Specification report to accompany the estimate for the Sub-work of

Maintenance of Butchireddypalem -Dagadarthi road from KM. 12/0 to 13/5 & 21/0 to 27/6 u

Maintanance of all roads in (R&B) Section, Allur for the year 2014-15
(Single package)
Rs.

AUTHORITY:-

As per instructions of the Executive Engineer (R&B) Kavali.

NECESSITY:-

The Butchireddypalem - Dagadarthi road is an important Ma


Nellore District connecting number of villages like Butchi, Dagada
Sunnapubatti in NH-5.

The Annual maintanance is to be carried out for the year 2014


No.132 for the above road. Hence this estimate is prepared with the fo
based on the KM war rates approved vide Go Ms No.132.

PROVISIONS:-

1
2
3
4
5
6
7
8

Providing B.T. Patch work with WMM for pot holes.


Providing BT patch work using 40mm HBG IRC metal
Providing B.T. Patch work with 12 -14 mm IRC HBG chips.
Clearing the Juliflora (Prosafis) Jungle

Stripping the excess soil from shoulders


Removal of unservicable soil
Brick Masonry with C.M. (1:6) for damaged parapet walls
Plastering with C.M. (1:5) 12 mm thick for parapets
9 White washing to culvert parapet walls.
10 Providing and applying two coats for tree banding
11 Engaging special labour for culverts vents clearence
12 Providing JCB for clearing of debris
13 Provision for seignorage charges
14 Provision for VAT Charges @ 5.0 %.
15 L,.S. Provision for cost supply of stationary, Xerox charges
and rounding off.

The estimate is prepared based on common S.S.R. for th


and the work will be carried out as per A.P.S.S. / MORT & H and it
instructions issued from time to time .

or the Sub-work of

0 to 13/5 & 21/0 to 27/6 under

or the year 2014-15


97200

road is an important Major District Road in


es like Butchi, Dagadarthi,Chennur and

ed out for the year 2014-15 as per Go Ms


is prepared with the following provisions
No.132.

C HBG chips.

parapet walls
arapets

nding
earence

Xerox charges

on common S.S.R. for the year 2014-2015


.S. / MORT & H and its relevant circular

Mtc of Butchi-Dagadarthi road From Km. 12/0 to 13/5 & 21/0 to 27/6 For The Year 2015-16 i
Nellore District.

Detailed cum Abstract Estimate


S.No
1

Description

Nos

Est amount:97,200
B

Qty

Providing, Laying, Spreading and compacting graded HBG crushed stone


aggregate to Wet Mix macadem specification including cost,seignorage of all
materials and including premixing the material with water at OMC in
Mechanical mix plant carriage of mixed material by tipper to site , laying in
uniform layers with paver in

base courses on well prepared surface and

compacting with Vibratory roller to acheive the desired density etc., as


directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4th
revision) for finished item of work.
Km 12/0 to 27/6
2

1.50
m3

Providing BT patch work for pot holes using 40mm HBG IRC metal with
required quantity of 9.5-11.2mm HBG IRC machine crushed key chips and
80/100 grade bitumen @ 42.00kgs per cum removal of loose materials in the
pot holes , trimming the edges to provide firm vertical faces cleaning applying
tack coat filling pot holes duly tamping to fill all voids etc complete and as
directed by the Engineer -in Charge .
Km 12/0 to 27/6

4.00
m3

Providing BT patch work for using 12-14mm HBG IRC machine crushed chips
and 80/100 grade bitumen @ 72.00kgs per cum removal of loose materials in
the pot holes , trimming the edges to provide firm vertical faces cleaning
applying tack coat filling pot holes duly tamping to fill all voids etc complete
and as directed by the Engineer -in Charge .
Km 12/0 to 27/6

3.50
m3

Clearing the Juliflora (Prosafis) jungle including uprooting and removing of


stumps clearing away from site, burning etc., complete as directed by the
Engineer-in-Charge during execution of work./1m2
Km 12/0 to 13/5 & 21/0 to 27/6
deduct voids 50%

3500

1.00

7000
-3500
3500
sqm

Stripping the excess soil from the shoulders surface with an average depth of
stripping as 75mm to achieve the approved level for sectioning th berms /
shoulders including all labour charges for dumping the stripped earth from
shoulders on the side slopes etc. complete.
Km 12/0 to 27/6
2

