TI Hardware Installation Standard

ZTE Quality & HSE Team

CONTENTS
Cabinet Installation
Cabinet Cabling

Indoor Labeling
TTA/RTA Installation
MW Installation
Site Environment

Schematic Diagram

DC Power/OF/IF

Fiber

DC Power

Internal use only

Cabinet System Layout


BTS Master Cabinet

ZTE All rights reserved

Internal use only

Cabinet System Layout


Battery Cabinet
(Not for all the sites)

ZTE All rights reserved

Internal use only

Cabinet Installation
Located in position as site design drawing

ZTE All rights reserved

Internal use only

Cabinet Installation
Cabinet mounting holes : Anchor Bolt M12

ZTE All rights reserved

Internal use only

Cabinet Installation

Anchor Bolt M12, one flat washer+ spring washer

ZTE All rights reserved

Internal use only

Cabinet Installation
Cabinet should be clean and not
scratched or dented or damage

Cabinet interior is free from dust and


no excess material.

ZTE All rights reserved

Internal use only

Cabinet Cabling
Cable gland
assignment for
scenario 1
(First 70 Sites)

10

ZTE All rights reserved

Internal use only

Cabinet Cabling
Cable gland assignment for scenario 1 (First 70 Sites)

MW Fiber
MW IF Cable
Trunk Fiber
Sector A&B&C
FOC Fiber

Trunk Power
Cable Sector A
Trunk Power
Cable Sector B
Trunk Power
Cable Sector C

MW DC
Cable
Battery Cable

Genset Modbus/SNMP
Grounding Cable of
Cabinet plinth

AC Power Cable
11

ZTE All rights reserved

For temp probe to Slave


GPS Feeder Cable

Internal use only

Cabinet Cabling
Cable gland
assignment for
scenario 2

12

ZTE All rights reserved

Internal use only

Cabinet Cabling
Cable gland assignment for scenario 2

FOC Fiber
Trunk Fiber
Sector A&B&C
MW IF Cable
MW Fiber
AC Power Cable
13

Battery Cable
Bank 3&4
Battery Cable
Bank 1&2

Trunk Power
Cable Sector B

Trunk Power
Cable Sector C

MW DC Cable
For temp probe to Slave

Trunk Power
Cable Sector A

Grounding Cable of
Cabinet plinth

GPS Feeder Cable


Genset Modbus/SNMP

ZTE All rights reserved

Internal use only

Cabinet Cabling---Cable Glands


Cables entries in plinth must sealed with glands

Caution:
Cant use big cable gland with incorrect
size cable

14

Cable wrapped with cable tape, to increase the


cables diameter, and then tight the cable gland

ZTE All rights reserved

Cable need to be fixed properly

Internal use only

Cabinet Cabling
Cables entries of the cabinet must be
sealed by cable bushing

15

ZTE All rights reserved

Internal use only

Cabinet Cabling
Signal cables and power cable routing shall
be separately at least 2cm.
DC Power Cable

Fiber ,IF and


Signal Cables

AC Power Cable

Power cable To
Battery Cabinet

Signal Cables to Battery Cabinet


16

ZTE All rights reserved

Internal use only

Cabinet Cabling---AC Power Cable


AC power and grounding cable connection

For Single phases:


need to put the
Shot Pin

ACPDU in Cabinet

17

For Three phases


For Single phases: 35mm2
For
three
phases:
10mm2
did not need the
cable for AC connection
cable for AC connection
Shot Pin

ZTE All rights reserved

Must connect the Grounding cable


first then connect AC cable

Internal use only

Cabinet Cabling---AC Power Cable


Before connect the AC power must make sure:
1. Verify that Site ACPDBs grounding bus bar is integrated to site MGB ;
2. Verify that the Neutral cable is firmly terminated to the PLN supply and is not floating ;
3. AC Input voltage measurements:
L1 Neutral (180Vac 250Vac)
L2 Neutral (180Vac 250Vac)
L3 Neutral (180Vac 250Vac)
Phase to Phase (346Vac 433Vac)
Neutral to Ground (<5Vac)
4. Grounding cable from site ACPDB to Cabinet ACPDU had connected.

