Vous êtes sur la page 1sur 3

SIEMENS

Inspection Schedule

Inspection And Test Plan (ITP)

MY1008 - Pengerang

Date of Inspection

Date of

No.

KKS

01-01

11MB

Component/System
Gas Turbine (MB800967)

Inspection Activities
Overspeed and high speed balancing

No.

Issue

Inspection Call (IC)


No.

Send to Owner

to be provided

Planned (CW)

Actual

2015-22

27th - 29th May

Final Balancing Run

MB-003

3rd June 2015

01-02

11MB

Gas Turbine (MB800967)

Rotor Placement

to be provided

2015-32

01-03

11MB

Gas Turbine (MB800967)

Verification of the final rotor alignment


to be provided

2015-34

01-04

11MB

Gas Turbine (MB800967)

Quality Release Note (QRN)

Supplier

Owner
Send to Owner

participation

Test result

SAG-PCP-1176

yes

passed

2015-05-12

PCP-PMT-SAG-LTR-

No.

Date of Issue

Location

Remarks

Siemens /Berlin

(Germany)

0558

Siemens /Berlin

(Germany)

yes

Siemens /Berlin

on closed gas turbine

Packing/ Shipment from factory

(Germany)

to be provided

2015-35

Siemens /Berlin

(Germany)

01-05
01-06
01-07

12MB
12MB
12MB

Gas Turbine (MB000078)


Gas Turbine (MB000078)
Gas Turbine (MB000078)

01-08

12MB

Gas Turbine (MB000078)

01-09

12MB

Gas Turbine (MB000078)

Overspeed and high speed balancing


Final Balancing Run
Rotor Placement
Verification of the final rotor alignment

to be provided
to be provided

01-10
01-11
01-12
01-13

21MB
21MB
21MB
21MB

Gas Turbine (MB000122)


Gas Turbine (MB000122)
Gas Turbine (MB000122)
Gas Turbine (MB000122)

Overspeed and high speed balancing


Final Balancing Run
Rotor Placement
Verification of the final rotor alignment

to be provided

01-15

01-16

01-17

01-18

21MB

22MB

22MB

22MB

22MB

Gas Turbine (MB000122)

Gas Turbine (MB000115)

Gas Turbine (MB000115)

Gas Turbine (MB000115)

Gas Turbine (MB000115)

Packing/ Shipment from factory

Overspeed and high speed balancing

Final Balancing Run

Rotor Placement

Verification of the final rotor alignment

to be provided

22MB

02-01

MA

Gas Turbine (MB000115)

HP Steam Turbine (A-000670-H)

Packing/ Shipment from factory

Over speed test - turbine rotor

MA

HP Steam Turbine (A-000670-H)

to be provided

Siemens /Berlin

MY1008-31MA-&MBD120-310066

Clearance check - Axial clearances of

MY1008-31MA-&MBD120-310066

(495183943)

MY1008-32MA-&MBD120-313132

blades and Axial shaft seal

(495185558)

Over speed test - turbine rotor

MY1008-32MA-&MBD120-313133

MY1008-32MA-&MBD120-313132

02-06

MA

Alignment check - Run out check

MY1008-32MA-&MBD120-313133

during manufacturing

(495185565)

03-01

11MK

Generator (MK008210)

Balancing and overspeed test

PCP-SAG-QAC-ITP-MK-360091

03-02

11MK

Generator (MK008210)

Final Electrical Test

PCP-SAG-QAC-ITP-MK-360091

Balancing and overspeed test

2014-11-25

21MK

Generator (MK008212)

Final Electrical Test

2014-11-25

22MK

Generator (MK008213)

Balancing and overspeed test

PCP-SAG-QAC-ITP-MK-360092

PCP-SAG-QAC-ITP-MK-360092

PCP-SAG-QAC-ITP-MK-360088

PCP-SAG-QAC-ITP-MK-360088

PCP-SAG-QAC-ITB-MK-360089

22MK

Generator (MK008213)

Final Electrical Test

PCP-SAG-QAC-ITB-MK-360089

31MK

Generator (MK000159)

Balancing and overspeed test

03-10

31MK

Generator (MK000159)

