
357
130
8
1375
0.09
8
3.4
A
3.4

SB 1
201
3
43
1352
0.00
0
0.1
A
0.1

4.5
45.2%
15

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected


RAC

ICU Level of Service

Synchro 8 Report
Page 3

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

88
1900
10
45
1
60
1.00
0.82

480
1900
12

85
1900
12
75
1

402
1900
12

81
1900
12
0
0

7
1900
10
0
0

59
1900
10
25
1

0.95
0.94
0.975

0.95

0.95
1.00
0.996

0.95

118
1900
9
165
1
85
1.00
0.93

342
1900
10

1.00
0.84
0.850

102
1900
9
0
1
25
1.00
0.87

255
1900
10

1.00

0
1900
12
0
0
25
1.00

0.95
0.96
0.978

0.95

1693

1568

3237

3189

2897

1693

1314
Yes
109

3237

0
Yes

3189

0
Yes

2897

0
Yes

158
33
0.97
3%

158

0.950
1668
0.470
678

31
30
112
2.5

30
205
4.7
155
0.97
1%

0.97
1%
0

91
pm+pt
5
2
5.0
9.0
9.0%
3.0
1.0
0.0
4.0
Lag
Yes
43.0
0.43
0.27
21.7
0.0
21.7
C

495
NA
2

34
66

39.0
47.0
47.0%
3.0
2.0
0.0
5.0
42.0
0.42
0.70
30.1
0.0
30.1
C
25.4
C
253
375

88
Perm

0.97
0%

0.97
1%

498
NA
6 26

2
39.0
47.0
47.0%
3.0
2.0
0.0
5.0
42.0
0.42
0.14
2.9
0.0
2.9
A
0
20

0.950
1577
0.401
580

46.0
0.46
0.33
1.7
0.4
2.1
A
2.1
A
12
14

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

0.950
1624
0.552
875

2
30
276
6.3
155
28
0.97
7%
0

198
0.97
3%

0.97
5%

105
pm+pt
3
8 24
7.0
11.0
11.0%
3.0
1.0
0.0
4.0
Lead
Yes
31.0
0.31
0.42
17.0
0.0
17.0
B

270
NA
8 24

16
m22

23.0
0.23
0.37
17.6
0.5
18.1
B
17.8
B
33
m46

18
30
330
7.5
84
15
0.97
0%
0

84
0.97
0%

0.97
4%
0

122
pm+pt
3
4 24
7.0
11.0
11.0%
3.0
1.0
0.0
4.0
Lead
Yes
31.0
0.31
0.38
24.7
0.6
25.4
C

414
NA
4 24

50
91

198
15
0.97
2%
0

23.0
0.23
0.61
37.3
0.0
37.3
D
34.6
C
119
171
Synchro 8 Report
Page 1

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

10

12

13

14

16

20

24

26

32

10

12

13

14

16

20

24

26

32

28.0
28.0
28%
3.0
2.0

10.0
10.0
10%
2.0
0.0

28.0
28.0
28%
3.0
2.0

38.0
47.0
47%
2.0
0.0

28.0
28.0
28%
2.0
0.0

8.0
9.0
9%
2.0
0.0

38.0
38.0
38%
3.0
1.0

28.0
28.0
28%
2.0
0.0

5.0
15.0
15%
3.0
1.0

4.0
4.0
4%
2.0
0.0

38.0
38.0
38%
3.0
1.0

10.0
10.0
10%
3.0
1.0

Lag
Yes

Lead
Yes

Lag
Yes

Lead
Yes

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
45
341
0
0
0
0.27

EBT
125
711
0
0
0
0.70

EBR

1/14/2016

WBL

75
615
0
0
0
0.14

WBT
32

WBR

1505
526
0
0
0.51

NBL

NBT
196

249
0
0
0
0.42

735
0
181
0
0.49

NBR

SBL
165
323
0
53
0
0.45

SBT
250

SBR

680
0
0
0
0.61

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 4:SBTL and 8:NBTL, Start of Green
Natural Cycle: 95
Control Type: Pretimed
Maximum v/c Ratio: 0.70
Intersection Signal Delay: 20.8
Intersection LOS: C
Intersection Capacity Utilization 65.7%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

1: North Broadway & Montrose Avenue

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 3

Lanes, Volumes, Timings


1: North Broadway & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

1/14/2016

10

12

13

14

16

20

24

26

32

Intersection Summary

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 4

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

48
1900
12
0
1
25
1.00
0.89

553
1900
12

4
1900
12
0
0

439
1900
10

48
1900
10
50
1

56
1900
10
0
1

44
1900
12
0
0

0.95
0.97
0.985

0.95

1.00

1.00
0.64
0.850

58
1900
12
0
0
25
1.00

128
1900
12

1.00

0
1900
10
0
0
25
1.00

85
2000
10

1.00
1.00
0.999

44
1900
10
50
1
100
1.00
0.95

1.00

1877

3014

1795

1478

1877

0
Yes

3014

0
Yes

1795

942
Yes
109

1.00
0.91
0.974
0.988
1551
0.913
1327

179
7
0.93
2%

179
0.93
2%

0.93
7%
0

60
Perm

0
Perm

247
NA
12 32

16 32

12 32

0.950
1770
0.362
602

0.950
1604
0.194
311

1
30
112
2.5
170
0.93
2%

0.93
1%

52
custom
13 20
10

599
NA
10 20

60.0
0.60
0.08
2.8
4.7
7.5
A
3
m6

60.0
0.60
0.53
4.1
1.8
5.9
A
6.0
A
36
58

13
30
672
15.3
181
32
0.93
0%
0

181
0.93
5%

0.93
2%
0

47
Perm

524
NA
14

14
38.0
38.0
38.0%
3.0
1.0
0.0
4.0
Lead
Yes
34.0
0.34
0.45
31.3
0.0
31.3
C
19
m53

38.0
38.0
38.0%
3.0
1.0
0.0
4.0
Lead
Yes
34.0
0.34
0.51
18.2
0.0
18.2
B
19.3
B
111
147

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

41
0.93
0%

0.93
4%

91
NA
16 32

36.0
0.36
0.14
6.0
0.0
6.0
A
4.0
A
10
m13

36.0
0.36
0.15
0.9
0.0
0.9
A
1
m1

0
Yes

13
30
277
6.3

30
252
5.7
170
6
0.93
0%

41
11
0.93
2%
0

36.0
0.36
0.51
28.1
0.0
28.1
C
28.1
C
115
193
Synchro 8 Report
Page 5

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

10

12

13

16

20

24

10

12

13

16

20

24

39.0
47.0
47%
3.0
2.0

7.0
11.0
11%
3.0
1.0

28.0
28.0
28%
3.0
2.0

5.0
9.0
9%
3.0
1.0

10.0
10.0
10%
2.0
0.0

28.0
28.0
28%
3.0
2.0

38.0
47.0
47%
2.0
0.0

28.0
28.0
28%
2.0
0.0

8.0
9.0
9%
2.0
0.0

28.0
28.0
28%
2.0
0.0

5.0
15.0
15%
3.0
1.0

4.0
4.0
4%
2.0
0.0

Lead
Yes

Lag
Yes

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Lag
Yes

Lag
Yes

Synchro 8 Report
Page 6

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

26

32

26

32

38.0
38.0
38%
3.0
1.0

10.0
10.0
10%
3.0
1.0

1/14/2016

Lead
Yes

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 7

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
32

618
512
0
0
0.49

1126
351
0
0
0.77

EBR

1/14/2016

WBL
50
105
0
0
0
0.45

WBT
592

WBR

1033
0
0
0
0.51

NBL

NBT
172

NBR

646
0
0
0
0.14

408
0
0
0
0.15

SBL

SBT
197

SBR

486
0
0
0
0.51

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 4:SBTL and 8:NBTL, Start of Green
Natural Cycle: 95
Control Type: Pretimed
Maximum v/c Ratio: 0.70
Intersection Signal Delay: 13.9
Intersection LOS: B
Intersection Capacity Utilization 82.7%
ICU Level of Service E
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