18

ZTE All rights reserved

Internal use only

Cabinet Cabling---AC Power Cable

Site ACPDB Cable Entries


sealed with IP cable gland

Use corrugated pipe to


protect the AC cable and
both end were sealed by tap

19

ZTE All rights reserved

AC power cable connector should be lugged,


with insulation jacket

Internal use only

Cabinet Cabling---AC Power Cable

AC power cable should be fixed properly in the


cable tray with black cable tie

If AC cable need to be buried underground, the minimum depth is 60cm.

20

ZTE All rights reserved

Internal use only

Cabinet Cabling--- DC Power cable


DC Breaker Distribution

21

ZTE All rights reserved

22

125A

BAT02

25A
16A
16A
16A
16A
16A

BBU02 or AOU03
IDU01 & IDU02 Redundancy
IDU01 Redundancy & IDU02
MW AOU01
MW AOU02
IPRAN

3
4
5
6
7
8
9
10
12
13
14
15
16
17
18
19
20
21
22
23

25A
25A
25A
25A
25A
25A
25A
25A
25A
25A
25A
25A

(Sector A) 18R01
(Sector A) 7R01
Spare
(Sector B) 9R02

(Sector B) 18R02
(Sector B) 7R02
Spare
(Sector C) 9R03
(Sector C) 18R03
(Sector C) 7R03
Spare

11

(Sector A) 9R01

DCPDU

16A

25A

BBU01

IPRAN Redundancy

16A

AUX

10A

Battery

DC Fan

DC SPD

125A

BAT01

Internal use only

Cabinet Cabling--- DC Power cable


DC breaker Distribution (Split RTA/TTA)
FAN
PRIORITY BREAKERS
NON-PRIORITY BREAKERS

BKR
LVBD
LVLD

ZTE All rights reserved

23

125A

BAT02

25A
16A
16A
16A
16A
16A

BBU02 or AOU03
IDU01 & IDU02 Redundancy
IDU01 Redundancy & IDU02
MW AOU01
MW AOU02
IPRAN

3
4
5
6
7
8
9
10
12
13
14
15
16
17
18
19
20
21
22
23

25A
25A
25A
25A
25A
25A
25A
25A
25A
25A
25A
25A

9R02
18R01
18R02
7R01

7R02
7R03
Spare
Spare
Spare
Spare
Spare

11

9R01

DCPDU

16A

25A

BBU01

IPRAN Redundancy

16A

AUX

10A

Battery

DC Fan

DC SPD

125A

BAT01

Internal use only

Cabinet Cabling--- DC Power cable


DC breaker Distribution (Metro RTA/TTA)
FAN
PRIORITY BREAKERS
NON-PRIORITY BREAKERS

BKR
LVBD
LVLD

ZTE All rights reserved

Internal use only

Cabinet Cabling--- DC Power cable


DC Power Cabling

DC power cable should be fixed properly


Bending protection in edge of cabinet rack
for DC cable did not had Protective Jacket

All DC Power Cable for the Modules


routing in the left side of the Cabinet.
24

ZTE All rights reserved

Internal use only

Cabinet Cabling--- DC Power cable


DC Power Cable Connection

DC Power cable terminal of


Modules in Power System
Terminal of Battery
Cable in Power System

-48VRTN

-48V
DC power cable connector should be lugged, with insulation jacket

25

ZTE All rights reserved

Internal use only

Cabinet Cabling--- DC Power cable


Cable connection between Master Cabinet and Aux Cabinet

26

ZTE All rights reserved

Internal use only

Cabinet Cabling--- DC Power cable


Cable connection between Master Cabinet and Aux Cabinet

27

ZTE All rights reserved

Internal use only

Cabinet Cabling--- DC Power cable


Battery DC Power Cable

Battery Cable (-)

28

ZTE All rights reserved

Battery Cable (+)

Internal use only

Cabinet Cabling---Cabinet Internal Grounding

1. All modules must grounding properly connect to the grounding bar of the
cabinet , connector should be lugged, with heat shrink tube or boots.
2. Internal grounding wire uses 16 mm diameter Yellow/Green cable.