Electrical Test

MY1008-31MKA-&AQA010-320010

DTL-SAG-PCP-TECH-0103

DTL-SAG-PCP-TECH-0103

03-11

31MK

Generator (MK000159)

Final Test

(Germany)

03-12

32MK

Generator (MK008214)

Balancing and overspeed test

PCP-SAG-QAC-ITP-MK-360090

03-13

32MK

Generator (MK008214)

Final Electrical Test

PCP-SAG-QAC-ITP-MK-360090

04-0

HA

PCP-SAG-QAC-ITP-MK-360090

2014-11-25

Siemens / Mlheim

(Germany)

Siemens / Mlheim

2016-09

(Germany)

Siemens / Mlheim

2015-50

(Germany)

2016-03

Siemens / Mlheim

DTL-SAG-PCP-TECH-0103

(Germany)

Siemens / Mlheim

2015-50

2014-12-05

2014-11-25

DTL-SAG-PCP-TECH-0103

2015-02-23

DTL-SAG-PCP-TECH-0433

2015-02-23

DTL-SAG-PCP-TECH-0433

(Germany)

Siemens / Mlheim

2016-02

2014-12-05

(Germany)

2015-21

2015-05-19/20

MK-003

2015-30

2016-07-27

MK-006_final

2015-04-20

2015-02-23

DTL-SAG-PCP-TECH-0433

DTL-SAG-PCP-TECH-0433

yes

passed

SAG-PCP-15876

2015-25

2015-06-16/17

MK-004_final

SAG-PCP-1324

2015-06-01

Siemens / Mlheim

(Germany)

yes

passed

PCP-PB-EPCC-L-2015-

Siemens / Mlheim

2015-04-20

2015-02-23

DTL-SAG-PCP-TECH-0433

(Germany)

Siemens / Mlheim

2015-40

2015-04-20

2015-02-23

DTL-SAG-PCP-TECH-0433

(Germany)

2015-44

Siemens / Mlheim

2015-04-20

2015-02-23

DTL-SAG-PCP-TECH-0433

(Germany)

Siemens / Mlheim

2016-16

2015-04-20

2015-02-23

DTL-SAG-PCP-TECH-0433

(Germany)

Siemens / Mlheim

2016-26

2015-04-20

2015-04-27

DTL-SAG-PCP-TECH-0466

2015-04-27

DTL-SAG-PCP-TECH-0466

2015-02-23

DTL-SAG-PCP-TECH-0433

2015-02-23

DTL-SAG-PCP-TECH-0433

2015-02-23

DTL-SAG-PCP-TECH-0433

(Germany)

2015-19

2015-05-08

MK-001

SAG-PCP-0908

2015-20

2015-05-11

MK-002

SAG-PCP-0909

2015-04-16

PCP-PB-EPCC-L-2015-

2015-25

2015-06-15

MK-005

SAG-PCP-1318

yes

2015-04-28

2015-04-16

2015-04-28

2015-04-20

(495819439)

2015-05-29

yes

passed

Siemens / Erfurt

passed

Siemens / Erfurt

passed

Siemens / Erfurt

PCP-PB-EPCC-L-2015-

(Germany)

0493

yes

(Germany)

0493

(Germany)

2015-42

Siemens / Erfurt

2016-02

Siemens / Mlheim

2015-04-20

2015-04-20

Siemens / Mlheim

(Germany)

0534

yes

2015-34

Siemens / Mlheim

(Germany)

no

2015-07-10

2015-04-20

2015-02-23

SAG-PCP-1120
2015-05-05

2015-04-20

(495819439)

(495819439)

2016-04

2014-12-05

(496515392)

Heat Recovery Steam Generator

2016-32

2014-12-05

(496515392)

MY1008-31MKA-&AQA010-320010

DTL-SAG-PCP-TECH-0093

2014-11-25

(495819422)

03-09

DTL-SAG-PCP-TECH-0093

2014-11-25

(495819422)

03-08

(Germany)

2014-12-02

(495558727)

03-07

2016-30

2014-12-02

(495558727)

03-06

(Germany)

Siemens /Berlin

(495819552)

Generator (MK008212)

2016-27

Siemens /Berlin

(495819552)

21MK

(Germany)

Siemens /Berlin

(495819446)

03-05

2016-21

Siemens /Berlin

(495819446)

