Vous êtes sur la page 1sur 37

C o n s u l ti n g E n g i n e e r s

7. S TRUCTURAL V ETTING P ROJECTS D ONE


NDA
7.1

BY

EOBI HOUSE AT SECTOR G-10/4, ISLAMABAD

Assignment Name:

Country:

EOBI HOUSE
Location within Country:

Pakistan

ISLAMABAD
Name of Client:

Professional Staff Provided by


your Firm:
2 Nos.
No. of Staff

EOBI (PRIMACO)
Address:

3 Nos.
No. of Staff Months:

EOBI House, Sector G-10/4, Islamabad


Start Date (Month/Year)
Completion Date (Month/Year):

3 Nos.
Approx. Value of Services (in
Current USD/Rs.)
July, 2007
July, 2007
Rs. 336,000/Name of Associated Firm (s), if any:
No. of Months of Professional
Staff Provided by Associated
Nil
Firm(s): Nil
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Muhammad Imran, Senior Structural Engineer
Narrative Description of Project
Construction of EOBI House at Islamabad with a built up area of around 206,000 square feet.
Description of Actual Services Provided by your Staff
Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

1
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

EOBI House, Islamabad

2
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

7.2

MABARAK CENTER, LAHORE (Foundation Pile Package)

Assignment Name:

Country:

MABARAK CENTER, LAHORE (Foundation Pile Package)


Location within Country:

Pakistan

LAHORE
Name of Client:

Professional Staff Provided by


your Firm:
6 Nos.
No. of Staff

M/s Taavun Pvt. Ltd.


Address:

20 Nos.
No. of Staff Months:

2-E-2 Oberoi House, Gulberg III, Lahore


Start Date (Month/Year)
Completion Date (Month/Year):

100 Nos.
Approx. Value of Services (in
Current USD/Rs.)
01st Feb, 2008
30th March, 2009
Rs. 50/- Million plus Rs. 100/Million Value Engineering fee
Name of Associated Firm (s), if any:
No. of Months of Professional
Staff Provided by Associated
Berkeley Associates, Lahore
Firm(s): 1 No. / 12 Nos.
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Team Leader
Muhammad Waqas Cheema, Project Manager
Khawaja Sajid Bashir, Resident Engineer
Azhar Khan Niazi, Assistant Resident Engineer
Engr. Zaki-ud-Din Shiekh, Contract Specialist
Dr. Tahir Masood, Geotechnical Specialist
Narrative Description of Project
Construction Supervision of about 2000 foundation piles each 42 meters long and 1200mm in
diameter for a 7million square feet mixed use development with Towers ranging from 45 stories
to 72 stories
Description of Actual Services Provided by your Staff
Design Review, Value Engineering, Resident Supervision and Quality Control of works executed
round the clock.
Consultants Name: NOOR DURRANI & ASSOCIATES

3
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

MABARAK CENTER, LAHORE

4
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Mabarak Center, Lahore : Steel Cage Lifted before Lowering in the pile borehole

Mabarak Center, Lahore : Lowering of the Steel Cage in Pile Bore Hole

5
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Mabarak Center, Lahore : Blocks placed for loading

Mabarak Center, Lahore : Taking reading of Inclinometer

6
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Mabarak Center, Lahore : Set up for Lateral Load Test

Mabarak Center, Lahore : Two hydraulic jacks placed on pile head

7
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Mabarak Center, Lahore : Drilling in progress

Mabarak Center, Lahore : Steel cage lowering in borehole

8
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Mabarak Center, Lahore : Steel cage lowering in borehole

Mabarak Center, Lahore : Drilling in progress

9
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Mabarak Center, Lahore : A view of Equipment

Mabarak Center, Lahore : Steel cage in progress

10
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Mabarak Center, Lahore : Final Arrangements in Progress for static Load Test

Mabarak Center, Lahore : Load is being applied during static load test

11
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

ORGANIZATION CHART
MABARAKCENTER LAHORE

PROJECT MANAGER

Geotechnical Specialist

Contract Specialist

Resident Engineer

Quality Control Engineer

Quality Inspector
Batching Plant

Inspector Incharge
Testing Lab

1.1.1.1.1.1.9 Sec
retary /
Messenger

Quality Inspector
Batching Plant

1.1.1.1.1.1.7 Site Engineer


(Geotechnical)