The bolt of grounding terminal must tighten up.

29

ZTE All rights reserved

Internal use only

Cabinet Cabling---Fiber

Indoor fiber must be protected


by specified coiled pipe

Fiber routing in the right side of the cabinet

30

Strap the fiber with specified


cable tie
Redundant indoor fiber must be spiral wrapped properly
in the cabinet side with bend radius no less than 5cm
ZTE All rights reserved

Internal use only

Cabinet Cabling--- Ethernet Cable

To IPRAN

31

ZTE All rights reserved

Internal use only

Cabinet Cabling--- Temperature Sensor

32

ZTE All rights reserved

Internal use only

Cabinet Cabling---External Grounding Layout

16mm2
33

16mm2
ZTE All rights reserved

Internal use only

Cabinet Cabling---External Grounding

1. Cabinet must grounding properly, grounding cable connector should be lugged, with heat shrink tube or boots
2. Grounding cable protected in corrugated pipe.
3. Grounding cable of the cabinet routed with going down direction to the Bus bar. (no upward direction)
4. Where cables are bolted to an earth bar or similar, one cable per bolt.

34

ZTE All rights reserved

Internal use only

Cabling Requirement
1. No rips or tears or breaks in any cables
2. All redundant cables are spiral wrapped
3. All cables runs are neat and straight
4. All cables runs are tied with correct cable ties (size and colour).
5. All cable ties are trimmed properly (flush cut and not sharp)
6. No crossed cables
7. Cables are protected from sharp objects
8. No cable joints are allowed and the insulation shall be intact without scratches or damage
9. Signal, alarm and power cables are kept separate
10. Optical cables are connected via the Optical patch panel
11. Optical fiber is neatly coiled in fiber management tray
12. Optical cables are protected with dust caps
13. Optical cables are greater than minimum bend radius (50 mm)
14. All cable plugs are securely seated No loose, unconnected cables
15. Verify that the spare fibers ports in the cable management tray are correctly terminated with dust caps

35

ZTE All rights reserved

Internal use only

Cabinet Indoor Labeling


All cables in cabinet are clearly labeled within 2-5 cm from end.

36

ZTE All rights reserved

Internal use only

TTA/RTA Installation

Fiber Connection Between BBU& MPO Cassette


(1) Split (GSM/FDD): 6*R8863(900M/1800M)+ 6*R8882(700M)
Scene

Number of RRU

Number of MPO Cassette

Fiber No.
Fiber 1
Fiber 2

Split
RTA/TTA

6*R8863

Fiber 3
Fiber 4
Fiber 5
Fiber 6
Fiber 1
Fiber 2

Split
TTA/RTA(2Port 700
RRU)

6*R8882

Fiber 3
Fiber 4
Fiber 5

37

Fiber
6
ZTE All rights
reserved

FS5 Port

MPO Cassette Port

TX0
RX0
TX1
RX1
TX2
RX2
TX3
RX3
OF4_Tx0
OF4_Rx0
OF5_Tx0
OF5_Rx0
OF0_Tx0
OF0_Rx0
OF1_Tx1
OF1_Rx1
OF2_Tx2
OF2_Rx2
OF3_Tx3
OF3_Rx3
OF4_Tx4
OF4_Rx4
OF5_Tx5
OF5_Rx5

Sector_A-MPO 1
Sector_A-MPO 2
Sector_B-MPO 1
Sector_B-MPO 2
Sector_C-MPO 1
Sector_C-MPO 2
Sector_A-MPO 9
Sector_A-MPO 10
Sector_B-MPO 9
Sector_B-MPO 10
Sector_C-MPO 9
Sector_C-MPO 10
Sector_A-MPO 18
Sector_A-MPO 17
Sector_B-MPO 18
Sector_B-MPO 17
Sector_C-MPO 18
Sector_C-MPO 17
Sector_A-MPO 20
Sector_A-MPO 19
Sector_B-MPO 20
Sector_B-MPO 19
Sector_C-MPO 20
Sector_C-MPO 19

LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC

Internal use only

TTA/RTA Installation

Fiber Connection Between BBU& MPO Cassette


(2) Split (GSM/FDD): 6*R8863(900M/1800M)+ 3*R8862A(700M)
Scene

Number of RRU

Number of MPO
Cassette

Fiber No.
Fiber 1
Fiber 2

Split
TTA/RTA

Fiber 3
6*R8863

3
Fiber 4
Fiber 5
Fiber 6
Fiber 1

Split
TTA/RTA(4Port 700
RRU)

3*R8862A

Fiber 2
Fiber 3

38

FS5 Port

MPO Cassette Port

TX0
RX0
TX1
RX1
TX2
RX2
TX3
RX3
OF4_Tx0
OF4_Rx0
OF5_Tx0
OF5_Rx0
OF0_Tx0

Sector_A-MPO 1
Sector_A-MPO 2
Sector_B-MPO 1
Sector_B-MPO 2
Sector_C-MPO 1
Sector_C-MPO 2
Sector_A-MPO 9
Sector_A-MPO 10
Sector_B-MPO 9
Sector_B-MPO 10
Sector_C-MPO 9
Sector_C-MPO 10
Sector_A-MPO 18

LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC

OF0_Rx0

Sector_A-MPO 17

LC-LC

OF1_Tx1

Sector_B-MPO 18

LC-LC

OF1_Rx1

Sector_B-MPO 17

LC-LC

OF2_Tx2

Sector_C-MPO 18

LC-LC

OF2_Rx2

Sector_C-MPO 17

LC-LC

ZTE All rights reserved

Internal use only

TTA/RTA Installation

Fiber Connection Between BBU& MPO Cassette


(3) Metro (GSM/FDD): 4*R8863(900M/1800M)+ 3*R8862A(700M)
Scene

Number of RRU

Number of MPO Cassette

Fiber No.
Fiber 1

Metro
TTA/RTA

Fiber 2
4*R8863

1
Fiber 3
Fiber 4
Fiber 1

Metro
TTA/RTA (4Port 700 RRU)

3*R8862A

Fiber 2
Fiber 3

39

ZTE All rights reserved

FS5 Port

MPO Cassette Port

TX0

MPO_1

LC-LC

RX0

MPO_2

LC-LC

TX1

MPO_5

LC-LC

RX1

MPO_6

LC-LC

TX3

MPO_9

LC-LC

RX3

MPO_10

LC-LC

TX4

MPO_14

LC-LC

RX4

MPO_13

LC-LC

OF0_Tx0

MPO_18

LC-LC

OF0_Rx0

MPO_17

LC-LC

OF1_Tx1

MPO_20

LC-LC

OF1_Rx1

MPO_19

LC-LC

OF2_Tx2

MPO_22

LC-LC

OF2_Rx2

MPO_21

LC-LC

Internal use only

TTA/RTA Cable Installation --- Fiber

40

ZTE All rights reserved

Internal use only

TTA/RTA Cable Installation --- Fiber DC Trunk Cable


Cable entry of the cabinet

41

ZTE All rights reserved

Internal use only

TTA/RTA Cable Installation --- Fiber and DC Trunk cable


Cable Clamp

Tighten to
3.5 4.5
N*m
Angle
Adapt
er

Tighten
to 6 - 8
N*m

42

ZTE All rights reserved

Internal use only

TTA/RTA Cable Installation --- Fiber and DC Trunk cable


one meter put one clam on the Tower cable tray
or Rooftop cable tray

43

ZTE All rights reserved

Internal use only

TTA Cable Installation

44

ZTE All rights reserved

Internal use only

TTA/RTA Cable Installation---DC Trunk Cable Grounding Kit


One grounding Kit for one DC
Trunk cable

Grounding Kit for TTA/RTA Power Cable will be installed 1m


before enter the power Cabinet.(depend on the position of
the grounding bar)

1 (tape) +3 (putty) +3
(tape) waterproof
treatment

45

ZTE All rights reserved

Internal use only

TTA/RTA Cable Installation---Fiber Trunk Grounding Kit


One grounding Kit for one Fiber
Trunk cable

Grounding Kit for TTA/RTA Fiber Cable will be installed 1m


before entry the power Cabinet.(depend on the position of
the grounding bar)