Final Electrical Test

(Germany)

Siemens /Berlin

(495185565)

Generator (MK008211)

2016-20

Siemens /Berlin

(495185558)

12MK

(Germany)

to be provided

Clearance check - Axial clearances of

03-04

2016-27

to be provided

blades and Axial shaft seal

Balancing and overspeed test

(Germany)

to be provided

Over speed test - turbine rotor

Generator (MK008211)

2016-25

to be provided

IP Steam Turbine (A-000660-I)

12MK

(Germany)

to be provided

IP Steam Turbine (A-000660-I)

03-03

Siemens /Berlin

2016-24

to be provided

MA

LP Steam Turbine (A-000660-L)

Siemens /Berlin

(Germany)

to be provided

MA

LP Steam Turbine (A-000660-L)

Siemens /Berlin

(Germany)

2016-23

to be provided

02-04

MA

Siemens /Berlin

(Germany)

2016-22

to be provided

02-03

02-05

Siemens /Berlin

(Germany)

2016-24

(495183943)
02-02

Siemens /Berlin

(Germany)

2016-22

to be provided

on closed gas turbine


01-19

Siemens /Berlin

(Germany)

2016-18

on closed gas turbine


01-14

(Germany)

2015-50

on closed gas turbine

Packing/ Shipment from factory

Siemens /Berlin

2015-49

(Germany)

(Germany)

Siemens / Vienna

Please note, IC HRSG004/-005 and -006

Revision: 10

Version: 0

Issued:

2015-07-22

Page 1 of 3

SIEMENS

Inspection Schedule

Inspection And Test Plan (ITP)

MY1008 - Pengerang

Date of Inspection

Date of
No.

KKS

04-01

HA

Component/System
HP- ,LP-Drums, Flashtank

Inspection Activities
Pre-Manufacturing Meeting

No.

MY1008-HAD-&MDC080-201206

Send to Owner

Planned (CW)

2015-02-04

DTL-SAG-PCP-TECH-0279

2015-20

(494804580)

HA

04-02

HP- ,LP-Drums, Flashtank

Final Inspection including review of

MY1008-HAD-&MDC080-201206

heat treatment report

(494804580)

04-03

HA

Finned Tubes / Header /Harps

Pre-Manufacturing Meeting incl. mock-

MY1008-HA-&MDC080-201202/-203/-204

up test CS tube finning

(494804597/494804610/494804603)

04-04

HA

Finned Tubes / Header /Harps

In-process inspection covering welding, MY1008-HA-&MDC080-201202/-203/-204

heat treatment and

2015-05-12/13

DTL-SAG-PCP-TECH-0279

2015-02-04

DTL-SAG-PCP-TECH-0279

2015-02-04

DTL-SAG-PCP-TECH-0279

2015-17

04-06

HA

(ASME B31.1)

(494804627)

Piping BP (Sect. 1), BEP & NBEP


In-process inspection covering welding MY1008-H-&MDC080-201205

(ASME B31.1)

and heat treatment of

SAG-PCP-1049

yes

--

GS Entec / Korea

2015-04-28

PCP-PB-EPCC-L-2015-

--

GS Entec / Korea

No.

Date of Issue

Location

Remarks

0486 / 0493

GS Entec / Korea

2015-02-27

2015-02-04

DTL-SAG-PCP-TECH-0279

2015-30

HRSG-003

SAG-PCP-0949

2015-04-08

PCP-PB-EPCC-L-2015-

3 week look

HRSG-008

SAG-PCP-1378

yes, dates tbc

ahead, weekly

HRSG-009

SAG-PCP-1399

transmittal

HRSG-010

SAG-PCP-1492

2015-07-29/30

HRSG-007-1

2015-02-04

0486

GS Entec / Korea

SAG-PCP-1560

SAG-PCP-1545

Sung Gwang Co

yes

PCP-PB-EPCC-L-2015-

2015-02-27

(494804627)

yes

2015-04-23

HRSG-011

MY1008-H-&MDC080-201205

Test result

2015-45

2015-02-27

(494804597/494804610/494804603)

Piping BP (Sect. 1), BEP & NBEP


Pre-Manufacturing Meeting

Supplier

participation

2015-02-27

inspection

HA

HRSG-002-1

Quality Release Note (QRN)

Owner
Send to Owner

Actual

2015-02-27

2015-02-04

pressure test and Pre-shipment

04-05

Inspection Call (IC)


No.

