Project/Contract Information
Design Engineering works & Interfacing Sealing End (Near Diamond X-ing - Ras Al Khor OHL)
Complete Design engineering, project engineering & Supervision of ERS BP At JAFZA for 400 kV
OHL (Phase I) using rutter poles and ERS Modular structures
Project Coordination with Utilities and Authorities on behalf of Main contractors top management
Design Engineering and supervision of by passing 400kV OHL at JAFZA (PHASE II) Using ERS
Modular structures
OHL Hot
Material Project
Project
Engineering
FEED Supervision
/ UG Line
Supply Staffing
Management
x
x
x
x
x
x
8
9
10
11
Design Engineering, Project engineeering and supervision of 400kV OHL by pass using ERS
modular structures viz existing LINDSEY inventory of DEWA's
12
Design Engineering for conversion of existing angle tower to terminal condition including
foundation, anchor design,method statement and other documentation
13
14
Structural Engineering and Installlation of Substation structures and gantries at 'L' station
15
Understringing and Interfacing critical Overhead Line to New Substation for commissioning in
short time period
16
Stringing and commissioning activities for approx 60kms 220kV D/C OHL
2008
2008
EEE/Centaur, Dubai
United Arab
Emirates
2008
2008
United Arab
Emirates
2008
2008
United Arab
Emirates
2008
2008
United Arab
Emirates
2008
2008
DEWA
TRANSCO Abu
Remcon Electrical Co. (L.L.C.)
Dhabi
2008
2008
DEWA
United Arab
Emirates
2008
2008
DEWA
United Arab
Emirates
2008
2008
TRANSCO
United Arab
Emirates
2008
2008
Zamil Steel
United Arab
Emirates
2008
2009
United Arab
Emirates
2008
2009
United Arab
Emirates
2008
2009
FEWA
United Arab
Emirates
2009
2009
DEWA
United Arab
Emirates
2009
2009
DEWA
United Arab
Emirates
2009
2009
United Arab
Emirates
2009
2009
Republic of Yemen
2009
2009
United Arab
Emirates
2009
2009
United Arab
Emirates
2009
2010
United Arab
Emirates
2010
2010
United Arab
Emirates
2010
2010
United Arab
Emirates
2010
2010
United Arab
Emirates
2010
2010
RTA
TRANSCO
x
x
x
Scrapping previous FEED and redeveloping a detailed version with updated standards
TRANSCO Abu
Kalpataru, Abu Dhabi
Dhabi
Total E & P
Design & drawing work for OHL Transformer Termination Gantry Structure to facilitate direct
termination to the Transformer at well heads
18
CONTRACT No: P041/E/01 Ruwais By Pass Road: 400kV & Complete - Engineering & Supervision Services for ERS By Pass system to facilitate 400kV &
220kV Overhead Lines modifications, relocations &
220KV lines modification for a critical road project of national importance including extensive
diversions
procurement assistance
19
DEWA
20
TRANSCO
CE/496A/2007 - UES Horse race S/s 400kV Grid Substation Gantries Erection and Equipment mounting at Horse Race 400kV S/S
22
23
Modification & relocation works for OHL in new Ruwais By Pass - Installation and Dismantling
ERS BP System
United Arab
Emirates
Complete Pre Tender Design Engineering,Vetting Survey and feed performed by previous
consultant
21
Finish
Start
DEWA
Year
Country
United Arab
Emirates
DEWA
x
x
Complete end to end engineering for awarded main contractor including developing Plan and
profiles, schedules, detailed structural and GA drawings, compiling final MTO'S/BOM, assistance
in procurement etc
Experience list
Customer/Main Contractor
ETA /Power Magic Electrical works
(L.L.C.), Dubai
DEWA
17
Client
Dept. of
Transport Abu KEC International Limited, Abu Dhabi
Dhabi
DEWA
Dept. of
TRANSCO Abu KEC International Limited, Abu Dhabi
Dhabi
Generating ground profiles drawing based on survey data provided by IA,furnishing profiles
structure schedule, stringing, 3D Views, leg extension design, Volume calculation under various
orders
Processing LIDAR survey data & compile extract from PLS - CADD
Design & detailing critical crossings and OHL 220kV/132kV Junction arrangement.