500

1.00

1000

S.No

Description

Nos

Removal of unserviceable soils upto SDR including


disposal upto 1000 mts etc.,

complete

Qty

excavation, loading and

including seignioarge charges for

finished item of work as per MoRT&H specification 301(4th Revision) and as


directed by the Engineer-in-Charge
Km 12/0 to 27/6
7

100

1.00

0.3

30.00
m3

Brick masonry in C.M. (1:6) mix using II nd class Bricks including cost, and
conveyance of cement sand, Bricks and all other materials confirming to APSS
specifications to site and all labour charges for mixing mortar construction of
masonry water curing with all leads and lifts for conveyance of water cost of
scaffolding charges etc complete and as directed by the Engineer-In-Charge
during execution of work
for damaged parapets(2*2)

3.00

0.4

0.60

2.88
3.00
m3

Plastering in CM (1:5) 12 mm thick including cost and conveyance of all


materials , seigniorage charges , labour charges , curing

etc complete for

finished item of work as directed by the Engineer -in-Charge


for damaged parapets & raising
parapets
4
6.80
0.60

16.32
17.00
m2

White washing two coats with best shell lime including cost and conveyance of
lime, gum, cunjee water and all labour charges for applying etc complete.
for Culvert parapets

100.00
m2

10 Painting to tree bands with ready mixed first quality synthetic enamel paint of approved
brand and shade over 1 coat of wood primer of approved brand including cost and
conveyance of all materials to work site and all operational, incidental, labour charges
etc., complete for finished iem of work as per SS 1212
tree bands
90
1.2

0.9

11 Towords Providing J.C.B for clearing of debries


(as per michinery rate)
12 Towords Providing special labour for clearing of vents &vegitation

97.20
97.20
m2
3.00
hrs
5.00

S.No

Description

Nos

Qty
nos

13 Provision for VAT 5%


14 Provision forseigniorage charges
15 Provision for Rounding off
TOTAL

S.No

Description

Nos

Qty

r The Year 2015-16 in SPSR

st amount:97,200
Rate

Amount

1460.10
m3

2190

3982.80
m3

15931

5251.70
m3

18381

3.70
sqm

12950

7.70

7700

Rate

Amount

sqm

56.60
m3

1698

4252.70

12758

m3

2394.40
10 m2

4070

156.83
10 m2

1568

110.00
m2

10692

690.00
hrs

2070

200.00

1000

Rate

Amount

each
91009
4550
1360
280
97200

Rate

Amount

14

SEINIORAGE CHARGES
Mtc of Butchi-Dagadarthi road From Km. 12/0 to 13/5 & 21/0 to 27/6 For The Year

Sl.No

Description of Item

Item quantity in
Cum

Coefficient

BT Patch work using 40mm

4.00

1.33

BT Patch work using WMM

1.50

1.33

BT Patch work using 12-14mm

3.50

1.33

Bricks for Masonry work

3.00

512

sand for Brick Masonry

3.00

0.28

Sand for plastering

17.00

0.021

Removal of unservicable soil

30.00

1.00

304385564.xlsx

304385564.xlsx

HARGES

o 27/6 For The Year 2015-16 in SPSR Nellore District.

Total Quantity
in Cum

Seiniorage Rate per


cum

5.32

50

266.00

2.00

50

99.75

4.66

50

232.75

1536.00

35

53.76

0.84

40

33.60

0.36

40

14.28

30.00

22

660.00

Total Amount

1360.14

say

304385564.xlsx

1360.00

304385564.xlsx

BREAK UP DETAILS

1. KIND OF MATERIAL:-

HBG MACHINE CRUSHED CHIPS & Metal.


Quarry at KM. 4/6 of Butchi Dagadarthi road with 0.80 KM CT.
C.T.
0.800
10 % C.T.
0.080
Butchi-Dagadarthi road km.4/6 to 12/0
7.400
Butchi-Dagadarthi road km.12/0 to 27/6
7.800
(Average lead (27.6-12.0)/2 =7.80)
16.080

2. KIND OF MATERIAL:-

Gravel.
Quarry at km 13/4 of B-D road with 0.20 KM ct.

CT
10 % CT
Butchi-Dagadarthi road km.13/4 to 12/0 & 13/4 to 27/6
(Average lead ((13.4-12.0)+(27.6-13.4))/2 =7.80)

3. KIND OF MATERIAL:-

Country bricks.
Kilns at Km. 11/2 of RI road with 0.20 KM CT

CT
10 % CT
RI road km. 11/2 to 18/0
PR road
A-U road Km.0/6 to 3/10
KK road Km.5/8 to 0/0
B-D road Km.27/6 to12/0
(Average lead (27.6-12.0)/2 =7.80)

4. KIND OF MATERIAL:-

0.200
0.020
4.800
18.800
7.800
31.620

Sand for Filling


Quarry at km 21/2 of the road with 0.20 KM Ct.