2: Sheridan Road & Montrose Avenue

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 8

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

1/14/2016

10

12

13

16

20

24

Intersection Summary

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 9

Lanes, Volumes, Timings


2: Sheridan Road & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

26

1/14/2016

32

Intersection Summary

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 10

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

NBL

NBT

NBR

SBL

SBT

SBR

SEL

SET

SER

NWL

NWT

NWR

73
1900
9
0
1
35
1.00
0.96

49
1900
10

14
1900
10
75
1

91
1900
10

0
1900
10
0
0

121
1900
10
0
1

92
1900
12
0
0

1.00

1.00

1.00

1.00
0.60
0.850

6
1900
12
0
0
25
1.00

291
1900
12

1.00

0
1900
10
0
0
25
1.00

306
1900
10

1.00
0.93
0.966

85
1900
9
0
1
25
1.00
0.72

1.00

1296

1642

1705

1436

1296

0
Yes

1642

0
Yes

1705

866
Yes
136

1.00
0.98
0.968
0.999
1742
0.994
1727

112
31
0.89
5%

112

0.950
1562
0.679
1075

0.950
1577
0.711
853

14
30
492
11.2
23
0.89
4%

0.89
11%
0

82
pm+pt
5
2
8.0
9.0
9.0%
3.5
0.5
0.0
4.0
Lag
Yes
31.0
0.31
0.23
25.1
0.0
25.1
C

71
NA
2

36
69

20.0
30.0
30.0%
3.5
0.5
0.0
4.0
Lead
Yes
26.0
0.26
0.20
25.6
0.0
25.6
C
25.4
C
28
64

30
252
5.7
98
12
0.89
7%
0

98
0.89
3%

0.89
8%

96
pm+pt
1
6
8.0
9.0
9.0%
3.5
0.5
0.0
4.0
Lag
Yes
31.0
0.31
0.32
18.9
0.0
18.9
B

102
NA
6

43
75

20.0
30.0
30.0%
3.5
0.5
0.0
4.0
Lead
Yes
26.0
0.26
0.24
22.2
1.1
23.3
C
21.2
C
55
92

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

32
0.89
0%

0.89
4%

344
136
NA custom
4 14
4
20.0
26.0
26.0%
3.5
0.5
0.0
4.0
57.0
0.57
0.35
13.8
2.1
15.9
B
20.0
C
68
156

22.0
0.22
0.46
29.8
0.7
30.5
C
52
101

0
Yes

16
30
494
11.2

30
276
6.3
23
11
0.89
0%

0.89
0%

0.89
4%

0
Perm

437
NA
8

8
20.0
35.0
35.0%
3.5
0.5

32
32
0.89
1%
0

20.0
35.0
35.0%
3.5
0.5
0.0
4.0
31.0
0.31
0.80
43.2
0.0
43.2
D
43.2
D
246
#392
Synchro 8 Report
Page 11

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

14

14
20.0
35.0
35%
3.5
0.5

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 12

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

NBL

NBT
412

357
0
0
0
0.23

347
0
0
0
0.20

NBR

1/14/2016

SBL

SBT
172

300
0
0
0
0.32

426
176
0
0
0.41

SBR

SEL

SET
196

SER

971
476
0
0
0.69

296
36
0
0
0.52

NWL

NWT
414

NWR

546
0
0
0
0.80

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 22 (22%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 70
Control Type: Pretimed
Maximum v/c Ratio: 0.80
Intersection Signal Delay: 28.8
Intersection LOS: C
Intersection Capacity Utilization 59.0%
ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:

3: Sheridan Road & North Broadway

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 13

Lanes, Volumes, Timings


3: Sheridan Road & North Broadway

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

1/14/2016

14

Intersection Summary

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 14

Lanes, Volumes, Timings


4: Hazel Street & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

35
1900
10
25
1
25
1.00
0.96

577
1900
12

50
1900
12
0
0

472
1900
12

23
1900
12
0
0

27
1900
9
0
0

23
1900
9
0
0

1.00
0.99
0.993

1.00

1.00

1656

1642

0
Yes

1656

0
Yes

0
Yes

1.00
0.88
0.930
0.979
1265
0.895
1102

1.00

1642

1.00
0.89
0.937
0.979
1318
0.895
1150

19
1900
9
0
0
25
1.00

2
1900
9

1.00

24
1900
9
0
0
25
1.00

6
1900
9

1.00
0.98
0.988

30
1900
10
25
1
25
1.00
0.95

0.950
1636
0.394
651

0.950
1620
0.309
499

9
30
672
15.3
106
0.92
3%

0.92
1%
0

38
Perm

681
NA
2

2
71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.09
10.3
0.0
10.3
B
10
m24

71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.62
16.9
0.1
17.0
B
16.7
B
253
373

5
30
665
15.1
180
37
0.92
5%
0

180
0.92
4%

0.92
2%
0

33
Perm

538
NA
6

6
71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.10
5.1
0.0
5.1
A
5
m11

71.0
71.0
71.0%
3.0
1.0
0.0
4.0
67.0
0.67
0.48
7.9
0.0
7.9
A
7.7
A
142
179

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

29
30
408
9.3
106
33
0.92
0%
0

59
0.92
0%

0.92
0%
0

0
Perm

62
NA
8

8
29.0
29.0
29.0%
3.0
1.0

29.0
29.0
29.0%
3.0
1.0
0.0
4.0
25.0
0.25
0.20
20.1
0.0
20.1
C
20.1
C
16
51

0
0
Yes

25
30
329
7.5
61
2
0.92
0%
0

61
0.92
0%

0.92
0%
0

0
Perm

48
NA
4

4
29.0
29.0
29.0%
3.0
1.0

59
4
0.92
5%
0

29.0
29.0
29.0%
3.0
1.0
0.0
4.0
25.0
0.25
0.16
18.8
0.0
18.8
B
18.8
B
11
41
Synchro 8 Report
Page 15

Lanes, Volumes, Timings


4: Hazel Street & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
436
0
0
0
0.09

EBT
592

EBR

1103
42
0
0
0.64

1/14/2016

WBL
25
334
0
0
0
0.10

WBT
585

WBR

1111
0
0
0
0.48

NBL

NBT
328
309
0
0
0
0.20

NBR

SBL

SBT
249

SBR

294
0
0
0
0.16

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.62
Intersection Signal Delay: 13.2
Intersection LOS: B
Intersection Capacity Utilization 75.0%
ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

4: Hazel Street & Montrose Avenue

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 16

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

95
1900
10
25
1
25
1.00
0.98

459
1900
12

57
1900
12
0
0

357
1900
12

74
1900
12
0
0

32
1900
10
0
0

109
1900
9
0
0

1.00
0.99
0.974

1.00

1.00
0.98
0.958

1.00

106
1900
9
50
1
25
1.00
0.95

96
1900
9

1.00

40
1900
10
25
1
25
1.00
0.96

83
1900
10

1.00
0.99
0.984

30
1900
10
25
1
25
1.00
0.97

1.00
0.96
0.920

1.00

1653

1598

1471

1322

1653

0
Yes

1598

0
Yes

1471

0
Yes

1322

0
Yes

0.950
1685
0.441
768

0.950
1685
0.382
660

12
30
665
15.1
38
0.96
0%

0.96
1%
0

99
Perm

537
NA
4

4
66.0
68.0
68.0%
3.0
1.0
0.0
4.0
64.0
0.64
0.20
3.7
0.0
3.7
A
6
m11

66.0
68.0
68.0%
3.0
1.0
0.0
4.0
64.0
0.64
0.51
4.8
0.0
4.8
A
4.6
A
33
46

0.950
1604
0.497
807

21
30
844
19.2
64
8
0.96
0%
0

64
0.96
0%

0.96
2%
0

31
Perm

449
NA
8

8
66.0
68.0
68.0%
3.0
1.0
0.0
4.0
64.0
0.64
0.07
7.4
0.0
7.4
A
7
18

66.0
68.0
68.0%
3.0
1.0
0.0
4.0
64.0
0.64
0.44
10.1
0.0
10.1
B
9.9
A
123
188

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

0.950
1624
0.654
1062

19
30
1232
28.0
38
5
0.96
9%
0

32
0.96
5%

0.96
2%
0

42
Perm

119
NA
2

2
32.0
32.0
32.0%
3.0
1.0
0.0
4.0
28.0
0.28
0.19
30.1
0.0
30.1
C
20
49

32.0
32.0
32.0%
3.0
1.0
0.0
4.0
28.0
0.28
0.28
25.6
0.0
25.6
C
26.8
C
49
98

57
30
182
4.1
34
6
0.96
0%
0

34
0.96
0%

0.96
2%
0

110
Perm

214
NA
6

6
32.0
32.0
32.0%
3.0
1.0
0.0
4.0
28.0
0.28
0.37
33.4
0.0
33.4
C
56
108

32
3
0.96
3%
0

32.0
32.0
32.0%
3.0
1.0
0.0
4.0
28.0
0.28
0.52
27.2
0.0
27.2
C
29.3
C
83
157
Synchro 8 Report
Page 17

