Académique Documents
Professionnel Documents
Culture Documents
Operation Procedure
Page 1 of 6
Work Instruction
G1-7009
Revision no.
Prepared by
Reviewed by
Approved by
Revision : 00
Date :
Effective date
Issue no.
DCC
Signature
Name Surname
Date
Guruh Iriyanto
06/05/2015
Rev.
Effective date
00
Revision : 00
Date :
Description of Revision
Initial Issue
Prepared
Reviewed
Approved
ENGLISH
BAHASA INDONESIA
1.
UNIT
Utility
1.
UNIT
Utility
2.
SYSTEM
Turbine
2.
SISTIM
Turbin
3.
SAFETY
Ensure all permits are signed off
3.
KESELAMATAN
Pastikan semua
ijin
kerja
sudah
ditandatangani
Ensure Operator is wearing
recommended PPE
yang disarankan
Semua Equipment dalam kondisi siap
untuk dijalankan.
Revision : 00
Date :
4.
peralatan
instrument
kondisi baik
BAHASA INDONESIA
dalam
ON
G1-7009
at
display/monitor
Ensure discharge pressure auxiliary oil
pump 10.5bar-11bar and current keep
normal
Ensure Auxiliary oil pump G1-7009
indikasi
pada
display
10.5bar-11bar
dan
abnormality
such
vibration, or temperature
Revision : 00
Date :
as
current
pompa normal
Pastikan Auxiliary oil pump G1-7009
bekerja dalam kondisi normal tidak ada
abnormality baik suara, vibrasi, atau pun
temperature
bahwa
noise,
BAHASA INDONESIA
ENGLISH
pompa
running
dan
lihat
dan
current
pompa
normal
Pastikan Auxiliary oil pump bekerja
dalam
kondisi
normal
tidak
ada
ENGLISH
Lihat
indikasi
pada
display
bahwa
G1-7009
light
offat
display/monitor
Ensure pump current is decrease G17009 (0 A)
Revision : 00
Date :