1 (tape) +3 (putty) +3
(tape) waterproof
treatment

46

ZTE All rights reserved

Internal use only

TTA/RTA Cable Installation---Redundant Cable


Redundant Power and Optical Cable are coiled and fixed
properly on the cable tray before entry the cabinet (Rooftop
site) or on bottom of the tower (GF site)

Power and Optical Cable bending radius does not exceed


minimum 6" (152mm).
47

ZTE All rights reserved

Internal use only

TTA/RTA Installation---DC Power Cable Connection in Junction Box


Connect the DC
Power Cable as the
instruction in the
inside of the Cover

Do not forget to connect the grounding cable


48

ZTE All rights reserved

Internal use only

TTA/RTA Installation--- Hoisting Grip for Fiber Trunk Cable


One Hoisting Grip for one Fiber
Trunk cable

Hoisting Grip need to be fixed with the Fiber


49

ZTE All rights reserved

Internal use only

TTA Installation
Bracket

One bolt with one flat washer+ spring washer


50

ZTE All rights reserved

Internal use only

TTA Installation
Bracket

Installation these two bracket before Hoisting


51

ZTE All rights reserved

Internal use only

TTA Installation
Bracket

Adjust the bracket base on the installation pole before Hoisting


52

ZTE All rights reserved

Internal use only

TTA Installation
Hoisting and Installation

53

ZTE All rights reserved

Internal use only

TTA Installation
Tower Top Assembly

54

ZTE All rights reserved

Internal use only

TTA Installation
Tower Top Assembly

55

ZTE All rights reserved

Internal use only

TTA Installation
Stiff Arms

56

ZTE All rights reserved

Internal use only

RTA Installation
RTA Overall view

57

ZTE All rights reserved

Internal use only

Antenna Installation--- For Split TTA/RTA

One bolt with one flat washer+ spring washer


58

ZTE All rights reserved

Internal use only

TTA/RTA Installation--- Grounding

Connect the grounding cable from TTA/RTA to the Tower/Rooftop Grounding Bar

59

ZTE All rights reserved

Internal use only

MW Installation---IF Cable Connector


1
2

60

ZTE All rights reserved

Internal use only

MW Installation---NR8250 ODU and Antenna


Grounding

Connector 1+3+3 waterproof


1 layer of insulation tape
3 layers of waterproof tape
3 layers of insulation tape
Use cable tie fasten two ends

61

ZTE All rights reserved

Internal use only

MW Installation---NR8950 AOU DC Power Connection


Lightning arrester PIMDC
NR8950

Can also find cable


connect instruction in
the inside of the Cover

62

ZTE All rights reserved

Internal use only

MW Installation---NR8950 AOU Fiber Connection


NR8950

Connect to IPRAN

63

ZTE All rights reserved

Internal use only

MW Installation---DC/Fiber/IF Cabling

64

ZTE All rights reserved

Internal use only

MW Installation---Fiber/DC/IF Cabling
one meter put one clam on the Tower cable tray or
Rooftop cable tray
Small hole For Fiber
After remove the gasket ,this small
hole can be used for DC or IF cable

Big hole For DC/IF Cable


65

ZTE All rights reserved

Internal use only

MW Installation---DC/IF Cable Grounding Kit


DC/IF Cable Grounding

Reserve DC/IF cable of proper


length (~5m recommended) at
the ODU end.
Loop the DC/IF cable & fix it at
the top platform with black cable
tie.

Grounding point (depend on


the existing tower grounding
bar)

DC/IF cable length <=60m, 1point grounding connection


DC/IF cable length > 60m, 2points grounding connection
(the other point is 1m form the connector on top of tower)
66

ZTE All rights reserved

Internal use only

MW Installation--- DC/IF Cable Grounding Kit


DC/IF Cable Grounding

Grounding kit

67

1 (tape) +3 (putty) +3 (tape)


waterproof treatment

ZTE All rights reserved

Internal use only

Site Environment
Clean and tidy
No waste or redundant material on site
Signs of burnt trash on site

68

ZTE All rights reserved

Thank you