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
491
0
0
0
0.20

EBT
585
1062
0
0
0
0.51

EBR

WBL
25
422
0
0
0
0.07

1/14/2016

WBT
764

WBR

1030
0
0
0
0.44

NBL
25
225
0
0
0
0.19

NBT
1152
425
0
0
0
0.28

NBR

SBL
50
297
0
0
0
0.37

SBT
102

SBR

411
0
0
0
0.52

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 84 (84%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.52
Intersection Signal Delay: 13.4
Intersection LOS: B
Intersection Capacity Utilization 92.8%
ICU Level of Service F
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

5: Clarendon Avenue & Montrose Avenue

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 18

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

EBR2

WBL2

WBL

WBT

WBR

NBL

NBT

NBR

NBR2

9
1900
10
0
0
25
1.00

137
1900
12

404
1900
10
25
1

47
1900
10

105
1900
10

375
1900
10

3
1900
10
0
0

33
1900
10
0
0

16
1900
10

1.00
0.97
0.850

1.00

1.00

1.00
1.00
0.999

1.00

37
1900
10
0
0
25
1.00

28
1900
10

1.00
1.00

21
1900
10
0
1
25
1.00

1.00

1.00

1494

1753

1449

0
No

1753

0
Yes

1.00
0.99
0.942
0.984
1557
0.984
1546

0
No

0
0

0.997
1705
0.978
1669

0.950
1671
0.658
1157

30
844
19.2

30
379
8.6

54
0.94
0%

0.94
0%
0

0
pm+pt
7
4
8.0
8.0
8.9%
3.0
0.0

156
NA
4
43.0
45.0
50.0%
3.0
2.0
0.0
5.0

6
0.94
1%

6
0.94
0%

480
Perm

0.94
1%

0.94
0%

0.94
1%

0
Perm

134
Perm

402
NA
8

8
37.0
37.0
41.1%
3.0
2.0

40.0
0.44
0.75
29.5
0.0
29.5
C

8
37.0
37.0
41.1%
3.0
2.0
0.0
5.0
Lag
Yes
32.0
0.36
0.33
23.9
0.0
23.9
C

220
348

55
103

4
43.0
45.0
50.0%
3.0
2.0
0.0
5.0

Lead
Yes

Lag
Yes
40.0
0.44
0.21
16.3
0.0
16.3
B
26.3
C
52
93

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

37.0
37.0
41.1%
3.0
2.0
0.0
5.0
Lag
Yes
32.0
0.36
0.65
30.1
0.0
30.1
C
28.5
C
188
290

30
720
16.4
54
1
0.94
0%
0

10
0.94
0%

0.94
19%

0.94
3%

0.94
0%

0
Split
2

121
NA
2

23.0
23.0
25.6%
3.0
2.0

23.0
23.0
25.6%
3.0
2.0
0.0
5.0
18.0
0.20
0.39
35.6
0.0
35.6
D
35.6
D
60
113
Synchro 8 Report
Page 19

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

SBL2

SBL

SBT

SBR

9
1900
10

101
1900
10

54
1900
10
25
1

1.00

37
1900
10
0
0
25
1.00

1.00

1.00
0.95
0.850

0.985
1645
0.985
1645

1/14/2016

1370
1307
No

30
377
8.6
10
0.94
0%

0.94
0%

0.94
9%

0.94
10%

0
Split
6

0
Split
6

156
NA
6

57
Perm

22.0
22.0
24.4%
3.0
2.0

22.0
22.0
24.4%
3.0
2.0

22.0
22.0
24.4%
3.0
2.0
0.0
5.0
17.0
0.19
0.50
39.2
0.0
39.2
D
37.8
D
80
142

6
22.0
22.0
24.4%
3.0
2.0
0.0
5.0
17.0
0.19
0.23
33.9
0.0
33.9
C
28
63

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 20

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
764
742
0
0
0
0.21

EBR

EBR2

WBL2

25
644
0
0
0
0.75

WBL

WBT
299

411
0
0
0
0.33

623
0
0
0
0.65

1/14/2016

WBR

NBL

NBT
640

NBR

NBR2

311
0
0
0
0.39

Intersection Summary
Area Type:
Other
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 81 (90%), Referenced to phase 2:NBTL, Start of Green
Natural Cycle: 90
Control Type: Pretimed
Maximum v/c Ratio: 0.75
Intersection Signal Delay: 29.4
Intersection LOS: C
Intersection Capacity Utilization 81.3%
ICU Level of Service D
Analysis Period (min) 15
Splits and Phases:

6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 21

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

SBL2

SBL

SBT
297
310
0
0
0
0.50

1/14/2016

SBR
25
246
0
0
0
0.23

Intersection Summary

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 22

Lanes, Volumes, Timings


7: Sheridan Road & Wilson Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

89
1900
10
25
1
25
1.00
0.94

364
1900
12

35
1900
12
0
0

304
1900
12

22
1900
12
0
0

38
1900
12
0
0

38
1900
12
0
0

1.00
0.99
0.990

1.00

1.00
0.96
0.971

1.00

52
1900
10
25
1
25
1.00
0.87

84
1900
12

1.00

27
1900
10
50
1
25
1.00
0.92

161
1900
12

1.00
0.98
0.987

69
1900
10
25
1
25
1.00
0.90

1.00
0.96
0.954

1.00

1620

1661

1524

1502

1620

0
No

1661

0
No

1524

0
No

1502

0
No

0.950
1604
0.481
763

0.950
1685
0.401
638

30
426
9.7
86
0.97
5%

0.97
2%
0

92
Perm

411
NA
4

4
32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.29
15.9
0.0
15.9
B
23
56

32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.61
19.7
0.0
19.7
B
19.0
B
123
208

0.950
1685
0.676
1108

30
1312
29.8
171
13
0.97
3%
0

171
0.97
0%

0.97
1%
0

71
Perm

336
NA
8

8
32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.27
11.8
0.0
11.8
B
15
m28

32.0
32.0
49.2%
3.0
2.0
0.0
5.0
27.0
0.42
0.49
13.2
0.0
13.2
B
13.0
B
107
149

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

0.950
1652
0.629
947

30
380
8.6
86
2
0.97
2%
0

78
0.97
0%

0.97
6%
0

28
Perm

205
NA
2

2
33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.06
11.3
0.0
11.3
B
6
20

33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.31
13.9
0.0
13.9
B
13.6
B
51
95

30
336
7.6
153
5
0.97
0%
0

153
0.97
2%

0.97
5%
0

54
Perm

126
NA
6

6
33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.13
12.3
0.0
12.3
B
12
32

78
11
0.97
4%
0

33.0
33.0
50.8%
3.0
2.0
0.0
5.0
28.0
0.43
0.19
12.5
0.0
12.5
B
12.5
B
30
61
Synchro 8 Report
Page 23

Lanes, Volumes, Timings


7: Sheridan Road & Wilson Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
25
316
0
0
0
0.29