Butchi-Dagadarthi road km.21/2 to 27/6 & 12/0 to 21/2


(Average lead ((21.2-12.0)+(27.6-21.2))/2 =7.80)

6. KIND OF MATERIAL:-

0.200
0.020
6.800
0.260
3.400
5.800
7.800
24.280

Sand for Mortar


Quarry at km 1/4 of N.B.B. road with 0.20 KM Ct.

CT
10 % CT
KT road km. 0/0 to 4/8
New NH 5 road km. 183/6 to 202/4
B-D road Km.27/6 to12/0
(Average lead (27.6-12.0)/2 =7.80)

5. KIND OF MATERIAL:-

0.200
0.020
7.800
8.020

7.800
7.800

80/100 GRADE PACKED BITUMEN


MRL Chennai

Chennai local
New NH 5 road km. 0/0 to 202/4
B-D road Km.27/6 to12/0
(Average lead (27.6-12.0)/2 =7.80)

5.000
202.40
7.800
215.20

0 KM CT.

OR

16.00 KMS.

OR

8.00 KMS.

OR

24.00 KMS.

OR

32.00 KMS.

OR

8.00 KMS.

OR

215.00 KMS.

NAME OF WORK :-Butchi-Dagadarthi road From Km.12/0 to 13/5 & 21/0 To 27/6 For The Year 2015-16 in SPSR Nellore Distict

LEAD STATEMENT

Sl.N
o

Description of Metal

Source of Supply

Lead in
Kms

Conveyance

Initial cost
less stacking

Blasting
charges

Machine
crushing
charges

Seigniorage
charges

FOR ROAD WORKS


1

60 to 63 mm IRC and MoRTH


HBG metal

Quarry at km 4/6
of B-D road

16.00

195.35

419.00

70.00

0.00

0.00

50 to 55 mm IRC and MoRTH


HBG metal

- do -

16.00

195.35

456.00

70.00

0.00

0.00

40 to 45 mm IRC and MoRTH


HBG metal

- do -

16.00

195.35

588.00

70.00

0.00

0.00

40 to 45 mm IRC and
MoRTH HBG M/C metal

- do -

16.00

195.35

588.00

70.00

147.00

0.00

25 to 27 mm IRC and
MoRTH HBG M/C metal

- do -

16.00

195.35

944.00

70.00

236.00

0.00

19 to 22 mm IRC and
MoRTH HBG M/C metal

- do -

16.00

195.35

984.00

70.00

246.00

0.00

12 to 14 mm IRC and
MoRTH HBG M/C metal

- do -

16.00

195.35

780.00

70.00

195.00

0.00

9.5 to 11.20 mm IRC and


MoRTH HBT M/C metal

- do -

16.00

195.35

656.00

70.00

164.00

0.00

5 to 7 mm IRC and MoRTH


HBG M/C metal

- do -

16.00

195.35

504.00

70.00

126.00

0.00

2.36 to 5 mm IRC and


MoRTH HBG M/C metal

- do -

16.00

195.35

308.00

70.00

77.00

0.00

10

Source of Supply

Lead in
Kms

Conveyance

Initial cost
less stacking

Blasting
charges

Machine
crushing
charges

Seigniorage
charges

- do -

16.00

195.35

340.00

0.00

0.00

0.00

- do -

16.00

195.35

85.00

0.00

0.00

0.00

13 Gravel

Quarry at km 13/4
of B-D road

8.00

106.93

103.00

0.00

0.00

0.00

14 Sand for Mortar

Quarry at Km 1/4
of NBB road

32.00

368.51

462.00

0.00

0.00

0.00

15 Sand for filling

Quarry at Km 21/2
of B-D road

8.00

106.93

342.00

0.00

0.00

0.00

16 II nd class Bricks

Quarry at Km 11/2
of R-I road

24.00

412.45

4700.00

0.00

0.00

0.00

17 Cement

0.00

0.00

5900.00

0.00

0.00

0.00

18 Shell lime

0.00

0.00

950.00

0.00

0.00

0.00

215.00

376.25

39995.97

0.00

0.00

0.00

Sl.N
o

11

Description of Metal

HBG Stone chips 2.36mm


and below

12 Stone Dust

19

Bitumen 80/100 as on
16.05.15

IOCL Chennai

Sl.N
o

Description of Metal

Source of Supply

Lead in
Kms

Conveyance

Initial cost
less stacking

Blasting
charges

Machine
crushing
charges

Seigniorage
charges

Sl.N
o

Description of Metal

Source of Supply

Lead in
Kms

Conveyance

Initial cost
less stacking

Blasting
charges

Machine
crushing
charges

Seigniorage
charges

16 in SPSR Nellore Distict.

