Practitioners Feedback:

Objective
Client: -Vodafone Essar Ltd. (Project managed by Vodafone), India

Project Type:-Development & Application Maintenance Services

The Data Warehouse project takes care of various services and applications that are
related to Vodafone India Ltd. which is a part of Vodafone Essar Ltd it operates
global as well as domestic(INDIA).
The complete historical(at subscriber as well as aggregated level) and daily data of
Postpaid and Prepaid is maintained by the Data Warehouse Project. The Source data
is gathered from various billing systems such as
BSCS,CRM,UPSS,AMDOCS,Madiation,Switch,Intelligent Network. etc and is used for
various reporting purposes.Few system have CDR and few others contain non CDR
information.For extracting the Daily, weekly , Monthly data, Teradata and Data
Stage is used as an ETL tool.The End user has access to view reports on the data
that is transformed via COGNOS Reporting tool in the form of Report/FTP
Dumps/Cubes. Basically the Data Warehouse takes care of Reporting and analytical
requirements of various business units.

The following are the demands that are worked during the period 16 th March 2015 DEC 2015.
Example:
1. DM - DM9828 last 90 days Non_Usage _Prepaid data for subscriber
Role: datastage developer
Duration: Jun 2015 - Oct 2015
Requirement Description
The requirement is for providing a 90 days non usage cube for prepaid customer
base to Vodafone group
Scope
The Scope of this document is to meet the following requirements:

90 days prepaid non-usage cases to be tracked with no balance left for


deduction. Summary of this report to be published to Group

This is for PAN India Implementation for prepaid subscribers.

A new cube that provides the details of 90 days non-usage prepaid


customers

Various Activities performed:


1. Requirement Gathering:
Coordinated with Business Architect, business IT and business users to understand
the requirement. Also integrated with internal teams to understand the requirement
and impact. Being involved in all the team meeting till date to understand the
requirement in a better way.
2. Design:
Technical design document is completed.
Also technical design is completed. The batch is successfully running. All the data is
loaded in cube form as per requirement it was a daily cube for Pan India.
3. Coding:
The report is generated for all circles as well as PAN India. Such a logic have been
developed for fetching data from source .As per requirement the subscriber who
does not use any of the data services from last 90 days such as call,SMS,GPRS
etc,have been identified and are reflected in daily cube ,which is produced by
cognos.
4. Testing UAT:
Unit testing was done during development and sample test cases were performed
on the data that were gathered by reporting. SIT was also performed on the data, I
was fully responsible for delivering the requirement throughout the various
phases of SDLC and necessary changes were implemented before delivery. SIT
signoff along with QA signoff was received and data was successfully loaded.
5 UAT:
The requirement was as per business need and therefore UAT signoff was received
to implement the necessary requirement in production which is in progress.
6. Implementation and Support:
Coordinated with TBO team and the cube was deployed in the production server and
implemented the requirement successfully.

Individual Role:
Cognos Developer/BI Deleloper/Datastage Developer

List Of Objectives:

(1) Business Requirement Analysis: This includes conducting large workshops with
the client teams and BA team to understand and document their functional and
non-functional requirements from the BUSINESS INTELLIGENCE solution.
(2) Design: The business requirements need to be translated to technical
requirements that are understood by the delivery team. This also includes analysis
of source systems for BUSINESS INTELLIGENCE and business rules required to
transform the data into the physical data model.
(3) Development: This includes development of code as per the design and conduct
code reviews and unit testing.
(4) Test: Required to make functional test cases for the system integration testing
and is required to ensure that the functional requirements are met as expected by
the solution developed. This also includes responsibility for ensuring a satisfactory
completion User Acceptance Test.
(5) Deployment : Includes coordination with TBO team and get the code
implemented as per the process.

Practitioners Results:
Attended and involved in workshop with clients and teh Business Analyst to
understand both Functional and Non Functional requirements with respect to
Business Intelligence.
Involved in converting the business requirements to techincal requirement. In this
the understanding of various source systems and building the physical data model
as per the requirement.
Developed the code for the specified data model. And performed code reviews and
Unit Testing.
Made functional test cases for the system integration testing was performed to
ensure that the functional requirements are met as expected by the solution
developed. This included responsibility for ensuring a satisfactory completion User
Acceptance Test.
Post User Acceptance Testing, co-ordinated with TBO team and productionised the
code that was developed.
Solvoed various trouble faced by the business users while working on the model
that was built.
Worked with the team as well as the Busniess to complete the deliverables
efficiently
Completed that deliverables within the given timelines.Took the ownership and
personal resposibility in delivering the work smoothly.