EBT
346

EBR

672
0
0
0
0.61

1/14/2016

WBL
25
265
0
0
0
0.27

WBT
1232

WBR

689
0
0
0
0.49

NBL
50
477
0
0
0
0.06

NBT
300
656
0
0
0
0.31

NBR

SBL
25
407
0
0
0
0.13

SBT
256

SBR

647
0
0
0
0.19

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 65
Control Type: Pretimed
Maximum v/c Ratio: 0.61
Intersection Signal Delay: 15.3
Intersection LOS: B
Intersection Capacity Utilization 70.8%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:

7: Sheridan Road & Wilson Avenue

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 24

Lanes, Volumes, Timings


8: Clarendon Avenue & Wilson Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

44
1900
1.00

362
1900
1.00
0.99
0.984
0.995
1629
0.933
1526

53
1900
1.00

69
1900
1.00

22
1900
1.00

49
1900
1.00

52
1900
1.00

0
Yes

0
Yes

0
Yes

84
1900
1.00
0.97
0.971
0.985
1585
0.872
1392

38
1900
1.00

64
1900
1.00
0.97
0.955
0.986
1550
0.877
1358

56
1900
1.00

304
1900
1.00
0.99
0.993
0.991
1665
0.859
1438

0
0

15
30
1312
29.8
30
0.90
0%

0.90
2%
0

0
Perm

510
NA
4

4
38.0
38.0
58.5%
3.0
1.0

38.0
38.0
58.5%
3.0
1.0
0.0
4.0

7
30
628
14.3
51
2
0.90
3%
0

51
0.90
0%

0.90
1%
0

0
Perm

439
NA
8

8
38.0
38.0
58.5%
3.0
1.0

38.0
38.0
58.5%
3.0
1.0
0.0
4.0

43
30
680
15.5
30
3
0.90
0%
0

50
0.90
0%

0.90
2%
0

0
Perm

187
NA
2

2
27.0
27.0
41.5%
3.0
1.0

27.0
27.0
41.5%
3.0
1.0
0.0
4.0

0
Yes

24
30
320
7.3
26
4
0.90
3%
0

26
0.90
2%

0.90
1%
0

0
Perm

193
NA
6

6
27.0
27.0
41.5%
3.0
1.0

50
2
0.90
0%
0

27.0
27.0
41.5%
3.0
1.0
0.0
4.0

34.0
0.52
0.63
9.0
0.0
9.0
A
9.0
A
48
68
1232

34.0
0.52
0.58
14.3
0.0
14.3
B
14.3
B
108
190
548

23.0
0.35
0.37
14.4
0.0
14.4
B
14.4
B
40
88
600

23.0
0.35
0.38
16.3
0.0
16.3
B
16.3
B
48
98
240

805
0

755
0

508
0

508
0

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 25

Lanes, Volumes, Timings


8: Clarendon Avenue & Wilson Avenue

Lane Group
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
0
0
0.63

EBR

1/14/2016

WBL

WBT
0
0
0.58

WBR

NBL

NBT
0
0
0.37

NBR

SBL

SBT
0
0
0.38

SBR

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 32 (49%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 65
Control Type: Pretimed
Maximum v/c Ratio: 0.63
Intersection Signal Delay: 12.6
Intersection LOS: B
Intersection Capacity Utilization 59.9%
ICU Level of Service B
Analysis Period (min) 15
Splits and Phases:

8: Clarendon Avenue & Wilson Avenue

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 26

Lanes, Volumes, Timings


9: Clarendon Avenue & Buena Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

6
1900
1.00

23
1900
1.00
0.96
0.952
0.994
1500
0.981
1468

16
1900
1.00

10
1900
1.00

3
1900
1.00

16
1900
1.00

9
1900
1.00

0
Yes

0
Yes

0
Yes

136
1900
1.00
1.00
0.996
0.997
1665
0.985
1640

5
1900
1.00

135
1900
1.00
0.98
0.974
0.996
1604
0.977
1571

36
1900
1.00

11
1900
1.00
0.96
0.984
0.979
1566
0.927
1437

0
0

17
30
501
11.4
44
0.93
33%

0.93
0%
0

0
Perm

48
NA
4

4
20.0
25.0
38.5%
3.0
1.0

20.0
25.0
38.5%
3.0
1.0
0.0
4.0

3
30
915
20.8
50
2
0.93
0%
0

50

30
30
477
10.8
44

34

0.93
0%

0.93
9%
0

0.93
0%

0.93
11%

0.93
1%
0

0
Perm

26
NA
8

0
Perm

201
NA
2

8
20.0
25.0
38.5%
3.0
1.0

20.0
25.0
38.5%
3.0
1.0
0.0
4.0

2
20.0
40.0
61.5%
3.0
1.0

20.0
40.0
61.5%
3.0
1.0
0.0
4.0

0
Yes

4
30
1232
28.0
68
11
0.93
0%
0

68
0.93
0%

0.93
2%
0

0
Perm

161
NA
6

6
20.0
40.0
61.5%
3.0
1.0

34
4
0.93
0%
0

20.0
40.0
61.5%
3.0
1.0
0.0
4.0

21.0
0.32
0.10
11.9
0.0
11.9
B
11.9
B
8
29
421

21.0
0.32
0.06
14.5
0.0
14.5
B
14.5
B
6
21
835

36.0
0.55
0.23
7.0
0.0
7.0
A
7.0
A
31
61
397

36.0
0.55
0.18
7.6
0.0
7.6
A
7.6
A
28
54
1152

485
0

466
0

883
0

910
0

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 27

Lanes, Volumes, Timings


9: Clarendon Avenue & Buena Avenue

Lane Group
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
0
0
0.10

EBR

1/14/2016

WBL

WBT
0
0
0.06

WBR

NBL

NBT
0
0
0.23

NBR

SBL

SBT
0
0
0.18

SBR

Intersection Summary
Area Type:
Other
Cycle Length: 65
Actuated Cycle Length: 65
Offset: 32 (49%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 40
Control Type: Pretimed
Maximum v/c Ratio: 0.23
Intersection Signal Delay: 8.2
Intersection LOS: A
Intersection Capacity Utilization 26.1%
ICU Level of Service A
Analysis Period (min) 15
Splits and Phases:

9: Clarendon Avenue & Buena Avenue

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 28

HCM Unsignalized Intersection Capacity Analysis


10: Clarendon Avenue & Sunnyside Avenue

1/14/2016

Movement
Lane Configurations
Sign Control
Volume (vph)
Peak Hour Factor
Hourly flow rate (vph)

EBL

EBR

NBL

NBT

SBT

SBR

Stop
8
0.78
10

0
0.78
0

14
0.78
18

Stop
121
0.78
155

Stop
178
0.78
228

32
0.78
41

Direction, Lane #
Volume Total (vph)
Volume Left (vph)
Volume Right (vph)
Hadj (s)
Departure Headway (s)
Degree Utilization, x
Capacity (veh/h)
Control Delay (s)
Approach Delay (s)
Approach LOS

EB 1
10
10
0
0.20
5.0
0.01
649
8.1
8.1
A

NB 1
173
18
0
0.05
4.2
0.20
832
8.3
8.3
A

SB 1
269
0
41
-0.06
4.0
0.30
882
8.8
8.8
A

Intersection Summary
Delay
Level of Service
Intersection Capacity Utilization
Analysis Period (min)

8.6
A
32.4%
15

ICU Level of Service

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 1

HCM Unsignalized Intersection Capacity Analysis


11: Clarendon Avenue & Agatite Avenue

Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)