FEWA
Page 1 of 2
Experience list
Project/Contract Information
OHL Hot
Project
Material Project
Engineering
FEED Supervision
/ UG Line
Management
Supply Staffing
Complete Design Engineering & Optimisation of 33kV OHL between Al Hamra & Al Ghail Power
Plant Tower
Supervision
Client
Customer/Main Contractor
Year
Country
Start
Finish
x
RAKIA
United Arab
Emirates
2010
2012
DEWA
United Arab
Emirates
2010
2010
Theoretical calculation (Zero Sequence Impedence calculation) for L Station and G station
DEWA
United Arab
Emirates
2011
2011
Detailed Engineering Services for 33kV OHL Network Wood Poles and three circuit lattice
towers,Including plan and profile stringing chart,staking chart, special wood pole structures,
spliced pole structures etc.
Total E & P
Republic of Yemen
2011
2011
28
Theoretical Calculation (Zero Sequence Impedence calculation) for 400kV Ckts lines H Mushriff G Mushriff
DEWA
United Arab
Emirates
2011
2011
29
Expert Supervision, Provision of Core Construction Crew and required equipments such as
Tension Stringing Equipment to facilitate construction for Total Route Length : Approx- 55 kms
Total E & P
Republic of Yemen
2012
2013
30
ETIHAD RAIL
United Arab
Emirates
2013
2014
31
ETIHAD RAIL
United Arab
Emirates
2013
2014
32
United Arab
Emirates
2013
2013
Nigeria
2013
2013
Uganda, Africa
2013
2013
United Arab
Emirates
2013
2013
24
25
Verification of strength of 132kV DC Gantry at Hatta for additional loading and change in loading
26
27
x
x
DEWA
TCNNG
IPDC, Nigeria
UETCL
SEPC, India
DEWA
33
Foundation Design Engineering for various types of 220kV Towers in different types of soil in hilly
terrain
34
Arranging Strategical business Alliance and preparartion of complete bid including Survey &
Estimation for prominent EPC to Bid turnkey world bank funded project
35
GCCIA
Cegelec, KSA
KSA
2014
2014
Impart basic field training to a crew of 20 composed of linemen and Engineers to understand,
erect and dismantle various type of ERS structures
GCCIA
Cegelec, KSA
KSA
2014
2014
Musanada
United Arab
Emirates
2014
On going
United Arab
Emirates
2014
On going
United Arab
Emirates
2014
2014
FEWA
United Arab
Emirates
2014
On going
DEWA
United Arab
Emirates
2015
On going
FEWA
United Arab
Emirates
2015
2016 Jan
ADCO
2015
On going
DEWA
2015
2015
36
Complete ERS, OHL & Project Engineering & project management Support to OHL contractor
and render expert supervision by ERS manufacturer's representatives.
37
Recovery Engineering and fast Tracking approvals from project consultant including Design of
Terminal Tower, re-doing Line profiles, foundation design,Insulation co-ordination & earthing
study and take over entire engineering for expediting
38
Verification of client's ERS Lot and application Engineering for ERS all crossings including expert
guidance and supervision
39
Recovery Engineering and fast Tracking approvals from project consultant, Design of Terminal
Tower & verfying Line profiles, perform Insulation co-ordination & earthing study and take over
entire engineering for expediting
40
41
Engaged on special basis to optimize overall execution methodology - OHL portion, guide and
closely supervise new construction team, Identify and re-submit Engineering submitals.
42
43
Source / Provide Entire crew of all categories to perform the job and assist in sourcing apt
equipments for the job
Theoretical Calculations (Zero Sequence Impedence,positive Sequence Impedence &
Capacitance) of Circuits Technology - CAR X & Dubai land
FEWA
Musanada
x
x
United Arab
Emirates
United Arab
Emirates
Page 2 of 2