Project Title:
Subcontractor:
Drawing/Document Title
PR2015-23-019
Reference No.
Page 1 of 4
Apprd
Rev. B
Project Name : Facility D Umm Al Houl Power Project Location of Vendor : Dubai Industrial City, Dubai, UAE
S=Surveillance
R =Review of Documentation
CHARACTERISTICS
TO BE VERIFIED
ACCEPTANCE
CRITERIA
VERIFYING
DOCUMENT
Packing List
Delivery Order
Approved visual
Procedure
Packing List
Packing list
Delivery Order
Approved drawings
No.
QUALITY RELEATED
ACTIVITY
3.0
Assent
Samsung C&T
Owner
N/A
N/A
N/A
N/A
STEEL ERECTION
Erection Method
statement,
Method Statement
Survey report
N/A
N/A
Method Statement
Method Statement
Method statement
N/A
N/A
Method Statement
Method Statement
Method Statement
N/A
N/A
Method Statement
Inspection Report
Inspection Report
N/A
N/A
Method Statement
N/A
N/A
3.1
(Page No. 2 of 3)
Rev. B
Project Name : Facility D Umm Al Houl Power Project Location of Vendor : Dubai Industrial City, Dubai, UAE
S=Surveillance
R =Review of Documentation
QUALITY RELEATED
ACTIVITY
3.7
3.9
CHARACTERISTICS
TO BE VERIFIED
ACCEPTANCE
CRITERIA
VERIFYING
DOCUMENT
Sub-Vendor
Assent
Approved Drawing
Inspection Report
Survey report
N/A
N/A
ISO 17637,
approved visual
procedure
Inspection Report
ISO 17637,
QCS 2014
Weld Inspection
Report
N/A
N/A
Approved NDT
Procedure
NDT Report
Approved NDT
Procedure
NDT Report
N/A
Approved
Dimensional
Procedure
Dimension Report
AWS D1.1,
QCS 2014
Dimension Report
N/A
4.0
4.1 Repair of damaged areas
N/A
N/A
Samsung C&T
Owner
PAINTING OF STEELWORK
Painting Procedure
Visual examination of
4.2 appearance and dry film
Approved Procedure
thickness check after completion
of erection
Review MTC
QCS 2014
Paint Report
N/A
QCS 2014
Visual Inspection
report
N/A
N/A
N/A
N/A
5.0
5.1 Final dossier and release
certificate.
REFERENCE
DOCUMENT
N/A
DOCUMENTATION
Punch list
Issue of acceptance
certificate
(Page No. 3 of 3)