1.1.1.1.1.1.1 Site Engineer


(Structural)

1.1.1.1.1.1.6 Site Engineer


(Structural)

Survey & Measurement Engineer

1.1.1.1.1.1.8 Inspector
Geotechnical
1.1.1.1.1.1.2 Inspec
tor Structural

1.1.1.1.1.1.3 Inspec
tor Structural

1.1.1.1.1.1.5 Inspec
tor Structural

1.1.1.1.1.1.4 Inspec
tor Structural

Surveyor

Quantity Surveyor

12
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

7.3

PTET TOWER, ISLAMABAD

Assignment Name:

Country:

PTET TOWER, ISLAMABAD


Location within Country:

Pakistan

ISLAMABAD
Name of Client:

Professional Staff Provided by


your Firm:
2 Nos.
No. of Staff

NESPAK, Islamabad
Address:

3 Nos.
No. of Staff Months:

NESPAK House, Sector G, 5/2, Islamabad


Start Date (Month/Year)
Completion Date (Month/Year):

6 Nos.
Approx. Value of Services (in
Current USD/Rs.)
June, 2006
July, 2006
Rs. 1.5/- Million
Name of Associated Firm (s), if any:
No. of Months of Professional
Staff Provided by Associated
Nil
Firm(s): Nil
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Muhammad Imran, Senior Structural Engineer
Narrative Description of Project
Construction of PTET Towers, Islamabad has been completed. The building is envisaged to have
33 stories with a built up area of around 500,000 square feet.
Description of Actual Services Provided by your Staff
Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

13
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

PTET Tower, Islamabad

14
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

PTET Tower, Islamabad

15
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

7.4

ISLAMABAD STOCK EXCHANGE BUILDING, ISLAMABAD

Assignment Name:

Country:

ISLAMABAD STOCK EXCHANGE, ISLAMABAD


Location within Country:

Pakistan

ISLAMABAD
Name of Client:

Professional Staff Provided by


your Firm:
2 Nos.
No. of Staff

Islamabad Stock Exchange, Islamabad


Address:

3 Nos.
No. of Staff Months:

Islamabad Stock Exchange, Islamabad


Start Date (Month/Year)
Completion Date (Month/Year):

6 Nos.
Approx. Value of Services (in
Current USD/Rs.)
August, 2006
November 2006
Rs. 1.25/- Million
Name of Associated Firm (s), if any:
No. of Months of Professional
Staff Provided by Associated
Nil
Firm(s): Nil
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Muhammad Imran, Senior Structural Engineer
Narrative Description of Project
Construction of ISE Building, Islamabad has been completed. The building is envisaged to have
28 stories with a built up area of around 400,000 square feet.
Description of Actual Services Provided by your Staff
Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

16
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Islamabad Stock Exchange Building, Islamabad

17
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Islamabad Stock Exchange Building, Islamabad

7.5

HOSTEL FOR TRAINEES OF FOREIGN OFFICE, ISLAMABAD

18
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Assignment Name:

Country:

Hostel for Trainees of Foreign Office, Islamabad


Location within Country:

Pakistan

ISLAMABAD
Name of Client:

Professional Staff Provided by


your Firm:
2 Nos.
No. of Staff

NESPAK, Islamabad
Address:

3 Nos.
No. of Staff Months:

NESPAK House, Sector G, 5/2, Islamabad


Start Date (Month/Year)
Completion Date (Month/Year):

3 Nos.
Approx. Value of Services (in
Current USD/Rs.)

November, 2006
November 2006
Name of Associated Firm (s), if any:

No. of Months of Professional


Staff Provided by Associated
Nil
Firm(s): Nil
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Muhammad Imran, Senior Structural Engineer
Narrative Description of Project
Construction of Hostel for Trainees of Foreign Office Training Academy with a built up area of
around 125,000 square feet.
Description of Actual Services Provided by your Staff
Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

7.6

NESPAK HOUSE, ISLAMABAD

19
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Assignment Name:

Country:

NESPAK House, Islamabad


Location within Country:

Pakistan

ISLAMABAD
Name of Client:

Professional Staff Provided by


your Firm:
2 Nos.
No. of Staff

NESPAK, Islamabad
Address:

