CONTENTS
Cabinet Installation
Cabinet Cabling
Indoor Labeling
TTA/RTA Installation
MW Installation
Site Environment
Schematic Diagram
DC Power/OF/IF
Fiber
DC Power
Cabinet Installation
Located in position as site design drawing
Cabinet Installation
Cabinet mounting holes : Anchor Bolt M12
Cabinet Installation
Cabinet Installation
Cabinet should be clean and not
scratched or dented or damage
Cabinet Cabling
Cable gland
assignment for
scenario 1
(First 70 Sites)
10
Cabinet Cabling
Cable gland assignment for scenario 1 (First 70 Sites)
MW Fiber
MW IF Cable
Trunk Fiber
Sector A&B&C
FOC Fiber
Trunk Power
Cable Sector A
Trunk Power
Cable Sector B
Trunk Power
Cable Sector C
MW DC
Cable
Battery Cable
Genset Modbus/SNMP
Grounding Cable of
Cabinet plinth
AC Power Cable
11
Cabinet Cabling
Cable gland
assignment for
scenario 2
12
Cabinet Cabling
Cable gland assignment for scenario 2
FOC Fiber
Trunk Fiber
Sector A&B&C
MW IF Cable
MW Fiber
AC Power Cable
13
Battery Cable
Bank 3&4
Battery Cable
Bank 1&2
Trunk Power
Cable Sector B
Trunk Power
Cable Sector C
MW DC Cable
For temp probe to Slave
Trunk Power
Cable Sector A
Grounding Cable of
Cabinet plinth
Caution:
Cant use big cable gland with incorrect
size cable
14
Cabinet Cabling
Cables entries of the cabinet must be
sealed by cable bushing
15
Cabinet Cabling
Signal cables and power cable routing shall
be separately at least 2cm.
DC Power Cable
AC Power Cable
Power cable To
Battery Cabinet
ACPDU in Cabinet
17
18
19
20
21
22
125A
BAT02
25A
16A
16A
16A
16A
16A
BBU02 or AOU03
IDU01 & IDU02 Redundancy
IDU01 Redundancy & IDU02
MW AOU01
MW AOU02
IPRAN
3
4
5
6
7
8
9
10
12
13
14
15
16
17
18
19
20
21
22
23
25A
25A
25A
25A
25A
25A
25A
25A
25A
25A
25A
25A
(Sector A) 18R01
(Sector A) 7R01
Spare
(Sector B) 9R02
(Sector B) 18R02
(Sector B) 7R02
Spare
(Sector C) 9R03
(Sector C) 18R03
(Sector C) 7R03
Spare
11
(Sector A) 9R01
DCPDU
16A
25A
BBU01
IPRAN Redundancy
16A
AUX
10A
Battery
DC Fan
DC SPD
125A
BAT01
BKR
LVBD
LVLD
23
125A
BAT02
25A
16A
16A
16A
16A
16A
BBU02 or AOU03
IDU01 & IDU02 Redundancy
IDU01 Redundancy & IDU02
MW AOU01
MW AOU02
IPRAN
3
4
5
6
7
8
9
10
12
13
14
15
16
17
18
19
20
21
22
23
25A
25A
25A
25A
25A
25A
25A
25A
25A
25A
25A
25A
9R02
18R01
18R02
7R01
7R02
7R03
Spare
Spare
Spare
Spare
Spare
11
9R01
DCPDU
16A
25A
BBU01
IPRAN Redundancy
16A
AUX
10A
Battery
DC Fan
DC SPD
125A
BAT01
BKR
LVBD
LVLD
-48VRTN
-48V
DC power cable connector should be lugged, with insulation jacket
25
26
27
28
1. All modules must grounding properly connect to the grounding bar of the
cabinet , connector should be lugged, with heat shrink tube or boots.
2. Internal grounding wire uses 16 mm diameter Yellow/Green cable.
29
Cabinet Cabling---Fiber
30
To IPRAN
31
32
16mm2
33
16mm2
ZTE All rights reserved
1. Cabinet must grounding properly, grounding cable connector should be lugged, with heat shrink tube or boots
2. Grounding cable protected in corrugated pipe.
3. Grounding cable of the cabinet routed with going down direction to the Bus bar. (no upward direction)
4. Where cables are bolted to an earth bar or similar, one cable per bolt.
34
Cabling Requirement
1. No rips or tears or breaks in any cables
2. All redundant cables are spiral wrapped
3. All cables runs are neat and straight
4. All cables runs are tied with correct cable ties (size and colour).
5. All cable ties are trimmed properly (flush cut and not sharp)
6. No crossed cables
7. Cables are protected from sharp objects
8. No cable joints are allowed and the insulation shall be intact without scratches or damage
9. Signal, alarm and power cables are kept separate
10. Optical cables are connected via the Optical patch panel
11. Optical fiber is neatly coiled in fiber management tray
12. Optical cables are protected with dust caps
13. Optical cables are greater than minimum bend radius (50 mm)
14. All cable plugs are securely seated No loose, unconnected cables
15. Verify that the spare fibers ports in the cable management tray are correctly terminated with dust caps
35
36
TTA/RTA Installation
Number of RRU
Fiber No.