SSR 2014-15.

Deduct stacking
Toal Cost per
charges for
Cum
conveyance

-8.70

675.65

-8.70

712.65

-8.70

844.65

-8.70

991.65

-8.70

1436.65

-8.70

1486.65

-8.70

1231.65

-8.70

1076.65

-8.70

886.65

-8.70

641.65

Deduct stacking
Toal Cost per
charges for
Cum
conveyance
-8.70

526.65

-8.70

271.65

-5.50

204.43

-5.50

825.01

-5.50

443.43

-10.00

5102.45

0.00

5900.00

0.00

950.00

-900.00

39472.22

Deduct stacking
Toal Cost per
charges for
Cum
conveyance

Deduct stacking
Toal Cost per
charges for
Cum
conveyance

Mtc of Butchi-Dagadarthi road From Km. 12/0 to 13/5 & 21/0 to 27/6 For The Year 2015-16 in SPS
DATAS
S.N
o
Quantity
Unit
Description
1
2
3
4
1 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate
to Wet Mix macadem specification including cost,seignorage of all materials and
including premixing the material with water at OMC in Mechanical mix plant
carriage of mixed material by tipper to site , laying in uniform layers with paver in
base courses on well prepared surface and compacting with Vibratory roller to
acheive the desired density etc., as directed by the Engineer-in-Charge and as per
MoRT&H specification.406 (4th revision) for finished item of work.

(A)
0.48
2.00
10.00
(B)
6.60
6.00
6.00
6.00
3.90
3.00
(C)
89.10
118.80
89.10
(D)
0.00
(E)
(F)

Unit = cum
Taking output = 225 cum
Labour

Rate
5

Page 110,111 of MoRT&H SDB

nos. Mate

345.00

nos. Mazdoor skilled


nos. Mazdoor

357.00
295.00

Total
Machinery
hr
Wet mix plant of 60 tonne hr. capacity
hr
Electric generating set 125 KVA
hr
front end loader 1 cum capacity
hr
Mechanical Paver finisher 100 TPH
hr
smooth wheeled roller 8 Ton
hr
Water tanker
Total
Material
cum 45 to 22.40mm IRC HBG metal @ 30%
(Av. Of 40-45, 25-27, 19-22mm )
cum 22.4 to 2.36mm IRC HBG metal @ 40%
(Av. Of 19-22, 12-14, 9.5-11.2, 5-7mm and 2.36mm to 5mm)
cum
2.36mm to 75 micron @ 30% (2.36mm & below)
Total
Over head charges @ 5%
%
Add for Over head charges @ 5% on (A)+(B)+( C)
Total of (A) + (B)+( C)+(D)
Add Contractors Profit at 10% on (E)
Cost per 225 cum (E) + (F)
Rate per 1 cum
Rate to be adopted per 1 cum

1646.00
1320.00
1646.00
0.00
1146.70
624.00

1304.98
1064.65
526.65

Providing BT patch work for pot holes using 40mm HBG IRC metal with required
quantity of 9.5-11.2mm HBG IRC machine crushed key chips and 80/100 grade
bitumen @ 42.00kgs per cum removal of loose materials in the pot holes , trimming
the edges to provide firm vertical faces cleaning applying tack coat filling pot holes
duly tamping to fill all voids etc complete and as directed by the Engineer -in
Charge .
Unit = 1cum
(C)
1.00

Material
cum 40 mm IRC HBG metal

Page 110,111 of MoRT&H SDB

991.65

S.N
o
1

Quantity
2
0.13
42.00

Unit
Description
3
4
cum 10-12 mm HBG key chips
Kgs 80/100 graded bitumen packed

Rate
5
1076.65
39472.22
Total

0.00

add extra for wastage of materials on cost of chips

2.86

nos

Labour charges

0.27

hrs

smooth wheeled roller 8 Ton

1.00

cum for Tools and Plants

1131.61
295.00
1146.70

Rate per 1 cum


Rate to be adopted per 1 cum
3

Providing B.T. Patch work using

12 mm to 14 mm size HBG machine crushed chips

and

80/100 grade bitumen at 72 kgs per 1.0 cum, removal of loose materials in the pot holes,
trimming the edges to provide for vertical faces, cleaning, applying tack coat, filling pot holes
duly tamping, to fill all voids etc complete and as directed by the Engineer-In-Charge .