3 Nos.
No. of Staff Months:

NESPAK House, Sector G, 5/2, Islamabad


Start Date (Month/Year)
Completion Date (Month/Year):

3 Nos.
Approx. Value of Services (in
Current USD/Rs.)

December, 2007
December 2007
Name of Associated Firm (s), if any:

No. of Months of Professional


Staff Provided by Associated
Nil
Firm(s): Nil
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Muhammad Imran, Senior Structural Engineer
Narrative Description of Project
Construction of NESPAK Office Building Islamabad
Description of Actual Services Provided by your Staff
Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

20
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

NESPAK House, Islamabad

7.7

FAUJI FERTILIZER COMPANY LTD, HEAD OFFICE BUILDING, RAWALPINDI

Assignment Name:

Country:

21
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

FFC HEAD OFFICE BUILDING, Rawalpindi


Location within Country:

Pakistan

RAWALPINDI
Name of Client:

Professional Staff Provided by


your Firm:
2 Nos.
No. of Staff

NESPAK, Islamabad
Address:

3 Nos.
No. of Staff Months:

NESPAK House, Sector G, 5/2, Islamabad


Start Date (Month/Year)
Completion Date (Month/Year):

3 Nos.
Approx. Value of Services (in
Current USD/Rs.)

November, 2007
November 2007
Name of Associated Firm (s), if any:

No. of Months of Professional


Staff Provided by Associated
Al-Imam Enterprises
Firm(s):
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Muhammad Imran, Senior Structural Engineer
Narrative Description of Project
Construction of Head Office Building, Fauji Fertilzer Company. Ltd, Rawalpindi
Description of Actual Services Provided by your Staff
Value Engineering / Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

22
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

FFC HEAD OFFICE BUILDING, Rawalpindi

7.8

HEADQUARTER OF BUREAU OF IMMIGRATION, ISLAMABAD

Assignment Name:

Country:

23
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Headquarter of Bureau of Immigration, Islamabad


Location within Country:

Pakistan

Islamabad
Name of Client:

Professional Staff Provided by


your Firm:
2 Nos.
No. of Staff

BUREAU OF IMMIGRATION
Address:

3 Nos.
No. of Staff Months:

Islamabad
Start Date (Month/Year)

3 Nos.
Approx. Value of Services (in
Current USD/Rs.)

Completion Date (Month/Year):

June, 2008
June, 2008
Name of Associated Firm (s), if any:

No. of Months of Professional


Staff Provided by Associated
Nil
Firm(s): Nil
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Muhammad Imran, Senior Structural Engineer
Narrative Description of Project
Construction of Headquarter of Bureau of Immigration with a built up area of around 168,000
square feet.
Description of Actual Services Provided by your Staff
Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

3.9

GUJRANWALA BUSINESS CENTER, GUJRANWALA

Assignment Name:

Country:

Gujranwala Business Center, Gujranwala

Pakistan
24

FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad


Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Location within Country:


Gujranwala
Name of Client:

Professional Staff Provided by


your Firm:
2 Nos.
No. of Staff

SMEDA, Lahore
Address:

3 Nos.
No. of Staff Months:

8th Floor, LDA Plaza, Egerton Road, Lahore


Start Date (Month/Year)
Completion Date (Month/Year):

3 Nos.
Approx. Value of Services (in
Current USD/Rs.)

November, 2007
November 2007
Name of Associated Firm (s), if any:

No. of Months of Professional


Staff Provided by Associated
Nil
Firm(s): Nil
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Muhammad Imran, Senior Structural Engineer
Narrative Description of Project
Construction of Gujranwala Business Center, Gujranwala
Description of Actual Services Provided by your Staff
Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

7.10

WORKER WELFARE FUND SECRETARIAT BUILDING, ISLAMABAD

Assignment Name:

Country:

Worker Welfare Fund Secretariate Building, Islamabad


Location within Country:

Pakistan
Professional Staff Provided by

25
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Islamabad
Name of Client:

your Firm:
2 Nos.
No. of Staff

Worker Welfare Fund, Islamabad


Address:

3 Nos.
No. of Staff Months:

Sector G, 10/4, Islamabad


Start Date (Month/Year)

3 Nos.
Approx. Value of Services (in
Current USD/Rs.)

Completion Date (Month/Year):

