S.B.C.Calculations For Abutment P5 Well Foundations


(Asper I.S:6403-1981)
DATA:
Location
Depth of U.D.Sample(d)
Bulk Density( b )

:
:

Shear Parameters:
Cohesion ( C )
For Local Shear failure ( C )
Angle of Internal Friction ( )
N'c =

P5
18.900 m

(+74.1 to +55.20)

1.89

t/m

:
:
:

0.40
0.27
31

t/m2
t/m3
degrees

14.830
Breadth of footing assumed (B)
Depth of Ground Water Table
Shape Factors for Circular Footing:
Sc=
1.3

N'q = 6.400
:
8.15
:
0.50

Factor of safety( F )

N' =
m
m

Hence W'=

5.390
0.5

Sq=

S=
1.2
0.6
Depth Factor Correction is to be applied only when back filling is done with proper compaction.
Inclination Factors ic = iq = i =
1 as angle of inclination is taken as 00
3

SBC= 1{ C N'c Sc dc ic + q ( N'q-1) Sq dq iq + x B b N' S d i W'} + (b-1)d


F
=
1
{
5.205
+
109.000
3
=
=

126.659
3

+
59.041 or say

Assistant Executive engineer (R&B)


Chodavaram

Executive Engineer(R&B)
Visakhapatnam-18.

16.821

= 42.220

12.454

+
+

16.821
16.821

59 t/m2

Dy Executive Engineer (R&B)


Yellamanchilli

Name of work:- Construction of HLB in Km 10 (9/8-10) across river Bodderu of road from Bheemunipatnam
- Narsipatnam road to Konam (via) Appalarajapuram, Khandivaram in Visakhapatnam Dist.
ABUTMENT WELL P5

Date

Reduced levels of guage remarks

Total
Total
Stening Sinking
(M)
(M)

17.60

18.90

Tilt along Tilt along


x-axis
y-axis
col.5 dia col.8 dia
of well
of well

Along x-axis Diff(3)-(4) Along y-axis Diff(6)-(7)


3
4
5
6
7
8

6.320

6.520

0.200

6.455

6.355

0.100

10

0.02500 0.01250

Along xaxis

Along yaxis

11

12

13

14

0.02800

0.1104

0.0552

0.1234

(A) Side U/s Side

8.46

Result
15

16

Proposals
submitted for
Bottom plugging

1 in

=(2.20+
15.40)

Assistant Executive engineer (R&B)


Chodavaram

Action taken
for
Remarks
rectification

Shift
at bottom

Resultant
Tilt

35.714

Dy Executive Engineer (R&B)


Yellamanchilli

Executive Engineer(R&B)
Visakhapatnam-18.

Signature
of others

17

TILT AND SHIFT OF PIER WELL P5


Well Outer Dia
Height of
sinking

Ponnada Side

9.00 m
10.370 m

6.520
6 cm
6.455

D/S Side

6.355

P5

U/S Side

6.320
12 cm

Srikakulam Side
TILT

(P) - (S) Direction =

6.320 -6.520

0.200

(S) side Down

U/S - D/S Direction =

6.355 -6.455

0.100

U/S side Down

Tilt During (P) - (S) direction X = 0.200


0.02222
=
9.00
Tilt During U/S-D/S direction Y = 0.100
0.01111
=
9.00
Resultant Tilt = x2 + y2 =
0.02222 2+ 0.01111 2 = 0.02480

1 in 40.3226
SHIFT Shift due to tilt at Bottom

(P) - (S) Direction =

In longitudinal direction
Shift at Top

Net Shift X

12.00 cm
=

Shift at Top
Net Shift Y

U/S - D/S Direction =

6.00 cm
=

0.2304 -

0.1200 = 0.1104 m
11.04 cm
=
Towards (P)

0.100 10.370
x
9.00

= 0.1152 m
= 11.52 cm
Towards D/S

Towards D/S

Shift at Top - Shift at Bottom =

Resultant Shift = X2 + Y2 =

= 0.2304 m
= 23.04 cm
Towards (P)

Towards (S) side

Shift at Top - Shift at Bottom =

Shift due to tilt at Bottom


In transverse direction

0.200 x 10.370
9.00

11.04 2+

0.0600

5.52 2 =

0.1152

= 0.0552 m
=
5.52 cm
Towards U/S

12.34

12.34 Cm
Towards (K) & U/S

Assistant Executive engineer (R&B)


Srikakulam

Dy Executive Engineer (R&B)


Srikakulam

Executive Engineer (R&B)


Srikakulam

Name of work:- Construction of HLB in Km 10 (9/8-10) across river Bodderu of road from
Bheemunipatnam - Narsipatnam road to Konam (via) Appalarajapuram,
Khandivaram in Visakhapatnam Dist.
PIER WELL P5

Observed strata
+ 74.100

Well cap
bottom level + 72.800

Brown clay sand


+72.910
Silty Sand
8.00 mts dia
+68.910
Coarse Sand with pebbles
and clay lumps
1.10 m
+66.910
Silty Sand with pebbles
+65.910
Yellowish Silty Sand
+62.910
Yeellowish brown clay Sand
+60.910
Coarse sand
+58.910
Light brown sandy clay
+57.410
Soft rock
Proposed/ Approved
+55.200 foundation level

5.80 mts

Assistant Executive engineer (R&B)


Chodavaram

Executive Engineer (R&B)