Observe proper sequencing of works: installation of cornice must be done after completion of
installation of drywalls.
2.
Use long elbow for electrical lines and prevent workers from burning PVC conduit pipes.
3.
4.
5.
6.
7.
8.
Replacement of Multi color door to QDE White paint for CHV SA 37.5 LIV and SA43.25 LIV
9.
Masonry Putty for Interior walls and Acrytex Cast for Exterior wall
Starts: CHP = Batch 68; CHV = Batch 47; CRP = Batch 34; VSL = Batch 22