Issue

Korea

0560

Sung Gwang Co

3 week look

DTL-SAG-PCP-TECH-0279

2015-02-27

ahead, weekly

P91, and traceability (in general) and

Korea

transmittal

Final Inspection on P91 main line

spools

HA

04-07

Non pressure parts

Pre-Manufacturing Meeting (optional)

MY1008-H-&MDC080-201208

2015-02-25

(494804641)

HA

04-08

Non pressure parts

In-process inspection covering welding, MY1008-H-&MDC080-201208

surface preparation

(494804641)

DTL-SAG-PCP-TECH-0279

2015-24

Safety valves

Final inspection incl. functional test

HRSG-001-1

2015-02-25

SAG-PCP-1268

2015-05-22

DTL-SAG-PCP-TECH-0279

3 week look

2015-02-27

ahead, weekly

and coating

HA

04-09

2015-06-12/13

2015-02-27

no

--

Saigon Shipyard

PCP-PB-EPCC-L-20150531

Saigon Shipyard

transmittal

to be provided as per MDL

Schwietzke (Bopp /

11/12/21/22LBA10AA191/192,

Reuther) / Germany

11/12/21/22HAD10AA191/192;

11/12/21/22LBA80AA191/192;
11/12/21/22HAD80AA191/192,

11/12/21/22LBG20AA191,
11/12/21/22HAA10AA 191

04-10

HA

On/off valves

Final inspection for HP-Iive steam stop

11/12/21/22LBA10AA001,

valves

to be provided as per MDL

HP Valves /
Netherlands, Korea

Final inspection for HP-feedwater valve to be provided as per MDL

Flow Serve / Austria

11/12/21/22LBA10AA002

04-11

HA

Control valves

11/12/21/22LAB30AA 101

Sempell/ Germany

11/12/21/22LAB30AA102

Seiko/ Austria

11/12/21/22HAC10AA102

11/12/21/22EKT15AA101

11/12/21/22LAE11AA101

11/12/21/22LAB95AA101

11/12/21/22LAB90AA101

05-0

xx

Piping (grade P91)

as per ITP

05-0

xx

Metallic Piping (CS, SS)

as per ITP

05-01

PAB

to be provided as per MDL

to be provided as per MDL

Fibreglass Reinforced Plastic (FRP) Mechanical Test

MY1008-30PAB20-&CBD120-433775

MCW Pipe

MY1008-30PAB20-&CBD120-433776

to

MY1008-30PAB20-&CBD120-433777

2014-12-10

2014-11-14 DTL-SAG-PCP-TECH-0069

2014-50

2014-12-09

PAB-001-1

SAG-PCP-0334

yes

2014-11-27

(as part of IC

passed

RPC / Indonesia

yes

passed

RPC / Indonesia

no

passed

RPC / Indonesia

yes

passed

RPC / Indonesia

PAB-002)

MY1008-30PAB20-&CBD120-433778

MY1008-30PAB20-&CBD120-433779

PAB

05-02

Main Cooling Water Pipe

Hydro-Test on Spool 30PAB20-27

MY1008-30PAB20-&CBD120-433775

2014-11-14 DTL-SAG-PCP-TECH-0069

2015-03

2015-01-16

MY1008-30PAB20-&CBD120-433776

to

MY1008-30PAB20-&CBD120-433777

2015-01-17

PAB-002

SAG-PCP-0417

2014-12-19

MY1008-30PAB20-&CBD120-433778

MY1008-30PAB20-&CBD120-433779

PAB

05-03

2014-11-14 DTL-SAG-PCP-TECH-0069

Fibreglass Reinforced Plastic (FRP) Final Inspections (pipe dimensions)