1.00
0.15
72.00

cum
cum
Kgs

12 to 14 mm IRC HBG M/C Chips


Cost of sand
80/100 Grade Packed Bitumen

1231.65
443.43
39472.22
Total

0%
2.86
0.27
1.00

Add extra for wastage of materials on cost of chips


Nos
hrs

Labour charges
smooth wheeled roller 8 Ton
Men & Materials.
cum For tools and Plants.

1298.16
295.00
1146.70

Total
Rate to be adopted per 1 cum
4

Clearing the Juliflora (Prosafis) jungle including uprooting and removing of stumps clearing
away from site, burning etc., complete as directed by the Engineer-in-Charge during
execution of work./1m2

1.00

Sq.m Rate as per SSR

3.70
Rate to be adopted per 1 Sq.m

Stripping the excess soil from the shoulders surface with an average depth of
stripping as 75mm to achieve the approved level for sectioning th berms /
shoulders including all labour charges for dumping the stripped earth from
shoulders on the side slopes etc. complete.
By mechanical means
Taking output 100 Sq.m
0.10
day Mate
2.50
day Mazdoor

345.00
295.00

Add for sundries for caution boards tools for ramming etc.,

Rate per 100 Sq.m


Rate per 1 Sq.m
Rate to be adopted per 1 sq.m

S.N
o
Quantity
Unit
Description
1
2
3
4
6 Removal of unserviceable soils upto SDR including excavation, loading and disposal

Rate
5

upto 1000 mts etc., complete including seignioarge charges for finished item of
work

as per MoRT&H specification 301(4th Revision)

and as directed by the

Engineer-in-Charge
Unit : Cum
Taking out put = 360 Cum
Page 58 of MoRT&H SDB
(A) Labour
0.08
day Mate
345.00
2.00
day Mazdoor unskilled
295.00
Total
(B) Machinery
360.00
cum Rate as per G.O.Ms No 10 Dt 26/7/2005
13.00
16.36
Hrs Tippers 5.50 cum Capacity
922.00
Total
(C) Seignorage Charges
360.00
cum Seignorage charges
0.00
Total
(D) Over head charges @ 5%(10%-VAT) on (A)+(B)+( c)
(E) Total of (A)+(B)+( C)+(D)
(F) Add contractors Profit at 10% on (E)
cost per 360 Cum (E)+(F)
Rate per Cum
Rate to be adopted per 1 cum

Cost of Cement Mortar ( 1:6)

1.00
1/6
1.00

cum Cost of Sand


cum Cost of Cement
cum Mixing Charges

825.01
8496.00
28.00
Total

Brick masonry in C.M. (1:6) mix using II nd class Bricks including cost, Seigniorage charges
and conveyance of cement sand, Bricks and all other materials confirming to APSS
specifications to site and all labour charges for mixing mortar construction of masonry water
curing with all leads and lifts for conveyance of water cost of scaffolding charges etc
complete and as directed by the Engineer-In-Charge during execution of work.

512.00
0.20
0.42
0.98
0.70
2.10

Nos
cum
Nos
Nos
Nos
Nos

Cost of II nd class bricks


Cost of CM 1:6
Mason Ist class
Mason II nd class
Man Mazdoor
Woman Mazdoor

4853.15
2269.01
357.00
345.00
295.00
295.00
Total
Rate to be adopted per 1 cum

Cost of Cement Mortar ( 1:5)

1.00
1/5
1.00

cum Cost of Sand


cum Cost of Cement
cum Mixing Charges

825.01
8496.00
28.00

S.N
o
1

Quantity
2

Unit
3

Description
4

Rate
5
Total

10 Plastering in CM (1:5) 20 mm thick including cost and conveyance of all materials ,


seigniorage charges , labour charges , curing

etc complete for finished item of

work as directed by the Engineer -in-Charge


0.21
0.66
1.54
0.50
3.20

cum
Nos
Nos
Nos
Nos

Cost of CM 1:5
Mason Ist class
Mason IInd class
Man Mazdoor
Woman Mazdoor

2552.21
357.00
345.00
295.00
295.00
Total
Rate to be adopted per 10 Sqm

11 White washing two coats with best shell lime including cost and conveyance of lime,
gum, cunjee water and all labour charges for applying etc complete.
0.07
0.48
1.12
0.50
2.70