Fiber 1
Fiber 2
Split
RTA/TTA
6*R8863
Fiber 3
Fiber 4
Fiber 5
Fiber 6
Fiber 1
Fiber 2
Split
TTA/RTA(2Port 700
RRU)
6*R8882
Fiber 3
Fiber 4
Fiber 5
37
Fiber
6
ZTE All rights
reserved
FS5 Port
TX0
RX0
TX1
RX1
TX2
RX2
TX3
RX3
OF4_Tx0
OF4_Rx0
OF5_Tx0
OF5_Rx0
OF0_Tx0
OF0_Rx0
OF1_Tx1
OF1_Rx1
OF2_Tx2
OF2_Rx2
OF3_Tx3
OF3_Rx3
OF4_Tx4
OF4_Rx4
OF5_Tx5
OF5_Rx5
Sector_A-MPO 1
Sector_A-MPO 2
Sector_B-MPO 1
Sector_B-MPO 2
Sector_C-MPO 1
Sector_C-MPO 2
Sector_A-MPO 9
Sector_A-MPO 10
Sector_B-MPO 9
Sector_B-MPO 10
Sector_C-MPO 9
Sector_C-MPO 10
Sector_A-MPO 18
Sector_A-MPO 17
Sector_B-MPO 18
Sector_B-MPO 17
Sector_C-MPO 18
Sector_C-MPO 17
Sector_A-MPO 20
Sector_A-MPO 19
Sector_B-MPO 20
Sector_B-MPO 19
Sector_C-MPO 20
Sector_C-MPO 19
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
TTA/RTA Installation
Number of RRU
Number of MPO
Cassette
Fiber No.
Fiber 1
Fiber 2
Split
TTA/RTA
Fiber 3
6*R8863
3
Fiber 4
Fiber 5
Fiber 6
Fiber 1
Split
TTA/RTA(4Port 700
RRU)
3*R8862A
Fiber 2
Fiber 3
38
FS5 Port
TX0
RX0
TX1
RX1
TX2
RX2
TX3
RX3
OF4_Tx0
OF4_Rx0
OF5_Tx0
OF5_Rx0
OF0_Tx0
Sector_A-MPO 1
Sector_A-MPO 2
Sector_B-MPO 1
Sector_B-MPO 2
Sector_C-MPO 1
Sector_C-MPO 2
Sector_A-MPO 9
Sector_A-MPO 10
Sector_B-MPO 9
Sector_B-MPO 10
Sector_C-MPO 9
Sector_C-MPO 10
Sector_A-MPO 18
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
LC-LC
OF0_Rx0
Sector_A-MPO 17
LC-LC
OF1_Tx1
Sector_B-MPO 18
LC-LC
OF1_Rx1
Sector_B-MPO 17
LC-LC
OF2_Tx2
Sector_C-MPO 18
LC-LC
OF2_Rx2
Sector_C-MPO 17
LC-LC
TTA/RTA Installation
Number of RRU
Fiber No.
Fiber 1
Metro
TTA/RTA
Fiber 2
4*R8863
1
Fiber 3
Fiber 4
Fiber 1
Metro
TTA/RTA (4Port 700 RRU)
3*R8862A
Fiber 2
Fiber 3
39
FS5 Port
TX0
MPO_1
LC-LC
RX0
MPO_2
LC-LC
TX1
MPO_5
LC-LC
RX1
MPO_6
LC-LC
TX3
MPO_9
LC-LC
RX3
MPO_10
LC-LC
TX4
MPO_14
LC-LC
RX4
MPO_13
LC-LC
OF0_Tx0
MPO_18
LC-LC
OF0_Rx0
MPO_17
LC-LC
OF1_Tx1
MPO_20
LC-LC
OF1_Rx1
MPO_19
LC-LC
OF2_Tx2
MPO_22
LC-LC
OF2_Rx2
MPO_21
LC-LC
40
41
Tighten to
3.5 4.5
N*m
Angle
Adapt
er
Tighten
to 6 - 8
N*m
42
43
44
1 (tape) +3 (putty) +3
(tape) waterproof
treatment
45
1 (tape) +3 (putty) +3
(tape) waterproof
treatment
46
TTA Installation
Bracket
TTA Installation
Bracket
TTA Installation
Bracket
TTA Installation
Hoisting and Installation
53
TTA Installation
Tower Top Assembly
54
TTA Installation
Tower Top Assembly
55
TTA Installation
Stiff Arms
56
RTA Installation
RTA Overall view
57
Connect the grounding cable from TTA/RTA to the Tower/Rooftop Grounding Bar
59
60
61
62
Connect to IPRAN
63
MW Installation---DC/Fiber/IF Cabling
64
MW Installation---Fiber/DC/IF Cabling
one meter put one clam on the Tower cable tray or
Rooftop cable tray
Small hole For Fiber
After remove the gasket ,this small
hole can be used for DC or IF cable
Grounding kit
67
Site Environment
Clean and tidy
No waste or redundant material on site
Signs of burnt trash on site
68
Thank you