MY1008-30PAB20-&CBD120-433775

MCW Pipe

MY1008-30PAB20-&CBD120-433776

to

MY1008-30PAB20-&CBD120-433777

2015-03

2015-03-09

2015-03-10

PAB-003

SAG-PCP-0655

2015-02-13

MY1008-30PAB20-&CBD120-433778

MY1008-30PAB20-&CBD120-433779

PAB

05-04

Fibreglass Reinforced Plastic (FRP) Incoming inspection on site

MY1008-30PAB20-&CBD120-433775

MCW Pipe

MY1008-30PAB20-&CBD120-433776

2014-11-14 DTL-SAG-PCP-TECH-0069

2015-24

2015-06-12

--

SMSB-PCP-0097

2015-06-11

MY1008-30PAB20-&CBD120-433777

MY1008-30PAB20-&CBD120-433778

MY1008-30PAB20-&CBD120-433779

06-0

BAT

Generator Transformer

FAT as per ITP

to be provided as per MDL

07-0

BBT

Auxiliary Transformer

FAT as per ITP

to be provided as per MDL

08-0

Axx

Air Insulated Switchyard

FAT as per ITP

to be provided as per MDL

09-0

XKA

Diesel Generator Set

FAT as per ITP

to be provided as per MDL

10-0

BAC

Generator Circuit Breaker

FAT as per ITP

to be provided as per MDL

11-0

MV Switchgear

FAT as per ITP

to be provided as per MDL

12-0

LV, DC Switchgear

FAT as per ITP

to be provided as per MDL

Isolated Phase Bus Duct

FAT as per ITP

to be provided as per MDL

13-0

BAA

Siemens EM TS (MY)

Revision: 10

Version: 0

Issued:

2015-07-22

Page 2 of 3

SIEMENS

Inspection Schedule

Inspection And Test Plan (ITP)

MY1008 - Pengerang

Date of Inspection

Date of

No.

KKS

Component/System

Inspection Activities

14-0

UPS (Inverter)

15-0

DCS (Pre-Commissioning Test)

FAT as per ITP

Issue

No.

Inspection Call (IC)


No.

Send to Owner

Planned (CW)

Actual

Quality Release Note (QRN)

Supplier

Owner
Send to Owner

participation

Test result

SAG-PCP-1474

yes

passed

No.

Date of Issue

Location

Remarks

to be provided as per MDL

as per EPCC Contract, TCCM #1, item to be provided as per MDL

6.50

16-03

UMx

Steel structures

Final inspection of material before

16-01

UMx

Steel structures (UMx)

Final inspection of material before

PCP-SAG-QAC-ITP-U-660001

2015-04-13 DTL-SAG-PCP-TECH-0412

2015-34

PCP-SAG-QAC-ITP-U-660001

2015-04-13 DTL-SAG-PCP-TECH-0412

2015-27

(11UMB Main+Crane

packing Lot 1a

PCP-SAG-QAC-ITP-U-660001

2015-04-13 DTL-SAG-PCP-TECH-0412

2015-32

PCP-SAG-QAC-ITP-U-660001

2015-04-13 DTL-SAG-PCP-TECH-0412

2015-37

PCP-SAG-QAC-ITP-U-660001

2015-04-13 DTL-SAG-PCP-TECH-0412

2015-39

FAT (one customer witness point per

PCP-SAG-QAC-ITP-460194

2015-06-22

type)

(UNID 496590757)

FAT (one customer witness point per

PCP-SAG-QAC-ITP-460294

type)

(UNID 496590771)

FAT (one customer witness point per

PCP-SAG-QAC-ITP-460494

type)

(UNID 495853716)

PCP-SAG-QAC-ITP-460394

packing Lot 2

16-02

UMx

Cl ddi
W lk structures
Steel

) Final inspection of material before

16-04

UMx

Steel structures

Final inspection of material before

16-05

UMx

Steel structures

Final inspection of material before

2015-07-02

11UMB-001

Bao Steel

Construction Co. Ltd.