1/14/2016

EBL

EBR

NBL

NBT

SBT

SBR

5
Stop
0%
0.83
6
28
12.0
4.0
2

46

23
0.83
28

178
Free
0%
0.83
214
2
10.0
4.0
0

0.83
55

130
Free
0%
0.83
157
8
10.0
4.0
1
None

None

0.83
0

332
457

250

242

457
6.4

250
6.2

242
4.1

3.5
99
540

3.3
93
770

2.2
98
1305

EB 1
61
6
55
739
0.08
7
10.3
B
10.3
B

NB 1
184
28
0
1305
0.02
2
1.3
A
1.3

SB 1
214
0
0
1700
0.13
0
0.0
0.0

1.9
36.0%
15

ICU Level of Service

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 2

HCM Unsignalized Intersection Capacity Analysis


12: Clarendon Avenue & Proposesd Access/Proposed Access

Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

37

0
Stop
0%
0.92
0

129

133

0.92
2

0.92
145

0.92
5

0.92
2

177
Free
0%
0.92
192

45

0.92
5

114
Free
0%
0.92
124

0.92
140

0
Stop
0%
0.92
0

0.92
40

None

0.92
49

None

182
0.97
639

0.97
640

217

0.97
777

0.97
661

0.97
127

241

0.97
129

612
7.1

613
6.5

217
6.2

755
7.1

635
6.5

84
6.2

241
4.1

86
4.1

3.5
89
359

4.0
100
352

3.3
83
823

3.5
98
240

4.0
100
341

3.3
100
946

2.2
89
1325

2.2
100
1464

EB 1
180
40
140
639
0.28
29
12.8
B
12.8
B

WB 1
8
5
2
304
0.02
2
17.1
C
17.1
C

NB 1
274
145
5
1325
0.11
9
4.7
A
4.7

SB 1
243
2
49
1464
0.00
0
0.1
A
0.1

5.3
45.6%
15

ICU Level of Service

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected


RAC

Synchro 8 Report
Page 3

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

50
1900
10
100
1
25
1.00
0.95

511
1900
10

74
1900
10
0
0

348
1900
10

48
1900
10
0
0

49
1900
10
0
0

88
1900
9
0
0

1.00
0.99
0.982

1.00

1.00
0.93
0.951

1.00

120
1900
9
50
1
25
1.00
0.85

303
1900
9

1.00

41
1900
10
25
1
25
1.00
0.93

100
1900
10

1.00
0.99
0.981

36
1900
10
100
1
25
1.00
0.98

1.00
0.96
0.966

1.00

1536

1505

1322

1374

1536

0
Yes

1505

0
Yes

1322

0
Yes

1374

0
Yes

0.950
1465
0.370
544

0.950
1685
0.189
329

11
30
665
15.1
89
0.92
15%

0.92
1%
0

54
pm+pt
7
4
8.0
10.0
11.1%
3.0
1.0
0.0
4.0
Lag
Yes
47.0
0.52
0.16
11.1
0.0
11.1
B

635
NA
4

13
29

44.0
45.0
50.0%
3.0
1.0
0.0
4.0
Lead
Yes
41.0
0.46
0.90
40.7
0.0
40.7
D
38.4
D
317
#542

0.950
1604
0.278
439

10
30
844
19.2
53
5
0.92
0%
0

53
0.92
0%

0.92
3%
0

39
pm+pt
3
8
8.0
10.0
11.1%
3.0
1.0
0.0
4.0
Lag
Yes
47.0
0.52
0.15
11.9
0.0
11.9
B

430
NA
8

9
23

0.950
1624
0.616
892

30
30
1232
28.0
89
3
0.92
0%
0

44.0
45.0
50.0%
3.0
1.0
0.0
4.0
Lead
Yes
41.0
0.46
0.62
23.0
0.0
23.0
C
22.1
C
175
277

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected with Improvements


RAC

104
0.92
5%

0.92
5%
0

45
Perm

162
NA
2

2
34.0
35.0
38.9%
3.0
1.0
0.0
4.0
31.0
0.34
0.30
28.2
0.0
28.2
C
19
50

34.0
35.0
38.9%
3.0
1.0
0.0
4.0
31.0
0.34
0.34
20.1
0.0
20.1
C
21.9
C
54
107

18
30
190
4.3
132
3
0.92
10%
0

132
0.92
0%

0.92
5%
0

130
Perm

425
NA
6

6
34.0
35.0
38.9%
3.0
1.0
0.0
4.0
31.0
0.34
0.42
27.9
0.0
27.9
C
56
110

104
4
0.92
0%
0

34.0
35.0
38.9%
3.0
1.0
0.0
4.0
31.0
0.34
0.88
47.7
0.0
47.7
D
43.1
D
216
#392
Synchro 8 Report
Page 1

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
100
345
0
0
0
0.16

EBT
585
705
0
0
0
0.90

EBR

WBL
100
262
0
0
0
0.15

1/14/2016

WBT
764

WBR

691
0
0
0
0.62

NBL
25
151
0
0
0
0.30

NBT
1152
475
0
0
0
0.34

NBR

SBL
50
307
0
0
0
0.42

SBT
110

SBR

485
0
0
0
0.88

Intersection Summary
Area Type:
Other
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 90
Control Type: Pretimed
Maximum v/c Ratio: 0.90
Intersection Signal Delay: 34.0
Intersection LOS: C
Intersection Capacity Utilization 81.6%
ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:

5: Clarendon Avenue & Montrose Avenue

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected with Improvements


RAC

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

EBR2

WBL2

WBL

WBT

WBR

NBL

NBT

NBR

NBR2

8
1900
10
0
0
25
1.00

58
1900
12

541
1900
10
150
1

82
1900
10

47
1900
10

317
1900
10

15
1900
10
0
0

30
1900
10
0
0

22
1900
10

1.00
0.97
0.850

1.00

1.00

1.00
1.00
0.993

1.00

47
1900
10
0
0
25
1.00

30
1900
10

1.00
1.00

42
1900
10
0
1
25
1.00

1.00

1.00

1503

1702

1460

0
No

1702

0
Yes

1.00
0.96
0.945
0.982
1576
0.982
1519

0
No

1
0.92
0%

1
0.92
0%

0
0

0.994
1574
0.962
1520

0.950
1677
0.710
1253

3
30
379
8.6

30
844
19.2
28
0.92
50%

0.92
2%
0

0
pm+pt
7
4
8.0
8.0
7.8%
3.0
0.0

72
NA
4
43.0
57.0
55.9%
3.0
2.0
0.0
5.0

6
0.92
0%

6
0.92
2%

677
Perm

0.92
0%

0.92
1%

0.92
1%

0
Perm

97
Perm

361
NA
8

8
43.0
49.0
48.0%
3.0
2.0

52.0
0.51
0.91
41.5
0.0
41.5
D

8
43.0
49.0
48.0%
3.0
2.0
0.0
5.0
Lag
Yes
44.0
0.43
0.18
19.0
0.0
19.0
B

386
#634

38
73

4
43.0
57.0
55.9%
3.0
2.0
0.0
5.0

Lead
Yes

Lag
Yes
52.0
0.51
0.09
13.3
0.0
13.3
B
38.8
D
23
47

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected with Improvements


RAC

43.0
49.0
48.0%
3.0
2.0
0.0
5.0
Lag
Yes
44.0
0.43
0.49
23.6
0.0
23.6
C
22.6
C
164
248

30
720
16.4
28
2
0.92
50%
0

48
0.92
2%

0.92
13%

0
Split
2

141
NA
2

21.0
21.0
20.6%
3.0
2.0

21.0
21.0
20.6%
3.0
2.0
0.0
5.0
16.0
0.16
0.57
49.9
0.0
49.9
D
49.9
D
86
150
Synchro 8 Report
Page 1

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

SBL2

SBL

SBT

SBR

9
1900
10

141
1900
10

67
1900
10
25
1

1.00

16
1900
10
0
0
25
1.00

1.00

1.00
0.85
0.850

0.993
1627
0.993
1627

1/14/2016

1322
1127
No

30
377
8.6
0.92
0%

0.92
6%

0.92
9%

0
Split
6

0
Split
6

180
NA
6

24.0
24.0
23.5%
3.0
2.0

24.0
24.0
23.5%
3.0
2.0

24.0
24.0
23.5%
3.0
2.0
0.0
5.0
19.0
0.19
0.59
47.1
0.0
47.1
D
45.5
D
108
181

48
1
0.92
14%
73
Perm
6
24.0
24.0
23.5%
3.0
2.0
0.0
5.0
19.0
0.19
0.35
41.6
0.0
41.6
D
42
86