cum
Nos
Nos
Nos
Nos

Cost of shell lime


Mason Ist class
Mason Iind class
Man Mazdoor
Woman Mazdoor

950.00
357.00
345.00
295.00
295.00
Total per 100 Sqm
Rate per 10 Sqm

12 Painting to tree bands with ready mixed first quality synthetic enamel paint of
approved brand and shade over 1 coat of wood primer of approved brand including
cost and conveyance of all materials to work site and all operational, incidental,
labour charges etc., complete for finished iem of work as per SS 1212
Unit : Sqm
Page 221,222 of MORT&H SDB
Taking out put = 10 Sqm
(A) Labour
0.33
nos. Painter I class
0.77
nos. Painter II class

Total

(B) Material
Cost of synthetic enamel paint
1.10
Litre

440.00
345.00

253.00
Total

( C) Over head charges @ 5% on (A)+(B)


(D) Total of (A)+(B)+( C)
(E) Add contractors Profit at 10% on (D)
cost per 10 Sqm (D)+(E)
Rate per Sqm
Rate to be adopted per 1 Sqm

015-16 in SPSR Nellore District.

Per
6

Amount
7

day

165.60

day
day

714.00
2950.00
3829.60

hr
hr
hr
hr
hr
hr

10863.60
7920.00
9876.00
0.00
4472.13
1872.00
35003.73

cum

116274.02

cum

126480.42

cum

46924.52
289678.96

Rs.

cum

0.00
328512.29
0.00
328512.29
1460.05
1460.10

991.65

Per
6
cum
MT

Amount
7
139.96
1657.83
2789.44
0.00

each

843.70

hour

309.61
40.00

Rs.

3982.75
3982.80

cum
cum
MT

1231.65
66.51
2842.00
4140.16

cum

0.00

Each
hrs

843.70

Rs.

227.80
40.00
5251.66
5251.70

Sq.m
Rs.

3.70
3.70

day
day

Rs.

34.50
737.50
0.20
772.20
7.722
7.70

Per
6

Amount
7

SDB
day
day

27.6
590.00
617.6

cum
Hrs

4680.00
15083.92
19763.92

cum

0.00

Rs.

0.00
20381.52
0.00
20381.52
56.62
56.60

cum
cum
cum
Rs.

825.01
1416.00
28.00
2269.01

1000 Nos

cum
Each
Each
Each
Each
Rs.

cum
cum
cum

2484.81
453.80
149.94
338.10
206.50
619.50
4252.65
4252.70

825.01
1699.20
28.00

Per
6
Rs.

cum
Each
Each
Each
Each
Rs.

cum
Each
Each
Each
Each
Rs.

Amount
7
2552.21

535.96
235.62
531.30
147.50
944.00
2394.38
2394.40

66.50
171.36
386.40
147.50
796.50
1568.26
156.83

day
day

145.20
265.65
410.85

Litre

278.30
689.15

Rs.

0.00
1100.00
0.00
1100.00
110.00
110.00

0.00
0.00

LEAD CHARGES
Earth/Grave
Metal
l/Sand

loading
unloading
stacking
0.25
0.5
1
2
3
4
5
6
7
8

46.05
13.95
0.00
27.63
27.63
27.63
38.68
51.67
62.72
73.77
84.82
95.88
106.93

92.11
13.95
0.00
26.67
26.67
26.67
37.37
51.67
62.72
73.77
84.82
95.88
106.93

9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

117.98
129.04
140.09
151.14
162.19
173.25
184.30
195.35
206.40
217.46
228.51
239.56
250.61
261.67
272.72
283.77
294.82
305.88
316.93
327.98
339.04
350.09
359.30

117.98
129.04
140.09
151.14
162.19
173.25
184.30
195.35
206.40
217.46
228.51
239.56
250.61
261.67
272.72
283.77
294.82
305.88
316.93
327.98
339.04
350.09
359.30

32
33
34
35

368.51
377.72
386.93
396.14

368.51
377.72
386.93
396.14

36

405.35

405.35

37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

414.56
423.77
432.98
442.19
451.40
460.61
469.82
479.04
488.25
497.46
506.67
515.88
525.09
534.30
543.51
552.72
561.93
571.14
580.35
589.56
598.77
607.98
617.19
626.40
635.61
644.82
654.04
663.25
672.46
681.67
690.88
700.09
709.30
718.51
727.72
736.93
746.14