February, 2008
February, 2008
Name of Associated Firm (s), if any:

No. of Months of Professional


Staff Provided by Associated
Nil
Firm(s): Nil
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Muhammad Imran, Senior Structural Engineer
Narrative Description of Project
Construction of Worker Welfare Fund Secretariat Building with a built up area of around
75,000 square feet.
Description of Actual Services Provided by your Staff
Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

7.11

PAKISTAN INSTITUTE OF TRADE & DEVELOPMENT (PITAD), ISLAMABAD

Assignment Name:

Country:

Pakistan Institute Trade & Development (PITAD)


Location within Country:

Pakistan
Professional Staff Provided by
your Firm:

26
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Islamabad
Name of Client:

2 Nos.
No. of Staff

Ministry of Commerce, Govt. of Pakistan


Address:

3 Nos.
No. of Staff Months:

Ministry of Commerce, Govt. of Pakistan


Start Date (Month/Year)
Completion Date (Month/Year):

3 Nos.
Approx. Value of Services (in
Current USD/Rs.)

December, 2009
December, 2009
Name of Associated Firm (s), if any:

No. of Months of Professional


Staff Provided by Associated
Nil
Firm(s): Nil
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Muhammad Imran, Senior Structural Engineer
Narrative Description of Project
Construction of Pakistan Institute of Trade & Development (PITAD) with a built up area of
around 100,000 square feet.
Description of Actual Services Provided by your Staff
Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

7.12

FEDERAL JUDICIAL ACADEMY (PHASE-II) AT H-8/4, ISLAMABAD


(ACADEMIC BLOCK, HOSTEL BLOCK, FACULTY SUITES AND GYMNASIUM &
SERVANT RESIDENCE)

Assignment Name:

Country:

Federal Judicial Academy (Phase II), Islamabad


Location within Country:

Pakistan
Professional Staff Provided by

27
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Islamabad
Name of Client:

your Firm:
2 Nos.
No. of Staff

Ministry of Law, Justice & Parliamentary Affairs


Address:

3 Nos.
No. of Staff Months:

H. No. 146, St. No.6, Main Margala Road , Islamabad


Start Date (Month/Year)
Completion Date (Month/Year):

3 Nos.
Approx. Value of Services (in
Current USD/Rs.)

March, 2011
March, 2011
Name of Associated Firm (s), if any:

No. of Months of Professional


Staff Provided by Associated
Nil
Firm(s): Nil
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Sheikh Ilyas Ahmed, Senior Structural Engineer
Mohsin Ali Syed, Junior Engineer
Narrative Description of Project
Construction of Federal Judicial Academy (Phase II) with a built up area of around 305,000
square feet.
Description of Actual Services Provided by your Staff
Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

7.13

NEW CHINA EMBASSY AT DIPLOMATIC ENCLAVE, ISLAMABAD

Assignment Name:

Country:

New China Embassy at Diplomatic Enclave, Islamabad


Location within Country:

Pakistan

Islamabad

Professional Staff Provided by


your Firm:
2 Nos.

28
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Name of Client:

No. of Staff

NESPAK, Islamabad
Address:

3 Nos.
No. of Staff Months:

NESPAK House, Sector G, 5/2, Islamabad


Start Date (Month/Year)
Completion Date (Month/Year):

3 Nos.
Approx. Value of Services (in
Current USD/Rs.)

December, 2011
December, 2011
Name of Associated Firm (s), if any:

No. of Months of Professional


Staff Provided by Associated
Nil
Firm(s): Nil
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Sheikh Ilyas Ahmed, Senior Structural Engineer
Mohsin Ali Syed, Junior Engineer
Narrative Description of Project
Construction of New China Embassy at Diplomatic Enclave, Islamabad with a built up area of
around 200,000 square feet.
Description of Actual Services Provided by your Staff
Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

7.14

FEDERAL SERVICES TRIBUNAL BUILDING, ISLAMABAD

Assignment Name:

Country:

Federal Services Tribunal Building, Islamabad


Location within Country:

Pakistan

Islamabad
Name of Client:

Professional Staff Provided by


your Firm:
2 Nos.
No. of Staff

29
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

NESPAK, Islamabad
Address:

3 Nos.
No. of Staff Months:

NESPAK House, Sector G, 5/2, Islamabad


Start Date (Month/Year)
Completion Date (Month/Year):

3 Nos.
Approx. Value of Services (in
Current USD/Rs.)

January, 2008
January, 2008
Name of Associated Firm (s), if any:

No. of Months of Professional


Staff Provided by Associated
Nil
Firm(s): Nil
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Muhammad Imran, Senior Structural Engineer
Narrative Description of Project
Construction of Federal Services Tribunal Building, Islamabad with a built up area of around
125,000 square feet.
Description of Actual Services Provided by your Staff
Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

7.14

G 4 Mall & Office Tower, Califton, Karachi

Assignment Name:

Country:

G 4 Mall & Office Tower, Califton, Karachi


Location within Country:

Pakistan

Karachi
Name of Client:

Professional Staff Provided by


your Firm:
3 Nos.
No. of Staff
4 Nos.

30
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Address:

No. of Staff Months:

Start Date (Month/Year)

4 Nos.
Approx. Value of Services (in
Current USD/Rs.)

Completion Date (Month/Year):

December, 2007
December 2007
Name of Associated Firm (s), if any:

No. of Months of Professional


Staff Provided by Associated
Berkeley Associates, Lahore
Firm(s):
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Naeem-ur-Rahman Durrani, Chief Engineer
Dr. Tahir Masood, Geotechnical Expert
Muhammad Imran, Senior Structural Engineer
Narrative Description of Project
Construction of Gujranwala Business Center, Gujranwala
Description of Actual Services Provided by your Staff
Review of Structural Design
Consultants Name: NOOR DURRANI & ASSOCIATES

7.15

METRO CASH & CARRY, ISLAMABAD

Assignment Name:

Country:

Metro Cash & Carry, Islamabad


Location within Country:
Islamabad
Name of Client:

Pakistan
Professional Staff Provided by
your Firm:
3 Nos.
No. of Staff

M/s Metro Cash & Carry, Pakistan


Address:

8 Nos.
No. of Staff Months:

31
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

Thokar Niaz Baig, Lahore


Start Date (Month/Year)

60 Nos.
Approx. Value of Services (in
Current USD/Rs.)
15th Aug, 2007
15th April, 2008
USD 50/- Million
Name of Associated Firm (s), if any:
No. of Months of Professional
Staff Provided by Associated
Nil
Firm(s): Nil
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
Completion Date (Month/Year):

Muhammad Waqas Cheema, Project Manager


Muhammad Abrar Malik, Resident Engineer
Engr. Zaki-ud-Din Sheikh, Contract Specialist
Narrative Description of Project
Whole Sale Store and Infrastructure spread over 50,000 sq yards of land. The Store had a built
up area of 130,000 sq ft with a pre engineered steel roof. The Project was built on fast track with
several specialist Contractors from Europe working round the clock.
Description of Actual Services Provided by your Staff
Design Review of Structural, Geotechnical and Plumbing Works, Project Management and
Resident Supervision of works.
Consultants Name: NOOR DURRANI & ASSOCIATES

32
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

METRO CASH & CARRY, ISLAMABAD : Front View

METRO CASH & CARRY, ISLAMABAD : Excavation in progress

33
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

METRO CASH & CARRY, ISLAMABAD : Concrete in progress

METRO CASH & CARRY, ISLAMABAD

34
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

METRO CASH & CARRY, ISLAMABAD : Purlins Top of Jack Beams in progress

METRO CASH & CARRY, ISLAMABAD : A Front View During Construction

35
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

METRO CASH & CARRY, ISLAMABAD


ORGANIZATION CHART

1.1.1.1.1.1.11 Qua
lity Control /
Safety Engineer

In charge Materials
Laboratory

PROJECT MANAGER

1.1.1.1.1.1.10 Con
trac

Resident Engineer (Civil)


(Planning Engineer)

Site Architect

MEP Engineer

Inspector Civil /
Archi. Works

Measurement &
Survey Engineer

Inspector Electrical /
HVAC

36
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

C o n s u l ti n g E n g i n e e r s

37
FEB & GIF: High-Rise BF Tower Project, Blue Area, Islamabad
Hiring of Consultancy Services for Third Party Evaluation of Structural Design

Vous aimerez peut-être aussi