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected with Improvements


RAC

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
764
776
0
0
0
0.09

EBR
150
744
0
0
0
0.91

EBR2

WBL2

WBL

WBT
299

540
0
0
0
0.18

735
0
0
0
0.49

1/14/2016

WBR

NBL

NBT
640

NBR

NBR2

247
0
0
0
0.57

Intersection Summary
Area Type:
Other
Cycle Length: 102
Actuated Cycle Length: 102
Offset: 3 (3%), Referenced to phase 2:NBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.91
Intersection Signal Delay: 36.2
Intersection LOS: D
Intersection Capacity Utilization 110.1%
ICU Level of Service H
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:

6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected with Improvements


RAC

Synchro 8 Report
Page 3

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

SBL2

SBL

SBT
297
303
0
0
0
0.59

1/14/2016

SBR
25
209
0
0
0
0.35

Intersection Summary

15-253 Montrose/Clarendon 8:00 am 11/18/2015 AM Projected with Improvements


RAC

Synchro 8 Report
Page 4

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

110
1900
10
100
1
25
1.00
0.98

381
1900
10

44
1900
10
0
0

547
1900
10

101
1900
10
0
0

30
1900
10
0
0

83
1900
9
0
0

1.00
0.99
0.977

1.00

1.00
0.97
0.969

1.00

78
1900
9
50
1
25
1.00
0.91

87
1900
9

1.00

37
1900
10
25
1
25
1.00
0.94

117
1900
10

1.00
0.99
0.984

26
1900
10
100
1
25
1.00
0.98

1.00
0.95
0.927

1.00

1542

1507

1362

1314

1542

0
Yes

1507

0
Yes

1362

0
Yes

1314

0
Yes

0.950
1604
0.255
422

0.950
1685
0.421
729

10
30
665
15.1
66
0.98
5%

0.98
1%
0

112
pm+pt
7
4
8.0
10.0
11.1%
3.0
1.0
0.0
4.0
Lag
Yes
56.0
0.62
0.33
10.4
0.0
10.4
B

434
NA
4

20
38

54.0
54.0
60.0%
3.0
1.0
0.0
4.0
Lead
Yes
50.0
0.56
0.50
14.6
0.0
14.6
B
13.7
B
139
219

0.950
1685
0.551
917

17
30
844
19.2
51
4
0.98
2%
0

51
0.98
0%

0.98
2%
0

27
pm+pt
3
8
8.0
10.0
11.1%
3.0
1.0
0.0
4.0
Lag
Yes
56.0
0.62
0.05
5.7
0.0
5.7
A

661
NA
8

5
13

0.950
1624
0.596
929

14
30
1232
28.0
66
8
0.98
3%
0

54.0
54.0
60.0%
3.0
1.0
0.0
4.0
Lead
Yes
50.0
0.56
0.78
23.6
0.0
23.6
C
22.9
C
270
432

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected with Improvements


RAC

36
0.98
0%

0.98
13%
0

38
Perm

150
NA
2

2
26.0
26.0
28.9%
3.0
1.0
0.0
4.0
22.0
0.24
0.17
29.2
0.0
29.2
C
17
44

26.0
26.0
28.9%
3.0
1.0
0.0
4.0
22.0
0.24
0.44
30.7
0.0
30.7
C
30.4
C
65
123

51
30
191
4.3
49
4
0.98
0%
0

49
0.98
0%

0.98
2%
0

80
Perm

174
NA
6

6
26.0
26.0
28.9%
3.0
1.0
0.0
4.0
22.0
0.24
0.35
33.5
0.0
33.5
C
38
81

36
1
0.98
4%
0

26.0
26.0
28.9%
3.0
1.0
0.0
4.0
22.0
0.24
0.48
25.6
0.0
25.6
C
28.1
C
59
123
Synchro 8 Report
Page 1

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
100
341
0
0
0
0.33

EBT
585
861
0
0
0
0.50

EBR

WBL
100
517
0
0
0
0.05

1/14/2016

WBT
764

WBR

844
0
0
0
0.78

NBL
25
224
0
0
0
0.17

NBT
1152
343
0
0
0
0.44

NBR

SBL
50
227
0
0
0
0.35

SBT
111

SBR

359
0
0
0
0.48

Intersection Summary
Area Type:
Other
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 86 (96%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 90
Control Type: Pretimed
Maximum v/c Ratio: 0.78
Intersection Signal Delay: 21.5
Intersection LOS: C
Intersection Capacity Utilization 81.2%
ICU Level of Service D
Analysis Period (min) 15
Splits and Phases:

5: Clarendon Avenue & Montrose Avenue

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected with Improvements


RAC

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

EBR2

WBL2

WBL

WBT

WBR

NBL

NBT

NBR

NBR2

13
1900
10
0
0
25
1.00

85
1900
12

334
1900
10
150
1

54
1900
10

54
1900
10

567
1900
10

10
1900
10
0
0

36
1900
10
0
0

10
1900
10

1.00

1.00

1.00

1.00
1.00
0.997

1.00

43
1900
10
0
0
25
1.00

52
1900
10

1.00
1.00

34
1900
10
0
1
25
1.00

1.00

1.00

1486

1749

1486

0
No

1749

0
Yes

1.00
0.98
0.956
0.985
1534
0.985
1502

0
No

0.850
0
0

0.993
1698
0.895
1529

0.950
1685
0.689
1222

1
30
379
8.6

30
844
19.2
25
0.93
0%

0.93
0%
0

0.93
1%

0.93
4%

0.93
0%

0.93
0%

0.93
1%

0
pm+pt
7
4
8.0
9.0
9.0%
3.0
0.0

105
NA
4

417
Perm

0
Perm

95
Perm

621
NA
8

8
45.0
47.0
47.0%
3.0
2.0

51.0
0.51
0.55
20.2
0.0
20.2
C

8
45.0
47.0
47.0%
3.0
2.0
0.0
5.0
Lag
Yes
42.0
0.42
0.19
19.5
0.0
19.5
B

173
266

37
72

46.0
56.0
56.0%
3.0
2.0
0.0
5.0

4
46.0
56.0
56.0%
3.0
2.0
0.0
5.0

Lead
Yes

Lag
Yes
51.0
0.51
0.13
13.4
0.0
13.4
B
18.8
B
33
62

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected with Improvements


RAC

45.0
47.0
47.0%
3.0
2.0
0.0
5.0
Lag
Yes
42.0
0.42
0.84
38.6
0.0
38.6
D
36.1
D
347
#551

30
720
16.4
25
3
0.93
0%
0

29
0.93
0%

0.93
24%

0.93
0%

0.93
0%

0
Split
2

152
NA
2

21.0
21.0
21.0%
3.0
2.0

21.0
21.0
21.0%
3.0
2.0
0.0
5.0
16.0
0.16
0.62
51.3
0.0
51.3
D
51.3
D
92
#161
Synchro 8 Report
Page 1

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

SBL2

SBL

SBT

SBR

10
1900
10

81
1900
10

70
1900
10
25
1

1.00

8
1900
10
0
0
25
1.00

1.00

1.00
0.90
0.850

0.991
1676
0.991
1676

1/14/2016

1346
1213
No

30
377
8.6
29
0.93
0%

0.93
0%

0.93
6%

0.93
12%

0
Split
6

0
Split
6

107
NA
6

75
Perm

23.0
23.0
23.0%
3.0
2.0

23.0
23.0
23.0%
3.0
2.0

23.0
23.0
23.0%
3.0
2.0
0.0
5.0
18.0
0.18
0.36
39.8
0.0
39.8
D
40.3
D
60
112

6
23.0
23.0
23.0%
3.0
2.0
0.0
5.0
18.0
0.18
0.34
41.0
0.0
41.0
D
42
86

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected with Improvements


RAC

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
764
786
0
0
0
0.13

EBR
150
757
0
0
0
0.55

EBR2

WBL2

WBL

WBT
299

513
0
0
0
0.19

735
0
0
0
0.84

1/14/2016

WBR

NBL

NBT
640

NBR

NBR2

245
0
0
0
0.62

Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 77 (77%), Referenced to phase 2:NBTL, Start of Green
Natural Cycle: 100
Control Type: Pretimed
Maximum v/c Ratio: 0.84
Intersection Signal Delay: 32.3
Intersection LOS: C
Intersection Capacity Utilization 84.9%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:

6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected with Improvements


RAC

Synchro 8 Report
Page 3

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

SBL2

SBL

SBT
297
301
0
0
0
0.36

1/14/2016

SBR
25
218
0
0
0
0.34

Intersection Summary

15-253 Montrose/Clarendon 5:00 pm 11/18/2015 PM Projected with Improvements


RAC

Synchro 8 Report
Page 4

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

95
1900
10
100
1
25
1.00
0.98

459
1900
10

57
1900
10
0
0

357
1900
10

74
1900
10
0
0

32
1900
10
0
0

109
1900
9
0
0

1.00
0.99
0.974

1.00

1.00
0.98
0.958

1.00

106
1900
9
50
1
25
1.00
0.95

96
1900
9

1.00

40
1900
10
25
1
25
1.00
0.96

83
1900
10

1.00
0.99
0.984

30
1900
10
100
1
25
1.00
0.97

1.00
0.96
0.920

1.00

1540

1489

1472

1324

1540

0
Yes

1489

0
Yes

1472

0
Yes

1324

0
Yes

0.950
1685
0.387
672

0.950
1685
0.316
544

10
30
665
15.1
38
0.96
0%

0.96
1%
0

99
pm+pt
7
4
8.0
10.0
11.1%
3.0
1.0
0.0
4.0
Lag
Yes
52.0
0.58
0.22
9.2
0.0
9.2
A

537
NA
4

21
40

50.0
50.0
55.6%
3.0
1.0
0.0
4.0
Lead
Yes
46.0
0.51
0.68
21.5
0.0
21.5
C
19.6
B
213
334

0.950
1604
0.513
834

17
30
844
19.2
64
8
0.96
0%
0

64
0.96
0%

0.96
2%
0

31
pm+pt
3
8
8.0
10.0
11.1%
3.0
1.0
0.0
4.0
Lag
Yes
52.0
0.58
0.08
7.6
0.0
7.6
A

449
NA
8

6
16

50.0
50.0
55.6%
3.0
1.0
0.0
4.0
Lead
Yes
46.0
0.51
0.58
18.5
0.0
18.5
B
17.8
B
162
258

0.950
1624
0.667
1084

22
30
1232
28.0
38
5
0.96
9%
0

32
0.96
5%

0.96
2%
0

42
Perm

119
NA
2

2
30.0
30.0
33.3%
3.0
1.0
0.0
4.0
26.0
0.29
0.17
26.4
0.0
26.4
C
18
45

30.0
30.0
33.3%
3.0
1.0
0.0
4.0
26.0
0.29
0.27
22.0
0.0
22.0
C
23.1
C
42
87

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected with Improvements


RAC

64
30
182
4.1
34
6
0.96
0%
0

34
0.96
0%

0.96
2%
0

110
Perm

214
NA
6

6
30.0
30.0
33.3%
3.0
1.0
0.0
4.0
26.0
0.29
0.35
29.3
0.0
29.3
C
49
97

32
3
0.96
3%
0

30.0
30.0
33.3%
3.0
1.0
0.0
4.0
26.0
0.29
0.50
23.0
0.0
23.0
C
25.2
C
69
138
Synchro 8 Report
Page 1

Lanes, Volumes, Timings


5: Clarendon Avenue & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL
100
455
0
0
0
0.22

EBT
585
792
0
0
0
0.68

EBR

WBL
100
390
0
0
0
0.08

1/14/2016

WBT
764

WBR

769
0
0
0
0.58

NBL
25
240
0
0
0
0.17

NBT
1152
440
0
0
0
0.27

NBR

SBL
50
313
0
0
0
0.35

SBT
102

SBR

428
0
0
0
0.50

Intersection Summary
Area Type:
Other
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 84 (93%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 90
Control Type: Pretimed
Maximum v/c Ratio: 0.68
Intersection Signal Delay: 20.5
Intersection LOS: C
Intersection Capacity Utilization 78.6%
ICU Level of Service D
Analysis Period (min) 15
Splits and Phases:

5: Clarendon Avenue & Montrose Avenue

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected with Improvements


RAC

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

1/14/2016

EBL

EBT

EBR

EBR2

WBL2

WBL

WBT

WBR

NBL

NBT

NBR

NBR2

9
1900
10
0
0
25
1.00

137
1900
12

404
1900
10
150
1

47
1900
10

105
1900
10

375
1900
10

3
1900
10
0
0

33
1900
10
0
0

16
1900
10

1.00
0.97
0.850

1.00

1.00

1.00
1.00
0.999

1.00

37
1900
10
0
0
25
1.00

28
1900
10

1.00
1.00

21
1900
10
0
1
25
1.00

1.00

1.00

1494

1753

1450

0
No

1753

0
Yes

1.00
0.99
0.942
0.984
1557
0.984
1546

0
No

0
0

0.997
1705
0.977
1667

0.950
1671
0.658
1157

30
844
19.2

30
379
8.6

54
0.94
0%

0.94
0%
0

0
pm+pt
7
4
8.0
8.0
8.6%
3.0
0.0

156
NA
4
43.0
48.0
51.6%
3.0
2.0
0.0
5.0

6
0.94
1%

6
0.94
0%

480
Perm

0.94
1%

0.94
0%

0.94
1%

0
Perm

134
Perm

402
NA
8

8
37.0
40.0
43.0%
3.0
2.0

43.0
0.46
0.72
27.5
0.0
27.5
C

8
37.0
40.0
43.0%
3.0
2.0
0.0
5.0
Lag
Yes
35.0
0.38
0.31
22.9
0.0
22.9
C

220
345

55
102

4
43.0
48.0
51.6%
3.0
2.0
0.0
5.0

Lead
Yes

Lag
Yes
43.0
0.46
0.20
15.7
0.0
15.7
B
24.6
C
52
92

30
720
16.4
54
1
0.94
0%

37.0
40.0
43.0%
3.0
2.0
0.0
5.0
Lag
Yes
35.0
0.38
0.61
28.3
0.0
28.3
C
27.0
C
188
286

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected with Improvements


RAC

10
0.94
0%

0.94
19%

0.94
3%

0.94
0%

0
Split
2

121
NA
2

23.0
23.0
24.7%
3.0
2.0

23.0
23.0
24.7%
3.0
2.0
0.0
5.0
18.0
0.19
0.40
37.5
0.0
37.5
D
37.5
D
63
117
Synchro 8 Report
Page 1

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Ped Bike Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

SBL2

SBL

SBT

SBR

9
1900
10

101
1900
10

54
1900
10
25
1

1.00

37
1900
10
0
0
25
1.00

1.00

1.00
0.95
0.850

0.985
1645
0.985
1645

1/14/2016

1370
1306
No

30
377
8.6
10
0.94
0%

0.94
0%

0.94
9%

0.94
10%

0
Split
6

0
Split
6

156
NA
6

57
Perm

22.0
22.0
23.7%
3.0
2.0

22.0
22.0
23.7%
3.0
2.0

22.0
22.0
23.7%
3.0
2.0
0.0
5.0
17.0
0.18
0.52
41.4
0.0
41.4
D
39.8
D
84
148

6
22.0
22.0
23.7%
3.0
2.0
0.0
5.0
17.0
0.18
0.24
35.6
0.0
35.6
D
29
65

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected with Improvements


RAC

Synchro 8 Report
Page 2

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

EBL

EBT
764
771
0
0
0
0.20

EBR
150
670
0
0
0
0.72

EBR2

WBL2

WBL

WBT
299

435
0
0
0
0.31

659
0
0
0
0.61

1/14/2016

WBR

NBL

NBT
640

NBR

NBR2

301
0
0
0
0.40

Intersection Summary
Area Type:
Other
Cycle Length: 93
Actuated Cycle Length: 93
Offset: 81 (87%), Referenced to phase 2:NBTL, Start of Green
Natural Cycle: 90
Control Type: Pretimed
Maximum v/c Ratio: 0.72
Intersection Signal Delay: 28.6
Intersection LOS: C
Intersection Capacity Utilization 81.3%
ICU Level of Service D
Analysis Period (min) 15
Splits and Phases:

6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected with Improvements


RAC

Synchro 8 Report
Page 3

Lanes, Volumes, Timings


6: Marine Drive & Lake Shore Drive Ramp & Montrose Avenue

Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio

SBL2

SBL

SBT
297
300
0
0
0
0.52

1/14/2016

SBR
25
238
0
0
0
0.24

Intersection Summary

15-253 Montrose/Clarendon 12:15 pm 11/18/2015 Saturday Midday Projected with Improvements


RAC

Synchro 8 Report
Page 4

95th Percentile Queue Tables

Montrose and Clarendon


Chicago, Illinois

A-7

95TH PERCENTILE QUEUE LENGTHSEXISTING CONDITIONS

Intersection
Montrose Avenue and North
Broadway
Montrose Avenue and Sheridan
Road
North Broadway and Sheridan
Road
Montrose Avenue and Hazel
Street
Clarendon Avenue and Montrose
Avenue
Montrose Avenue and Marine
Drive/Lake Shore Drive Ramp
Sheridan Road and Wilson
Avenue
Clarendon Avenue and Wilson
Avenue
Clarendon Avenue and Buena
Avenue
Queue length measured in feet.

Operating Conditions by Approach


Eastbound
Westbound
Northbound Southbound
Peak
Hour L
T
R
L
T R L
T R L
T
R
AM 49 406 4
15
27 46
44 118
PM
61 271 8
19
29 55
79 134
SAT 63 315 19
15
23 47
73 161
AM
1
14
9
91
25 1
154
PM
5
30
13 145
16 0
174
SAT
5
38
39 111
12 0
180
AM 89 65
159
60 85
73 88
PM
88 79
353
75 68
71 71
SAT 141 98
340
68 55
66 91
AM
3
65
5 142
42
41
PM
10 95
11 155
31
29
SAT 25 295
12 146
41
40
AM 13 189
20 143
54 117
88 355
PM
23 146
7 131
42 100
34 76
SAT
3
46
18 148
47 71
49 89
AM 37 569
78 240
141
171 81
PM
49 138
73 422
151
110 82
SAT 89 268
100 224
110
139 59
AM 39 170
19 83
23 96
57 206
PM
80 165
8 240
19 124
40 118
SAT 54 178
9 192
17 90
37 139
AM
85
353
87
227
PM
79
187
80
58
SAT
71
146
62
94
AM
73
19
65
103
PM
33
32
69
37
SAT
28
21
48
43

95TH PERCENTILE QUEUE LENGTHSPROJECTED CONDITIONS

Intersection
Montrose Avenue and North
Broadway
Montrose Avenue and Sheridan
Road
North Broadway and Sheridan
Road
Montrose Avenue and Hazel
Street
Clarendon Avenue and
Montrose Avenue
Montrose Avenue and Marine
Drive/Lake Shore Drive Ramp
Sheridan Road and Wilson
Avenue
Clarendon Avenue and Wilson
Avenue
Clarendon Avenue and Buena
Avenue

Operating Conditions by Approach


Eastbound
Westbound
Northbound
Southbound
Peak
Hour L
T
R
L
T R L
T R L
T
R
AM 51 447 5
15
28 47
50 127
PM 65 320 9
21
27 53
98 144
SAT 66 375 20
14
22 46
91 171
AM 1 16
14 109
31 1
163
PM
7 56
16 145
17 0
186
SAT 6 58
53 147
13 1
193
AM
102 68
166
62 92
72 97
PM
101 82
417
76 79
68 81
SAT
156 101
392
69 64
75 92
AM 2 71
4 178
55
42
PM 10 126
14 191
38
29
SAT 24 373
11 179
51
41
AM 23 196
21 166
64 128
132 469
PM 49 142
6 136
44 124
79 124
SAT 11 46
18 188
49 98
108 157
AM
40 663 79 269
144
175 83
PM
59 189 75 575
155
112 86
SAT
93 348 103 209
113
142 63
AM 42 190
20 89
27 103
59 214
PM 89 195
6 220
21 131
42 127
SAT 56 208
28 149
20 95
32 61
AM
88
400
108
244
PM
80
258
106
61
SAT
68
190
88
98
AM
78
20
73
119
PM
35
34
85
45
SAT
29
21
61
54

Queue length measured in feet.

95TH PERCENTILE QUEUE LENGTHSPROJECTED CONDITIONS WITH


IMPROVEMENTS

Intersection
Clarendon Avenue and
Montrose Avenue
Montrose Avenue and Marine
Drive/Lake Shore Drive Ramp
Queue length measured in feet.

Operating Conditions by Approach


Eastbound
Westbound
Northbound
Southbound
Peak
Hour L
T
R
L
T R L
T R L
T
R
AM 29 542
23 277
50 107
110 392
PM 38 219
13 432
44 123
81 123
SAT 40 334
16 258
45 87
97 138
AM
47 634 73 248
150
181 86
PM
62 266 72 551
161
112 86
SAT
92 345 102 286
117
148 65

Proposed Striping/On-Street Parking Modifications

Montrose and Clarendon


Chicago, Illinois

A-8

LOSS OF 9 PARKING SPACES

DE AVE
I
S
UNNY
S

NOT TO SCALE
CLARENDON

DO

EN TER

NO T

AVE

LOSS OF 7 PARKING SPACES


M

E AVE
T
I
AGAT

N
RI
A
R
D

AL
OT
0SFT
0
2
,
2

AL 2
OT
0SFT
0
2
,
AL 2
OT
0SFT
0
2
,
2

DR
SHORE
LAKE

8
T0
UNI
7
T0
UNI
6
T0
UNI
5
T0
UNI
4
T0
UNI
3
T0
UNI
OWNHOUSE
2
T0
UNI
OWNHOUSET
1
T
T0
UNI
OWNHOUSE
T
OWNHOUSE
T
OWNHOUSE
T
AL
OT
OWNHOUSE
0SFT
0
T
2
,
AL 2
OT
OWNHOUSE
0SFT
T
0
2
,
AL 2
OT
OWNHOUSE
0SFT
T
0
2
,
AL 2
OT
0SFT
0
2
,
AL 2
OT
0SFT
0
2
,

WAY
ONE
LOSS OF 5 PARKING SPACES

50'

0'
5

0'
5

11'
18'11'

E AVE
OS
R
MONT

Y
L
N
O

11'16'
13'

Y
L
N
O

15'
11'
15'

Y
L
N
O

0'
5

Y
L
N
O

LOSS OF 9 PARKING SPACES

11'
11'
11'
11'

ALLEY

00'
1

'
5
2
1

0'
5

0'
5

LOSS OF 7 PARKING SPACES

$DATE$

$DATE$
10-01-15

SCALE:

9575 West Higgins Road, Suite 400


Rosemont, Illinois 60018
P: (847) 518-9990 F: (847) 518-9987
Kenig,Lindgren,O'Hara,Aboona,Inc.

DATE

DATE MODIFIED -

$DATE$
LRA

CHECKED

DRAWN

MD

LOSS OF 9 PARKING SPACES

PROJECT # 15-253

1" = 100' 11x17

DRAWN

MD

CHECKED

LRA

DATE

01-14-2016

MONTROSE AND CLARENDON


MIXED-USE DEVELOPMENT
CHICAGO, ILLINOIS

EXHIBIT NO.

PROPOSED STRIPING PLAN


D

Vous aimerez peut-être aussi