414.56
423.77
432.98
442.19
451.40
460.61
469.82
479.04
488.25
497.46
506.67
515.88
525.09
534.30
543.51
552.72
561.93
571.14
580.35
589.56
598.77
607.98
617.19
626.40
635.61
644.82
654.04
663.25
672.46
681.67
690.88
700.09
709.30
718.51
727.72
736.93
746.14

74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116

755.35
764.56
773.77
782.98
792.19
801.40
810.61
819.82
829.04
838.25
847.46
856.67
865.88
875.09
884.30
893.51
902.72
911.93
921.14
930.35
939.56
948.77
957.98
967.19
976.40
985.61
994.82
1004.04
1013.25
1022.46
1031.67
1040.88
1050.09
1059.30
1068.51
1077.72
1086.93
1096.14
1105.35
1114.56
1123.77
1132.98
1142.19

755.35
764.56
773.77
782.98
792.19
801.40
810.61
819.82
829.04
838.25
847.46
856.67
865.88
875.09
884.30
893.51
902.72
911.93
921.14
930.35
939.56
948.77
957.98
967.19
976.40
985.61
994.82
1004.04
1013.25
1022.46
1031.67
1040.88
1050.09
1059.30
1068.51
1077.72
1086.93
1096.14
1105.35
1114.56
1123.77
1132.98
1142.19

117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

1151.40
1160.61
1169.82
1179.04
1188.25
1197.46
1206.67
1215.88
1225.09
1234.30
1243.51
1252.72
1261.93
1271.14
1280.35
1289.56
1298.77
1307.98
1317.19
1326.40
1335.61
1344.82
1354.04
1363.25
1372.46
1381.67
1390.88
1400.09
1409.30
1418.51
1427.72
1436.93
1446.14
1455.35

1151.40
1160.61
1169.82
1179.04
1188.25
1197.46
1206.67
1215.88
1225.09
1234.30
1243.51
1252.72
1261.93
1271.14
1280.35
1289.56
1298.77
1307.98
1317.19
1326.40
1335.61
1344.82
1354.04
1363.25
1372.46
1381.67
1390.88
1400.09
1409.30
1418.51
1427.72
1436.93
1446.14
1455.35

Cost of Materials, Labour

Material Rates
60 to 63 mm IRC & MoRTH HBG metal
50 to 55 mm IRC & MoRTH HBG metal
40 to 45 mm IRC & MoRTH HBG metal
Roughstone 300mm (HBG) for revetment
Roughstone 225mm (HBG) for revetment
SS Revetment work 225mm
SS Revetment work 300mm
SS Revetment work 450mm
Laterite for Revetment 225mm
Laterite for Revetment 300mm
Jeddy stone above 450 mm to 600 mm
Quarry spall(Field picked metal)
Av. Of rate 25mm & 40mm
150 mm soling stone HBG metal
40 to 45 mm IRC & MoRTH HBG M/C metal
25 to 27 mm IRC & MoRTH HBG M/C metal
19 to 22 mm IRC & MoRTH HBG M/C metal
12 to 14 mm IRC & MoRTH HBG M/C metal
9.5 to 11.20 mm IRC & MoRTH HBG M/C metal
5 to 7 mm IRC & MoRTH HBG M/C metal
2.36 to 5 mm IRC & MoRTH HBG M/C metal
HBG Stone chips 2.36 mm and below
Gravel
40 mm SS-5 m/c HBG metal
25 mm SS-5 m/c HBG metal
20 mm SS-5 m/c HBG metal
12 mm SS-5 m/c HBG metal
10 mm SS-5 m/c HBG metal
6 mm SS-5 m/c HBG metal
Sand for concrete
Sand for Filling
HYSD Steel
Mild Steel
Cement
Mild Steel 6mm

SSR
Page
No
419.00
17
456.00
17
588.00
16
156.00
154.00
144.00
164.00
136.00
118.00
138.00
188.00

13
13
13
13
13
13
13

45.00
95.00
588.00
944.00
984.00
780.00
656.00
504.00
308.00
340.00
103.00
620.00
994.00
1036.00
822.00
692.00
532.00
462.00
342.00
44000.00
43000.00
5900.00
45000.00

16
16
16
16
16
16
16
18
18
15
15
15
15
14
14
19
19
..
.
..

