Vous êtes sur la page 1sur 5

ALI MOHSIN

OBJECTIVE

To succeed in an environment of growth and excellence and earn a job which provides
me job satisfaction and self-development and help me achieve personal as well as
Organizational goals.

SUMMARY

I am a Mechanical Engineer with 5+ years of post-graduation experience in the


Field of Project Planning. I have executed many projects as Planning Engineer and
Area Planner for the clients in different sectors of Pakistan. I am currently working as
Planning Engineer for Sendan International Company, Saudi Arabia.

EXPERIENCE

PLANNING ENGINEER SENDAN INTERNATIONAL COMPAMY, SAUDI ARABIA


November 2015 Present
Major Responsibilities
Creation of construction & shutdown plans (in Primavera) in conjunction with
discipline engineers.
Manage and control contract resources in order to facilitate the engineering
construction plans. E.g. scaffolding, hire equipment, cranes etc.
Develop and manage relationships with key service providers including equipment
overhaul/refurbishment and management of quality critical hold points.
Ensure the completion of appropriately detailed plans and costs for a monthly and
weekly look ahead.
Understand and able to utilize planning tools such as MS excel, Access, MS Project,
and Primavera.
Track, monitor and forecast progress of all activities and deliverable such as
products, engineering documents, fabrication status and construction of all
discipline.
Monitor, manage and review defined KPI at business review meetings.
Monitoring of contracts and critical activities procedures with construction team and
Hold regular discussion and meetings with the supervision staff.
Preparation of Weekly, Monthly progress actual quantities comparison with planned
values to ensure the proper implementation of the work plan.
Analyzing the differences between the quantities planned and the total quantities
from the items input.
Preparation of progress delay analysis reports & Evaluation of weekly productivity
factors by using earned and actual man-hours.
Monitoring progress against the Plan (S-curve) at various levels on weekly and
monthly basis
Monitor the reporting system with partner companies and sub-contractors.
Heading the weekly planning coordination meeting with construction and subcontractors.
To update the punch list clearance.

PLANNING ENGINEER DESCON ENGINEERING LIMITED, PAKISTAN


July 2013 October 2015
Major Responsibilities:
To submit daily/weekly/monthly progress reports.

Preparation of look ahead schedules, BAR charts, Man Power Histograms, SCurves
Procurement of Status & Equipment deployment Chart as applicable

for the Project. Preparing and distributing a description and timeline of


the project.
Prepare Project schedules & critical paths with forecasting.
To monitor project through Cost Estimation, Budgets, Value of Actual Work /
Projected work & prepare Invoices as per the Contract.
Prepare (EPC, Shutdowns, maintenance) Project planning in PRIMAVERA P6 with
Base line Scheduling, Monitoring & Critical Activity Analysis, Resource Management,
" S " curves, Bar Charts etc.of the project.
Evaluate the performance of project execution & review the progress of work
against the planned / base line schedules.
Monitor & Analyze deviation, delay & prepare a Recovery/Catch Up plan (if required)
to meet the Milestones.
To develop & Circulate to Engineering, Purchase & Construction department's
weekly/Monthly Schedule & Updates, Lag & Foreseen Reports & expedite the
target of different Projects.
Coordinate & Communicate with Different vendors for Material procurement
ensuring swift delivery.
Develop & submit the Progress Reports to Consultant & Client as per the
schedule.
Develop & monitor the Project Plan through Budget Controlling & Cost planning
Preparing Pre- commissioning Schedule and maintaining Punch points.
Reporting through various reports the Cause of Delay with Rectification Plan.
Ensure proper Team work by regularly Coordinating with internal departments,
Consultants, Clients, Contractor & Site Team.

AREA PLANNER DESCON ENGINEERING LIMITED, PAKISTAN


May 2011 June2013
Major Responsibilities:
Responsible for planning, scheduling, conducting and coordinating the technical and
management aspects of projects.
Develop scope baseline
Preparing Work Breakdown Structure according to scope baseline.
Develop baseline schedules using Primevera P6.
Identify and update requirement of manpower, direct material and
equipment based on 3 months plan.
Budget monitoring and trend tracking.
Participating in Client/Contractor meetings and resolving Client/engineering
and management project issues.
Monitored and analyzed the progress of all the mechanical activities.
Making sure that field has enough work-front available according to planned
quantities.
Detailed analysis of Estimated costs and Actual costs.
Prepared project close out report
TRAINEE ENGINEER DESCON ENGINEERING LIMITED, PAKISTAN
August 2010 May 2011
Major Responsibilities

To develop project objectives by reviewing project proposals and plans;


conferring with management.
To determine project responsibilities by identifying project phases and
elements; assigning personnel to phases and elements; reviewing bids from
contractors.
To determine project schedule by studying project plan and specifications;
calculating time requirements; sequencing project elements.
To maintain project schedule by monitoring project progress
To Control project plan by reviewing design, specifications, and plan and schedule
changes; recommending actions.
To prepare project status reports by collecting, analyzing, and summarizing
information and trends; recommending actions

EDUCATIO
N

NATIONAL UNIVERSITY OF SCIENCE & TECHNOLOGY, ISLAMABAD


B.E Mechanical , 2006-2010
SADIQ PUBLIC SCHOOL, BAHAWALPUR
A Level, 2003-2005
SADIQ PUBLIC SCHOOL, BAHAWALPUR
O Level, 2000-2003

WHA Side Cut Methanol Recovery Project


Client: SABIC AR Razi, Al Jubail Saudi Arabia

MAJOR
ASSIGNMENTS
&

2.66 MW WHRB Power Plant


Client: Yunus Energy Limited, Pakistan
9.5 MW Heat Recovery & Grid Power Project Phase-II,K- Electric KGTPS-II (EPCC)
Client: K-Electric, Pakistan

9.5 MW Heat Recovery & Grid Power Project Phase-II,K- Electric SGTPS-II (EPCC)
Client: K-Electric, Pakistan
5TPH Fire Tube Boiler on EPCC basis
Client: Coca Cola Beverages Pakistan Limited, Pakistan
40TPH Direct Fire Boiler on EPCC basis
Client: Pakistan Refinery Limited, Pakistan

SOFTWARE
COMPETENCE

Primavera , P6
Microsoft Office

AutoCAD
Pro- Engineer
SAP PS Module

PERSONAL
PROFILE

REFERENCES

Name:
Fathers Name:

Ali Mohsin
Mushtaq Hussain Shah

Sect:

Sunni

Language Skills:

English, Urdu

Mailing Address:

3/C Rashid Minhas Road, Street No. 6,


Model Town A, Bahawalpur, Pakistan

Contact No.

+966-546656901, +966596308061

E mail Address:

syedalymohsin@yahoo.com

Passport No.

AS0115461

Passport Expiry Date:

6th August, 2016

Will be furnished upon request

Vous aimerez peut-être aussi