Bao Steel

packing Lot 1b

Construction Co. Ltd.

packing Lot 3

packing Lot 4

LAC

17-0
18-0

LCB
PAC

19-0

Feedwater Pumps
Condensate Extraction Pumps
Cooling Water Pumps

20-0

LDH

Deaerator Pump

FAT (one customer witness point per


type)

496830945

21-0

LDL

Condensate Transfer Pump

FAT (one customer witness point per

PCP-SAG-QAC-ITP-460694

type)

(UNID 496590788)

as per ITP

PCP-SAG-QAC-ITP-454504

LDH

22-0

Condensate Deaerator Tank

SMM01

24-0

PAD

Cooling Tower (mechanical parts)

24-01

PAD

FAN

Main Cranes (UMA/UMB)

as per ITP

2015-47

Sulzer Germany

2016-01

Sulzer Germany

2015-40

Flowserve Pump

2015-07-07

2015-03-26 DTL-SAG-PCP-TECH-0445

2015-04-22

2015-06-19

DTL-SAG-PCP-TECH-0723

2015-07-07

Division, Spain

2015-07-03 DTL-SAG-PCP-TECH-0736
2015-07-03

DTL-SAG-PCP-TECH-0723

Apollo

2015-06-24

DTL-SAG-PCP-TECH-0783

Stork

2015-07-16

to be provided as per MDL

Demag

SPIG Italy

Galvanisation inspection: wall thickness PCP-SAG-ENG-SPN-PAD-430159

2015-03-04

DTL-SAG-PCP-TECH-0308

2015-32

2015-03-05

PAD

24-02

ACTUATED VALVE

Sulzer Germany

2016-01

2015-07-07

(UNID 496829291)

23-0

DTL-SAG-PCP-TECH-0723

Pressure Test / FAT

PCP-SAG-ENG-SPN-PAD-430159

2015-03-04

DTL-SAG-PCP-TECH-0308

2015-08-10

PAD-005

2015-09-09

PAD-006

SPIG Italy

SAG-PCP-1594

(Axial Fan - Italy)

SPIG Italy

2015-32

2015-03-05

PAD

24-03

FRP Profile

Kick-Off Meeting

PCP-SAG-ENG-SPN-PAD-430159

2015-03-04

DTL-SAG-PCP-TECH-0308

(KSB - France)

2015-30

2015-07-22

PAD-001

SAG-PCP-1506

2015-03-05

24-04

PAD

FRP Profile

Final Inspection Lot 1

PCP-SAG-ENG-SPN-PAD-430159

2015-03-04

DTL-SAG-PCP-TECH-0308

PCP-PB-EPCC2015-32

2015-08-05

PAD-002

SAG-PCP-1506

2015-03-05

24-05

PAD

FRP Profile

Final Inspection Lot 2

PCP-SAG-ENG-SPN-PAD-430159

2015-03-04

DTL-SAG-PCP-TECH-0308

yes

2015-37

2015-09-10

PAD-003

SAG-PCP-1506

Malaysia)

yes

SPIG Italy

PAD

Fan stack

Mechanical Test Certificate

PCP-SAG-ENG-SPN-PAD-430159

2015-03-04

DTL-SAG-PCP-TECH-0308

24-07

PAD

Casing Panel

Final Inspection

PCP-SAG-ENG-SPN-PAD-430159

2015-03-04

DTL-SAG-PCP-TECH-0308

Malaysia)

yes

SPIG Italy

PCP-PB-EPCC-

IC
ITP
QRN
tbdl

Fuel Gas Supply System

as per ITP

Malaysia)

(tbd)

2015-32

2015-08-07

PAD-004-1

SAG-PCP-1597

2015-03-05

EK

(HEXAGON SPIG Italy

2015-31

2015-03-05

25-0

(HEXAGON -

L-2015-0565

L-2015-0565

24-06

(HEXAGON -

L-2015-0565

PCP-PB-EPCC-

2015-03-05

SPIG Italy

SPIG Italy

(FIBROSAN - Turkey)

to be provided as per MDL

= Inspection Call

The preliminary version of Inspection Schedule serves for information only and will be transferred into a working document.

= Inspection and Test Plan

The working document shall be continuously updated to include all necessary information for enabling clients Inspection Agency a planning of resources of inspection activities.

= Quality Release Note

The working document will be revised on a 4 week basis during the manufacturing period.

= to be defined later

= Planned dates are tentative and subject to change

= Planned dates shown as MM/YYYY - MM/YYYY include design and manufacturing activities as per current time schedule. A detailed inspection forecast is only possible after sub-contracting. The Inspection Schedule will be updated accordingly.

= This inspection shall be only performed at the first time.

Revision: 10

Version: 0

Issued:

2015-07-22

Page 3 of 3

Vous aimerez peut-être aussi