Blasting charges
Blasting charges
Blasting charges for rough stone
Seigniorage charges

70.00
70.00

Metal

50.00

Gravel/earth
Sand
Labour Rates
Mate
Mazdoor skilled
Mazdoor unskilled
Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader 3.35 M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5.5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller.
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA
Generator set 125 KVA
Generator set 35 KVA
Concrete mixer 0.4/0.28 cum
Tipper 5.50 cum capacity per Tonne per km
Tipper 5.50 cum per km
Plate compactor/Power rammer
Sand for Mortar

22.00
40.00

17
17
As per

345.00
357.00
295.00
2575.60
3216.00
2848.50
1646.00
922.00
2678.30
1146.70
624.00
415.00
422.00
422.00
507.50
1646.00
357.00
1498.00
860.00
19120.00
2249.00
2567.00
1646.00
1283.00
1143.00
1850.00
1320.00
861.70
453.00
7.22
72.20
48.00
606.00

GO
.-Do.-Do10
10
25
25
25
25
25
25
25
25
25
25
25
25
26
26
26
26
26
26
26
26
26
26
27
27
28
27

28
19

Blacksmith
Driller
Blaster

Tipper 10Tonne capacity for carriage of stone


chips from stock pile on road side to chip
spreader

385.00
440.00
440.00

10
9
8

5
6
7
8
9
10
11
12
13
14
15
16

12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6

84.1
96.7
109.3
121.9
134.5
147.1
159.7
172.3
184.9
197.5
210.1
222.7

73.77
84.82
95.88
106.93
117.98
129.04
140.09
151.14
162.19
173.25
184.3
195.35

17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5

235.3
247.9
260.5
273.1
285.7
298.3
310.9
323.5
336.1
348.7
361.3
373.9
386.5
399.1
409.6
420.1
430.6
441.1
451.6
462.1
472.6
483.1
493.6

206.4
217.46
228.51
239.56
250.61
261.67
272.72
283.77
294.82
305.88
316.93
327.98
339.04
350.09
359.3
368.51
377.72
386.93
396.14
405.35
414.56
423.77
432.98

40
41
42
43

10.5
10.5
10.5
10.5

504.1
514.6
525.1
535.6

442.19
451.4
460.61
469.82

44

10.5

546.1

479.04

45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81

10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5

556.6
567.1
577.6
588.1
598.6
609.1
619.6
630.1
640.6
651.1
661.6
672.1
682.6
693.1
703.6
714.1
724.6
735.1
745.6
756.1
766.6
777.1
787.6
798.1
808.6
819.1
829.6
840.1
850.6
861.1
871.6
882.1
892.6
903.1
913.6
924.1
934.6

488.25
497.46
506.67
515.88
525.09
534.3
543.51
552.72
561.93
571.14
580.35
589.56
598.77
607.98
617.19
626.4
635.61
644.82
654.04
663.25
672.46
681.67
690.88
700.09
709.3
718.51
727.72
736.93
746.14
755.35
764.56
773.77
782.98
792.19
801.4
810.61
819.82

82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124

10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5

945.1
955.6
966.1
976.6
987.1
997.6
1008.1
1018.6
1029.1
1039.6
1050.1
1060.6
1071.1
1081.6
1092.1
1102.6
1113.1
1123.6
1134.1
1144.6
1155.1
1165.6
1176.1
1186.6
1197.1
1207.6
1218.1
1228.6
1239.1
1249.6
1260.1
1270.6
1281.1
1291.6
1302.1
1312.6
1323.1
1333.6
1344.1
1354.6
1365.1
1375.6
1386.1

829.04
838.25
847.46
856.67
865.88
875.09
884.3
893.51
902.72
911.93
921.14
930.35
939.56
948.77
957.98
967.19
976.4
985.61
994.82
1004.04
1013.25
1022.46
1031.67
1040.88
1050.09
1059.3
1068.51
1077.72
1086.93
1096.14
1105.35
1114.56
1123.77
1132.98
1142.19
1151.4
1160.61
1169.82
1179.04
1188.25
1197.46
1206.67
1215.88

125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5

1396.6
1407.1
1417.6
1428.1
1438.6
1449.1
1459.6
1470.1
1480.6
1491.1
1501.6
1512.1
1522.6
1533.1
1543.6
1554.1
1564.6
1575.1
1585.6
1596.1
1606.6
1617.1
1627.6
1638.1
1648.6
1659.1

1225.09
1234.3
1243.51
1252.72
1261.93
1271.14
1280.35
1289.56
1298.77
1307.98
1317.19
1326.4
1335.61
1344.82
1354.04
1363.25
1372.46
1381.67
1390.88
1400.09
1409.3
1418.51
1427.72
1436.93
1446.14
1455.35